KR101692542B1 - Manufacturing method of steel tube pile for retaining wall - Google Patents

Manufacturing method of steel tube pile for retaining wall Download PDF

Info

Publication number
KR101692542B1
KR101692542B1 KR1020150108121A KR20150108121A KR101692542B1 KR 101692542 B1 KR101692542 B1 KR 101692542B1 KR 1020150108121 A KR1020150108121 A KR 1020150108121A KR 20150108121 A KR20150108121 A KR 20150108121A KR 101692542 B1 KR101692542 B1 KR 101692542B1
Authority
KR
South Korea
Prior art keywords
steel pipe
construction
file
pile
manufacturing
Prior art date
Application number
KR1020150108121A
Other languages
Korean (ko)
Inventor
김준태
Original Assignee
우종열
(주)힐건설
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 우종열, (주)힐건설 filed Critical 우종열
Priority to KR1020150108121A priority Critical patent/KR101692542B1/en
Application granted granted Critical
Publication of KR101692542B1 publication Critical patent/KR101692542B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/02Foundation pits
    • E02D17/04Bordering surfacing or stiffening the sides of foundation pits
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/06Foundation trenches ditches or narrow shafts
    • E02D17/08Bordering or stiffening the sides of ditches trenches or narrow shafts for foundations
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/02Sheet piles or sheet pile bulkheads
    • E02D5/03Prefabricated parts, e.g. composite sheet piles
    • E02D5/04Prefabricated parts, e.g. composite sheet piles made of steel
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/02Sheet piles or sheet pile bulkheads
    • E02D5/03Prefabricated parts, e.g. composite sheet piles
    • E02D5/04Prefabricated parts, e.g. composite sheet piles made of steel
    • E02D5/08Locking forms; Edge joints; Pile crossings; Branch pieces

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Composite Materials (AREA)
  • Bulkheads Adapted To Foundation Construction (AREA)

Abstract

The present invention relates to a method to manufacture a steel pile for the construction of a soil retaining wall. More specifically, as a pile, including a hook-shaped joint, is manufactured with a steel tube, the pile, including the hook-shaped joint, is easily manufactured through a simple formation process using a mold. Also, the steel pile for the construction of a soil retaining wall is constructed by being inserted into the ground, and then is easily taken out by filling the steel tube. As the taken steel pile is able to be recycled, the present invention is capable of enabling efficient manufacture and construction in the aspect of finance while achieving purposes about the protection of adjacent structures, ground subsidence, and resistance against earth pressure and water pressure. Moreover, if the joint is separately welded on both sides of the steel tube, a connection point for the joint is not properly set so linear construction is able to be difficult. To solve the problem, as the steel tube, including the joint, is formed but the tube is divided into two parts in a horizontal or vertical direction and then each of the parts is able to be welded in the field, the present invention is capable of enabling accurate linear construction while easily dealing with a variety of construction environments in the field.

Description

흙막이벽 시공용 강관 파일의 제조방법{MANUFACTURING METHOD OF STEEL TUBE PILE FOR RETAINING WALL}TECHNICAL FIELD [0001] The present invention relates to a method for manufacturing a steel pipe for construction of a wall for earth wall,

본 발명은 후크(hook) 형태의 이음수단을 가지는 파일을 강관(steel tube)으로 제작할 수 있도록 하는, 흙막이벽 시공용 강관 파일의 제조방법에 관한 것이다.
The present invention relates to a method of manufacturing a steel pipe pile for constructing earth retaining walls, in which a file having a hook type joining means can be manufactured as a steel tube.

일반적으로 흙막이 가시설 또는 지하벽체(이하 통칭하여' 흙막이벽'이라 함.)는 터파기 공사나 지하 구조물 시공 시, 토압과 수압 등에 대해 저항하고 주변지반의 침하와 인접구조물의 보호를 목적으로 시공되는 것으로, C.I.P.(cast in place pile) 공법, S.C.W.(soil cement wall) 공법 등 다양한 공법이 개발되어 운용되고 있다.
Generally, a temporary retaining wall or an underground wall (hereinafter collectively referred to as a 'retaining wall') is constructed to resist against earth pressure and water pressure during the construction of a trench construction or an underground structure, Various methods such as CIP (cast in place pile) method and SCW (soil cement wall) method have been developed and operated.

한편, 상기와 같은 종래의 흙막이벽 시공방법은 굴착-철근조립-철근설치-콘크리트 타설-콘크리트 양생-터파기 등의 공정을 거쳐 이루어지는데 그 공정이 많고 복잡하여 공기가 오래 걸릴 뿐만 아니라, 이는 공기 지연 및 공사비를 증가시키는 원인이 되는 문제점이 있었다.
Meanwhile, the conventional earth retaining wall construction method is carried out through processes such as excavation-reinforcing steel assembly-reinforcing steel installation-concrete insertion-concrete curing-terrafter, etc., Delay and construction cost.

이를 해결하기 위한 방안으로, 프리캐스트(precast) 콘크리트 기둥을 이용하여 그 공정을 단축시키기 위한 기술이 개발되었으며, 관련 선행기술로써 특허문헌 1 내지 4가 있다.
As a method for solving this problem, a technique for shortening the process by using a precast concrete column has been developed, and Patent Documents 1 to 4 are related prior arts.

하지만, 상기와 같은 종래 기술의 경우, 콘크리트 기둥 사이에서 토사나 지하수가 유입되는 것을 차단하기 위한 별도의 차수공정이 추가되어야하며, 상기 차수공정의 대표적인 형태는 도 1의 '(a)'에 도시된 바와 같이, 콘크리트 기둥(10) 사이에 모르타를 이용하여 차수막(12)을 형성시키는 베노트 주열공법이나, 도 1의 '(b)'에 도시된 바와 같이, 콘크리트 기둥(10)을 포개어 배치하는 오버래핑 공법이 있다.
However, in the case of the conventional art as described above, a separate water treatment process for blocking the introduction of soil or ground water between the concrete columns must be added, and a representative form of the water treatment process is shown in (a) As shown in FIG. 1 (b), the concrete columns 10 are superimposed on each other, as shown in FIG. 1 (b), to form a block 12 by using a mortar between the concrete columns 10, There is overlapping method to place.

한편, 프리캐스트 콘크리트 기둥(10)을 이용한 경우에도 도 1의 '(c)'에 도시된 바와 같이, 프리캐스트 콘크리트 기둥(10) 사이의 접속부에 형성된 홈에 모르타르(14)를 주입하여 지하수와 토사의 유입을 방지하는 공법이 있다.
As shown in FIG. 1 (c), the mortar 14 is injected into the grooves formed at the connection portion between the precast concrete columns 10, There is a method to prevent the inflow of soil.

하지만, 상기와 같은 공법들은 별도로 차수 공정을 수행해야하므로 여전히 시공이 복잡하고, 공사의 세분화로 인한 공기 및 공사비 증가의 문제점이 있었다.
However, since the above-mentioned methods have to be separately performed, the construction is still complicated, and there is a problem of air and construction cost increase due to the subdivision of the construction.

또한, 상기와 같은 종래의 흙막이벽 시공방법은 콘크리트 기둥들을 일직선으로 시공 및 유지하기가 어려운 문제점이 있었다.
In addition, the conventional method of constructing the earth retaining wall has a problem that it is difficult to construct and maintain the concrete columns in a straight line.

이를 해결하기 위하여, 특허문헌 5에서는 도 2에 도시된 바와 같이, PHC(prestressed high-strength concrete) 합성 파일의 양측에 상호 맞물릴 수 있는 형태의 연결부재(10,10')를 일체로 구비시켜, 상기 PHC 합성 파일(1)이 연결부재(10,10')를 통해 이웃하는 PHC 합성 파일(1)과 연속적으로 결합되도록 하는 PHC 합성 파일을 제안하였다.
In order to solve this problem, as shown in Fig. 2, Patent Literature 5 has integrally provided connecting members 10 and 10 'which are mutually engageable on both sides of a prestressed high-strength concrete (PHC) , A PHC synthesis file is proposed in which the PHC synthesis file 1 is continuously connected to the neighboring PHC synthesis file 1 via the connection members 10 and 10 '.

그리고 특허문헌 6에서는, 도 3에 도시된 바와 같이, 공장에서 사전 제작되는 PC(precast concrete) 파일(20)을 흙막이벽의 시공에 적용하되, 후크(hook) 형태의 끝단에 팽창형 지수제가 코팅된 이음수단(21)을 상기 PC 파일의 양측면에 사전에 설치하여 제작하고, 각각의 PC 파일(20, 20')의 설치 시, 팽창형 지수제가 코팅된 각각의 이음수단(21)이 인접한 이음수단(21')과 상호 체결됨으로써, 별도의 차수 공정을 수행하지 않아도 완벽한 차수가 이루어지며, 이로 인해 공정을 단순화시키고 공기를 단축시킬 뿐만 아니라 공사비를 절감할 수 있도록 하며, 또한 일직선 시공이 용이하도록 하는 흙막이벽 시공용 프리캐스트 콘크리트 파일 및 이를 이용한 흙막이벽 시공방법을 제안하였다.
In Patent Document 6, as shown in FIG. 3, a precast concrete (PC) file 20 preliminarily manufactured at a factory is applied to the construction of the earth retaining wall, and an expansive index agent (21) are installed in advance on both sides of the PC file, and when the respective PC files (20, 20 ') are installed, the respective joining means (21) By mutual engagement with the means 21 ', a perfect order is achieved without performing a separate order process, thereby simplifying the process, shortening the air, reducing the construction cost, and facilitating straight line construction This paper proposes a precast concrete pile construction and a method of constructing an earth retaining wall using the same.

하지만, 상기 특허문헌 5 또는 6에서 사용된 PHC 합성 파일이나 PC 파일의 경우, 거푸집을 이용하여 양생 및 경화과정을 거쳐 제조해야 할 뿐만 아니라 이음수단을 형성시키기 위해 별도의 정착수단(앵커부재 등)을 설치해야하는 등 복잡한 제조과정을 거쳐야하는 문제점이 있었다.
However, in the case of the PHC composite file or the PC file used in the Patent Document 5 or 6, it is necessary not only to manufacture the cemented product by curing and curing using the form, but also to separate the fixing means (anchor member, etc.) A complicated manufacturing process has to be performed.

아울러, 현장에서 그 시공환경에 맞게 가변적으로 제작하지 못하고 필수적으로 사전제작해야함에 따라 다양한 시공환경에 대응하지 못할 뿐만 아니라, 한 번 시공된 파일을 재사용하지 못함에 따라 제조 또는 시공비용 등의 측면에서 비효율적인 문제점이 있었다.
In addition, since it can not be manufactured in a variable manner in accordance with the construction environment in the field, it can not cope with various construction environments because it is required to be produced in advance, and in addition, since the once constructed file can not be reused, There was an inefficiency problem.

특허문헌 1 : 대한민국 공개특허공보 제10-2009-0120092호 "기성 콘크리트 말뚝을 이용한 흙막이 벽 및 그 시공방법"Patent Document 1: Korean Patent Laid-Open Publication No. 10-2009-0120092 "Earth retaining wall using an existing concrete pile and its construction method" 특허문헌 2 : 대한민국 등록특허공보 제10-0975948호 "프리캐스트 패널 및 이를 이용한 지중 연속벽 시공방법"Patent Document 2: Korean Patent Registration No. 10-0975948 entitled " Precast panel and method for constructing a continuous wall using the same " 특허문헌 3 : 대한민국 공개특허공보 제10-2011-0080676호 "기둥 선시공 공법을 위한 콘크리트 단위 기둥 부재 및 이를 이용한 영구기둥 선시공 방법"Patent Document 3: Korean Patent Laid-Open Publication No. 10-2011-0080676 entitled " Concrete unit column member for column column construction method and permanent column column construction method using the same 특허문헌 4 : 대한민국 공개특허공보 제10-2012-0001289호 "H형 프리캐스트 콘크리트 파일을 이용한 지하 연속벽 및 이의 구축공법"Patent Document 4: Korean Patent Laid-Open Publication No. 10-2012-0001289 "Underground continuous wall using H-type precast concrete file and construction method thereof" 특허문헌 5 : 대한민국 등록특허공보 제10-1212279호 "PHC 합성 파일의 제조방법"Patent Document 5: Korean Patent Registration No. 10-1212279 entitled "PHC Synthesis File Manufacturing Method" 특허문헌 6 : 대한민국 공개특허공보 제10-2015-0033870호 "흙막이벽 시공용 프리캐스트 콘크리트 파일 및 이를 이용한 흙막이벽 시공방법"Patent Document 6: Korean Patent Laid-Open Publication No. 10-2015-0033870 entitled "Precast Concrete Fill For Erection Wall Construction And Method For Construction Of Waste Wall Using It"

본 발명은 상술한 문제점을 해결하기 위한 것으로, 후크(hook) 형태의 이음수단을 가지는 파일을 강관(steel tube)으로 제작함으로써, 금형 등을 이용한 단순한 성형 공정을 통해 후크 형태의 이음수단을 가지는 파일을 손쉽게 제작할 수 있도록 함을 과제로 한다.
SUMMARY OF THE INVENTION The present invention has been made in order to solve the above-mentioned problems, and it is an object of the present invention to provide a hook having a hook-shaped file as a steel tube, So that it can be easily manufactured.

아울러, 상기와 같은 흙막이벽 시공용 강관 파일의 경우, 지반에 삽입하여 시공한 후 강관 내부에 모래를 채우면서 손쉽게 빼낼 수 있도록 하고, 이렇게 빼낸 강관 파일은 재활용이 가능함에 따라, 토압과 수압 등에 대한 저항성, 지반의 침하와 인접구조물의 보호 목적을 달성하면서도 비용적인 측면에서 매우 효율적인 제조 및 시공이 가능하도록 함을 다른 과제로 한다.
In addition, in the case of the above-mentioned pipe fitting pipe for constructing the earth retaining wall, it is possible to easily remove the steel pipe by inserting it into the ground, filling the inside of the steel pipe with sand, and recycling the extracted steel pipe pile. Resistance, settlement of the ground, and protection of adjacent structures while achieving cost-effective manufacturing and construction.

한편, 강관의 양측면에 이음수단을 별도로 각각 용접할 경우, 이음수단의 접합점 설정이 재대로 이루어지지 않아 일직선 시공이 어렵게 되는 문제점이 있음에 따라, 강관에 이음수단이 형성된 형태로 성형하되, 이를 가로 또는 세로방향으로 이등분하여 성형하고 각 부분을 현장에서 용접하여 제작할 수 있게 함으로써, 현장에서의 다양한 시공환경에 용이하게 대응하면서도 일직선 시공이 정확하게 이루어질 수 있도록 함을 또 다른 과제로 한다.
On the other hand, when joining means is separately welded to both side surfaces of the steel pipe, there is a problem that the joining point setting of the joining means is not performed again and it is difficult to straighten the joining means. Or by vertically bisecting each part, and welding each part by welding in the field, thereby making it possible to accurately perform a straight line construction while easily responding to various construction environments in the field.

본 발명은 흙막이벽 시공용 강관 파일의 제조방법에 있어서, 제 1 이음수단(12)과 제 1 강관 몸체(11)가 일체로 성형된 제 1 파일(10)을 제작하는 단계(S100); 별도로, 제 2 이음수단(22)과 제 2 강관 몸체(21)가 일체로 성형된 제 2 파일(20)을 제작하는 단계(S200); 및 상기 제 1 파일(10) 및 제 2 파일(20)을 상호 용접하여 접합하는 단계(S300);를 포함하여 이루어지는 것을 특징으로 하는, 흙막이벽 시공용 강관 파일의 제조방법을 과제의 해결 수단으로 한다.
The present invention provides a method of manufacturing a steel pipe pile for constructing a earth retaining wall, comprising the steps of: (S100) manufacturing a first pile 10 in which a first joining means 12 and a first steel pipe body 11 are integrally formed; Separately, a step S200 of manufacturing a second pile 20 in which the second joint means 22 and the second steel pipe body 21 are integrally formed; And joining and joining the first file (10) and the second file (20) to each other (S300). The method of manufacturing a steel pipe pile for earth wall cladding do.

한편, 상기 제 1 파일(10) 또는 제 2 파일(20)은, 완성된 강관 파일을 가로 또는 세로방향으로 2등분한 형태와 대응되는 형태를 가지는 것이 바람직하다.
It is preferable that the first file 10 or the second file 20 has a shape corresponding to a shape obtained by bisecting the finished steel pipe file in the horizontal or vertical direction.

아울러, 상기 제 1 이음수단(12) 및 제 2 이음수단(22)은, 상호 반대 방향으로 절곡된 후크 형태를 가지는 것이 바람직하다.
In addition, it is preferable that the first joining means 12 and the second joining means 22 have a hook shape bent in mutually opposite directions.

본 발명은 후크 형태의 이음수단을 가지는 파일을 강관으로 제작함으로써, 금형 등을 이용한 단순한 성형 공정을 통해 후크 형태의 이음수단을 가지는 파일을 손쉽게 제작할 수 있도록 하고, 아울러, 상기와 같은 흙막이벽 시공용 강관 파일의 경우, 지반에 삽입하여 시공한 후 강관 내부에 모래를 채우면서 손쉽게 빼낼 수 있도록 하고, 이렇게 빼낸 강관 파일은 재활용이 가능함에 따라, 토압과 수압 등에 대한 저항성, 지반의 침하와 인접구조물의 보호 목적을 달성하면서도 비용적인 측면에서 매우 효율적인 제조 및 시공이 가능하도록 하며, 또한 상기와 같은 후크 형태의 이음수단을 가지는 강관 파일을 제작함에 있어, 강관에 이음수단이 형성된 형태로 성형하되, 이를 가로 또는 세로방향으로 이등분하여 성형하고 각 부분을 현장에서 용접하여 제작할 수 있게 함으로써, 현장에서의 다양한 시공환경에 용이하게 대응하면서도 일직선 시공이 정확하게 이루어질 수 있도록 하는 효과가 있다.
The present invention makes it possible to easily produce a file having a hook type joining means through a simple molding process using a mold or the like by making a file having a hook type joining means as a steel pipe, In the case of steel pipe file, it is inserted into the ground and it is easily removed while filling sand inside the steel pipe. Since the steel pipe file can be recycled, resistance to earth pressure and water pressure, settlement of the ground, In addition, in manufacturing a steel pipe file having the above-described hook type joining means, the steel pipe is molded in the form of a joining means formed in a steel pipe, Or longitudinally bisected, and each part is welded in situ By allowing to be, there is an effect that enables easily meet various installation environments, while a straight line in the field of the construction can be made accurately.

도 1은 종래 흙막이벽 시공방법의 차수공정을 나타낸 도면
도 2는 특허문헌 5에 따른 PHC 합성파일을 나타낸 도면
도 3은 특허문헌 6에 따른 프리캐스트 콘크리트 파일을 나타낸 도면
도 4는 본 발명에 따른 흙막이벽 시공용 강관 파일의 제조방법을 나타낸 공정흐름도
도 5는 본 발명에 따른 흙막이벽 시공용 강관 파일의 제조방법을 나타낸 도면
도 6은 본 발명에 따른 흙막이벽 시공용 강관 파일의 설치 상태를 나타낸 도면
1 is a view showing an order process of a conventional earth retaining wall construction method
2 is a diagram showing a PHC synthesis file according to Patent Document 5
3 is a view showing a precast concrete file according to Patent Document 6
4 is a flow chart showing a method of manufacturing a steel pipe pile for earth retaining wall construction according to the present invention.
5 is a view showing a method of manufacturing a steel pipe pile for earth retaining wall construction according to the present invention
6 is a view showing an installation state of a steel pipe pile for earth retaining wall construction according to the present invention

상기의 효과를 달성하기 위한 본 발명은 흙막이벽 시공용 강관 파일의 제조방법에 관한 것으로, 각 도면 및 상세한 설명에서 이 분야의 종사자들이 용이하게 알 수 있는 구성 및 작용과 그리고 본 발명의 기술적 특징과 직접적으로 연관되지 않는 요소의 구체적인 기술적 구성 및 작용에 대한 상세한 설명 및 도시는 간략히 하거나 생략하였다.
In order to accomplish the above-mentioned effects, the present invention relates to a method of manufacturing a steel pipe pile for earth wall construction, and in each drawing and the detailed description thereof, Detailed descriptions and illustrations of specific technical configurations and operations of elements that are not directly related are simplified or omitted.

이하, 각 도면을 참조하여 본 발명에 따른 흙막이벽 시공용 강관 파일의 제조방법을 상세히 설명하면 다음과 같다.
Hereinafter, a method for manufacturing a steel pipe pile for earth retaining wall construction according to the present invention will be described in detail with reference to the drawings.

도 4는 본 발명에 따른 흙막이벽 시공용 강관 파일의 제조방법을 나타낸 공정흐름도이고, 도 5는 본 발명에 따른 흙막이벽 시공용 강관 파일의 제조방법을 나타낸 도면이다.
FIG. 4 is a flow chart showing a method of manufacturing a steel pipe pile for earth wall construction according to the present invention, and FIG. 5 is a view showing a method of manufacturing a steel pipe pile for earth retaining wall construction according to the present invention.

본 발명에 따른 흙막이벽 시공용 강관 파일의 제조방법은 도 4에 도시된 바와 같이, 제 1 파일(10)을 제작하는 단계(S100), 제 2 파일(20)을 제작하는 단계(S200) 및 이를 상호 용접하는 단계(S300)를 포함한다.
As shown in FIG. 4, a method of manufacturing a steel pipe pile for constructing a earth retaining wall according to the present invention includes steps of manufacturing a first file 10 (S100), fabricating a second file 20 (S200) And welding them together (S300).

상기 S100 단계는 제 1 이음수단(12)과 제 1 강관 몸체(11)가 일체로 성형된 제 1 파일(10)을 제작하는 단계이며, 상기 S200 단계는 제 2 이음수단(22)과 제 2 강관 몸체(21)가 일체로 성형된 제 2 파일(20)을 제작하는 단계로써, 상기 제 1 파일(10) 또는 제 2 파일(20)은 도 5에 도시된 바와 같이 완성된 강관 파일을 가로 또는 세로방향으로 2등분한 형태와 대응되는 형태를 가진다.
In step S100, the first pile 10 having the first joint unit 12 and the first steel pipe body 11 formed therein is manufactured. In step S200, the second joint unit 22 and the second joint unit The first file 10 or the second file 20 is a step of making a finished steel pipe file as shown in FIG. 5, Or a shape corresponding to a shape divided into two in the longitudinal direction.

아울러, 상기 제 1 이음수단(12) 및 제 2 이음수단(22)은, 도 5에 도시된 바와 같이 상호 반대 방향으로 절곡된 후크 형태를 가지는 것이 바람직하지만 여기에 한정되는 것은 아니고 상호 맞물릴 수 있는 다양한 형태(예를들면, ㄷ, ㄴ, C, ㅕ형 등)를 가질 수 있다.
The first and second connecting means 12 and 22 preferably have a hook shape bent in mutually opposite directions as shown in FIG. 5, but are not limited thereto. (For example, c, c, c, and so on).

상기 S300 단계는 상기 제 1 파일(10) 및 제 2 파일(20)을 상호 용접하여 접합하는 단계로써, 상기 제 1 강관 몸체(11) 및 제 2 강관 몸체(21)가 원형을 이루도록 위치한 상태에서 상호 용접되며, 이미 공지된 다양한 용접 방법 및 용접 장치를 적용할 수 있다.
The step S300 is a step of welding the first file 10 and the second file 20 to each other and joining them so that the first and second steel pipe bodies 11 and 21 are circular Various welding methods and welding apparatuses which are mutually welded and well known can be applied.

아울러, 상기 제 1 이음수단(12) 및 제 2 이음수단(22)에는 팽창형 지수제가 사전에 코팅되어 구성될 수 있으며, 상기 팽창형 지수제는 시공 후, 수분과의 접촉에 의해 팽창하는 지수제로써, 클로로프렌(chloroprene) 또는 네오프렌(neoprene) 수지 등을 적용하는 것이 바람직하나, 지수제 사용대신 용접하여 차수할 수도 있다.
In addition, the first joint means 12 and the second joint means 22 may be formed by coating an expansive exponential agent in advance, and the expansive exponent agent may have an exponent that expands upon contact with moisture For example, it is preferable to apply chloroprene or neoprene resin, but it may be welded instead of using an exponent.

즉, 상기와 같은 구조의 흙막이벽 시공용 강관 파일은 금형 등을 이용한 단순한 성형 공정을 통해 후크 형태의 이음수단(12, 22)을 가지는 파일을 손쉽게 제작할 수 있게 되며, 또한 강관 몸체(11, 21)에 이음수단(12, 22)이 형성된 형태로 성형된 상태에서 각 부분을 현장에서 용접하여 제작할 수 있게 함으로써, 현장에서의 다양한 시공환경에 용이하게 대응하면서도 일직선 시공이 정확하게 이루어질 수 있게 되는 것이다.
That is, the steel pipe pile for earth retaining wall construction having the above structure can easily produce a file having the hook-shaped joining means 12, 22 through a simple molding process using a mold or the like, The joint parts 12 and 22 can be welded to each other in a state where the joint parts 12 and 22 are formed. In this way, it is possible to precisely perform straight line construction while easily coping with various construction environments in the field.

한편, 상기와 같이 후크 형태의 이음수단(12, 22)을 가지는 강관 파일은 지반을 굴착하여 다수개가 삽입 설치된 후, 구조물이 위치될 공간을 터파기 하여 흙막이벽을 시공하게 되는데, 도 6에 도시된 바와 같이, 하나의 강관 파일에 설치된 제 2 이음수단(22)이 이에 인접하여 설치되는 다른 강관 파일의 제 1 이음수단(12')과 상호 맞물려 체결하도록 설치된다.
Meanwhile, as described above, the steel pipe file having the hook-type joining means 12 and 22 is constructed by digging the ground, inserting a plurality of the ground, and then disposing the space in which the structure is to be placed to construct the earth retaining wall. The second joint means 22 installed in one steel pipe file is installed to be interlocked with the first joint means 12 'of another steel pipe file installed adjacent thereto.

아울러, 상기와 같은 시공과정이 완료된 후, 상기 강관 파일의 내부에 모래를 채우면서 손쉽게 빼낼 수 있으며, 이렇게 빼낸 강관 파일은 재활용이 가능함에 따라 토압과 수압 등에 대한 저항성, 지반의 침하와 인접구조물의 보호 목적을 달성하면서도 비용적인 측면에서 매우 효율적인 제조 및 시공이 가능해지는 것이다.
In addition, after the construction process as described above is completed, the steel pipe can be easily removed while filling the inside of the steel pipe file. As the steel pipe file can be recycled, resistance to earth pressure and water pressure, settlement of the ground, It is possible to manufacture and construct very efficiently in terms of cost while achieving the protection purpose.

또한, 이상에서 설명한 본 발명은 전술한 실시예 및 첨부된 도면에 의해 한정되는 것은 아니고, 본 발명의 기술적 사상을 벗어나지 않는 범위 내에서 여러가지 치환, 변형 및 변경이 가능함은 본 발명이 속하는 기술분야에서의 통상의 지식을 가진 자에게 있어 명백할 것이다.
The present invention is not limited to the above-described embodiments and the accompanying drawings, and various changes, modifications and variations may be made without departing from the scope of the present invention. Will be apparent to those of ordinary skill in the art.

10 : 제 1 파일 11 : 제 1 강관 몸체
12 : 제 1 이음수단 20 : 제 2 파일
21 : 제 2 강관 몸체 22 : 제 2 이음수단
10: first file 11: first steel pipe body
12: first connecting means 20: second file
21: second steel pipe body 22: second joint means

Claims (4)

흙막이벽 시공용 강관 파일의 제조방법에 있어서,
제 1 이음수단(12)과 반원형의 제 1 강관 몸체(11)가 일체로 성형된 제 1 파일(10)을 제작하는 단계(S100);
별도로, 제 2 이음수단(22)과 반원형의 제 2 강관 몸체(21)가 일체로 성형된 제 2 파일(20)을 제작하는 단계(S200); 및
상기 제 1 파일(10) 및 제 2 파일(20)을 상호 용접하여 접합하는 단계(S300);를 포함하여 이루어지되,
상기 S300 단계는, 상기 제 1 강관 몸체(11) 및 제 2 강관 몸체(21)가 하나의 원형을 이루도록 위치한 상태에서 상호 용접하여 접합하고,
상기 제 1 파일(10) 또는 제 2 파일(20)은, 완성된 강관 파일을 가로 또는 세로방향으로 2등분한 형태와 대응되는 형태를 가지며,
상기 제 1 이음수단(12) 및 제 2 이음수단(22)은, 상호 반대 방향으로 절곡된 후크 형태를 가지고,
상기 제 1 이음수단(12) 및 제 2 이음수단(22)에는 클로로프렌(chloroprene) 또는 네오프렌(neoprene) 수지로 이루어지는 팽창형 지수제가 사전에 코팅되어 이루어지는 것을 특징으로 하는, 흙막이벽 시공용 강관 파일의 제조방법.
A method of manufacturing a steel pipe pile for earth wall construction,
A step (S100) of manufacturing a first pile 10 in which the first joint means 12 and the semicircular first steel pipe body 11 are integrally formed;
Separately, a step (S200) of manufacturing a second pile 20 in which the second joint means 22 and the semicircular second steel pipe body 21 are integrally formed; And
(S300) welding and joining the first file (10) and the second file (20) together,
In step S300, the first steel pipe body 11 and the second steel pipe body 21 are welded to each other in a state where the first steel pipe body 11 and the second steel pipe body 21 are positioned so as to form a circular shape,
The first file 10 or the second file 20 has a shape corresponding to a shape obtained by bisecting the finished steel pipe file in the lateral or longitudinal direction,
The first joining means 12 and the second joining means 22 have a hook shape bent in mutually opposite directions,
Characterized in that the first joint means (12) and the second joint means (22) are precoated with an expansive indexing agent made of chloroprene or neoprene resin. Gt;
삭제delete 삭제delete 삭제delete
KR1020150108121A 2015-07-30 2015-07-30 Manufacturing method of steel tube pile for retaining wall KR101692542B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020150108121A KR101692542B1 (en) 2015-07-30 2015-07-30 Manufacturing method of steel tube pile for retaining wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020150108121A KR101692542B1 (en) 2015-07-30 2015-07-30 Manufacturing method of steel tube pile for retaining wall

Publications (1)

Publication Number Publication Date
KR101692542B1 true KR101692542B1 (en) 2017-01-09

Family

ID=57810769

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020150108121A KR101692542B1 (en) 2015-07-30 2015-07-30 Manufacturing method of steel tube pile for retaining wall

Country Status (1)

Country Link
KR (1) KR101692542B1 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109610476A (en) * 2019-01-31 2019-04-12 上海宝钢工程咨询有限公司 Steel pipe Larsen sheet pile precipitation building enclosure
CN113802576A (en) * 2021-10-11 2021-12-17 云南建投第一勘察设计有限公司 Recoverable large-diameter steel pipe support pile and construction method
KR20230058821A (en) 2021-10-25 2023-05-03 엑시아지반 주식회사 the improved retaining wall structure reduced its thickness

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003213670A (en) * 2002-01-22 2003-07-30 Sumitomo Metal Ind Ltd Water sealing structure
KR100862385B1 (en) * 2006-12-01 2008-10-13 김형구 A square shape, wall structure using it and method for constructing thereof
KR20090120092A (en) 2008-05-19 2009-11-24 (주) 아이제이컨티넨탈엔지니어링 Precast concrete wall and construction method using the same
KR100975948B1 (en) 2009-11-20 2010-08-16 (주)정토지오텍 Precast diaphragm wall and it's construction technique
KR20110080676A (en) 2010-01-06 2011-07-13 주식회사 한빛구조엔지니어링 Precast concrete column material for permanent column pre-establishment method
KR20120001289A (en) 2010-06-29 2012-01-04 삼성물산 주식회사 Underground continuous wall using h shaped precast concrete pile and construction method thereof
KR101212279B1 (en) 2012-02-01 2012-12-18 삼표건설 주식회사 Phc synthesis pile and fabrication method for the same
KR101405024B1 (en) * 2012-01-27 2014-06-13 (주)한맥기술 Manufacturing Method of Concrete Strengthening Steel Tube Pile
KR20150033870A (en) 2013-09-25 2015-04-02 (주)힐건설 Precast concrete pile for retaining wall and construction method of retaining wall using the same

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003213670A (en) * 2002-01-22 2003-07-30 Sumitomo Metal Ind Ltd Water sealing structure
KR100862385B1 (en) * 2006-12-01 2008-10-13 김형구 A square shape, wall structure using it and method for constructing thereof
KR20090120092A (en) 2008-05-19 2009-11-24 (주) 아이제이컨티넨탈엔지니어링 Precast concrete wall and construction method using the same
KR100975948B1 (en) 2009-11-20 2010-08-16 (주)정토지오텍 Precast diaphragm wall and it's construction technique
KR20110080676A (en) 2010-01-06 2011-07-13 주식회사 한빛구조엔지니어링 Precast concrete column material for permanent column pre-establishment method
KR20120001289A (en) 2010-06-29 2012-01-04 삼성물산 주식회사 Underground continuous wall using h shaped precast concrete pile and construction method thereof
KR101405024B1 (en) * 2012-01-27 2014-06-13 (주)한맥기술 Manufacturing Method of Concrete Strengthening Steel Tube Pile
KR101212279B1 (en) 2012-02-01 2012-12-18 삼표건설 주식회사 Phc synthesis pile and fabrication method for the same
KR20150033870A (en) 2013-09-25 2015-04-02 (주)힐건설 Precast concrete pile for retaining wall and construction method of retaining wall using the same

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109610476A (en) * 2019-01-31 2019-04-12 上海宝钢工程咨询有限公司 Steel pipe Larsen sheet pile precipitation building enclosure
CN109610476B (en) * 2019-01-31 2024-05-17 上海宝钢工程咨询有限公司 Steel pipe Larson sheet pile precipitation building envelope
CN113802576A (en) * 2021-10-11 2021-12-17 云南建投第一勘察设计有限公司 Recoverable large-diameter steel pipe support pile and construction method
KR20230058821A (en) 2021-10-25 2023-05-03 엑시아지반 주식회사 the improved retaining wall structure reduced its thickness

Similar Documents

Publication Publication Date Title
KR101161332B1 (en) Construction method of the underground tunnel
KR101542126B1 (en) PHC pile for Prestressed Concrete Member, Manufacturing method of PHC pile amd Construction method of retaining wall using PHC pile
KR101938658B1 (en) Conection structure of precast panel for large-size double-wall
KR101692542B1 (en) Manufacturing method of steel tube pile for retaining wall
KR100862977B1 (en) Precast concrete file and method for constructing thereof
KR100752397B1 (en) Construction method for underground watertight wall and subsidiary casing used in the same
KR20140047924A (en) Construction method of cast-in-place step retaining wall using pc panel needless of concrete forms for slope reinforcement
KR100936668B1 (en) A composite pile for earth retaining wall and centrifugal force type earth retaining wall using it
JP2004232328A (en) Structure of half precast type arch culvert and its construction method
JP2634381B2 (en) Split type box culvert and method of assembling the same
KR101567422B1 (en) Vertical structure construction method for vertical and horizontal regid connection
KR20150033870A (en) Precast concrete pile for retaining wall and construction method of retaining wall using the same
KR101431621B1 (en) Mehod for constructing underground wall in extension of undergound parking lot
KR101275468B1 (en) The structure assembly for building a tunnel and building method thereof
KR102021496B1 (en) Retaining wall construction method and retaining wall structure by the method
JP2019157550A (en) Construction method of underground structure
JPS61122320A (en) Method of coupling continuous underground wall with underground structure
KR20220028563A (en) Method for forming a two-way girder using press-fit steel pipes in underground structure construction
KR101481810B1 (en) Method for construction of constinuous overlap pile wall using the double casing for construction of constinuous overlap pile wall
KR102120849B1 (en) Installation structure and method of precast concrete culvert
JP2018053466A (en) Open shield method
KR101219451B1 (en) Concrete structure and construction method for the same, constructing method of underground wall as a retaining structural wall used in the same
JP6882024B2 (en) Joining structure of precast concrete slab and construction method of precast concrete slab
KR100828078B1 (en) Mold that can be adjusted height and thereof mold for manhole
KR101657880B1 (en) Assembling method of underground structure and underground structure thereby

Legal Events

Date Code Title Description
X091 Application refused [patent]
N231 Notification of change of applicant
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20191223

Year of fee payment: 4