KR101571470B1 - Shower - Google Patents

Shower Download PDF

Info

Publication number
KR101571470B1
KR101571470B1 KR1020130087003A KR20130087003A KR101571470B1 KR 101571470 B1 KR101571470 B1 KR 101571470B1 KR 1020130087003 A KR1020130087003 A KR 1020130087003A KR 20130087003 A KR20130087003 A KR 20130087003A KR 101571470 B1 KR101571470 B1 KR 101571470B1
Authority
KR
South Korea
Prior art keywords
hole
water
supply port
guide
port
Prior art date
Application number
KR1020130087003A
Other languages
Korean (ko)
Other versions
KR20150011716A (en
Inventor
김기철
Original Assignee
김기철
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 김기철 filed Critical 김기철
Priority to KR1020130087003A priority Critical patent/KR101571470B1/en
Publication of KR20150011716A publication Critical patent/KR20150011716A/en
Application granted granted Critical
Publication of KR101571470B1 publication Critical patent/KR101571470B1/en

Links

Images

Classifications

    • AHUMAN NECESSITIES
    • A47FURNITURE; DOMESTIC ARTICLES OR APPLIANCES; COFFEE MILLS; SPICE MILLS; SUCTION CLEANERS IN GENERAL
    • A47KSANITARY EQUIPMENT NOT OTHERWISE PROVIDED FOR; TOILET ACCESSORIES
    • A47K3/00Baths; Douches; Appurtenances therefor
    • A47K3/28Showers or bathing douches
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B05SPRAYING OR ATOMISING IN GENERAL; APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
    • B05BSPRAYING APPARATUS; ATOMISING APPARATUS; NOZZLES
    • B05B1/00Nozzles, spray heads or other outlets, with or without auxiliary devices such as valves, heating means
    • B05B1/02Nozzles, spray heads or other outlets, with or without auxiliary devices such as valves, heating means designed to produce a jet, spray, or other discharge of particular shape or nature, e.g. in single drops, or having an outlet of particular shape
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B05SPRAYING OR ATOMISING IN GENERAL; APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
    • B05BSPRAYING APPARATUS; ATOMISING APPARATUS; NOZZLES
    • B05B1/00Nozzles, spray heads or other outlets, with or without auxiliary devices such as valves, heating means
    • B05B1/14Nozzles, spray heads or other outlets, with or without auxiliary devices such as valves, heating means with multiple outlet openings; with strainers in or outside the outlet opening
    • B05B1/18Roses; Shower heads
    • B05B1/185Roses; Shower heads characterised by their outlet element; Mounting arrangements therefor
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B05SPRAYING OR ATOMISING IN GENERAL; APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
    • B05BSPRAYING APPARATUS; ATOMISING APPARATUS; NOZZLES
    • B05B1/00Nozzles, spray heads or other outlets, with or without auxiliary devices such as valves, heating means
    • B05B1/30Nozzles, spray heads or other outlets, with or without auxiliary devices such as valves, heating means designed to control volume of flow, e.g. with adjustable passages
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03CDOMESTIC PLUMBING INSTALLATIONS FOR FRESH WATER OR WASTE WATER; SINKS
    • E03C1/00Domestic plumbing installations for fresh water or waste water; Sinks
    • E03C1/02Plumbing installations for fresh water
    • E03C2001/026Plumbing installations for fresh water with flow restricting devices

Landscapes

  • Health & Medical Sciences (AREA)
  • Public Health (AREA)
  • Epidemiology (AREA)
  • General Health & Medical Sciences (AREA)
  • Nozzles (AREA)

Abstract

본 발명은 샤워기에 관한 것으로, 보다 상세하게는 물의 급수를 축상에 서로 엇갈리도록 형성된 관통공을 통하여 분사하되, 고압분사, 중압분사, 고압분사가 조절되도록 함으로써, 물의 공급을 선택적으로 공급함과 동시에 물의 토출 효율과 절수 효과 및 세척력을 향상시킨 샤워기에 관한 것이다.
상기한 목적을 달성하기 위한 본 발명은 물을 공급하는 유로가 형성된 몸체부와, 상기 몸체부로부터 공급되는 물을 제어하는 제어부와, 상기 몸체부에 설치되어 제어부에 의해 제어된 물을 배출시키는 배출부로 이루어진 것을 특징으로 한다.
The present invention relates to a shower, and more particularly, to a shower, and more particularly, to an apparatus and a method for spraying water by spraying a water supply water through a through hole formed on a shaft in a staggered manner, To a shower having improved discharge efficiency, water saving effect and cleaning ability.
According to an aspect of the present invention, there is provided a water purifier including a body portion having a flow path for supplying water, a control portion for controlling water supplied from the body portion, a discharge portion for discharging water controlled by the control portion, .

Description

샤워기{Shower}Shower

본 발명은 샤워기에 관한 것으로, 보다 상세하게는 물의 급수를 축상에 서로 엇갈리도록 형성된 관통공을 통하여 분사하되, 고압분사, 중압분사, 고압분사가 조절되도록 함으로써, 물의 공급을 선택적으로 공급함과 동시에 물의 토출 효율과 절수 효과 및 세척력을 향상시킨 샤워기에 관한 것이다.
The present invention relates to a shower, and more particularly, to a shower, and more particularly, to an apparatus and a method for spraying water by spraying a water supply water through a through hole formed on a shaft in a staggered manner, To a shower having improved discharge efficiency, water saving effect and cleaning ability.

일반적으로 샤워기는 가정의 욕실이나, 공중이용시설(대중목용탕) 등에 냉. 온수밸브가 설치된 수도전에 연결되어 수도전으로부터 공급되는 물을 분사시키는 것으로, 분사되는 물을 이용하여 사용자가 머리를 감거나, 샤워 등을 하는데 사용되고 있다.Generally, shower is cold in home's bathroom, public use facility (mass wooden bath). And is connected to the water supply port where the hot water valve is installed so as to spray water supplied from water conduction, and is used by the user to wind the hair or shower with the water to be sprayed.

이에, 수도전으로부터 물을 공급받아 샤워기를 통하여 배출되는 물을 직수 또는 분사방식으로 배출되도록 함으로써, 물을 사용하는 용도에 따라 사용자가 선택적으로 조절하여 사용할 수 있게 되어 보다 효율적으로 사용할 수 있게 되었다.Accordingly, the water discharged from the shower head through the shower is discharged in a direct or sprayed manner, so that the user can selectively use the water according to the use of the water.

즉, 샤워헤드의 내부에는 물을 직수 또는 분수 형태로 선택하여 토출시키기 위한 유로변환수단이 내장되어 있다.That is, the shower head has a built-in channel conversion means for selecting and discharging water in the form of direct water or a fraction.

일예로, 도 1은 대한민국 공개특허 제10-2010-95802호 "샤워기"에 도시된 것으로, 유로변환수단(40)은 전환스위치(41)와, 전환스위치(41)와 함께 중간몸체(30)에 피벗가능하게 설치된 밸브(42)와, 중심토출공(12a)과 소통하는 제1토출공간(44a) 및 주변토출공(12b)과 소통하는 제2토출공간(44b)을 가진 유로가이드(44)로 구성되어 있다.For example, FIG. 1 is shown in Korean Patent Laid-Open No. 10-2010-95802 "Shower". The flow path conversion means 40 includes a changeover switch 41 and an intermediate switch 30, A valve 42 provided to be pivotally mounted on the main discharge port 44a and a flow guide 44 having a first discharge space 44a communicating with the central discharge hole 12a and a second discharge space 44b communicating with the peripheral discharge hole 12b, ).

특히, 밸브(42)는 그 일단에 피벗부(42a)를 가지고, 그 타단에는 밸브부(42b)가 형성되고, 피벗부(42a)는 중간몸체(30)의 피벗설치리브(34)의 피벗공(34a)에 끼워지고, 이에 전환스위치(41)를 조작함에 따라 밸브(42)는 그 피벗부(42a)를 중심으로 피벗되며, 밸브부(42b)의 내부에는 구형상의 밸브체(42c) 및 이 밸브체(42c)를 탄성지지하는 탄성부재(42d)가 구비되어 있다.Particularly, the valve 42 has a pivot portion 42a at one end thereof, a valve portion 42b at the other end thereof, and a pivot portion 42a, The valve 42 is pivoted about the pivot portion 42a as the changeover switch 41 is operated and the spherical valve body 42c is inserted in the valve portion 42b, And an elastic member 42d for elastically supporting the valve body 42c.

따라서, 유로변환수단(40)은 직수 또는 분수 형태 중에서 어느 하나로 선택하여 물을 토출시키기 위하여 전환스위치(41)를 조작하면 이 전환스위치(41)의 조작에 연동하여 밸브(42)는 그 피벗부(42a)를 중심으로 피벗하고, 이에 밸브(42)의 밸브체(42c)가 유로부재(43)의 제1 및 제2유통공(43a)(43b) 중에서 어느 하나를 폐쇄할 경우 개방된 나머지 유통공(43a)(43b)을 통해 물이 유입되게 된다.Therefore, when the change-over switch 41 is operated in order to select water in a direct or fractional manner and to discharge water, the flow path changing means 40, in conjunction with the operation of the change-over switch 41, When the valve body 42c of the valve 42 pivots about the first flow passage 42a and closes any one of the first and second flow passages 43a and 43b of the flow passage member 43, So that water is introduced through the flow holes 43a and 43b.

이렇게, 유입된 물은 개방된 유통공(43a)(43b)을 통과하여 유로가이드(44)의 제1 및 제2토출공간(44a)(44b) 중에서 어느 일측으로 유입된 후에 샤워플레이트(12)의 중심토출공(12a) 및 주변토출공(12b) 중 어느 일측을 통해 토출되게 된다.The inflowing water passes through the open flow holes 43a and 43b and flows into the shower plate 12 after flowing into one of the first and second discharge spaces 44a and 44b of the flow guide 44. [ Is discharged through either the center discharge hole 12a or the peripheral discharge hole 12b.

그러나, 전환스위치(40)의 조작에 의해 밸브체(42c)가 중심토출공(12a) 및 주변토출공(12b)과 연통되게 유도가이드(44)에 누수를 방지하기 위하여 설치되는 유로부재(43)에 형성된 제1,2소통공(43a)(43b)을 이동하는 동작을 반복적으로 수행하는 과정에서 유로부재(43)에 마모가 발생하게 되어 물의 배출 조절이 이루어지지 않게 되는 문제점이 있었다.The flow path member 43 is provided to prevent the leakage of the induction guide 44 so that the valve element 42c communicates with the central discharge hole 12a and the peripheral discharge hole 12b by the operation of the change- In the process of repeatedly performing the operation of moving the first and second communication holes 43a and 43b formed in the first and second communication holes 43a and 43b.

또한, 구형상의 밸브체(42c)의 반복 동작에 의해 유로부재(43)의 마모로 인해 밸브체(42c)가 이탈되는 현상이 발생하게 되어 밸브체(42c)의 이탈 또는 유로부재(43)의 마모로 인해 사용자가 원하지 않는 중심토출공(12a) 및 주변토출공(12c)으로 동시에 물이 공급되어 직수 및 분사방식으로 동시에 물이 배출되게 되어 물의 낭비가 발생하는 문제점이 있었다.
The repetitive operation of the valve body 42c in the spherical shape causes a phenomenon in which the valve body 42c is disengaged due to wear of the flow passage member 43, Water is simultaneously supplied to the central discharging hole 12a and the peripheral discharging hole 12c which are not desired by the user due to abrasion, so that water is simultaneously discharged through the direct water spraying method and the waste water is wasted.

본 발명은 상기한 종래의 문제점을 해결하기 위하여 안출된 것으로, 물을 중앙분사와 일반분사 및 고압분사 형태로 선택하여 토출시키는 방식으로, 다수개가 서로 엇갈리게 관통공이 형성된 조절축을 이용하여 급수를 조절함으로써, 사용자가 원하지 않는 방향으로는 물이 배출되지 않게 되어 물의 낭비를 방지할 수 있도록 하는데 그 목적이 있다.Disclosure of Invention Technical Problem [8] Accordingly, the present invention has been made to solve the above-mentioned problems occurring in the prior art, and it is an object of the present invention to provide an apparatus and a method for controlling water supply using a control shaft having a plurality of through- And water is not discharged in a direction that the user does not desire, so that waste of water can be prevented.

그리고, 고압분사구로 분사되는 물의 분사력은 원수압보다 강한 압력으로 분사됨으로써, 분사력이 향상되고 이물질 등을 용이하게 제거할 수 있도록 하는데 그 목적이 있다.The jetting force of the water jetted to the high-pressure jet opening is sprayed at a pressure higher than the raw water pressure, thereby improving the jetting force and facilitating removal of foreign matter and the like.

또한, 조절축에 서로 엇갈리도록 관통공이 형성되고, 이 관통공의 사이 및 양측 끝단부에 위치되게 조절축에 오링을 구비함으로써, 이웃하는 공급구로 물의 침입을 방지하여 원하지 않는 방향으로 물이 배출되는 것을 방지할 수 있도록 하는데 그 목적이 있다.In addition, through-holes are formed so as to be offset from each other in the adjustment shaft, and o-rings are provided in the adjustment shaft at the positions between the through holes and the opposite end portions, thereby preventing water from being introduced into the neighboring supply ports and discharging water in an undesired direction And to prevent such a problem.

그리고, 샤워기의 구조가 복잡하지 않고 최소의 부품으로 구성함으로써, 샤워기의 고장 발생이 적고, 유지보수 작업 또는 용이하게 수행할 수 있도록 하는데 그 목적이 있다.
In addition, since the structure of the shower is not complicated and it is constituted by a minimum number of parts, the occurrence of a failure of the shower is small, and maintenance or work can be easily performed.

상기한 목적을 달성하기 위한 본 발명은 물을 공급하는 유로가 형성된 몸체부와, 상기 몸체부로부터 공급되는 물을 제어하는 제어부와, 상기 몸체부에 설치되어 제어부에 의해 제어된 물을 배출시키는 배출부로 이루어진 것을 특징으로 한다.According to an aspect of the present invention, there is provided a water purifier including a body portion having a flow path for supplying water, a control portion for controlling water supplied from the body portion, a discharge portion for discharging water controlled by the control portion, .

여기서, 상기 몸체부는 유로가 내측에 형성된 손잡이와, 상기 유로와 연통되게 설치공간이 형성되되, 하부가 개방되고, 개방된 하부 외측부에 나사산이 형성되며, 양측부에는 서로 대응되는 고정공이 형성된 헤드부재로 이루어진 것을 특징으로 한다.Here, the body portion includes a handle having a passage formed on the inner side thereof, a mounting space formed to communicate with the flow passage, a lower portion thereof being opened, a thread portion being formed on a lower outer portion thereof, .

그리고, 상기 제어부는 몸체부의 헤드부재 설치공간에 설치되는 설치부재와, 상기 설치부재에 설치되되, 헤드부재의 고정공 외측으로 돌출되게 설치되는 조절축으로 이루어진 것을 특징으로 한다.The control unit includes an installation member installed in a head member installation space of the body, and an adjustment shaft provided on the installation member and protruding outside the fixing hole of the head member.

여기서, 상기 설치부재는 길이 방향으로 조절축이 결합되는 설치공이 형성되고, 중앙부에는 내측에 통공이 형성된 일반공급구가 형성되며, 일측부에는 통공이 형성된 중앙공급구가 형성되고, 타측부에는 통공이 형성된 고압공급구가 형성된 것을 특징으로 한다.Here, the installation member is provided with an installation hole to which the adjustment shaft is coupled in the longitudinal direction, a central supply port having a through hole formed therein at its center, a central supply port formed with a through hole at one side thereof, And a high-pressure supply port formed thereon.

나아가, 상기 조절축은 일측 끝단부에 레버가 구비되고, 중앙부에는 설치부재의 일반공급구와 중앙공급구 및 고압공급구에 대응되는 제1,2,3관통공이 형성되되, 제1,2,3관통공은 서로 엇갈리게 형성된 것을 특징으로 한다.Further, the control shaft is provided with a lever at one end thereof, first, second and third through holes corresponding to the general supply port, the central supply port and the high-pressure supply port of the mounting member are formed at the center, The balls are characterized by being staggered from each other.

또한, 상기 배출부는 상부가 개방되어 몸체부의 헤드부재에 형성된 나사산에 결합되는 나사공이 형성되고, 하단부 중앙에는 일반분사구가 형성되며, 일반분사구의 외측에는 고압분사구가 형성되고, 이 고압분사구의 외측부에는 중압분사구가 형성된 것을 특징으로 한다.The discharge port is formed with a threaded hole which is opened at an upper portion to be coupled to a thread formed in the head member of the body portion, a general jet port is formed at the center of the lower end, a high pressure jet port is formed outside the general jet port, And an intermediate pressure jetting port is formed.

여기서, 상기 고압분사구의 외측에는 링 형상의 돌출구가 형성되고, 이 돌출구의 상부를 커버하되, 다수개의 통공이 형성된 커버부재가 구비된 것을 특징으로 한다.Here, a ring-shaped protrusion is formed on the outer side of the high-pressure nozzle, and a cover member covering the upper portion of the protrusion is provided.

나아가, 상기 배출부의 일반분사구 외주면에 나사 결합되는 가이드부재가 더 구비된 것을 특징으로 한다.Further, a guide member is further provided, which is screwed to the outer circumferential surface of the general injection hole of the discharge portion.

그리고, 상기 제어부와 배출부의 사이에는 안내부가 더 구비된 것을 특징으로 한다.Further, a guide part is further provided between the control part and the discharge part.

여기서, 상기 안내부는 중앙부에 제어부의 설치부재에 형성된 일반공급구에 결속되는 결속구가 형성되고, 이 결속구의 외측부에는 안내실이 형성되며, 이 안내실의 일측부로 연통되게 돌출되어 설치부재의 고압공급구가 안착되는 안착구가 형성된 안내부재가 구비된 것을 특징으로 한다.The guide portion is formed at its center with a coupling hole that is engaged with a general supply hole formed in a mounting member of the control portion. A guide chamber is formed on the outer side of the coupling hole. The guide portion is protruded so as to communicate with one side portion of the guide hole, And a guide member having a seat for receiving the guide member.

나아가, 상기 안내부재의 안내실 바닥면에는 배출부의 고압분사구에 결합되되, 내측에 분사공이 형성된 다수개의 돌기가 형성된 것을 특징으로 한다.Furthermore, a plurality of protrusions are formed on the bottom surface of the guide chamber of the guide member, the plurality of protrusions being coupled to the high-pressure injection hole of the discharge unit, and having a spray hole formed therein.

아울러, 상기 돌기에 형성된 분사공의 끝단부는 "V"자 형상으로 형성된 것을 특징으로 한다.
In addition, the end of the injection hole formed in the projection is formed in a "V" shape.

이와 같이 구성된 본 발명은 물을 중앙분사와 일반분사 및 고압분사 형태로 선택하여 토출시키는 방식으로, 다수개가 서로 엇갈리게 관통공이 형성된 조절축을 이용하여 급수를 조절함으로써, 사용자가 원하지 않는 방향으로는 물이 배출되지 않게 되어 물의 낭비를 방지할 수 있도록 하는 효과가 있다.According to the present invention configured as described above, the water is selectively discharged in the form of a central spray, a general spray, and a high-pressure spray, and a water supply is controlled by using an adjustment shaft having a plurality of through holes formed by alternately crossing each other. It is possible to prevent the waste of water from being discharged.

그리고, 고압분사구로 분사되는 물의 분사력은 원수압보다 강한 압력으로 분사됨으로써, 분사력이 향상되고 이물질 등을 용이하게 제거할 수 있도록 하는 효과가 있다.The jetting force of the water jetted to the high-pressure jetting hole is injected at a pressure higher than the raw water pressure, thereby improving the jetting force and facilitating removal of foreign matter and the like.

또한, 조절축에 서로 엇갈리도록 관통공이 형성되고, 이 관통공의 사이 및 양측 끝단부에 위치되게 조절축에 오링을 구비함으로써, 이웃하는 공급구로 물의 침입을 방지하여 원하지 않는 방향으로 물이 배출되는 것을 방지할 수 있도록 하는 효과가 있다.In addition, through-holes are formed so as to be offset from each other in the adjustment shaft, and o-rings are provided in the adjustment shaft at the positions between the through holes and the opposite end portions, thereby preventing water from being introduced into the neighboring supply ports and discharging water in an undesired direction It is possible to prevent the problem from occurring.

그리고, 샤워기의 구조가 복잡하지 않고 최소의 부품으로 구성함으로써, 샤워기의 고장 발생이 적고, 유지보수 작업 또는 용이하게 수행할 수 있도록 하는 효과가 있다.
In addition, since the structure of the shower is not complicated and it is constituted by a minimum number of parts, the occurrence of the trouble of the shower is small, and the maintenance work or the operation can be easily performed.

도 1은 종래의 샤워기를 보인 분리사시도.
도 2는 본 발명에 따른 샤워기를 보인 단면도.
도 3은 본 발명에 따른 샤워기를 보인 평면도.
도 4는 본 발명의 헤드부재를 보인 단면도.
도 5a 내지 도 5d는 본 발명의 제어부를 보인 도면.
도 6a 내지 도 6c는 본 발명의 안내부를 보인 도면.
도 7a 및 도 7b는 본 발명의 분사부를 보인 도면.
도 8a 내지 도 8c는 본 발명에 따른 샤워기의 작용관계를 보인 도면.
도 9는 본 발명에 따른 샤워기의 다른 실시예를 보인 도면.
1 is an exploded perspective view showing a conventional shower.
2 is a sectional view showing a shower according to the present invention.
3 is a plan view of a shower according to the present invention.
4 is a sectional view showing the head member of the present invention.
5A to 5D show a control section of the present invention.
6A to 6C show the guide part of the present invention.
Figures 7A and 7B show the jetting section of the present invention.
8A to 8C are views showing a functional relationship of a shower according to the present invention.
9 is a view showing another embodiment of the shower according to the present invention.

이하, 본 발명에 따른 샤워기에 대하여 첨부된 도면을 참조하여 상세히 설명하면 다음과 같다.Hereinafter, a shower according to the present invention will be described in detail with reference to the accompanying drawings.

도 2는 본 발명에 따른 샤워기를 보인 단면도이고, 도 3은 본 발명에 따른 샤워기를 보인 평면도이고, 도 4는 본 발명의 헤드부재를 보인 단면도이고, 5a 내지 도 5d는 본 발명의 제어부를 보인 도면이고, 도 6a 내지 도 6c는 본 발명의 안내부를 보인 도면이고, 도 7a 및 도 7b는 본 발명의 분사부를 보인 도면이다.FIG. 2 is a sectional view showing a shower according to the present invention, FIG. 3 is a plan view showing a shower according to the present invention, FIG. 4 is a sectional view showing the head member of the present invention, FIGS. 6A to 6C are views showing the guide unit of the present invention, and FIGS. 7A and 7B are views showing the jetting unit of the present invention.

도 2 내지 도 7b에 도시된 바와 같이 본 발명에 따른 샤워기(100)는 수도전에 연결되는 호스(미도시)에 결속된 몸체부(110)와, 몸체부(110)로부터 공급되는 물을 제어하는 제어부(210)와 몸체부(110)에 설치되어 제어부(210)에 의해 제어된 물을 배출시키는 배출부(410)로 구성된다.2 to 7B, the shower 100 according to the present invention includes a body 110 coupled to a hose (not shown) connected to the water supply unit, and a controller 110 for controlling the water supplied from the body 110 And a discharge unit 410 installed in the body 110 to discharge the water controlled by the controller 210. [

여기서, 상기 몸체부(110)는 내측에 유로(114)가 형성되고, 일측부는 호스(미도시)에 결속되는 몸체(112)가 구비된다.Here, the body 110 has a body 112 formed with an oil passage 114 on the inner side and a hose (not shown) on one side.

나아가, 상기 몸체(112)의 일측부에 일체로 형성되되, 내측에는 하부가 개방되게 설치공간(122)이 형성되고, 설치공간(112)의 개방부 외측부에는 단턱지게 형성되며, 이 단턱진 외주면에는 나사산(124)이 형성된 헤드부재(120)가 구비된다.Further, an installation space 122 is formed at one side of the body 112 to open the lower part of the body 112, a step is formed at the outer side of the opening part of the installation space 112, A head member 120 having a thread 124 is provided.

아울러, 상기 헤드부재(120)의 양측부에는 설치공간(122)과 연통되는 한 쌍의 고정공(126)이 형성된다.In addition, a pair of fixing holes 126 are formed on both sides of the head member 120 to communicate with the installation space 122.

그리고, 상기 몸체부(110)의 헤드부재(120) 설치공간(122)에 설치되어 유로(114)로 공급되는 물을 제어하는 제어부(210)가 구비된다.The control unit 210 is installed in the installation space 122 of the head member 120 of the body 110 to control the water supplied to the flow path 114.

여기서, 상기 제어부(210)는 몸체부(110)의 헤드부재(120)에 형성된 설치공간(122)에 설치되는 설치부재(212)가 구비된다.The control unit 210 includes an installation member 212 installed in an installation space 122 formed in the head member 120 of the body 110.

나아가, 상기 설치부재(212)는 길이 방향, 즉 헤드부재(120)에 형성된 고정공(126)과 연통됨과 동시에 동일축상에 위치되게 설치공(214)이 형성되고, 수직 방향으로 중앙부에는 내측에 관통되는 통공(216a)이 형성되어 하부로 돌출되게 일반공급구(216)가 형성된다.The mounting member 212 is connected to the fixing hole 126 formed in the longitudinal direction of the head member 120 and is disposed on the same axis so that the mounting hole 214 is formed. A through hole 216a is formed and a general supply port 216 is formed so as to protrude downward.

이때, 상기 설치부재(212)의 하부로 돌출된 일반공급구(216)의 외주면에는 나사산이 형성된다.At this time, a thread is formed on the outer peripheral surface of the common supply port 216 protruding to the lower portion of the mounting member 212.

아울러, 상기 일반공급구(216)의 일측부에는 수직 방향으로 통공(218a)이 형성되어 하부로 돌출되되, 일반공급구(216)보다 짧게 돌출된 중압공급구(218)가 형성되고, 중압공급구(218)가 형성된 타측부에는 관통되게 내측에 수직 방향으로 통공(220a)이 형성되어 일반공급구(216)보다 짧고 중압공급구(218)보다 길게 돌출된 고압공급구(220)가 형성된다.A through hole 218a is formed in a vertical direction at one side of the general supply port 216. A middle pressure supply port 218 protruding downward and protruding from the normal supply port 216 is formed, A through hole 220a is formed in a vertical direction on the inner side so as to penetrate through the other side where the sphere 218 is formed so that a high pressure supply port 220 is formed which is shorter than the normal supply port 216 and protruded longer than the intermediate pressure supply port 218 .

이때, 상기 고압공급구(220)의 일측부 하단, 즉 일반공급구(216)가 형성된 방향에는 절개홈(220b)이 형성된다. At this time, a cutout groove 220b is formed in the lower end of one side of the high-pressure supply port 220, that is, in the direction in which the common supply port 216 is formed.

따라서, 상기 몸체(112)의 유로(114)를 통하여 공급되는 물은 이 설치부재(212)에 형성된 일반공급구(216)와 중압공급구(216) 및 고압공급구(220) 중 어느 하나의 통공(216a)(218a)(220a)을 통하여 하부로 공급되게 된다.The water supplied through the flow path 114 of the body 112 is supplied to the common supply port 216 formed in the mounting member 212 and to the intermediate pressure supply port 216 and the high pressure supply port 220 And is supplied to the lower portion through the through holes 216a, 218a, and 220a.

또한, 상기 설치부재(212)의 설치공(214)에 결합되어 뭄체(112)의 유로(114)를 통하여 공급되는 물을 일반공급구(216)와 중압공급구(218) 및 고압공급구(220) 중 어느 하나를 통하여 공급되도록 제어하는 조절축(230)이 구비된다.The water supplied through the flow path 114 of the dredging body 112 is connected to the installation hole 214 of the installation member 212 and is connected to the general supply port 216 and the intermediate pressure supply port 218 and the high pressure supply port The control shaft 230 is controlled to be supplied through any one of the first and second control valves 220 and 220.

여기서, 상기 조절축(230)은 설치부재(212)의 설치공(214)에 설치되어 양측 끝단부가 헤드부재(120)의 양측부에 형성된 고정공(126)을 통하여 외측으로 돌출되게 설치되고, 헤드부재(120)의 외측으로 돌출된 일측부에는 조절축(230)을 동작시키는 레버(232)가 구비되고, 타측부는 C링 등 고정수단에 의해 고정되게 된다.The adjusting shaft 230 is installed on the mounting hole 214 of the mounting member 212 so that both ends of the adjusting shaft 230 protrude outward through fixing holes 126 formed on both sides of the head member 120, A lever 232 for operating the adjusting shaft 230 is provided on one side portion protruding outward of the head member 120 and the other side portion is fixed by a fixing means such as a C ring.

나아가, 상기 조절축(230)에는 제1,2,3관통공(230a)(230b)(230c)이 형성되되, 설치부재(212)에 형성된 일반공급구(216)와 중압공급구(218) 및 고압공급구(220)에 대응되는 위치에 형성되게 된다.The first and second and third through holes 230a and 230b and 230c are formed in the control shaft 230 and the common supply port 216 and the intermediate pressure supply port 218 formed in the installation member 212 are formed. And the high-pressure supply port 220, respectively.

이때, 상기 조절축(230)에 형성된 제1,2,3관통공(230a)(230b)(230c)은 서로 엇갈리도록 형성되게 된다.In this case, the first, second and third through holes 230a, 230b, and 230c formed in the control shaft 230 are formed to be offset from each other.

그리고, 상기 조절축(230)에는 누수를 방지하는 오링(234)이 구비되되, 이 오링(234)은 제1,2,3관통공(230a)(230b)(230c) 사이 및 제1,3관통공(230a)(230c) 외측부에 위치되게 구비된다.The adjustment shaft 230 is provided with an O-ring 234 for preventing water leakage. The O-ring 234 is provided between the first, second, and third through holes 230a, 230b, And is disposed on the outer side of the through holes 230a and 230c.

따라서, 상기 레버(232)의 조작에 의해 조절축(230)이 회전을 하게 되고, 이 조절축(230)의 회전시 설치부재(212)에 형성된 일반공급구(216)와 중압공급구(218) 및 고압공급구(220) 중 어느 하나에 제1,2,3관통공(230a)(230b)(230c) 중 어느 하나가 일치하게 되면 일치하는 일반공급구(216)와 중압공급구(218) 및 고압공급구(220) 중 어느 하나가 개방되어 물이 이동되게 된다.The control shaft 230 rotates by the operation of the lever 232 and the common supply port 216 and the intermediate pressure supply port 218 formed in the mounting member 212 when the control shaft 230 rotates. 3 and the first, second, and third through holes 230a, 230b, and 230c are aligned with any one of the high pressure supply port 220 and the high pressure supply port 220, the common supply port 216 and the intermediate pressure supply port 218 And the high-pressure supply port 220 are opened to move the water.

또한, 상기 제어부(210)의 하단부에는 조절축(230)을 통하여 공급된 물을 안내하는 안내부(310)가 구비된다.In addition, a guide 310 for guiding the water supplied through the adjustment shaft 230 is provided at the lower end of the controller 210.

여기서, 상기 안내부(310)는 설치부재(212)의 중앙부에 형성된 일반공급구(216)에 결속되는 결속구(314)가 형성되고, 이 결속구(314)의 외측부에는 상부가 개방되게 안내실(316)이 형성된 안내부재(312)가 구비된다.The guiding part 310 is formed with a coupling hole 314 which is connected to a common supply hole 216 formed at a central portion of the installation member 212. The coupling hole 314 is formed in the outer side of the coupling hole 314, And a guide member 312 having a guide groove 316 formed therein.

나아가, 상기 안내부재(312)의 일측부에는 안내실(316)과 연통되게 돌출 형성되어 설치부재(212)의 고압공급구(220)가 안착되는 안착구(318)가 형성된다.Further, a seat 318 is formed at one side of the guide member 312 so as to communicate with the guide chamber 316 to seat the high-pressure supply port 220 of the installation member 212.

이때, 상기 안착구(318)는 일측부, 즉 안내실(316)이 형성된 방향이 개방되게 연통공(318a)이 형성된다.At this time, the seating hole 318 is formed with a communication hole 318a so that one side, that is, the direction in which the guide chamber 316 is formed is opened.

아울러, 상기 안내부재(312)의 하단부, 즉 안내실(316)과 연통되게 분사공(322)이 형성된 돌기(320)가 하부로 돌출 형성된다.The lower end of the guide member 312, that is, the protrusion 320 formed with the injection hole 322 to communicate with the guide chamber 316, is protruded downward.

이때, 상기 돌기(320)에 형성된 분사공(322)의 하단부에는 "V"자 형상의 V홈(322a)이 형성된다.At this time, a V groove 322a having a "V" shape is formed at the lower end of the injection hole 322 formed in the projection 320. [

따라서, 상기 설치부재(212)의 중앙부에 형성된 일반공급구(216)를 통하여 공급되는 물은 안내부재(312)의 중앙부에 형성된 결속구(314)를 통하여 이동되고, 고압공급구(220)를 통하여 공급되는 물은 안내부재(312)의 안착구(318)를 통하여 안내실(316)로 공급되어 돌기(320)에 형성된 분사공(322)을 통하여 분사되며, 중압공급구(218)를 통하여 공급되는 물은 안내부재(312)의 외측으로 공급되게 된다.The water supplied through the common supply port 216 formed at the center of the installation member 212 is moved through the binding port 314 formed at the center of the guide member 312 and the high pressure supply port 220 The water supplied through the supply port 218 is supplied to the guide chamber 316 through the seat 318 of the guide member 312 and is injected through the injection hole 322 formed in the projection 320, The water is supplied to the outside of the guide member 312.

그리고, 상기 몸체부(110)의 헤드부재(120)의 하부에 결속되어 제어부(210) 및 안내부(310)로부터 공급되는 물을 외부로 배출시키는 배출부(410)가 구비된다.A discharge unit 410 is coupled to the lower portion of the head member 120 of the body 110 to discharge the water supplied from the controller 210 and the guide unit 310 to the outside.

여기서, 상기 배출부(410)는 상부가 개방되게 내측에 공급공(414)이 형성되고, 상부 내주면에는 몸체부(110)의 헤드부재(120)에 형성된 나사산(124)에 나사 결합되는 나사공(416)이 형성되며, 하단부 중앙에는 일반분사구(418)가 형성된 분사부재(412)가 구비된다.The discharging part 410 is formed with a supply hole 414 on the inner side so as to open the upper part and a screw hole 424 formed on the inner circumferential surface of the discharging part 410 to be screwed to the thread 124 formed on the head member 120 of the body part 110. [ And a jetting member 412 having a common jet opening 418 formed at the center of the lower end thereof.

이때, 상기 분사부재(412)에 형성된 일반분사구(418)에는 설치부재(212)의 중앙부에 형성된 일반공급구(216)가 결합되되, 안내부재의 결속구에 끼워져 설치부재의 일반공급구의 외주면에 나사 결합 되는 가이드부재(419)가 구비된다.At this time, the general injection port 216 formed at the center of the installation member 212 is coupled to the general injection port 418 formed in the injection member 412, and is inserted into the coupling hole of the guide member, And a guide member 419 which is screwed is provided.

나아가, 상기 분사부재(412)의 하부에 형성된 일반분사구(418)의 외측에는 안내부재(312)의 돌기(320)가 결합되는 다수개의 고압분사구(420)가 형성된다.Further, a plurality of high-pressure ejection openings 420 are formed on the outer side of the general ejection openings 418 formed in the lower portion of the ejection member 412, to which the protrusions 320 of the guide member 312 are coupled.

아울러, 상기 고압분가구(420)가 형성된 외측부에는 다수개의 중압분사구(422)가 형성된다.In addition, a plurality of intermediate-pressure nozzles 422 are formed on the outer side of the high pressure furnace 420.

이때, 상기 고압분사구(420)가 형성된 외측부에는 상부로 돌출된 링 형상의 돌출구(424)가 형성되고, 이 돌출구(424)의 상부를 커버하되, 다수개의 통공(426a)이 형성된 커버부재(426)가 구비된다.In this case, a ring-shaped protrusion 424 protruding upward is formed on the outer side formed with the high-pressure injection port 420, and a cover member 426 formed with a plurality of through-holes 426a covers the top of the protrusion 424 .

따라서, 상기 안내부재(312)의 결속구(314)에 결합된 일반공급구(216)로 공급되는 물은 일반분사구(418)를 통하여 외부로 배출되고, 고압공급구(220)를 통하여 공급된 물은 안내부재(312)의 안내에 따라 안내부재(312)에 형성된 분사공(322)을 통하여 외부로 분사되며, 중압공급부(218)로 공급된 물은 분사부재(412)의 공급공(414)으로 공급되고, 공급공(414)으로 공급된 물은 중압분사구(424)를 통하여 외부로 분사되게 된다.
The water supplied to the general supply port 216 coupled to the coupling port 314 of the guide member 312 is discharged to the outside through the general injection port 418 and discharged through the high pressure supply port 220 The water is injected to the outside through the injection hole 322 formed in the guide member 312 in accordance with the guide of the guide member 312 and the water supplied to the intermediate pressure supply unit 218 is supplied to the supply hole 414 of the injection member 412 And the water supplied to the supply hole 414 is injected to the outside through the intermediate-pressure injection hole 424. [

이와 같이 구성된 본 발명에 따른 샤워기에 대한 작용관계를 설명하면 다음과 같다. Hereinafter, the functional relationship of the shower according to the present invention will be described.

도 8a 내지 도 8c는 본 발명에 따른 샤워기의 작용관계를 보인 도면이다.8A to 8C are diagrams showing the functional relationship of the shower according to the present invention.

이에 도시된 바와 같이 본 발명에 따른 샤워기(100)는 먼저, 수도전에 연결된 호스를 통하여 공급되는 물은 몸체(112)의 유로(114)를 통하여 헤드부재(120)로 공급된다.As shown in the figure, the shower 100 according to the present invention first supplies water to the head member 120 through the channel 114 of the body 112 through the hose connected to the water supply.

이렇게, 상기 헤드부재(120)로 공급된 물은 헤드부재(120)에 설치된 제어부(210)의 제어에 의해 일반공급구(216)와 중압공급구(218) 및 고압공급구(220) 중 어느 하를 통하여 분사부재(412) 방향으로 공급된다.The water supplied to the head member 120 is supplied to the head member 120 under the control of the control unit 210 installed in the head member 120 so that the water can be supplied to the head member 120 through either the common supply port 216 or the intermediate pressure supply port 218 or the high pressure supply port 220 To the direction of the jetting member 412. [

즉, 도 8a에 도시된 바와 같이 상기 조절축(230)에 형성된 제1관통공(230a)과 설치부재(212)의 중압공급구(218)와 서로 연통되게 일치된 상태에서 헤드부재(120)로 공급된 물은 제1관통공(230a)과 중압공급구(218)를 통하여 분사부재(412)의 공급공(414)으로 공급되고, 공급공(414)으로 공급된 물은 분사부재(412)의 중압분사구(424)를 통하여 외부로 분사되게 된다.8A, the first through hole 230a formed in the adjustment shaft 230 and the intermediate pressure supply port 218 of the mounting member 212 are connected to each other so as to communicate with each other, The water supplied to the supply hole 414 is supplied to the supply hole 414 of the injection member 412 through the first through hole 230a and the intermediate pressure supply port 218, Pressure injection orifice 424 of the fuel injection valve 424.

또한, 도 8b에 도시된 바와 같이 제1관통공(230a)과 설치부재(212)의 중압공급구(218)가 일치된 상태에서 레버(232)를 일 방향으로 회전, 즉 레버(232)를 수직이 되게 회전시키게 되면 조절축(230)이 회전하면서 제2관통공(230b)이 설치부재(212)의 일반공급구(216)와 일치됨과 동시에 제1관통공(230a)은 중압공급구(218)로부터 벗어나면서 제1관통공(230a)으로 공급되던 물은 제2관통공(230b)과 일반공급구(216)를 통하여 분사부재(412)의 중앙부에 형성된 일반분사구(418)를 통해 직접 외부로 배출되게 된다. 8B, when the first through hole 230a and the intermediate pressure supply port 218 of the mounting member 212 coincide with each other, the lever 232 is rotated in one direction, that is, the lever 232 The adjusting shaft 230 rotates so that the second through hole 230b coincides with the normal supply port 216 of the mounting member 212 and the first through hole 230a communicates with the intermediate pressure supply port The water that has been supplied to the first through hole 230a while escaping from the first through hole 218 passes through the second through hole 230b and the common supply port 216 and passes through the general injection port 418 formed at the center of the injection member 412, And is discharged to the outside.

그리고, 도 8c에 도시된 바와 같이 상기 제2관통공(230b)과 설치부재(212)의 일반공급구(216)와 일치 상태에서 레버(232)를 일방향으로 회전시키게 되면 조절축(230)이 회전하면서 제3관통공(230c)이 설치부재(212)의 고압공급구(220)와 일치됨과 동시에 제2관통공(230b)은 중압공급구(218)로부터 벗어나면서 제3관통공(230c)과 고압공급구(220)을 통하여 안내부(310)로 공급되게 된다.8C, when the lever 232 is rotated in one direction in a state where the second through hole 230b and the common supply port 216 of the mounting member 212 coincide with each other, The third through hole 230c is aligned with the high pressure supply port 220 of the mounting member 212 and the second through hole 230b is disengaged from the intermediate pressure supply port 218 and the third through hole 230c, And the high-pressure supply port 220, as shown in FIG.

이때, 상기 고압공급구(220)를 통하여 안내부재(312)의 안착구(318)로 공급된 물은 안착구(318)의 연통구(318a)를 통하여 안내실(316)로 공급되고, 안내실(316)로 공급된 물은 돌기(320)에 형성된 분사공(322)을 통하여 외부로 분사되게 된다.At this time, the water supplied to the seat 318 of the guide member 312 through the high-pressure supply port 220 is supplied to the guide chamber 316 through the communication hole 318a of the seat 318, 316 are injected to the outside through the injection holes 322 formed in the projections 320.

따라서, 상기 레버(232)의 조작에 의해 조절축(230)이 회전하면서 제1,2,3관통공(230a)(230b)(230c)과 설치부재(212)에 형성된 일반공급구(216)와 중압공급구(218) 및 고압공급구(220) 중 어느 하나에 일치하는 방향으로 물이 공급되고, 공급된 물은 분사부재(412)에 형성된 일반분사구(418)와 고압분사구(420) 및 중압분사구(424)를 통하여 외부로 배출되게 된다.The control shaft 230 is rotated by the operation of the lever 232 so that the general supply port 216 formed in the first, second and third through holes 230a, 230b, 230c and the mounting member 212, The water is supplied in the direction corresponding to any one of the intermediate pressure supply port 218 and the high pressure supply port 220. The supplied water is supplied to the common injection port 418, the high pressure injection port 420, And is discharged to the outside through the intermediate-pressure injection port 424.

이와 같이 상기 레버(232)의 조작에 의해 조절축(230)이 회전하면서 설치부재(212)의 일반공급구(216)와 중압공급구(218) 및 고압공급구(220)를 선택적으로 개방하여 물이 공급되도록 함으로써, 사용자가 원하지 않는 방향으로 물이 공급 분사되는 것을 방지하여 물의 낭비를 방지할 수 있게 된다.The control shaft 230 is rotated by the operation of the lever 232 to selectively open the normal supply port 216 and the middle pressure supply port 218 and the high pressure supply port 220 of the mounting member 212 By supplying water, it is possible to prevent water from being sprayed in a direction that the user does not desire, thereby preventing waste of water.

또한, 상기 고압공급구(220)를 통하여 고압분사구(420)로 분사되는 물의 분사력이 향상되어 이를 이용하여 이물질 등을 제거시 용이하게 제거할 수 있게 된다.
Further, the jetting force of the water jetted to the high-pressure jet opening 420 through the high-pressure supply port 220 is improved, so that the foreign matter can be easily removed when the foreign substance is removed.

도 9는 본 발명에 따른 샤워기의 다른 실시예를 보인 도면이다.9 is a view showing another embodiment of the shower according to the present invention.

이에 도시된 바와 같이 상기 몸체부(110)의 헤드부재(120) 상부에 결속수단(130)을 구비하여 싱크대용 물 분사기로 사용 가능하다.As shown in the figure, the binding unit 130 is provided on the head member 120 of the body part 110 and can be used as a sink water sprayer.

즉, 상기 헤드부재(120)의 일측부에 구비된 몸체(112)를 형성하지 않고, 헤드부재(120)의 상부에 수도꼭지에 결속시키는 결속수단(130)을 형성하여 일반분사와 중압분사 및 고압분사를 사용자가 원하는 상태로 조절하여 사용할 수 있는 싱크대용 물 분사기로 사용할 수 있게 된다.
That is, the body member 112 provided at one side of the head member 120 is not formed, and the binding member 130 for binding the head member 120 to the faucet is formed at the top of the head member 120, The spray can be used as a water spray for a sink that can be adjusted to a desired state.

이와 같이 구성된 본 발명에 따른 샤워기에 대한 작용관계는 전자에서와 동일한 방법에 의해 이루어지는 것으로, 여기에서는 작용관계에 대한 설명은 생략한다.
The functional relationship of the shower according to the present invention thus constituted is the same as that of the former, and a description of the working relationship is omitted here.

상기에서는 본 발명에 따른 샤워기에 대한 바람직한 실시예에 대하여 설명하였지만, 본 발명은 이에 한정되는 것이 아니고, 특허청구범위와 발명의 상세한 설명 및 첨부한 도면의 범위 안에서 여러 가지로 변형하여 실시하는 것이 가능하고, 이 또한 본 발명의 권리범위에 속한다. Although the preferred embodiments of the shower according to the present invention have been described above, the present invention is not limited thereto, but may be modified in various ways within the scope of the claims, the detailed description of the invention and the accompanying drawings. , Which also falls within the scope of the present invention.

100 : 샤워기 110 : 몸체부
112 : 몸체 114 : 유로
120 : 헤드부재 122 : 설치공간
124 : 나사산 126 : 고정공
210 : 제어부 212 : 설치부재
214 : 설치공 216 : 일반공급구
216a, 218a, 220a : 통공 218 : 중압공급구
220 : 고압공급구 220b : 절개홈
230 : 조절축 230a, 230b, 230c : 제1,2,3관통공
232 : 레버 234 : 오링
310 : 안내부 312 : 안내부재
314 : 결속구 316 : 안내실
318 : 안착구 318a : 연통공
320 : 돌기 322 : 분사공
322a : V홈 410 : 배출부
412 : 분사부재 414 : 공급공
416 : 나사공 418 : 일반분사구
420 : 고압분사구 422 : 돌출구
424 : 중압분사구 426 : 커버부재
100: shower 110: body
112: body 114:
120: head member 122: installation space
124: threads 126: stationary ball
210: control unit 212: installation member
214: installation hole 216: normal supply hole
216a, 218a, 220a: through hole 218: intermediate pressure supply port
220: high pressure supply port 220b: incision groove
230: Control shaft 230a, 230b, 230c: 1st, 2nd and 3rd through holes
232: Lever 234: O-ring
310: guide portion 312: guide member
314: coupling unit 316:
318: seat 318a: communicating hole
320: projection 322:
322a: V-groove 410:
412: injection member 414: supply hole
416: screw hole 418: general nozzle
420: High-pressure nozzle 422:
424: intermediate pressure nozzle 426: cover member

Claims (12)

물을 공급하는 유로가 형성된 몸체부와,
상기 몸체부로부터 공급되는 물을 제어하는 제어부와,
상기 몸체부에 설치되어 제어부에 의해 제어된 물을 배출시키는 배출부로 이루어지되,
상기 제어부는 몸체부의 헤드부재 설치공간에 설치되는 설치부재와,
상기 설치부재에 설치되되, 헤드부재의 고정공 외측으로 돌출되게 설치되는 조절축으로 이루어지고,
상기 설치부재는 길이 방향으로 조절축이 결합되는 설치공이 형성되고, 중앙부에는 내측에 통공이 형성된 일반공급구가 형성되며, 일측부에는 통공이 형성된 중앙공급구가 형성되고, 타측부에는 통공이 형성된 고압공급구가 형성된 것을 특징으로 하는 샤워기.
A body portion having a flow path for supplying water,
A controller for controlling water supplied from the body portion,
And a discharge unit installed in the body and discharging water controlled by the controller,
The control unit includes an installation member installed in a head member installation space of the body part,
And an adjusting shaft provided on the mounting member and protruding outside the fixing hole of the head member,
The mounting member is provided with a mounting hole through which the adjusting shaft is coupled in the longitudinal direction, a central supply port formed with a through hole at the center thereof, a central supply port formed with a through hole at one side thereof, And a high-pressure supply port is formed.
제 1 항에 있어서,
상기 몸체부는 유로가 내측에 형성된 손잡이와,
상기 유로와 연통되게 설치공간이 형성되되, 하부가 개방되고, 개방된 하부 외측부에 나사산이 형성되며, 양측부에는 서로 대응되는 고정공이 형성된 헤드부재로 이루어진 것을 특징으로 하는 샤워기.
The method according to claim 1,
Wherein the body portion includes a handle having an oil passage formed on the inner side thereof,
And a head member formed with a mounting space communicating with the flow path, a lower portion thereof being opened, a threaded portion being formed at a lower outer side portion of the lower portion, and a fixing hole corresponding to each of the fixing portions being formed at both side portions thereof.
삭제delete 삭제delete 제 1 항에 있어서,
상기 조절축은 일측 끝단부에 레버가 구비되고, 중앙부에는 설치부재의 일반공급구와 중앙공급구 및 고압공급구에 대응되는 제1,2,3관통공이 형성되되, 제1,2,3관통공은 서로 엇갈리게 형성된 것을 특징으로 하는 샤워기.
The method according to claim 1,
The control shaft includes a lever at one end, a first, a second and a third through-hole corresponding to a general supply port, a central supply port, and a high-pressure supply port of the mounting member, The shower plate being formed to be offset from each other.
제 1 항에 있어서,
상기 배출부는 상부가 개방되어 몸체부의 헤드부재에 형성된 나사산에 결합되는 나사공이 형성되고, 하단부 중앙에는 일반분사구가 형성되며, 일반분사구의 외측에는 고압분사구가 형성되고, 이 고압분사구의 외측부에는 중압분사구가 형성된 것을 특징으로 하는 샤워기.
The method according to claim 1,
The discharge port is formed with a screw hole which is opened at an upper portion thereof to be coupled to a screw thread formed in a head member of the body portion, a general jet port is formed at the center of the lower end, a high pressure jet port is formed outside the general jet port, Is formed.
제 6 항에 있어서,
상기 고압분사구의 외측에는 링 형상의 돌출구가 형성되고, 이 돌출구의 상부를 커버하되, 다수개의 통공이 형성된 커버부재가 구비된 것을 특징으로 하는 샤워기.
The method according to claim 6,
And a cover member having a ring-shaped protrusion formed on the outer side of the high-pressure nozzle and covering an upper portion of the protrusion, wherein a plurality of through-holes are formed.
제 6 항에 있어서,
상기 배출부의 일반분사구 외주면에 나사 결합되는 가이드부재가 더 구비된 것을 특징으로 하는 샤워기.
The method according to claim 6,
Further comprising a guide member screwed to an outer circumferential surface of a general injection port of the discharge portion.
제 1 항에 있어서,
상기 제어부와 배출부의 사이에는 안내부가 더 구비된 것을 특징으로 하는 샤워기.
The method according to claim 1,
Wherein a guide portion is further provided between the control portion and the discharge portion.
제 9 항에 있어서,
상기 안내부는 중앙부에 제어부의 설치부재에 형성된 일반공급구에 결속되는 결속구가 형성되고, 이 결속구의 외측부에는 안내실이 형성되며, 이 안내실의 일측부로 연통되게 돌출되어 설치부재의 고압공급구가 안착되는 안착구가 형성된 안내부재가 구비된 것을 특징으로 하는 샤워기.
10. The method of claim 9,
The guide portion is formed at its center with a coupling hole which is engaged with a general supply hole formed in the installation member of the control portion. A guide chamber is formed on the outer side of the coupling hole, and a high pressure supply hole of the installation member is seated Wherein the guide member is provided with a seat fastening member.
제 10 항에 있어서,
상기 안내부재의 안내실 바닥면에는 배출부의 고압분사구에 결합되되, 내측에 분사공이 형성된 다수개의 돌기가 형성된 것을 특징으로 하는 샤워기.
11. The method of claim 10,
Wherein a plurality of protrusions are formed on a bottom surface of the guide chamber of the guide member, the plurality of protrusions being coupled to the high-pressure injection port of the discharge unit, and having a spray hole formed therein.
제 11 항에 있어서,
상기 돌기에 형성된 분사공의 끝단부는 "V"자 형상으로 형성된 것을 특징으로 하는 샤워기.
12. The method of claim 11,
And the end portion of the spray hole formed in the projection is formed in a "V" shape.
KR1020130087003A 2013-07-23 2013-07-23 Shower KR101571470B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020130087003A KR101571470B1 (en) 2013-07-23 2013-07-23 Shower

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020130087003A KR101571470B1 (en) 2013-07-23 2013-07-23 Shower

Publications (2)

Publication Number Publication Date
KR20150011716A KR20150011716A (en) 2015-02-02
KR101571470B1 true KR101571470B1 (en) 2015-11-24

Family

ID=52488052

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020130087003A KR101571470B1 (en) 2013-07-23 2013-07-23 Shower

Country Status (1)

Country Link
KR (1) KR101571470B1 (en)

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200234597Y1 (en) * 2001-03-07 2001-09-28 신원테크 (주) shower head
KR100522189B1 (en) 2003-04-29 2005-10-20 와토스코리아 주식회사 automatic close type water saving in hand shower
KR101270789B1 (en) 2011-07-14 2013-06-05 유충춘 Vibrating shower device having a function of a massage

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200234597Y1 (en) * 2001-03-07 2001-09-28 신원테크 (주) shower head
KR100522189B1 (en) 2003-04-29 2005-10-20 와토스코리아 주식회사 automatic close type water saving in hand shower
KR101270789B1 (en) 2011-07-14 2013-06-05 유충춘 Vibrating shower device having a function of a massage

Also Published As

Publication number Publication date
KR20150011716A (en) 2015-02-02

Similar Documents

Publication Publication Date Title
USRE47552E1 (en) Aerator with dual spraying functions
US6367710B2 (en) Showerhead
US20120012676A1 (en) Handheld water discharging device
RU2534088C1 (en) Shower head
IE60826B1 (en) Improved spray head for ablutionary appliances
US10086390B2 (en) Multi-function sprayhead
KR100838999B1 (en) Flow path control valve of a bidet, and a bidet including the same
US20050205697A1 (en) Combination showerhead with waterfall nozzle
KR101571470B1 (en) Shower
CA2979011C (en) Variable dual flow fitting
JP2007130614A (en) Showerhead
KR200307823Y1 (en) automatic close type water saving in hand shower
CN110404697B (en) Water jet head with fluid pressure operated valve
KR100522189B1 (en) automatic close type water saving in hand shower
CN112449663B (en) Spray head for a sanitary fitting having an actuating element for a plurality of diaphragm valves
KR20180003628U (en) shower faucet with assembly shutter and waterway
KR101307186B1 (en) Shower head
JP4675460B2 (en) Water tap
KR101250325B1 (en) Water distributor apparatus and shower device using the same
CN101213027A (en) Shower head
KR20210046417A (en) Shower Head
KR200388138Y1 (en) water cock
KR200415716Y1 (en) Shower head equipped side nozzles
KR200340464Y1 (en) bodyshower in possible for hand shower
CN220514462U (en) Water spray former and water outlet device

Legal Events

Date Code Title Description
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
LAPS Lapse due to unpaid annual fee