KR101596660B1 - Apparatus and method for removing waste PHC pile of reclaimed land - Google Patents

Apparatus and method for removing waste PHC pile of reclaimed land Download PDF

Info

Publication number
KR101596660B1
KR101596660B1 KR1020150108678A KR20150108678A KR101596660B1 KR 101596660 B1 KR101596660 B1 KR 101596660B1 KR 1020150108678 A KR1020150108678 A KR 1020150108678A KR 20150108678 A KR20150108678 A KR 20150108678A KR 101596660 B1 KR101596660 B1 KR 101596660B1
Authority
KR
South Korea
Prior art keywords
screw
crushing
phc
ground
pile
Prior art date
Application number
KR1020150108678A
Other languages
Korean (ko)
Inventor
차수익
윤태원
윤상준
Original Assignee
차수익
윤태원
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 차수익, 윤태원 filed Critical 차수익
Priority to KR1020150108678A priority Critical patent/KR101596660B1/en
Application granted granted Critical
Publication of KR101596660B1 publication Critical patent/KR101596660B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D9/00Removing sheet piles bulkheads, piles, mould-pipes or other moulds or parts thereof
    • E02D9/02Removing sheet piles bulkheads, piles, mould-pipes or other moulds or parts thereof by withdrawing
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D13/00Accessories for placing or removing piles or bulkheads, e.g. noise attenuating chambers
    • E02D13/08Removing obstacles

Abstract

The present invention relates to an apparatus and a method for removing a waste PHC pile buried in land. The present invention aims to provide an apparatus and a method for directly crushing a waste PHC pile buried in land using a double casing, which comprises: an incasing; and, an outcasing, and a crushing screw to tow the crushed remainders onto the land, and to remove them. The apparatus of the present invention comprises: a double casing which is combined with a casing auger of a piece of ground excavating equipment and installed on the circumference of a waste PHC pile buried in land by rotation and which comprises: an incasing; and, an outcasing, which are used for towing crushed remainders; and, a crushing screw combined with the screw auger of the ground excavating equipment and installed on the side of the internal diameter of the incasing which makes the double casing, which has a screw formed on the circumference from the bottom, makes a conical screw hammer bit, into which compressed air is supplied, an air hammer, and a screw pile be combined and rotate and fall with the double casing, lets the conical screw hammer bit crush the buried waste PHC pile, and is used for towing the crushed remainders onto the ground with the incasing.

Description

지중 매설된 폐 PHC 파일 제거 장치 및 공법{Apparatus and method for removing waste PHC pile of reclaimed land}Technical Field [0001] The present invention relates to an apparatus and method for removing a buried PHC pile of reclaimed land,

본 발명은 지중 매설된 폐 PHC 파일 제거 장치 및 공법에 관한 것으로, 자세하게는 연약지반 또는 구조물의 기초 보강을 위해 지중에 매립된 후 노후화된 PHC 파일을 지중 매설된 상태에서 직접 파쇄시킨 다음 잔재물(골재, PC강선, 나선철근)을 인양할 수 있는 장치 및 공법에 관한 것이다.More particularly, the present invention relates to an apparatus and a method for removing waste PHC files buried in the ground. More particularly, the present invention relates to an apparatus and method for removing buried PHC piles, , PC steel wire, and spiral reinforcing steel).

일반적으로 건축 또는 토목공사 등의 구조물이나 건축물을 시공하는 과정에서 안전성 확보와 지반 침하 현상을 방지하기 위해 복수개의 파일(PILE)을 지하 암반에 박거나 매립시켜 기초를 다진 다음 다양한 구조물을 시공하게 된다.Generally, in order to secure safety and prevent settlement during construction or civil engineering works, several piles are embedded or buried in underground rocks to form various foundation structures .

파일 시공방법은 크게 지반에 직접 파일을 타설하여 시공하는 방법과 지반 굴착후 파일을 매립하는 방법이 있다. 지반The file construction method is largely a method of constructing a file by directly placing the file on the ground and a method of embedding the file after the excavation of the ground. Ground

상기 파일을 지반에 직접 타설 시공하는 방법은 해머 등의 중량체를 권양 로프 또는 유압 유니트의 유압을 이용하여 상승시켰다가 하강시켜 파일 상부를 타격하여 지반에 타설하는 방법이다. The method of directly placing the pile on the ground is a method in which a weight such as a hammer is elevated by using the hydraulic rope or a hydraulic unit, and then lowered, and the upper portion of the pile is hammered into the ground.

또한 상기 지반을 굴착하여 파일을 매립하는 방법은 파일을 직접 타설시 발생하는 소음과 환경오염 문제 때문에 최근에 각광받고 있는 방법으로 도 9에는 이처럼 종래 연약지반등에 PHC파일을 매립하기 위해 지반을 천공하는 지반굴착장비가 도시되어 있다. 도시된 바와 같은 지반굴착장비를 이용하여 케이싱 오거에 결합된 케이싱과 스크류 오거에 결합된 스크류가 지반을 천공하여 생긴 천공홀에 파일을 매립하는 방법이다. 이때 천공된 지반의 붕괴를 막기 위해 상기 케이싱이 사용된다. 지반 굴착장비의 구성은 크레인 등의 중장비에 기립 설치되어 있는 리더에 스크류오거와 케이싱오거가 설치되고, 스크류오거와 케이싱오거 하부에 각각 스크류와 케이싱이 장치되어 서로 다른 방향으로 회전하면서 지반을 굴착하게 된다. 즉, 케이싱이 지반에 삽입되면서 그와 반대방향으로 회전하는 스크류가 케이싱 내부의 토사를 밖으로 배출하도록 구성된다. 이후 필요한 깊이로 천공되면 스크류를 인발 후 파일을 매립하고, 파일이 매립되면 케이싱을 인발하여 제거함으로써 파일 시공 공정이 완료된다.In addition, in the method of excavating the ground by digging the ground, a method has been popular recently due to the noise and environmental pollution problem caused when the pile is directly laid. In Fig. 9, the ground is punched to embed the PHC file in the soft ground The ground excavation equipment is shown. A casing coupled to a casing auger and a screw coupled to a screw auger using a ground excavation equipment as shown in the figure are methods for embedding a file in a perforation hole formed by drilling the ground. At this time, the casing is used to prevent collapse of the perforated ground. The ground excavation equipment consists of a screw auger and a casing auger installed on a standing leader in a heavy equipment such as a crane, and a screw and a casing installed on the bottom of the screw auger and casing auger, respectively, do. That is, the casing is configured to be inserted into the ground and the screw rotating in the opposite direction to discharge the gravel inside the casing. Then, the file is buried after drawing out the screw when the required depth is drilled, and when the file is buried, the casing is pulled out and removed to complete the file construction process.

상기와 같이 지반에 직접 파일을 타설하여 시공하거나 지반 굴착후 파일을 매립하는 방법에 의해 파일이 지중에 매설되면, 지상에 노출된 파일의 두부를 절단후 두부보강체를 삽입하거나 직접 파일의 두부를 절단기 등을 이용하여 일정크기로 절단후 PC 강선을 노출시킨 상태에서 콘크리트를 타설하여 바닥 슬래브를 형성함으로써 기초 보강 공사가 완료되게 된다.If the file is buried in the ground by the method of placing the file directly on the ground as described above or by embedding the file after the earth excavation, the head of the file exposed on the ground is cut and the head reinforcement is inserted, After cutting to a certain size using a cutter or the like, after the PC steel wire is exposed, the concrete is laid to form the bottom slab, thereby completing the basic reinforcement work.

최근에는 상기 파일 시공 공법에 사용되는 파일은 연약지반과 해안지역에서의 건설 또는 내진설계법의 도입에 따른 구조물의 안전성 확보를 위해 보다 깊은 관입량과 큰 압축력과 지지력이 요구되고 있는데, 이 때문에 강관 파일이나 PHC파일(Pretensioned spun High strength Concrete Pile)이 많이 사용되고 있다. PHC 파일이란 고강도 콘크리트 파일로써, 주로 공장이나 다른 장소에서 완제품으로 만들어 현장에서 조립식으로 사용하거나 직접 사용할 수 있는 원통형 구조의 파일이다.Recently, the file used in the pile construction method is required to have a deeper penetration amount and large compressive force and bearing capacity in order to secure the safety of the structure due to the construction of the soft ground and the coastal area or the introduction of the seismic design method. Or a PHC file (Pretensioned spun high strength concrete pile). A PHC file is a high-strength concrete file. It is a cylindrical-shaped file that can be used as a finished product in a factory or elsewhere, or can be used in the field in the field.

한편, 지반 기초보강 공사에 사용된 PHC파일은 일정 기간이 지나 해당 부지에서 재건축 또는 재개발 때문에 구조물이 해체될 경우 또는 새로운 구조물의 신축을 위해 부지 정리시 신규 파일 시공하는데 방해가 되고, 또한 계속 지중에 매립시킨 채로 방치할 경우 토양 오염과 같은 환경오염 문제가 있기 때문에 지중 매립된 폐 PHC파일을 제거해야 한다. On the other hand, the PHC file used for the site-based reinforcement works to prevent construction of a new file when the site is dismantled due to reconstruction or redevelopment at the site after a certain period of time or when the site is newly constructed for new construction of the new structure, If left untreated, there is a problem of environmental pollution such as soil pollution.

지중 매립된 폐 PHC파일을 제거하는 일반적인 방법으로는 폐 PHC 파일 주변을 굴삭하여 매립된 파일을 빼내는 방법이 있다.A common way to remove underground buried PHC files is to excavate the surrounding PHC files to extract the buried files.

하지만 이와 같은 종래의 제거방법은 지중 매립된 복수개의 폐 PHC파일 때문에 굴삭 작업 공간이 간섭 받을 수 있고 또한 개별 폐 PHC 파일마다 반복적인 굴삭 작업을 하기 때문에 비교적 공기가 오래 걸리고, 기매립된 파일의 길이가 깊어서 굴삭작업이 불가능한 경우가 많고, 인력과 비용도 많이 소요되는 등 여러 문제점이 있다.However, such a conventional removal method has a problem that the excavation work space may be interfered due to a plurality of buried PHC files embedded in the ground, and the excavation work is repeated for each individual PHC file, so that the air takes a relatively long time, There is a problem that the excavation work is impossible in many cases, and labor and cost are also increased.

상기한 문제점을 해결하기 위한 방법으로 최근에는 PHC 파일을 굴삭작업 없이 빠르게 인발하여 제거할 수 있는 지중 매립 폐 PHC 파일 제거 공법이 있다.As a method for solving the above-mentioned problem, recently, there is a method for removing buried PHC files that can extract and remove a PHC file quickly without excavation.

대한민국 특허 등록 제 10-1248393호는 "지중에 매설된 콘크리트 파일 인발 공법 및 인발구"에 관한 것으로, 그 목적은 지중에 매설된 콘크리트 파일 주변 지반을 굴삭하지 않고도 콘크리트 파일을 소음과 진동 없이 신속하고 간편하게 뽑아낼 수 있도록 하는 지중에 매설된 콘크리트 파일 인발 공법과 그 인발구를 제공하는 것으로, 이를 위해 상기 특허는 지중에 매설된 콘크리트 파일의 두부 주변 지반을 정리하는 단계와; 콘크리트 파일의 외경보다 큰 내경을 가진 중공부를 형성한 배출관의 중심을 상기 콘크리트 파일의 중심과 일치시켜 지중에 매설된 콘크리트 파일이 배출관의 중공부에 삽관되도록 콘크리트 파일의 전체 길이만큼 배출관을 지중에 매설하는 단계와; 지상으로 노출된 콘크리트 파일의 두부에 인발구를 연결하는 단계와; 상기 인발구를 크레인과 연결하여 인발구를 끌어올려 콘크리트 파일을 지반에서 뽑아내는 단계로 구성되는 지중에 매설된 콘크리트 파일 인발 공법에 있어서, 상기 배출관을 지중에 매설하는 단계에서 배출관의 중공부에 삽입되는 콘크리트 파일과 배출관 사이의 공간으로 압축공기나 물을 강제 주입하는 공정을 포함하고, 상기 배출관 하단부에는 보강부재를 일체로 형성하며, 상기 인발구는 상부가 넓고 하부가 좁은 깔때기 형으로 형성되며, 내주면에는 콘크리트 파일의 외주면과 밀착하는 가압돌부를 형성하여 콘크리트 파일의 상부에 끼워지는 고정관과; 상기 고정관의 외주면 하부에 밀착되게 끼워지도록 원형으로 형성되며, 외측면에는 고리부를 형성하여 고리부를 연결하는 연결로프를 구비한 밴드로 구성하여 지중에 매설된 콘크리트 파일을 인발하는 방법을 특징으로 한다.Korean Patent Registration No. 10-1248393 relates to a method of drawing a concrete pile buried in the ground and a drawing pile, and its object is to provide a concrete pile buried in the ground, The present invention relates to a method of drawing a concrete pile buried in the ground and a pile of the concrete pile buried in the ground so that the pile can be easily pulled out. The center of the discharge pipe having a hollow portion having an inner diameter larger than the outer diameter of the concrete pile is aligned with the center of the concrete pile so that the concrete pile buried in the ground is inserted into the hollow portion of the discharge pipe, ; Connecting a drawer to the head of a concrete pile exposed to the ground; And drawing the concrete pile from the ground by pulling up the draw-out port by connecting the draw-out port with a crane, the concrete pile-in-ground concrete pile drawing method comprising the steps of: And a reinforcing member is integrally formed at a lower end of the discharge pipe, and the drawer is formed into a funnel shape having a wide upper part and a narrower lower part, A fixing pipe which is fitted to the upper portion of the concrete pile by forming a pressing protrusion in close contact with an outer circumferential surface of the concrete pile; And a band having a connecting rope formed on an outer side of the outer surface of the fixing pipe so as to form an annular portion and connecting the annular portion so as to pull out the concrete pile embedded in the ground.

하지만 상기와 같이 매설된 콘크리트 파일을 인발하여 제거하는 종래의 공법은 콘크리트 파일의 외경보다 큰 내경을 가진 중공부를 형성한 배출관을 지중에 매설후 콘크리트 파일의 두부에 인발구를 연결하여 인양시 배출관의 내경과 콘크리트 파일의 외경부 사이 공간에 채워진 흙과 기 시공된 시멘트 그라우트재가 압밀된 상태여서 비록 압축공기나 물을 주입한다 하더라도 하부까지 압밀 상태가 해소되기 어려워 여전히 인양에 부하로 작용하는 상당한 마찰력이 존재하여 심할 경우 파일이 중단부 절단 등의 사유로 인양작업이 쉽게 이루어질 수 없다는 문제점이 있다.However, in the conventional method of pulling out and removing the concrete pile as described above, a discharge pipe having a hollow portion having an inner diameter larger than the outer diameter of the concrete pile is buried in the ground, and a piercing hole is connected to the head of the concrete pile. Because the filled soil and the cement grout material in the space between the inner diameter and the outer diameter of the concrete pile are consolidated, even if compressed air or water is injected, it is difficult to dissolve the consolidated state to the lower part. There is a problem in that the file can not be easily lifted due to the cut of the interruption part.

더욱이 상기와 같은 인발을 통한 콘크리트 파일의 제거공법은 콘크리트 파일의 외경부쪽에 배출관을 매립하기 위해 항타 또는 회전 압입방법으로 매설하게 되는데 천공용 스크류가 아닌 배출관을 사용해서는 구조상 지중 암반층을 뚫고 매설할 수가 없어서 콘크리트 파일의 하단부가 박혀 있는 암반층에는 배출관을 접근시킬 수 없다는 구조적 문제점이 있다.Further, the method of removing the concrete pile through the drawing as described above is buried in the pile of the concrete pile at the outer side of the pile to pile up the discharge pipe. However, by using the discharge pipe instead of the pile screw, There is a structural problem that the drain pipe can not be approached to the rock layer where the lower end of the concrete pile is embedded.

즉, 일반적으로 콘크리트 파일을 지중에 매립할 때 견고한 지지력을 제공하기 위해 암반층까지 뚫어 콘크리트 파일을 매설하게 되는데 비록 상기 공법에서 미설명되었지만 배출관 하부에 링 비트가 형성되어 있어도 천공용 스크류 없이는 이와 같은 구조의 배출관만으로는 암반층을 뚫기 어렵기 때문이다.That is, in order to provide a solid supporting force when the concrete pile is buried in the ground, a concrete pile is buried to the rock layer to form a concrete pile. However, even though a ring bit is formed under the discharge pipe, It is difficult to penetrate the rock layer only by the discharge pipe of the pipe.

이 때문에 상기 개시된 종래 공법의 특징상 콘크리트 파일의 하단부까지 배출관을 매립시킬 수 있는 기술이 개시되어 있지 않아 압축공기나 물을 주입하여도 암반층까지 도달되기 어렵고, 이 때문에 암반층에 견고히 박힌 콘크리트 파일때문에 콘크리트 파일의 두부에 인발구를 연결후 크레인을 사용하여 인발구를 끌어올려도 인발 자체가 이루어지지 않거나 원활하지 않을 수 있다는 구조적 문제점이 있다.As a result, it is difficult to reach the rock layer even when compressed air or water is injected. Therefore, because of the concrete file that is firmly embedded in the rock layer, There is a structural problem that pulling out by pulling the pulling-out port by using a crane after connecting the pulling-out port to the head of the file may not be performed or may not be smooth.

따라서 이러한 문제점을 해결할 수 있는 대책이 필요한 실정이다.Therefore, countermeasures are needed to solve these problems.

한국 등록특허공보 등록번호 10-1248393(2013.03.22.)Korean Registered Patent Publication No. 10-1248393 (March 23, 2013) 한국 등록특허공보 등록번호 10-1178277(2012.08.23.)Korean Registered Patent Publication No. 10-1178277 (Aug. 23, 2012) 한국 등록특허공보 등록번호 10-0804812(2008.02.12.)Korean Patent Registration No. 10-0804812 (Feb. 12, 2008) 한국 등록특허공보 등록번호 10-0994374(2010.11.09.)Korean Patent Registration No. 10-0994374 (2010.11.09.)

상기와 같은 문제점을 해결하기 위한 본 발명의 목적은 인케이싱과 아웃케이싱으로 이루어진 이중 케이싱과 파쇄 스크류를 이용하여 지중 매립된 폐 PHC파일을 지중에서 직접 파쇄 후 파쇄된 잔재물을 지상으로 인양하여 제거하는 장치와 공법을 제공하는 데 있다.SUMMARY OF THE INVENTION [0008] In order to solve the above problems, an object of the present invention is to provide a method for removing waste PHC piles buried in the ground using a double casing and a crushing screw made of ingressing and outcasing, Device and method.

본 발명의 다른 목적은 암반층에 하단부가 박힌 폐 PHC파일을 이중 케이싱 내부에 설치된 파쇄 스크류를 추가 하강시키면서 암반층 구간의 폐 PHC파일을 파쇄 후 회전에 의해 잔재물을 케이싱 내부로 배출시킨 다음, 기 파쇄된 상부쪽 잔재물과 함께 지상으로 인양하여 제거할 수 있는 공법을 제공하는 데 있다.Another object of the present invention is to provide a method of disposing a waste PHC pile having a lower end in a rock layer and a crushing screw provided inside a double casing, further reducing the waste PHC pile in the rock layer section, discharging the waste into the casing by rotation, So that it is possible to remove the residue on the ground along with the upper residue to be removed.

본 발명의 다른 목적은 파쇄된 폐 PHC파일 인양 후 남겨진 폐 천공구의 무너짐을 방지하기 위해 폐 PHC파일 인양시는 이중 케이싱의 인케이싱만을 이용하여 인양하고, 아웃케이싱은 토사로 폐 천공구를 메꾼 다음 인양토록 한 공법을 제공하는 데 있다.Another object of the present invention is to prevent the collapse of the waste cloth tool remaining after the shredded waste PHC file is lifted by lifting the waste PHC pile using only the ingress of the double casing, The next step is to provide the construction method.

상기한 바와 같은 목적을 달성하고 종래의 결점을 제거하기 위한 과제를 수행하는 본 발명은 지반굴착장비의 케이싱 오거에 결합되어 회전에 의해 지중에 매립된 폐 PHC 파일의 둘레에 설치되고, 파쇄된 잔재물의 인양시 사용되는 인케싱과 아웃케이싱으로 이루어진 이중 케이싱과; The present invention for achieving the object and eliminating the drawbacks of the prior art is installed around a closed PHC pile buried in the ground by being coupled to a casing auger of a ground excavation equipment, A double casing made of an ingching and an out casing used for lifting the casing;

지반굴착장비의 스크류 오거에 결합되어 상기 이중 케이싱을 구성하는 인케이싱 내경쪽에 설치되고, 하부로부터 각각 둘레에 스크류가 형성되고 내부로 압축공기가 공급되는 원뿔형 스크류 해머 비트, 에어 해머 및 스크류 파일이 결합되어 상기 이중 케이싱과 함께 회전 하강하면서 원뿔형 스크류 해머 비트가 매립된 폐 PHC 파일을 파쇄토록 하고, 파쇄 완료된 잔재물을 인케이싱과 함께 지상으로 인양시 사용되는 파쇄 스크류;를 포함하여 구성된 것을 특징으로 하는 지중 매설된 폐 PHC 파일 제거 장치를 제공함으로써 달성된다.A conical screw hammer bit, an air hammer and a screw file, which are connected to the screw auger of the ground excavation equipment and are installed on the inner diameter side of the ingot constituting the double casing, And a crushing screw used to crush the waste PHC file in which the conical screw hammer bit is buried while being rotated downward together with the double casing, and to use the crushing residue to be lifted to the ground together with the crushing residue. And a buried waste PHC pile removal device.

바람직한 실시예로, 상기 이중케이싱을 구성하는 인케이싱과 아웃케이싱의 선단에는 각각 링비트가 형성되고, 상기 인케이싱 하단 내경면을 따라 힌지에 의해 작동되는 복수개의 접이식 잔재물받이가 설치되어 인케이싱 하강시는 폐 PHC 파일쪽으로 기울어진 기립 상태를 유지하고 인케이싱 상승시는 파쇄된 잔재물에 걸려 수평하게 펼쳐져 잔재물을 인양토록 구성될 수 있다.In a preferred embodiment, ring bits are formed at the ends of the ingress and outcasing constituting the double casing, respectively, and a plurality of collapsible retention bases operated by the hinges along the ingress lower end inner diameter surface are provided, The poem maintains a tilted upright position towards the lung PHC file, and when the ingestion rises, it can be horizontally unfolded to pick up the residue, caught by the shredded residue.

바람직한 실시예로, 상기 잔재물받이는 힌지 또는 인케이싱 내경면 일지점에 설치된 각도조절용 스톱퍼의 형상에 의해 케이싱 하강시 폐 PHC 파일쪽으로 기울어진 기립 상태를 유지토록 구성될 수 있다.In a preferred embodiment, the remnant receptacle may be configured to maintain an inclined state toward the closed PHC pile when the casing is lowered by the shape of the angle adjusting stopper provided at one point on the hinge or ingraining inner surface.

바람직한 실시예로, 상기 원뿔형 스크류 해머 비트는 폐 PHC 파일의 중공부에 일부 구간이 삽입되도록 하단에서 상부방향으로 갈수록 외경이 넓게 형성되고, 둘레에는 파쇄 및 잔재물 이송용 복수개의 스크류가 형성되고, 상단에는 에어 해머의 하단에 삽입되어 회전력과 타격력 및 압축공기를 받아 폐 PHC 파일 파쇄에 사용되도록 돌출 형성된 다각형 구조의 결합구가 형성되고, 내부에는 상부 결합구에서 하단 또는 측방에 형성된 배출구까지 압축공기 통로가 형성되어 잔재물에 압축공기를 배출토록 구성될 수 있다.In a preferred embodiment, the conical screw hammer bit is formed such that the outer diameter of the conical screw hammer bit increases toward the upper direction from the lower end so that a part of the hollow PHC pile is inserted into the hollow portion of the closed PHC pile, a plurality of screws for crushing and transferring the remnant are formed, A coupling hole having a polygonal structure formed by protruding from the lower end of the air hammer so as to be used for crushing the closed PHC pile by receiving a rotational force, a striking force and compressed air, and a compressed air passage So that the compressed air can be discharged to the residue.

바람직한 실시예로, 상기 에어 해머는 둘레에 잔재물 이송용 스크류가 형성되고, 상단에는 스크류 파일의 하단에 삽입되어 회전력과 압축공기를 공급받는 결합구가 형성되고, 하단에는 원뿔형 스크류 해머 비트의 결합구가 삽입되는 다각형 삽입홈이 형성되고, 내부에는 상단의 결합구에서 하단의 삽입홈까지 연통되는 압축공기통로가 형성되고, 압축공기 통로 내부에는 피스톤이 형성되어 상기 원뿔형 스크류 해머 비트의 결합구를 타격하도록 구성될 수 있다.In a preferred embodiment of the present invention, the air hammer is provided with a screw for conveying the remnants, a coupling hole for inserting a rotating force and compressed air is inserted into a lower end of the screw file at an upper end thereof, And a piston is formed in the compressed air passage so that the engagement hole of the conical screw hammer bit is struck by the piston of the compression air passage, .

바람직한 실시예로, 상기 스크류 파일은 둘레에 잔재물 이송용 스크류가 형성되고, 상단은 스크류오거와 결합되어 회전력과 압축공기를 공급받도록 구성되고, 하단에는 에어해머의 결합구가 삽입되는 다각형 삽입홈이 형성되고, 내부에는 상단에서 하단의 삽입홈까지 연통되는 압축공기통로가 형성될 수 있다.According to a preferred embodiment of the present invention, the screw file is formed with a screw for conveying the remnants, and the upper end thereof is coupled with the screw auger to receive rotational force and compressed air, and at the lower end, a polygonal insertion groove And a compressed air passage communicating from the upper end to the lower end insertion groove may be formed therein.

바람직한 실시예로, 상기 인케이싱의 내경과 폐 PHC 파일의 외경간의 틈새 및 원뿔형 스크류 해머 비트의 크기는 직경이 400mm이고 두께가 70mm인 내경 260mm의 PHC 파일 기준으로 원뿔형 스크류 해머 비트의 최대 직경은 내경보다 60 ~ 80mm 큰 320mm ~ 340mm를 사용하고, 인케이싱은 내경이 420 ~ 430mm인 것을 사용하는 크기 비례로 구성될 수 있다.In a preferred embodiment, the clearance between the inner diameter of the ingression and the outer diameter of the closed PHC pile and the size of the conical screw hammer bit are such that the maximum diameter of the conical screw hammer bit, on the basis of a PHC file of an inner diameter of 260 mm with a diameter of 400 mm and a thickness of 70 mm, 320 mm to 340 mm larger than 60 to 80 mm is used, and the incising can be made in a size proportional to using an inner diameter of 420 to 430 mm.

또한 본 발명은 다른 실시양태로 상기 지중 매설된 폐 PHC 파일 제거 장치를 구비하여 인케이싱과 아웃케이싱으로 이루어진 이중 케이싱과 파쇄 스크류를 회전 하강시키면서 지중 매립된 폐 PHC파일을 지중에서 직접 파쇄 후, 파쇄된 잔재물을 지상으로 인양하여 제거하는 단계로 이루어진 것을 특징으로 하는 지중 매설된 폐 PHC 파일 제거 공법을 제공함으로써 달성된다.According to another aspect of the present invention, there is provided an apparatus for removing waste PHC files embedded in the ground, comprising: a double casing comprising an ingress and an out casing; a crushing screw rotatably moving downward; And removing the removed residues to the ground to remove the waste PHC files.

바람직한 실시예로, 상기 폐 PHC 파일 제거 공법은, 스크류 오거에 결합된 파쇄 스크류를 매립된 폐 PHC파일의 지반 노출부위에 올려 놓고, 케이싱 오거에 다중 결합된 인케이싱과 아웃케이싱으로 이루어진 이중 케이싱은 폐 PHC파일 둘레를 감싸게 지반에 내려 위치를 정렬하는 제 1 단계와;In a preferred embodiment of the present invention, the waste PHC file removal method is a method in which a crushing screw coupled to a screw augment is placed on a ground exposure site of a buried waste PHC pile, and a double casing consisting of an inching and an outcasing, A first step of aligning the position of the lower PHC pile to the ground;

이후 이중 케이싱을 파쇄 스크류보다 선행하여 회전 하강시키면서 지중에 삽입시키고, 스크류 오거에 결합된 파쇄 스크류를 회전 하강시키면서 압축공기를 이용 타격하여 폐 PHC파일을 파쇄하는 제 2 단계와;A second step of crushing the waste PHC pile by blowing compressed air while rotating the crushing screw coupled to the screw auger by inserting the double casing into the ground while rotating and lowering the crushing screw prior to the crushing screw;

이후 폐 PHC파일의 하단까지 파쇄작업이 완료되면 인케싱과 파쇄스크류를 인양하여 내부의 폐 PHC파일 잔재물을 함께 지상으로 인양하는 제 3 단계와;After the crushing operation is completed up to the lower end of the closed PHC file, lifting the incineration and crushing screw to raise the waste PHC pile of the inside together to the ground;

이후 지중에 남아 있는 아웃케이싱에 토사를 부어 폐 천공구를 메꾸는 제 4 단계와;A fourth step of pouring the soil to the outcasing remaining in the ground to drain the waste cloth tool;

이후 아웃케이싱을 지상으로 인발하는 제 5 단계;를 포함하여 구성될 수 있다.And then a fifth step of drawing the out casing to the ground.

바람직한 실시예로, 상기 제 2 단계는 암반층에 매립된 폐 PHC 파일 경우에는 암반층에 도달한 이중케이싱을 해당 위치에서 회전시키면서 내부에 위치한 파쇄 스크류의 원뿔형 스크류 해머 비트를 추가적으로 암반층까지 회전 하강시키면서 압축공기를 이용한 타격력을 가해 폐 PHC파일을 파쇄하고, 파쇄된 잔재물은 원뿔형 스크류 해머 비트의 둘레에 형성된 스크류를 이용하여 상부 인케이싱쪽으로 배출하는 제 2-1 단계;를 더 포함하여 구성될 수 있다.According to a preferred embodiment, in the second step, in case of a closed PHC pile buried in a rock layer, the conical screw hammer bit of the crushing screw located inside is rotated while the double casing reaching the rock layer is rotated at the corresponding position, And crushing the waste PHC pile and discharging the crushed residue to the upper incising side using a screw formed around the conical screw hammer bit.

바람직한 실시예로, 상기 제 3 단계는 인케이싱과 결합된 케이싱 오거를 일정 높이로 들어올려 인케이싱의 하단 내경면을 따라 설치된 복수개의 접이식 잔재물받이가 내부에 충전된 잔재물에 걸려 펼쳐지게 하고, 잔재물받이가 닿지 않는 중앙부분은 파쇄스크류의 하부를 이루는 원뿔형 스크류 해머 비트가 막아 잔재물이 하부로 빠지는 것을 막은 상태에서 인양하는 단계일 수 있다.In a preferred embodiment, the third step includes lifting the casing auger coupled with the incising to a predetermined height so that a plurality of foldable residue receptacles installed along the inner surface of the lower end of the incising member are hooked on the residue filled in the receptacle, Can be a step of lifting the conical screw hammer bit constituting the lower part of the crushing screw to block the residue to the bottom.

바람직한 실시예로, 상기 제 2 단계는 파쇄스크류를 구성하는 에어 해머가 원뿔형 스크류 해머 비트를 타격시 사용한 압축공기를 원뿔형 스크류 해머 비트의 하단 또는 측방에 형성된 배출구를 통해 분사시켜 파쇄된 잔재물에 의한 쿠션현상을 제거하면서 파쇄토록 하는 단계일 수 있다.In a preferred embodiment, the second step is such that the air hammer, which constitutes the crushing screw, blows compressed air using the conical screw hammer bit when blowing it through the outlet formed at the lower end or the side of the conical screw hammer bit, And removing the phenomenon and causing it to shatter.

상기와 같은 특징을 갖는 본 발명은 지반 기초보강 공사에 사용된 PHC파일 제거시 이중 케이싱과 파쇄 스크류를 이용하여 지중 매립된 폐 PHC파일을 지중에서 직접 파쇄 후 파쇄된 잔재물을 지상으로 인양함으로써 신속하게 제거할 수 있다는 장점과,According to the present invention having the above-described characteristics, when the PHC pile used in the ground reinforcing work is removed, the waste PHC pile buried in the ground is directly crushed in the ground using the double casing and the crushing screw, The advantage of being able to remove,

또한 암반층에 하단부가 박힌 폐 PHC파일을 제거할 경우 이중 케이싱을 매설할 수 없는 암반층 구간은 파쇄 스크류를 추가로 하강시켜 파쇄 후 회전에 의해 잔재물을 이중 케이싱의 내부를 구성하는 인케이싱쪽으로 배출시킨 다음, 기 파쇄된 상부쪽 잔재물과 함께 인케이싱을 지상으로 인양함으로써 폐 PHC파일이 매립된 지반 조건에 상관 없이 제거가 가능하다는 장점과,In addition, when the waste PHC pile with the bottom part is removed in the rock layer, the rock layer section where the double casing can not be buried is further lowered by the crushing screw, and after the crushing, the residue is discharged to the incising part constituting the inside of the double casing , It is possible to remove the incineration regardless of the ground conditions in which the waste PHC pile is buried,

폐 PHC파일 인양 후 남겨진 폐 천공구의 무너짐을 방지하기 위해 폐 PHC파일 인양시는 이중 케이싱의 인케이싱만을 이용하여 인양하고, 아웃케이싱은 토사로 폐 천공구를 메꾼 다음 인양토록 함으로써 지반을 단단하게 복원하면서도 환경오염을 방지할 수 있다는 장점을 가진 유용한 발명으로 산업상 그 이용이 크게 기대되는 발명인 것이다.In order to prevent collapsing of the waste cloth tool left after the lifting of the closed PHC file, the lifting of the closed PHC file should be lifted only by the ingress of the double casing, It is a useful invention having an advantage of being able to prevent environmental pollution while restoring it.

도 1은 본 발명의 한 실시예에 따른 폐 PHC파일 제거장치의 전체 구성을 보인 예시도이고,
도 2는 본 발명의 한 실시예에 따른 케이싱의 작동을 보인 예시도이고,
도 3은 본 발명의 한 실시예에 따른 폐 PHC파일 제거장치를 구성하는 파쇄 스크류를 보인 예시도이고,
도 4는 본 발명의 한 실시예에 따른 폐 PHC파일 제거장치가 폐 PHC파일에 설치되어 파쇄스크류가 폐 PHC파일의 두부에 위치한 모습을 보인 예시도이고,
도 5는 본 발명의 한 실시예에 따른 폐 PHC파일 제거장치가 암반층에 설치된 폐 PHC파일의 하단부를 파쇄하는 모습을 보인 예시도이고,
도 6은 본 발명의 한 실시예에 따른 폐 PHC파일 제거장치가 암반층에 설치된 폐 PHC파일의 하단부 파쇄 후 상부 케이싱으로 배출하는 모습을 보인 예시도이고,
도 7은 본 발명의 한 실시예에 따른 폐 PHC파일 제거장치를 구성하는 케이싱을 지상으로 인출시 잔재물받이가 작동하여 인양하는 모습을 보인 예시도이고,
도 8은 본 발명의 한 실시예에 따른 폐 PHC파일 제거후 폐 천공구가 메꾸어진 모습을 보인 예시도이고,
도 9는 종래 연약지반등에 PHC파일을 매립하기 위해 지반을 천공하는 지반굴착장비를 보인 예시도이다.
BRIEF DESCRIPTION OF THE DRAWINGS FIG. 1 is an exemplary view showing the entire configuration of a device for removing a PHC file according to an embodiment of the present invention,
2 is an exemplary view showing the operation of the casing according to one embodiment of the present invention,
3 is a view illustrating an example of a dismantling screw constituting an apparatus for removing a spent PHC file according to an embodiment of the present invention,
FIG. 4 is an exemplary view showing a device for removing a closed PHC file according to an embodiment of the present invention installed in a closed PHC file,
FIG. 5 is an exemplary view showing a state in which a lower end portion of a closed PHC file installed on a rock layer is crushed by an apparatus for removing a closed PHC file according to an embodiment of the present invention,
FIG. 6 is an exemplary view showing a device for removing a waste PHC file according to an embodiment of the present invention, after a lower end of a waste PHC file installed in a rock layer is crushed and discharged to an upper casing,
FIG. 7 is an exemplary view showing a state in which a remnant retainer is lifted when a casing constituting an apparatus for removing a closed PHC file according to an embodiment of the present invention is drawn out to the ground,
FIG. 8 is an exemplary view showing a closed cloth tool after removal of a closed PHC file according to an embodiment of the present invention,
9 is an example of a conventional ground excavation equipment for drilling a ground to embed a PHC file on a soft ground.

이하 본 발명의 실시 예인 구성과 그 작용을 첨부도면에 연계시켜 상세히 설명하면 다음과 같다. 또한 본 발명을 설명함에 있어서, 관련된 공지기능 혹은 구성에 대한 구체적인 설명이 본 발명의 요지를 불필요하게 흐릴 수 있다고 판단되는 경우 그 상세한 설명은 생략한다. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS Hereinafter, embodiments of the present invention will be described in detail with reference to the accompanying drawings. In the following description of the present invention, a detailed description of known functions and configurations incorporated herein will be omitted when it may make the subject matter of the present invention rather unclear.

도 1은 본 발명의 한 실시예에 따른 폐 PHC파일 제거장치의 전체 구성을 보인 예시도이고, 도 2는 본 발명의 한 실시예에 따른 케이싱의 작동을 보인 예시도이고, 도 3은 본 발명의 한 실시예에 따른 폐 PHC파일 제거장치를 구성하는 파쇄 스크류를 보인 예시도이다. 이하 도면에 도시된 스크류의 회전방향은 편의상 일측방향으로 회전하도록 구성하였는데, 시공여건에 따라 타측방향으로 회전이 이루어지도록 형성할 수 있음은 물론이다.2 is a view illustrating an operation of a casing according to an embodiment of the present invention, and FIG. 3 is a view illustrating an operation of the present invention FIG. 8 is a view showing a crushing screw constituting an apparatus for removing a closed PHC file according to an embodiment of the present invention. The rotation direction of the screw shown in the drawings is configured to rotate in one direction for convenience, but it may be formed to rotate in the other direction according to the construction condition.

도시된 바와 같이 본 발명에 따른 지중에 매립된 폐 PHC 파일 제거장치는 미도시된 통상의 지반굴착장비 케이싱 오거에 결합되어 회전에 의해 지중에 매립된 폐 PHC 파일(3)의 둘레에 설치되어 파쇄된 잔재물을 인양하는데 사용되는 이중 케이싱(1)이 구비된다. 본 발명에 따른 이중케이싱(1)은 내부의 인케이싱(11)과 외부의 아웃케이싱(12)으로 구성된 이중 구조로 각각의 상부가 동일축상에서 하나의 케이싱 오거에 장착되어 회전하게 된다. 미도시된 케이싱오거를 구비한 지반굴착장비는 토목공사나 연약지반 공사등에 일상적으로 사용되는 공지의 장치이므로 구체적인 설명은 생략한다. 이중케이싱(1)을 구성하는 인케이싱(11)과 아웃케이싱(12)은 붙어있지 않고 약간 이격되어 있으면 충분하다.As shown in the figure, the apparatus for removing waste PHC files buried in the ground according to the present invention is installed around a closed PHC pile (3) buried in the ground by rotation by being coupled to a conventional ground excavation equipment casing auger A double casing 1 used for lifting the remaining residue is provided. The double casing 1 according to the present invention has a double structure composed of an inner casing 11 and an outer casing 12, and each of the upper casing is mounted on one casing auger on the same axis and rotated. The ground excavation equipment provided with the casing auger not shown is a well-known device that is routinely used in civil engineering work or soft ground construction, and thus a detailed description thereof will be omitted. It is sufficient that the ingress 11 and the out casing 12 constituting the double casing 1 are not attached to each other but are slightly spaced from each other.

또한 상기 지반굴착장비의 스크류 오거에 결합된 상기 이중 케이싱(1)의 인케이싱(11) 내경쪽에는 파쇄스크류(2)가 위치하여 설치된다. 이 파쇄스크류는 하부로부터 각각 둘레에 스크류가 형성되고 내부로 압축공기가 공급되는 원뿔형 스크류 해머 비트(21), 에어 해머(22) 및 스크류 파일(23)이 수직하게 결합 구성되어 상기 케이싱과 함께 회전 하강하면서 스크류 및 압축공기에 의한 해머링으로 지중에 매립된 하부의 폐 PHC 파일(3)을 파쇄하고, 파쇄된 잔재물을 이중 케이싱(1) 중 인케이싱(11)의 상부방향으로 배출하거나 인케이싱(11)과 함께 지상으로 인양하는데 사용된다. 다만, 상기 원뿔형 스크류 해머 비트(21)의 최대 직경은 에어 해머(22) 및 스크류 파일(23)의 둘레에 형성된 스크류를 제외한 본체(원통)의 직경 보다 크게 형성하는 것이 바람직하다.The crushing screw (2) is installed on the inner diameter side of the ingress (11) of the double casing (1) coupled to the screw auger of the ground excavation equipment. The crushing screw is composed of a conical screw hammer bit 21, an air hammer 22 and a screw pile 23, which are screw-formed around the periphery of the crushing screw and supplied with compressed air, The lower waste PHC pile 3 buried in the ground is crushed by hammering by the screw and the compressed air while descending and the crushed residue is discharged to the upper side of the incising 11 of the double casing 1, 11) to the ground. It is preferable that the maximum diameter of the conical screw hammer bit 21 is larger than the diameter of the main body (cylinder) excluding the screw formed around the air hammer 22 and the screw pile 23.

상기 이중 케이싱(1)은 전술한 바와 같이 인케이싱(11)과 아웃케이싱(12)으로 구성되고, 각각의 두부쪽이 케이싱 오거에 장치되고, 회전 하강하면서 지반에 매립된 폐 PHC 파일(3) 둘레에 설치되는 장치이다. 이를 위해 인케이싱(11)과 아웃케이싱(12)의 선단(하단)에는 각 케이싱의 직경과 동일한 직경을 가지는 링비트(111, 121)가 형성된다. 링비트(111,121)는 복수개의 단위 비트가 둘레에 일정 간격으로 배열되어 케이싱 오거가 하부에 장치된 인케이싱(11)과 아웃케이싱(12)을 회전시키면 하강 회전하면서 지중의 흙 또는 경질 흙을 부수면서 지반과의 마찰력을 감소시켜 인케이싱(11)과 아웃케이싱(12)이 원활하게 지중에 삽입되도록 한다.As described above, the double casing 1 is constituted by an ingress 11 and an outcasing 12, each of which is provided on a casing auger, and a waste PHC file 3, which is buried in the ground while rotating down, It is a device installed around. To this end, ring bits 111 and 121 having the same diameter as the diameter of each casing are formed at the tips (lower ends) of the ingresses 11 and the outcasing 12, respectively. The ring bits 111 and 121 are formed by arranging a plurality of unit bits at regular intervals around the casing auger 11 and the outer casing 12, The friction force with the ground is reduced so that the ingress (11) and the outcasing (12) are smoothly inserted into the ground.

특히 본 발명은 이중 케이싱(1)을 구성하는 인케이싱(11)의 하단 내경면을 따라 복수개의 접이식 잔재물받이(112)가 설치되는데, 이 잔재물받이(112)는 인 케이싱(11)의 내경면을 따라 설치된 힌지(113)에 의해 접이식으로 작동되도록 구성되어 하강시에는 폐 PHC 파일(3)의 외경부에 지지되어 기울어진 기립 상태로 하강하고, 폐 PHC 파일(3)이 파쇄된 후 인케이싱(11)을 상승시킬 경우에는 파쇄 후 내부에 충전된 폐 PHC 파일(3)의 잔재물에 걸리면서 힌지 작용에 의해 수평방향 즉, 내경방향으로 펼쳐지게 된다. Particularly, the present invention is characterized in that a plurality of collapsible retentate bins 112 are installed along the inner surface of the lower end of the ingress 11 constituting the double casing 1, And is supported by the outer diameter portion of the closed PHC pile (3) to descend in an inclined state. When the opened PHC pile (3) is crushed, In the case of lifting the crushed PHC pile (11), it is spread in the horizontal direction, that is, the inner diameter direction by the hinge action while being caught by the residue of the waste PHC pile (3)

상기와 같이 인케이싱(11)의 선단 내경면을 따라 복수개의 잔재물받이(112)가 펼쳐지면 잔재물 인양시 인케이싱(11) 하부쪽으로 잔재물이 빠지는 것을 최대한 방지하게 된다. 이때 잔재물받이(112)가 닿지 않는 인케이싱(11)의 하단 중앙부분은 파쇄 스크류(2)가 막고 있기 때문에 잔재물이 빠지는 것을 방지하게 된다.As described above, when a plurality of remotely disposed troughs 112 are unfolded along the inner diameter surface of the ingress 11, it is possible to prevent the debris from being dropped to the lower portion of the ingress 11 when the trough is lifted. At this time, the bottom central portion of the intake 11, which is not contacted by the residue receiver 112, is prevented by the crushing screw 2 from being detached.

상기 잔재물받이(112)는 하강시 폐 PHC 파일(3) 둘레에 기댄 형상을 가지도록 수직하지 않고 폐 PHC 파일(3)의 내경쪽으로 기운 상태를 유지하고, 승강시는 인케이싱(11) 내부에 충전된 잔재물에 걸려 수평방향으로 펼쳐진 상태를 가지는데, 이를 위해 평상시 또는 하강시 수직한 상태가 아닌 폐 PHC 파일(3)쪽으로 기운 상태를 항시 유지토록 각도가 조절되게 설치된다. The retainer 112 is not vertical so as to have a shape leaning around the closed PHC pile 3 when it is lowered but is kept inclined toward the inner diameter of the closed PHC pile 3, In order to do this, the angle is adjusted so that the PHC pile (3) is kept at a constant angle, not in a vertical state when it is normally or downward.

한 실시예로 들어 설명하자면 잔재물받이(112)가 내경 쪽으로 기울어진 각도를 유지토록 잔재물받이(112)를 회전시키는 힌지(113) 또는 인케이싱(11) 내경면 일지점에 설치된 각도조절용 스톱퍼(114)의 형상에 의해 인케이싱(11) 하강시는 내경쪽으로 기울어진 상태를 유지하고 상승시는 펼쳐진 상태를 유지하도록 한다. 상기 각도조절용 스톱퍼(114)의 형상이라함은 수직하지 않고 기울어진 각도를 가지도록 형성된 형상을 말한다.A hinge 113 for rotating the remained material receptacle 112 or an angle adjusting stopper 114 provided at one point of the inner diameter surface of the ingress 11 so as to maintain the angle of the reminder receptacle 112 toward the inner diameter, When the incising member 11 is lowered, it is maintained in the inclined state toward the inner diameter, and the unfolded state is maintained when the incising member 11 is lifted. The shape of the angle adjusting stopper 114 is a shape formed not to be vertical but to have an inclined angle.

물론 본 발명에서 요구하는 기운 상태를 유지할 수만 있다면 각도조절용 스톱퍼(114)는 다양한 구조로 변형실시 될 수 있음은 물론이다.Needless to say, it is needless to say that the stopper 114 for adjusting the angle can be modified into various structures as long as it can maintain the athletic state required by the present invention.

상기 파쇄 스크류(2)는 스크류 오거에 장치되어 회전하면서 인케이싱(11) 내부에 위치한 폐 PHC 파일(3)의 상부부터 하부까지 파쇄하면서 하강하는 장치이다.The crushing screw 2 is a device for descending from the upper part to the lower part of the waste PHC pile 3 located in the ingress 11 while being rotated by the screw auger.

이를 위해 파쇄 스크류(2)는 폐 PHC 파일(3)의 길이 방향으로 형성된 가운데 중공부에 그 하부쪽 일부 구간이 삽입되어 걸쳐진 후 회전 및 압축공기가 공급되면 회전 하강하면서 폐 PHC 파일(3)을 파쇄하고 파쇄된 잔재물을 상부로 배출할 수 있게 둘레를 따라 복수개의 스크류(211)가 형성되고, 하단에서 상부방향으로 갈수록 외경이 넓게 형성된 원뿔형 스크류 해머 비트(21)와;For this purpose, the crushing screw 2 is inserted into the hollow part of the hollow PHC pile 3 in the longitudinal direction thereof, and then the lower PHC pile 3 is inserted into the hollow PHC pile 3, A conical screw hammer bit (21) formed with a plurality of screws (211) along the perimeter so as to discharge the crushed and crushed remnants to the upper part, and having a larger outer diameter from the lower end toward the upper direction;

상기 원뿔형 스크류 해머 비트(21)의 상부와 결합되어 원뿔형 스크류 해머 비트(21)가 회전시 지속적으로 타격을 가해 흙이나 암반을 파쇄함과 동시에 파쇄된 잔재물을 상부로 배출할 수 있게 둘레에 스크류(221)가 형성된 에어 해머(22)와;When the conical screw hammer bit 21 is engaged with the upper portion of the conical screw hammer bit 21, the conical screw hammer bit 21 continuously hits the rotary hammer bit 21 to break the soil or the rock, 221) are formed;

상기 에어 해머(22)의 상부와 결합되어 스크류 오거의 회전력을 전달하고 압축공기를 전달하면서 파쇄된 잔재물을 상부쪽으로 배출하도록 둘레에 스크류*231)가 형성된 스크류 파일(23)로 구성된다.And a screw pile 23 which is engaged with an upper portion of the air hammer 22 and transmits a rotational force of the screw auger and is provided with a screw 231 around the pile to transfer the compressed air while discharging the crushed residue.

상기 상하 방향으로 수직하게 적층 결합된 원뿔형 스크류 해머 비트(21), 에어 해머(22) 및 스크류 파일(23)은 인접된 서로간의 경계부에서 스크류(211, 221, 231)가 연속적으로 연결되어 원활한 잔재물 배출이 되도록 구성한다. 다만, 상기 스크류 중 원뿔형 스크류 해머 비트(21)는 초경 금속 또는 초경 합금으로 이루어지고, 둘레에 형성된 스크류(211)는 에어 해머(22) 및 스크류 파일(23)의 스크류(221, 231)처럼 잔재물의 이송 역할도 하지만 주된 목적은 폐 PHC 파일의 파쇄를 위한 스크류로 스크류날의 폭이 상대적으로 에어 해머(22) 및 스크류 파일(23)의 스크류(221, 231) 작고 복수개로 구성된다.The screws 211, 221 and 231 are continuously connected to each other at the boundary between adjacent ones of the conical screw hammer bit 21, the air hammer 22 and the screw pile 23 which are stacked vertically and vertically, To be discharged. The screw 211 of the circumference is made of a hard metal or a cemented carbide and the circumference of the screw 211 is sandwiched between the hammer 22 and the screws 231 of the screw pile 23, But the main purpose is to crush the waste PHC pile, and the width of the screw blade is relatively small and a plurality of screws 221 and 231 of the air hammer 22 and the screw pile 23 are formed.

또한 상기 원뿔형 스크류 해머 비트(21), 에어 해머(22), 스크류 파일(23)은 중앙 길이 방향으로 직결되게 압축 공기통로(212, 222, 232)가 연통 형성되어 미도시된 공기 컴프레셔를 통해 공급된 압축공기가 공급되면 에어 해머(22)를 작동시켜 원뿔형 스크류 해머 비트(21)를 타격하도록 하고, 타격에 사용된 압축공기는 모두 원뿔형 스크류 해머 비트(21)의 하단 또는 측방에 형성된 배출구(213)를 통해 분사시켜 파쇄 후 하부에 적층된 잔재물에 의한 쿠션현상을 제거하여 원활한 해머 타격과 회전이 이루어지도록 구성된다. 상기 배출구의 위치는 필요시 도시된 지점 뿐만 아니라 원뿔형 스크류 해머 비트(21)의 여러 지점에 형성할 수 있다.The compressed air passageways 212, 222 and 232 are connected to the conical screw hammer bit 21, the air hammer 22 and the screw paddle 23 so as to be directly connected to each other in the central longitudinal direction, The air hammer 22 is actuated to strike the conical screw hammer bit 21 and the compressed air used for the striking is discharged to the discharge port 213 formed at the lower end or the side of the conical screw hammer bit 21 So that the hammer strikes and rotates smoothly by removing the cushioning phenomenon caused by the residues deposited on the lower part after crushing. The position of the outlet can be formed at various points of the conical screw hammer bit 21, as well as at the points shown if necessary.

상기 원뿔형 스크류 해머 비트(21), 에어 해머(22), 스크류 파일(23)간의 상하 직결을 위해 에어 해머(22), 스크류 파일(23) 상단에는 돌출 형성된 육각 또는 오각 기둥 형상의 결합구(214, 223)가 각각 형성되고, 이 결합구(214, 223)와 각각 결합되는 에어 해머(22)와 스크류 파일(23)의 하단에는 육각 또는 오각 홈 형상의 다각형 삽입홈(224, 233)이 형성되어 상기 육각 또는 오각 기둥 형상의 결합구(214, 223)가 삽입되어 결합되도록 구성된다. 물론 바람직한 실시예로 설명한 결합구의 형상은 육각 또는 오각 기둥 형상 말고도 회전력이 전달되도록 걸림 작용이 일어날 수 있는 다각형 구조이면 충분하다. An air hammer 22 for direct vertical coupling between the conical screw hammer bit 21, the air hammer 22 and the screw pile 23, and a hexagonal or hexagonal column shaped coupling member 214 And polygon insertion grooves 224 and 233 having a hexagonal or pentagonal groove shape are formed at the lower ends of the air hammer 22 and the screw pile 23 which are respectively engaged with the coupling holes 214 and 223 And the hexagonal or pentagonal column-shaped coupling members 214 and 223 are inserted and joined. Needless to say, the shape of the coupling hole described in the preferred embodiment is not limited to hexagonal or pentagonal columns but may be a polygonal structure in which the latching action can occur so that the rotational force is transmitted.

상기 육각 또는 오각 기둥 형상의 결합구 중앙부에는 길이방향으로 상기에서 설명한 압축 공기통로(212, 222)가 형성되어 압축공기가 하부로 공급되도록 구성된다.The compressed air passageways (212, 222) described above are formed in the longitudinal direction at the center of the hexagonal or pentagonal pillar-shaped coupling hole to supply the compressed air to the lower portion.

상기 에어 해머(22)는 스크류 파일(23)처럼 원기둥 형상으로 이루어져 압축된 공기를 이용하여 내부의 압축 공기통로(222)에 장치된 피스톤(도시생략)을 압축공기로 승하강시켜 상기 원뿔형 스크류 해머 비트(21)의 상단에 형성된 육각 또는 오각 기둥 형상의 결합구를 타격하여, 원뿔형 스크류 해머 비트(21)가 하부에 위치한 흙이나 암반에 충격을 가하도록 구성된다. The air hammer 22 has a cylindrical shape like a screw pile 23 and uses a compressed air to move up and down a piston (not shown) installed in an internal compressed air passage 222 with compressed air, The hexagonal or pentagonal pillar-shaped engagement hole formed at the upper end of the bit 21 is struck to cause the conical screw hammer bit 21 to impact the soil or the rock placed below.

또한 상기 에어 해머(22) 둘레에는 스크류(221)가 형성되어 그 하부에 위치한 원뿔형 스크류 해머 비트(21)의 둘레에 형성된 복수개의 스크류를 통해 상부쪽으로 배출된 잔재물을 연속적으로 상부에 위치한 스크류 파일(23)까지 배출시킬 수 있도록 구성하였다.A screw 221 is formed around the air hammer 22. A remnant discharged to the upper side through a plurality of screws formed around the conical screw hammer bit 21 located below the screw 22 is continuously connected to a screw file 23).

다만, 압축공기를 이용하여 하부에 설치된 원뿔형 스크류 해머 비트(21)의 상단 결합구(214)에 연속적인 타격을 가하는 에어 해머(22)의 구체적인 작동원리나 상세 구조는 공지의 것을 사용하면 충분하므로 구체적인 설명은 생략한다. 참고로 에어해머의 원리나 구조를 나타낸 특허로는 대한민국 특허 등록번호 10-1178277호와 10-0804812 등이 있다.However, it is sufficient to use a well-known one for the specific operation principle and detailed structure of the air hammer 22 which continuously applies the blow to the upper end fitting part 214 of the conical screw hammer bit 21 installed at the lower part by using compressed air A detailed description thereof will be omitted. For reference, patents showing the principle and structure of the air hammer are Korean Patent Registration Nos. 10-1178277 and 10-0804812.

한편, 상기 본 발명에서는 인케이싱(11)의 내경과 폐 PHC 파일(3)의 외경간의 틈새(간격)가 매우 중요하다. 그 이유는 틈새(간격)가 클 경우 파쇄 스크류(2)의 하부를 구성하는 원뿔형 스크류 해머 비트(21)가 회전하여 폐 PHC 파일(3)을 파쇄시 인케이싱(11)의 내경과 폐 PHC 파일(3)의 외경 간의 틈새에 충전된 지반 흙 등이 파쇄 스크류(2)의 회전시 발생하는 진동을 이기지 못하고 다른 쪽 틈새로 밀려나면 폐 PHC 파일(3)이 흙 등이 밀려난 자리의 인케이싱(11)쪽으로 밀리게 되기 때문이다. 이와 같이 폐 PHC 파일(3)이 인케이싱(11)쪽으로 밀리는 현상이 발생하면 폐 PHC 파일(3)의 중공 상단에 걸쳐진 후 회전 및 진동에 의해 폐 PHC 파일(3)을 파쇄하면서 하강하는 파쇄 스크류(2)의 원뿔형 스크류 해머 비트(21)의 중심이 폐 PHC 파일(3)과 어긋나 원활한 파쇄작용이 일어나지 않고 불완전한 파쇄가 이루어져서 폐 PHC 파일(3)의 하단부까지 파쇄를 할 수 없게 된다.On the other hand, in the present invention, a clearance (interval) between the inner diameter of the incising member 11 and the outer diameter of the closed PHC pile 3 is very important. The reason is that when the clearance (interval) is large, the conical screw hammer bit 21 constituting the lower part of the crushing screw 2 rotates and the crushing of the crushed PHC file 3 causes the inner diameter of the crushing 11 and the closed PHC file If the ground soil charged in the gap between the outer diameters of the crushing screw 3 does not overcome the vibrations generated during rotation of the crushing screw 2 and is pushed to the other gap, the incineration of the soil PHC pile 3 (11). When the phenomenon that the closed PHC file 3 is pushed toward the incising 11 occurs in this way, the broken PHC pile 3 is crushed by crushing the broken PHC pile 3 by spins on the hollow top of the closed PHC pile 3, The center of the conical screw hammer bit 21 of the closed PHC pile 3 is displaced from the closed PHC pile 3 so that the pile is not crushed smoothly and incomplete crushing can not be performed until the lower end of the closed PHC pile 3 is broken.

이 때문에 인케이싱(11)의 내경과 폐 PHC 파일(3)의 외경간의 틈새(간격) 그리고 폐 PHC 파일(3)의 상단부에 위치하여 가압하면서 파쇄하는 원뿔형 스크류 해머 비트(21)의 직경 크기 등이 중요한 인자로 작용하게 된다. Therefore, a gap (gap) between the inner diameter of the incising 11 and the outer diameter of the closed PHC pile 3, and the size of the conical screw hammer bit 21 which is located at the upper end of the closed PHC pile 3, Is an important factor.

다만, 지반 매립 등에 사용되는 PHC파일의 규격은 지반 조건이나 매립 깊이에 따라 직경(D)이 400mm이고 두께가 70mm인 내경 260mm의 PHC 파일, 직경(D)이 500mm이고 두께가 80mm인 내경 340mm의 PHC 파일, 직경(D)이 600mm이고 두께가 90mm인 내경 420mm의 PHC 파일과 같이 여러 종류가 사용되기 때문에 인케이싱(11)의 내경과 폐 PHC 파일(3)의 외경간의 틈새(간격) 그리고 원뿔형 스크류 해머 비트(21)의 직경 크기가 동일한 특정 수치로만 한정되는 것이 아니다. However, the PHC file to be used for landfill and the like has a PHC file having an inner diameter of 260 mm and a diameter D of 400 mm and a thickness of 70 mm, a PHC pile having a diameter D of 500 mm and an inner diameter of 340 mm (Gap) between the inner diameter of the incising element 11 and the outer diameter of the closed PHC pile 3 and the shape of the conical shape of the PHC pile 3 because a plurality of kinds such as a PHC file, a PHC file having a diameter D of 600 mm and a thickness of 90 mm, The diameter of the screw hammer bit 21 is not limited to the same specific value.

아래에서는 하나의 PHC 파일 규격을 예로 들어 본 발명의 바람직한 수치 조건을 설명한다. 따라서 PHC 파일의 규격이 다를 경우 아래에서 설명하는 수치에 따른 비례 조건에 따라 다른 규격의 파일의 수치조건도 한정되게 된다.The preferred numerical conditions of the present invention will be described below by taking one PHC file standard as an example. Therefore, when the specification of the PHC file is different, the numerical conditions of files of other standards are limited according to the proportional condition according to the numerical values described below.

즉, 직경(D)이 400mm이고 두께가 70mm인 내경 260mm의 PHC 파일이 매립되어 있을 경우 원뿔형 스크류 해머 비트(21)의 최대 직경은 내경보다 60 ~ 80mm 정도 큰 320mm ~ 340mm 정도인 것을 사용하고 인케이싱(11)은 내경이 420 ~ 430mm 정도인 것을 사용하면 된다. 이와 같은 조건일 때 폐 PHC 파일(3)의 파쇄가 잘 이루어져 폐 PHC 파일(3)을 구성하는 콘크리트와 콘크리트의 수직방향 보강을 위한 PC강선 및 수평방향 보강을 위한 와이어 철근 또는 링철근이 50mm 내외의 콘크리트 골재와 이로부터 분리된 PC강선 및 와이어 철근으로 잘 분리된 잔재물이 발생하게 된다. That is, when a PHC file having an inner diameter of 260 mm and a diameter D of 400 mm and a thickness of 70 mm is embedded, the maximum diameter of the conical screw hammer bit 21 is about 320 mm to 340 mm, which is about 60 to 80 mm larger than the inner diameter, The islands 11 may have an inner diameter of about 420 to 430 mm. In this condition, the broken PHC pile (3) is well broken, and the PC steel wire for vertical reinforcement of the concrete and concrete constituting the closed PHC pile (3) Of concrete aggregate and PC steel wire and wire steel separated therefrom.

상기에서 원뿔형 스크류 해머 비트(21)의 크기를 한정한 이유는 직경(D) 400mm,두께 70mm, 내경 260mm인 PHC 파일을 기준으로 상기 수치보다 작으면 폐 PHC 파일(3)의 외경까지 파쇄되지 않게 되고, 상기 수치보다 크게 되면 너무 작게 파쇄되거나 파쇄시 인케이싱(11)과 충돌할 수도 있기 때문이다.The reason for limiting the size of the conical screw hammer bit 21 is that if the PHC file having a diameter D of 400 mm, a thickness of 70 mm and an inside diameter of 260 mm is used as a reference, If it is larger than the above value, it may be crushed too small or may collide with the incising 11 during crushing.

또한 상기에서 인케이싱(11)의 내경을 한정한 이유는 직경(D) 400mm,두께 70mm, 내경 260mm인 PHC 파일을 기준으로 상기 수치보다 작으면 폐 PHC 파일(3)이 파쇄되면서 바깥방향으로 발생하는 잔재물의 저장 공간이 협소하여 압밀될 경우 원뿔형 스크류 해머 비트(21)의 원활한 회전을 방해할 수 있고, 상기 수치보다 크게 되면 폐 PHC 파일(3)이 인케이싱(11)쪽으로 밀려 폐 PHC 파일(3)의 원활한 파쇄가 일어나지 않을 수 있기 때문이다.The reason why the diameter of the encasing 11 is limited is that when the PHC file having a diameter of 400 mm, a thickness of 70 mm and an inside diameter of 260 mm is used as a reference, the closed PHC pile (3) The closed PHC file 3 is pushed toward the incising 11 and the opened PHC pile 3 is pushed toward the incising 11 to prevent the smooth rotation of the conical screw hammer bit 21 when the storage space of the residue is compacted. 3) may not occur smoothly.

도 4는 본 발명의 한 실시예에 따른 폐 PHC파일 제거장치가 폐 PHC파일에 설치되어 파쇄스크류가 폐 PHC파일의 두부에 위치한 모습을 보인 예시도이고, 도 5는 본 발명의 한 실시예에 따른 폐 PHC파일 제거장치가 암반층에 설치된 폐 PHC파일의 하단부를 파쇄하는 모습을 보인 예시도이고, 도 6은 본 발명의 한 실시예에 따른 폐 PHC파일 제거장치가 암반층에 설치된 폐 PHC파일의 하단부 파쇄 후 상부 케이싱으로 배출하는 모습을 보인 예시도이고, 도 7은 본 발명의 한 실시예에 따른 폐 PHC파일 제거장치를 구성하는 케이싱을 지상으로 인출시 잔재물받이가 작동하여 인양하는 모습을 보인 예시도이고, 도 8은 본 발명의 한 실시예에 따른 폐 PHC파일 제거후 폐 천공구가 메꾸어진 모습을 보인 예시도이다.FIG. 4 is an exemplary view showing an apparatus for removing a closed PHC file according to an embodiment of the present invention, which is installed in a closed PHC file and a fracture screw is located on a head of a closed PHC file, and FIG. FIG. 6 is a view showing an example in which a device for removing a PHC file according to an embodiment of the present invention is installed in a lower part of a closed PHC file installed in a rock layer, FIG. 7 is a view illustrating a state in which the remnant cistern is lifted when the casing constituting the device for removing the PHC files according to the embodiment of the present invention is taken out to the ground, And FIG. 8 is an exemplary view showing a state in which a waste cloth tool is removed after the removal of a closed PHC file according to an embodiment of the present invention.

이하에서는 도 4 내지 8을 참조하여 본 발명의 제거장치를 이용한 폐 PHC파일의 제거 공법을 설명한다. 본 발명의 폐 PHC파일 제거 공법은 다음과 같은 단계를 거친다.Hereinafter, a method of removing a waste PHC file using the removal device of the present invention will be described with reference to FIGS. The waste PHC file removing method of the present invention is carried out as follows.

(제 1 단계) 위치 정렬 단계(First step)

먼저 지반굴착장비를 제거대상 폐 PHC파일의 상부쪽에 위치시킨 후 동일 축상에 구비된 지반굴착장비의 케이싱 오거(Auger) 및 스크류 오거(Auger)에 각각 이중케이싱(1)을 구성하는 인케이싱(11)과 아웃케이싱(12)의 상단과 파쇄 스크류(2)의 상단 스크류 파일(23)을 결합하고 압축공기 라인을 상단 스크류 파일(23)에 연결한 다음 지반에 노출된 폐 PHC파일 위치에 맞게 케이싱 오거(Auger) 및 스크류 오거(Auger)를 하강시킨다. First, the ground excavation equipment is placed on the upper side of the removed PHC pile, and then the casing auger and the screw auger of the ground excavation equipments provided on the same axis are respectively provided with an incineration 11 And the upper screw file 23 of the crushing screw 2 and the compressed air line is connected to the upper screw file 23 and then the casing 22 is exposed to the ground, Lower the Auger and Screw Auger.

하강시 먼저 스크류 오거(Auger)를 내려 파쇄 스크류(2)의 하단을 구성하는 원뿔형 스크류 해머 비트(21)가 지반에 일정 높이로 노출된 폐 PHC파일의 두부 중공부에 삽입되도록 하여 걸쳐 놓고, 그 다음 케이싱 오거(Auger)를 하강시켜 하부에 결합된 이중 케이싱(1)을 구성하는 인케이싱(11)과 아웃케이싱(12)의 선단에 형성된 각각의 링비트(111, 121)가 지반에 돌출된 폐 PHC파일의 둘레 지반에 닿도록 내려 놓는 위치 정렬 단계를 가진다. A screw auger is first operated to descend and the conical screw hammer bit 21 constituting the lower end of the crushing screw 2 is inserted into the hollow portion of the waste PHC pile exposed at a predetermined height on the ground, The ingress 11 constituting the double casing 1 coupled to the lower portion of the casing auger is lowered and the respective ring bits 111 and 121 formed at the ends of the outcasing 12 protrude from the ground And a positioning step of lowering the waste PHC pile so as to be in contact with the ground.

이때 인케이싱(11)의 하단 내경면을 따라 설치된 복수개의 접이식 잔재물받이(112)는 지반에 노출된 폐 PHC파일 둘레쪽으로 기울어진 상태 또는 기댄 상태를 가지게 된다.At this time, a plurality of collapsible remnant bins 112 installed along the lower inner diameter surface of the ingress 11 have a tilted state or a leaning state toward the periphery of the exposed PHC pile.

(제 2 단계) 폐 PHC 파일 파쇄단계(Second step) Destruction of waste PHC file

상기와 같은 위치 정렬 단계가 완료되면 케이싱 오거(Auger) 및 스크류 오거(Auger)를 이용하여 이중 케이싱(1)과 파쇄 스크류(2)를 회전시키면 파쇄가 시작된다. When the above-described alignment process is completed, crushing is started when the double casing 1 and the crushing screw 2 are rotated using a casing auger and a screw auger.

상기 이중 케이싱(1)을 구성하는 인케이싱(11)과 아웃케이싱(12)은 폐 PHC파일의 둘레를 따라 회전하면서 선단에 설치된 각각의 링비트(111, 121)가 흙을 파헤치면서 지반 속으로 삽입하게 된다. The ingresses 11 and the outcases 12 constituting the double casing 1 are rotated along the circumference of the closed PHC pile so that the respective ring bits 111 and 121 provided at the leading ends dig into the ground .

이때 이중 케이싱(1)은 상기 파쇄 스크류(2) 보다 먼저 선행 하강하여 파쇄 스크류(2)의 가이드 역할을 함과 동시에 폐 PHC 파일(3)이 매립 위치로부터 이탈되는 것을 방지하게 된다.At this time, the double casing 1 precedes the crushing screw 2 so as to guide the crushing screw 2 and prevent the waste PHC pile 3 from being separated from the buried position.

또한 파쇄스크류(2)의 하단을 구성하는 원뿔형 스크류 해머 비트(21)는 먼저 하강하고 있는 이중케이싱(1)을 뒤따라 하강하면서 둘레에 형성된 복수개의 스크류(211)와 압축공기를 이용한 에어 해머(22)에서 가해지는 타격력 그리고 타격 후 배출되는 압축공기를 이용하여 폐 PHC파일의 하단부까지 모두 파쇄하여 잔재물화 한다. The conical screw hammer bit 21 constituting the lower end of the crushing screw 2 is formed by a plurality of screws 211 formed around the lower casing 2 while descending the double casing 1 and an air hammer 22 ) And the compressed air discharged after the striking are used to crush the lower end portion of the closed PHC pile to make a residue.

상기 파쇄스크류는 스크류오거에서 공급되는 회전력이 상하로 직결된 스크류 파일(23)에서 에어 해머(22)로 그리고 원뿔형 스크류 해머 비트(21)로 전달되어 회전하게 된다. The crushing screw is transmitted to the air hammer 22 and the conical screw hammer bit 21 from the screw file 23 directly connected to the upper and lower rotary power supplied from the screw auger.

또한 압축공기에 의한 타격력은 스크류오거에서 공급되는 압축공기가 스크류파일(23)의 중앙부에 수직하게 형성된 압축 공기통로(232)를 통해 에어해머(22)에 공급되면 에어해머(22)가 원뿔형 스크류 해머 비트(21)의 상단에 돌출된 결합구(214)를 타격하여 원뿔형 스크류 해머 비트(21)가 회전하면서 하부쪽에 위치한 폐 PHC파일을 파쇄하게 된다. When the compressed air supplied from the screw auger is supplied to the air hammer 22 through the compressed air passage 232 formed vertically to the center of the screw pile 23, the air hammer 22 is guided by the conical screw The conical screw hammer bit 21 rotates to break the waste PHC file located at the lower side by striking the coupling hole 214 protruding from the upper end of the hammer bit 21.

한편, 상기 에어 해머(22) 작동에 사용된 압축공기는 원뿔형 스크류 해머 비트(21)의 하단 또는 측방에 형성된 배출구(213)를 통해 분사되어 파쇄된 잔재물에 의한 쿠션현상을 제거하여 원활한 해머 타격과 회전이 이루어지게 된다.The compressed air used in the operation of the air hammer 22 is injected through the discharge port 213 formed at the lower end or the side of the conical screw hammer bit 21 to remove the cushioning phenomenon caused by the crushed residue, The rotation is performed.

상기 파쇄시 발생되는 잔재물은 전술한 바와 같이 콘크리트, 콘크리트의 인장력을 보강하는 PC강선 그리고 콘크리트의 둘레 방향 강도를 보강하기 위한 와이어 철근 또는 링 철근인데, 바람직한 실시예에 따라 직경(D) 400mm, 두께 70mm, 내경 260mm의 폐 PHC 파일(3)에 최대 직경이 320mm ~ 340mm 정도인 원뿔형 스크류 해머 비트(21)와 내경이 420 ~ 430mm인 인케이싱(11)을 사용할 경우 대략 50mm 내외의 콘크리트 골재와 이로부터 분리된 PC강선 및 와이어 철근으로 잘 분리된 잔재물이 발생하게 된다.The remnants generated during the crushing are wire reinforcing bars or ring reinforcing bars for reinforcing the tensile strength of concrete and concrete, and PC reinforcing steel for reinforcing concrete strength in the circumferential direction. As described above, according to a preferred embodiment, When a conical screw hammer bit 21 having a maximum diameter of 320 mm to 340 mm and an incising element 11 having an internal diameter of 420 to 430 mm are used in a closed PHC file 3 having a diameter of 70 mm and an inside diameter of 260 mm, And the PC steel wire and the wire reinforcing steel separated from the steel wire and the steel wire are separated from each other.

또한 상기 파쇄시 인케이싱(11)과 파쇄 스크류(2) 서로간의 회전 방향은 동일하지 않은 방향으로 회전시키는데 이와 같은 회전 방향 때문에 파쇄 단계에서 일부 잔재물들이 스크류(211, 221, 231)와 인케이싱(11) 사이 공간을 통해 지면 밖으로 배출되게 된다.Also, in the crushing step, the rotating direction of the crushing screw 11 and the crushing screw 2 are not the same. Due to the rotating direction, some of the remnants are crushed by the screws 211, 221, 11) to the outside of the ground.

(제 2-1 단계) 암반층 내 폐 PHC파일 제거 단계(Step 2-1) Removal of waste PHC files in the rock layer

한편 상기와 같은 파쇄단계에 사용되는 인케이싱(11)과 아웃케이싱(12)으로 이루어진 이중케이싱(1)은 암반층이 아닌 일반적인 흙과 같은 연약지반에 매립된 폐 PHC 파일(3)일 경우에는 폐 PHC 파일(3)의 하부 선단까지 위치시킬 수 있으나, 암반층까지 굴착되어 매립된 폐 PHC 파일(3)의 제거공정일 경우에는 암반층 상부까지만 도달할 수 있다는 구조적 문제점이 있다. On the other hand, in the case of a closed PHC pile (3) embedded in a soft ground such as a general soil other than a rock layer, the double casing (1) composed of the incising (11) and the outcasing (12) The PHC pile 3 can be positioned up to the lower end of the PHC pile 3. However, when the buried PHC pile 3 is excavated to the rock layer, the upper part of the pile can be reached.

이와 같은 암반층에 매립된 폐 PHC 파일(3)의 경우 종래 폐 PHC 인발공법 이용한 제거 방법으로는 비록 명시적으로 기재되어 있지 않지만 실제 인발할 방법은 없다. 그 이유는 암반층에 단단히 고착되어 고정된 파일을 인양하기 뒤해서는 엄청난 인발력을 가진 지반굴착장비나 크레인이 필요하기 때문이다. 더욱이 너무 강한 인발력을 제공하면 암반층과 일반 흙지반 간의 경계부에서 폐 PHC파일이 절단되어 그대로 암반층에 남아 불완전한 제거가 될수 있다.In the case of the closed PHC pile (3) buried in such a rock layer, although it is not explicitly described as a removing method using the conventional pulsed PHC drawing method, there is no method of actually drawing it. The reason for this is that it requires a ground excavation equipment or a crane with a great pulling power after lifting a fixed file firmly attached to the rock layer. Furthermore, if the pulling force is too strong, the waste PHC pile is cut at the boundary between the rock layer and the general soil so that it can remain in the rock layer and be incompletely removed.

하지만 본 발명에 따른 폐 PHC파일 제거 공법에서는 암반층에 도달한 이중케이싱(1)은 그 자리에서 회전하는 상태로 두고, 추가적으로 파쇄 스크류(2)에 회전시키면서 압축공기를 이용한 타격력을 가하여 이중케이싱(1)이 도달하지 못하는 암반층까지 원뿔형 스크류 해머 비트(21)를 진입시켜 계속 폐 PHC파일(3)을 파쇄토록 한다.However, in the waste PHC file removing method according to the present invention, the double casing 1 that has reached the rock layer is rotated while being rotated in place, and the hitting force using compressed air is applied to the crushing screw 2 to rotate the double casing 1 The conical screw hammer bit 21 goes into the rock layer where it can not reach the crushed rock PHC pile 3 so that the crushed PHC pile 3 continues to be crushed.

이후 암반층에 매립된 폐 PHC파일(3)이 모두 파쇄되면 암반층에 적층된 잔재물 배출을 위해 파쇄스크류(2)와 서로 다른 방향으로 회전하는 이중케이싱(1)을 계속 회전시키면 암반층에 있는 충전된 잔재물이 원뿔형 스크류 해머 비트(21)의 둘레에 형성된 스크류를 통해 상부로 배출되면서 폐 PHC파일(3)이 있던 암반층 공간에는 빈 천공구가 생기면서 잔재물 배출이 완료되게 된다. 물론 천공구에 약간의 폐 PHC파일 파쇄시 발생한 잔재물이 남아 있을 수 있지만 나중에 양질의 토양으로 메꿔지기 때문에 환경오염 문제는 거의 일어나지 않게 된다.When the waste PHC piles (3) buried in the rock layer are all crushed, if the double casing (1) rotating in different directions with the crushing screw (2) is continuously rotated for discharging the residues deposited on the rock layer, Is discharged to the upper part through a screw formed around the conical screw hammer bit (21), and an empty cloth tool is formed in the rock layer space where the closed PHC pile (3) was present, so that the discharge of the residue is completed. Of course, some of the garbage generated by the crushing of the waste PHC pile may be left in the cloth tool, but the pollution problem will hardly occur because it is replaced with good soil later.

(제 3 단계) 잔재물 인양단계(The third stage)

상기와 같은 파쇄작업이 완료되면 인케이싱과 결합된 케이싱 오거를 일정 높이로 들어올려 인케이싱(11)의 하단 내경면을 따라 설치된 복수개의 접이식 잔재물받이(12)가 내부에 충전된 잔재물에 걸려 펼쳐지게 한다. 이때 아웃케이싱과의 결합은 해제한 상태에서 들어올려 아웃케이싱의 매립 위치는 변동이 없게 된다.When the crushing operation is completed, the casing auger coupled with the incising is lifted up to a certain height, and a plurality of foldable residue receptacles (12) installed along the inner surface of the lower end of the incising (11) do. At this time, the engagement with the outcasing is lifted in the released state, so that the embedding position of the outcasing is not changed.

상기 복수개의 잔재물받이(12)가 내경방향으로 수평하게 펼쳐지면 중앙부 공간부에 원뿔형 스크류 해머 비트(21)의 둘레가 닿게 되어 인케이싱(11)의 하부쪽으로 잔재물이 빠질 공간이 거의 없어지게 된다.When the plurality of remotely disposed tanks 12 are horizontally expanded in the inner diameter direction, the circumferential portion of the conical screw hammer bit 21 is contacted to the central space portion, and the space where the tails are removed from the lower portion of the ingathering 11 is substantially eliminated.

이와 같은 상태에서 지반굴착장비의 케이싱 오거(Auger) 및 스크류 오거(Auger)를 상승시키게 되면 인케이싱(11)과 파쇄 스크류(2)가 인양되면서 인케이싱(11)과 파쇄 스크류(2) 사이 공간에 있는 잔재물이 함께 지상으로 인양되게 된다.When the casing auger and the screw auger of the ground excavation equipment are raised in such a state, the ingressage 11 and the crushing screw 2 are lifted and the space between the ingressing and crushing screw 2 and the crushing screw 2 And the residue in the bottom surface is lifted to the ground.

한편, 상기와 같은 인케이싱(11)과 파쇄스크류(2)의 인양시 아웃케이싱(12)은 그대로 지반에 둔 상태에서 인양작업을 한다. On the other hand, when lifting of the incising 11 and the crushing screw 2 as described above, the outcasing 12 performs the lifting work while being kept in the ground.

(제 4 단계) 폐 천공구 메꿈 단계(Fourth step) Cloth cloth tool plugging step

상기와 같은 인양단계가 끝나면 지중에 매립되어 있는 아웃케이싱(12) 내부에 양질의 토사를 공급하여 메꾸는 단계를 가진다. 아웃케이싱이 존재한 상태에서 양질의 토사를 공급하는 이유는 폐천공구만 남아 있을 경우 폐 천공구가 지반의 횡압을 받아 무너지거나 상부로부터 이물질이 유입될 수 있어 원활한 메꿈 작업이 이루어지지 않아 지반이 불안정해질 수 있기 때문이다.After the above-mentioned lifting step is completed, the step of supplying high-quality gravel to the interior of the outcasing 12 embedded in the ground is performed. The reason for supplying the good quality soil with the outcasing in the presence of the pulp is that the waste cloth tool is damaged due to lateral pressure of the ground or foreign matter may flow from the upper part, It can be done.

(제 5 단계) 아웃케이싱 인발단계(Step 5) Outcasing drawing step

상기와 같이 아웃케이싱 내부에 양질의 토사를 채워 넣어 메꿈 작업이 완료되면 인발하여 지중에서 빼낸다. As described above, the outer casing is filled with high quality gravel and is pulled out from the ground when the plugging operation is completed.

아웃케이싱을 인발하는 방법은 케이싱 오거를 아웃케이싱의 두부와 결합시킨 후 인발하거나, 인양크레인을 이용하여 아웃케이싱 상부에 와이어를 감아 인발하거나, 아웃케이싱 상부에 인양구를 결합시킨 후 인양크레인으로 직접 인발하는 것과 같은 다양한 방법 중 어느 것을 사용해도 상관없다.The outcasing can be pulled out by connecting the casing auger to the head of the outcasing and pulling it out, or by pulling the wire on the top of the outcasing by using a lifting crane, or connecting the lifting mechanism to the top of the outcasing, It is acceptable to use any of various methods such as drawing.

또한 아웃케이싱이 빠져나간 자리에 일부 틈새가 있을 수 있는데 이와 같은 틈새는 폐천공구 메꿈 단계에서 충전된 토사나 지반의 토사가 자연스럽게 메꿔주면 충분하고 필요시 추가 토사를 약간 넣어 메꿔주면 된다.There may be some gaps in the outcasing. This gap should be enough for the gravel and soil that are charged in the plugging process of the longevity gardens to fill up naturally, and if necessary, add some additional gravel.

이와 같은 단계가 종료되면 폐 PHC파일 제거 공정이 완료되게 된다.When this step is completed, the process of removing the waste PHC file is completed.

본 발명은 상술한 특정의 바람직한 실시 예에 한정되지 아니하며, 청구범위에서 청구하는 본 발명의 요지를 벗어남이 없이 당해 발명이 속하는 기술분야에서 통상의 지식을 가진 자라면 누구든지 다양한 변형실시가 가능한 것은 물론이고, 그와 같은 변경은 청구범위 기재의 범위 내에 있게 된다. It will be understood by those skilled in the art that various changes in form and details may be made therein without departing from the spirit and scope of the invention as defined in the appended claims and their equivalents. Of course, such modifications are within the scope of the claims.

(1) : 이중 케이싱 (2) : 파쇄 스크류
(3) : 폐 PHC 파일 (11) : 인케이싱
(12) : 아웃 케이싱 (21) : 원뿔형 스크류 해머 비트
(22) : 에어 해머 (23) : 스크류 파일
(111, 121) : 링비트 (112) : 잔재물받이
(113) : 힌지 (114) : 각도조절용 스톱퍼
(211, 221, 231) :스크류 (212, 222, 232) : 압축 공기통로
(213) : 배출구 (214, 223) : 결합구
(224, 233) : 삽입홈
(1): double casing (2): crushing screw
(3): Closed PHC file (11): Inching
(12): out casing (21): conical screw hammer bit
(22): air hammer (23): screw file
(111, 121): Ring bit (112): Residual water tray
(113): Hinge (114): Stopper for angle adjustment
(211, 221, 231): screws (212, 222, 232)
(213): Outlets (214, 223): Coupling port
(224, 233): insertion groove

Claims (12)

지반굴착장비의 케이싱 오거에 결합되어 회전에 의해 지중에 매립된 폐 PHC 파일의 둘레에 설치되고, 파쇄된 잔재물의 인양시 사용되는 인케싱과 아웃케이싱으로 이루어진 이중 케이싱과;
지반굴착장비의 스크류 오거에 결합되어 상기 이중 케이싱을 구성하는 인케이싱 내경쪽에 설치되고, 하부로부터 각각 둘레에 스크류가 형성되고 내부로 압축공기가 공급되는 원뿔형 스크류 해머 비트, 에어 해머 및 스크류 파일이 결합되어 상기 이중 케이싱과 함께 회전 하강하면서 원뿔형 스크류 해머 비트가 매립된 폐 PHC 파일을 파쇄토록 하고, 파쇄 완료된 잔재물을 인케이싱과 함께 지상으로 인양시 사용되는 파쇄 스크류;를 포함하여 구성되되,
상기 원뿔형 스크류 해머 비트는 폐 PHC 파일의 중공부에 일부 구간이 삽입되도록 하단에서 상부방향으로 갈수록 외경이 넓게 형성되고, 둘레에는 파쇄 및 잔재물 이송용 복수개의 스크류가 형성되고, 상단에는 에어 해머의 하단에 삽입되어 회전력과 타격력 및 압축공기를 받아 폐 PHC 파일 파쇄에 사용되도록 돌출 형성된 다각형 구조의 결합구가 형성되고, 내부에는 상부 결합구에서 하단 또는 측방에 형성된 배출구까지 압축공기 통로가 형성되어 잔재물에 압축공기를 배출토록 구성된 것을 특징으로 하는 지중 매설된 폐 PHC 파일 제거 장치.
A dual casing which is installed around a closed PHC pile which is coupled to a casing auger of a ground excavation equipment and is buried in the ground by rotation, and which is used for lifting of the crushed residue;
A conical screw hammer bit, an air hammer and a screw file, which are connected to the screw auger of the ground excavation equipment and are installed on the inner diameter side of the ingot constituting the double casing, And a crushing screw used to crush the waste PHC file in which the conical screw hammer bit is buried while being rotated downward together with the double casing, and to use the crushing residue to be lifted to the ground together with the crushing residue,
The conical screw hammer bit is formed such that an outer diameter of the conical screw hammer bit is increased toward the upper direction from the lower end to insert a part of the hollow PHC pile, and a plurality of screws for crushing and transferring the remnant are formed on the periphery, And a compression air passage is formed in the inside of the upper coupling hole from the upper coupling hole to the lower coupling hole or the side of the compression hole, And the compressed air is discharged.
청구항 1에 있어서,
상기 이중케이싱을 구성하는 인케이싱과 아웃케이싱의 선단에는 각각 링비트가 형성되고, 상기 인케이싱 하단 내경면을 따라 힌지에 의해 작동되는 복수개의 접이식 잔재물받이가 설치되어 인케이싱 하강시는 폐 PHC 파일쪽으로 기울어진 기립 상태를 유지하고 인케이싱 상승시는 파쇄된 잔재물에 걸려 수평하게 펼쳐져 잔재물을 인양토록 구성된 것을 특징으로 하는 지중 매설된 폐 PHC 파일 제거 장치.
The method according to claim 1,
A ring bit is formed at the tip of the ingress and outcasing constituting the double casing, and a plurality of folding remotely operated troughs, which are operated by a hinge along the inner surface of the ingressing lower end, are provided, And the waste material is horizontally unfolded by the crushed residue to lift up the residues.
청구항 2에 있어서,
상기 잔재물받이는 힌지 또는 인케이싱 내경면 일지점에 설치된 각도조절용 스톱퍼의 형상에 의해 케이싱 하강시 폐 PHC 파일쪽으로 기울어진 기립 상태를 유지토록 구성된 것을 특징으로 하는 지중 매설된 폐 PHC 파일 제거 장치.
The method of claim 2,
Wherein the remained water receptacle is configured to maintain an upright standing state toward the closed PHC pile when the casing is lowered by the shape of the angle adjusting stopper provided at one point on the inner surface of the hinge or ingraining.
삭제delete 청구항 1에 있어서,
상기 에어 해머는 둘레에 잔재물 이송용 스크류가 형성되고, 상단에는 스크류 파일의 하단에 삽입되어 회전력과 압축공기를 공급받는 결합구가 형성되고, 하단에는 원뿔형 스크류 해머 비트의 결합구가 삽입되는 다각형 삽입홈이 형성되고, 내부에는 상단의 결합구에서 하단의 삽입홈까지 연통되는 압축공기통로가 형성되고, 압축공기 통로 내부에는 피스톤이 형성되어 상기 원뿔형 스크류 해머 비트의 결합구를 타격하도록 구성된 것을 특징으로 하는 지중 매설된 폐 PHC 파일 제거 장치.
The method according to claim 1,
The air hammer is provided with a screw for conveying the remnants and has an upper end formed with a coupling hole to be inserted into the lower end of the screw pile for receiving rotational force and compressed air and a polygonal insert And a piston is formed inside the compressed air passage so as to strik the coupling hole of the conical screw hammer bit. [0028] According to another aspect of the present invention, Underground buried waste PHC file removal device.
청구항 1에 있어서,
상기 스크류 파일은 둘레에 잔재물 이송용 스크류가 형성되고, 상단은 스크류오거와 결합되어 회전력과 압축공기를 공급받도록 구성되고, 하단에는 에어해머의 결합구가 삽입되는 다각형 삽입홈이 형성되고, 내부에는 상단에서 하단의 삽입홈까지 연통되는 압축공기통로가 형성된 것을 특징으로 하는 지중 매설된 폐 PHC 파일 제거 장치.
The method according to claim 1,
The screw pile is formed with a screw for conveying the remnants and the upper end is connected with the screw auger to receive rotational force and compressed air. The lower end of the screw pile is formed with a polygonal insertion groove into which a coupling hole of an air hammer is inserted. And a compressed air passage communicating from the upper end to the lower end insertion groove is formed.
청구항 1에 있어서,
상기 인케이싱의 내경과 폐 PHC 파일의 외경간의 틈새 및 원뿔형 스크류 해머 비트의 크기는 직경이 400mm이고 두께가 70mm인 내경 260mm의 PHC 파일 기준으로 원뿔형 스크류 해머 비트의 최대 직경은 내경보다 60 ~ 80mm 큰 320mm ~ 340mm를 사용하고, 인케이싱은 내경이 420 ~ 430mm인 것을 사용하는 크기 비례로 구성된 것을 특징으로 하는 지중 매설된 폐 PHC 파일 제거 장치.
The method according to claim 1,
The maximum diameter of the conical screw hammer bit is 60 to 80 mm larger than the inner diameter based on a PHC file having an inner diameter of 260 mm and a diameter of 400 mm and a thickness of 70 mm, the gap between the inner diameter of the ingaking and the outer diameter of the closed PHC pile, 320 mm to 340 mm, and the incising is made in a size proportional to using an inner diameter of 420 to 430 mm.
청구항 1, 2, 3, 5, 6, 7 중 어느 한항에 따른 지중 매설된 폐 PHC 파일 제거 장치를 구비하여 인케이싱과 아웃케이싱으로 이루어진 이중 케이싱과 파쇄 스크류를 회전 하강시키면서 지중 매립된 폐 PHC파일을 지중에서 직접 파쇄 후, 파쇄된 잔재물을 지상으로 인양하여 제거하는 단계로 이루어진 것을 특징으로 하는 지중 매설된 폐 PHC 파일 제거 공법.
Claims [1], [2], [3], [5], [6] and [7] to provide a double casing comprising an ingress and an outcasing and a decommissioning PHC file And then removing the crushed residue from the ground to remove the crushed residue from the ground.
청구항 8에 있어서,
상기 폐 PHC 파일 제거 공법은, 스크류 오거에 결합된 파쇄 스크류를 매립된 폐 PHC파일의 지반 노출부위에 올려 놓고, 케이싱 오거에 다중 결합된 인케이싱과 아웃케이싱으로 이루어진 이중 케이싱은 폐 PHC파일 둘레를 감싸게 지반에 내려 위치를 정렬하는 제 1 단계와;
이후 이중 케이싱을 파쇄 스크류보다 선행하여 회전 하강시키면서 지중에 삽입시키고, 스크류 오거에 결합된 파쇄 스크류를 회전 하강시키면서 압축공기를 이용 타격하여 폐 PHC파일을 파쇄하는 제 2 단계와;
이후 폐 PHC파일의 하단까지 파쇄작업이 완료되면 인케싱과 파쇄스크류를 인양하여 내부의 폐 PHC파일 잔재물을 함께 지상으로 인양하는 제 3 단계와;
이후 지중에 남아 있는 아웃케이싱에 토사를 부어 폐 천공구를 메꾸는 제 4 단계와;
이후 아웃케이싱을 지상으로 인발하는 제 5 단계;를 포함하여 구성된 것을 특징으로 하는 지중 매설된 폐 PHC 파일 제거 공법.
The method of claim 8,
In the method of removing the waste PHC file, the crushing screw coupled to the screw auger is placed on the exposed portion of the buried waste PHC pile, and the double casing composed of the incising and outcasing combined with the casing auger is wound around the waste PHC pile A first step of wrapping and aligning the position on the ground;
A second step of crushing the waste PHC pile by blowing compressed air while rotating the crushing screw coupled to the screw auger by inserting the double casing into the ground while rotating and lowering the crushing screw prior to the crushing screw;
After the crushing operation is completed up to the lower end of the closed PHC file, lifting the incineration and crushing screw to raise the waste PHC pile of the inside together to the ground;
A fourth step of pouring the soil to the outcasing remaining in the ground to drain the waste cloth tool;
And a fifth step of drawing the out casing to the ground.
청구항 9에 있어서,
상기 제 2 단계는 암반층에 매립된 폐 PHC 파일 경우에는 암반층에 도달한 이중케이싱을 해당 위치에서 회전시키면서 내부에 위치한 파쇄 스크류의 원뿔형 스크류 해머 비트를 추가적으로 암반층까지 회전 하강시키면서 압축공기를 이용한 타격력을 가해 폐 PHC파일을 파쇄하고, 파쇄된 잔재물은 원뿔형 스크류 해머 비트의 둘레에 형성된 스크류를 이용하여 상부 인케이싱쪽으로 배출하는 제 2-1 단계;를 더 포함하여 구성된 것을 특징으로 하는 지중 매설된 폐 PHC 파일 제거 공법.
The method of claim 9,
In the second step, in the case of a closed PHC pile buried in the rock layer, the conical screw hammer bit of the crushing screw located inside is rotated while the double casing reaching the rock layer is rotated at the corresponding position, and the crushing force using the compressed air is applied And a second step of crushing the waste PHC pile and discharging the crushed residue to the upper crushing side using a screw formed around the conical screw hammer bit. Removal method.
청구항 9에 있어서,
상기 제 3 단계는 인케이싱과 결합된 케이싱 오거를 일정 높이로 들어올려 인케이싱의 하단 내경면을 따라 설치된 복수개의 접이식 잔재물받이가 내부에 충전된 잔재물에 걸려 펼쳐지게 하고, 잔재물받이가 닿지 않는 중앙부분은 파쇄스크류의 하부를 이루는 원뿔형 스크류 해머 비트가 막아 잔재물이 하부로 빠지는 것을 막은 상태에서 인양하는 단계인 것을 특징으로 하는 지중 매설된 폐 PHC 파일 제거 공법.
The method of claim 9,
In the third step, the casing auger combined with the ingressing is lifted up to a certain height so that a plurality of foldable remnant basins installed along the lower inner diameter surface of the ingressing can be hooked on the remainder filled in the inside, Is a step of lifting the cone-shaped screw hammer bit constituting the lower part of the crushing screw to prevent the residue from falling down.
청구항 9에 있어서,
상기 제 2 단계는 파쇄스크류를 구성하는 에어 해머가 원뿔형 스크류 해머 비트를 타격시 사용한 압축공기를 원뿔형 스크류 해머 비트의 하단 또는 측방에 형성된 배출구를 통해 분사시켜 파쇄된 잔재물에 의한 쿠션현상을 제거하면서 파쇄토록 하는 단계인 것을 특징으로 하는 지중 매설된 폐 PHC 파일 제거 공법.
The method of claim 9,
In the second step, compressed air using the air hammer which constitutes the crushing screw blows the cone-shaped screw hammer bit through the outlet formed at the lower end or the side of the cone-shaped screw hammer bit to remove the cushioning phenomenon by the crushed residue, And a step of removing the buried PHC files buried underground.
KR1020150108678A 2015-07-31 2015-07-31 Apparatus and method for removing waste PHC pile of reclaimed land KR101596660B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020150108678A KR101596660B1 (en) 2015-07-31 2015-07-31 Apparatus and method for removing waste PHC pile of reclaimed land

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020150108678A KR101596660B1 (en) 2015-07-31 2015-07-31 Apparatus and method for removing waste PHC pile of reclaimed land

Publications (1)

Publication Number Publication Date
KR101596660B1 true KR101596660B1 (en) 2016-02-23

Family

ID=55449346

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020150108678A KR101596660B1 (en) 2015-07-31 2015-07-31 Apparatus and method for removing waste PHC pile of reclaimed land

Country Status (1)

Country Link
KR (1) KR101596660B1 (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106894416A (en) * 2017-03-23 2017-06-27 中铁建设集团有限公司 A kind of rotary digging formula draws core light instrument and a construction method
KR20190035350A (en) 2017-09-26 2019-04-03 주식회사 금호메카텍 Pile removal apparatus
KR102187757B1 (en) * 2020-01-22 2020-12-07 장기영 Method And Apparatus For Removing Reinforced Concrete Pile
CN112095607A (en) * 2020-07-30 2020-12-18 北京建工土木工程有限公司 Device and method for quickly removing pile core soil of precast tubular pile
CN113374061A (en) * 2021-05-26 2021-09-10 长江生态环保集团有限公司 Multipurpose cleaning tool for cleaning sediment in inspection well and operation method thereof
KR20230092256A (en) * 2021-12-17 2023-06-26 한국전력공사 Punching apparatus for auger bits of excabator

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0641959A (en) * 1991-06-17 1994-02-15 Okadagumi:Kk Withdrawing device for existing concrete pile
JP3361776B2 (en) * 1999-06-22 2003-01-07 株式会社相馬組 Crushing equipment for underground piles
KR100804812B1 (en) 2006-11-02 2008-02-20 허희숙 Restoring process for method hammer bit
KR100994374B1 (en) 2009-02-18 2010-11-15 (주)이에스연구소 Apparatus for driving pile by rotation and method thereof
KR101178277B1 (en) 2009-12-22 2012-08-29 (주)한진디엔비 air hammer for drilling machine
KR101248393B1 (en) 2010-03-26 2013-03-28 허희숙 Concrete file drawing public law and the drawing which are laid in

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0641959A (en) * 1991-06-17 1994-02-15 Okadagumi:Kk Withdrawing device for existing concrete pile
JP3361776B2 (en) * 1999-06-22 2003-01-07 株式会社相馬組 Crushing equipment for underground piles
KR100804812B1 (en) 2006-11-02 2008-02-20 허희숙 Restoring process for method hammer bit
KR100994374B1 (en) 2009-02-18 2010-11-15 (주)이에스연구소 Apparatus for driving pile by rotation and method thereof
KR101178277B1 (en) 2009-12-22 2012-08-29 (주)한진디엔비 air hammer for drilling machine
KR101248393B1 (en) 2010-03-26 2013-03-28 허희숙 Concrete file drawing public law and the drawing which are laid in

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106894416A (en) * 2017-03-23 2017-06-27 中铁建设集团有限公司 A kind of rotary digging formula draws core light instrument and a construction method
KR20190035350A (en) 2017-09-26 2019-04-03 주식회사 금호메카텍 Pile removal apparatus
KR102070490B1 (en) * 2017-09-26 2020-01-29 주식회사 금호메카텍 Pile removal apparatus
KR102187757B1 (en) * 2020-01-22 2020-12-07 장기영 Method And Apparatus For Removing Reinforced Concrete Pile
CN112095607A (en) * 2020-07-30 2020-12-18 北京建工土木工程有限公司 Device and method for quickly removing pile core soil of precast tubular pile
CN112095607B (en) * 2020-07-30 2021-11-02 北京建工土木工程有限公司 Device and method for quickly removing pile core soil of precast tubular pile
CN113374061A (en) * 2021-05-26 2021-09-10 长江生态环保集团有限公司 Multipurpose cleaning tool for cleaning sediment in inspection well and operation method thereof
KR20230092256A (en) * 2021-12-17 2023-06-26 한국전력공사 Punching apparatus for auger bits of excabator
KR102627606B1 (en) * 2021-12-17 2024-01-24 한국전력공사 Punching apparatus for auger bits of excabator

Similar Documents

Publication Publication Date Title
KR101596660B1 (en) Apparatus and method for removing waste PHC pile of reclaimed land
US8079780B2 (en) Slotted mandrel for lateral displacement pier and method of use
JP5932124B1 (en) Steel pipe pile construction method
CN109653682B (en) Drill bit with adjustable drill diameter and hole digging machine
CN105780763A (en) Construction method of medium-hole vibrating casing wall protection type long spiral cast-in-situ bored pile
CN111395330B (en) Construction method for concrete cast-in-situ bored pile complete steel casing penetrating through underground gallery
CN108729445B (en) Drill bit for breaking waste solid piles and method for breaking old solid piles and filling new piles
CN114108654A (en) Construction method for removing obstacles in foundation pit area invaded by pressure-bearing water dock
JP5700611B1 (en) Underground pile removal method and underground pile removal device
US3921410A (en) System and method of permafrost pile forming
JP2017025534A (en) Underground pile removal method and underground pile removal device
GB2154630A (en) Construction method for foundation piling
KR102070490B1 (en) Pile removal apparatus
JP6212147B2 (en) Crushed stone pile
KR102472139B1 (en) Cutting arms for forming reinforced apparatus of piles and construction method of piles with reinforced apparatus
JP2010189952A (en) Existing pile removing device
JP4074198B2 (en) How to remove existing piles
CN113653052A (en) Obstacle clearing construction method for large-diameter underground steel-concrete composite structure
JP5303352B2 (en) Removal method of existing concrete piles
JP4400700B2 (en) Cutting and drawing method and equipment for existing piles
KR101337223B1 (en) Apparatus Equipped with Double Casing for Inserting Plastic Drain Board and Process thereof
GB2132667A (en) Method of installing precast concrete piles
JP4142737B1 (en) Waste treatment equipment
JP3187326B2 (en) Vertical drilling machine
KR20130084363A (en) Drill bit for drilling machine

Legal Events

Date Code Title Description
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20190219

Year of fee payment: 4

FPAY Annual fee payment

Payment date: 20200218

Year of fee payment: 5