KR101543421B1 - Strut for constructing conduit line and method for constructing conduit line using the same - Google Patents

Strut for constructing conduit line and method for constructing conduit line using the same Download PDF

Info

Publication number
KR101543421B1
KR101543421B1 KR1020140112483A KR20140112483A KR101543421B1 KR 101543421 B1 KR101543421 B1 KR 101543421B1 KR 1020140112483 A KR1020140112483 A KR 1020140112483A KR 20140112483 A KR20140112483 A KR 20140112483A KR 101543421 B1 KR101543421 B1 KR 101543421B1
Authority
KR
South Korea
Prior art keywords
strut
pipeline
wall
piping
earth retaining
Prior art date
Application number
KR1020140112483A
Other languages
Korean (ko)
Inventor
강경식
김재홍
Original Assignee
케이앤케이컴퍼니 주식회사
강경식
한국수자원공사
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 케이앤케이컴퍼니 주식회사, 강경식, 한국수자원공사 filed Critical 케이앤케이컴퍼니 주식회사
Priority to KR1020140112483A priority Critical patent/KR101543421B1/en
Application granted granted Critical
Publication of KR101543421B1 publication Critical patent/KR101543421B1/en
Priority to PCT/KR2015/008906 priority patent/WO2016032220A1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/02Foundation pits
    • E02D17/04Bordering surfacing or stiffening the sides of foundation pits
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F3/00Sewer pipe-line systems
    • E03F3/06Methods of, or installations for, laying sewer pipes
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L1/00Laying or reclaiming pipes; Repairing or joining pipes on or under water
    • F16L1/024Laying or reclaiming pipes on land, e.g. above the ground
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2200/00Geometrical or physical properties
    • E02D2200/15Geometrical or physical properties including at least a hinge
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2220/00Temporary installations or constructions

Abstract

The present invention relates to a strut for constructing a conduit line and a method for constructing an earth retaining wall and an underground conduit line using the same so as to stably support an earth retaining wall through a strut, and further, conveniently and quickly construct a conduit line under the ground regardless of a length. According to the present invention, a strut for constructing a conduit line comprises: a first and a second wall side strut beam (110, 120) respectively fixated on earth retaining walls facing each other; and a strut conduit line socket unit (130) formed between the first and second wall side strut beams (110, 120).

Description

관로시공 겸용 버팀대 및 이를 이용한 흙막이와 지중 관로 시공 공법{STRUT FOR CONSTRUCTING CONDUIT LINE AND METHOD FOR CONSTRUCTING CONDUIT LINE USING THE SAME} BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method of constructing a piping system for a pipeline construction,

본 발명은 관로시공 겸용 버팀대 및 이를 이용한 흙막이와 지중 관로 시공 공법에 관한 것으로, 더욱 상세하게는 버팀대를 통해 흙막이 벽체를 안정적으로 지지함과 더불어 길이에 상관없이 관로를 편리하고 신속하게 지중에 시공할 수 있는 관로시공 겸용 버팀대 및 이를 이용한 흙막이와 지중 관로 시공 공법에 관한 것이다.
More particularly, the present invention relates to a method and apparatus for supporting a retaining wall through a pair of braces, and a method for constructing a channel in a convenient and quick manner, regardless of the length of the retaining wall. And a method for constructing the earth retaining structure and the underground pipeline using the same.

일반적으로 지중에 관로(가스관 등)를 시공하기 위한 흙막이 공사는 엄지말뚝 수평널(H-PILE+토류벽) 공법, 강널말뚝(SHEET PILE) 공법, 주열식 지중벽(S.C.W;SOIL CEMENT WALL) 공법, 주열식 현장타설 말뚝(C.I.P ; CAST-IN PLACED PILE)공법 등이 시공 조건에 따라 다양하게 이용된다.Generally, the earthwork works for constructing pipelines (gas pipes, etc.) in the ground include the pile pile horizontal wall (H-PILE + soil wall) method, steel sheet pile method, SCW (SOIL CEMENT WALL) (CIP) method is widely used according to the construction conditions.

그 중에서도 H-PILE 토류벽 공법은 개착식 공법으로 일정 간격으로 H-PILE을 항타 또는 천공후 삽입하여 설치한 다음에, 도랑 등 터파기 굴착 작업을 진행하면서 상기 H-PILE 사이에 목재 등으로 된 토류판을 끼워 넣어, 벽체를 형성하면서 흙막이를 하는 공법이다.Among them, the H-PILE toothed wall method is installed by inserting the H-PILE at regular intervals by hitching or puncturing by an opening method, and then performing a trenching excavation work such as a ditch, To form a wall, and to form a retaining wall.

한편 종래 관로의 지중 시공을 위한 흙막이 구조물은 마주하는 흙막이 벽체가 토압에 의해 붕괴되지 않도록 가로보인 버팀대가 적용된다.Meanwhile, in the conventional retaining structure for underground construction of a pipeline, a transverse brace is applied so that the facing retaining wall is not collapsed by the earth pressure.

상기 버팀대는 상호 간에 일정 간격을 두고 다수개(또는 다수개 및 다단)가 설치되어 흙막이 벽체를 지지한다.A plurality of (or a plurality of and a plurality of) and a plurality of stages are installed at a certain interval from each other to support the earth retaining wall.

도 1은 종래 관로 시공의 예를 도시한 것으로, 흙막이 벽체(2,3)에 이들 흙막이 벽체(2,3)를 지지하기 위한 다수의 버팀대(10)가 일정 간격 예를 들어 4m를 두고 설치되어 있다.1 shows an example of a conventional pipeline construction, in which a plurality of braces 10 for supporting the earth retaining walls 2, 3 are installed at predetermined intervals of, for example, 4 m on the retaining walls 2, 3 have.

이와 같은 흙막이 구조물에서 관로(1)를 지중에 시공하는 경우, 관로(1)의 길이가 버팀대(10)들 사이의 간격보다 짧은 길이라면 관로(1)를 어려움없이 지중에 설치할 수 있으나 버팀대(10)의 간격은 흙막이 벽체(2,3)의 붕괴 방지를 위하여 정해져 있으며 버팀대(10)들의 간격보다 길이가 긴 관로(1)의 시공이 매우 어렵고 불가능하다. 즉, 버팀대(10)들 사이의 간격보다 길이가 긴 관로(1)를 시공하기 위해서는 관로(1)를 버팀대(10)들 사이에 경사지게 삽입하고 관로(1)의 아래 부분을 이동하면서 관로(1)를 버팀대(10)들 아래쪽으로 삽입하여야 하며 이러한 과정을 통해 관로(1)의 시공이 가능할 수 있지만 공정이 너무 복잡하고 번거로워 공기가 길어진다. 또한, 장대 관로(1)의 경우에는 버팀대(10)들 사이에 경사지게 삽입한 후 기울이면서 시공할 수 없는 길이기 때문에 버팀대(10)들을 그대로 설치한 상태에서는 시공할 수 없다.
If the length of the channel 1 is shorter than the interval between the braces 10, it is possible to install the channel 1 in the ground without difficulty. However, when the channel 1 is installed in the ground, Are designed to prevent collapse of the retaining walls 2 and 3 and it is very difficult and impossible to construct the pipeline 1 having a length longer than the interval of the braces 10. That is, in order to construct the pipeline 1 having a longer length than the interval between the braces 10, the pipeline 1 is sloped between the braces 10 and the pipeline 1 is moved while moving the lower part of the pipeline 1 Should be inserted below the braces 10, and the pipeline 1 can be constructed through this process, but the process is too complicated and troublesome, and the air is lengthened. In addition, in the case of the long pipe line 1, since the length of the long pipe line 1 is inclined between the pair of the pair of braces 10 and can not be applied while being inclined, the pair of braces 10 can not be installed.

대한민국 등록실용신안공보 제20-0416567호Korean Utility Model Registration No. 20-0416567

본 발명은 전술한 바와 같은 문제점을 해결하기 위한 것으로, 버팀대를 통해 흙막이 벽체를 안정적으로 지지함과 더불어 길이에 상관없이 관로를 편리하고 신속하게 지중에 시공할 수 있는 관로시공 겸용 버팀대 및 이를 이용한 흙막이와 지중 관로 시공 공법을 제공하려는데 그 목적이 있다.
SUMMARY OF THE INVENTION The present invention has been made to solve the above-mentioned problems and it is an object of the present invention to provide a piping system which can stably support an earth retaining wall through a brace and can construct a channel easily and quickly in the ground regardless of its length, And an underground pipeline construction method.

본 발명에 의한 관로시공 겸용 버팀대는, 서로 마주하는 흙막이 벽체에 각각 고정되어 상기 흙막이 벽체를 시공 상태로 지지하는 제1,2벽체측 버팀보와; 상기 제1,2벽체측 버팀보의 사이에 형성되며 상기 제1,2벽체측 버팀보와 결합 상태를 유지하면서 관로를 지중에 시공하도록 하는 버팀겸용 관로 소켓부를 포함하고, 상기 버팀겸용 관로 소켓부는, 상기 제1,2벽체측 버팀보의 사이에 상하로 배열되면서 상기 제1,2벽체측 버팀보에 분리 가능하게 결합되는 개폐식 하부 버팀보 및 개폐식 상부 버팀보로 이루어지며, 이에 의하여 상기 제1,2버팀대가 상기 흙막이 벽체에 고정되고 상기 개폐식 하부 버팀보와 개폐식 상부 버팀보 중 어느 하나가 상기 제1,2버팀대에 연결된 상태에서 상기 관로를 상기 흙막이 벽체 사이의 지중에 시공하도록 하는 것을 특징으로 한다.The piping construction-use supporting bracket according to the present invention comprises first and second wall-side brackets fixed to an earth retaining wall facing each other to support the earth retaining wall in a construction state; And a pair of pipe socket sockets formed between the first and second wall-side strut brackets and configured to allow the pipe to be installed in the ground while maintaining a state of engagement with the first and second wall side strut assemblies, A pair of brackets disposed on the first and second wall side struts and detachably coupled to the first and second wall side struts, respectively, and the first and second braces are connected to the first and second brackets, And the channel is fixed to the ground between the earth retaining walls in a state where one of the retractable lower strut and the openable strut is connected to the first and second struts.

본 발명에 의한 관로시공 겸용 버팀대를 이용한 흙막이와 지중 관로 시공 공법은, 지중에 관로의 배관방향을 따라 상호 간에 일정 거리를 두고 흙막이 벽체를 설치하는 제1단계와; 상기 제1단계에서 시공된 흙막이 벽체 사이의 공간에 청구항 1에 의한 관로시공 겸용 버팀대를 일정 거리를 두고 삽입한 후 상기 관로시공 겸용 버팀대의 제1,2벽체측 버팀보를 상기 흙막이 벽체에 각각 고정하는 제2단계와; 상기 제2단계 이후 상기 흙막이 벽체 사이의 지중에 관로를 삽입 시공하는 제3단계를 포함하고, 상기 제3단계는, 상기 관로시공 겸용 버팀대의 버팀겸용 관로 소켓부의 개폐식 상부 버팀보의 일측 이상을 상기 제1,2벽체측 버팀보에서 분리하여 상기 개폐식 하부 버팀보의 상부가 노출되도록 한 후 상기 개폐식 하부 버팀보 위에 관로를 안착하는 제3-1단계, 상기 제3-1단계 이후 상기 개폐식 상부 버팀보를 덮어 상기 제1,2벽체측 버팀보에 연결하는 제3-2단계, 상기 제3-2단계를 통해 상기 개폐식 상부 버팀보를 상기 제1,2벽체측 버팀보에 연결하여 상기 흙막이 벽체를 지지하는 상태에서 상기 개폐식 하부 버팀보의 일측 이상을 상기 제1,2벽체측 버팀보에서 분리하여 상기 개폐식 하부 버팀보에 안착된 관로를 지중에 삽입하는 제3-3단계, 상기 흙막이 벽체 사이의 공간을 되메우기하는 제3-4단계, 상기 관로시공 겸용 버팀대를 철거 및 마무리하는 제3-5단계를 포함하는 것을 특징으로 한다.
The method of the present invention includes a first step of installing an earth retaining wall at a certain distance from each other along the piping direction of the pipeline in the ground, The piping system according to claim 1, wherein a pair of struts are installed at a predetermined distance from each other in a space between the earth retaining walls constructed in the first step, and then the first and second wall struts are fixed to the earth retaining wall A second step; And a third step of inserting a pipeline in the ground between the earth retaining walls after the second step, wherein the third step includes: a step of inserting at least one side of the retractable upper strut of the socket portion of the piping- A first step of separating the upper strut from the first and second strut brackets to expose the upper part of the lower strut, and then placing the channel on the lower strut; A step 3-2 of connecting the first and second strand brackets to the first and second strand brackets, and connecting the first and second strand brackets to the first and second strand brackets through the step 3-2, A third step of separating at least one side of the strut from the first and second strut brackets and inserting a channel seated in the open lower strut, A step 3 - 4 of lifting up the space of the pipeline, and a step 3 - 5 of finishing and finishing the pipeline construction combined pillar.

본 발명에 의한 관로시공 겸용 버팀대 및 이를 이용한 흙막이와 지중 관로 시공 공법에 의하면, 마주하는 흙막이 벽체에 항상 지지되어 흙막이 벽체를 지지함으로써 흙막이 구조물의 버팀대로서 신뢰성을 유지하고, 관로의 시공시 개폐식 하부 버팀보와 개폐식 상부 버팀보 중 어느 하나를 반드시 흙막이 벽체에 지지하면서 관로를 지중에 안착시킬 수 있으므로 관로의 길이에 상관없이 즉 장대 관로도 용이하게 시공하는 효과가 있다.
According to the present invention, it is possible to maintain the reliability of the retaining structure of the retaining structure by supporting the retaining wall by being always supported on the facing retaining wall, And the retractable upper strut bracket can be surely supported on the earth retaining wall and the pipeline can be seated in the ground. Therefore, the construction can be easily performed regardless of the length of the pipeline, that is, the long pipeline can be easily constructed.

도 1은 종래 기술에 의한 관로 시공의 문제점을 보이기 위한 도면.
도 2는 본 발명에 의한 관로시공 겸용 버팀대의 사시도.
도 3은 본 발명에 의한 관로시공 겸용 버팀대의 정면도.
도 4는 본 발명에 의한 관로시공 겸용 버팀대에 적용된 제1,2벽체측 버팀보가 각각 일체형인 예를 보인 정면도.
도 5는 본 발명에 의한 관로시공 겸용 버팀대에 적용된 제1,2벽체측 버팀보가 각각 하부 버팀보와 상부 버팀보로 분할된 예를 보인 도면.
도 6은 본 발명에 의한 관로시공 겸용 버팀대에 적용된 개폐식 하부 버팀보와 개폐식 상부 버팀보가 슬라이드식으로 연결되는 예를 보인 도면.
도 7 내지 도 9는 각각 본 발명에 의한 관로시공 겸용 버팀대의 다른 예시도.
도 10은 본 발명에 의한 관로시공 겸용 버팀대를 이용한 지중 관로 시공 공정도.
도 11은 본 발명에 의한 관로시공 겸용 버팀대를 이용한 지중 관로 시공 과정을 보인 도면.
BRIEF DESCRIPTION OF THE DRAWINGS FIG. 1 is a view for showing a problem of pipeline construction according to the prior art; FIG.
2 is a perspective view of a pair of piping and piping construction according to the present invention.
3 is a front view of a pair of piping and piping construction according to the present invention.
FIG. 4 is a front view showing an example in which the first and second wall side strut brackets applied to the pipeline construction joint according to the present invention are integrated.
5 is a view showing an example in which the first and second wall side strut boding beams applied to the piping construction joint according to the present invention are divided into a lower strut beam and an upper strut beam, respectively.
6 is a view illustrating an example in which a retractable lower strut and a retractable upper strut are slidably connected to each other in a piping construction joint according to the present invention.
FIG. 7 to FIG. 9 are diagrams showing another example of a pair of piping construction and conduit construction according to the present invention; FIG.
FIG. 10 is a view showing a construction process of an underground pipe using a pair of pipelines for pipeline construction according to the present invention. FIG.
11 is a view showing an underground pipeline construction process using a pair of pipelines for pipeline construction according to the present invention.

도 2와 도 3에서 보이는 바와 같이, 본 실시예에 의한 관로시공 겸용 버팀대(100)는, 지중에 상호 간에 일정 거리[관로(1)의 시공을 위한 거리]를 두고 서로 마주하도록 시공되는 흙막이 벽체(2,3)를 지지하는 제1,2벽체측 버팀보(110,120), 제1,2벽체측 버팀보(110,120)들 사이에 형성되며 제1,2벽체측 버팀보(110,120)에 의해 흙막이 벽체(2,3)를 지지하면서 관로(1)가 지중에 설치되도록 하는 버팀겸용 관로 소켓부(130)로 구성된다.As shown in FIGS. 2 and 3, the pair of piping construction and support joints 100 according to the present embodiment are constructed in such a manner that they are spaced apart from each other by a predetermined distance (a distance for installation of the pipeline 1) The first and second wall side struts 110 and 120 and the first and second wall side struts 110 and 120 supporting the first and second wall side struts 2 and 3 and the first and second wall side struts 110 and 120, And a piping socket unit 130 for supporting the pipeline 1 in the ground while supporting the piping 1 and 3.

제1,2벽체측 버팀보(110,120)는 흙막이 벽체(2,3)를 통해 전가되는 토압에 의해 휨 변형되지 않는 강도와 구조의 모든 자재가 사용 가능하고, 예를 들어 H 빔 등이 가능하다.The first and second wall side strut bosses 110 and 120 can use all materials having strength and structure that are not deformed by the earth pressure transferred through the earth retaining walls 2 and 3, for example, H beams.

제1,2벽체측 버팀보(110,120)는 흙막이 벽체(2,3)에 직접 또는 간접적으로 고정되며, 예를 들어 흙막이 벽체(2,3)의 지주에 직접 고정될 수 있고 또는 흙막이 벽체(2,3)에 횡방향으로 설치되는 띠장(4,5)에 고정될 수 있으며 띠장(4,5)을 통해 흙막이 벽체(2,3)에 설치되는 것을 예로 들어 도시하고 설명한다. 제1,2벽체측 버팀보(110,120)는 띠장(4,5)에 볼팅식, 용접식 등 다양한 방법이 가능하고, 한편 흙막이 벽체(2,3)의 지주에 직접 고정되는 경우 슬라이드식, 볼팅식, 용접식 등 다양한 방법이 가능하다.The first and second wall side struts 110 and 120 are directly or indirectly fixed to the earth retaining walls 2 and 3 and can be fixed directly to the support of the earth retaining walls 2 and 3, 3 and 4 and installed in the earth retaining walls 2 and 3 through the wales 4 and 5 as an example. The first and second wall struts 110 and 120 can be formed by various methods such as a bolting type and a welding type on the wales 4 and 5. On the other hand, in the case where the first and second wall side struts 110 and 120 are directly fixed to the strut of the earth retaining wall bodies 2 and 3, , Welding method, and so on.

제1,2벽체측 버팀보(110,120)는 띠장(4,5)에 체결구를 통해 분리 가능하게 연결되는 고정판이 구비되는 것이 바람직하다.The first and second wall struts 110 and 120 are preferably provided with a fixing plate detachably connected to the wales 4 and 5 through fastening holes.

제1,2벽체측 버팀보(110,120)에는 버팀겸용 관로 소켓부(130)의 개폐식 하부 버팀보(131)와 개폐식 상부 버팀보(132)가 각각 연결되며, 도 4에서 보이는 바와 같이, 개폐식 하부 버팀보(131)와 개폐식 상부 버팀보(132)가 각각 연결되는 단품일 수 있고, 또는 도 5에서처럼, 개폐식 하부 버팀보(131)와 개폐식 상부 버팀보(132)가 각각 연결되는 하부 버팀보(111,121)와 상부 버팀보(112,122)로 분할될 수 있다. 즉 서로 제1벽체측 버팀보(110)는 하부 버팀보(111)와 상부 버팀보(112)가 체결구 등을 통해 분리 가능하게 결합됨으로써 필요한 부분만 선택하여 교체 및 유지 보수할 수 있는 이점이 있다[제2벽체측 버팀보(120)도 제1벽체측 버팀보(110)와 동일한 구조로 이루어져 동일한 효과를 도출함].As shown in FIG. 4, the openable and closable lower strut 131 and the openable upper strut 132 are connected to the first and second wall struts 110 and 120, respectively. The lower strut brackets 111 and 121 and the upper strut brackets 112 and 122 are connected to the open and close type lower strut brackets 131 and 132, respectively, as shown in FIG. Lt; / RTI > That is, the first strut bracket 110 is detachably coupled to the lower strut 111 and the upper strut 112 via fasteners or the like, so that only a necessary portion can be selected, replaced, and maintained. And the two-wall side strut 120 has the same structure as the first strut side strut 110 so as to produce the same effect.

제1,2벽체측 버팀보(110,120)는 버팀겸용 관로 소켓부(130)의 개폐식 하부 버팀보(131)와 개폐식 상부 버팀보(132)가 맞닿는 경사부가 형성될 수 있다. 물론 이는 개폐식 하부 버팀보(131)와 개폐식 상부 버팀보(132)의 분리 방식에 따라 경사부, 직각부 등 다양하게 변경 가능하다.
The first and second wall struts 110 and 120 may be formed with an inclined portion in which the open and closed upper strut 132 and the openable and descendable lower strut 131 of the socket unit 130 are combined. Of course, it can be changed variously according to the separation method of the open and closed type lower sprocket 131 and the opening and closing type sprocket 132, such as an inclined part and a right angle part.

관로 소켓부(130)는 개폐식 하부 버팀보(131)와 개폐식 상부 버팀보(132)가 종방향으로 배열되어 이들 사이에 관로 수용홀(133)이 형성된다.In the channel socket portion 130, a retractable lower strut 131 and a retractable upper strut 132 are longitudinally arranged to form a channel receiving hole 133 therebetween.

개폐식 하부 버팀보(131)와 개폐식 상부 버팀보(132)는 마주하는 면에 관로(1)의 외주면과 동일한 단면인 반원형의 안착부와 덮음부가 구성될 수 있고, 다양한 재질로 구성될 수 있다.The semicircular seating portion and the covering portion, which have the same cross section as the outer circumferential surface of the conduit 1, may be formed on the facing surface of the retractable lower strut 131 and the retractable upper strut 132, and may be formed of various materials.

개폐식 하부 버팀보(131)와 개폐식 상부 버팀보(120)는 각각 정면에서 볼 때 좌우 양측이 제1,2벽체측 버팀보(110,120)에 각각 연결되어 제1,2벽체측 버팀보(110,120)와 함께 버팀대의 기능을 수행하며 따라서 흙막이 벽체(2,3)가 토압에 의해 넘어지지 않고 시공 상태를 유지하도록 한다.The openable and closable lower strut brace 131 and the openable and closable upper strut 120 are respectively connected to the first and second wall strut 110 and 120 on the left and right sides respectively from the front side to form the first and second strut struts 110 and 120, So that the retaining wall bodies 2 and 3 are maintained in the construction state without falling by the earth pressure.

단, 개폐식 하부 버팀보(131)와 개폐식 상부 버팀보(132)는 관로(1)의 시공을 위하여 제1,2벽체측 버팀보(110,120)에서 분리 가능하도록 구성되어야 하며, 좌우 양측 중 일측이 힌지를 통해 제1벽체측 버팀보(110) 또는 제2벽체측 버팀보(120)에 회동 가능하게 연결되고 타측이 반대쪽의 제2벽체측 버팀보(120) 또는 제1벽체측 버팀보(110)에 볼팅, 핀 등을 통해 분리 가능하게 연결된다.It should be noted that the retractable lower strut 131 and the retractable upper strut 132 must be detachable from the first and second wall struts 110 and 120 for the construction of the channel 1, A bolt and a pin are rotatably connected to the first wall side strut 110 or the second wall side strut 120 and the other side is connected to the second strut bracket 120 or the first wall strut 110 on the opposite side. Lt; / RTI >

또한, 개폐식 하부 버팀보(131)와 개폐식 상부 버팀보(132)는 어느 하나가 반드시 제1,2벽체측 버팀보(110,120)에 연결되어 흙막이 벽체(2,3)를 지지하도록 사용되며 이는 하기의 관로 시공 방법에서 구체적으로 설명한다.One of the retractable lower strut 131 and the retractable upper strut 132 is necessarily connected to the first and second wall struts 110 and 120 to support the retained wall bodies 2,3. The method will be described in detail.

개폐식 하부 버팀보(131)와 개폐식 상부 버팀보(120)는 좌우 양측 중 일측 이상이 제1 또는 제2벽체측 버팀보(110,120)에 힌지식으로 연결되는 것으로 한정되지 아니하고, 다른 예로서, 도 6에서 보이는 것처럼, 제1,2벽체측 버팀보(110,120)에 슬라이딩 레일(113,114)(123,124)을 형성하고, 개폐식 하부 버팀보(131)와 개폐식 상부 버팀보(120)에 각각 슬라이딩 돌기(131a,132a)가 구성되어, 개폐식 하부 버팀보(131)와 개폐식 상부 버팀보(120)가 슬라이드식으로 결합/분리될 수 있다. The open and close type lower sprocket 131 and the opening and closing upper sprocket 120 are not limited to being hingedly connected to the first or second wall side strut 110 or 120 on either side of the right or left side, Sliding rails 113 and 114 are formed on the first and second wall struts 110 and 120 and sliding protrusions 131a and 132a are formed on the opening and closing upper and lower strut brackets 131 and 120, The retractable lower strut 131 and the retractable upper strut 120 can be slidably engaged / disengaged.

슬라이딩 레일(113,114)(123,124)과 슬라이딩 돌기(131a,132a)는 도면에 도시된 형상으로 한정되지 아니하고 토압에 의해 이탈과 변형되지 않는 다른 형상 예컨대 더브테일(dovetail) 형상도 가능하다.The sliding rails 113 and 114 (123 and 124) and the sliding protrusions 131a and 132a are not limited to the shapes shown in the drawings and may have other shapes such as dovetail shapes that are not separated and deformed by the earth pressure.

도 7은 본 발명에 의한 관로시공 겸용 버팀대(100)의 다른 구조를 보인 도면으로, 제1,2벽체측 버팀보(110,120)는 동일한 형태이며 각각 개폐식 하부 버팀보(110)와 개폐식 상부 버팀보(120)의 일측(힌지 결합되는 부분)이 삽입되는 홈을 갖는 형태이다.The first and second wall-side struts 110 and 120 are of the same shape and each have an open-and-close type lower strut 110 and an open-type strut 120, respectively. (A part hinged to the hinge) is inserted.

도 8은 본 발명에 의한 관로시공 겸용 버팀대(100)의 다른 구조를 보인 도면으로, 개폐식 하부 버팀보(110)와 개폐식 상부 버팀보(120)가 횡방향으로 회전하도록 구성될 수 있다.FIG. 8 is a view showing another structure of the piping construction 100 according to the present invention. The open and close type lower strut 110 and the openable upper strut 120 may be configured to rotate in the horizontal direction.

도 9는 본 발명에 의한 관로시공 겸용 버팀대(100)의 다른 실시예를 도시한 것으로, 제1,2벽체측 버팀보(110,120)는 동일한 형태로 구성되고, 버팀겸용 관로 소켓부(140)는, 내부에 관로가 삽입 지지되며 하나 이상의 개방부(도면에는 하나로 도시됨)가 구비된 관로 삽입부(141)가 구비되며 제1,2벽체측 버팀보(110,120)에 회전 가능하게 지지되는 소켓 몸체(142), 소켓 몸체(142)의 관로 삽입부(141)를 개폐하는 덮개(143)로 이루어진다. 소켓 몸체(142)의 회전 구조는 예를 들어 제1,2벽체측 버팀보(110,120)에 레일을 형성하고 소켓 몸체(142)와 덮개(143)에 상기 레일을 따라 회전하는 가이드부가 구성됨으로써 가능하다.
The first and second wall strut assemblies 110 and 120 are formed in the same shape and the strut channel socket section 140 is formed in the same shape as the first and second wall strut assemblies 110 and 120. [ And a pipe body 142 142 having a pipe insertion part 141 having one or more openings (one of which is shown in the drawing) and being rotatably supported by the first and second wall struts 110 and 120, And a cover 143 for opening and closing the pipe insertion portion 141 of the socket body 142. The rotating structure of the socket body 142 is made possible by forming a rail on the first and second strand brackets 110 and 120 and constituting a guide portion for rotating the socket body 142 and the lid 143 along the rail .

본 실시예에 따르면, 덮개(143)가 지상을 향하도록 소켓 몸체(142)를 배치하고, 덮개(143)를 열어 관로 삽입부(141)가 개방되도록 한 후 관로(1)를 관로 삽입부(141)에 삽입하고 덮개(143)를 덮는다.According to the present embodiment, the socket body 142 is disposed such that the lid 143 faces the ground, and the lid 143 is opened to open the channel inserting portion 141, and then the channel 1 is inserted into the channel inserting portion 141 and covers the lid 143. [

소켓 몸체(142)를 돌려 덮개(143)가 지중을 향하도록 한 후 덮개(143)를 열은 후 관로(1)를 지중에 삽입하는 방법으로 관로(1)를 시공한다.
The pipe body 142 is turned so that the lid 143 faces the ground and the lid 143 is opened and then the pipeline 1 is inserted into the ground.

도 10에서 보이는 바와 같이, 본 발명에 의한 관로시공 겸용 버팀대를 이용한 흙막이와 지중 관로 시공 공법은 다음과 같다.As shown in FIG. 10, the earth retaining and underground pipeline construction method using the pipeline construction joint pile according to the present invention is as follows.

(S10) 흙막이 벽체 시공.(S10) Construction of retaining walls.

지중에 관로를 시공하기 위해서 관로의 배관 경로를 따라 흙막이 벽체(2,3)를 시공한다. 예를 들어 흙막이 벽체(2,3)는 일정 거리를 두고 세워지는 지주, 상기 지주들 사이에 1단 이상으로 적층되는 흙막이패널로 구성된다.In order to construct the channel in the ground, the earth retaining walls (2, 3) are installed along the pipeline of the channel. For example, the earth retaining walls (2, 3) are composed of a column, which is erected at a predetermined distance, and a strut panel, which is stacked in one or more stages between the columns.

상호 간에 일정 거리를 두고 흙막이 벽체(2,3)를 각각 항타 등에 의해 지중에 시공한다.The earth retaining walls (2, 3) are fixed to the ground by hammers or the like with a predetermined distance from each other.

물론, 흙막이 벽체(2,3)는 터파기 후 설치되는 것도 포함된다.
Of course, the earth retaining walls (2, 3) also include those installed after the earthquake.

(S20) 띠장, 관로시공 겸용 버팀대 설치 및 굴착.(S20) Installation and excavation of torsion and duct construction.

흙막이 벽체(2,3) 사이의 공간을 굴착하여 흙막이 벽체(2,3) 사이의 지중에 관로의 시공을 위한 공간을 확보하며, 이 과정에서 흙막이 벽체(2,3)를 지지하기 위하여 흙막이 벽체(2,3)의 안쪽면에 띠장(4,5)을 설치하고 마주하는 띠장(4,5) 사이에 본 발명의 관로시공 겸용 버팀대(100)를 설치한다.The space between the retaining walls 2 and 3 is excavated to secure a space for the construction of the channel in the ground between the retaining walls 2 and 3. In order to support the retaining walls 2 and 3 in this process, (4, 5) are provided on the inner surface of the tubular bodies (2, 3) and the pair of struts (4,5) facing each other.

관로시공 겸용 버팀대(100)의 제1,2벽체측 버팀보(110,120)를 띠장(4,5)에 각각 고정한다. 이때, 개폐식 하부 버팀보(131)와 개폐식 상부 버팀보(132)는 제1,2벽체측 버팀보(110,120)에 각각 연결된 상태이다.The first and second wall side strut bosses 110 and 120 of the pipeline construction and bracing 100 are fixed to the wales 4 and 5, respectively. At this time, the retractable lower strut 131 and the retractable upper strut 132 are connected to the first and second wall struts 110 and 120, respectively.

따라서 관로시공 겸용 버팀대(100)가 마주하는 흙막이 벽체(2,3)를 지지하기 때문에 토압이 가해지더라도 흙막이 벽체(2,3)는 시공 상태를 유지한다.Therefore, the earth retaining wall bodies 2 and 3 maintain the construction even when the earth pressure is applied because the earth retaining wall 100 supports the earth retaining wall bodies 2 and 3 facing each other.

본 발명의 관로시공 겸용 버팀대(100)는 상호 간에 일정 거리(종래와 동일한 거리)를 두고 다수개가 설치된다. 이때, 다수개의 관로시공 겸용 버팀대(100)는 동일한 높일 수 있고 또는 일측으로 가면서 하향 경사지는 형태일 수도 있다.
A plurality of the piping construction-use supporting braces 100 of the present invention are installed at a predetermined distance (the same distance as the conventional one). At this time, the plurality of piping construction combined bracing members 100 may have the same height or may be inclined downward to one side.

(S30) 개폐식 상부 버팀보 개방.(S30) Opening and closing upper strut opening.

흙막이 벽체(2,3) 사이의 굴착 등 관로(1)의 시공을 위한 모든 준비 작업을 완료한 후 관로(1)를 시공하며, 개폐식 상부 버팀보(132)를 회전 또는 분리하여 개폐식 하부 버팀보(131)의 상부가 개방되도록 한다.After completion of all preparatory work for the construction of the pipeline 1 such as excavation between the retaining walls 2 and 3, the pipeline 1 is constructed and the open and closed type upper strut 132 is rotated or separated to open and close the lower strut 131 Is open.

개폐식 하부 버팀보(131)의 상부에 관로(1)를 올려놓는다. The pipeline 1 is placed on the upper part of the retractable lower strut 131.

이와 같이 개폐식 상부 버팀보(132)가 제1,2벽체측 버팀보(110,120) 중 하나 이상과 연결되지 않아도 개폐식 하부 버팀보(131)가 제1,2버팀대(110,120)에 연결되어 있기 때문에 흙막이 벽체(2,3)를 지지한다.
Since the retractable lower strut 131 is connected to the first and second struts 110 and 120 without being connected to at least one of the first and second strut struts 110 and 120, , 3).

(S40) 개폐식 상부 버팀보 설치.(S40) Retractable upper strut installation.

관로(1)를 개폐식 하부 버팀보(131)에 안착한 후 개폐식 상부 버팀보(132)를 덮어 제1,2벽체측 버팀보(110,120)에 연결한다.The pipeline 1 is mounted on the opening and closing type lower strut boat 131 and then the opening and closing upper strut 132 is connected to the first and second wall strut 110 and 120.

이상의 과정에서 관로(1)는 길이에 따라 1개 이상의 관로시공 겸용 버팀대(100)에 올려져 있으며, 관로(1)를 지중에 안정적으로 시공하기 위해서 인양기 등을 통해 지지하는 것이 바람직하다.
In the above-described process, the pipeline 1 is mounted on at least one piping construction 100 for supporting the pipeline, and it is preferable to support the pipeline 1 through a lifter or the like in order to stably construct the pipeline 1 in the ground.

(S50) 개폐식 하부 버팀보 개방.(S50) Retractable lower strut opening.

개폐식 상부 버팀보(132)를 제1,2버팀보(110,120)에 연결하여 흙막이 벽체(2,3)를 지지한 상태에서 개폐식 하부 버팀보(131)를 제1,2버팀보(110,120)에서 분리한다.The retractable lower strut brace 131 is separated from the first and second strut brackets 110 and 120 while the retractable upper strut bracket 132 is connected to the first and second strut brackets 110 and 120 to support the retaining wall bodies 2,3.

이렇게 되면 관로(1)의 저부에는 관로(1)를 구속하는 지장물이 없으므로 관로(1)를 지면 위에 거치 시공(인양기를 이용하여 관로를 지면에 하강 및 안착)한다.In this case, there is no obstacle for restricting the channel 1 at the bottom of the channel 1, so that the channel 1 is placed on the ground surface (the channel is lowered and seated on the ground using a lifting device).

도 9는 3개의 관로시공 겸용 버팀대(100)가 4m 간격으로 설치되고, 관로(1)가 3개의 관로시공 겸용 버팀대(100)에 걸쳐 올려진 상태의 예시도이며, 즉 8m 이상 길이의 관로(1)를 3개의 관로시공 겸용 버팀대(100) 위에 올린 후 3개의 관로시공 겸용 버팀대(100)에 구성된 3개의 개폐식 하부 버팀보(131)를 동시에 개방하여 관로(1)를 지면과 평행하게 하강시킬 수 있고, 또는 어느 하나의 개폐식 하부 버팀보(131)부터 개방하여 관로(1)를 경사지게 한 후 다른 곳의 개폐식 하부 버팀보(131)를 개방하여 관로(1)를 지면에 하강시킬 수 있다.
9 is an exemplary view showing a state in which three piping construction supporting bracings 100 are installed at intervals of 4 m and a pipeline 1 is laid over three piping construction supporting bracings 100. That is, 1 is placed on the piping 100 for the pipeline construction and then the pipeline 100 is simultaneously opened by simultaneously opening the three openable and closable lower strut braids 131 constituting the piping 100 for the pipeline construction 100 to lower the pipeline 1 in parallel with the ground Alternatively, the pipe 1 may be opened from any one of the open and lower lifting brackets 131 to tilt the pipe 1, and then the openable and removable lower strut 131 may be opened to lower the pipe 1 to the ground.

(S60) 되메우기.(S60).

관로(1)의 시공을 완료한 후 관로(1) 상부를 되메우기 한다.
After completing the construction of the pipeline 1, the upper part of the pipeline 1 is backed up.

(S70) 띠장, 관로시공 겸용 버팀대 철거.(S70) Torsion and pipe line construction.

띠장(4,5)과 관로시공 겸용 버팀대(100)를 흙막이 벽체(2,3)에서 철거한 후 지중을 지면까지 되메우기하여 마무리한다. 흙막이 벽체(2,3)도 지중에서 지상으로 인발되어 철거될 수 있다.
After the wales 4, 5 and the pipeline construction joint 100 are removed from the retaining walls 2, 3, the ground is refilled to the ground and finished. The retaining walls (2, 3) can also be pulled out to the ground in the ground and demolished.

본 발명은 부가적으로 이웃하는 관로시공 겸용 버팀대(100)를 서로 연결하는 것도 가능하며, 예를 들어, 제1,2벽체측 버팀보(110,120)를 연결대로 연결할 수 있고, 또는 개폐식 하부/상부 버팀보(131,132)를 연결대로 연결할 수 있다.For example, the first and second wall struts 110 and 120 may be connected to each other by a connection, or the first and second wall struts 110 and 120 may be connected to each other. Alternatively, (131, 132).

또한, 관로시공 겸용 버팀대(100)는 도면에 1단으로 설치되는 것으로만 도시되었으나, 2단 이상으로도 설치 가능하고 이 경우 관로(1)를 위단의 관로시공 겸용 버팀대(100)에 거치한 후 전술한 작용에 의해 아랫단의 관로시공 겸용 버팀대(100)로 이동하고 최종적으로 지면에 시공할 수 있다.
In this case, the piping 100 can be installed in two or more stages. In this case, the piping 100 is mounted on the piping construction-supported joint 100 at the upper end By the above-mentioned operation, it is possible to move to the lower piping construction-use supporting bracket 100 and finally to the ground.

1 : 관로, 100 : 관로시공 겸용 버팀대
110,1120 : 제1,2벽체측 버팀보, 130 : 버팀겸용 관로 소켓부
131 : 개폐식 하부 버팀보, 132 : 개폐식 상부 버팀보
1: Pipeline, 100: Pipeline construction combined bracing
110, 1120: first and second wall side struts, 130:
131: retractable lower strut, 132: retractable upper strut

Claims (9)

서로 마주하는 흙막이 벽체에 각각 고정되어 상기 흙막이 벽체를 시공 상태로 지지하는 제1,2벽체측 버팀보(110,120)와; 상기 제1,2벽체측 버팀보의 사이에 형성되며 상기 제1,2벽체측 버팀보와 결합 상태를 유지하면서 관로(1)를 지중에 시공하도록 하는 버팀겸용 관로 소켓부(130)를 포함하고, 상기 버팀겸용 관로 소켓부는, 상기 제1,2벽체측 버팀보의 사이에 상하로 배열되면서 상기 제1,2벽체측 버팀보에 각각 개폐 내지 분리 가능하게 결합되는 개폐식 하부 버팀보(131)와 개폐식 상부 버팀보(132) 및 상기 개폐식 하부 버팀보와 개폐식 상부 버팀보의 사이에 형성되는 관로 수용홀(133)로 이루어지되, 상기 개폐식 하부 버팀보는 관로가 안착되는 반원형의 안착부가 포함되고,
이에 의하여 상기 제1,2버팀대가 상기 흙막이 벽체에 고정되고 상기 개폐식 하부 버팀보와 개폐식 상부 버팀보 중 어느 하나가 상기 제1,2버팀대에 연결된 상태에서 상기 관로를 상기 흙막이 벽체 지중에 시공하도록 하는 것으로, 상기 관로 수용홀의 상부가 개방되도록 상기 개폐식 상부 버팀보를 상기 제1,2벽체측 버팀보에서 분리 또는 회전시킨 후 관로를 상기 개폐식 하부 버팀보의 안착부에 안착되도록 하고, 상기 개폐식 상부 버팀보를 상기 제1,2벽체측 버팀보에 결합한 후 상기 개폐식 하부 버팀보를 분리 또는 회전시켜 상기 관로 수용홀의 하부를 개방시켜 관로를 하강에 의해 지중에 시공하도록 하는 것을 특징으로 하는 관로시공 겸용 버팀대.
First and second wall struts 110 and 120 fixed to the earth retaining walls facing each other to support the earth retaining wall in an installed state; And a piping socket (130) formed between the first and second wall-side strut brackets and configured to allow the piping (1) to be installed in the ground while maintaining a state of engagement with the first and second wall- The sewing tube socket unit includes an openable and removable lower strut 131 and an openable and closable upper strut 132 which are vertically arranged between the first and second wall strut, And a duct receiving hole 133 formed between the openable and removable lower sprocket and the openable and closable upper sprocket, the openable and closable lower sprocket includes a semicircular seating portion on which a duct is seated,
The first and second struts are fixed to the earth retaining wall and one of the retractable lower strut and the retractable upper strut is connected to the first and second struts to construct the channel in the earth retaining wall body, The upper and lower strut brackets are separated from the first and second strut brackets so as to open the upper portion of the channel receiving hole, and then the pipeline is seated on the seating portion of the openable and removable lower strut bracket, And the lower bracket is detached or rotated to open the lower portion of the pipe receiving hole so that the pipe can be lowered to the ground by lowering the pipe.
서로 마주하는 흙막이 벽체에 각각 고정되어 상기 흙막이 벽체를 시공 상태로 지지하는 제1,2벽체측 버팀보(110,120)와;
상기 제1,2벽체측 버팀보의 사이에 형성되며 상기 제1,2벽체측 버팀보와 결합 상태를 유지하면서 관로를 지중에 시공하도록 하는 버팀겸용 관로 소켓부(130)를 포함하고,
상기 버팀겸용 관로 소켓부는, 내부에 상기 관로가 삽입 지지되며 하나 이상의 개방부가 구비된 관로 삽입부가 구비되며 상기 제1,2벽체측 버팀보에 회전 가능하게 지지되는 소켓 몸체, 상기 소켓 몸체의 개방부를 개폐하는 덮개로 이루어지며, 이에 의하여 상기 제1,2버팀대가 상기 흙막이 벽체에 고정되고 상기 소켓 몸체의 관로 삽입부에 상기 관로를 삽입한 후 상기 소켓 몸체를 돌려 상기 관로를 지중에 시공하도록 하는 특징으로 하는 관로시공 겸용 버팀대.
First and second wall struts 110 and 120 fixed to the earth retaining walls facing each other to support the earth retaining wall in an installed state;
And a piping socket (130) formed between the first and second wall-side strut brackets and configured to allow the piping to be installed in the ground while maintaining a state of engagement with the first and second wall-
The piping socket according to any one of claims 1 to 3, wherein the piping socket portion comprises a socket body in which the pipeline is inserted and supported by the pipe inserting portion having one or more open portions and is rotatably supported by the first and second spine pillars, Wherein the first and second struts are fixed to the earth retaining wall and the pipe body is inserted into the pipe body inserting portion of the socket body and then the socket body is rotated to construct the pipe body in the ground Piping construction joint bracing.
삭제delete 삭제delete 삭제delete 청구항 1에 있어서, 상기 제1,2벽체측 버팀보는 상기 개폐식 하부 버팀보와 개폐식 상부 버팀보가 각각 연결되는 하부 버팀보와 상부 버팀보의 결합에 의해 이루어지는 것을 특징으로 하는 관로시공 겸용 버팀대.[3] The brace according to claim 1, wherein the first and second wall side struts are each formed by coupling a lower strut and an upper strut connected to each other, the open and thelow type lower strut are connected to each other. 지중에 관로의 배관방향을 따라 상호 간에 일정 거리를 두고 흙막이 벽체를 설치하는 제1단계와; 상기 제1단계에서 시공된 흙막이 벽체 사이의 공간에 청구항 1에 의한 관로시공 겸용 버팀대를 일정 거리를 두고 삽입한 후 상기 관로시공 겸용 버팀대의 제1,2벽체측 버팀보를 상기 흙막이 벽체에 각각 고정하는 제2단계와; 상기 제2단계 이후 상기 흙막이 벽체 사이의 지중에 관로를 삽입 시공하는 제3단계를 포함하고, 상기 제3단계는, 상기 관로시공 겸용 버팀대의 버팀겸용 관로 소켓부의 개폐식 상부 버팀보의 일측 이상을 상기 제1,2벽체측 버팀보에서 분리하여 상기 개폐식 하부 버팀보의 관로 안착부가 노출되도록 한 후 상기 개폐식 하부 버팀보 위에 관로를 안착하는 제3-1단계, 상기 제3-1단계 이후 상기 개폐식 상부 버팀보를 덮어 상기 제1,2벽체측 버팀보에 연결하는 제3-2단계, 상기 제3-2단계를 통해 상기 개폐식 상부 버팀보를 상기 제1,2벽체측 버팀보에 연결하여 상기 흙막이 벽체를 지지하는 상태에서 상기 개폐식 하부 버팀보의 일측 이상을 상기 제1,2벽체측 버팀보에서 분리하여 상기 개폐식 하부 버팀보에 안착된 관로를 하강에 의해 지중에 삽입 안착하는 제3-3단계, 상기 흙막이 벽체 사이의 공간을 되메우기하는 제3-4단계, 상기 관로시공 겸용 버팀대를 철거 및 마무리하는 제3-5단계를 포함하고, 상기 관로는 이웃하는 2개 이상의 관로시공 겸용 버팀대의 개폐식 하부 버팀보의 관로 안착부에 올려지며, 상기 제3-3단계에서는 상기 2개 이상의 관로시공 겸용 버팀대의 개폐식 하부 버팀보를 동시에 개방하여 상기 관로를 지면과 평행하게 하강시켜 안착하거나 2개 이상의 관로시공 겸용 버팀대의 개폐식 하부 버팀보를 하나씩 순차적으로 개방하여 상기 관로를 경사지게 삽입하여 안착하는 것을 특징으로 하는 관로시공 겸용 버팀대를 이용한 흙막이와 지중 관로 시공 공법.A first step of installing an earth retaining wall body at a certain distance from each other along the piping direction of the pipeline in the ground; The piping system according to claim 1, wherein a pair of struts are installed at a predetermined distance from each other in a space between the earth retaining walls constructed in the first step, and then the first and second wall struts are fixed to the earth retaining wall A second step; And a third step of inserting a pipeline in the ground between the earth retaining walls after the second step, wherein the third step includes: a step of inserting at least one side of the retractable upper strut of the socket portion of the piping- A step 3-1 of separating the upper and lower strut brackets from the first and second wall strut brackets so as to expose the duct mounting portion of the retractable lower strut bracket and then placing the pipeline on the openable lower strut bracket; 3-2 connecting the first and second braces to the first and second braces, and connecting the first and second braces to the first and second braces by means of the third and second steps to support the earth retaining wall, And separating at least one side of the lower strut from the first and second strut brackets so that the pipeline seated on the openable lower strut is inserted and seated in the ground by descending. A third step of lifting up the space between the earth retaining walls and a third step of finishing and finishing the piping for the pipeline construction, wherein the pipeline includes at least two neighboring pipeline construction- In the step 3 - 3, the openable and removable lower strut brace of the two or more pipeline construction joints is simultaneously opened so that the pipeline can be lowered in parallel with the ground surface to be seated, or two or more pipeline construction And the opening and closing type lower struts are sequentially opened one by one so that the ducts are inclinedly inserted and seated. The construction method of the earth retaining and underground duct using the pair of pipelines. 삭제delete 지중에 관로의 배관방향을 따라 상호 간에 일정 거리를 두고 흙막이 벽체를 설치하는 제1단계와;
상기 제1단계에서 시공된 흙막이 벽체 사이의 공간에 청구항 2에 의한 관로시공 겸용 버팀대를 일정 거리를 두고 삽입한 후 상기 관로시공 겸용 버팀대의 제1,2벽체측 버팀보를 상기 흙막이 벽체에 각각 고정하는 제2단계와;
상기 제2단계 이후 상기 흙막이 벽체 사이의 지중에 관로를 삽입 시공하는 제3단계를 포함하고,
상기 제3단계는, 상기 관로시공 겸용 버팀대의 버팀겸용 관로 소켓부의 덮개를 열어 상기 소켓 몸체의 관로 삽입부를 개방하여 상기 소켓 몸체의 관로 삽입부에 관로를 안착하는 제3-1단계,
상기 제3-1단계 이후 상기 덮개를 덮고 상기 덮개가 지중을 향하도록 상기 소켓 몸체를 돌리는 제3-2단계,
상기 제3-2단계 이후 상기 덮개를 열고 상기 관로를 지중에 삽입 안착하는 제3-3단계,
상기 흙막이 벽체 사이의 공간을 되메우기하는 제3-4단계,
상기 관로시공 겸용 버팀대를 철거 및 마무리하는 제3-5단계를 포함하는 것을 특징으로 하는 관로시공 겸용 버팀대를 이용한 흙막이와 지중 관로 시공 공법.
A first step of installing an earth retaining wall body at a certain distance from each other along the piping direction of the pipeline in the ground;
The piping construction according to claim 2 is inserted into a space between the earth retaining walls constructed in the first step with a certain distance therebetween, and then the first and second wall-side struts of the pipeline construction- A second step;
And a third step of inserting a pipeline into the ground between the earth retaining walls after the second step,
The third step includes a third step of opening the lid of the piping socket portion of the pair of piping joints for the pipeline construction and opening the pipeline insertion portion of the socket body to seat the pipeline in the pipeline insertion portion of the socket body,
A step 3-2 of covering the cover after the step 3-1 and turning the socket body so that the cover faces the ground,
A step 3 - 3 of opening the lid after the step 3 - 2 and placing the pipeline in the ground,
A third step of backing up the space between the earth retaining walls,
And a third step (5) of removing and finishing the piping and the piping construction. The piping construction method according to claim 1,
KR1020140112483A 2014-08-27 2014-08-27 Strut for constructing conduit line and method for constructing conduit line using the same KR101543421B1 (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
KR1020140112483A KR101543421B1 (en) 2014-08-27 2014-08-27 Strut for constructing conduit line and method for constructing conduit line using the same
PCT/KR2015/008906 WO2016032220A1 (en) 2014-08-27 2015-08-26 Combined pipeline constructing and bracing strut and method for constructing earth retaining structure and underground pipelines by using strut

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020140112483A KR101543421B1 (en) 2014-08-27 2014-08-27 Strut for constructing conduit line and method for constructing conduit line using the same

Publications (1)

Publication Number Publication Date
KR101543421B1 true KR101543421B1 (en) 2015-08-10

Family

ID=53886490

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020140112483A KR101543421B1 (en) 2014-08-27 2014-08-27 Strut for constructing conduit line and method for constructing conduit line using the same

Country Status (2)

Country Link
KR (1) KR101543421B1 (en)
WO (1) WO2016032220A1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101647701B1 (en) * 2015-12-31 2016-08-11 주식회사 신암이앤씨 Pipe Burying Method Using Support for Long Pipe
KR101649834B1 (en) * 2015-12-31 2016-08-19 주식회사 신암이앤씨 Support for Long Pipe Burying

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000297432A (en) * 1999-04-15 2000-10-24 Toda Constr Co Ltd Shore strut and its erection

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100937643B1 (en) * 2009-09-18 2010-01-19 (주)핸스 Connecting structure of steel pipe strut
KR20120134208A (en) * 2011-06-01 2012-12-12 변웅호 Construction machinery for pipe and constrution method
KR101322020B1 (en) * 2011-12-01 2013-10-28 재단법인 포항산업과학연구원 Connection apparatus of Steel pipe for strut, steel pipe strut using thereof and method of constructing the steel pipe strut
KR20140005672A (en) * 2012-07-06 2014-01-15 박건호 Strut assembly

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000297432A (en) * 1999-04-15 2000-10-24 Toda Constr Co Ltd Shore strut and its erection

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101647701B1 (en) * 2015-12-31 2016-08-11 주식회사 신암이앤씨 Pipe Burying Method Using Support for Long Pipe
KR101649834B1 (en) * 2015-12-31 2016-08-19 주식회사 신암이앤씨 Support for Long Pipe Burying

Also Published As

Publication number Publication date
WO2016032220A1 (en) 2016-03-03

Similar Documents

Publication Publication Date Title
KR101543421B1 (en) Strut for constructing conduit line and method for constructing conduit line using the same
KR101688048B1 (en) Assembly type protection wall device and, method for constructing conduit line using this same
EP3194663B1 (en) Trench wall support
JP6151285B2 (en) Supporting device for lining pipe in pipe and construction method of supporting work
KR20150143997A (en) The moving type shoring apparatus
CN210887239U (en) Municipal administration pipeline slot supporting construction
US11242750B2 (en) Adjustable lattice girder
KR101436119B1 (en) Holding apparatus for CFT column and the construction method of the CFT column using it
KR200389266Y1 (en) Slide rail type shoring apparatus
JP5976976B1 (en) Slide rail method built-in simple earth retaining method
JP6178030B1 (en) Prior construction method for earth retaining of excavation groove and supporting device used for the construction method
CN114753380A (en) Civil engineering foundation pit supporting system and implementation method thereof
JP2010090588A (en) Pile hole excavating method
BG62411B1 (en) Casing for supporting endpiece of a supporting plate for excavations
JPS5873623A (en) Sheathing work for excavated trench and sheeting therefor
JP2000257069A (en) Earth retaining and earth retaining construction method
JP6078178B1 (en) Supporting device for lining pipe in pipe and construction method of supporting work
KR101647701B1 (en) Pipe Burying Method Using Support for Long Pipe
JP6764113B2 (en) Work floor for pile holes
JP3183635U (en) Square frame for earth retaining
KR101649834B1 (en) Support for Long Pipe Burying
JP2006070437A (en) Earth retaining method and device for excavated ditch
JP6948697B2 (en) Handrail support for formwork
KR200416567Y1 (en) Pile chamber type trench shoring apparatus
AU2012245054B1 (en) Scaffold System

Legal Events

Date Code Title Description
A201 Request for examination
A302 Request for accelerated examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
N231 Notification of change of applicant
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20180730

Year of fee payment: 4

FPAY Annual fee payment

Payment date: 20190731

Year of fee payment: 5