KR101392508B1 - Lifting device for power transmission steel tower - Google Patents

Lifting device for power transmission steel tower Download PDF

Info

Publication number
KR101392508B1
KR101392508B1 KR1020140037197A KR20140037197A KR101392508B1 KR 101392508 B1 KR101392508 B1 KR 101392508B1 KR 1020140037197 A KR1020140037197 A KR 1020140037197A KR 20140037197 A KR20140037197 A KR 20140037197A KR 101392508 B1 KR101392508 B1 KR 101392508B1
Authority
KR
South Korea
Prior art keywords
connection hole
hole portion
horizontal
bracket
vertical
Prior art date
Application number
KR1020140037197A
Other languages
Korean (ko)
Inventor
육지성
Original Assignee
(주)비에스
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by (주)비에스 filed Critical (주)비에스
Priority to KR1020140037197A priority Critical patent/KR101392508B1/en
Application granted granted Critical
Publication of KR101392508B1 publication Critical patent/KR101392508B1/en

Links

Images

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G7/00Overhead installations of electric lines or cables
    • H02G7/20Spatial arrangements or dispositions of lines or cables on poles, posts or towers
    • H02G7/205Installation of electric cables, extending along a pole
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H12/00Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
    • E04H12/34Arrangements for erecting or lowering towers, masts, poles, chimney stacks, or the like
    • HELECTRICITY
    • H01ELECTRIC ELEMENTS
    • H01BCABLES; CONDUCTORS; INSULATORS; SELECTION OF MATERIALS FOR THEIR CONDUCTIVE, INSULATING OR DIELECTRIC PROPERTIES
    • H01B17/00Insulators or insulating bodies characterised by their form
    • H01B17/02Suspension insulators; Strain insulators
    • H01B17/06Fastening of insulator to support, to conductor, or to adjoining insulator
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G1/00Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines
    • H02G1/02Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines for overhead lines or cables

Abstract

The present invention includes a plurality of vertical members vertically arranged to form a structure surrounding an outer portion of a steel power; a plurality of horizontal members connected with the vertical members to form the structure surrounding the outer portion of the steel tower and horizontally arranged; a plurality of brackets including an upper connection hole part, a lower connection hole part, a first horizontal connection hole part, and a second horizontal connection hole part, which are integrally formed with each other, to connect the vertical members with the horizontal members; a diagonal member for connecting the brackets with each other and for maintaining the connection state between the vertical and horizontal members; a detaching unit provided in the upper connection hole part, the lower connection hole part, the first horizontal connection hole part, and the second horizontal connection hole part to lock the vertical members or the horizontal members; a lower end support coupled with the bracket to support a lower portion of the structure formed by the vertical members, the horizontal members, and the diagonal members; a connection unit to connect the lower end support to the steel tower; an interval maintaining unit installed between the bracket and the steel tower to maintain the interval between the bracket and the steel tower; and an erroneous operation preventing unit provided in the bracket to expose or cover the detaching unit.

Description

송전, 배전, 변전용 철탑 인상장치 {LIFTING DEVICE FOR POWER TRANSMISSION STEEL TOWER}BACKGROUND OF THE INVENTION 1. Field of the Invention [0001] The present invention relates to a lifting device for power transmission,

본 발명은 송전, 배전, 변전용 철탑 인상장치에 관한 것으로서, 보다 상세하게는, 철탑에 용이하게 설치할 수 있고, 철탑의 인상작업이 완료된 후에 쉽게 해체할 수 있으며, 철탑과 인상장치 사이의 간격을 유지하고 오조작에 의한 인상장치의 해체를 방지할 수 있는 송전, 배전, 변전용 철탑 인상장치에 관한 것이다.
More particularly, the present invention relates to a steel tower lifting device for power transmission, distribution and transformation, and more particularly, to a steel tower lifting device capable of being easily installed on a steel tower, easily disassembled after the lifting operation of the steel tower is completed, Power distribution, and stowing tower towing apparatus capable of preventing the pulling-up device from being disassembled due to erroneous operation.

산업이 발달함에 따라, 전력 수요가 늘어나고 있으며, 전력을 송전하기 위한 설비의 개수는 점점 증가하고 있고, 도시화에 따라 시설물이 점점 대형화가 되고 있다.As the industry develops, the demand for electric power is increasing, the number of facilities for transmitting power is increasing, and the facilities are becoming larger and larger due to urbanization.

이와 같은 시설물의 대형화에 의해서 시설물과 송전선이 설치되는 송전철탑간의 안전 이격 거리가 확보되지 못해 접촉 위험성이 늘어나고 있고, 안전 이격 거리를 확보하지 못함에 따라 양질의 전력 공급 및 고장 발생 역시 증가하고 있다.Due to the enlargement of such facilities, the safety distances between the facilities and transmission towers where transmission lines are installed can not be ensured, and the risk of contact increases. As the safety distance can not be ensured, good quality of power supply and faults are also increasing.

이를 방지하기 위해 송전철탑과 시설물간의 안전 이격 거리 확보를 위해 송전철탑의 인상이 필요하다.In order to prevent this, it is necessary to raise the transmission tower in order to secure a safe separation distance between the transmission tower and the facility.

그런데, 송전철탑의 인상을 위해서는 별도의 임시 송전철탑이나 신설 송전철탑을 세워야 한다는 번거로움이 있다.However, in order to raise the transmission tower, it is troublesome to construct a separate temporary transmission tower or a new transmission tower.

이와 같은 임시 송전철탑 또는 신설 송전철탑의 설치를 위해서는 용지 확보 어려움 및 큰 비용이 발생하므로 송전철탑 인상을 위한 송전철탑 인상 장비가 개발되었다.In order to install such a temporary transmission tower or a new transmission tower, difficulties in securing paper and a large cost are incurred, so a transmission tower towing apparatus for transmission tower towing was developed.

송전철탑 인상 장비를 활용한 철탑상향공사는 별도의 철탑 신설 없이 기존철탑에 철탑인상장비(Helper- Tower)를 장착해서 임시 송전선로를 구성한 후에 송전하고, 기존철탑 상부를 인상하여 철탑높이를 상향하는 공법이다.
Upgrading of steel towers utilizing transmission tower towing equipment is carried out by constructing temporary transmission towers by attaching tow tower elevator (Helper-Tower) to existing towers without installing additional tow towers, It is a public law.

본 발명의 배경기술은 대한민국 등록특허공보 제10-1306208호(2013년 9월 9일 공고, 발명의 명칭 : 송전철탑 인상 장치)에 개시되어 있다.
BACKGROUND ART [0002] The background art of the present invention is disclosed in Korean Registered Patent No. 10-1306208 (issued September 9, 2013, entitled " Transmission Tower Towing Apparatus ").

일반적인 인상장치는 철탑의 중앙부로부터 상측으로 다수 개의 지지대가 구조물을 이루도록 설치한 후에 철탑의 상부를 구조물에 의해 지지시키면서 상승시키기 때문에 다수 개의 지지대가 구조물을 이루도록 설치하는데 소요되는 시간을 줄이기 어려운 문제점이 있다.A general lifting device has a problem that it is difficult to reduce the time required to install a plurality of supports so as to form a structure because a plurality of support rods are installed from the central portion of the steel tower to the upper portion thereof, .

따라서 이를 개선할 필요성이 요청된다.Therefore, there is a need for improvement.

본 발명은 철탑에 용이하게 설치할 수 있고, 철탑의 인상작업이 완료된 후에 쉽게 해체할 수 있으며, 철탑과 인상장치 사이의 간격을 유지하고 오조작에 의한 인상장치의 해체를 방지할 수 있는 송전, 배전, 변전용 철탑 인상장치를 제공하는데 그 목적이 있다.
The present invention can be easily installed on a steel tower, and can be easily disassembled after the lifting operation of the tower is completed. In addition, it is possible to maintain the distance between the tower and the lifting device and to prevent disconnection of the lifting device by erroneous operation. And to provide a steel tower elevator for exclusive use of a movable elevator.

본 발명은, 철탑의 외곽을 둘러싸는 구조물을 이루도록 수직방향으로 배치되는 복수 개의 수직부재; 상기 수직부재와 연결되어 상기 철탑의 외곽을 둘러싸는 상기 구조물을 이루도록 수직부재와 연결되고 수평방향으로 배치되는 복수 개의 수평부재; 상기 수직부재와 상기 수평부재를 연결하도록 상부연결홀부, 하부연결홀부, 제1수평연결홀부 및 제2수평연결홀부가 일체로 형성되는 복수 개의 브래킷; 복수 개의 상기 브래킷을 서로 연결하고 상기 수직부재와 상기 수평부재의 연결상태를 유지하는 대각선부재; 상기 상부연결홀부, 상기 하부연결홀부, 상기 제1수평연결홀부 및 상기 제2수평연결홀부에 구비되고 상기 수직부재 또는 상기 수평부재를 걸림결합시키는 착탈부; 상기 수직부재, 상기 수평부재 및 상기 대각선부재에 의해 이루어지는 상기 구조물의 하부를 지지하도록 상기 브래킷에 결합되는 하단지지대; 상기 하단지지대를 상기 철탑에 연결시키는 연결부; 상기 브래킷과 상기 철탑 사이에 설치되고 상기 브래킷과 상기 철탑 사이의 간격을 유지시키는 간격유지부; 및 상기 착탈부를 노출 또는 커버하도록 상기 브래킷에 구비되는 오조작방지부를 포함하는 것을 특징으로 한다.The present invention relates to a vertical structure comprising: a plurality of vertical members arranged in a vertical direction so as to form a structure surrounding an outer periphery of a steel tower; A plurality of horizontal members connected to the vertical member and connected to the vertical member to form the structure surrounding the outer periphery of the steel tower and disposed in a horizontal direction; A plurality of brackets integrally formed with the upper connection hole portion, the lower connection hole portion, the first horizontal connection hole portion, and the second horizontal connection hole portion so as to connect the vertical member and the horizontal member; A diagonal member connecting the plurality of brackets to each other and maintaining the connection state of the vertical member and the horizontal member; A detachable portion provided at the upper connection hole portion, the lower connection hole portion, the first horizontal connection hole portion, and the second horizontal connection hole portion and engaging the vertical member or the horizontal member; A lower end support coupled to the bracket to support a lower portion of the structure formed by the vertical member, the horizontal member, and the diagonal member; A connecting part connecting the lower support to the steel tower; An interval maintaining unit installed between the bracket and the iron tower and maintaining a distance between the bracket and the iron tower; And a erroneous operation preventing portion provided on the bracket to expose or cover the detachable portion.

또한, 본 발명의 상기 수직부재, 상기 수평부재 및 상기 대각선부재에는, 상기 상부연결홀부, 상기 하부연결홀부, 상기 제1수평연결홀부 및 상기 제2수평연결홀부에 구비되는 가이드돌기가 삽입되도록 가이드홈부가 형성되고, 상기 수직부재 및 상기 수평부재의 단부에는 경사면이 형성되는 것을 특징으로 한다.In the vertical member, the horizontal member, and the diagonal member of the present invention, guide protrusions provided in the upper connection hole portion, the lower connection hole portion, the first horizontal connection hole portion, and the second horizontal connection hole portion are inserted And a sloped surface is formed at an end of the vertical member and the horizontal member.

또한, 본 발명의 상기 브래킷은, 상기 상부연결홀부 또는 상기 하부연결홀부와 상기 제1수평연결홀부 사이의 연결부위, 및 상기 상부연결홀부 또는 상기 하부연결홀부와 상기 제2수평연결홀부 사이의 연결부위에 대각선부재의 걸림홈부에 삽입되는 연결편이 형성되고, 연결편에는 대각선부재의 결합홀부에 대향되는 제1고정홀부가 형성되는 것을 특징으로 한다.In addition, the bracket of the present invention may further comprise: a connection portion between the upper connection hole portion or the lower connection hole portion and the first horizontal connection hole portion, and a connection between the upper connection hole portion or the lower connection hole portion and the second horizontal connection hole portion And a first fixing hole portion opposed to the coupling hole portion of the diagonal member is formed on the connecting piece.

또한, 본 발명의 상기 착탈부는, 상기 상부연결홀부, 상기 하부연결홀부, 상기 제1수평연결홀부 및 상기 제2수평연결홀부에 구비되는 장착홈부; 상기 장착홈부에 회전축에 의해 회전 가능하게 설치되고 일단에 후크부가 형성되며 타단에 노브가 형성되고 걸림돌기가 구비되는 착탈패널; 상기 장착홈부와 상기 걸림돌기 사이의 간격을 벌리면서 상기 후크부를 상기 수직부재 또는 상기 수평부재의 걸림홈부 측으로 회전시키는 토션스프링을 포함하는 것을 특징으로 한다.Further, the detachable portion of the present invention may include: a mounting groove portion provided in the upper connection hole portion, the lower connection hole portion, the first horizontal connection hole portion, and the second horizontal connection hole portion; A mounting and dismounting panel rotatably mounted on the mounting groove and having a hook formed at one end thereof and a knob formed at the other end thereof and having a locking protrusion; And a torsion spring for rotating the hook portion toward the hooking groove portion of the vertical member or the horizontal member while widening the gap between the mounting groove portion and the engagement protrusion.

또한, 본 발명의 상기 간격유지부는, 상기 브래킷에 구비되는 제1유지홀부; 상기 제1유지홀부에 연결되는 제2유지홀부를 구비하는 연결본체; 상기 연결본체에 설치되는 베어링에 의해 회전 가능하게 설치되는 너트부재; 상기 너트부재에 결합되고 상기 연결본체 내부 또는 외부로 출몰 가능하게 설치되며 상기 철탑에 걸림결합되는 연결고리가 구비되는 볼트축을 포함하고; 상기 오조작방지부는, 상기 수직부재 및 상기 수평부재가 삽입되는 상기 브래킷의 단부에 돌출되게 형성되는 지지패널; 상기 지지패널로부터 상기 브래킷의 중앙부 측으로 연장되고 지지돌기가 구비되는 복수 개의 지지축; 상기 지지축이 슬라이딩 가능하게 삽입되는 삽입홀부가 형성되고, 상기 지지돌기가 걸리는 걸림턱부가 형성되며, 상기 브래킷에 설치되는 상기 착탈부를 노출 또는 커버하는 링부재; 및 상기 링부재와 상기 지지패널 사이에 개재되도록 상기 지지축에 설치되는 탄성부재를 포함하는 것을 특징으로 한다.
In addition, the gap holding portion of the present invention may include a first holding hole portion provided in the bracket; And a second holding hole portion connected to the first holding hole portion; A nut member rotatably installed by a bearing installed in the connection body; And a bolt shaft which is coupled to the nut member and is installed to be able to protrude or retract into the connection body or to the outside, and has a connection ring engaged with the steel tower; Wherein the erroneous operation preventing portion includes: a support panel protruding from an end of the bracket into which the vertical member and the horizontal member are inserted; A plurality of support shafts extending from the support panel to the center side of the bracket and provided with support protrusions; A ring member formed with an insertion hole into which the support shaft is slidably insertable and having a locking protrusion for locking the support protrusion and exposing or covering the detachable portion provided on the bracket; And an elastic member provided on the support shaft to be interposed between the ring member and the support panel.

본 발명에 따른 송전, 배전, 변전용 철탑 인상장치는, 수직부재, 수평부재 및 대각선부재에 의해 이루어지는 구조물이 철탑의 하부에 설치되고, 철탑의 상부와 하부를 분리시켜 인상작업을 행하므로 별도의 철탑을 설치하지 않은 상태에서 철탑의 인상작업을 행할 수 있는 이점이 있다.The steel tower lifting device for power transmission, distribution and transformation according to the present invention is constructed such that a structure composed of a vertical member, a horizontal member, and a diagonal member is installed at a lower portion of a steel tower and separates the upper and lower portions of the steel tower, There is an advantage that the elevation of the steel tower can be performed in a state in which the steel tower is not installed.

또한, 본 발명은, 수직부재 및 수평부재가 착탈부의 작동에 의해 브래킷에 원터치 방식으로 결합되고 분리되므로 인상작업을 행하기 위한 구조물의 설치와 해체에 소요되는 시간과 비용을 절감할 수 있는 이점이 있다.In addition, since the vertical member and the horizontal member are coupled and separated from the bracket in one-touch manner by the operation of the detachable portion, there is an advantage that the time and cost required for installing and disassembling the structure for performing the pull- have.

또한, 본 발명은, 간격유지부에 의해 인상장치와 철탑 사이의 간격이 좁아지거나 넓어지는 것을 방지할 수 있고, 인상장치의 설치작업 또는 설치 후에 작업자의 부주위로 인해 착탈부가 오조작되는 것을 방지할 수 있어 인상장치의 설치작업 또는 철탑의 인상작업 중에 발생되는 안전사고를 예방할 수 있는 이점이 있다.
Further, according to the present invention, it is possible to prevent the distance between the pulling device and the pylon from being narrowed or widened by the gap holding portion, and to prevent the erroneous operation of the attaching / detaching portion due to the worker's posture There is an advantage that it is possible to prevent a safety accident occurring during installation work of the lifting device or lifting of the steel tower.

도 1은 본 발명의 일 실시예에 따른 송전, 배전, 변전용 철탑의 인상장치가 도시된 구성도이다.
도 2는 본 발명의 일 실시예에 따른 송전, 배전, 변전용 철탑의 인상장치의 브래킷 장착구조가 도시된 사시도이다.
도 3은 본 발명의 일 실시예에 따른 송전, 배전, 변전용 철탑의 인상장치의 브래킷 장착구조가 도시된 단면도이다.
도 4는 본 발명의 일 실시예에 따른 송전, 배전, 변전용 철탑의 인상장치의 연결부가 도시된 사시도이다.
도 5는 본 발명의 일 실시예에 따른 송전, 배전, 변전용 철탑의 인상장치의 연결상태가 도시된 구성도이다.
도 6은 본 발명의 일 실시예에 따른 송전, 배전, 변전용 철탑의 인상장치에 의한 인상작업이 도시된 작업 상태도이다.
FIG. 1 is a view showing a drawing device of a transmission tower, a power distribution tower, and a turnover tower according to an embodiment of the present invention.
FIG. 2 is a perspective view illustrating a bracket mounting structure of a power towing apparatus for power transmission, distribution, and service of a steerable tower according to an embodiment of the present invention.
3 is a cross-sectional view illustrating a bracket mounting structure of a transmission tower, a power distribution tower, and a tower tower for a movable tower according to an embodiment of the present invention.
FIG. 4 is a perspective view illustrating a connection portion of a powertrain, a power distribution, and a pulling-up device for a steerable tower according to an embodiment of the present invention.
FIG. 5 is a view illustrating a connection state of power transmission, power distribution, and pull-up devices for dedicated steel towers according to an embodiment of the present invention.
FIG. 6 is a view showing an operation state of the pulling operation by the pulling device of the transmission tower, the power distribution, and the turnover tower according to the embodiment of the present invention.

이하, 첨부된 도면들을 참조하여 본 발명에 따른 송전, 배전, 변전용 철탑의 인상장치의 일 실시예를 설명한다.DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS Hereinafter, an embodiment of a pulling device for power transmission, distribution, and transmission towers according to the present invention will be described with reference to the accompanying drawings.

이러한 과정에서 도면에 도시된 선들의 두께나 구성요소의 크기 등은 설명의 명료성과 편의상 과장되게 도시되어 있을 수 있다.In this process, the thicknesses of the lines and the sizes of the components shown in the drawings may be exaggerated for clarity and convenience of explanation.

또한, 후술되는 용어들은 본 발명에서의 기능을 고려하여 정의된 용어들로써, 이는 사용자, 운용자의 의도 또는 관례에 따라 달라질 수 있다.In addition, the terms described below are terms defined in consideration of the functions of the present invention, which may vary depending on the intention or custom of the user, the operator.

그러므로 이러한 용어들에 대한 정의는 본 명세서 전반에 걸친 내용을 토대로 내려져야 할 것이다.
Therefore, definitions of these terms should be made based on the contents throughout this specification.

도 1은 본 발명의 일 실시예에 따른 송전, 배전, 변전용 철탑의 인상장치가 도시된 구성도이고, 도 2는 본 발명의 일 실시예에 따른 송전, 배전, 변전용 철탑의 인상장치의 브래킷 장착구조가 도시된 사시도이고, 도 3은 본 발명의 일 실시예에 따른 송전, 배전, 변전용 철탑의 인상장치의 브래킷 장착구조가 도시된 단면도이다.FIG. 1 is a schematic view showing a pulling-up device for power transmission, distribution, and transmission towers according to an embodiment of the present invention. FIG. 2 is a schematic view of a pulling- FIG. 3 is a cross-sectional view illustrating a bracket mounting structure of a transmission tower, a power distribution tower, and a tow-up apparatus for a tower according to an embodiment of the present invention.

또한, 도 4는 본 발명의 일 실시예에 따른 송전, 배전, 변전용 철탑의 인상장치의 연결부가 도시된 사시도이고, 도 5는 본 발명의 일 실시예에 따른 송전, 배전, 변전용 철탑의 인상장치의 연결상태가 도시된 구성도이고, 도 6은 본 발명의 일 실시예에 따른 송전, 배전, 변전용 철탑의 인상장치에 의한 인상작업이 도시된 작업 상태도이다.FIG. 4 is a perspective view illustrating a connection portion of a power transmission, distribution, and pull-up device for a dedicated tower according to an exemplary embodiment of the present invention, FIG. 5 is a perspective view of a power transmission, 6 is a view showing an operation state of the pulling operation by the pull-up device of the power transmission, distribution, and steerable tower according to the embodiment of the present invention.

도 1 내지 도 6을 참조하면, 본 발명의 일 실시예에 따른 송전, 배전, 변전용 철탑의 인상장치는, 철탑(200)의 외곽을 둘러싸는 구조물을 이루도록 수직방향으로 배치되는 복수 개의 수직부재(110)와, 수직부재(110)와 연결되어 철탑(200)의 외곽을 둘러싸는 구조물을 이루도록 수직부재(110)와 연결되고 수평방향으로 배치되는 복수 개의 수평부재(112)와, 수직부재(110)와 수평부재(112)를 연결하도록 상부연결홀부(710), 하부연결홀부(720), 제1수평연결홀부(730) 및 제2수평연결홀부(740)가 일체로 형성되는 복수 개의 브래킷(700)과, 복수 개의 브래킷(700)을 서로 연결하고 수직부재(110)와 수평부재(112)의 연결상태를 유지하는 대각선부재(113)와, 상부연결홀부(710), 하부연결홀부(720), 제1수평연결홀부(730) 및 제2수평연결홀부(740)에 구비되고 수직부재(110) 또는 수평부재(112)를 걸림결합시키는 착탈부(770)와, 수직부재(110), 수평부재(112) 및 대각선부재(113)에 의해 이루어지는 구조물의 하부를 지지하도록 브래킷(700)에 결합되는 하단지지대(780)와, 하단지지대(780)를 철탑(200)에 연결시키는 연결부(130)와, 브래킷(700)과 철탑(200) 사이에 설치되고 브래킷(700)과 철탑(200) 사이의 간격을 유지시키는 간격유지부(810)와, 착탈부(770)를 노출 또는 커버하도록 브래킷(700)에 구비되는 오조작방지부(820)를 포함한다.1 to 6, an apparatus for lifting a transmission tower, a power distribution system, and a utility tower according to an embodiment of the present invention includes a plurality of vertical members arranged vertically to form a structure surrounding an outer periphery of a steel tower 200, A plurality of horizontal members 112 connected to the vertical member 110 and connected to the vertical member 110 to form a structure surrounding the outer periphery of the steel tower 200 and disposed in the horizontal direction, A plurality of brackets 710 and a plurality of second brackets 730 are integrally formed to integrally form an upper connection hole 710, a lower connection hole 720, a first horizontal connection hole 730 and a second horizontal connection hole 740, A diagonal member 113 for connecting the plurality of brackets 700 to each other and maintaining the connection between the vertical member 110 and the horizontal member 112 and an upper connection hole portion 710, 720), the first horizontal connection hole portion 730 and the second horizontal connection hole portion 740, and the vertical member 110 or the horizontal member 11 A lower support 780 coupled to the bracket 700 to support the lower portion of the structure made up of the vertical member 110, the horizontal member 112 and the diagonal member 113, A connection part 130 connecting the lower stage support 780 to the steel tower 200 and a connection part 130 installed between the bracket 700 and the steel tower 200 to maintain a distance between the bracket 700 and the steel tower 200 And a erroneous operation preventing portion 820 provided on the bracket 700 to expose or cover the detachable portion 770. [

4개의 수평부재(112)를 브래킷(700)의 제1수평연결홀부(730) 및 제2수평연결홀부(740)에 각각 끼우면서 사각형 모양으로 연결하고, 브래킷(700)의 상부연결홀부(710) 및 하부연결홀부(720)에 수직부재(110)를 끼우면서 사각기둥 모양의 구조물을 제작한다.The four horizontal members 112 are inserted into the first horizontal connection hole portion 730 and the second horizontal connection hole portion 740 of the bracket 700 and connected in a rectangular shape and the upper connection hole portion 710 And the vertical connection member 110 are inserted in the lower connection hole 720 to form a rectangular columnar structure.

이때, 상부연결홀부(710), 하부연결홀부(720), 제1수평연결홀부(730) 및 제2수평연결홀부(740)에 구비되는 착탈부(770)에 의해 수직부재(110) 및 수평부재(112)는 원터치 방식으로 쉽게 브래킷(700)에 연결되면서 구조물을 이루게 된다.At this time, the vertical member 110 and the horizontal member 110 are separated by the detachable portion 770 provided in the upper connection hole portion 710, the lower connection hole portion 720, the first horizontal connection hole portion 730 and the second horizontal connection hole portion 740, The member 112 is easily connected to the bracket 700 in a one-touch manner to form a structure.

하단지지대(780)와 연결부(130)를 연결하여 연결부(130)를 철탑(200) 하부의 둘레면에 설치한 후에 하단지지대(780)의 상측으로 수평부재(112) 및 수직부재(110)를 단계적으로 적층시키면서 철탑(200)의 둘레면을 감싸는 구조물을 설치할 수 있게 된다.The lower support frame 780 and the connection part 130 are connected to each other and the connection part 130 is installed on the circumferential surface of the lower part of the steel tower 200 and then the horizontal member 112 and the vertical member 110 are fixed to the upper side of the lower support frame 780 A structure that surrounds the circumferential surface of the steel tower 200 can be installed while being stacked step by step.

구조물의 설치가 완료되면 철탑(200)의 상부(210)와 하부(220)를 분리하고, 와이어, 가이드롤러 및 구동부를 포함하는 견인장치를 인상장치 또는 지면에 설치하여 철탑(200)의 상부(210)를 인상장치를 따라 상측으로 견인시킨 후에 철탑(200)의 상부(210)와 하부(220)를 연결하는 연결구조물을 설치한다.When the installation of the structure is completed, the upper part 210 and the lower part 220 of the steel tower 200 are separated, and a pulling device including a wire, a guide roller and a driving part is installed on the pulling device or the ground, 210 are pulled upward along the lifting device and then a connecting structure for connecting the upper part 210 and the lower part 220 of the steel tower 200 is installed.

이후에 견인장치 및 인상장치를 철탑(200)으로부터 해체하여 철탑(200)의 인상작업을 종료한다.Then, the pulling device and the pulling device are disassembled from the steel tower 200, and the pulling operation of the steel tower 200 is completed.

본 실시예의 수직부재(110), 수평부재(112) 및 대각선부재(113)에는, 상부연결홀부(710), 하부연결홀부(720), 제1수평연결홀부(730) 및 제2수평연결홀부(740)에 구비되는 가이드돌기가 삽입되도록 가이드홈부(117)가 형성되고, 수직부재(110) 및 수평부재(112)의 단부에는 경사면(118)이 형성된다.The vertical member 110, the horizontal member 112 and the diagonal member 113 of this embodiment are provided with an upper connection hole portion 710, a lower connection hole portion 720, a first horizontal connection hole portion 730, A guide groove 117 is formed to insert a guide projection provided in the horizontal member 740 and an inclined surface 118 is formed at an end of the vertical member 110 and the horizontal member 112.

따라서 수직부재(110) 및 수평부재(112)를 상부연결홀부(710), 하부연결홀부(720), 제1수평연결홀부(730) 또는 제2수평연결홀부(740)에 삽입할 때에 수직부재(110) 또는 수평부재(112)의 단부와 착탈부(770)가 간섭되는 것을 방지할 수 있게 된다.When the vertical member 110 and the horizontal member 112 are inserted into the upper connection hole portion 710, the lower connection hole portion 720, the first horizontal connection hole portion 730 or the second horizontal connection hole portion 740, It is possible to prevent the end portion of the horizontal member 112 and the detachable portion 770 from interfering with each other.

착탈부(770)의 후크부(772a)는, 상부연결홀부(710), 하부연결홀부(720), 제1수평연결홀부(730) 또는 제2수평연결홀부(740)의 내벽으로부터 내측으로 방향으로 출몰 가능하게 설치되므로 수직부재(110) 또는 수평부재(112)가 삽입될 때에 경사면(118)에 의해 후크부(772a)가 상부연결홀부(710), 하부연결홀부(720), 제1수평연결홀부(730) 또는 제2수평연결홀부(740)의 외측으로 밀리면서 수직부재(110) 또는 수평부재(112)가 용이하게 삽입될 수 있도록 한다.The hook portion 772a of the detachable portion 770 is inwardly directed from the inner wall of the upper connection hole portion 710, the lower connection hole portion 720, the first horizontal connection hole portion 730 or the second horizontal connection hole portion 740 When the vertical member 110 or the horizontal member 112 is inserted, the hook portion 772a is engaged with the upper connection hole portion 710, the lower connection hole portion 720, the first horizontal So that the vertical member 110 or the horizontal member 112 can be easily inserted into the connection hole 730 or the second horizontal connection hole 740.

브래킷(700)은, 상부연결홀부(710) 또는 하부연결홀부(720)와 제1수평연결홀부(730) 사이의 연결부(130)위, 및 상부연결홀부(710) 또는 하부연결홀부(720)와 제2수평연결홀부(740) 사이의 연결부(130)위에 대각선부재(113)의 걸림홈부(113a)에 삽입되는 연결편(750)이 형성되고, 연결편(750)에는 대각선부재(113)의 결합홀부(113b)에 대향되는 제1고정홀부(752)가 형성된다.The bracket 700 is disposed on the connection portion 130 between the upper connection hole portion 710 or the lower connection hole portion 720 and the first horizontal connection hole portion 730 and the upper connection hole portion 710 or the lower connection hole portion 720, A connecting piece 750 inserted into the latching groove 113a of the diagonal member 113 is formed on the connecting part 130 between the first horizontal connecting hole part 740 and the second horizontal connecting hole part 740. In the connecting piece 750, A first fixing hole portion 752 opposed to the hole portion 113b is formed.

상부연결홀부(710)와 하부연결홀부(720)는 수직방향으로 동일 직선상에 배치되도록 일체로 연결되고, 상부연결홀부(710)와 하부연결홀부(720)의 연결부(130)위로부터 측 방향으로 제1수평연결홀부(730)와 제2수평연결홀부(740)가 연장되도록 일체로 연결된다.The upper connection hole portion 710 and the lower connection hole portion 720 are integrally connected so as to be arranged in the same straight line in the vertical direction and are integrally connected from the connection portion 130 of the upper connection hole portion 710 and the lower connection hole portion 720 in the lateral direction The first horizontal connection hole portion 730 and the second horizontal connection hole portion 740 are integrally connected to each other.

제1수평연결홀부(730)와 제2수평연결홀부(740)는 서로 직각을 이루도록 연장되므로 상부연결홀부(710) 및 하부연결홀부(720)에 각각 수직부재(110)가 삽입되고, 제1수평연결홀부(730) 및 제2수평연결부(130)재에 수평부재(112)가 삽입되면 사각기둥 모양으로 이루어지는 구조물의 테두리가 형성된다.The first horizontal connection hole portion 730 and the second horizontal connection hole portion 740 extend perpendicularly to each other so that the vertical member 110 is inserted into the upper connection hole portion 710 and the lower connection hole portion 720, When the horizontal member 112 is inserted into the horizontal connection hole portion 730 and the second horizontal connection portion 130, a rim of a rectangular columnar structure is formed.

상기한 바와 같이 2개의 수직부재(110)와 2개의 수평부재(112) 단부가 하나의 브래킷(700)에 의해 연결되므로 4개의 브래킷(700)에 의해 8개의 수직부재(110)와 4개의 수평부재(112)가 구조물을 이루도록 서로 연결될 수 있게 된다.As described above, since the two vertical members 110 and the two horizontal members 112 are connected by one bracket 700, the four vertical members 110 and the four horizontal members 112 are connected by the four brackets 700, The members 112 can be connected to each other to form a structure.

상기한 바와 같이 4개의 브래킷(700)이 상측으로 연속되게 배치되면서 수직부재(110) 및 수평부재(112)를 연결하면 사각기둥 모양의 구조물을 이루게 되며, 수직부재(110)의 개수에 따라 구조물의 높이가 결정될 수 있게 된다.As described above, when four brackets 700 are continuously arranged on the upper side and the vertical member 110 and the horizontal member 112 are connected to each other, a rectangular columnar structure is formed. In accordance with the number of the vertical members 110, Can be determined.

착탈부(770)는, 상부연결홀부(710), 하부연결홀부(720), 제1수평연결홀부(730) 및 제2수평연결홀부(740)에 구비되는 장착홈부(771)와, 장착홈부(771)에 회전축(774)에 의해 회전 가능하게 설치되고 일단에 후크부(772a)가 형성되며 타단에 노브(772b)가 형성되고 걸림돌기(776a)가 구비되는 착탈패널(772)과, 장착홈부(771)와 걸림돌기(776a) 사이의 간격을 벌리면서 후크부(772a)를 수직부재(110) 또는 수평부재(112)의 걸림홈부(113a) 측으로 회전시키는 토션스프링(776)을 포함한다.The detachable portion 770 includes a mounting groove portion 771 provided in the upper connection hole portion 710, the lower connection hole portion 720, the first horizontal connection hole portion 730 and the second horizontal connection hole portion 740, A detachable panel 772 rotatably mounted on a rotating shaft 771 by a rotation shaft 774 and having a hook portion 772a formed at one end thereof and a knob 772b formed at the other end thereof and provided with a locking protrusion 776a, And a torsion spring 776 that rotates the hook portion 772a toward the engagement groove portion 113a of the vertical member 110 or the horizontal member 112 while spreading the gap between the groove portion 771 and the engagement projection 776a .

상부연결홀부(710), 하부연결홀부(720), 제1수평연결홀부(730) 및 제2수평연결홀부(740)의 내벽에는 장착홈부(771)가 형성되고, 장착홈부(771)의 내측에는 회전축(774)에 의해 착탈패널(772)이 회전 가능하게 설치된다.A mounting groove portion 771 is formed on the inner walls of the upper connection hole portion 710, the lower connection hole portion 720, the first horizontal connection hole portion 730 and the second horizontal connection hole portion 740, A detachable panel 772 is rotatably mounted by a rotating shaft 774. [

회전축(774)은 착탈패널(772)의 중앙부에 형성되어 착탈패널(772)의 일단부 및 타단부를 선택적으로 상부연결홀부(710), 하부연결홀부(720), 제1수평연결홀부(730) 및 제2수평연결홀부(740) 내측으로 돌출시키게 된다.The rotary shaft 774 is formed at a central portion of the attaching / detaching panel 772 so that one end and the other end of the attaching / detaching panel 772 are selectively connected to the upper connecting hole 710, the lower connecting hole 720, And the second horizontal connection hole portion 740, as shown in FIG.

토션스프링(776)의 단부는 장착홈부(771)와 걸림돌기(776a) 사이의 간격을 넓히도록 설치되므로 후크부(772a)는 상부연결홀부(710), 하부연결홀부(720), 제1수평연결홀부(730) 및 제2수평연결홀부(740)의 내측 방향으로 돌출된 상태를 유지하게 된다.The end of the torsion spring 776 is provided to widen the gap between the mounting groove portion 771 and the locking projection 776a so that the hook portion 772a is connected to the upper connection hole portion 710, the lower connection hole portion 720, The first and second horizontal connection hole portions 730 and 740 protrude toward the inner side of the connection hole portion 730 and the second horizontal connection hole portion 740, respectively.

따라서 상부연결홀부(710), 하부연결홀부(720), 제1수평연결홀부(730) 및 제2수평연결홀부(740) 내측으로 수직부재(110) 또는 수평부재(112)를 삽입하면 경사면(118)에 의해 후크부(772a)가 외측으로 이동되면서 수직부재(110) 또는 수평부재(112)가 상부연결홀부(710), 하부연결홀부(720), 제1수평연결홀부(730) 및 제2수평연결홀부(740) 내측으로 삽입된다.When the vertical member 110 or the horizontal member 112 is inserted into the upper connection hole portion 710, the lower connection hole portion 720, the first horizontal connection hole portion 730 and the second horizontal connection hole portion 740, The vertical member 110 or the horizontal member 112 is moved upward by the hook portion 772a by the hook portion 772a and the vertical hook portion 772a by the hook portion 772a to cause the vertical member 110 or the horizontal member 112 to contact the upper connection hole portion 710, the lower connection hole portion 720, the first horizontal connection hole portion 730, Two horizontal connection hole portions 740 are inserted.

이후에, 후크부(772a)가 수직부재(110) 또는 수평부재(112)의 구속홈부(116)에 대향되게 배치되면 토션스프링(776)의 복원력에 의해 후크부(772a)가 상부연결홀부(710), 하부연결홀부(720), 제1수평연결홀부(730) 및 제2수평연결홀부(740) 내측으로 돌출되면서 구속홈부(116)에 삽입되어 수직부재(110) 또는 수평부재(112)를 구속하게 된다.Thereafter, when the hook portion 772a is disposed so as to oppose the vertical member 110 or the restricting groove portion 116 of the horizontal member 112, the hook portion 772a is retreated from the upper connection hole portion 772a by the restoring force of the torsion spring 776 The vertical member 110 or the horizontal member 112 is inserted into the restricting groove portion 116 while being protruded to the inside of the first horizontal connection hole portion 710, the lower connection hole portion 720, the first horizontal connection hole portion 730 and the second horizontal connection hole portion 740, .

철탑(200)의 인상작업이 완료된 후에는 수직부재(110) 및 수평부재(112)로 이루어지는 구조물을 해체하게 되는데, 이때, 작업자는 상부연결홀부(710), 하부연결홀부(720), 제1수평연결홀부(730) 및 제2수평연결홀부(740) 외측으로 돌출된 노브(772b)를 누르면 착탈패널(772)이 회전되면서 후크부(772a)가 후퇴하여 수직부재(110) 또는 수평부재(112)의 구속이 해제된다.After the lifting operation of the steel tower 200 is completed, the structure including the vertical member 110 and the horizontal member 112 is dismantled. At this time, the operator can dismantle the upper connection hole portion 710, the lower connection hole portion 720, When the knob 772b protruding outward from the horizontal connection hole 730 and the second horizontal connection hole 740 is pressed, the hook portion 772a retracts while the detachable panel 772 is rotated so that the vertical member 110 or the horizontal member 112 are released.

이때, 노브(772b)가 구비되는 착탈패널(772)의 타단부는 수직부재(110) 또는 수평부재(112)에 형성되는 해제홈부(116a) 내측으로 삽입되면서 후크부(772a)가 장착홈부(771) 내측으로 후퇴할 수 있는 공간을 제공하게 된다.At this time, the other end of the detachable panel 772 provided with the knob 772b is inserted into the release groove portion 116a formed in the vertical member 110 or the horizontal member 112, and the hook portion 772a is inserted into the mounting groove portion 771).

따라서 작업자는 브래킷(700)으로부터 수직부재(110) 또는 수평부재(112)를 손쉽게 분리하면서 수직부재(110) 및 수평부재(112)에 의해 이루어지는 구조물의 해체작업을 용이하게 행할 수 있게 된다.The worker can easily separate the vertical member 110 or the horizontal member 112 from the bracket 700 and easily perform the disassembly work of the structure made up of the vertical member 110 and the horizontal member 112.

하단지지대(780)는, 수평부재(112)와 동일하게 사각형 모양으로 이루어지는 수평부(784)와, 수평부(784)의 모서리로부터 상측으로 연장되고 하부연결홀부(720)에 삽입되어 연결되는 수직부(782)와, 수평부(784)에 구비되고 대각선부재(113)가 연결되도록 제2고정홀부(788)를 구비하는 고정편(786)을 포함한다.The lower support frame 780 includes a horizontal portion 784 having a rectangular shape similar to the horizontal member 112 and a vertical portion 784 extending upward from the edge of the horizontal portion 784 and inserted and connected to the lower connection hole portion 720, And a fixing piece 786 provided on the horizontal portion 784 and having a second fixing hole portion 788 for connecting the diagonal member 113. [

수평부(784)는 4개의 수평부재(112)가 사각형으로 연결된 모양을 이루고, 수평부(784)의 모서리로부터 상측으로 각각 4개의 수직부(782)가 연장되므로 브래킷(700)의 하부연결홀부(720)에 삽입될 수 있게 된다.The horizontal portion 784 has a shape in which four horizontal members 112 are connected in a quadrangular shape and four vertical portions 782 extend upward from the edge of the horizontal portion 784, (Not shown).

하단지지대(780)의 모서리에는 연결부(130)가 결합되고, 연결부(130)는 철탑(200)의 하부에 결합되어 수직부재(110) 및 수평부재(112)에 의해 이루어지는 구조물이 철탑(200)의 하부에 고정될 수 있도록 한다.The connecting part 130 is coupled to the lower support 780 and the connecting part 130 is coupled to the lower part of the steel tower 200 and a structure formed by the vertical member 110 and the horizontal member 112 is connected to the steel tower 200, As shown in FIG.

또한, 본 실시예의 대각선부재(113)의 단부에는 연결편(750)이 삽입되는 걸림홈부(113a)가 형성되고, 걸림홈부(113a)의 전면 및 배면에는 제1고정홀부(752)에 대향되는 걸림홀부가 형성되어 체결부재에 의해 브래킷(700)과 대각선부재(113)를 연결할 수 있게 된다.The end of the diagonal member 113 of the present embodiment is formed with a locking groove portion 113a into which the connecting piece 750 is inserted. A hole is formed so that the bracket 700 and the diagonal member 113 can be connected by the fastening member.

따라서 대각선부재(113)는 수직부재(110) 및 수평부재(112)에 의해 이루어지는 사각기둥 모양의 구조물이 비틀어지는 것을 방지할 수 있게 된다.Therefore, the diagonal member 113 can prevent the rectangular columnar structure formed by the vertical member 110 and the horizontal member 112 from being twisted.

또한, 본 실시예의 인상장치는, 임시 전선암(120)을 더 포함하고, 임시 전선암(120)은 송전철탑(200) 인상장치의 일단에 설치된다.The lifting device of the present embodiment further includes a temporary wire arm 120, and the temporary wire arm 120 is installed at one end of the device for pulling up the transmission steel tow 200.

임시 전선암(120)은 수평부재(112)의 끝단에 설치되며, 임시 전선암(120)에는 철탑(200)에 설치된 전선이 임시로 설치되고, 임시 전선암(120)은 폴리머 절연암으로 이루어진다.The temporary wire arm 120 is installed at the end of the horizontal member 112. The temporary wire arm 120 is temporarily provided with a wire installed in the steel tower 200 and the temporary wire arm 120 is made of a polymer insulating arm .

연결부(130)는 하단지지대(780)와 연결되는 제1연결단(131)과, 철탑(200)의 하부와 연결되는 제2연결단(132)과, 제1연결단(131)과 제2연결단(132)을 각도 조절 가능하도록 연결하는 각도조절단(133)을 포함한다.The connection unit 130 includes a first connection end 131 connected to the lower end support 780, a second connection end 132 connected to the lower end of the pylon 200, a first connection end 131, And an angle adjusting end 133 connecting the connecting end 132 so as to be adjustable in angle.

각도조절단(133)은 제1연결단(131)과 제2연결단(132)을 연결하고, 제1연결단(131)과 제2연결단(132)간의 각도를 조절할 수 있다.The angle adjusting end 133 may connect the first connection end 131 and the second connection end 132 and adjust the angle between the first connection end 131 and the second connection end 132.

따라서 각도조절단(133)에 의해서 기울기(Slope)가 존재하는 철탑(200)의 몸체에 인상장치를 설치하는 경우, 각도조절로 철탑(200)의 몸체에 인상장치를 용이하게 접합할 수 있다.Therefore, when the pulling device is installed on the body of the steel pellet 200 having a slope by the angle adjusting pellet 133, the pulling device can be easily joined to the body of the pellet 200 by adjusting the angle.

연결부(130)의 제1연결단(131)은 인상장치의 하부에 설치된 하단지지대(780)와 연결되고, 제2연결단(132)은 철탑(200)의 하부와 연결된다.The first connection end 131 of the connection part 130 is connected to the lower end support 780 provided at the lower part of the lifting device and the second connection end 132 is connected to the lower part of the steel pillar 200.

즉, 연결부(130)는 인상장치와 철탑(200)의 몸체에 장착됨으로써, 철탑(200)과 인상장치를 접합시키게 된다.That is, the connection part 130 is mounted on the body of the lifting device and the steel tower 200, thereby joining the steel tower 200 and the lifting device.

또한, 수직부재(110)와 철탑(200)의 하부 사이에는 별도의 턴버클과 같은 연결장치가 설치되어 수직부재(110) 및 수평부재(112)에 의해 이루어지는 구조물이 철탑(200)의 둘레면에 간격을 유지하며 배치될 수 있도록 설치된다.A connecting device such as a separate turnbuckle is provided between the vertical member 110 and the lower portion of the steel tower 200 so that a structure formed by the vertical member 110 and the horizontal member 112 is formed on the circumferential surface of the steel tower 200 So as to be spaced apart.

상기한 바와 같은 연결장치는 본 발명의 기술구성을 인지한 당업자가 용이하게 변경하여 실시할 수 있는 것이므로 연결장치에 대한 구체적인 도면이나 설명은 생략하기로 한다.Since the above-described connecting device can be easily changed by a person skilled in the art who knows the technical structure of the present invention, detailed drawings or description of the connecting device will be omitted.

간격유지부(810)는, 브래킷(700)에 구비되는 제1유지홀부(812)와, 제1유지홀부(812)에 연결되는 제2유지홀부(814a)를 구비하는 연결본체(814)와, 연결본체(814)에 설치되는 베어링(814b)에 의해 회전 가능하게 설치되는 너트부재(816)와, 너트부재(816)에 결합되고 연결본체(814) 내부 또는 외부로 출몰 가능하게 설치되며 철탑(200)에 걸림결합되는 연결고리(818a)가 구비되는 볼트축(818)을 포함한다.The interval maintaining portion 810 includes a connection body 814 having a first holding hole portion 812 provided in the bracket 700 and a second holding hole portion 814a connected to the first holding hole portion 812, A nut member 816 rotatably mounted by a bearing 814b provided on the connection body 814, a nut member 816 coupled to the nut member 816 and provided so as to protrude in or out of the connection body 814, And a bolt shaft 818 provided with a linking ring 818a which is engaged with the link 200.

브래킷(700)의 상부연결홀부(710) 및 하부연결홀부(720)의 둘레면에는 각각 제1유지홀부(812)가 형성되고, 제1유지홀부(812)에는 연결본체(814)의 일단부에 형성되는 제2유지홀부(814a)가 연결되어 연결본체(814)는 브래킷(700)에 유동 가능하게 설치된다.A first retention hole 812 is formed in the peripheral surface of the upper connection hole 710 and the lower connection hole 720 of the bracket 700 and a first retention hole 812 is formed in the first retention hole 812, And the connecting main body 814 is installed to be able to flow in the bracket 700. The second holding hole 814a is formed in the bracket 700,

연결본체(814)는 긴 막대 모양으로 형성되고, 연결본체(814)의 중앙부에는 볼트축(818)이 출몰 가능하게 삽입되는 홈부가 형성되며, 연결본체(814)의 타단에는 볼트축(818)이 삽입되는 홀부가 형성된다.A bolt shaft 818 is formed at the other end of the connection body 814. The bolt shaft 818 is inserted into the connection body 814. The bolt shaft 818 is inserted into the connection body 814, Is formed.

연결본체(814)의 내부에는 너트부재(816)가 베어링(814b)에 의해 회전 가능하게 설치되고, 연결본체(814) 내부로 삽입되는 볼트축(818)은 너트부재(816)와 볼트결합된다.A nut member 816 is rotatably installed inside the connection body 814 by a bearing 814b and a bolt shaft 818 inserted into the connection body 814 is bolted to the nut member 816 .

따라서 작업자가 너트부재(816)를 정방향으로 회전시키면 볼트축(818)이 연결본체(814) 외측으로 돌출되고, 너트부재(816)를 역방향으로 회전시키면 볼트축(818)이 연결본체(814) 내측으로 삽입된다.When the operator rotates the nut member 816 in the forward direction, the bolt shaft 818 protrudes to the outside of the connecting body 814 and when the nut member 816 is rotated in the reverse direction, Respectively.

볼트축(818)의 외측 단부에는 철탑(200)에 걸림결합되는 연결고리(818a)가 형성되므로 철탑(200)의 둘레면을 감싸도록 배치되는 4개의 브래킷(700)으로부터 연장되는 볼트축(818)을 각각 철탑(200)에 걸림결합시켜 브래킷(700)과 철탑(200) 사이에 장력이 생성되도록 볼트축(818)을 연결본체(814) 내부로 삽입시키면 철탑(200)과 브래킷(700) 사이의 간격을 일정하게 조절할 수 있게 된다.The bolt shafts 818 are formed at the outer ends of the bolt shafts 818 with bolts 818a extending from four brackets 700 arranged to surround the circumference of the bolt shafts 818, The bolt shaft 818 is inserted into the connection body 814 so as to generate a tension between the bracket 700 and the steel tower 200. The steel tower 200 and the bracket 700 are coupled to each other, It is possible to adjust the interval between the light source and the light source to be constant.

따라서 인상장치와 철탑(200) 사이의 간격이 유지되면서 인상장치와 철탑(200)이 서로 간섭되면서 발생되는 안전사고를 방지할 수 있게 된다.Accordingly, it is possible to prevent a safety accident caused by interfering with the lifting device and the steel tower 200 while maintaining a gap between the lifting device and the steel tower 200.

오조작방지부(820)는, 수직부재 및 수평부재가 삽입되는 브래킷(700)의 단부에 돌출되게 형성되는 지지패널(822)과, 지지패널(822)로부터 브래킷(700)의 중앙부 측으로 연장되고 지지돌기(824a)가 구비되는 복수 개의 지지축(824)과, 지지축(824)이 슬라이딩 가능하게 삽입되는 삽입홀부(826a)가 형성되고, 지지돌기(824a)가 걸리는 걸림턱부(826b)가 형성되며, 브래킷(700)에 설치되는 착탈부를 노출 또는 커버하는 링부재(826)와, 링부재(826)와 지지패널(822) 사이에 개재되도록 지지축(824)에 설치되는 탄성부재(828)를 포함한다.The erroneous operation preventing portion 820 includes a support panel 822 protruding from the end of the bracket 700 into which the vertical member and the horizontal member are inserted and a support panel 822 extending from the support panel 822 toward the center of the bracket 700 A plurality of support shafts 824 provided with the support protrusions 824a and an insertion hole portion 826a into which the support shaft 824 is slidably inserted are formed and the engagement protrusions 826b to which the support protrusions 824a are caught A ring member 826 for exposing or covering a detachable portion provided on the bracket 700 and an elastic member 828 provided on the support shaft 824 to be interposed between the ring member 826 and the support panel 822 ).

링부재(826)는 브래킷(700) 외측으로 돌출되게 설치되는 노브(772b)를 커버하여 작업자가 인상장치 설치작업 또는 철탄 인상작업 중에 부주위로 노브(772b)를 눌러 수직부재(110) 또는 수평부재(112)가 브래킷(700)으로부터 분리되는 안전사고를 예방할 수 있게 된다.The ring member 826 covers the knob 772b protruding outwardly of the bracket 700 so that the operator can press the knob 772b on the prong during the pulling-up device installation operation or the iron- It is possible to prevent a safety accident in which the bracket 112 is separated from the bracket 700.

수직부재(110) 또는 수평부재(112)가 삽입되는 브래킷(700)의 단부에는 측 방향으로 돌출되는 지지패널(822)이 형성되고, 지지패널(822)로부터 다수 개의 지지축(824)이 브래킷(700)의 중앙부 측으로 연장된다.A support panel 822 protruding in the lateral direction is formed at an end of the bracket 700 into which the vertical member 110 or the horizontal member 112 is inserted and a plurality of support shafts 824 are secured from the support panel 822 to the bracket 700. [ (700).

지지축(824)의 단부에는 측 방향으로 돌출되는 지지돌기(824a)가 형성되고, 지지축(824)이 슬라이딩 가능하게 삽입되는 링부재(826)의 삽입홀부(826a) 입구 측에는 지지돌기(824a)가 걸려 지지축(824)이 삽입홀부(826a) 외측으로 분리되는 것을 방지하는 걸림턱부(826b)가 형성된다.A support protrusion 824a projecting laterally is formed at an end of the support shaft 824 and a support protrusion 824a is formed at the entrance side of the insertion hole 826a of the ring member 826 into which the support shaft 824 is slidably inserted. To prevent the shaft 824 from separating out of the insertion hole portion 826a.

링부재(826)와 지지패널(822) 사이에 탄성부재(828)가 개재되도록 스프링 모양으로 이루어지는 탄성부재(828)에 지지축(824)이 삽입되어 링부재(826)를 노브(772b) 측으로 가압하는 탄성력을 제공하게 된다.The support shaft 824 is inserted into the spring member 828 so that the elastic member 828 is interposed between the ring member 826 and the support panel 822 so that the ring member 826 is moved toward the knob 772b side Thereby providing an elastic force for pressing.

따라서 작업자는 노브(772b)를 조작할 때에 링부재(826)를 지지패널(822) 측으로 밀어 탄성부재(828)를 압축시키면서 링부재(826)와 노브(772b)를 이격시키고, 링부재(826)와 노브(772b)가 이격되면서 링부재(826) 외측으로 노출되는 노브(772b)를 누르면 브래킷(700)으로부터 수직부재(110) 또는 수평부재(112)를 분리할 수 있게 된다.The operator pushes the ring member 826 toward the support panel 822 when the knob 772b is operated to compress the elastic member 828 to separate the ring member 826 and the knob 772b and press the ring member 826 The vertical member 110 or the horizontal member 112 can be separated from the bracket 700 by pressing the knob 772b exposed to the outside of the ring member 826 while the knob 772b and the knob 772b are separated from each other.

이후에, 작업자가 링부재(826)에 가하던 외력을 해제하면 탄성부재(828)의 복원력에 의해 링부재(826)가 원상태로 복귀되면서 링부재(826)가 노브(772b)를 커버하게 되어 노브(772b)가 브래킷(700) 외측으로 노출되는 것을 방지하게 된다.Thereafter, when the worker releases the external force applied to the ring member 826, the ring member 826 returns to the original state due to the restoring force of the elastic member 828, and the ring member 826 covers the knob 772b Thereby preventing the knob 772b from being exposed to the outside of the bracket 700.

상기한 바와 같이 링부재(826)가 노브(772b)를 커버하면 작업자가 실수로 노브(772b)를 누르게 되는 오작동을 방지할 수 있어 인상장치 설치작업 또는 철탑(200) 인상작업 중에 수직부재(110) 또는 수평부재(112)가 브래킷(700)으로부터 분리되어 발생되는 안전사고를 예방할 수 있게 된다.As described above, when the ring member 826 covers the knob 772b, it is possible to prevent a malfunction that an operator accidentally depresses the knob 772b. Thus, during the lifting device installation work or the lifting operation of the steel tower 200, Or the horizontal member 112 is detached from the bracket 700, it is possible to prevent safety accidents.

이로써, 철탑에 용이하게 설치할 수 있고, 철탑의 인상작업이 완료된 후에 쉽게 해체할 수 있으며, 철탑과 인상장치 사이의 간격을 유지하고 오조작에 의한 인상장치의 해체를 방지할 수 있는 송전, 배전, 변전용 철탑 인상장치를 제공할 수 있게 된다.
This makes it possible to easily install the steel towers on the steel towers, to easily disassemble the steel towers after completion of the lifting operation of the steel towers, to maintain the distance between the steel towers and the lifting devices, It is possible to provide a steel tower elevating device for exclusive use by the user.

본 발명은 도면에 도시되는 일 실시예를 참고로 하여 설명되었으나, 이는 예시적인 것에 불과하며, 당해 기술이 속하는 분야에서 통상의 지식을 가진 자라면 이로부터 다양한 변형 및 균등한 타 실시예가 가능하다는 점을 이해할 것이다.While the present invention has been particularly shown and described with reference to exemplary embodiments thereof, it is to be understood that the invention is not limited to the disclosed embodiments, but, on the contrary, is intended to cover various modifications and equivalent arrangements included within the spirit and scope of the appended claims. .

또한, 송전, 배전, 변전용 철탑의 인상장치를 예로 들어 설명하였으나, 이는 예시적인 것에 불과하며, 송전, 배전, 변전용 철탑의 인상장치가 아닌 다른 제품에도 본 발명의 인상장치가 사용될 수 있다.In addition, although the power transmission, distribution, and towing apparatuses of the towering tower are described as examples, the towing apparatus of the present invention can be also used for other products other than power towers, power distribution towers, and tower towers.

따라서 본 발명의 진정한 기술적 보호범위는 아래의 특허청구범위에 의해서 정하여져야 할 것이다.
Accordingly, the true scope of the present invention should be determined by the following claims.

110 : 수직부재 112 : 수평부재
113 : 대각선부재 116 : 구속홈부
116a : 해제홈부 117 : 가이드홈부
118 : 경사면 700 : 브래킷
710 : 상부연결홀부 720 : 하부연결홀부
730 : 제1수평연결홀부 740 : 제2수평연결홀부
750 : 연결편 770 : 착탈부
780 : 하단지지대 810 : 간격유지부
820 : 오조작방지부
110: vertical member 112: horizontal member
113 diagonal member 116 restraining groove portion
116a: Release groove 117: Guide groove
118: slope 700: bracket
710: upper connection hole portion 720: lower connection hole portion
730: first horizontal connection hole part 740: second horizontal connection hole part
750: connecting piece 770: detachable part
780: Lower stage support 810:
820:

Claims (3)

철탑의 외곽을 둘러싸는 구조물을 이루도록 수직방향으로 배치되는 복수 개의 수직부재;
상기 수직부재와 연결되어 상기 철탑의 외곽을 둘러싸는 상기 구조물을 이루도록 수직부재와 연결되고 수평방향으로 배치되는 복수 개의 수평부재;
상기 수직부재와 상기 수평부재를 연결하도록 상부연결홀부, 하부연결홀부, 제1수평연결홀부 및 제2수평연결홀부가 일체로 형성되는 복수 개의 브래킷;
복수 개의 상기 브래킷을 서로 연결하고 상기 수직부재와 상기 수평부재의 연결상태를 유지하는 대각선부재;
상기 상부연결홀부, 상기 하부연결홀부, 상기 제1수평연결홀부 및 상기 제2수평연결홀부에 구비되고 상기 수직부재 또는 상기 수평부재를 걸림결합시키는 착탈부;
상기 수직부재, 상기 수평부재 및 상기 대각선부재에 의해 이루어지는 상기 구조물의 하부를 지지하도록 상기 브래킷에 결합되는 하단지지대;
상기 하단지지대를 상기 철탑에 연결시키는 연결부;
상기 브래킷과 상기 철탑 사이에 설치되고 상기 브래킷과 상기 철탑 사이의 간격을 유지시키는 간격유지부; 및
상기 착탈부를 노출 또는 커버하도록 상기 브래킷에 구비되는 오조작방지부를 포함하는 것을 특징으로 하는 송전, 배전, 변전용 철탑 인상장치.
A plurality of vertical members arranged in a vertical direction so as to form a structure surrounding the outer periphery of the steel tower;
A plurality of horizontal members connected to the vertical member and connected to the vertical member to form the structure surrounding the outer periphery of the steel tower and disposed in a horizontal direction;
A plurality of brackets integrally formed with the upper connection hole portion, the lower connection hole portion, the first horizontal connection hole portion, and the second horizontal connection hole portion so as to connect the vertical member and the horizontal member;
A diagonal member connecting the plurality of brackets to each other and maintaining the connection state of the vertical member and the horizontal member;
A detachable portion provided at the upper connection hole portion, the lower connection hole portion, the first horizontal connection hole portion, and the second horizontal connection hole portion and engaging the vertical member or the horizontal member;
A lower end support coupled to the bracket to support a lower portion of the structure formed by the vertical member, the horizontal member, and the diagonal member;
A connecting part connecting the lower support to the steel tower;
An interval maintaining unit installed between the bracket and the iron tower and maintaining a distance between the bracket and the iron tower; And
And an erroneous operation preventing portion provided on the bracket to expose or cover the detachable portion.
제1항에 있어서,
상기 수직부재, 상기 수평부재 및 상기 대각선부재에는, 상기 상부연결홀부, 상기 하부연결홀부, 상기 제1수평연결홀부 및 상기 제2수평연결홀부에 구비되는 가이드돌기가 삽입되도록 가이드홈부가 형성되고, 상기 수직부재 및 상기 수평부재의 단부에는 경사면이 형성되고;
상기 브래킷은,
상기 상부연결홀부 또는 상기 하부연결홀부와 상기 제1수평연결홀부 사이의 연결부위, 및 상기 상부연결홀부 또는 상기 하부연결홀부와 상기 제2수평연결홀부 사이의 연결부위에 대각선부재의 걸림홈부에 삽입되는 연결편이 형성되고, 연결편에는 대각선부재의 결합홀부에 대향되는 제1고정홀부가 형성되는 것을 특징으로 하는 송전, 배전, 변전용 철탑의 인상장치.
The method according to claim 1,
Guide grooves are formed in the vertical member, the horizontal member, and the diagonal member so that the guide protrusions provided in the upper connection hole portion, the lower connection hole portion, the first horizontal connection hole portion, and the second horizontal connection hole portion are inserted, An inclined surface is formed at an end of the vertical member and the horizontal member;
The bracket
And the second horizontal connection hole portion is inserted into the engagement groove portion of the diagonal member at the connection portion between the upper connection hole portion or the lower connection hole portion and the first horizontal connection hole portion and between the upper connection hole portion or between the lower connection hole portion and the second horizontal connection hole portion And a first fixing hole portion facing the coupling hole portion of the diagonal member is formed on the connection piece.
제1항에 있어서, 상기 착탈부는,
상기 상부연결홀부, 상기 하부연결홀부, 상기 제1수평연결홀부 및 상기 제2수평연결홀부에 구비되는 장착홈부;
상기 장착홈부에 회전축에 의해 회전 가능하게 설치되고 일단에 후크부가 형성되며 타단에 노브가 형성되고 걸림돌기가 구비되는 착탈패널;
상기 장착홈부와 상기 걸림돌기 사이의 간격을 벌리면서 상기 후크부를 상기 수직부재 또는 상기 수평부재의 걸림홈부 측으로 회전시키는 토션스프링을 포함하고;
상기 간격유지부는,
상기 브래킷에 구비되는 제1유지홀부;
상기 제1유지홀부에 연결되는 제2유지홀부를 구비하는 연결본체;
상기 연결본체에 설치되는 베어링에 의해 회전 가능하게 설치되는 너트부재;
상기 너트부재에 결합되고 상기 연결본체 내부 또는 외부로 출몰 가능하게 설치되며 상기 철탑에 걸림결합되는 연결고리가 구비되는 볼트축을 포함하고;
상기 오조작방지부는,
상기 수직부재 및 상기 수평부재가 삽입되는 상기 브래킷의 단부에 돌출되게 형성되는 지지패널;
상기 지지패널로부터 상기 브래킷의 중앙부 측으로 연장되고 지지돌기가 구비되는 복수 개의 지지축;
상기 지지축이 슬라이딩 가능하게 삽입되는 삽입홀부가 형성되고, 상기 지지돌기가 걸리는 걸림턱부가 형성되며, 상기 브래킷에 설치되는 상기 착탈부를 노출 또는 커버하는 링부재; 및
상기 링부재와 상기 지지패널 사이에 개재되도록 상기 지지축에 설치되는 탄성부재를 포함하는 것을 특징으로 하는 송전, 배전, 변전용 철탑 인상장치.
The connector according to claim 1,
A mounting groove portion provided in the upper connection hole portion, the lower connection hole portion, the first horizontal connection hole portion, and the second horizontal connection hole portion;
A mounting and dismounting panel rotatably mounted on the mounting groove and having a hook formed at one end thereof and a knob formed at the other end thereof and having a locking protrusion;
And a torsion spring for rotating the hook portion toward the engaging groove portion of the vertical member or the horizontal member while widening the gap between the mounting groove portion and the engaging projection;
The space-
A first holding hole portion provided in the bracket;
And a second holding hole portion connected to the first holding hole portion;
A nut member rotatably installed by a bearing installed in the connection body;
And a bolt shaft which is coupled to the nut member and is installed to be able to protrude or retract into the connection body or to the outside, and has a connection ring engaged with the steel tower;
The erroneous-
A support panel protruding from an end of the bracket to which the vertical member and the horizontal member are inserted;
A plurality of support shafts extending from the support panel to the center side of the bracket and provided with support protrusions;
A ring member formed with an insertion hole into which the support shaft is slidably insertable and having a locking protrusion for locking the support protrusion and exposing or covering the detachable portion provided on the bracket; And
And an elastic member provided on the support shaft so as to be interposed between the ring member and the support panel.
KR1020140037197A 2014-03-28 2014-03-28 Lifting device for power transmission steel tower KR101392508B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020140037197A KR101392508B1 (en) 2014-03-28 2014-03-28 Lifting device for power transmission steel tower

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020140037197A KR101392508B1 (en) 2014-03-28 2014-03-28 Lifting device for power transmission steel tower

Publications (1)

Publication Number Publication Date
KR101392508B1 true KR101392508B1 (en) 2014-05-12

Family

ID=50893364

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020140037197A KR101392508B1 (en) 2014-03-28 2014-03-28 Lifting device for power transmission steel tower

Country Status (1)

Country Link
KR (1) KR101392508B1 (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004278757A (en) * 2003-03-18 2004-10-07 Calsonic Kansei Corp Three-dimensional spherical joint
JP2006052530A (en) * 2004-08-09 2006-02-23 Yurtec Corp Steel tower raising device
KR101038078B1 (en) * 2010-10-27 2011-06-01 한국전력공사 Device for lifting of power transmission steel tower
KR20110113444A (en) * 2010-04-09 2011-10-17 안경수 Joint unit structure of pipe truss for temporary assembly and method constructing the truss bridge with it

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004278757A (en) * 2003-03-18 2004-10-07 Calsonic Kansei Corp Three-dimensional spherical joint
JP2006052530A (en) * 2004-08-09 2006-02-23 Yurtec Corp Steel tower raising device
KR20110113444A (en) * 2010-04-09 2011-10-17 안경수 Joint unit structure of pipe truss for temporary assembly and method constructing the truss bridge with it
KR101038078B1 (en) * 2010-10-27 2011-06-01 한국전력공사 Device for lifting of power transmission steel tower

Similar Documents

Publication Publication Date Title
US20210129928A1 (en) Crawler drive system
CA2984776C (en) System for coupling together segments of a utility pole, and a utility pole assembly comprising the same
KR101483779B1 (en) Point displacement measuring instrument for bridge
KR101728413B1 (en) A ground plate for electric pole
KR101392508B1 (en) Lifting device for power transmission steel tower
KR200477922Y1 (en) Unit provided with a lock bolt for fixing the anchor bolt
KR101389995B1 (en) Lifting device for power transmission steel tower
CN115709938B (en) Electric power construction equipment
KR101533454B1 (en) Checking device for safety of bridge structure
CN105710083A (en) Flow guiding device
KR101627147B1 (en) Fixing Device for Tack Welding of an Extension Pipe
KR20120095092A (en) Device for lifting of power transmission steel tower
KR101839601B1 (en) A ground plate for electric pole
CN210517676U (en) Corner branching device for cable bridge
CN103350952B (en) A kind of horizontal guide wheel device
CN203793428U (en) Stay wire fixing device and automobile
KR101622381B1 (en) Facilities and method for pulling installation of cable using cable guiding device
KR101038077B1 (en) Method for lifting of power transmission steel tower using lifting device
CN202790316U (en) Clamping device for automatic machine operating belt
US10906144B2 (en) Tool and method for connecting/disconnecting a runner to/from a shaft assembly
KR20130039991A (en) Apparatus for fixing cable
CN202008572U (en) Mounting mechanism for camera pan-tilt head
CN104078875A (en) Bus duct installing method
CN205442221U (en) Novel cable pulls supplementaryly device
KR101613896B1 (en) Fixing jig for device assembling and dismantling of Elbor Connector

Legal Events

Date Code Title Description
A201 Request for examination
A302 Request for accelerated examination
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20170206

Year of fee payment: 4

FPAY Annual fee payment

Payment date: 20180319

Year of fee payment: 5

FPAY Annual fee payment

Payment date: 20190306

Year of fee payment: 6

FPAY Annual fee payment

Payment date: 20200311

Year of fee payment: 7