KR101562362B1 - Methode and structure for intergarally formed with wall and external insulation - Google Patents

Methode and structure for intergarally formed with wall and external insulation Download PDF

Info

Publication number
KR101562362B1
KR101562362B1 KR1020150084837A KR20150084837A KR101562362B1 KR 101562362 B1 KR101562362 B1 KR 101562362B1 KR 1020150084837 A KR1020150084837 A KR 1020150084837A KR 20150084837 A KR20150084837 A KR 20150084837A KR 101562362 B1 KR101562362 B1 KR 101562362B1
Authority
KR
South Korea
Prior art keywords
heat insulating
insulating material
wall
fixing
slab
Prior art date
Application number
KR1020150084837A
Other languages
Korean (ko)
Inventor
백호
최지혜
원혁
박성균
이상헌
Original Assignee
현대산업개발 주식회사
고려대학교 산학협력단
주식회사 한라
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 현대산업개발 주식회사, 고려대학교 산학협력단, 주식회사 한라 filed Critical 현대산업개발 주식회사
Priority to KR1020150084837A priority Critical patent/KR101562362B1/en
Application granted granted Critical
Publication of KR101562362B1 publication Critical patent/KR101562362B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/84Walls made by casting, pouring, or tamping in situ
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/62Insulation or other protection; Elements or use of specified material therefor
    • E04B1/74Heat, sound or noise insulation, absorption, or reflection; Other building methods affording favourable thermal or acoustical conditions, e.g. accumulating of heat within walls
    • E04B1/76Heat, sound or noise insulation, absorption, or reflection; Other building methods affording favourable thermal or acoustical conditions, e.g. accumulating of heat within walls specifically with respect to heat only
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/84Walls made by casting, pouring, or tamping in situ
    • E04B2/842Walls made by casting, pouring, or tamping in situ by projecting or otherwise applying hardenable masses to the exterior of a form leaf
    • E04B2/847Walls made by casting, pouring, or tamping in situ by projecting or otherwise applying hardenable masses to the exterior of a form leaf the form leaf comprising an insulating foam panel
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G11/00Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
    • E04G11/06Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for walls, e.g. curved end panels for wall shutterings; filler elements for wall shutterings; shutterings for vertical ducts
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G17/00Connecting or other auxiliary members for forms, falsework structures, or shutterings
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A30/00Adapting or protecting infrastructure or their operation
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B30/00Energy efficient heating, ventilation or air conditioning [HVAC]
    • Y02B30/90Passive houses; Double facade technology

Abstract

The present invention relates to a construction structure of a wall formed integrally with an external insulation and a construction method thereof. According to the present invention, the wall where the insulation and concrete are integrally formed is constructed while securing stability with respect to a self-weight and a bending load by improving a structure of a gang form. Therefore, a superior freezing damage preventing effect of the concrete is secured in winter, and work efficiency is improved to reduce a work time, thereby improving an economic effect. The insulation is conveniently constructed by installing a box member on an interior of the gang form in such a manner that the box member can be separated from a plate body, and a contact area between the concrete and the insulation is increased while reducing damage to the insulation, thereby increasing an adhesive force. A heat bridge (heat loss) from a fixing part is minimized to secure a superior quality of a product with an increased durability life, thereby allowing a user to improve reliability of the product. The construction structure of the wall formed integrally with the external insulation comprises: the gang form; a fixing bolt; the box member; the insulation; an euro form; a Sepa tie; the wall; the fixing part; a nonflammable insulation; and a finishing material.

Description

구조물의 벽체와 외부 단열재가 일체로 형성되는 시공구조 및 방법{Methode and structure for intergarally formed with wall and external insulation}BACKGROUND OF THE INVENTION 1. Field of the Invention [0001] The present invention relates to a structure and a method for constructing a wall and an external insulation,

본 발명은, 구조물의 벽체와 외부 단열재가 일체로 형성되는 시공구조 및 방법에 관한 것으로, 갱폼의 구조를 개선하여 자중 및 휨하중에 대한 안전성을 확보함으로써, 사용자로 하여금 제품에 대한 신뢰성을 향상시킬 수 있을 뿐만 아니라 박스부재가 판체로부터 분리가능하도록 하여 갱폼내에 설치되는 단열재의 시공이 간편함은 물론 단열재의 파손을 줄이면서 콘크리트와 단열재의 접촉면적을 확대하여 부착력을 높이고, 고정구로부터의 열교(열손실)를 최소화하는 구조물의 벽체와 외부 단열재가 일체로 형성되는 시공구조 및 방법에 관한 것이다.
The present invention relates to a construction structure and a method in which a wall of a structure and an external heat insulating material are integrally formed. By improving the structure of a gantry and securing safety against self weight and flexural load, In addition, the box member can be separated from the plate, thereby simplifying the construction of the heat insulator provided in the gang form, increasing the contact area between the concrete and the heat insulator while reducing the damage of the heat insulator, And the external insulation is integrally formed.

일반적으로 건물의 단열성능을 높이기 위해 사용되는 단열공법은, 단열재의 사용 위치에 따라 내단열, 외단열 및 중단열로 구분되는데, 이 중에서 외단열공법은 건축물의 외부에 단열재를 부착하고 단열재의 낮은 내구성과 내충격성을 보완해 줄 수 있는 외부 마감재료로 마감하는 방법이다.In general, the insulation method used to improve the insulation performance of a building is divided into internal insulation, external insulation, and interruption heat depending on the location of the insulation. Of these, the external insulation method attaches the insulation material to the exterior of the building, It is a method of finishing with an outer finishing material that can complement durability and impact resistance.

상기 외단열공법은, 크게 두 가지로 분류되는데, 구조체에 단열재를 접착제와 같은 접착부재로 고정하는 방법인 습식공법과, 상기 구조체에 단열재를 앵커와 같은 고정안내부재로 고정하는 방법인 건식공법이 있다.The external heat insulating method is roughly divided into two types: a wet method, which is a method of fixing a heat insulating material to a structure with an adhesive member such as an adhesive, and a dry method, which is a method of fixing a heat insulating material to the structure with a fixing guide member such as an anchor have.

상기 습식공법과 건식공법은, 골조공사가 끝나고 가설비계를 설치하거나 곤도라를 이용하여 외면에 단열재 고정 작업을 실시하여야 하므로 가설비계 및 곤도라 설치에 필요한 비용 증가와 시공시 안전에 대한 문제가 상존하고 있다. 특히, 고층 건물에는 그 비용의 증가와 안전문제로 상기의 공법을 적용하는데 한계가 있어 외단열공법이 우수함에도 불구하고 확대되지 못하는 문제점이 있다.Since the wet method and the dry method require the installation of a scaffold or a gondola to fix the heat insulating material to the outer surface after the frame construction, there is a problem of increase in the cost for installing the scaffold and gondola, and safety during construction . Particularly, there is a problem that the above-mentioned method is limited to high-rise buildings due to an increase in costs and safety problems, and thus it is difficult to expand even though the external insulation method is excellent.

또한, 상기 건식공법은, 단열재를 기계적인 방법으로 고정하는 공법으로서, 고정에 대한 안전성은 우수한 편이나, 골조에 앵커로 인한 균열 등의 손상으로 구조체의 내구성을 저해하고 습식공법에 비하여 시공비가 증가하는 문제점이 있다.In addition, the dry method is a method of fixing a heat insulating material by a mechanical method. Although the safety of the method is excellent, the durability of the structure is deteriorated due to damage such as cracks due to an anchor on the frame, .

또한, 상기 습식공법은, 접착제의 품질과 시공 숙련도에 따라 단열재와 구조체의 접착력이 유지되나, 단열재와 구조체의 접착면이 적어 부착력이 취약함은 물론 구조체와 단열재 사이에 공간이 발생하여 강풍 발생시, 떨어지거나 균열 및 파손되는 문제점이 있었고, 화재시, 연돌현상에 의한 화염이 확산되어 피해가 커지는 문제점이 있었다.In addition, although the wet process maintains the adhesive force between the heat insulating material and the structure depending on the quality of the adhesive and the skill of the adhesive, the adhesive force of the heat insulating material and the structure is low and thus a space is formed between the structure and the heat insulating material. There is a problem that it is fallen, cracked and broken, and a flame is spread by a stacking phenomenon in the case of fire, so that the damage is increased.

상기의 문제점을 해결하기 위해 본 건 출원인은 대한민국 등록특허 제10-1224160호에 구조물의 벽체와 외부 단열재가 일체로 형성되는 시공구조와 방법을 등록받은 바 있다.In order to solve the above problems, the applicant of the present invention has been registered in Korean Patent No. 10-1224160 with a construction structure and a method in which a wall of a structure and an external heat insulating material are integrally formed.

선 등록된 특허는, 갱폼 내면에 단열재가 고정되도록 설치한 후, 유로폼과 단열재 사이에 콘크리트를 타설 및 양생하여 벽체가 단열재와 일체로 형성되도록 함으로써, 부착력이 증대되어 우수한 품질을 확보함은 물론 공기를 단축시킬 수 있으므로 종래의 문제점을 해결할 수 있었다.In the patent registered in the prior art, after the heat insulating material is fixed on the inner surface of the gang form, the concrete is placed and cured between the gypsum and the heat insulator so that the wall is formed integrally with the heat insulator, The conventional problems can be solved.

그러나 선 등록된 특허는, 외부 단열재를 벽체와 일체로 형성하는 구성으로 벽체만 형성하는 기존 공법보다 작업자 및 자재의 하중이 가중되어 갱폼의 안전성 확보가 중요함은 물론 전단부재인 볼트를 1단으로 설계하여 갱폼의 하중에 따라 처짐의 변형이 우려되는 문제점이 있었다.However, in the patent registered in the prior art, the load of the worker and the material is increased and the safety of the ganged foam is more important than the existing method in which the external insulation is integrally formed with the wall, There is a problem in that deformation of the deflection may be caused by the load of the gantry.

또한, 박스부재가 판체에 고정되어 있으므로 길이가 긴 층고높이의 단열재를 시공할 경우, 이음철근의 간섭 및 박스부재로 인해 시공이 매우 어려운 문제점이 있었고, 콘크리트와 단열재가 면접촉되어 부착력이 떨어지는 문제점 있었다.
In addition, since the box member is fixed to the plate member, there is a problem that when the heat insulating material having a long height and a long height is installed, the construction is very difficult due to the interference of the reinforcing bars and the box member, there was.

이에 상술한 바와 같은 종래의 제반 결함을 감안하여 이루어진 것으로, 본 발명의 목적은, 갱폼의 구조를 개선하여 자중 및 휨하중에 대한 안전성을 확보함으로써, 사용자로 하여금 제품에 대한 신뢰성을 향상시킬 수 있는 구조물의 벽체와 외부 단열재가 일체로 형성되는 시공구조 및 방법을 제공함에 있다.SUMMARY OF THE INVENTION The present invention has been made in view of the above-described conventional defects, and it is an object of the present invention to provide a method and apparatus for improving the reliability of a product by improving the structure of a ganged foam to secure safety against self weight and flexural load And a construction structure and a method in which a wall of a structure and an external heat insulating material are integrally formed.

또한, 본 발명의 다른 목적은, 박스부재가 판체로부터 분리가능하도록 하여 갱폼내에 설치되는 단열재의 시공이 간편함은 물론 단열재의 파손을 줄이면서 콘크리트와 단열재의 접촉면적을 확대하여 부착력을 높이고, 고정구로부터의 열교(열손실)를 최소화하는 구조물의 벽체와 외부 단열재가 일체로 형성되는 시공구조 및 방법을 제공함에 있다.
It is another object of the present invention to provide a method of manufacturing a gantry, which can easily separate a box member from a plate, simplify the construction of a heat insulating material installed in the gantry, reduce the damage of the heat insulating material, increase the contact area between the concrete and the heat insulating material, And a wall structure of the structure minimizing heat bridging (heat loss) from the external heat insulating material and the external heat insulating material are integrally formed.

본 발명 구조물의 벽체와 외부 단열재가 일체로 형성되는 시공구조는,The construction structure in which the wall of the structure of the present invention and the external heat insulating material are integrally formed,

판체의 일면에 수평,수직보강부재가 부착고정되고, 상기 수직보강부재에 지지대가 설치되어 벽체의 외면을 형성하는 갱폼과;A gantry to which a horizontal and vertical reinforcing member is fixedly attached to one surface of the plate body and a support base is provided on the vertical reinforcing member to form an outer surface of the wall;

상기 갱폼을 통해 하부층 슬라브에 매몰된 앵커에 고정되어 갱폼을 지지하는 고정볼트와;A fixing bolt fixed to the anchor buried in the lower layer slab through the gang foam to support the gang foam;

상기 갱폼의 판체 상면에 절곡된 안내면을 따라 이동 및 분리가능하게 설치되어 상부층 슬라브 시공시, 지지대가 설치되는 설치공간을 형성하면서 타설되는 콘크리트를 지지하도록 하는 박스부재와;A box member which is installed movably and separably along a guide surface bent on the upper surface of the ganged plate to support a concrete being laid while forming an installation space in which a support is installed when the upper slab is installed;

상기 갱폼의 판체 타면에 밀착되면서 콘크리트 페이스트 누출 및 고정구에 의한 열교를 방지하고, 내부에 일정간격으로 다수의 설치공이 관통된 단열재와;A heat insulating material in which a plurality of installation holes penetrate through the inside of the gantry to prevent heat leakage from the concrete paste leaks and fixtures while being in close contact with the other surface of the gantry;

상기 갱폼과 대응되면서 일정간격 이격되게 설치되어 벽체의 내면을 형성하도록 하는 유로폼과;A plurality of grooves formed on the inner surface of the wall to correspond to the gaps;

상기 유로폼을 통해 원터치볼트에 고정되어 갱폼과 유로폼을 지지하는 세파타이와;A septa tie fixed to the one-touch bolt through the euro foam to support the gum foam and the euro foam;

상기 유로폼과 단열재 사이에 콘크리트가 타설 및 양생되면서 단열재와 일체로 형성되는 벽체와;A wall formed integrally with the heat insulating material with concrete poured and cured between the Euroform and the heat insulating material;

상기 벽체로부터 갱폼이 이탈되면서 단열재에 형성된 설치공을 통해 세파타이에 장착되어 단열재를 고정하는 고정구와;A fixture mounted on the cave tie through the installation hole formed in the heat insulating material to detach the heat insulating material from the wall;

상기 갱폼이 벽체로부터 이탈되면서 하부층 슬라브 측면에 형성된 공간으로 장착고정되는 불연단열재와;The gang foam being detached from the wall and being mounted and fixed in a space formed in a side surface of the lower layer slab;

상기 단열재와 불연단열재를 마감하는 마감재를 포함하여 구성되는 것을 특징으로 하는 것이다.
And a finishing material for finishing the heat insulating material and the fireproof insulating material.

또한, 본 발명 구조물의 벽체와 외부 단열재가 일체로 형성되는 시공방법은,In addition, the construction method in which the wall of the structure of the present invention and the external heat insulating material are integrally formed,

판체의 일면에 수평,수직보강부재가 부착고정되면서 상기 수직보강부재에 지지대가 설치되고, 판체의 상면에 절곡된 안내면에 박스부재를 이동가능하게 장착한 갱폼을 형성하는 제1단계와;A first step of forming a gantry on which a horizontal and vertical reinforcing members are fixedly attached to one surface of the plate body and a support member is provided on the vertical reinforcing member and a box member is movably mounted on a guide surface bent on the upper surface of the plate body;

상기 갱폼이 벽체의 측면을 형성하도록 이동시키면서 지지대를 하부층 슬라브 측면에 밀착시킨 후, 상기 갱폼과 하부층 슬라브에 매몰된 앵커를 고정볼트로 고정하는 제2단계와;A second step of moving the gantry to form a side surface of the wall and bringing the gantry into close contact with the side surface of the lower layer slab and fixing the anchors buried in the gantry and the lower layer slab with the fixing bolts;

상기 갱폼에 형성된 지지대에 다수의 설치공이 관통된 단열재를 안착시키면서 판체의 타면에 밀착되도록 한 후, 판체의 안내면을 따라 박스부재를 전방으로 이동시켜 상부층 슬라브 시공시, 지지대의 설치공간을 형성하면서 타설되는 콘크리트를 지지하도록 하는 제3단계와;The box member is moved forward along the guide surfaces of the plate body to move the box member forward to form an installation space of the support member during the installation of the upper layer slab, A third step of supporting the concrete to be formed;

상기 판체와 단열재를 원터치볼트로 고정하는 제4단계와;A fourth step of fixing the plate body and the heat insulating material with a one-touch bolt;

상기 갱폼과 대응되도록 일정간격 이격되어 벽체의 내면을 형성하는 유로폼을 설치하는 제5단계와;A fifth step of disposing a Euroform which is spaced apart from the gaps by a predetermined distance to form an inner surface of the wall;

상기 유로폼을 통해 원터치볼트에 세파타이를 장착하여 갱폼과 유로폼을 연결하는 제6단계와;A sixth step of attaching a three-piece tie to the one-touch bolt through the euro foam to connect the gum foam and the euro foam;

상기 판체에 밀착된 단열재와 유로폼 사이 및 유로폼 상면에 콘크리트를 타설 및 양생하여 콘크리트와 단열재가 일체로 형성되는 벽체와 상부층 슬라브를 형성하는 제7단계와;A seventh step of forming a wall and an upper slab integrally formed with the concrete and the heat insulating material by pouring and curing the concrete between the heat insulating material adhered to the plate and the Euroform and the upper surface of the Euroform;

상기 벽체 및 상부층 슬라브가 형성되면, 원터치볼트를 세파타이에서 분리하고, 상,하부층 슬라브에 매몰된 앵커로부터 고정볼트를 순차적으로 분리하면서, 박스부재를 후방으로 이동시켜 상부층 슬라브로부터 이탈되도록 한 후, 인양장비로 갱폼을 벽체의 반대방향으로 일정간격 이동시킨 상태에서 수직으로 층간격만큼 인양하는 제8단계와;When the wall and the upper layer slab are formed, the one-touch bolt is separated from the septa, the fixing bolts are sequentially separated from the anchors buried in the upper and lower layer slabs, the box member is moved backward to be separated from the upper layer slab, An eleventh step of vertically lifting the gantry with the lifting device while vertically moving the gantry in a direction opposite to the wall;

상기 갱폼이 층간격만큼 인양되면, 상기 갱폼을 벽체 방향으로 일정간격 이동시키면서 박스부재의 이탈로 상부층 슬라브에 형성된 설치공간을 통해 상부층 슬라브 측면에 지지대가 밀착되도록 한 후, 상부층 슬라브에 매몰된 앵커와 고정볼트로 고정하는 제2단계 내지 제8단계를 반복하면서 단열재의 설치공으로 고정구를 장착하여 세타파이에 고정하고, 상기 지지대의 이탈로 형성된 하부층 슬라브의 공간에 불연단열재를 설치하는 제9단계와;When the gauze is lifted by a distance between the upper and lower slabs, the gauze is moved at a predetermined distance in the direction of the wall, and the support member is closely attached to the side of the upper slab through an installation space formed in the upper slab by releasing the box member. A ninth step of fixing the fixture to the setter by fixing the fixture with the installation hole of the heat insulation material while repeating the second to eighth steps of fixing the fixture with the fixing bolt and installing the fireproof insulation material in the space of the lower layer slab formed by the detachment of the support stand;

상기 단열재 및 불연단열재를 마감재로 마감하는 제10단계와;Closing the heat insulating material and the fireproof material with a finishing material;

상기 제9단계 내지 제10단계를 반복하여 구조물의 각 층을 형성하는 제11단계를 포함하여 이루어지는 것을 특징으로 하는 것이다.
And repeating the ninth through tenth steps to form each layer of the structure.

본 발명에 의하면, 갱폼의 구조를 개선하여 자중 및 휨하중에 대한 안전성을 확보하면서 단열재와 콘크리트가 일체로 형성되는 벽체를 형성함으로써, 동절기 콘크리트의 동해방지효과 우수 및 작업능률의 향상으로 작업시간을 단축시켜 경제성을 향상시킬 수 있는 이점을 가질 수 있는 것이다.According to the present invention, by improving the structure of ganged foam and securing safety against self-weight and flexural load, it is possible to form a wall in which the heat insulating material and concrete are integrally formed, It is possible to shorten the cost and improve the economical efficiency.

또한, 본 발명에 의하면, 박스부재가 판체로부터 분리가능하도록 하여 갱폼내에 설치되는 단열재의 시공이 간편함은 물론 단열재의 파손을 줄이면서 콘크리트와 단열재의 접촉면적을 확대하여 부착력을 높이고, 고정구로부터의 열교(열손실)를 최소화하여 내구연한이 증가하는 우수한 품질 확보할 수 있으므로 사용자로 하여금 제품에 대한 신뢰성을 향상시킬 수 있는 이점을 가질 수 있는 것이다.
In addition, according to the present invention, since the box member can be separated from the plate, it is possible to simplify the construction of the heat insulator provided in the gang form, increase the contact area between the concrete and the heat insulator while reducing breakage of the heat insulator, The heat conduction (heat loss) can be minimized and the durability can be increased and the quality can be secured. Therefore, the user can have an advantage of improving the reliability of the product.

도 1은 본 발명의 정면사시도
도 2는 본 발명의 배면사시도
도 3은 본 발명의 단면도
도 4는 도 3의 확대도
도 5 내지 도 11은 본 발명의 시공과정도
도 13은 본 발명에 의한 구조물의 단면도
Figure 1 is a front perspective view of the present invention.
2 is a rear perspective view of the present invention.
Figure 3 is a cross-
4 is an enlarged view of Fig. 3
5 to 11 illustrate the construction process of the present invention
13 is a cross-sectional view of a structure according to the present invention

이하, 첨부된 도면에 의거하여 본 발명을 상세히 설명한다. 도 1은 본 발명의 정면사시도이고, 도 2는 본 발명의 배면사시도이다.Hereinafter, the present invention will be described in detail with reference to the accompanying drawings. FIG. 1 is a front perspective view of the present invention, and FIG. 2 is a rear perspective view of the present invention.

본 발명 구조물의 벽체와 외부 단열재가 일체로 형성되는 시공구조(100)는, 판체(111)의 일면에 수평,수직보강부재(112)(113)가 부착고정되고, 상기 수직보강부재(113)에 지지대(114)가 설치되어 벽체(170)의 외면을 형성하는 갱폼(110)이 구성되며, 상기 갱폼(110)을 통해 하부층 슬라브(10)에 매몰된 앵커(20)에 고정되어 갱폼(110)을 지지하는 고정볼트(120)가 구성되고, 상기 갱폼(110)의 판체(111) 상면에 절곡된 안내면(111')을 따라 이동 및 분리가능하게 설치되어 상부층 슬라브(10') 시공시, 지지대(114)가 설치되는 설치공간(130')을 형성하면서 타설되는 콘크리트를 지지하도록 하는 박스부재(130)가 구성되며, 상기 갱폼(110)의 판체(111) 타면에 밀착되면서 콘크리트 페이스트 누출 및 고정구(180)의 열교를 방지하고, 내부에 일정간격으로 다수의 설치공(141)이 관통된 단열재(140)가 구성되고, 상기 갱폼(110)과 대응되면서 일정간격 이격되게 설치되어 벽체(170)의 내면을 형성하도록 하는 유로폼(150)이 구성되며, 상기 유로폼(150)을 통해 원터치볼트(140')에 고정되어 갱폼(110)과 유로폼(150)을 지지하는 세파타이(160)가 구성되고, 상기 유로폼(150)과 단열재(140) 사이에 콘크리트가 타설 및 양생되면서 단열재(140)와 일체로 형성되는 벽체(170)가 구성되며, 상기 벽체(170)로부터 갱폼(110)이 이탈되면서 단열재(140)에 형성된 설치공(141)을 통해 세파타이(160)에 장착되어 단열재(140)를 고정하는 고정구(180)가 구성되고, 상기 갱폼(110)이 벽체(170)로부터 이탈되면서 하부층 슬라브(10) 측면에 형성된 공간(114')으로 장착고정되는 불연단열재(190)가 구성되며, 상기 단열재(140)와 불연단열재(190)를 마감하는 마감재(200)를 포함하여 구성되는 것으로, 이를 좀더 구체적으로 설명하면 다음과 같다.The horizontal and vertical reinforcement members 112 and 113 are fixedly attached to one surface of the plate body 111 and the vertical reinforcement member 113 is fixed to one side of the plate body 111. [ A support rod 114 is installed on the lower wall slab 10 to form an outer surface of the wall body 170. The support wall 114 is fixed to the anchor 20 buried in the lower layer slab 10 through the gangway 110, The slab 10 'is installed movably and separably along a guiding surface 111' bent on the upper surface of the plate body 111 of the gangue 110 so that when the upper slab 10 'is installed, A box member 130 for supporting a concrete to be laid while forming an installation space 130 'in which a support base 114 is installed is formed and the concrete paste is leaked and adhered to the other surface of the plate body 111 of the gang- It is possible to prevent the fixing bridge 180 from being thermally bridged, Touching bolt 140 is formed through the Euroform 150 so as to form an inner surface of the wall body 170 by being spaced apart from each other by a predetermined distance in correspondence with the gang- And the concrete is inserted and cured between the flow path foam 150 and the heat insulating material 140 so that the heat insulating material 140 is integrally formed with the heat insulating material 140. [ The gang foam 110 is detached from the wall body 170 and is mounted on the septa 160 through the installation hole 141 formed in the heat insulating material 140 so that the heat insulating material 140 And the gangway 110 is detached from the wall 170 to constitute a fireproof thermal insulating material 190 mounted and fixed in a space 114 'formed in a side surface of the lower layer slab 10, And a finishing material 200 for finishing the heat insulating material 140 and the fireproof thermal insulating material 190, This will be described in more detail as follows.

상기 지지대(114)는 하부층 슬라브(10) 측면에 밀착되어 판체(111)를 지지하면서 불연단열재(190)가 설치되는 공간(114')을 형성한다.The support base 114 is in close contact with a side surface of the lower slab 10 to form a space 114 'in which the flameproof heat insulation material 190 is installed while supporting the plate body 111.

상기 앵커(20)와 고정볼트(120)는, 적어도 2열 이상 일정간격 이격되게 형성된다.The anchor 20 and the fixing bolt 120 are spaced apart from each other by at least two rows.

상기 박스부재(130)는, 'ㄴ'자형의 수평면(131a)과 수직면(131b)으로 형성되어 수평면(131a)이 판체(111) 상면에 절곡된 안내면(111')에 안착되는 박스안내판(131)이 구비되고, 상기 박스안내판(131)의 수직면(131b) 일면에 장착되어 상부층 슬라브(10')를 형성하는 돌출부(132)가 구비되며, 상기 박스안내판(131)의 수직면(131b) 타면에 고정되는 수평,수직보강부재(133)(134)가 구비되고, 상기 박스안내판(131)의 수평면(131a)과 판체(111)의 안내면(111')에 관통된 통공(135)이 구비되며, 상기 통공(135)을 통해 박스안내판(131)의 수평면(131a)과 판체(111)의 안내면(111')을 고정하는 볼트/너트(136)를 포함하여 구비된다.The box member 130 includes a box guide plate 131 formed by a horizontal plane 131a and a vertical plane 131b and having a horizontal plane 131a mounted on a guide plane 111 ' And a protrusion 132 which is mounted on one side of the vertical surface 131b of the box guide plate 131 to form an upper slab 10'is provided on the other side of the vertical surface 131b of the box guide plate 131 And a through hole 135 penetrating the horizontal surface 131a of the box guide plate 131 and the guide surface 111 'of the plate body 111 is provided, And a bolt / nut 136 for fixing the horizontal surface 131a of the box guide plate 131 and the guide surface 111 'of the plate body 111 through the through hole 135.

상기 판체(111)의 안내면(111')과 갱폼(110)의 수직보강부재(113)에 고정되는 보강리브(137)를 더 포함하여 구비된다.And a reinforcing rib 137 fixed to the guide surface 111 'of the plate body 111 and the vertical reinforcement member 113 of the gang form 110.

상기 박스안내판(131)의 수평면(131a)에 관통된 통공(135)은 장공인 것이 바람직하다.The through hole 135 passing through the horizontal plane 131a of the box guide plate 131 is preferably long.

상기 설치공(141)에 결합된 고정구(180)의 열교를 방지하도록 고정구(180)가 안착된 단열재(140)의 설치공간(141')을 폐쇄하는 단열캡(180a)을 더 포함하여 구성된다.And a heat insulating cap 180a for closing the installation space 141 'of the heat insulating material 140 on which the fixture 180 is seated to prevent the heat conduction of the fixture 180 coupled to the installation hole 141 .

상기 단열재(140) 일면에 콘크리트와의 접촉면적을 넓히도록 요철(142)이 형성되는 것이 바람직하다.It is preferable that unevenness 142 is formed on one surface of the heat insulating material 140 to widen the contact area with concrete.

상기 단열재(140)와 인접하는 단열재와의 결합이 용이하도록 단열재(140)와 인접하는 단열재 중 어느 하나의 단열재에 홈(143)이 형성되고, 상기 홈(143)에 결합되도록 다른 하나의 단열재에 돌기(144)가 형성된다.
A groove 143 is formed in any one of the heat insulating materials adjacent to the heat insulating material 140 so that the heat insulating material 140 and the adjacent heat insulating material can be easily coupled to each other, A projection 144 is formed.

다음은 상기와 같이 구성된 본 발명의 시공과정을 설명한다.Hereinafter, a construction process of the present invention will be described.

먼저, 도 3 내지 도 4에 도시된 바와 같이, 사각형상으로 형성되면서 상면에 통공(135)이 일정간격 다수 관통된 안내면(111')이 절곡된 판체(111)를 형성하는데, 상기 안내면(111') 저면과 수직보강부재(113)를 보강리브(137)로 연결하여 보강할 수 있으며, 상기 판체(111)의 일면에 수평보강부재(112) 및 수직보강부재(113)를 일정간격으로 고정시켜 판체(111)를 보강하고, 상기 수직보강부재(113)의 하단부에는 지지대(114)가 돌출되는 갱폼(110)을 형성하게 된다.As shown in FIGS. 3 to 4, a plate 111 is formed in a rectangular shape and a guide surface 111 ', which is formed by passing a plurality of through holes 135 at predetermined intervals, is formed on an upper surface. The horizontal reinforcement member 112 and the vertical reinforcement member 113 may be fixed to one surface of the plate body 111 at regular intervals And the supporter 114 is protruded from the lower end of the vertical reinforcement member 113 to form a gantry 110.

상기 지지대(114)의 길이는 단열재(140)의 두께와 동일하게 형성하는 것이 바람직하다.The length of the support member 114 is preferably the same as the thickness of the heat insulating member 140.

또한, 상기 갱폼(110)의 안내면(111')에 박스부재(130)를 안착시키는데, 상기 박스부재(130)는, 'ㄴ'자형으로 절곡된 박스안내판(131)의 수직면(131b) 일면에는 수평,수직보강부재(133)(134)가 일정간격으로 고정되고, 타면에는 단열재(140)와 동일한 두께의 돌출부(132)가 구비되어 박스안내판(131)의 수평면(131a)을 안내면(111')에 안착된 후, 상기 수평면(131a)과 안내면(111')에 관통된 통공(135)을 통해 볼트/너트로 체결하여 판체(111)와 박스부재(130)를 고정시키는데, 수평면(131a)에 관통된 통공(135)은 장공으로 안내면(111')을 따라 박스부재(130)의 이동을 안내할 수 있으며, 상기 박스부재(130)는 안내면(111')의 후단부로 이동된 상태이다.The box member 130 is mounted on the guide surface 111 'of the gangue 110. The box member 130 is formed on one surface of the vertical surface 131b of the box guide plate 131 bent in an' The horizontal and vertical reinforcing members 133 and 134 are fixed at regular intervals and the other surface is provided with a protrusion 132 having the same thickness as the heat insulating material 140 so that the horizontal plane 131a of the box guide plate 131 is guided by the guide surface 111 ' The valve body 111 and the box member 130 are fixed by bolts / nuts through a through hole 135 formed in the horizontal surface 131a and the guide surface 111 ' The through hole 135 passing through the guide surface 111 'can guide the movement of the box member 130 along the guide surface 111' with the long hole and the box member 130 is moved to the rear end of the guide surface 111 '.

상기와 같이 형성된 갱폼(110)이 구조물의 벽체(170)를 형성하기 위해 설치하려면, 도 5에 도시된 바와 같이, 갱폼(110)의 지지대(114)가 하부층 슬라브(10)에 형성된 공간(114')을 통해 하부층 슬라브(10) 측면에 밀착되도록 한 후, 지지대(114)와 하부층 슬라브(10)에 매몰된 앵커(20)를 고정볼트(120)로 고정한다.5, the supporter 114 of the gnomere 110 forms a space 114 formed in the lower layer slab 10 in order to form the gnom 110 formed as described above to form the wall 170 of the structure And the anchor 20 buried in the lower slab 10 is fixed by the fixing bolts 120. The anchor 20 is fixed to the lower slab 10 by the supporting bolts 120. [

상기 앵커(20)와 고정볼트(120)는, 적어도 2열 이상 다수 고정시켜 지지대(114)의 휨변형에 대한 안전성을 확보할 수 있는 것이다.At least two or more rows of the anchor 20 and the fixing bolts 120 are secured so as to ensure safety against bending deformation of the support base 114.

상기 고정볼트(120)가 앵커(120)에 고정되면, 상기 지지대(114)에 단열재(140)를 안착시키면서 갱폼(110)의 판체(111) 타면에 밀착시킨 후, 설치공(141)을 수용하도록 소켓(미도시)을 단열재(140)에 밀착시킨 상태에서 단열재(140)에 관통된 설치공(141)으로 원터치볼트(140')를 결합한다.When the fixing bolt 120 is fixed to the anchor 120, the heat insulating material 140 is seated on the support base 114 and is brought into close contact with the other surface of the plate body 111 of the gung- Touch bolt 140 'is engaged with an installation hole 141 penetrating through the heat insulating material 140 in a state where a socket (not shown) is in close contact with the heat insulating material 140.

이때, 상기 단열재(140)는 내부에 설계도면에 따라 설치공(141)이 다수 관통되고, 도 6 내지 도 7에 도시된 바와 같이, 단열재(140)와 인접하는 단열재 중 어느 하나의 단열재에 형성된 홈(143)으로 다른 하나의 단열재에 형성된 돌기(144)를 결합하면서 설치할 수 있다.6 to 7, a plurality of installation holes 141 are formed in the heat insulating material 140, and the heat insulating material 140 is formed in any one of the heat insulating materials adjacent to the heat insulating material 140 And the protrusion 144 formed on the other one of the heat insulating materials can be coupled to the groove 143.

또한, 상기 하부층 슬라브(10)에 형성된 벽체(170)와 수직선상으로 하부층 슬라브(10)에 철근을 배근한 상태에서 박스부재(130)를 안내면(111')의 선단부로 이동시켜 상기 박스안내판(131)의 수직면(131b)과 판체(111)는 수직선상을 유지하면서 돌출부(132)가 단열재(140)의 두께만큼 수직면(131b)으로부터 돌출되도록 한 후, 상기 수직면(131b)과 안내면(111')에 관통된 통공(135)으로 볼트/너트(136)를 체결하여 판체(111)에 박스부재(130)를 고정한 후, 상기 박스부재(130)를 통해 고정볼트(120)를 상부층 슬라브(10')를 형성하는 위치의 철근에 고정된 앵커(20)에 고정한다.The box member 130 is moved to the leading end of the guide surface 111 'while the reinforcing bars are arranged on the lower layer slab 10 in a line perpendicular to the wall 170 formed in the lower layer slab 10, The vertical surface 131b of the upper plate 131 and the plate body 111 are maintained in a vertical line and the protruding portion 132 protrudes from the vertical surface 131b by the thickness of the heat insulating material 140 and then the vertical surface 131b and the guide surface 111 ' And the fixing bolt 120 is fixed to the upper layer slab 10 through the box member 130 after fixing the box member 130 to the valve body 111 by fastening the bolt / 'To the anchor 20 fixed to the reinforcing bar at the position.

상기 박스부재(130)가 안내면(111')에 고정되면, 상기 갱폼(110)과 일정간격 이격되게 대응되도록 하부층 슬라브(10) 상면에 상부층 슬라브(10') 및 벽체(170)를 형성하도록 유로폼(150)을 설치하는데, 상기 유로폼(150)에 관통된 통공(미도시)을 통해 세파타이(160)을 결합하면서 원터치볼트(140')에 고정한 후, 세파타이(160)의 일단부에 통상의 핀부재(미도시)를 결합하여 이동되지 않도록 함은 물론 유로폼(150)과 갱폼(110)을 연결할 수 있는 것이다.When the box member 130 is fixed to the guide surface 111 ', the upper slab 10' and the wall body 170 are formed on the upper surface of the lower slab 10 so as to be spaced apart from the gang- Touch bolt 140 'through a through hole (not shown) penetrating through the euromon 150 while fixing the septum 160 to the one-touch bolt 140' (Not shown) of the gusset 110 and the gusset 110 can be connected to each other.

상기의 과정으로 유로폼(150)과 갱폼(110)이 세파타이(160)와 원터치볼트(140')로 고정되면, 도 8에 도시된 바와 같이, 상기 유로폼(150)과 단열재(140) 사이의 공간 및 상부층 슬라브(10')를 형성하는 유로폼(150) 상면에 콘크리트를 타설 및 양생하여 벽체(170) 및 상부층 슬라브(10')를 형성하는데, 상기 단열재(140)와 박스부재(130)가 거푸집 역할을 함과 동시에 하부층 슬라브(10) 상면 및 단열재(140) 저면이 동일 선상에 위치하므로 타설되는 콘크리트가 지지대(114) 내부로 유입되는 것을 방지할 수 있는 것이다.8, when the europium 150 and the gum 110 are fixed by the septa 160 and the one-touch bolt 140 ', the gap between the euro foam 150 and the heat insulating material 140 The concrete and the curing concrete are formed on the upper surface of the Euroform 150 forming the space and the upper slab 10 'to form the wall 170 and the upper slab 10'. The heat insulating material 140 and the box member 130 Since the upper surface of the lower slab 10 and the lower surface of the heat insulating material 140 are located on the same line, the concrete being poured can be prevented from flowing into the support base 114.

상기 유로폼(150)과 갱폼(110)은 세파타이(160)와 원터치볼트(140') 및 하부층 슬라브(10)에 매몰된 앵커(20)에 고정볼트(120)가 고정되어 있으므로 타설되는 콘크리트 압력에 의한 유로폼(150)과 갱폼(110)의 유동을 방지하면서 양생되는 콘크리트와 단열재(140)가 일체로 형성되는 벽체(170)을 얻을 수 있다.Since the fixing bolts 120 are fixed to the anchor 20 embedded in the septa 160, the one-touch bolt 140 'and the lower layer slab 10, the concrete foam 150 It is possible to obtain the wall body 170 in which the concrete to be cured and the heat insulating material 140 are integrally formed while preventing the flow of the euro foam 150 and the gang foam 110 by the water.

상기의 과정으로 벽체(170)가 형성되면, 도 9 내지 도 10에 도시된 바와 같이, 상기 세타파이(160)로부터 원터치볼트(140')를 분리한 후, 상부층 슬라브(10')에 매몰된 앵커(20)로부터 고정볼트(120)를 분리하면서 상부층 슬라브(10')를 형성하는 박스부재(130)의 볼트/너트(136) 체결력을 완화시키킨 상태에서 박스부재(130)가 안내면(111')을 따라 수평면(131a)에 관통된 통공(135) 즉, 장공의 간격만큼 후방으로 이동시켜 상부층 슬라브(10) 측면으로부터 이탈되도록 하고, 하부층 슬라브(10)에 매몰된 앵커(20)로부터 고정볼트(120)를 분리한다.After the wall 170 is formed as described above, the one-touch bolt 140 'is detached from the settler 160 as shown in FIGS. 9 to 10, and then the anchor buried in the upper slab 10' The box member 130 is guided by the guide surface 111 'in a state in which the fastening bolt 120 is separated from the guide groove 20 and the fastening force of the bolt / nut 136 of the box member 130 forming the upper slab 10' The slabs 10 are moved from the anchor 20 buried in the lower layer slab 10 to the fixing bolts 13 by moving the slits in the vertical direction along the horizontal plane 131a, (120).

상기 고정부재(120)가 하,상부층 슬라브(10)(10')에 매몰된 앵커(20)로부터 분리되면, 갱폼(110)과 박스부재(130)에 각각 형성된 인양고리에 결합된 와이어를 타원크레인과 같은 인양장비로 갱폼(110)을 벽체(170)의 반대방향으로 일정간격 즉, 지지대(114)가 단열재(140)로부터 분리되는 간격만큼 수평이동시킨 상태에서 구조물의 층간격만큼 인양시키고, 도 11에 도시된 바와 같이, 다시 갱폼(110)을 벽체(170) 방향으로 일정간격 이동시켜 박스부재(130)의 이탈로 상부층 슬라브(10')에 형성된 설치공간(130')으로 지지대(114)가 이동되면서 상부층 슬라브(10') 측면에 밀착되도록 하고, 상기 지지대(114)와 상부층 슬라브(10')에 매몰된 앵커(20)를 고정볼트(120)로 고정한다.When the fixing member 120 is separated from the anchors 20 buried in the upper and lower slabs 10 and 10 ', the wires coupled to the lifting hooks respectively formed on the gang- Lifting the ganged foam 110 by a lifting device such as a crane in a direction opposite to the wall 170 so as to be spaced apart by a distance between layers of the structure in a state in which the support 114 is moved horizontally by an interval separated from the heat insulating material 140, The gantry 110 is moved in the direction of the wall 170 to move the gantry 110 to the installation space 130 'formed in the upper slab 10' And the anchors 20 buried in the upper slabs 10 'are fixed by the fixing bolts 120. The fixing bolts 120 are fixed to the upper slabs 10'.

상기 갱폼(110)의 인양으로 나타나는 하부층 슬라브(10)의 공간(114')으로 불열단열재(190)를 설치하여 화재발생시, 상부층으로의 화염확산을 방지하면서 단열재(140)의 설치공(141)으로 고정구(180)를 결합하면서 세파타이(160)에 체결고정하여 단열재(140)의 부착력을 보강할 수 있다.The heat insulating material 190 is installed in the space 114 'of the lower layer slab 10 as shown by the lifting of the gnomere 110 to prevent the flame spread to the upper layer when a fire occurs, So that the adhesive force of the heat insulating material 140 can be reinforced.

그리고, 도 12에 도시된 바와 같이, 상기 고정구(180)가 결합된 설치공간(141')에 단열캡(180a)을 장착하여 폐쇄시킴으로 고정구(180)의 열교현상을 방지할 수 있고, 상기 단열재(140) 일면에는 요철(142)이 형성되어 있으므로 콘크리트와의 접촉면적을 넓혀 단열재(140)와 콘크리트의 부착력을 강화할 수 있으며, 단열재(140)와 콘크리트가 일체로 형성되는 벽체(170)를 형성함으로써, 습,건식공법 대비 시공성 향상으로 공기를 단축시킴과 아울러 동절기 콘크리트의 동해방지효과 우수 및 골조 내구연한이 증가함은 물론 우수에 의한 누수를 방지할 수 있는 것이다.12, it is possible to prevent the thermal bridge phenomenon of the fixture 180 by mounting and closing the heat insulating cap 180a in the installation space 141 'to which the fixture 180 is coupled, The concave and convex portions 142 are formed on one surface of the body 140 so that the contact area between the heat insulating material 140 and the concrete can be increased and the wall 170 formed integrally with the heat insulating material 140 is formed As a result, it is possible to shorten the air due to the improvement of the workability compared to the wet and dry method, and to prevent the frost damage of the winter concrete and to increase the durability of the concrete structure.

또한, 도 13에 도시된 바와 같이, 상기 단열재(140)와 불열단열재(190)를 시멘트몰탈처리, 석재 및 드라이비트 등의 마감재(200)로 마감하고, 상기의 일련의 과정을 반복하면서 구조물의 각 층을 형성함은 물론 구조물의 시공을 완료할 수 있는 것이다.13, the heat insulating material 140 and the heat insulating material 190 are closed with a finishing material 200 such as a cement mortar treatment, a stone and a dry bit, and the above- It is possible to complete the construction of the structure as well as form each layer.

이상과 같이 본 발명은, 비록 한정된 실시예와 도면에 의해 설명하였으나, 본 명세서 및 청구범위에 사용된 용어나 단어는 통상적이거나 사전적인 의미로 한정되어 해석되어서는 아니되며, 본 발명의 기술적 사상에 부합하는 의미와 개념으로 해석되어야만 한다. 따라서, 본 명세서에 기재된 실시예와 도면에 도시된 구성은 본 발명의 일실시예에 불과할 뿐이고, 본 발명의 기술적 사상을 모두 대변하는 것은 아니므로, 본 발명의 청구범위를 벗어나지 않는 한도 내에서 다양한 균등물과 변형예들이 있을 수 있음을 이해하여야 한다.
While the present invention has been described in connection with certain exemplary embodiments and drawings, it is to be understood that the phraseology and terminology used herein are for the purpose of description and should not be interpreted as limiting the invention in any way. It must be interpreted in terms of meaning and concept. Therefore, the embodiments described in the present specification and the configurations shown in the drawings are only examples of the present invention, and not all of the technical ideas of the present invention are described. Therefore, It is to be understood that equivalents and modifications are possible.

100: 시공구조 110: 갱폼
120: 고정볼트 130: 박스부재
140: 단열재 150: 유로폼
160: 세파타이 170: 벽체
180: 고정구 190: 불연단열재
200: 마감재
100: construction structure 110:
120: fixing bolt 130: box member
140: Insulation material 150: Eurofoam
160: Sephai 170: Wall
180: fixture 190: fireproof insulator
200: Finishing material

Claims (13)

판체의 일면에 수평,수직보강부재가 부착고정되고, 상기 수직보강부재에 지지대가 설치되어 벽체의 외면을 형성하는 갱폼과;
상기 갱폼을 통해 하부층 슬라브에 매몰된 앵커에 고정되어 갱폼을 지지하는 고정볼트와;
상기 갱폼의 판체 상면에 절곡된 안내면을 따라 이동 및 분리가능하게 설치되어 상부층 슬라브 시공시, 지지대가 설치되는 설치공간을 형성하면서 타설되는 콘크리트를 지지하도록 하는 박스부재와;
상기 갱폼의 판체 타면에 밀착되면서 콘크리트 페이스트 누출방지 및 고정구의 열교를 방지하면서 내부에 일정간격으로 다수의 설치공이 관통된 단열재와;
상기 갱폼과 대응되면서 일정간격 이격되게 설치되어 벽체의 내면을 형성하도록 하는 유로폼과;
상기 유로폼을 통해 원터치볼트에 고정되어 갱폼과 유로폼을 지지하는 세파타이와;
상기 유로폼과 단열재 사이에 콘크리트가 타설 및 양생되면서 단열재와 일체로 형성되는 벽체와;
상기 벽체로부터 갱폼이 이탈되면서 단열재에 형성된 설치공을 통해 세파타이에 장착되어 단열재를 고정하는 고정구와;
상기 갱폼이 벽체로부터 이탈되면서 하부층 슬라브 측면에 형성된 공간으로 장착고정되는 불연단열재와;
상기 단열재와 불연단열재를 마감하는 마감재를 포함하여 구성되는 것을 특징으로 하는 구조물의 벽체와 외부 단열재가 일체로 형성되는 시공구조.
A gantry to which a horizontal and vertical reinforcing member is fixedly attached to one surface of the plate body and a support base is provided on the vertical reinforcing member to form an outer surface of the wall;
A fixing bolt fixed to the anchor buried in the lower layer slab through the gang foam to support the gang foam;
A box member which is installed movably and separably along a guide surface bent on the upper surface of the ganged plate to support a concrete being laid while forming an installation space in which a support is installed when the upper slab is installed;
A heat insulating material having a plurality of installation holes penetrating the inside of the gantry at regular intervals while preventing the leakage of the concrete paste and the heat conduction of the fixing hole while being in contact with the other surface of the ganged foam;
A plurality of grooves formed on the inner surface of the wall to correspond to the gaps;
A septa tie fixed to the one-touch bolt through the euro foam to support the gum foam and the euro foam;
A wall formed integrally with the heat insulating material with concrete poured and cured between the Euroform and the heat insulating material;
A fixture mounted on the cave tie through the installation hole formed in the heat insulating material to detach the heat insulating material from the wall;
The gang foam being detached from the wall and being mounted and fixed in a space formed in a side surface of the lower layer slab;
And a finishing material for finishing the heat insulating material and the fire-extinguishing heat insulating material, wherein the wall of the structure and the external heat insulating material are integrally formed.
청구항 1에 있어서,
상기 지지대는 하부층 슬라브 측면에 밀착되어 판체를 지지하면서 불연단열재가 설치되는 공간을 형성하는 것을 특징으로 하는 구조물의 벽체와 외부 단열재가 일체로 형성되는 시공구조.
The method according to claim 1,
Wherein the supporting member is in close contact with a side surface of the lower layer slab to form a space in which the flammable insulating material is installed while supporting the plate member.
청구항 1에 있어서,
상기 앵커와 고정볼트는, 적어도 2열 이상 일정간격 이격되게 형성되는 것을 특징으로 하는 구조물의 벽체와 외부 단열재가 일체로 형성되는 시공구조.
The method according to claim 1,
Wherein the anchor and the fixing bolt are spaced apart from each other by at least two rows at a predetermined interval, wherein the wall of the structure and the external heat insulating material are integrally formed.
청구항 1에 있어서, 상기 박스부재는,
'ㄴ'자형의 수평면과 수직면으로 형성되어 수평면이 판체 상면에 절곡된 안내면에 안착되는 박스안내판과;
상기 박스안내판의 수직면 일면에 장착되어 상부층 슬라브를 형성하는 돌출부와;
상기 박스안내판의 수직면 타면에 고정되는 수평,수직보강부재와;
상기 박스안내판의 수평면과 판체의 안내면에 관통된 통공과;
상기 통공을 통해 박스안내판의 수평면과 판체의 안내면을 고정하는 볼트/너트를 포함하여 구비되는 것을 특징으로 하는 구조물의 벽체와 외부 단열재가 일체로 형성되는 시공구조.
[2] The apparatus according to claim 1,
A box guide plate which is formed with a horizontal plane and a vertical plane of a 'b' shape and is seated on a guide surface whose horizontal plane is bent on the upper surface of the plate;
A protrusion mounted on one side of the vertical surface of the box guide plate to form an upper slab;
A horizontal and vertical reinforcing member fixed to the other surface of the box guide plate on a vertical plane;
A through hole penetrating through the horizontal surface of the box guide plate and the guide surface of the plate member;
And a bolt / nut for fixing the horizontal surface of the box guide plate and the guide surface of the plate body through the through hole. The structure of claim 1, wherein the wall of the structure and the external heat insulating material are integrally formed.
청구항 4에 있어서,
상기 판체의 안내면과 갱폼의 수직보강부재에 고정되는 보강리브를 더 포함하여 구비되는 것을 특징으로 하는 구조물의 벽체와 외부 단열재가 일체로 형성되는 시공구조.
The method of claim 4,
Further comprising a reinforcing rib fixed to a guide surface of the plate and a vertical reinforcement member of the gang-foam. The construction of claim 1, wherein the reinforcing rib is integrally formed with the wall of the structure.
청구항 4에 있어서,
상기 박스안내판의 수평면에 관통된 통공은 장공인 것을 특징으로 하는 구조물의 벽체와 외부 단열재가 일체로 형성되는 시공구조.
The method of claim 4,
Wherein the through hole penetrating the horizontal plane of the box guide plate is a long hole, and the wall of the structure and the external heat insulating material are integrally formed.
청구항 1에 있어서,
상기 설치공에 결합된 고정구의 열교를 방지하도록 고정구가 안착된 단열재의 설치공간을 폐쇄하는 단열캡을 더 포함하여 구성되는 것을 특징으로 하는 구조물의 벽체와 외부 단열재가 일체로 형성되는 시공구조.
The method according to claim 1,
Further comprising a heat insulating cap which closes an installation space of the heat insulating material on which the fixture is seated to prevent a heat bridge of the fixture coupled to the installation hole.
청구항 1에 있어서,
상기 단열재 일면에 콘크리트와의 접촉면적을 넓히도록 요철이 형성되는 것을 특징으로 하는 구조물의 벽체와 외부 단열재가 일체로 형성되는 시공구조.
The method according to claim 1,
Wherein a concavity and convexity are formed on one surface of the heat insulating material so as to widen the contact area with the concrete, wherein the wall of the structure and the external heat insulating material are integrally formed.
청구항 1 또는 청구항 8에 있어서,
상기 단열재와 인접하는 단열재와의 결합이 용이하도록 단열재와 인접하는 단열재 중 어느 하나의 단열재에 홈이 형성되고, 상기 홈에 결합되도록 다른 하나의 단열재에 돌기가 형성되는 것을 특징으로 하는 구조물의 벽체와 외부 단열재가 일체로 형성되는 시공구조.
The method according to claim 1 or 8,
Wherein a groove is formed in any one of the heat insulating material adjacent to the heat insulating material so that the heat insulating material and the adjacent heat insulating material can be easily coupled to each other and the other heat insulating material is formed with a protrusion so as to be coupled to the groove. A construction in which the external insulation is integrally formed.
청구항 1에 있어서,
상기 갱폼과 박스부재에 각각 형성되는 인양고리를 더 포함하여 구성되는 것을 특징으로 하는 구조물의 벽체와 외부 단열재가 일체로 형성되는 시공구조.
The method according to claim 1,
Wherein the wall of the structure and the external heat insulating material are formed integrally with each other.
판체의 일면에 수평,수직보강부재가 부착고정되면서 상기 수직보강부재에 지지대가 설치되고, 판체의 상면에 절곡된 안내면에 박스부재를 이동가능하게 장착한 갱폼을 형성하는 제1단계와;
상기 갱폼이 벽체의 측면을 형성하도록 이동시키면서 지지대를 하부층 슬라브 측면에 밀착시킨 후, 상기 갱폼과 하부층 슬라브에 매몰된 앵커를 고정볼트로 고정하는 제2단계와;
상기 갱폼에 형성된 지지대에 다수의 설치공이 관통된 단열재를 안착시키면서 판체의 타면에 밀착되도록 한 후, 판체의 안내면을 따라 박스부재를 전방으로 이동시켜 상부층 슬라브 시공시, 지지대의 설치공간을 형성하면서 타설되는 콘크리트를 지지하도록 하는 제3단계와;
상기 판체와 단열재를 원터치볼트로 고정하는 제4단계와;
상기 갱폼과 대응되도록 일정간격 이격되어 벽체의 내면을 형성하는 유로폼을 설치하는 제5단계와;
상기 유로폼을 통해 원터치볼트에 세파타이를 장착하여 갱폼과 유로폼을 연결하는 제6단계와;
상기 판체에 밀착된 단열재와 유로폼 사이 및 유로폼 상면에 콘크리트를 타설 및 양생하여 콘크리트와 단열재가 일체로 형성되는 벽체와 상부층 슬라브를 형성하는 제7단계와;
상기 벽체 및 상부층 슬라브가 형성되면, 원터치볼트를 세파타이에서 분리하고, 상,하부층 슬라브에 매몰된 앵커로부터 고정볼트를 순차적으로 분리하면서, 박스부재를 후방으로 이동시켜 상부층 슬라브로부터 이탈되도록 한 후, 인양장비로 갱폼을 벽체의 반대방향으로 일정간격 이동시킨 상태에서 수직으로 층간격만큼 인양하는 제8단계와;
상기 갱폼이 층간격만큼 인양되면, 상기 갱폼을 벽체 방향으로 일정간격 이동시키면서 박스부재의 이탈로 상부층 슬라브에 형성된 설치공간을 통해 상부층 슬라브 측면에 지지대가 밀착되도록 한 후, 상부층 슬라브에 매몰된 앵커와 고정볼트로 고정하는 제2단계 내지 제8단계를 반복하면서 단열재의 설치공으로 고정구를 장착하여 세타파이에 고정하고, 상기 지지대의 이탈로 형성된 하부층 슬라브의 공간에 불연단열재를 설치하는 제9단계와;
상기 단열재 및 불연단열재를 마감재로 마감하는 제10단계와;
상기 제9단계 내지 제10단계를 반복하여 구조물의 각 층을 형성하는 제11단계를 포함하여 이루어지는 것을 특징으로 하는 구조물의 벽체와 외부 단열재가 일체로 형성되는 시공방법.
A first step of forming a gantry on which a horizontal and vertical reinforcing members are fixedly attached to one surface of the plate body and a support member is provided on the vertical reinforcing member and a box member is movably mounted on a guide surface bent on the upper surface of the plate body;
A second step of moving the gantry to form a side surface of the wall and bringing the gantry into close contact with the side surface of the lower layer slab and fixing the anchors buried in the gantry and the lower layer slab with the fixing bolts;
The box member is moved forward along the guide surfaces of the plate body to move the box member forward to form an installation space of the support member during the installation of the upper layer slab, A third step of supporting the concrete to be formed;
A fourth step of fixing the plate body and the heat insulating material with a one-touch bolt;
A fifth step of disposing a Euroform which is spaced apart from the gaps by a predetermined distance to form an inner surface of the wall;
A sixth step of attaching a three-piece tie to the one-touch bolt through the euro foam to connect the gum foam and the euro foam;
A seventh step of forming a wall and an upper slab integrally formed with the concrete and the heat insulating material by pouring and curing the concrete between the heat insulating material adhered to the plate and the Euroform and the upper surface of the Euroform;
When the wall and the upper layer slab are formed, the one-touch bolt is separated from the septa, the fixing bolts are sequentially separated from the anchors buried in the upper and lower layer slabs, the box member is moved backward to be separated from the upper layer slab, An eleventh step of vertically lifting the gantry with the lifting device while vertically moving the gantry in a direction opposite to the wall;
When the gauze is lifted by a distance between the upper and lower slabs, the gauze is moved at a predetermined distance in the direction of the wall, and the support member is closely attached to the side of the upper slab through an installation space formed in the upper slab by releasing the box member. A ninth step of fixing the fixture to the setter by fixing the fixture with the installation hole of the heat insulation material while repeating the second to eighth steps of fixing the fixture with the fixing bolt and installing the fireproof insulation material in the space of the lower layer slab formed by the detachment of the support stand;
Closing the heat insulating material and the fireproof material with a finishing material;
And repeating the ninth step to the tenth step to form each layer of the structure. The method of claim 1, wherein the wall of the structure and the external heat insulating material are integrally formed.
청구항 11에 있어서, 상기 제2단계에서,
상부층 슬라브 시공시, 상부층 슬라브에 매몰되는 앵커를 철근에 고정하는 단계를 더 포함하여 이루어지는 것을 특징으로 하는 구조물의 벽체와 외부 단열재가 일체로 형성되는 시공방법.
12. The method of claim 11, wherein in the second step,
Further comprising the step of fixing the anchor to be buried in the upper slab to the reinforcing steel when the upper slab is constructed, wherein the wall of the structure and the external insulating material are integrally formed.
청구항 11에 있어서, 제9단계에서,
상기 고정구가 설치공을 통해 세타파이에 고정되면, 상기 고정구가 결합된 고정구의 열교를 방지하도록 고정구가 안착된 단열재의 설치공간을 단열캡으로 폐쇄하는 단계를 더 포함하여 이루어지는 것을 특징으로 하는 구조물의 벽체와 외부 단열재가 일체로 형성되는 시공방법.
The method of claim 11, wherein, in the ninth step,
Further comprising the step of closing the installation space of the heat insulating material on which the fixture is seated by the heat insulating cap so as to prevent the heat fixing of the fixture to which the fixture is coupled when the fixture is fixed to the setter through the installation hole. And the outer heat insulating material are integrally formed.
KR1020150084837A 2015-06-16 2015-06-16 Methode and structure for intergarally formed with wall and external insulation KR101562362B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020150084837A KR101562362B1 (en) 2015-06-16 2015-06-16 Methode and structure for intergarally formed with wall and external insulation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020150084837A KR101562362B1 (en) 2015-06-16 2015-06-16 Methode and structure for intergarally formed with wall and external insulation

Publications (1)

Publication Number Publication Date
KR101562362B1 true KR101562362B1 (en) 2015-10-22

Family

ID=54427041

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020150084837A KR101562362B1 (en) 2015-06-16 2015-06-16 Methode and structure for intergarally formed with wall and external insulation

Country Status (1)

Country Link
KR (1) KR101562362B1 (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20180080606A (en) 2017-01-04 2018-07-12 주식회사 포스코건설 Structure of exterior insulation
KR101985310B1 (en) 2018-03-23 2019-06-04 미진정공(주) Improved exterior wall construction method using gang form
KR102017494B1 (en) * 2018-11-08 2019-09-03 (주)유송엔지니어링 Supporting assembly for mold having truss structure
KR20190134347A (en) * 2018-05-25 2019-12-04 한국항공우주연구원 A Insulation Pressurization Apparatus For Launcher And The Method Of Attaching Insulation

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200370254Y1 (en) 2004-09-21 2004-12-13 김영화 Device For Connecting Concrete Form
KR101224160B1 (en) 2012-11-28 2013-01-21 현대산업개발 주식회사 Methode and structure for intergarally formed with wall and external insulation

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200370254Y1 (en) 2004-09-21 2004-12-13 김영화 Device For Connecting Concrete Form
KR101224160B1 (en) 2012-11-28 2013-01-21 현대산업개발 주식회사 Methode and structure for intergarally formed with wall and external insulation

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20180080606A (en) 2017-01-04 2018-07-12 주식회사 포스코건설 Structure of exterior insulation
KR101985310B1 (en) 2018-03-23 2019-06-04 미진정공(주) Improved exterior wall construction method using gang form
KR20190134347A (en) * 2018-05-25 2019-12-04 한국항공우주연구원 A Insulation Pressurization Apparatus For Launcher And The Method Of Attaching Insulation
KR102062745B1 (en) * 2018-05-25 2020-02-11 한국항공우주연구원 A Insulation Pressurization Apparatus For Launcher And The Method Of Attaching Insulation
KR102017494B1 (en) * 2018-11-08 2019-09-03 (주)유송엔지니어링 Supporting assembly for mold having truss structure

Similar Documents

Publication Publication Date Title
KR101562362B1 (en) Methode and structure for intergarally formed with wall and external insulation
KR200452381Y1 (en) Device for Fixing a Exterior Materials of Building
KR101986990B1 (en) Outside heat-insulation wall method and outside heat-insulation wall thereby
KR101224160B1 (en) Methode and structure for intergarally formed with wall and external insulation
KR101125549B1 (en) Slab constructing method using truss deck plate with heat insulator
KR101650365B1 (en) An Expansion Joint Filler
CN109057099B (en) Steel structure engineering precast concrete composite integrated partition wall and manufacturing and using methods thereof
KR101847827B1 (en) Exterior panel anchorage for building, and outer wall and exterior panel install method with form combined with insulation
KR102128291B1 (en) A fixing apparatus of insulation material and constructing method thereof
KR102452514B1 (en) Insulation-equipped building-integrated formwork and manufacturing method therefor
KR101978599B1 (en) Apparatus for fixing gangform to the wall
CN107246794B (en) Assembled tunnel cave
KR101043751B1 (en) insulation deck plate for slab
KR20230081573A (en) Novel composite insulation layer building formwork assembly
CZ31130U1 (en) A dismountable joint of the ceiling elements and the supporting structure with fire protection and sealing
EA034679B1 (en) Method for producing products with a layer of thermal insulation for the construction of buildings and structures
KR100988270B1 (en) Level spacer device
KR102017494B1 (en) Supporting assembly for mold having truss structure
KR101714591B1 (en) Exterior insulation system intergrated insulatin material using the gangform
RU2639218C1 (en) Method of manufacturing products based on binder with thermal insulating layer from mineral wool thermal insulation for construction of buildings and structures
RU2635666C1 (en) Method of manufacturing products based on binder with thermal insulating layer from mineral wool thermal insulation for construction of buildings and structures
KR101955352B1 (en) Fixing apparatus of embedded-type for securing a support means and installation method of support means using the same
KR200418001Y1 (en) A location fixing device for aluminum form
CN108425444A (en) A kind of integrated wallboard of assembled heat insulation decoration maintenance
KR200315815Y1 (en) Anchor hall member for expansion joint of bridge

Legal Events

Date Code Title Description
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20181008

Year of fee payment: 4

FPAY Annual fee payment

Payment date: 20191014

Year of fee payment: 5