KR101529280B1 - The metal tile construction methode - Google Patents

The metal tile construction methode Download PDF

Info

Publication number
KR101529280B1
KR101529280B1 KR1020130137433A KR20130137433A KR101529280B1 KR 101529280 B1 KR101529280 B1 KR 101529280B1 KR 1020130137433 A KR1020130137433 A KR 1020130137433A KR 20130137433 A KR20130137433 A KR 20130137433A KR 101529280 B1 KR101529280 B1 KR 101529280B1
Authority
KR
South Korea
Prior art keywords
metal tile
anchor fixing
anchor
fixing hole
metal
Prior art date
Application number
KR1020130137433A
Other languages
Korean (ko)
Other versions
KR20150055285A (en
Inventor
유춘화
Original Assignee
유춘화
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 유춘화 filed Critical 유춘화
Priority to KR1020130137433A priority Critical patent/KR101529280B1/en
Publication of KR20150055285A publication Critical patent/KR20150055285A/en
Application granted granted Critical
Publication of KR101529280B1 publication Critical patent/KR101529280B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C2/00Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels
    • E04C2/30Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels characterised by the shape or structure
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F13/00Coverings or linings, e.g. for walls or ceilings
    • E04F13/07Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor
    • E04F13/08Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor composed of a plurality of similar covering or lining elements
    • E04F13/12Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor composed of a plurality of similar covering or lining elements of metal or with an outer layer of metal or enameled metal
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F15/00Flooring
    • E04F15/02Flooring or floor layers composed of a number of similar elements
    • E04F15/06Flooring or floor layers composed of a number of similar elements of metal, whether or not in combination with other material
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F15/00Flooring
    • E04F15/02Flooring or floor layers composed of a number of similar elements
    • E04F15/10Flooring or floor layers composed of a number of similar elements of other materials, e.g. fibrous or chipped materials, organic plastics, magnesite tiles, hardboard, or with a top layer of other materials

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Working Measures On Existing Buildindgs (AREA)
  • Auxiliary Methods And Devices For Loading And Unloading (AREA)

Abstract

본 발명은, 지게차 및 화물차량과 같이 중량물을 운반하는 차량이 진출입하는 공장이나 물류창고의 집입로 및 통로 바닥면에 형성된 앙카고정홀로 4개의 금속타일 앙카부를 '+'자로 삽입하여 바닥내면에 밀착되도록 하여 금속타일의 평활도를 용이하게 유지함은 물론 앙카고정홀에 삽입된 금속타일의 앙카부가 충진제로 견고하게 고정되므로 정밀시공이 가능함은 물론 외부에서 가해지는 중량물의 마찰력에도 금속타일의 가장자리가 들뜨지 않아 안전사고를 미연에 방지할 수 있는 금속타일 및 이의 시공방법에 관한 것이다.In the present invention, four metal tile anchors are inserted into the anchor fixing holes formed on the floor of the entrance and exit of a factory or a warehouse where a vehicle carrying heavy objects such as a forklift and a freight car enters and exits, The anchor portion of the metal tile inserted into the anchor fixing hole is firmly fixed by the filler, so that the precision construction can be performed and the edge of the metal tile is not exposed to the frictional force of the heavy material applied from the outside To a metal tile which can prevent a safety accident in advance and a method of applying the metal tile.

Description

금속타일의 시공방법{The metal tile construction methode}TECHNICAL FIELD The present invention relates to a metal tile construction method,

본 발명은, 지게차 및 화물차량과 같이 중량물을 운반하는 차량이 진출입하는 공장이나 물류창고의 집입로 및 통로에 설치되는 금속타일의 시공방법에 관한 것이다.
TECHNICAL FIELD The present invention relates to a method of constructing a metal tile installed in a factory for entering and exiting a vehicle for transporting heavy objects such as a forklift and a freight vehicle, and an entryway and a passage for a warehouse.

일반적으로 공장이 물류창고의 진입로 및 통로는 콘크리트바닥면으로 이루어져 지게차 및 화물차량의 이동 및 프레스 장치나 펀칭 장치 등 심한 충격이 발생되는 기계설비를 갖는 공장의 콘크리트바닥면이 쉽게 파손되어 바닥 보수작업이 번번이 이루어지고 있으므로 유지관리가 어려운 문제점이 있었다.Generally, the entranceway and passage of the factory warehouse are made of concrete floor, and the floor of the concrete of the factory, which has heavy machinery such as forklift and freight vehicle movement and press device or punching device, There is a problem in that maintenance is difficult.

상기의 문제점을 해결하기 위해 근래에는 대한민국 등록특허 제10-0751516호로 금속타일과, 이를 구비하는 공장용 바닥구조 및 이의시공방법이 등록된 바 있다.In order to solve the above problems, Korean Patent No. 10-0751516 has recently registered a metal tile, a floor structure for a plant having the same, and a construction method thereof.

선 등록된 특허는, 공장의 바닥면에 접착층을 형성하고, 상기 접착층에 금속타일의 지지대 및 복수의 다리가 묻히도록 판상몸체를 접착층에 안착시킨 상태에서 상기 접착층이 경화되도록 함으로써, 종래의 문제점을 해결할 수 있었다.In the patent registered in advance, an adhesive layer is formed on the bottom surface of a factory, and the adhesive layer is cured in a state in which the plate-shaped body is placed on the adhesive layer so that a support of the metal tile and a plurality of legs are embedded in the adhesive layer. I could solve it.

그러나 선 등록된 특허는, 공장의 바닥면에 형성된 접착층에 금속타일의 지지대 및 복수의 다리가 묻히도록 시공되나, 금속타일의 평활도를 유지하는 구성이 없어 정밀시공이 불가능한 문제점이 있었고, 상기 금속타일의 지지대 및 복수의 다리가 묻히도록 공장의 바닥면에 형성된 접착층의 경화시간이 많이 소요되므로 시공기간이 늘어나 비경제적인 문제점이 있었다.However, in the patent registered in advance, there is a problem that a support of a metal tile and a plurality of legs are embedded in an adhesive layer formed on a bottom surface of a factory, but there is no construction for maintaining smoothness of the metal tile, The curing time of the adhesive layer formed on the bottom surface of the factory is increased so that the supporting base and the plurality of legs are buried.

또한, 중량물을 운반하는 화물차량 및 지게차 바퀴와의 마찰력을 견디지 못하고, 접착층이 손상되면서 금속타일의 가장자리부터 분리될 뿐만 아니라 분리된 금속타일의 가장자리가 외부로 돌출되어 진출입하는 화물차량 및 지게차 바퀴의 손상은 물론 안전사고를 유발하는 문제점이 있었다.
In addition, since the adhesive layer is damaged and the edge of the metal tile is separated from the edge of the metal tile, the edge of the separated metal tile protrudes to the outside, and the cargo vehicle and the forklift wheel There was a problem of causing damage as well as safety accidents.

이에 상술한 바와 같은 종래의 제반 문제점을 감안하여 이루어진 것으로, 본 발명의 목적은, 공장이나 물류창고의 바닥면에 형성된 앙카고정홀에 금속타일의 앙카부가 앙카고정홀 바닥내면에 밀착되면서 금속타일의 몸체가 바닥면에 도포된 충진재에 안착되어 금속타일의 평활도를 용이하게 유지하도록 함은 물론 접착제의 소모를 줄일 수 있는 금속타일의 시공방법을 제공함에 있다.SUMMARY OF THE INVENTION It is an object of the present invention to provide an anchor fixing hole formed in a bottom surface of a warehouse or a warehouse and an anchor portion of a metal tile being in close contact with an inner surface of an anchor fixing hole, The present invention provides a method of manufacturing a metal tile in which a body is seated on a filler applied on a floor surface to easily maintain smoothness of a metal tile and consumption of an adhesive can be reduced.

또한, 본 발명의 다른 목적은, 앙카고정홀에 삽입된 금속타일의 앙카부가 충진제로 견고하게 고정되므로 정밀시공이 가능함은 물론 외부에서 가해지는 중량물의 마찰력에도 금속타일의 가장자리가 들뜨지 않도록 하는 금속타일의 시공방법을 제공함에 있다.
Another object of the present invention is to provide a metal tile which is firmly fixed by a filler to an anchor portion of a metal tile inserted in an anchor fixing hole, The method comprising the steps of:

삭제delete

삭제delete

삭제delete

삭제delete

본 발명 금속타일의 시공방법은,A method of manufacturing a metal tile according to the present invention comprises:

화물차량 및 지게차가 진출입되는 위치의 바닥면에 금속타일의 설치간격으로 격자형의 표시선을 표시하는 단계와;Displaying a grid-shaped marking line at an installation interval of the metal tile on the bottom surface of the position where the freight vehicle and the forklift go in and out;

상기 표시선의 교차지점에 앙카고정홀을 형성하는 단계와;Forming an anchor fixing hole at an intersection of the display lines;

상기 앙카고정홀이 형성된 바닥면을 청소하는 단계와;Cleaning the bottom surface of the anchor fixing hole;

상기 앙카고정홀 및 바닥면에 충진재를 도포하는 단계와;Applying a filler to the anchor fixing hole and the bottom surface;

금속타일의 판체 네 변 중 대향하는 각변 모서리에 돌출 및 절곡된 앙카부와 인접하는 금속타일 판체 네 변 중 대향하는 각변 모서리에 돌출 및 절곡된 앙카부가 동일선상에 위치하면서 상기 금속타일과 인접하는 금속타일 및 이에 인접하는 금속타일 4개의 앙카부가 앙카고정홀에 삽입되어 각 금속타일의 사이가 '+'자 형상이 되도록 하고, 각 금속타일의 판체 저면이 앙카고정홀에 도포된 충진재에 안착되도록 하는 단계와; A metal tile protruding from the opposite sides of the four sides of the metal tile, and a metal tile adjacent to the bent anchor and protruding and bent anchors on opposite sides of the four sides, Tiles and adjacent metal tiles are inserted into the anchor fixing holes so that the spaces between the metal tiles are in the shape of '+', and the bottom surface of each metal tile is seated on the filling material applied to the anchor fixing holes ;

상기 앙카고정홀에 앙카부가 삽입된 금속타일의 틈새를 메지로 메움하는 단계와;Filling the gap of the metal tile into which the anchor is inserted in the anchor fixing hole;

상기 충진재를 경화는 단계를 포함하여 이루어지는 것을 특징으로 하는 것이다.
And curing the filler material.

본 발명에 의하면, 공장이나 물류창고의 바닥면에 형성된 앙카고정홀에 금속타일의 앙카부가 앙카고정홀 바닥내면에 밀착되면서 금속타일의 몸체가 바닥면에 도포된 충진재에 안착되어 금속타일의 평활도를 용이하게 유지하도록 함은 물론 접착제의 소모를 줄임으로써 시공기간 단축 및 시공비중의 절감으로 경제성을 향상시킬 수 있는 이점을 가질 수 있는 것이다.According to the present invention, the anchor portion of the metal tile is closely attached to the inner surface of the floor of the anchor fixing hole in the anchor fixing hole formed in the floor of the factory or the warehouse, and the body of the metal tile is seated on the filler coated on the bottom surface, It is possible to reduce the time required for the construction and to reduce the weight of the construction, thereby improving the economical efficiency.

또한, 본 발명에 의하면, 앙카고정홀에 삽입된 금속타일의 앙카부가 충진제로 견고하게 고정되므로 정밀시공이 가능함은 물론 외부에서 가해지는 중량물의 마찰력에도 금속타일의 가장자리가 들뜨지 않아 안전사고를 미연에 방지할 수 있는 이점을 가질 수 있는 것이다.
In addition, according to the present invention, since the anchor portion of the metal tile inserted into the anchor fixing hole is firmly fixed by the filler, it is possible to precisely construct the metal tile, and the edge of the metal tile is not exposed to the frictional force of the heavy material externally, It is possible to have an advantage that can be prevented.

도 1은 본 발명의 사시도
도 2는 본 발명의 측단면구성도
도 3 내지 도 10은 본 발명의 시공과정도
BRIEF DESCRIPTION OF THE DRAWINGS FIG.
2 is a side cross-sectional view
Figs. 3 to 10 show the construction process of the present invention

이하, 첨부된 도면에 의거하여 본 발명을 상세히 설명한다. 도 1은 본 발명의 사시도이고, 도 2는 본 발명의 측단면구성도이다.Hereinafter, the present invention will be described in detail with reference to the accompanying drawings. Fig. 1 is a perspective view of the present invention, and Fig. 2 is a side sectional view of the present invention.

본 발명 금속타일(100)은, 사각형상의 판체(110)가 구성되고, 상기 판체(110)의 네 변 중 대향하는 각변 모서리에 돌출 및 절곡되어 공장이나 물류창고의 바닥면에 형성된 앙카고정홀(200)에 삽입되는 앙카부(120)가 구성되며, 상기 앙카부(120)에는 앙카고정홀(200)에 충진되는 충진재(300)와 접촉면적을 넓히면서 경화된 충진재(300)에 걸리도록 요철형상의 돌기(130)가 구비된다.The metal tile 100 according to the present invention comprises a rectangular plate body 110 and protrudes and bends at opposing corners of four sides of the plate body 110 to form an anchor fixing holes The anchor portion 120 is formed with a concave and convex shape so as to be engaged with the cured filler 300 while widening the contact area with the filler 300 filled in the anchor fixing hole 200. [ As shown in FIG.

또한, 상기 앙카부(120)에 관통되어 충진재(300)가 충진되도록 하는 충진홀(140)을 더 포함하여 구비된다.
Further, it may further include a filling hole 140 penetrating through the anchor 120 to fill the filling material 300.

다음은 상기와 같이 구성된 금속타일(100)의 제작과정 및 이의 시공과정을 설명한다.Hereinafter, a manufacturing process of the metal tile 100 constructed as described above and its construction process will be described.

먼저, 통상 권취되어 공급되는 금속재료의 일면을 에칭(etching)가공법으로 논슬립되도록 한 후, 보호필름을 부착하는데, 상기 금속재료는 인장강도가 크고, 내부식성 및 내마모성이 좋은 스테인레스스틸을 사용하는 것이 바람직하다.First, one surface of a metal material that is normally wound and supplied is made to be non-slip by an etching method, and then a protective film is attached. The metal material is made of stainless steel having a high tensile strength and good corrosion resistance and abrasion resistance desirable.

상기 보호필름이 부착된 금속재료를 프레스로 가압하여 사각형상의 판체(110) 및 상기 판체(110)의 네 변 중 각변 각 모서리에 앙카부(120)가 형성되도록 절단하고, 상기 앙카부(120)가 절곡되도록 가압하여 금속타일(100)을 형성한다.The metal material to which the protective film is attached is pressed by a press to cut the rectangular plate body 110 and the plate body 110 so that the anchor portion 120 is formed at each corner of the four sides of the plate body 110, So that the metal tile 100 is formed.

이때, 상기 앙카부(120)에는 요철형상의 돌기(130) 및 충진홀(140)이 형성됨은 물론이다.At this time, it is needless to say that the protrusion 130 and the filling hole 140 are formed in the anchor 120.

상기의 과정으로 금속타일(100)이 형성되면, 도 3에 도시된 바와 같이, 상기 금속타일(100)이 설치되는 공장이나 물류창고의 화물차량 및 지게차가 진출입되는 진출입로의 바닥면에 금속타일(100)의 간격으로 격자형의 표시선을 표시하면서 바닥면에 인접되게 설치될 다수의 금속타일(100)의 테두리를 보호하는 테두리보호대(미도시)를 설치한다.When the metal tile 100 is formed as described above, the metal tile 100 is installed on the bottom surface of the entrance / exit path where the freight vehicle and the forklift of the warehouse or the warehouse are installed / (Not shown) for protecting the edges of a plurality of metal tiles 100 to be installed adjacent to the bottom surface while displaying a grid-shaped display line at an interval between the metal tiles 100.

또한, 도 4에 도시된 바와 같이, 상기 격자형으로 표시된 표시선의 각 교차지점에 앙카고정홀(200)을 형성하는데, 도 5 내지 도 6에 도시된 바와 같이, 상기 앙카고정홀(200)은 1개의 드릴이 형성된 단축드릴머신(210)이나 적어도 2개 이상의 드릴이 형성된 다축드릴머신(220) 중 어느 하나로 형성한 후, 상기 앙카고정홀(200) 및 바닥면의 이물질을 제거한다.As shown in FIG. 4, the anchor fixing holes 200 are formed at the respective intersections of the grid lines. In the anchor fixing holes 200, as shown in FIGS. 5 to 6, The drill is formed of any one of the uniaxial drill machine 210 having one drill and the multi-axis drill machine 220 having at least two drillers, and then foreign substances are removed from the anchor fixing hole 200 and the bottom surface.

도 7에 도시된 바와 같이, 이물질이 제거된 앙카고정홀(200)에 충진재(300)를 충진하면서 바닥면에 충진재(300)를 도포하는데, 상기 바닥면에 도포되는 충진재(300)는 1~2mm의 두께로 도포된다.7, the filling material 300 is applied to the bottom surface while filling the filling material 300 in the anchor fixing hole 200 from which the foreign substance is removed. In the filling material 300 applied to the bottom surface, 2 mm.

여기서, 상기 충진재(130)는, 2액형 폴리아마이드(polyamide) 도료로서, 일반 에폭시 도료와 달리 콘크리트면에 침투성 및 습윤면 부착성이 우수하며 건조속도가 매우 빠르며, 건조된 도막은 접착력, 내알카리성, 내산성, 내수성 등의 물리,화학적 성능이 우수하여 콘크리트 보강에 적합한 도료이다.The filler 130 is a two-pack type polyamide paint. Unlike ordinary epoxy paints, the filler material 130 has excellent permeability and wetting property on the concrete surface and has a very high drying speed. The dried film has excellent adhesion, , Acid resistance, water resistance and other physical and chemical properties.

상기 충진재(130)가 앙카고정홀(200) 및 바닥면에 도포되면, 도 8 내지 도 10에 도시된 바와 같이, 금속타일(100)의 판체 네 변 중 대향하는 각변 모서리에 돌출 및 절곡된 앙카부(120)와 상기 금속타일(100)과 인접하는 금속타일의 판체 네 변 중 대향하는 각변 모서리에 돌출 및 절곡된 앙카부가 동일선상에 위치하면서 상기 금속타일(100)과 인접하는 금속타일 및 이에 인접하는 금속타일 4개의 앙카부(120)가 상기 앙카고정홀(200)에 삽입되면서 각 금속타일(100)의 사이가 '+'형상이 되도록 하고, 각 금속타일(100)의 판체(110) 저면이 앙카고정홀(200)에 도포된 충진재에 안착되도록 한다.8 to 10, when the filler 130 is applied to the anchor fixing hole 200 and the bottom surface of the metal tile 100, (120) and metal tiles (100) adjacent to the metal tile (100), the protruded and bent anchors are located on the opposite sides of the metal tiles (100) The four anchor portions 120 of adjacent metal tiles are inserted into the anchor fixing holes 200 so that the spaces between the metal tiles 100 are in a positive shape and the plate bodies 110 of the metal tiles 100 are connected to each other, So that the bottom surface is seated on the filler applied to the anchor fixing hole 200.

이때, 상기 앙카부(120)에 형성된 요철형상의 돌기(130)는 앙카고정홀(200) 내면에 근접되게 밀착되어 사각형상의 판체(110)의 유동을 방지함은 물론 상기 앙카부(120) 저면이 앙카고정홀(200) 바닥면에 밀착됨과 동시에 판체(110)의 저면이 바닥면에 도포된 충진재(300)에 안착되면서 금속타일(100)은 수평을 유지할 수 있는 것이다.At this time, the projections 130 formed in the anchor portion 120 closely contact the inner surface of the anchor fixing hole 200 to prevent the flow of the square plate 110, and the bottom surface of the anchor portion 120 The bottom surface of the plate 110 is seated on the filler 300 applied to the bottom surface of the anchor fixing hole 200 and the metal tile 100 can be kept horizontal.

또한, 상기 앙카부(120)에 형성된 충진홀(140)로 충진재(300)가 위치하게 되며, 상기 금속타일(100)의 표면에 부착된 보호필름(미도시)를 제거한 후, 인접하는 금속타일(100)의 틈새를 메지로 메운 후, 충진재(300)를 경화하면 된다.The filling material 300 is placed in the filling hole 140 formed in the anchor 120 and the protective film (not shown) attached to the surface of the metal tile 100 is removed, The filler 300 may be cured after filling the gap between the filler 100 and the filler 300.

상기 충진재(300)는 상온에서 24~48시간 자연건조시키면 되고, 상기 앙카부(120)의 요철형상의 돌기(130) 및 충진홀(140)에 충진된 충진재(300)가 건조되어 고정되면서 앙카부(120)와 충진재(300)의 접촉면적이 돌기(130) 및 충진홀(140)에 의해 넓어짐에 따라 금속타일(100)을 좀더 견고하게 고정하여 금속타일(100) 가장자리의 들뜸을 방지할 수 있는 것이다.The filling material 300 is naturally dried at room temperature for 24 to 48 hours and the filling material 300 filled in the projections 130 and the filling hole 140 of the anchor portion 120 is dried and fixed, As the contact area between the part 120 and the filler 300 is enlarged by the protrusion 130 and the fill hole 140, the metal tile 100 is more firmly fixed to prevent lifting of the edge of the metal tile 100 You can.

상기의 과정을 반복하여 공장이나 물류창고의 진입로에 다수의 금속타일(100)이 격자형으로 설치되어 화물차량 및 지게차의 중량에 의한 콘크리트 바닥면의 손상을 방지함은 물론 금속타일(100)에 형성된 다수의 홈(100') 및 에칭가공법으로 형성된 요철에 의해 표면마찰력을 증가시켜 미끄러짐을 방지할 수 있는 것이다.A plurality of metal tiles 100 are installed in the entrance of the factory or the warehouse by repeating the above process so as to prevent the concrete floor from being damaged by the weight of the freight vehicle and the forklift, The surface friction force can be increased by the concavities and convexities formed by the plurality of grooves 100 'formed by the etching process and the formed grooves 100' to prevent slipping.

이상과 같이 본 발명은, 비록 한정된 실시예와 도면에 의해 설명되었으나, 본 명세서 및 청구범위에 사용된 용어나 단어는 통상적이거나 사전적인 의미로 한정되어 해석되어서는 아니되며, 본 발명의 기술적 사상에 부합하는 의미와 개념으로 해석되어야만 한다. 따라서, 본 명세서에 기재된 실시예와 도면에 도시된 구성은 본 발명의 일실시예에 불과할 뿐이고, 본 발명의 기술적 사상을 모두 대변하는 것은 아니므로, 본 발명의 청구범위를 벗어나지 않는 한도 내에서 다양한 균등물과 변형예들이 있을 수 있음을 이해하여야 한다.
Although the present invention has been described in connection with certain exemplary embodiments and drawings, it is to be understood that the phraseology and terminology used herein are for the purpose of description and should not be interpreted to limit the scope of the present invention. It must be interpreted in terms of meaning and concept. Therefore, the embodiments described in the present specification and the configurations shown in the drawings are only examples of the present invention, and not all of the technical ideas of the present invention are described. Therefore, It is to be understood that equivalents and modifications are possible.

100: 금속타일 110: 판체
120: 앙카부 130: 돌기
140: 충진홀 200: 앙카고정홀
300: 충진재
100: metal tile 110:
120: anchor portion 130: projection
140: Filling hole 200: Anchor fixing hole
300: filler

Claims (6)

삭제delete 삭제delete 화물차량 및 지게차가 진출입되는 위치의 바닥면에 금속타일의 설치간격으로 격자형의 표시선을 표시하는 단계와;
상기 표시선의 교차지점에 앙카고정홀을 형성하는 단계와;
상기 앙카고정홀이 형성된 바닥면을 청소하는 단계와;
상기 앙카고정홀 및 바닥면에 충진재를 도포하는 단계와;
금속타일의 판체 네 변 중 대향하는 각변 모서리에 돌출 및 절곡된 앙카부와 인접하는 금속타일 판체 네 변 중 대향하는 각변 모서리에 돌출 및 절곡된 앙카부가 동일선상에 위치하면서 상기 금속타일과 인접하는 금속타일 및 이에 인접하는 금속타일 4개의 앙카부가 앙카고정홀에 삽입되어 각 금속타일의 사이가 '+'자 형상이 되도록 하고, 각 금속타일의 판체 저면이 앙카고정홀에 도포된 충진재에 안착되도록 하는 단계와;
상기 앙카고정홀에 앙카부가 삽입된 금속타일과 인접된 금속타일의 틈새를 메지로 메움하는 단계와;
상기 충진재를 경화하는 단계를 포함하여 이루어지는 것을 특징으로 하는 금속타일의 시공방법.
Displaying a grid-shaped marking line at an installation interval of the metal tile on the bottom surface of the position where the freight vehicle and the forklift go in and out;
Forming an anchor fixing hole at an intersection of the display lines;
Cleaning the bottom surface of the anchor fixing hole;
Applying a filler to the anchor fixing hole and the bottom surface;
A metal tile protruding from the opposite sides of the four sides of the metal tile, and a metal tile adjacent to the bent anchor and protruding and bent anchors on opposite sides of the four sides, Tiles and adjacent metal tiles are inserted into the anchor fixing holes so that the spaces between the metal tiles are in the shape of '+', and the bottom surface of each metal tile is seated on the filling material applied to the anchor fixing holes ;
Filling a gap between the metal tile in which the anchor portion is inserted into the anchor fixing hole and the adjacent metal tile;
And curing the filler. ≪ RTI ID = 0.0 > 11. < / RTI >
청구항 3에 있어서, 상기 앙카고정홀 형성 단계에서,
상기 앙카고정홀은 단축드릴머신으로 1개의 앙카고정홀을 형성하거나 다축드릴머신으로 적어도 2개 이상의 앙카고정홀을 형성하는 것 중 어느 하나로 형성하는 것을 특징으로 하는 금속타일의 시공방법.
4. The method according to claim 3, wherein in the anchor fixing hole forming step,
Wherein the anchor fixing hole is formed by one of an anchor fixing hole formed by a uniaxial drilling machine or by at least two anchor fixing holes formed by a multi-axis drilling machine.
청구항 3에 있어서,
상기 충진재는 2액형 폴리아마이드(polyamide) 도료인 것을 특징으로 하는 금속타일의 시공방법.
The method of claim 3,
Wherein the filler is a two-part polyamide paint.
청구항 3에 있어서,
상기 금속타일의 앙카부가 앙카고정홀의 내주면에 면접촉되어 삽입되는 것을 특징으로 하는 금속타일의 시공방법.
The method of claim 3,
Wherein an anchor portion of the metal tile is inserted into the inner peripheral surface of the anchor fixing hole in a surface contact manner.
KR1020130137433A 2013-11-13 2013-11-13 The metal tile construction methode KR101529280B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020130137433A KR101529280B1 (en) 2013-11-13 2013-11-13 The metal tile construction methode

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020130137433A KR101529280B1 (en) 2013-11-13 2013-11-13 The metal tile construction methode

Publications (2)

Publication Number Publication Date
KR20150055285A KR20150055285A (en) 2015-05-21
KR101529280B1 true KR101529280B1 (en) 2015-06-17

Family

ID=53390916

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020130137433A KR101529280B1 (en) 2013-11-13 2013-11-13 The metal tile construction methode

Country Status (1)

Country Link
KR (1) KR101529280B1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20180073051A (en) * 2016-12-22 2018-07-02 안성환 Floor construction process for structure
KR102385581B1 (en) 2021-08-20 2022-04-14 페트라개발(주) Floor tile of double structure and constructing method using the same

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR950014487U (en) * 1993-11-10 1995-06-16 원명선 Metal tile
KR100669524B1 (en) * 2006-05-04 2007-01-16 주식회사 현진기업 Concrete columnand stainless lining reinforce a method of construction
KR100751516B1 (en) * 2006-05-08 2007-08-23 김태현 Steel tile, factory floor structure having the same and method for constructing of it
KR100937016B1 (en) * 2009-02-27 2010-01-18 주식회사 피엘테크코리아 A tile, waterproofing concrete wall using the tile and constructing methode thereof

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR950014487U (en) * 1993-11-10 1995-06-16 원명선 Metal tile
KR100669524B1 (en) * 2006-05-04 2007-01-16 주식회사 현진기업 Concrete columnand stainless lining reinforce a method of construction
KR100751516B1 (en) * 2006-05-08 2007-08-23 김태현 Steel tile, factory floor structure having the same and method for constructing of it
KR100937016B1 (en) * 2009-02-27 2010-01-18 주식회사 피엘테크코리아 A tile, waterproofing concrete wall using the tile and constructing methode thereof

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20180073051A (en) * 2016-12-22 2018-07-02 안성환 Floor construction process for structure
KR101936592B1 (en) 2016-12-22 2019-04-03 안성환 Floor construction process for structure
KR102385581B1 (en) 2021-08-20 2022-04-14 페트라개발(주) Floor tile of double structure and constructing method using the same

Also Published As

Publication number Publication date
KR20150055285A (en) 2015-05-21

Similar Documents

Publication Publication Date Title
US9328528B2 (en) Tower for a wind power station
TWI429833B (en) Seismic isolator and structure provided with the seismic isolator
US20120036798A1 (en) Tower for a Wind Power Installation
KR101529280B1 (en) The metal tile construction methode
CN204527545U (en) Floating platform
US20120047840A1 (en) Tower for a Wind Power Installation
US20160138285A1 (en) Arrangement and method for reinforcing supporting structures
KR101385829B1 (en) Construction method of multicoating waterproof layer using ployurea
JP5835390B2 (en) Foundation structure
KR100695325B1 (en) Non-slip draining Plate
KR101554673B1 (en) Method for installing seismic isolation floor
KR100751516B1 (en) Steel tile, factory floor structure having the same and method for constructing of it
KR101327378B1 (en) Drain board for base floor of construction
US10612253B2 (en) Construction method for reinforcing a column and reinforcing structure for a column
KR101749686B1 (en) deck plate having non-slip layer
KR20170142250A (en) One unified body construction method of the building concrete wall together with complex boards which has the insulation materials and the finishing materials
JP4968972B2 (en) Exterior wall construction method and exterior wall structure using horizontal slit material
KR101936592B1 (en) Floor construction process for structure
JP2017002713A (en) Column reinforcement method and column reinforcement structure
JP2017002549A (en) Column reinforcement method and column reinforcement structure
KR20160043501A (en) A sump or elevator pit under structure
KR101074429B1 (en) Method for waterproof coating
CN203769288U (en) Cold-formed thin-walled steel scaffold board
JP2020007788A (en) Layered panel floor slab bridge and construction method of layered panel slab bridge
US20170167162A1 (en) Free-Standing Modular Fence System

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
N231 Notification of change of applicant
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
LAPS Lapse due to unpaid annual fee