KR101595396B1 - Prominent balcony and construction method for promenent balcony - Google Patents

Prominent balcony and construction method for promenent balcony Download PDF

Info

Publication number
KR101595396B1
KR101595396B1 KR1020140131359A KR20140131359A KR101595396B1 KR 101595396 B1 KR101595396 B1 KR 101595396B1 KR 1020140131359 A KR1020140131359 A KR 1020140131359A KR 20140131359 A KR20140131359 A KR 20140131359A KR 101595396 B1 KR101595396 B1 KR 101595396B1
Authority
KR
South Korea
Prior art keywords
slab
balcony
abdomen
protrusion
protruding
Prior art date
Application number
KR1020140131359A
Other languages
Korean (ko)
Inventor
최익준
전병갑
김준삼
장흑운
조영욱
Original Assignee
삼성물산 주식회사
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 삼성물산 주식회사 filed Critical 삼성물산 주식회사
Priority to KR1020140131359A priority Critical patent/KR101595396B1/en
Application granted granted Critical
Publication of KR101595396B1 publication Critical patent/KR101595396B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The present invention provides a prefabricated protrusion balcony. According to the present invention, the prefabricated protrusion balcony protruding from a slab (1) of a building includes: a support unit (100) formed on the slab (1); a protrusion unit (200) connected to the slab (1); a mounting unit (300) formed in the protrusion unit (200) and mounted on the support unit (100); and a connection unit (400) connecting the support unit(100) and the mounting unit (300). According to the present invention, the prefabricated protrusion balcony enables a protrusion balcony to be simply constructed by using the protrusion unit of a precast method and a gang form.

Description

조립형 돌출발코니 및 이의 시공방법{PROMINENT BALCONY AND CONSTRUCTION METHOD FOR PROMENENT BALCONY}Technical Field [0001] The present invention relates to an assembled protruding balcony and a method of constructing the same,

본 발명은 토목 및 건축분야에 관한 것으로서, 보다 상세하게는 건물에서 돌출되어 형성되는 돌출형 발코니를 갱폼 및 프리캐스트 발코니를 이용한 조립형 발코니 및 이의 시공방법에 관한 것이다.
The present invention relates to a civil engineering and construction field, and more particularly, to an assembled balcony using a protruding balcony protruding from a building and a pre-cast balcony and a construction method thereof.

일반적으로 고층 아파트와 같은 단면 구조물은 갱폼에 의해 외관을 형성시키는 것이 일반적이다. Generally, a cross-sectional structure such as a high-rise apartment is generally formed by gauze.

갱폼(gang form)이란, 주로 고층 아파트와 같이 평면상 상ㆍ하부가 동일한 단면 구조물에서, 외부 벽체 거푸집과 발판용 케이지를 일체로 하여 제작한 대형 거푸집을 말한다. A gang form is a large formwork which is made by integrating the exterior wall formwork and the footing cage in a cross-sectional structure with the same upper and lower planes, such as a high-rise apartment building.

여기서 케이지(cage)란 갱폼의 외부 벽체 거푸집 부분을 제외한 부분으로서, 거푸집의 설치 및 해체작업, 후속 미장 및 견출작업 등을 안전하게 수행할 수 있도록 설치한 작업발판, 안전난간을 말한다. Here, the cage is a part of the gantry excluding the formwork of the outer wall, which means a work footrest and a safety guardrail installed to safely perform the installation and disassembly of the formwork, the subsequent plastering, and the laying work.

케이지는 일반적으로 상부 케이지와 하부 케이지가 존재하며, 상부 케이지는 갱폼 케이지의 작업발판 중 거푸집의 설치 및 해체 작업용으로 사용되는 상부에 있는 작업발판을 말하며, 하부 케이지는 미장, 견출 작업용으로 사용되는 하부에 있는 작업발판을 말한다.
The upper cage generally refers to a work foot on the upper side which is used for installation and disassembly of the work scaffold of the gang-shaped cage, and the lower cage is a lower work scaffold which is used for plastering, Is the work footing in.

최근 건축물에 관한 입면 디자인 가이드라인에 따라 아파트 입면디자인의 차별화를 꾀하기 위해 돌출발코니의 설치가 요구되는 상황이다. Recently, it is required to install a protruding balcony in order to differentiate the design of the facade of the apartment according to the elevation design guideline concerning the building.

돌출발코니가 일정하게 형성되는 경우에는 갱폼에 의한 시공이 가능하지만, 돌출발코니의 돌출 위치가 불규칙적이고, 일부 층에 한정되어 돌출발코니가 형성되는 경우에는 갱폼만에 의한 돌출발코니의 시공이 곤란한 문제점이 있다.
In the case where the protruding balcony is formed constantly, it is possible to construct the protruding balcony by irregularity. However, when the protruding position of the protruding balcony is irregular and the protruding balcony is formed only in some of the floors, have.

이러한 돌출발코니의 시공을 위해 복수의 형태를 가진 갱폼 세트를 사용하거나, 프리캐스트 방식만으로 발코니를 시공하거나 및 시스템 비계를 사용하는 시공방법 등이 고안되어 왔으나, 상술된 돌출발코니의 시공방법들은 모두 높은 공사비가 요구됨과 아울러 공기의 연장 요소로 작용되어 왔다. In order to construct such a protruding balcony, a gang set having a plurality of forms is used, a balcony is installed only by a precast method, and a construction method using a system scaffold has been devised. However, the above- Construction cost has been required and it has been acting as an extension of air.

또한, 입면 변화층의 슬래브 지지 방법이 난해하고, 크랙이나 누수 등의 구조적 안전성을 담보하지 못하는 문제점이 존재하여 왔다.
Further, the method of supporting the slab of the elevation change layer is complicated, and structural safety such as cracks and leaks can not be secured.

본 발명은 상술된 종래의 돌출발코니의 시공방법의 문제점을 해결하기 위해 안출된 것으로서, 본 발명의 목적은 갱폼과 프리캐스트 방식의 돌출부를 이용하여 간단하게 돌출발코니를 시공할 수 있는 조립형 돌출발코니 및 이의 시공방법을 제공함에 있다.
SUMMARY OF THE INVENTION The present invention has been made to solve the above-mentioned problems of the conventional method of constructing a protruding balcony, and it is an object of the present invention to provide a protruding balcony which can easily construct a protruding balcony using gang- And a method of constructing the same.

본 발명의 다른 목적은 돌출부가 조립되는 슬래브에 장착된 받침부의 레벨을 정확하게 확보할 수 있는 조립형 돌출발코니 및 이의 시공방법을 제공함에 있다.
Another object of the present invention is to provide an assembled protruding balcony capable of accurately securing a level of a support portion mounted on a slab on which protrusions are assembled, and a method of constructing the same.

본 발명의 또 다른 목적은 2 종류의 갱폼을 이용하지 않고도 돌출발코니를 시공할 수 있는 조립형 돌출발코니 및 이의 시공방법을 제공함에 있다.
It is another object of the present invention to provide an assembled protruding balcony which can construct a protruding balcony without using two types of gauze, and a method of constructing the protruding balcony.

본 발명의 또 다른 목적은 공기를 단축하고 시공의 난이도를 낮출 수 있는 조립형 돌출발코니 및 이의 시공방법을 제공함에 있다.
Another object of the present invention is to provide an assembled protruding balcony which can shorten the air and reduce the difficulty of construction, and a method of constructing the same.

본 발명의 일 측면에 따르면, 건물의 슬래브(1)에서 돌출되어 형성되는 조립형 돌출발코니에 있어서, 상기 슬래브(1)에 형성된 받침부(100); 상기 슬래브(1)와 결합되는 돌출부(200); 상기 돌출부(200)에 형성되며, 상기 받침부(100)에 거치되는 거치부(300); 및 상기 받침부(100)와 상기 거치부(300)를 결합하는 결합부(400);를 포함하는 것을 특징으로 하는 조립형 돌출발코니가 제공된다.
According to an aspect of the present invention, there is provided an assembled protruding balcony formed by protruding from a slab (1) of a building, comprising: a support (100) formed on the slab (1); A protrusion (200) coupled with the slab (1); A mounting part 300 formed on the protrusion part 200 and fixed to the receiving part 100; And a coupling part (400) for coupling the receiving part (100) and the mounting part (300).

여기서, 상기 받침부(100)는, 상기 슬래브(1)의 단부면에 형성된 받침 플레이트(110); 및 상기 받침 플레이트(110)와 결합되며 상기 슬래브(1) 내부에 매립된 제1 매립 보강부재(120);를 포함하며, 상기 받침 플레이트(110)는, 상부 받침부(111); 하부 받침부(112); 및 상기 상부 받침부(111)와 상기 하부 받침부(112)를 연결하는 제1 복부(113);를 포함하는 것을 특징으로 하는 조립형 돌출발코니일 수 있다.
Here, the receiving unit 100 includes a receiving plate 110 formed on an end surface of the slab 1; And a first embedding reinforcing member 120 coupled to the supporting plate 110 and embedded in the slab 1. The supporting plate 110 includes a top supporting part 111; A lower receiving portion 112; And a first abdomen (113) connecting the upper receiving unit (111) and the lower receiving unit (112) to each other.

또한, 상기 제1 매립 보강부재(120)는 상기 슬래브(1) 내부에서 꺽인 형태로 형성된 것을 특징으로 하는 조립형 돌출발코니일 수 있다.
Also, the first embedding reinforcing member 120 may be a built-in protruding balcony, which is formed in the slab 1.

또한, 상기 거치부(300)는, 상기 거치부(300)의 단부면에 형성됨과 아울러, 상기 받침부(100)의 형성지점과 대응되는 지점에 형성된 거치 플레이트(310); 및 상기 거치 플레이트(310)와 결합되며 상기 돌출부(200) 내부에 매립된 제2 매립 보강부재(320);를 포함하며, 상기 거치 플레이트(310)는, 상기 상부 받침부(111)에 거치되는 상부 거치부(311); 상기 하부 받침부(112)에 거치되는 하부 거치부(312); 및 상기 상부 거치부(311)와 상기 하부 거치부(312)를 연결하며, 상기 제1 복부(113)와 접촉되는 제2 복부(313);을 포함하는 것을 특징으로 하는 조립형 돌출발코니일 수 있다.
The mounting portion 300 may include a mounting plate 310 formed on an end surface of the mounting portion 300 and formed at a position corresponding to a forming point of the mounting portion 100; And a second embedding reinforcing member 320 coupled to the mounting plate 310 and embedded in the protrusion 200. The mounting plate 310 is mounted on the upper receiving portion 111 An upper mounting portion 311; A lower mounting part (312) for receiving the lower supporting part (112); And a second abdomen part (313) connecting the upper mounting part (311) and the lower mounting part (312) and making contact with the first abdomen part (113) have.

또한, 상기 제2 매립 보강부재(320)는 상기 돌출부(100) 내부에서 꺽인 형태로 형성된 것을 특징으로 하는 조립형 돌출발코니일 수 있다.
Also, the second embedding reinforcing member 320 may be formed as an assembled protruding balcony, which is formed in the protruding portion 100 in a bent shape.

또한, 상기 결합부(400)는, 일부가 상기 슬라브(1) 내부에 매립되며, 상기 상부 받침부(111)를 관통하여 돌출된 돌출나사(410); 및 상기 돌출나사(410)와 결합되는 제1 너트(420);를 포함하며, 상기 돌출나사(410)는 상기 상부 거치부(311)에 형성된 제1 나사공(314)을 통과하여 상기 제1 너트(420)와 결합되는 것을 특징으로 하는 조립형 돌출발코니일 수 있다.
The engaging portion 400 is partially embedded in the slab 1 and includes a projecting screw 410 protruding through the upper receiving portion 111; And a first nut 420 coupled to the protruding screw 410. The protruding screw 410 passes through a first screw hole 314 formed in the upper mounting portion 311 and is inserted into the first And is coupled to the nut 420. [0035]

또한, 상기 제1 매립 보강부재(120)는 상기 제1 복부(113)와 결합된 것을 특징으로 하는 조립형 돌출발코니일 수 있다.
In addition, the first embedding reinforcing member 120 is coupled to the first abdomen 113, and may be an assembled protruding balcony.

또한, 상기 제2 매립 보강부재(320)는 상기 제2 복부(313) 또는 상기 상부 거치부(311)와 결합된 것을 특징으로 하는 조립형 돌출발코니일 수 있다.
The second embedment reinforcing member 320 is coupled to the second stomach 313 or the upper stomach 311.

본 발명의 다른 일 측면에 따르면, 제6항의 조립형 돌출발코니를 시공하는 방법에 있어서, 상기 받침부(100)를 형성하는 제1 단계(S100); 및 상기 결합부(400)를 이용하여 상기 받침부(100)와 상기 거치부(300)를 결합함으로써 상기 슬래브(1)와 상기 돌출부(300)를 결합하는 제2 단계(S200);를 포함하는 것을 특징으로 하는 조립형 돌출발코니를 시공하는 방법이 제공된다.
According to another aspect of the present invention, there is provided a method of constructing the assembled protruding balcony of claim 6, comprising: a first step (S100) of forming the receiving unit (100); And a second step (S200) of coupling the slab (1) and the protrusion (300) by coupling the receiving part (100) and the receiving part (300) using the coupling part (400) Wherein the method comprises the steps of:

여기서, 상기 제1 단계(S100)는, 갱폼(2)에 형성된 레벨조정부(500)에 상기 받침부(100)를 결합하는 단계(S110); 및 상기 갱폼(2)에 콘크리트를 타설하여 상기 슬래브(1)를 형성하는 단계(S120);를 포함하는 것을 특징으로 하는 조립형 돌출발코니를 시공하는 방법일 수 있다.
Here, the first step S100 may include a step S110 of coupling the receiving unit 100 to a level adjusting unit 500 formed on the gantry 2; And forming the slab (1) by pouring concrete into the gnomes (2) (S120).

또한, 상기 레벨조정부(500)는, "L"형 채널(510); 및 상기 "L"형 채널(510)에 형성된 제2 나사공(511)을 통과한 상기 돌출나사(410)와 결합되는 제2 너트(520);를 포함하는 것을 특징으로 하는 조립형 돌출발코니를 시공하는 방법일 수 있다.
Also, the level adjusting unit 500 includes an "L" type channel 510; And a second nut 520 coupled to the protruding screw 410 through a second screw hole 511 formed in the "L" -shaped channel 510. [ It can be a method of construction.

또한, 상기 제1 복부(113)에는 상기 갱폼(2)에 타설된 콘크리트가 상기 제2 복부가 위치되는 상기 제1 복부(113)의 전방면으로 유입되는 것을 방지하기 위한 날개부(114)가 형성된 것을 특징으로 하는 조립형 돌출발코니를 시공하는 방법일 수 있다.
A wing portion 114 for preventing the concrete poured into the gang 2 from flowing into the front surface of the first stomach portion 113 where the second stomach portion is located is formed in the first stomach portion 113 The method of the present invention may be a method of constructing an assembled protruding balcony.

본 발명에 따르면 갱폼과 프리캐스트 방식의 돌출부를 이용하여 간단하게 돌출발코니를 시공할 수 있는 효과가 있다.
According to the present invention, there is an effect that a protruding balcony can be easily constructed by using a protruding portion of gang-bubble and precast method.

본 발명에 따르면 돌출부가 조립되는 슬래브에 장착된 받침부의 레벨을 정확하게 확보하여 시공의 정확도를 높일 수 있는 효과가 있다.
According to the present invention, the level of the support portion mounted on the slab on which the projecting portion is assembled can be accurately secured, thereby improving the accuracy of the construction.

본 발명에 따르면 2 종류의 갱폼을 이용하지 않고도 돌출발코니를 시공할 수 있는 효과가 있다.
According to the present invention, it is possible to construct a protruding balcony without using two types of gauze.

본 발명에 따르면 공기를 단축하고 시공의 난이도를 낮출 수 있는 효과가 있다.
According to the present invention, there is an effect that the air can be shortened and the difficulty of the construction can be lowered.

도 1은 본 발명의 일 실시예에 따른 조립형 돌출발코니가 시공된 건물의 입면을 나타내는 도면.
도 2는 본 발명의 일 실시예에 따른 조립형 돌출발코니의 구성을 나타내는 투시도.
도 3은 본 발명의 일 실시예에 조립형 돌출발코니의 받침부가 형성된 슬래브를 나타내는 도면.
도 4는 본 발명의 일 실시예에 따른 조립형 돌출발코니의 돌출부를 나타내는 도면.
도 5는 본 발명의 일 실시예에 따른 조립형 돌출발코니의 결합부를 나타내는 도면.
도 6은 본 발명의 일 실시예에 따른 조립형 돌출발코니의 받침부와 돌출부가 결합된 상태를 나타내는 도면.
도 7은 본 발명의 일 실시예에 따른 조립형 돌출발코니의 시공방법 중 레벨조정부에 받침부를 결합한 상태를 나타내는 도면.
도 8은 본 발명의 일 실시예에 따른 조립형 돌출발코니의 시공방법 중 갱폼에 콘크리트를 타설하여 받침부를 형성하는 상태를 나타내는 도면.
도 9는 본 발명의 일 실시예에 따른 조립형 돌출발코니의 시공방법 중 갱폼이 해체된 상태의 받침부를 나타내는 도면.
도 10은 본 발명의 일 실시예에 따른 조립형 돌출발코니의 시공방법 중 받침부와 돌출부를 결합부에 의해 결합하는 상태를 나타내는 도면.
도 11은 본 발명의 일 실시예에 따른 조립형 돌출발코니의 시공방법 중 결합이 완료된 받침부와 돌출부의 상태를 나타내는 도면.
도 12는 본 발명의 일 실시예에 따른 조립형 돌출발코니의 단면도.
도 13은 본 발명의 일 실시예에 따른 날개부가 형성된 받침부를 나타내는 도면.
BRIEF DESCRIPTION OF THE DRAWINGS Fig. 1 is a view showing an elevation of a building in which an assembled protruding balcony according to an embodiment of the present invention is installed. Fig.
2 is a perspective view showing the construction of an assembled protruding balcony according to an embodiment of the present invention;
3 is a view of a slab in which a support portion of an assembled protruding balcony is formed in an embodiment of the present invention.
4 is a view of a protrusion of an assembled protruding balcony according to an embodiment of the present invention;
5 is a view of a coupling portion of an assembled protruding balcony according to an embodiment of the present invention.
6 is a view showing a state in which a receiving portion and a protruding portion of an assembled protruding balcony according to an embodiment of the present invention are combined.
7 is a view showing a state in which a receiving unit is coupled to a level adjusting unit in a method of constructing an assembled protruding balcony according to an embodiment of the present invention.
8 is a view showing a state in which concrete is laid on a gantry to form a receiving part in a method of constructing an assembled protruding balcony according to an embodiment of the present invention.
FIG. 9 is a view showing a receiving unit in a state in which gang-foam is dismantled in a method of constructing an assembled protruding balcony according to an embodiment of the present invention. FIG.
10 is a view showing a state in which a receiving portion and a protruding portion are coupled by an engaging portion in a method of constructing an assembled protruding balcony according to an embodiment of the present invention.
FIG. 11 is a view showing a state of a receiving part and a protruding part that are combined in the method of constructing the assembled protruding balcony according to an embodiment of the present invention. FIG.
12 is a sectional view of an assembled overhang balcony according to an embodiment of the invention.
13 is a view showing a receiving portion having a wing portion according to an embodiment of the present invention.

본 발명에 따른 조립형 돌출발코니 및 이의 시공방법의 실시예를 첨부도면을 참조하여 상세히 설명하기로 하며, 첨부 도면을 참조하여 설명함에 있어, 동일하거나 대응하는 구성 요소는 동일한 도면 번호를 부여하고 이에 대한 중복되는 설명은 생략하기로 한다.
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS Embodiments of an assembled protruding balcony and a construction method thereof according to the present invention will be described in detail with reference to the accompanying drawings, wherein like reference numerals designate like or corresponding components, A duplicate description will be omitted.

또한, 이하 사용되는 제1, 제2 등과 같은 용어는 동일 또는 상응하는 구성 요소들을 구별하기 위한 식별 기호에 불과하며, 동일 또는 상응하는 구성 요소들이 제1, 제2 등의 용어에 의하여 한정되는 것은 아니다.
It is also to be understood that the terms first, second, etc. used hereinafter are merely reference numerals for distinguishing between identical or corresponding components, and the same or corresponding components are defined by terms such as first, second, no.

또한, 결합이라 함은, 각 구성 요소 간의 접촉 관계에 있어, 각 구성 요소 간에 물리적으로 직접 접촉되는 경우만을 뜻하는 것이 아니라, 다른 구성이 각 구성 요소 사이에 개재되어, 그 다른 구성에 구성 요소가 각각 접촉되어 있는 경우까지 포괄하는 개념으로 사용하도록 한다.
In addition, the term " coupled " is used not only in the case of direct physical contact between the respective constituent elements in the contact relation between the constituent elements, but also means that other constituent elements are interposed between the constituent elements, Use them as a concept to cover each contact.

본 발명의 일 실시예에 따른 조립형 돌출발코니는 도 1에 도시된 바와 같이 비정형적으로 돌출된 발코니를 시공하는 경우 시공의 난이도 및 시공의 편의성을 갖을 수 있다. The assembled protruding balcony according to an embodiment of the present invention may have difficulty in construction and convenience of construction when a balcony protruding at irregularly as shown in FIG.

건물 일부에 형성된 발코니의 시공을 위해 2 이상의 갱폼을 사용하는 것은 시공의 난이도를 높이고 공기를 장기화시키며, 공사비용을 상승시키는 문제점이 있다. The use of two or more gangbangs for the construction of balconies on part of the building increases the difficulty of the construction, prolongs the air, and increases the construction cost.

따라서, 본 발명에 따른 조립형 돌출발코니는 슬라브(1)에 돌출부(100)를 결합시키는 것만으로 돌출형발코니의 시공을 완료할 수 있어, 시공의 편의성 및 공사비용의 절감의 효과를 얻을 수 있다. Therefore, the assembled protruding balcony according to the present invention can complete the construction of the protruding balcony by merely bonding the protruding portion 100 to the slab 1, thereby achieving the convenience of construction and reducing the construction cost .

다만, 이러한 조립형 돌출발코니를 시공함에 있어 슬라브(1)에 돌출부(100)를 정위치에 결합시키기 위한 결합부(400)의 레벨확보 및 시공의 정확도 확보가 구조적 안정성 및 건물 미감 상승을 위한 중요 해결 문제라 할 수 있다. 따라서, 본 발명은 조립식 돌출발코니의 구성을 제시함에 있어, 상술된 문제점을 해결하는 것을 발명의 주요 해결 과제로 하였다.
However, securing the level of the joining part 400 for joining the projecting part 100 to the slab 1 in the correct position and securing the accuracy of the construction in the construction of such an assembled protruding balcony is important for the structural stability and building aesthetic increase It is a problem to solve. Accordingly, it is a main object of the present invention to solve the above-mentioned problems in the construction of the prefabricated protruding balcony.

본 발명의 일 실시예에 따른 조립형 돌출발코니는 기본적으로 건물의 슬래브(1)에서 돌출되어 형성되는 조립형 돌출발코니로써, 슬래브(1)에 형성된 받침부(100), 슬래브(1)와 결합되는 돌출부(200), 돌출부(200)에 형성되며 받침부(100)에 거치되는 거치부(300) 및 받침부(100)와 거치부(300)를 결합하는 결합부(400)를 포함한다(도 2).
The assembled protruding balcony according to an embodiment of the present invention is basically an assembled protruding balcony formed by protruding from a slab 1 of a building. The protruding balcony is composed of a support 100 formed on the slab 1, A mounting part 300 formed on the supporting part 100 and a coupling part 400 coupling the supporting part 100 and the mounting part 300 to the protrusion 200 and the protrusion 200 2).

받침부(100) 돌출부(200)에 형성된 거치부(300)와 결합되는 구성으로서, 슬래브(1)의 단부면에 형성된 받침 플레이트(110) 및 받침 플레이트(110)와 결합되며 슬래브(1) 내부에 매립된 제1 매립 보강부재(120)를 포함할 수 있다(도 3, 도 12). The support plate 110 is coupled to the support plate 110 formed on the end face of the slab 1 and is coupled to the support 300 formed on the protrusion 200 of the support unit 100, And a first embedding reinforcing member 120 embedded in the first embedding reinforcing member 120 (FIGS. 3 and 12).

받침 플레이트(110)는 후술되는 거치부(300)에 포함된 거치 플레이트(310)를 지지함으로써, 거치 플레이트(310)에 의해 전달되어지는 돌출부(100)의 하중을 슬래브(1)에 전달한다. The support plate 110 supports the mounting plate 310 included in the mounting portion 300 to be described later so that the load of the projection portion 100 to be transferred by the mounting plate 310 is transferred to the slab 1. [

구체적으로 거치 플레이트(310)에 전달된 돌출부(100)의 하중은 슬래브(1) 내부에 매립된 제1 매립 보강부재(120)를 통해 슬래브(1) 전체에 전달된다. The load of the protrusion 100 transmitted to the mounting plate 310 is transmitted to the entire slab 1 through the first embedding reinforcing member 120 embedded in the slab 1. [

효율적인 하중 전달을 통한 구조적 안정성의 확보를 위해 제1 매립 보강부재(120)는 슬래브(1) 내부에서 꺽인 형태로 형성되는 것이 바람직하다(도 2). It is preferable that the first embedding reinforcing member 120 is formed in a slit shape inside the slab 1 in order to ensure structural stability through efficient load transfer (FIG. 2).

제1 매립 보강부재(120)는 제1 복부(113)와 결합되는 것이 하중의 전달의 측면에서 바람직하다.
The first embedment reinforcing member 120 is preferably engaged with the first abdomen 113 in view of the transmission of the load.

받침 플레이트(110)는 상부 받침부(111), 하부 받침부(112) 및 상부 받침부(111)와 상기 하부 받침부(112)를 연결하는 제1 복부(113)의 실시예로 형성될 수 있다(도 2, 도 12).
The receiving plate 110 may be formed as an embodiment of the first abdomen 113 connecting the upper receiving unit 111, the lower receiving unit 112 and the upper receiving unit 111 and the lower receiving unit 112 (Figs. 2 and 12).

거치부(300)는 받침부(100)에 결합되는 구성으로써, 거치부(300)의 단부면에 형성됨과 아울러 받침부(100)의 형성지점과 대응되는 지점에 형성된 거치 플레이트(310) 및 거치 플레이트(310)와 결합되며 돌출부(200) 내부에 매립된 제2 매립 보강부재(320)를 포함할 수 있다(도 2, 도 4, 도 12). The mounting part 300 is coupled to the receiving part 100 and includes a mounting plate 310 formed at an end surface of the mounting part 300 and formed at a position corresponding to a forming point of the receiving part 100, And a second embedment reinforcing member 320 coupled to the plate 310 and embedded in the protrusion 200 (FIGS. 2, 4, and 12).

거치 플레이트(310)는 받침 플레이트(110)에 돌출부(200)의 하중을 전달한다. The mounting plate 310 transfers the load of the protrusion 200 to the receiving plate 110.

구체적으로 거치 플레이트(310)의 일부 및 돌출부(200) 내부에 매립된 제2 매립 보강부재(320)를 통해 전달된 돌출부(200)의 하중을 받침 플레이트(110)에 전달한다. The load of the protrusion 200 transmitted through the portion of the mounting plate 310 and the second embedding reinforcing member 320 embedded in the protrusion 200 is transmitted to the receiving plate 110.

효율적인 하중 전달을 통한 구조적 안정성의 확보를 위해 제2 매립 보강부재(320)는 돌출부(200) 내부에서 꺽인 형태로 형성되는 것이 바람직하다(도 2). The second embedment reinforcing member 320 is preferably formed in a bent shape inside the protrusion 200 in order to ensure structural stability through efficient load transfer (FIG. 2).

제2 매립 보강부재(320)는 제2 복부(313) 또는 상부 거치부(311)와 결합되는 것이 하중의 효율적인 전달의 측면에서 바람직하다.
The second embedment reinforcing member 320 is preferably combined with the second abdomen 313 or the upper embedding unit 311 in terms of effective load transfer.

거치 플레이트(310)는 상부 받침부(111)에 거치되는 상부 거치부(311), 하부 받침부(112)에 거치되는 하부 거치부(312) 및 상부 거치부(311)와 하부 거치부(312)를 연결하며 제1 복부(113)와 접촉되는 제2 복부(313)을 포함할 수 있다(도 2, 도 12). The mounting plate 310 includes an upper mounting portion 311 mounted on the upper mounting portion 111, a lower mounting portion 312 mounted on the lower mounting portion 112 and a lower mounting portion 311 and a lower mounting portion 312 And a second abdomen 313 contacting the first abdomen 113 (Figs. 2 and 12).

거치 플레이트(310)의 형상을 받침 플레이트(110)의 형상에 대응되도록 형성시키는 경우 시공시의 거치의 안정성 및 시공 완료 이후의 구조적 안정성을 높일 수 있는 효과를 갖는다.
When the shape of the mounting plate 310 is formed to correspond to the shape of the supporting plate 110, stability of mounting at the time of construction and structural stability after completion of the construction can be improved.

결합부(400)는 받침부(100)와 거치부(300)를 결합시키기 위한 구성으로써, 일부가 슬라브(1) 내부에 매립되며 상부 받침부(111)를 관통하여 돌출된 돌출나사(410) 및 돌출나사(410)와 결합되는 제1 너트(420)를 포함할 수 있다(도 2, 도 12). The engaging portion 400 is configured to engage the receiving portion 100 and the mounting portion 300 and includes a projecting screw 410 which is partially embedded in the slab 1 and protrudes through the upper receiving portion 111, And a first nut 420 coupled with the projecting screw 410 (Figs. 2 and 12).

돌출나사(410)는 상부 거치부(311)에 형성된 제1 나사공(314)을 통과하여 제1 너트(420)와 결합되며, 시공의 용이성을 위해 제1 나사공(314)의 직경은 돌출나사(410)의 직경보다 10mm 이상의 유격을 두는 것이 바람직하다(도 5).  The protrusion screw 410 is coupled to the first nut 420 through the first screw hole 314 formed in the upper mounting portion 311 and the diameter of the first screw hole 314 is protruded It is preferable to set a clearance of 10 mm or more larger than the diameter of the screw 410 (Fig. 5).

이 경우 제1 너트(420)에 의한 결합력을 안정적으로 제공하기 위해 제1 너트(420)와 상부 거치부(311) 상면 사이에 마감 플레이트(430)를 형성시키는 것이 바람직하다(도 5).
In this case, it is preferable to form a finishing plate 430 between the first nut 420 and the upper surface of the upper mounting part 311 to stably provide the first nut 420 with a coupling force (FIG. 5).

이하 본 발명의 일 실시예에 따른 조립형 돌출발코니의 시공방법에 대하여 설명한다. Hereinafter, a method of constructing an assembled protruding balcony according to an embodiment of the present invention will be described.

본 발명의 일 실시예에 따른 조립형 돌출발코니를 시공하는 방법은 받침부(100)를 형성하는 제1 단계(S100) 및 결합부(400)를 이용하여 받침부(100)와 거치부(300)를 결합함으로써 슬래브(1)와 돌출부(300)를 결합하는 제2 단계(S200)를 포함한다(도 7 내지 도 11). The method of constructing the assembled protruding balcony according to an embodiment of the present invention includes the first step S100 of forming the receiving unit 100 and the mounting of the receiving unit 100 and the mounting unit 300 And a second step S200 of joining the slab 1 and the protrusion 300 by joining the slab 1 and the protrusion 300 (Figs. 7 to 11).

돌출부(300)는 프리캐스트 방식으로 선 제작되어 시공 현장에서 슬래브(1)와 결합되는 것이 시공의 편의성 및 공사기간의 단축면에서 바람직하다.
It is preferable that the protrusions 300 are pre-casted and bonded to the slab 1 at the construction site in view of convenience of construction and shortening of the construction period.

제1 단계(S100)는 갱폼(2)에 형성된 레벨조정부(500)에 받침부(100)를 결합하는 단계(S110) 및 갱폼(2)에 콘크리트를 타설하여 슬래브(1)를 형성하는 단계(S120)를 포함할 수 있다(도 7). The first step S100 includes a step S110 of joining the receiving unit 100 to the level adjusting unit 500 formed on the gantry 2 and a step of placing the concrete on the gantry 2 to form the slab 1 S120) (Fig. 7).

레벨조정부(500)는 받침부(100)를 슬래브(1)의 정위치에 형성시키기 위한 부재로써, "L"형 채널(510) 및 "L"형 채널(510)에 형성된 제2 나사공(511)을 통과한 돌출나사(410)와 결합되는 제2 너트(520)를 포함할 수 있다(도 7). The level adjusting unit 500 is a member for forming the receiving unit 100 at a predetermined position of the slab 1 and includes a second screw hole 510 formed in the "L" And a second nut 520 coupled with the protruding screw 410 passing through the first nut 511 (FIG. 7).

"L"형 채널(510)의 일면은 갱폼(2)에 결합되며, 타면은 받침부(100)와 결합되어 슬래브(1) 형성을 위한 콘크리트의 양생이 완료될 때까지 받침부(100)가 정위치에 위치될 수 있도록 한다. One side of the " L "-shaped channel 510 is joined to the ganged foam 2, and the other side is joined to the receiving part 100 to receive the receiving part 100 until the curing of the concrete for forming the slab 1 is completed. So that it can be positioned in the correct position.

이 경우 슬래브(1) 형성을 위해 갱폼에 타설된 콘크리트가 제2 복부가 위치되는 제1 복부(113)의 전방면으로 유입되는 것을 방지하기 위해, 복부(113)와 갱폼(2) 사이의 공간을 폐쇄하는 날개부(114)가 형성될 수 있다(도 13). In this case, in order to prevent the concrete laid on the gang form for the formation of the slab 1 from flowing into the front surface of the first abdomen 113 where the second abdomen is located, the space between the abdomen 113 and the gang form 2 A wing portion 114 may be formed (Fig. 13).

본 발명의 일 실시예에 따른 조립형 돌출발코니의 시공방법에 따르면 기존의 갱폼을 이용하여 받침부(100)가 형성된 슬래브(1)를 형성시키고, 받침부(100)에 돌출부(200)를 결합시키는 것만으로 돌출형발코니의 시공을 완료할 수 있으므로 시공의 편의성이 매우 높다.
According to the method of constructing the assembled protruding balcony according to the embodiment of the present invention, the slab 1 having the receiving part 100 is formed using the conventional gauze, and the protruding part 200 is coupled to the receiving part 100 So that the construction of the protruding balcony can be completed, so that the convenience of construction is very high.

이상은 본 발명에 의해 구현될 수 있는 바람직한 실시예의 일부에 관하여 설명한 것에 불과하므로, 주지된 바와 같이 본 발명의 범위는 위의 실시예에 한정되어 해석되어서는 안 될 것이며, 위에서 설명된 본 발명의 기술적 사상과 그 근본을 함께 하는 기술적 사상은 모두 본 발명의 범위에 포함된다고 할 것이다.
It will be apparent to those skilled in the art that various modifications and variations can be made in the present invention without departing from the spirit or scope of the invention as defined in the appended claims. It is to be understood that both the technical idea and the technical spirit of the invention are included in the scope of the present invention.

1 : 슬래브
2 : 갱폼
100 : 받침부
200 : 돌출부
300 : 거치부
400 : 결합부
500 : 레벨조정부
1: Slab
2: Modification
100:
200: protrusion
300:
400:
500: Level adjuster

Claims (12)

건물의 슬래브(1)에서 돌출되어 형성되는 조립형 돌출발코니에 있어서,
상기 슬래브(1)에 형성된 받침부(100);
상기 슬래브(1)와 결합되는 돌출부(200);
상기 돌출부(200)에 형성되며, 상기 받침부(100)에 거치되는 거치부(300); 및
상기 받침부(100)와 상기 거치부(300)를 결합하는 결합부(400);를 포함하며,
상기 받침부(100)는,
상기 슬래브(1)의 단부면에 형성된 받침 플레이트(110); 및
상기 받침 플레이트(110)와 결합되며 상기 슬래브(1) 내부에 매립된 제1 매립 보강부재(120);를 포함하며,
상기 받침 플레이트(110)는,
상부 받침부(111);
하부 받침부(112); 및
상기 상부 받침부(111)와 상기 하부 받침부(112)를 연결하는 제1 복부(113);를 포함하되,
상기 받침 플레이트(110)는 상기 슬래브(1)의 단부면에 형성된 함몰부(3)에 안착되며,
상기 제1 매립 보강부재(120)는
상기 슬래브(1) 내부에서 꺽인 형태로 형성된 것을 특징으로 하는 조립형 돌출발코니.
In an assembled protruding balcony protruding from a slab (1) of a building,
A support part (100) formed on the slab (1);
A protrusion (200) coupled with the slab (1);
A mounting part 300 formed on the protrusion part 200 and fixed to the receiving part 100; And
And an engaging part (400) for engaging the receiving part (100) and the mounting part (300)
The receiving unit 100 includes:
A support plate (110) formed on an end face of the slab (1); And
And a first embedding reinforcing member (120) coupled to the supporting plate (110) and embedded in the slab (1)
The backing plate 110 is a plate-
A top receiving portion 111;
A lower receiving portion 112; And
And a first abdomen (113) connecting the upper receiving portion (111) and the lower receiving portion (112)
The support plate 110 is seated on a depression 3 formed on an end surface of the slab 1,
The first embedding reinforcing member 120
Is formed in a bent shape inside the slab (1).
삭제delete 삭제delete 제1항에 있어서,
상기 거치부(300)는,
상기 거치부(300)의 단부면에 형성됨과 아울러, 상기 받침부(100)의 형성지점과 대응되는 지점에 형성된 거치 플레이트(310); 및
상기 거치 플레이트(310)와 결합되며 상기 돌출부(200) 내부에 매립된 제2 매립 보강부재(320);를 포함하며,
상기 거치 플레이트(310)는,
상기 상부 받침부(111)에 거치되는 상부 거치부(311);
상기 하부 받침부(112)에 거치되는 하부 거치부(312); 및
상기 상부 거치부(311)와 상기 하부 거치부(312)를 연결하며, 상기 제1 복부(113)와 접촉되는 제2 복부(313);을
포함하는 것을 특징으로 하는 조립형 돌출발코니.
The method according to claim 1,
The mounting part (300)
A mounting plate 310 formed at an end face of the mounting part 300 and formed at a position corresponding to a forming point of the supporting part 100; And
And a second embedding reinforcing member (320) coupled to the mounting plate (310) and embedded in the protrusion (200)
The mounting plate (310)
An upper mounting part (311) mounted on the upper supporting part (111);
A lower mounting part (312) for receiving the lower supporting part (112); And
A second abdomen 313 connecting the upper and lower embroidery units 311 and 312 and contacting the first abdomen 113;
Wherein the projecting balcony comprises a plurality of projecting balconies.
제4항에 있어서,
상기 제2 매립 보강부재(320)는
상기 돌출부(100) 내부에서 꺽인 형태로 형성된 것을 특징으로 하는 조립형 돌출발코니.
5. The method of claim 4,
The second embedment reinforcing member 320
Is formed in a bent shape inside the protrusion (100).
제4항에 있어서,
상기 결합부(400)는,
일부가 상기 슬라브(1) 내부에 매립되며, 상기 상부 받침부(111)를 관통하여 돌출된 돌출나사(410); 및
상기 돌출나사(410)와 결합되는 제1 너트(420);를 포함하며,
상기 돌출나사(410)는 상기 상부 거치부(311)에 형성된 제1 나사공(314)을 통과하여 상기 제1 너트(420)와 결합되는 것을 특징으로 하는 조립형 돌출발코니.
5. The method of claim 4,
The engaging portion 400 includes:
A protruding screw 410 partially embedded in the slab 1 and protruding through the upper receiving portion 111; And
And a first nut 420 coupled with the projecting screw 410,
Wherein the projecting screw (410) passes through a first screw hole (314) formed in the upper mounting part (311) and is engaged with the first nut (420).
제6항에 있어서,
상기 제1 매립 보강부재(120)는 상기 제1 복부(113)와 결합된 것을 특징으로 하는 조립형 돌출발코니.
The method according to claim 6,
Wherein the first embedding reinforcing member (120) is coupled to the first abdomen (113).
제7항에 있어서,
상기 제2 매립 보강부재(320)는 상기 제2 복부(313) 또는 상기 상부 거치부(311)와 결합된 것을 특징으로 하는 조립형 돌출발코니.
8. The method of claim 7,
Wherein the second embedment reinforcing member (320) is engaged with the second abdomen (313) or the upper mounting portion (311).
제6항의 조립형 돌출발코니를 시공하는 방법에 있어서,
상기 받침부(100)를 형성하는 제1 단계(S100); 및
상기 결합부(400)를 이용하여 상기 받침부(100)와 상기 거치부(300)를 결합함으로써 상기 슬래브(1)와 상기 돌출부(300)를 결합하는 제2 단계(S200);를 포함하며,
상기 제1 단계(S100)는,
갱폼(2)에 형성된 레벨조정부(500)에 상기 받침부(100)를 결합하는 단계(S110); 및
상기 갱폼(2)에 콘크리트를 타설하여 상기 슬래브(1)를 형성하는 단계(S120);를 포함하되,
상기 레벨조정부(500)는,
"L"형 채널(510); 및
상기 "L"형 채널(510)에 형성된 제2 나사공(511)을 통과한 상기 돌출나사(410)와 결합되는 제2 너트(520);를
포함하는 것을 특징으로 하는 조립형 돌출발코니를 시공하는 방법.
A method of constructing an assembled overhang balcony of claim 6,
A first step S100 of forming the receiving unit 100; And
And a second step S200 of coupling the slab 1 and the protrusion 300 by coupling the receiving unit 100 and the mounting unit 300 using the coupling unit 400,
In the first step S100,
(S110) of joining the pedestal part (100) to the level adjusting part (500) formed on the gang form (2); And
(S120) of forming the slab (1) by pouring concrete into the gnomere (2)
The level adjusting unit 500,
An "L" shaped channel 510; And
And a second nut 520 coupled with the projecting screw 410 through a second screw hole 511 formed in the "L"
Wherein the method comprises the steps of:
제9항에 있어서,
상기 제1 복부(113)에는 상기 갱폼(2)에 타설된 콘크리트가 상기 제2 복부가 위치되는 상기 제1 복부(113)의 전방면으로 유입되는 것을 방지하기 위한 날개부(114)가 형성된 것을 특징으로 하는 조립형 돌출발코니를 시공하는 방법.
10. The method of claim 9,
The first abdomen 113 is formed with a wing 114 for preventing the concrete laid on the gang 2 from flowing into the front surface of the first abdomen 113 where the second abdomen is located A method of constructing an assembled overhanging balcony.
삭제delete 삭제delete
KR1020140131359A 2014-09-30 2014-09-30 Prominent balcony and construction method for promenent balcony KR101595396B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020140131359A KR101595396B1 (en) 2014-09-30 2014-09-30 Prominent balcony and construction method for promenent balcony

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020140131359A KR101595396B1 (en) 2014-09-30 2014-09-30 Prominent balcony and construction method for promenent balcony

Publications (1)

Publication Number Publication Date
KR101595396B1 true KR101595396B1 (en) 2016-02-19

Family

ID=55448852

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020140131359A KR101595396B1 (en) 2014-09-30 2014-09-30 Prominent balcony and construction method for promenent balcony

Country Status (1)

Country Link
KR (1) KR101595396B1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR102046876B1 (en) * 2018-11-15 2019-11-20 (주)이수이앤씨 A PC Open Balcony
KR102628910B1 (en) * 2023-07-25 2024-01-24 오종한 Mounting brackets for precast concrete structure and a mounting method precast concrete structure using the mounting brackets

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0762726A (en) * 1993-08-31 1995-03-07 Sekisui Chem Co Ltd Connecting construction of balcony
JPH07300898A (en) * 1994-05-10 1995-11-14 Sekisui Chem Co Ltd Mounting structure of external work member
JPH0978684A (en) * 1995-09-12 1997-03-25 Fujita Corp Pc balcony member and construction method of balcony
KR101353491B1 (en) * 2013-07-03 2014-01-22 삼표건설 주식회사 Method for constructing the balcony using a precast concrete balcony and the precast concrete balcony for a building

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0762726A (en) * 1993-08-31 1995-03-07 Sekisui Chem Co Ltd Connecting construction of balcony
JPH07300898A (en) * 1994-05-10 1995-11-14 Sekisui Chem Co Ltd Mounting structure of external work member
JPH0978684A (en) * 1995-09-12 1997-03-25 Fujita Corp Pc balcony member and construction method of balcony
KR101353491B1 (en) * 2013-07-03 2014-01-22 삼표건설 주식회사 Method for constructing the balcony using a precast concrete balcony and the precast concrete balcony for a building

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR102046876B1 (en) * 2018-11-15 2019-11-20 (주)이수이앤씨 A PC Open Balcony
KR102628910B1 (en) * 2023-07-25 2024-01-24 오종한 Mounting brackets for precast concrete structure and a mounting method precast concrete structure using the mounting brackets

Similar Documents

Publication Publication Date Title
US8789339B2 (en) Method for making façades of buildings
US20150284948A1 (en) Wall base structure for light buildings
KR101595396B1 (en) Prominent balcony and construction method for promenent balcony
RU2598664C1 (en) Method of mounting support masonry formwork profile
RU2008152058A (en) VERTICAL BUILDING SEAMS
KR20110124476A (en) Assembly trench and trench structure using the same
KR102484159B1 (en) Rapid Construction Structure of Core Part Using Multi-Story Precast Wall
KR101456159B1 (en) Foothold for Slab Construction of Structure
KR101826094B1 (en) Construction method for transfer mat and transfer mat using the same
RU97405U1 (en) Prefabricated Monolithic Reinforced Concrete Building Frame
JP2008223399A (en) Foundation structural body for facility
CN110593418A (en) Assembled shear wall and mounting method thereof
KR20130030508A (en) Lower runer fixing device of variable type wall panel, variable type wall system and constructing method using the same
KR100988270B1 (en) Level spacer device
KR20200033396A (en) A fixing apparatus of insulation material and constructing method thereof
KR100583072B1 (en) Method for pre-constructing staircase in building and pc member therefor
KR20180117498A (en) Truss deck which is available for slab maintenance repair and manufacture method
KR20180043033A (en) Truss deck which is available for slab maintenance repair
RU162330U1 (en) INTERIOR PLATE AND WALL PANEL CONNECTION ASSEMBLY
KR100964206B1 (en) Watertight projection
RU136459U1 (en) REINFORCED CONCRETE BUILDING FRAME
CN105421671A (en) Antique zhengwen and installation method thereof
KR100390059B1 (en) Level for a plaster
KR102149289B1 (en) Waterproof hummock with improved construction convenience
KR20060025425A (en) A heating panel

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
N231 Notification of change of applicant
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20200128

Year of fee payment: 5