KR101509501B1 KR20120052303A KR20120052303A KR101509501B1 KR 101509501 B1 KR101509501 B1 KR 101509501B1 KR 20120052303 A KR20120052303 A KR 20120052303A KR 20120052303 A KR20120052303 A KR 20120052303A KR 101509501 B1 KR101509501 B1 KR 101509501B1
Authority
KR
South Korea
Prior art keywords
project
change
similar
tag
similar project
Prior art date
Application number
KR20120052303A
Other languages
Korean (ko)
Other versions
KR20130128525A (en
Inventor
구혜정
Original Assignee
삼성탈레스 주식회사
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 삼성탈레스 주식회사 filed Critical 삼성탈레스 주식회사
Priority to KR20120052303A priority Critical patent/KR101509501B1/en
Publication of KR20130128525A publication Critical patent/KR20130128525A/en
Application granted granted Critical
Publication of KR101509501B1 publication Critical patent/KR101509501B1/en

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F8/00Arrangements for software engineering
    • G06F8/70Software maintenance or management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F9/00Arrangements for program control, e.g. control units
    • G06F9/06Arrangements for program control, e.g. control units using stored programs, i.e. using an internal store of processing equipment to receive or retain programs
    • G06F9/44Arrangements for executing specific programs

Landscapes

  • Engineering & Computer Science (AREA)
  • Software Systems (AREA)
  • Theoretical Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

본 발명은 유사 프로젝트(Derivative projects) 형상 관리 시스템과 그 방법에 관한 것으로서, 다수의 유사 프로젝트에 대하여 서로 연관된 프로젝트임을 표시하는 태그(tag)가 각각 하나 또는 둘 이상 부착하고, 상기 부착된 태그를 이용하여 형상을 관리하는 태그 관리 모듈 및 상기 태그가 부착된 유사 프로젝트 중에서 사용자에 의해 변경된 유사 프로젝트와 동일한 태그가 부착된 다른 유사 프로젝트에 상기 변경 사항을 적용하고, 상기 변경 사항이 적용된 유사 프로젝트에 부착된 다른 태그와 동일한 태그가 부착된 또 다른 유사 프로젝트에 상기 변경 사항을 적용하는 과정을 반복 수행하여, 상기 변경된 유사 프로젝트와 연관된 유사 프로젝트에 연쇄적으로 상기 변경 사항을 적용하는 변경 관리 모듈을 포함하도록 구성될 수 있다. 상기와 같은 유사 프로젝트 형상 관리 시스템 및 그 방법에 따르면, 작업 시 소요되는 시간을 많이 감소시키고, 수동 작업으로 인한 사용자의 실수에 따른 오류를 방지한다. 또한, 해당 변경 사항에 대한 통합적인 관리를 통하여 해당 변경 사항에 대하여 유사 프로젝트 전체에 대한 변경을 관리할 수 있다. 따라서, 다수의 유사 프로젝트에 대한 종합적인 형상 관리가 가능하게 되며, 태그와 자동 선별 적용을 통해 더욱 효율적이고 완벽한 형상 관리가 이루어지며 사용자의 개발 속도 또한 많이 증가하는 효과가 있다.The present invention relates to a system and a method for managing a similar project, and more particularly, it relates to a system and method for managing a similar project by using one or more tags each indicating that the project is related to a plurality of similar projects, A tag management module for managing the shape of the similar project and a similar project to which the tag is attached and applying the change to another similar project having the same tag as the similar project changed by the user, And a change management module for repeating the process of applying the change to another similar project having the same tag as another tag to apply the change in a cascade to the similar project associated with the changed similar project . According to the similar project configuration management system and method as described above, the time required for the work can be greatly reduced, and errors due to the user's mistakes due to the manual work can be prevented. In addition, through the integrated management of the changes, it is possible to manage changes to similar projects as a whole. Therefore, it is possible to perform comprehensive configuration management for many similar projects, and more efficient and complete configuration management can be achieved through tag and automatic selection application, and the user's development speed also increases.

Description

유사 프로젝트 형상 관리 시스템 및 그 방법{CONFIGURATION MANAGEMENT SYSTEM OF DERIVATIVE PROJECTS AND METHOD THEREOF}TECHNICAL FIELD [0001] The present invention relates to a project management system,

본 발명은 유사 프로젝트 형상 관리 시스템에 관한 것으로서, 좀 더 상세하게는 유사 프로젝트 형상 관리 시스템 및 그 방법에 관한 것이다.The present invention relates to a similar project configuration management system, and more particularly, to a similar project configuration management system and a method thereof.

도 1은 종래 기술에 따른 단일 프로젝트를 위한 형상 관리 시스템의 개념도이다.1 is a conceptual diagram of a configuration management system for a single project according to the prior art.

도 1을 살펴보면, 단일 프로젝트를 위한 형상 관리 시스템에서 주 프로그램 A에 대하여 변경 사항을 관리하는 과정을 보여준다. File A : Code B와 File B : Code A를 변경하기 위하여 부 프로젝트 A-1가 생성하고, File A : Code A와 File B : Code C를 변경하기 위하여 부 프로젝트 A-2가 생성한다. 이후, 주 프로젝트 A는 부 프로젝트 A-1과 A-2의 변경 사항을 반영하여 수정하게 된다. 이러한 종래의 형상 관리 시스템은 하나의 주 프로젝트(Project A)를 형상 관리하기 위하여 부 프로젝트들(Project A-1, Project A-2)을 생성하여 각각의 변경 사항을 관리하고 주 프로젝트에 적용 가능한 변경 사항들을 선별하여 반영하게 된다.Referring to FIG. 1, a process for managing changes to the main program A in a configuration management system for a single project is shown. File A: Code B and File B: Subproject A-1 is created to change Code A, and Subproject A-2 is created to change File A: Code A and File B: Code C. Thereafter, the main project A is modified to reflect the changes in subprojects A-1 and A-2. In this conventional configuration management system, sub-projects (Project A-1, Project A-2) are created to manage a change of one main project (Project A) And then reflects them selectively.

그러나, 최근에는 기술의 급진적인 발전과 소프트웨어의 사용 범위가 확대됨에 따라 소프트웨어 재사용률이 높아지게 되어 유사 프로젝트들을 동시에 관리해야 할 필요성이 부각되었다. 종래의 형상 관리 시스템은 단일 프로젝트를 위한 형상 관리에 최적화되어 개발되어 있어 이러한 요구를 반영하지 못하므로 유사 프로젝트에 대하여 개발자가 수작업을 통해 전파되어야 할 변경 가능성을 선별하여 적용하고 있다. 또한, 종래의 형상 관리 시스템에서는 사용자가 일일이 소스 코드를 읽어 변경 여부를 판단해야 하므로 프로젝트를 지연시키고, 수동으로 소스코드 복사 시 사용자의 실수로 프로젝트의 오류를 초래할 가능성을 내재하는 문제점이 있다.However, in recent years, with the rapid development of technology and the expanded use of software, the reuse rate of software has become higher, and it has become necessary to manage similar projects simultaneously. Conventional configuration management system is optimized for configuration management for a single project and does not reflect such a requirement. Therefore, the possibility of change to be propagated through a manual operation of a similar project is selected and applied. In addition, in the conventional configuration management system, there is a problem that the user has to read the source code one by one to judge whether or not to change it, so that the project is delayed and the error of the project is caused by the user's mistake when manually copying the source code.

본 발명의 목적은 유사 프로젝트 형상 관리 시스템을 제공하는 데 있다.It is an object of the present invention to provide a similar project configuration management system.

본 발명의 다른 목적은 유사 프로젝트 형상 관리 방법을 제공하는 데 있다.Another object of the present invention is to provide a similar project configuration management method.

상술한 본 발명의 목적에 따른 유사 프로젝트 형상 관리 시스템은, 다수의 유사 프로젝트(Derivative projects)에 대하여 서로 연관된 프로젝트임을 표시하는 태그(tag)가 각각 하나 또는 둘 이상 부착하고, 상기 부착된 태그를 이용하여 형상을 관리하는 태그 관리 모듈 및 상기 태그가 부착된 유사 프로젝트 중에서 사용자에 의해 변경된 유사 프로젝트와 동일한 태그가 부착된 다른 유사 프로젝트에 상기 변경 사항을 적용하고, 상기 변경 사항이 적용된 유사 프로젝트에 부착된 다른 태그와 동일한 태그가 부착된 또 다른 유사 프로젝트에 상기 변경 사항을 적용하는 과정을 반복 수행하여, 상기 변경된 유사 프로젝트와 연관된 유사 프로젝트에 연쇄적으로 상기 변경 사항을 적용하는 변경 관리 모듈을 포함하도록 구성될 수 있다. 여기에서, 상기 변경 관리 모듈은, 상기 변경된 유사 프로젝트와 동일한 태그가 부착된 다른 유사 프로젝트에 상기 변경 사항을 적용하기 전에 사용자로부터 적용 여부를 선택받을 수 있다. The similar project configuration management system according to the above-described object of the present invention is characterized in that one or two or more tags each indicating that the projects are related to each other are attached to a plurality of similar projects (Derivative projects) A tag management module for managing the shape of the similar project and a similar project to which the tag is attached and applying the change to another similar project having the same tag as the similar project changed by the user, And a change management module for repeating the process of applying the change to another similar project having the same tag as another tag to apply the change in a cascade to the similar project associated with the changed similar project . Here, the change management module may be selected from the user before applying the change to another similar project having the same tag as the changed similar project.

상술한 본 발명의 다른 목적에 따른 유사 프로젝트 형상 관리 방법은 다수의 유사 프로젝트(Derivative projects)에 대하여 서로 연관된 프로젝트임을 표시하는 태그(tag)가 각각 하나 또는 둘 이상 부착하는 단계, 상기 태그가 부착된 유사 프로젝트 중에서 소정의 유사 프로젝트가 사용자에 의해 변경되는 단계, 상기 변경된 유사 프로젝트와 동일한 태그가 부착된 다른 유사 프로젝트에 상기 변경 사항을 적용하는 단계 및 상기 변경 사항이 적용된 유사 프로젝트에 부착된 다른 태그와 동일한 태그가 부착된 또 다른 유사 프로젝트에 상기 변경 사항을 적용하는 과정을 반복 수행하는 단계를 포함하도록 구성될 수 있다. 여기에서, 상기 변경된 프로젝트와 동일한 태그가 부착된 다른 프로젝트에 상기 변경 사항을 적용하는 단계는, 상기 변경된 유사 프로젝트와 동일한 태그가 부착된 다른 유사 프로젝트에 상기 변경 사항을 적용하기 전에 사용자로부터 적용 여부를 선택받을 수 있도록 구성될 수 있다. 또한, 상기 변경 사항이 적용된 유사 프로젝트에 부착된 다른 태그와 동일한 태그가 부착된 또 다른 유사 프로젝트에 상기 변경 사항을 적용하는 과정을 반복 수행하는 단계는, 상기 변경된 유사 프로젝트와 동일한 태그가 부착된 다른 유사 프로젝트에 상기 변경 사항을 적용하기 전에 사용자로부터 적용 여부를 선택받을 수 있도록 구성될 수 있다. The similar project configuration management method according to another aspect of the present invention includes the steps of attaching one or more tags to each of a plurality of similar projects to indicate that the projects are related to each other, A step of changing a predetermined similar project from a similar project by a user, applying the change to another similar project to which the same tag as the changed similar project is attached, and other tags attached to the similar project to which the change is applied And repeating the process of applying the change to another similar project to which the same tag is attached. Herein, the step of applying the change to another project to which the same tag as the changed project is attached may be applied from the user before the change is applied to another similar project having the same tag as the changed similar project And can be configured to be selected. The step of repeating the process of applying the change to another similar project having the same tag as another tag attached to the similar project to which the change is applied may further include the steps of: And may be configured to be selected from the user before the change is applied to the similar project.

상기와 같은 유사 프로젝트 형상 관리 시스템 및 그 방법에 따르면, 독립적이고 병렬적으로 존재하는 유사 프로젝트의 각 변경 사항에 대하여, 동일한 태그가 부착된 다른 유사 프로젝트로의 적용 여부를 사용자로부터 입력받아 이를 자동으로 선별 적용함으로써, 작업 시 소요되는 시간을 많이 감소시키고, 수동 작업으로 인한 사용자의 실수에 따른 오류를 방지한다. 또한, 해당 변경 사항에 대한 통합적인 관리를 통하여 해당 변경 사항에 대하여 유사 프로젝트 전체에 대한 변경을 관리할 수 있다. 따라서, 다수의 유사 프로젝트에 대한 종합적인 형상 관리가 가능하게 되며, 태그와 자동 선별 적용을 통해 더욱 효율적이고 완벽한 형상 관리가 이루어지며 사용자의 개발 속도 또한 많이 증가하는 효과가 있다.According to the similar project configuration management system and method as described above, it is possible to automatically receive, from the user, whether or not the application of the similar project having the same tag is applied to each change of the similar and parallel existing project By selectively applying, it reduces the time required for the work, and prevents errors due to user's mistakes due to manual work. In addition, through the integrated management of the changes, it is possible to manage changes to similar projects as a whole. Therefore, it is possible to perform comprehensive configuration management for many similar projects, and more efficient and complete configuration management can be achieved through tag and automatic selection application, and the user's development speed also increases.

도 1은 종래 기술에 따른 유사 프로젝트 형상 관리 시스템의 개념도이다.
도 2는 본 발명의 일 실시예에 따른 유사 프로젝트 형상 관리 시스템의 블록구성도이다.
도 3은 본 발명의 일 실시예에 따른 유사 프로젝트 형상 관리 방법의 순서도이다.
도 4는 본 발명의 일 실시예에 따른 유사 프로젝트 형상 관리 방법의 개념도이다.
1 is a conceptual diagram of a similar project configuration management system according to the prior art.
2 is a block diagram of a similar project configuration management system according to an embodiment of the present invention.
3 is a flowchart of a similar project shape management method according to an exemplary embodiment of the present invention.
4 is a conceptual diagram of a similar project shape management method according to an embodiment of the present invention.

본 발명은 다양한 변경을 가할 수 있고 여러 가지 실시예를 가질 수 있는 바, 특정 실시 예들을 도면에 예시하고 상세한 설명에 상세하게 설명하고자 한다. 그러나, 이는 본 발명을 특정한 실시 형태에 대해 한정하려는 것이 아니며, 본 발명의 사상 및 기술 범위에 포함되는 모든 변경, 균등물 내지 대체물을 포함하는 것으로 이해되어야 한다. 각 도면을 설명하면서 유사한 참조부호를 유사한 구성요소에 대해 사용하였다.While the invention is susceptible to various modifications and alternative forms, specific embodiments thereof are shown by way of example in the drawings and will herein be described in detail. It should be understood, however, that the invention is not intended to be limited to the particular embodiments, but includes all modifications, equivalents, and alternatives falling within the spirit and scope of the invention. Like reference numerals are used for like elements in describing each drawing.

제1, 제2, A, B 등의 용어는 다양한 구성요소들을 설명하는데 사용될 수 있지만, 상기 구성요소들은 상기 용어들에 의해 한정되어서는 안된다. 상기 용어들은 하나의 구성요소를 다른 구성요소로부터 구별하는 목적으로만 사용된다. 예를 들어, 본 발명의 권리 범위를 벗어나지 않으면서 제1 구성요소는 제2 구성요소로 명명될 수 있고, 유사하게 제2 구성요소도 제1 구성요소로 명명될 수 있다. 및/또는 이라는 용어는 복수의 관련된 기재된 항목들의 조합 또는 복수의 관련된 기재된 항목들 중의 어느 항목을 포함한다.The terms first, second, A, B, etc. may be used to describe various components, but the components should not be limited by the terms. The terms are used only for the purpose of distinguishing one component from another. For example, without departing from the scope of the present invention, the first component may be referred to as a second component, and similarly, the second component may also be referred to as a first component. And / or < / RTI > includes any combination of a plurality of related listed items or any of a plurality of related listed items.

어떤 구성요소가 다른 구성요소에 "연결되어" 있다거나 "접속되어" 있다고 언급된 때에는, 그 다른 구성요소에 직접적으로 연결되어 있거나 또는 접속되어 있을 수도 있지만, 중간에 다른 구성요소가 존재할 수도 있다고 이해되어야 할 것이다. 반면에, 어떤 구성요소가 다른 구성요소에 "직접 연결되어" 있다거나 "직접 접속되어" 있다고 언급된 때에는, 중간에 다른 구성요소가 존재하지 않는 것으로 이해되어야 할 것이다.It is to be understood that when an element is referred to as being "connected" or "connected" to another element, it may be directly connected or connected to the other element, . On the other hand, when an element is referred to as being "directly connected" or "directly connected" to another element, it should be understood that there are no other elements in between.

본 출원에서 사용한 용어는 단지 특정한 실시예를 설명하기 위해 사용된 것으로, 본 발명을 한정하려는 의도가 아니다. 단수의 표현은 문맥상 명백하게 다르게 뜻하지 않는 한, 복수의 표현을 포함한다. 본 출원에서, "포함하다" 또는 "가지다" 등의 용어는 명세서상에 기재된 특징, 숫자, 단계, 동작, 구성요소, 부품 또는 이들을 조합한 것이 존재함을 지정하려는 것이지, 하나 또는 그 이상의 다른 특징들이나 숫자, 단계, 동작, 구성요소, 부품 또는 이들을 조합한 것들의 존재 또는 부가 가능성을 미리 배제하지 않는 것으로 이해되어야 한다.The terminology used in this application is used only to describe a specific embodiment and is not intended to limit the invention. The singular expressions include plural expressions unless the context clearly dictates otherwise. In the present application, the terms "comprises" or "having" and the like are used to specify that there is a feature, a number, a step, an operation, an element, a component or a combination thereof described in the specification, But do not preclude the presence or addition of one or more other features, integers, steps, operations, elements, components, or combinations thereof.

다르게 정의되지 않는 한, 기술적이거나 과학적인 용어를 포함해서 여기서 사용되는 모든 용어들은 본 발명이 속하는 기술 분야에서 통상의 지식을 가진 자에 의해 일반적으로 이해되는 것과 동일한 의미를 가지고 있다. 일반적으로 사용되는 사전에 정의되어 있는 것과 같은 용어들은 관련 기술의 문맥 상 가지는 의미와 일치하는 의미를 가지는 것으로 해석되어야 하며, 본 출원에서 명백하게 정의하지 않는 한, 이상적이거나 과도하게 형식적인 의미로 해석되지 않는다.Unless defined otherwise, all terms used herein, including technical or scientific terms, have the same meaning as commonly understood by one of ordinary skill in the art to which this invention belongs. Terms such as those defined in commonly used dictionaries are to be interpreted as having a meaning consistent with the contextual meaning of the related art and are to be interpreted as either ideal or overly formal in the sense of the present application Do not.

이하, 본 발명에 따른 바람직한 실시예를 첨부된 도면을 참조하여 상세하게 설명한다.Hereinafter, preferred embodiments according to the present invention will be described in detail with reference to the accompanying drawings.

도 2는 본 발명의 일 실시예에 따른 유사 프로젝트 형상 관리 시스템의 블록구성도이다. 2 is a block diagram of a similar project configuration management system according to an embodiment of the present invention.

도 2를 참조하면, 유사 프로젝트 형상 관리 시스템(100)은 기존 형상 관리 모듈(110), 태그 관리 모듈(120) 및 변경 관리 모듈(130)을 포함하도록 구성될 수 있다. Referring to FIG. 2, the similar project configuration management system 100 may include an existing configuration management module 110, a tag management module 120, and a change management module 130.

기존 형상 관리 모듈(110)은 본 발명의 특징이 부여되지 않은 종래 기술에 따른 소프트웨어의 형상 관리 모듈로, 소프트웨어 개발 전반에 걸쳐 정의되는 형상항목을 식별하여 기능적 물리적 특성을 문서화하고 이에 대한 변경을 제어하고 관리한다. 태그 관리 모듈(120)은 다수의 유사 프로젝트(Derivative projects)에 대하여 서로 연관된 프로젝트임을 표시하는 태그(tag)가 각각 하나 또는 둘 이상 부착하고, 부착된 태그를 이용하여 형상을 관리한다. 또한, 변경 관리 모듈(130)은 태그 관리 모듈(120)에 의해 태그가 부착된 유사 프로젝트 중에서 사용자에 의해 변경된 유사 프로젝트와 동일한 태그가 부착된 다른 유사 프로젝트에 변경 사항을 적용하고, 변경 사항이 적용된 유사 프로젝트에 부착된 다른 태그와 동일한 태그가 부착된 또 다른 유사 프로젝트에 변경 사항을 적용하는 과정을 반복 수행하여, 사용자에 의해 변경된 유사 프로젝트와 연관된 유사 프로젝트에 연쇄적으로 변경 사항을 적용할 수 있다. 여기에서, 변경 관리 모듈(130)은, 변경된 유사 프로젝트와 동일한 태그가 부착된 다른 유사 프로젝트에 변경 사항을 적용하기 전에 사용자로부터 적용 여부를 선택받을 수 있다.The existing configuration management module 110 is a configuration management module of software according to the prior art in which features of the present invention are not given. The existing configuration management module 110 identifies configuration items defined throughout software development, documents functional physical characteristics, And management. The tag management module 120 attaches one or more tags to each of a plurality of similar projects (Derivative projects) indicating that the projects are related to each other, and manages the shapes using the attached tags. In addition, the change management module 130 applies the change to the similar project having the same tag as the similar project changed by the user among the similar project to which the tag is attached by the tag management module 120, The process of applying changes to another similar project with the same tag as another tag attached to the similar project can be repeatedly applied to the similar project associated with the similar project changed by the user . Here, the change management module 130 may be selected from the user before the change is applied to another similar project having the same tag as the changed similar project.

도 3은 본 발명의 일 실시예에 따른 유사 프로젝트 형상 관리 방법의 순서도이다.3 is a flowchart of a similar project shape management method according to an exemplary embodiment of the present invention.

도 3을 참조하면, 유사 프로젝트 형상을 관리하기 위하여 먼저 태그 관리 모듈(120)은 다수의 유사 프로젝트(Derivative projects)에 대하여 서로 연관된 프로젝트임을 표시하는 태그(tag)를 각각 하나 또는 둘 이상 부착한다(S110). 다음으로, 태그가 부착된 유사 프로젝트 중에서 소정의 유사 프로젝트가 사용자에 의해 변경된다(S120). 변경 관리 모듈(130)은 유사 프로젝트의 변경을 감지하고, 변경된 유사 프로젝트와 동일한 태그가 부착된 다른 유사 프로젝트에 변경 사항의 적용 여부를 사용자로부터 선택 받는다(S130). 이때, 변경된 유사 프로젝트에 둘 이상의 태그가 부착되어 있는 경우, 각각의 태그에 대한 적용 여부를 사용자로부터 선택 받을 수 있다. 만약 사용자로부터 하나의 태그에 대하여 변경 사항의 적용을 선택 받는 경우, 해당 태그와 동일한 태그가 부착된 다른 유사 프로젝트에 변경 사항을 적용한다(S140). 그리고 변경 사항이 적용된 유사 프로젝트에 다른 태그가 추가로 더 부착되어 있는지 여부를 확인한다(S150). 다른 태그가 더 부착되어 있는 경우, 다른 태그 에 대해서 변경 사항의 적용 여부를 사용자로부터 선택 받고 적용하는 과정을 반복적으로 수행한다. 만약 사용자로부터 변경 사항을 적용하지 않는 것을 선택받거나, 또는 변경 사항이 적용된 프로젝트에 또 다른 태그가 부착되어 있지 않은 경우, 변경 사항의 적용 과정을 종료한다.3, in order to manage a similar project shape, the tag management module 120 attaches one or more tags to each of a plurality of similar projects (Derivative projects) indicating that the projects are related to each other S110). Next, a predetermined similar project among similar projects with tags is changed by the user (S120). The change management module 130 detects the change of the similar project and selects whether the change is applied to another similar project having the same tag as the changed similar project (S130). At this time, if more than one tag is attached to the changed similar project, the user can select whether or not the tag is applied to each tag. If the change is applied to one tag from the user, the change is applied to another similar project having the same tag as the corresponding tag (S140). Then, it is determined whether another tag is additionally attached to the similar project to which the change is applied (S150). If another tag is attached, the process of selecting and applying the change from the user to the other tag is repeatedly performed. If the user chooses not to apply the changes, or if no other tag is attached to the project to which the change is applied, the process of applying the change is terminated.

이하, 도 4를 참조하여 일 실시예에 따른 유사 프로젝트 형상 관리 방법을 보다 상세하게 설명한다.Hereinafter, a similar project configuration management method according to an embodiment will be described in more detail with reference to FIG.

도 4는 본 발명의 일 실시예에 따른 유사 프로젝트 형상 관리 방법의 개념도이다.4 is a conceptual diagram of a similar project shape management method according to an embodiment of the present invention.

각각 독립적이고 병렬적으로 존재하는 유사 프로젝트 A, B, C, D에 대하여, 태그 관리 모듈(120)은 서로 연관된 프로젝트를 그룹화하기 위하여 각각의 유사 프로젝트에 태그(tag)를 하나 또는 둘 이상 부착한다. 태그 1이 부착된 프로젝트는 A, B이고, 태그 2가 부착된 프로젝트는 B, C이며, 태그 3이 부착된 프로젝트는 C, D이다. 유사 프로젝트 형상 관리 시스템(100)을 통해 관리되고 있는 각 프로젝트 A, B, C, D에 변경이 일어난 경우, 변경 관리 모듈(130)은 다음과 같이 동작한다.For similar projects A, B, C, and D that exist independently and in parallel, the tag management module 120 attaches one or more tags to each similar project in order to group related projects . Projects with tag 1 are A and B, projects with tag 2 are B and C, and projects with tag 3 are C and D. When a change is made to each of the projects A, B, C, and D managed through the similar project configuration management system 100, the change management module 130 operates as follows.

프로젝트 A에서 File A : Code A가 변경된 경우, 변경 관리 모듈(130)은 프로젝트 A에 부착된 태그 1에 대하여 동일한 태그 1이 부착된 다른 유사 프로젝트(프로젝트 B)에 변경 사항을 적용할지 여부를 사용자로부터 선택받는다. 이때, 사용자가 변경 사항의 적용을 선택하게 되면 태그 1이 부착된 프로젝트 B에 변경 사항을 적용한다. 그리고 변경 사항이 적용된 프로젝트 B에 부착된 다른 태그 2에 대하여 변경 사항의 적용 여부를 사용자로부터 선택받고, 사용자가 변경 사항의 적용을 선택하게 되면 태그 2가 부착된 프로젝트 C에 변경 사항을 적용한다. 마찬가지로, 변경 사항이 적용된 프로젝트 C에 부착된 또 다른 태그 3에 대하여 변경 사항의 적용 여부를 사용자로부터 선택받고, 사용자가 변경 사항의 적용을 선택하게 되면 태그 3이 부착된 프로젝트 D에 변경 사항을 적용한다. 따라서, 프로젝트 A에서 변경된 File A : Code A는 태그 1, 2 및 3으로 연결된 프로젝트 B, C, D에 연쇄적으로 모두 적용된다. When the file A: Code A is changed in the project A, the change management module 130 determines whether to apply the change to another similar project (project B) to which the same tag 1 is attached to the tag 1 attached to the project A, . At this time, when the user selects the application of the change, the change is applied to the project B to which the tag 1 is attached. Then, the user selects whether the change is applied to the other tag 2 attached to the project B to which the change is applied, and when the user selects the change, the change is applied to the project C to which the tag 2 is attached. Likewise, if another tag 3 attached to the project C to which the change has been applied is selected from the user and whether or not the change is applied, the change is applied to the project D to which the tag 3 is attached do. Therefore, File A: Code A changed in Project A is applied to Projects B, C, and D linked to Tags 1, 2, and 3 in a cascade.

그러나, 프로젝트 A에서 File A : Code B가 변경되어 프로젝트 A에 부착된 태그 1에 대하여 변경 사항의 적용 여부를 사용자로부터 선택받을 때에, 사용자가 적용하지 않는 것을 선택하게 되면, 프로젝트 A의 변경 사항인 File A : Code B는 동일한 태그 1이 부착된 프로젝트 B에 적용되지 않는다.However, when File A: Code B is changed in Project A and the user selects from the user whether or not the change is applied to the tag 1 attached to the project A, if the user selects something not to be applied, File A: Code B does not apply to Project B with the same tag 1 attached.

다음으로, 프로젝트 B에서 File A : Code C가 변경되었을 때, 프로젝트 B에 부착된 두 개의 태그 1과 2에 대해서 각각의 변경 사항 적용 여부를 사용자로부터 선택받게 된다. 이때, 사용자가 태그 1에 대해서는 적용을 선택하고, 태그 2에 대해서는 적용을 선택하지 않게 되면, 프로젝트 B의 변경 사항인 File A : Code C는 태그 1이 부착된 프로젝트 A에는 적용되지만, 태그 2가 부착된 프로젝트 C에는 적용되지 않는다. 마찬가지로, 프로젝트 B에서 File B : Code A가 변경된 경우, 사용자가 태그 1에 대해서는 적용을 선택하지 않고, 태그 2에 대해서 적용을 선택하게 되면, 프로젝트 B의 변경 사항인 File B : Code A는 태그 1이 부착된 프로젝트 A에는 적용되지 않고, 태그 2가 부착된 프로젝트 C에만 적용된다. 변경 사항이 적용된 프로젝트 C에서 태그 2 외의 다른 태그 3이 더 부착되어 있으므로, 다시 사용자에게 태그 3에 대하여 변경 사항 적용 여부를 선택받게 되는데, 이때 사용자가 적용을 선택하지 않게 되면 태그 3이 부착된 프로젝트 D에는 변경 사항이 적용되지 않는다.Next, when the file A: Code C is changed in the project B, the user selects whether or not to apply the respective changes to the two tags 1 and 2 attached to the project B. At this time, if the user selects Apply for Tag 1 and does not select Apply for Tag 2, the change of Project B, File A: Code C, is applied to Project A with tag 1, It does not apply to attached project C. Similarly, if File B: Code A is changed in Project B, and the user selects Apply for Tag 2 instead of Apply for Tag 1, the change in Project B, File B: Code A, Is not applied to project A with attached tag A, but only to project C with tag 2 attached. Since the tag C 2 is attached to another tag 3 in the project C to which the change has been applied, the user is again requested to apply the change to the tag 3. At this time, if the user does not select the application, D does not apply to changes.

마지막으로 프로젝트 D에서 File B : Code C가 변경된 경우, 프로젝트 D에 부착된 태그 3에 대하여 사용자로부터 변경 사항 적용 여부를 선택받게 되는데, 이때 변경 사항의 적용이 선택되는 경우 프로젝트 태그 3이 부착된 프로젝트 C에 변경 사항이 적용된다. 또한, 변경 사항이 적용된 프로젝트 C에 태그 3 이외에 태그 2가 더 부착되어 있으므로 다시 한번 사용자로부터 태그 2에 대하여 변경 사항의 적용 여부를 선택받게 되고, 사용자가 적용을 선택하게 되면 태그 2가 부착된 프로젝트 B에도 변경 사항이 적용된다. 마찬가지로, 변경 사항이 적용된 프로젝트 B에 부착된 또 다른 태그 1에 대해서도 변경 사항의 적용 여부를 사용자로부터 선택받아 적용이 선택되면 태그 1이 부착된 프로젝트 A에 변경 사항이 적용된다. 따라서, 프로젝트 D에서 변경된 File B : Code C는 태그 3으로 연결된 프로젝트 C에 적용되고, 프로젝트 C와 태그 2로 연결된 프로젝트 B에도 적용되며, 프로젝트 B와 태그 1로 연결된 프로젝트 A에도 동일하게 적용된다. Finally, if File B: Code C is changed in Project D, the user will be asked to apply changes to tag 3 attached to Project D. If the change is applied at this time, the project with tag 3 Changes to C apply. In addition, since the tag 2 is attached to the project C to which the change is applied in addition to the tag 3, it is again selected whether or not the change is applied to the tag 2 from the user. When the user selects the application, Changes to B also apply. Likewise, if another tag 1 attached to the project B to which the change has been applied is selected from the user whether or not the change is applied, the change is applied to the project A to which the tag 1 is attached. Therefore, File B: Code C changed in Project D is applied to Project C linked with Tag 3, and also to Project B linked with Project C and Tag 2, and to Project A connected with Project B and Tag 1.

이러한 방법으로 다수의 유사 프로젝트에 대하여 각각의 변경된 사항은 사용자로부터 적용 여부를 선택받아 동일한 태그로 연결된 다른 유사 프로젝트에 자동으로 선별되어 적용된다. In this way, for each of a number of similar projects, each changed item is automatically selected and applied to other similar projects linked to the same tag by selecting the application from the user.

100: 유사 프로젝트 형상 관리 시스템 110: 기존 형상 관리 모듈
120: 태그 관리 모듈 130: 변경 관리 모듈
100: similar project configuration management system 110: existing configuration management module
120: tag management module 130: change management module

Claims (5)

다수의 유사 프로젝트(Derivative projects)에 대하여 서로 연관된 프로젝트임을 표시하는 태그(tag)가 각각 하나 또는 둘 이상 부착하고, 상기 부착된 태그를 이용하여 형상을 관리하는 태그 관리 모듈;
상기 태그가 부착된 유사 프로젝트 중에서 사용자에 의해 변경된 유사 프로젝트와 동일한 태그가 부착된 다른 유사 프로젝트에 상기 변경 사항을 적용하고, 상기 변경 사항이 적용된 유사 프로젝트에 부착된 다른 태그와 동일한 태그가 부착된 또 다른 유사 프로젝트에 상기 변경 사항을 적용하는 과정을 반복 수행하여, 상기 변경된 유사 프로젝트와 연관된 유사 프로젝트에 연쇄적으로 상기 변경 사항을 적용하는 변경 관리 모듈을 포함하고,
상기 변경 관리 모듈은,
상기 변경된 유사 프로젝트와 동일한 태그가 부착된 다른 유사 프로젝트에 상기 변경 사항을 적용하기 전에 사용자로부터 적용 여부를 선택 받는 것을 특징으로 하는 유사 프로젝트 형상 관리 시스템.
A tag management module for attaching one or more tags to each of a plurality of similar projects to indicate that the projects are related to each other and managing a shape using the attached tags;
The change is applied to another similar project having the same tag as the similar project changed by the user among the similar projects to which the tag is attached and the same tag attached to another project attached to the similar project to which the change is applied And a change management module for repeatedly applying the change to another similar project to sequentially apply the change to a similar project associated with the changed similar project,
The change management module includes:
Wherein the application is selected from the user before the change is applied to another similar project having the same tag as the changed similar project.
삭제delete 다수의 유사 프로젝트(Derivative projects)에 대하여 서로 연관된 프로젝트임을 표시하는 태그(tag)가 각각 하나 또는 둘 이상 부착하는 단계;
상기 태그가 부착된 유사 프로젝트 중에서 소정의 유사 프로젝트가 사용자에 의해 변경되는 단계;
상기 변경된 유사 프로젝트와 동일한 태그가 부착된 다른 유사 프로젝트에 상기 변경 사항을 적용하는 단계;
상기 변경 사항이 적용된 유사 프로젝트에 부착된 다른 태그와 동일한 태그가 부착된 또 다른 유사 프로젝트에 상기 변경 사항을 적용하는 과정을 반복 수행하는 단계를 포함하고,
상기 변경된 프로젝트와 동일한 태그가 부착된 다른 프로젝트에 상기 변경 사항을 적용하는 단계는,
상기 변경된 유사 프로젝트와 동일한 태그가 부착된 다른 유사 프로젝트에 상기 변경 사항을 적용하기 전에 사용자로부터 적용 여부를 선택받는 것을 특징으로 하는 유사 프로젝트 형상 관리 방법.
Attaching one or more tags to each of a plurality of similar projects indicating that the projects are related to each other;
Changing a predetermined similar project from a similar project to which the tag is attached, by a user;
Applying the change to another similar project having the same tag as the changed similar project;
And repeating the process of applying the change to another similar project to which the same tag is attached as another tag attached to the similar project to which the change is applied,
The step of applying the change to another project to which the same tag as the changed project is attached,
Wherein the application is selected from a user before applying the change to another similar project having the same tag as the changed similar project.
삭제delete 제3항에 있어서, 상기 변경 사항이 적용된 유사 프로젝트에 부착된 다른 태그와 동일한 태그가 부착된 또 다른 유사 프로젝트에 상기 변경 사항을 적용하는 과정을 반복 수행하는 단계는,
상기 변경된 유사 프로젝트와 동일한 태그가 부착된 다른 유사 프로젝트에 상기 변경 사항을 적용하기 전에 사용자로부터 적용 여부를 선택 받는 것을 특징으로 하는 유사 프로젝트 형상 관리 방법.
4. The method of claim 3, wherein the step of applying the change to another similar project to which the same tag as the another tag attached to the similar project to which the change is applied,
Wherein the application is selected from a user before applying the change to another similar project having the same tag as the changed similar project.
KR20120052303A 2012-05-17 2012-05-17 Configuration management system of derivative projects and method thereof KR101509501B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR20120052303A KR101509501B1 (en) 2012-05-17 2012-05-17 Configuration management system of derivative projects and method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR20120052303A KR101509501B1 (en) 2012-05-17 2012-05-17 Configuration management system of derivative projects and method thereof

Publications (2)

Publication Number Publication Date
KR20130128525A KR20130128525A (en) 2013-11-27
KR101509501B1 true KR101509501B1 (en) 2015-04-06

Family

ID=49855568

Family Applications (1)

Application Number Title Priority Date Filing Date
KR20120052303A KR101509501B1 (en) 2012-05-17 2012-05-17 Configuration management system of derivative projects and method thereof

Country Status (1)

Country Link
KR (1) KR101509501B1 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111125566B (en) * 2019-12-11 2021-08-31 贝壳找房(北京)科技有限公司 Information acquisition method and device, electronic equipment and storage medium

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20030009643A (en) * 2001-07-23 2003-02-05 주식회사 노엘정보테크 Project EDMS(electronic document management system)
JP2003058523A (en) 2001-08-21 2003-02-28 Nippon Telegr & Teleph Corp <Ntt> Method and device for generating conversion rule of structured document, conversion rule generation program, and recording medium recorded with the program
JP4235628B2 (en) * 2005-06-13 2009-03-11 キヤノン株式会社 Document management apparatus, document management system, information management apparatus, information processing apparatus, and document management apparatus control method
KR20110026286A (en) * 2009-09-07 2011-03-15 주식회사 인큐브테크 Producing apparatus and method for a standized electronic book

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20030009643A (en) * 2001-07-23 2003-02-05 주식회사 노엘정보테크 Project EDMS(electronic document management system)
JP2003058523A (en) 2001-08-21 2003-02-28 Nippon Telegr & Teleph Corp <Ntt> Method and device for generating conversion rule of structured document, conversion rule generation program, and recording medium recorded with the program
JP4235628B2 (en) * 2005-06-13 2009-03-11 キヤノン株式会社 Document management apparatus, document management system, information management apparatus, information processing apparatus, and document management apparatus control method
KR20110026286A (en) * 2009-09-07 2011-03-15 주식회사 인큐브테크 Producing apparatus and method for a standized electronic book

Also Published As

Publication number Publication date
KR20130128525A (en) 2013-11-27

Similar Documents

Publication Publication Date Title
US9063808B2 (en) Deploying a package for a software application
US8281187B1 (en) Unified and extensible meta-testing framework
CN103744680B (en) Method and device for business process processing
CN101625738A (en) Method and device for generating context-aware universal workflow application
CN111510468B (en) Scheduling method and device of computing task, server and computing system
CN103399748A (en) Equipment configuration standardization detecting device and method
CN104317604A (en) Program code generating method and device
CN102572896A (en) Upgrading method and upgrading device for wireless communication system
US20080109329A1 (en) Method and apparatus for variable regulatory or conditional use compliance maximizing use of available inventory
CN111784318A (en) Data processing method and device, electronic equipment and storage medium
CN105069059A (en) Database synchronization method and apparatus
KR101509501B1 (en) Configuration management system of derivative projects and method thereof
US9817632B2 (en) Custom narration of a control list via data binding
WO2016078445A1 (en) Method and device for upgrading multi-mode base station and network management system
US9053084B1 (en) Self-service testing
CN110019207A (en) Data processing method and device and script display methods and device
US20090158289A1 (en) Workflow execution plans through completion condition critical path analysis
CN105207799A (en) Batch command executing method and device
CN101458628A (en) Program edition management method
CN103714065A (en) Method for integrating information data
CN115048158A (en) Process arranging and calling method, system and computer equipment thereof
CN114663177A (en) State change control method, device, electronic equipment and storage medium
CN109240743B (en) Method for switching codes by using specific label
CN105718536A (en) Mobile terminal order query method and system
CN104484719A (en) Method and device for determining node line to be recommended

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
FPAY Annual fee payment

Payment date: 20180329

Year of fee payment: 4

FPAY Annual fee payment

Payment date: 20190325

Year of fee payment: 5