KR101373655B1 - Air flow equipment of floor for construction - Google Patents

Air flow equipment of floor for construction Download PDF

Info

Publication number
KR101373655B1
KR101373655B1 KR1020090132268A KR20090132268A KR101373655B1 KR 101373655 B1 KR101373655 B1 KR 101373655B1 KR 1020090132268 A KR1020090132268 A KR 1020090132268A KR 20090132268 A KR20090132268 A KR 20090132268A KR 101373655 B1 KR101373655 B1 KR 101373655B1
Authority
KR
South Korea
Prior art keywords
fixing member
building
flow path
member body
air flow
Prior art date
Application number
KR1020090132268A
Other languages
Korean (ko)
Other versions
KR20110075734A (en
Inventor
서상원
Original Assignee
서상원
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 서상원 filed Critical 서상원
Priority to KR1020090132268A priority Critical patent/KR101373655B1/en
Publication of KR20110075734A publication Critical patent/KR20110075734A/en
Application granted granted Critical
Publication of KR101373655B1 publication Critical patent/KR101373655B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F15/00Flooring
    • E04F15/02Flooring or floor layers composed of a number of similar elements
    • E04F15/024Sectional false floors, e.g. computer floors
    • E04F15/02447Supporting structures
    • E04F15/02452Details of junctions between the supporting structures and the panels or a panel-supporting framework
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F15/00Flooring
    • E04F15/02Flooring or floor layers composed of a number of similar elements
    • E04F15/024Sectional false floors, e.g. computer floors
    • E04F15/02447Supporting structures
    • E04F15/02464Height adjustable elements for supporting the panels or a panel-supporting framework
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F2290/00Specially adapted covering, lining or flooring elements not otherwise provided for
    • E04F2290/02Specially adapted covering, lining or flooring elements not otherwise provided for for accommodating service installations or utility lines, e.g. heating conduits, electrical lines, lighting devices or service outlets

Abstract

본 발명은 건축물용 바닥부 공기 유로 설비를 제공한다. 상기 건축물용 바닥부 공기 유로 설비는 일정 길이를 갖고 건축물의 층간 기준면에 세워져 설치되는 다수의 지지 부재들과; 상기 지지 부재들의 상부에 배치되는 바닥 패널과; 상기 지지 부재들 각각의 상단과 상기 바닥 패널의 사이에 설치되며, 상기 바닥 패널을 고정하는 고정 부재; 및 상기 지지 부재들 각각의 양측부에 배치되며, 하단이 상기 기준면에 고정되고 상단이 상기 고정 부재의 양측부에 체결 고정되어 공기의 유로를 형성하는 다수의 채널 플레이트들을 포함한다. 따라서, 본 발명은 건축물의 냉난방을 위하여 사용되는 공기의 흐름 유로를 건축물의 층간 바닥부의 내부에 형성할 수 있다.The present invention provides a floor air flow path for a building. The building bottom air flow path installation includes a plurality of support members having a predetermined length and installed on an interlayer reference plane of the building; A bottom panel disposed above the support members; A fixing member installed between an upper end of each of the supporting members and the bottom panel, and fixing the bottom panel; And a plurality of channel plates disposed at both sides of each of the support members, the lower end of which is fixed to the reference surface and the upper end of which is fastened and fixed to both sides of the fixing member to form a flow path of air. Therefore, the present invention can form a flow path of air used for heating and cooling the building inside the interlayer floor of the building.

Description

건축물용 바닥부 공기 유로 설비{AIR FLOW EQUIPMENT OF FLOOR FOR CONSTRUCTION}AIR FLOW EQUIPMENT OF FLOOR FOR CONSTRUCTION}

본 발명은 건축물의 냉난방을 위하여 사용되는 공기의 흐름 유로를 건축물의 층간 바닥부의 내부에 형성할 수 있는 건축물용 바닥부 공기 유로 설비에 관한 것이다.The present invention relates to a building floor air flow path equipment capable of forming an air flow path used for cooling and heating a building inside an interlayer floor of a building.

전형적으로, 아파트와 빌딩과 같은 건축물들은 일정의 층들을 갖도록 설계되어 건축된다. 그리고, 상기 건축물들의 층간은 일정의 높이를 이루고, 바닥부와 천장부를 이루어 그 사이의 생활 공간을 이루도록 설계된다.Typically, buildings such as apartments and buildings are designed and built to have a certain level. In addition, the floors of the buildings form a certain height and are designed to form a living space between the floor and the ceiling.

또한, 상기 건축물들에는 공기 조화용 냉방 또는 난방을 위한 설비들이 더 설치된다. 상기 공기 조화 설비들은 냉난방 뿐만 아니라, 내부의 공기를 외기로 배출하고, 외기를 필터링하여 내부로 유입시킴의 순환 과정을 거쳐 공기 정화의 기능도 수행한다.In addition, the buildings are further equipped with air conditioning cooling or heating equipment. The air conditioning equipment not only cools and heats, but also discharges the air into the outside air, and performs the function of air purification through a circulation process of filtering the outside air into the inside.

이러한 공기 조화 설비는 일반적으로 공기가 이동되는 유로를 형성하는 이는 덕트로서 구현된다.Such an air conditioning system is generally implemented as a duct, which forms a flow path through which air moves.

종래에는 상기 덕트를 상기 건축물의 벽체에 매립함과 아울러, 각 층간의 천 장부의 내부 공간에 설치하는 방식을 사용하였다. 이러한 경우에, 별도의 덕트를 천장부에 매립 설치함과, 덕트 간의 연결 구조에 따르는 부자재들이 투입됨에 따라, 설치 비용이 증가되는 문제점이 있다.Conventionally, the duct is embedded in the wall of the building and used in the interior space of the ceiling between the floors. In this case, there is a problem in that the installation cost is increased by installing a separate duct buried in the ceiling and the subsidiary materials according to the connection structure between the ducts.

또한, 종래에는, 천장부에 덕트를 별도로 설치함으로 인하여, 유지 보수시에 천장부를 개방하여 실시함에 따르는 공수 작업의 문제점이 있었다.In addition, conventionally, due to the separate installation of the duct in the ceiling, there is a problem of the airborne work that is performed by opening the ceiling during maintenance.

또한, 종래에는, 천장부의 내부 영역의 크기에 따라, 이에 해당되는 덕트를 설치해야 하는 불편함이 있었다.In addition, conventionally, according to the size of the inner region of the ceiling portion, there was an inconvenience in that a corresponding duct should be provided.

이에 더하여, 종래에는, 상기 천장부에 공기 조화에 요구되는 다양한 장치들을 내장하여 설치하기 어려운 문제점이 있고, 다양한 장치들을 설치한다 하더라도 이에 필요한 배선 경로를 덕트들을 가로 질러 형성하기 어려운 문제점이 있었다.In addition, in the related art, there is a problem in that it is difficult to install various devices required for air conditioning in the ceiling, and even if various devices are installed, it is difficult to form wiring paths across the ducts.

본 발명은 상기와 같은 문제점을 해결할 수 있도록 창출된 것으로서, 본 발명의 목적은 건축물의 냉난방을 위하여 사용되는 공기의 흐름 유로를 건축물의 층간 바닥부의 내부에 형성함으로써, 유지 보수를 용이하게 할 수 있는 건축물용 바닥부 공기 유로 설비를 제공함에 있다.The present invention was created to solve the above problems, an object of the present invention is to form a flow path of air used for cooling and heating of the building in the interior of the floor between the floor, it is possible to facilitate maintenance The present invention provides a floor air passage facility for a building.

본 발명은 건축물용 바닥부 공기 유로 설비를 제공한다.The present invention provides a floor air flow path for a building.

상기 건축물용 바닥부 공기 유로 설비는 일정 길이를 갖고 건축물의 층간 기준면에 세워져 설치되는 다수의 지지 부재들과; 상기 지지 부재들의 상부에 배치되 는 바닥 패널과; 상기 지지 부재들 각각의 상단과 상기 바닥 패널의 사이에 설치되며, 상기 바닥 패널을 고정하는 고정 부재; 및 상기 지지 부재들 각각의 양측부에 배치되며, 하단이 상기 기준면에 고정되고 상단이 상기 고정 부재의 양측부에 체결 고정되어 공기의 유로를 형성하는 다수의 채널 플레이트들을 포함한다.The building bottom air flow path installation includes a plurality of support members having a predetermined length and installed on an interlayer reference plane of the building; A bottom panel disposed above the support members; A fixing member installed between an upper end of each of the supporting members and the bottom panel, and fixing the bottom panel; And a plurality of channel plates disposed at both sides of each of the support members, the lower end of which is fixed to the reference surface and the upper end of which is fastened and fixed to both sides of the fixing member to form a flow path of air.

여기서, 상기 지지 부재들 각각은, 상기 기준면에 고정 설치되는 하부 지지 플레이트와, 일정 길이를 갖고 하단이 상기 고정 플레이트에 고정되는 지지 로드와, 상기 지지 로드의 상단에 설치되는 상부 지지 플레이트를 구비하는 것이 바람직하다.Here, each of the support members includes a lower support plate fixed to the reference surface, a support rod having a predetermined length and a lower end fixed to the fixed plate, and an upper support plate provided on an upper end of the support rod. It is preferable.

그리고, 상기 상부 지지 플레이트의 하단면에는 돌출 형성되는 나사부가 마련되고, 상기 지지 로드의 상단부에는 상기 나사부가 나사 끼움되는 끼움홀이 형성되는 것이 바람직하다.In addition, the lower end surface of the upper support plate is provided with a threaded portion protruding, and the upper end of the support rod is preferably formed with a fitting hole for screwing the threaded portion.

또한, 상기 고정 부재는, '

Figure 112009080954627-pat00001
' 형상으로 형성되며 상단에 제 1체결홀이 형성되는 제 1고정 부재 몸체와, 상기 제 1고정 부재 몸체의 양측 하단으로부터 상기 상부 지지 플레이트의 상면에 밀착됨과 아울러 끝단이 상기 상부 지지 플레이트의 외주를 커버하도록 하방으로 벤딩되는 제 2고정 부재 몸체를 구비하는 것이 바람직하다.In addition, the fixing member,
Figure 112009080954627-pat00001
A first fixing member body formed in a shape and having a first fastening hole formed at an upper end thereof, and being closely adhered to an upper surface of the upper supporting plate from both lower ends of the first fixing member body, and an end of the first fixing member body It is preferred to have a second fixing member body that is bent downward to cover.

또한, 상기 제 1체결홀에는 체결 볼트가 끼워지고, 상기 체결 볼트는 상기 상부 지지 플레이트와 상기 지지 로드의 상단을 관통하도록 형성되는 제 2체결홀에 끼워져, 상기 고정 부재와 상기 지지 부재는 서로 체결되는 것이 바람직하다.In addition, a fastening bolt is fitted into the first fastening hole, and the fastening bolt is fitted into a second fastening hole formed to penetrate the upper end of the upper support plate and the support rod, so that the fixing member and the support member are fastened to each other. It is preferable to be.

또한, 상기 바닥 패널의 하단부에는 상기 제 1고정 부재 몸체가 끼워지는 일 정 길이의 끼움홈이 형성되고, 상기 끼움홈과 상기 체결 볼트의 사이에는 가스켓이 개재되는 것이 바람직하다.In addition, it is preferable that a fitting groove having a predetermined length in which the first fixing member body is fitted is formed at the lower end of the bottom panel, and a gasket is interposed between the fitting groove and the fastening bolt.

또한, 상기 바닥 패널과 상기 제 2고정 부재 몸체와 상기 상부 지지 플레이트는 서로 볼트 결합되는 것이 바람직하다.In addition, the bottom panel, the second fixing member body and the upper support plate is preferably bolted to each other.

또한, 상기 제 2고정 부재 몸체의 양측부는 상기 채널 플레이트들의 내측에 위치되어 서로 볼트 결합되며, 상기 제 2고정 부재 몸체와 상기 채널 플레이트들의 사이 공간을 기밀 시키도록 상기 제 2고정 부재 몸체의 상면과 상기 채널 플레이트들의 외주를 잇도록 부착되는 기밀 테이프를 더 구비하는 것이 바람직하다.In addition, both side portions of the second fixing member body are located inside the channel plates and bolted to each other, and an upper surface of the second fixing member body to seal the space between the second fixing member body and the channel plates. It is preferable to further include an airtight tape attached to connect the outer circumferences of the channel plates.

본 발명은 건축물의 층간 바닥부의 내부에 형성함으로써, 유지 보수를 용이하게 할 수 있는 효과를 갖는다.The present invention has an effect that can be easily maintained by forming in the interior floor of the building.

또한, 본 발명은 공기 조화용으로 사용되는 공기 유로를 바닥부의 내부 형성 높이에 용이하게 대응하여 설치할 수 있는 효과를 갖는다.In addition, the present invention has the effect that the air flow path used for the air conditioner can be easily installed corresponding to the internal forming height of the bottom portion.

또한, 본 발명은 건축물의 층간 바닥부의 내부에 설치되는 공기 유로의 기밀을 용이하게 유지할 수 있는 효과를 갖는다.In addition, the present invention has an effect that can easily maintain the airtightness of the air flow path provided inside the interlayer floor of the building.

이하, 첨부되는 도면들을 참조로 하여, 본 발명의 건축물용 바닥부 공기 유로 설비를 설명하도록 한다.Hereinafter, with reference to the accompanying drawings, it will be described the floor air passage facility for buildings of the present invention.

도 1은 본 발명의 건축물용 바닥부 공기 유로 설비를 보여주는 분해 사시도이다. 도 2는 도 1의 건축물용 바닥부 공기 유로 설비를 따르는 단면도이다. 도 3 은 본 발명의 건축물용 바닥부 공기 유로 설비를 보여주는 다른 분해 사시도이다. 도 4는 도 3의 건축물용 바닥부 공기 유로 설비를 따르는 다른 단면도이다. 1 is an exploded perspective view showing a floor air flow path for a building of the present invention. FIG. 2 is a cross-sectional view of the building bottom air flow path of FIG. 1. Figure 3 is another exploded perspective view showing a building bottom air flow path installation of the present invention. 4 is another cross-sectional view of the building bottom air flow path installation of FIG. 3.

도 1 내지 도 4를 참조 하면, 본 발명의 건축물용 바닥부 공기 유로 설비(2)는 건축물에 형성되는 바닥부(1)의 내부에 설치된다.1 to 4, the building bottom air passage facility 2 of the present invention is installed inside the bottom 1 formed in the building.

바람직하게는, 상기 바닥부(1)는 건축물의 층간을 이루도록 형성된다. 그리고, 상기 바닥부(1)는 일정의 상하로의 높이를 이룰 수 있고, 이에는 일정 공간이 형성된다. 따라서, 상기 공기 유로 설비(2)는 상기 바닥부(1)의 내부 공간에 설치되는 것이 좋다.Preferably, the bottom portion 1 is formed to form the floor of the building. In addition, the bottom portion 1 may achieve a predetermined height up and down, and a predetermined space is formed therein. Therefore, the air flow path equipment 2 is preferably installed in the interior space of the bottom portion (1).

그리고, 상기 바닥부(1)는 그 저면에 층간 기준면(S)을 이루고, 상기 기준면(S)으로부터 일정 높이에는 바닥 패널(100)이 위치될 수 있다. 또한, 상기 기준면(S)은 콘크리트와 같은 재질의 일정 강도를 지닌 재질로 이루어질 수 있다.The bottom portion 1 forms an interlayer reference plane S on a bottom thereof, and the bottom panel 100 may be positioned at a predetermined height from the reference plane S. In addition, the reference surface S may be made of a material having a certain strength of a material such as concrete.

본 발명의 공기 유로 설비(2)는 크게 상기 바닥 패널(100)과, 상기 기준면(S)과 상기 바닥 패널(100)의 사이에서 상기 기준면(S)에 고정되는 지지 부재들(200)과, 상기 지지 부재들(200)의 상단에 설치되어 상기 바닥 패널(100)을 고정하는 고정 부재들(300)과, 상기 지지 부재들(200)의 양측부에 결합되어 다수의 공기 유로들을 형성하는 채널 플레이트들(400)로 구성된다.The air flow path installation 2 of the present invention is largely the bottom panel 100, the support members 200 fixed to the reference surface (S) between the reference surface (S) and the bottom panel 100, Fixing members 300 which are installed on top of the support members 200 to fix the bottom panel 100, and channels that are coupled to both sides of the support members 200 to form a plurality of air flow paths. It consists of plates 400.

상기의 구성을 상세하게 설명하도록 한다.The above configuration will be described in detail.

상기 지지 부재들(200) 각각은, 일정 길이를 갖고 건축물의 층간 기준면(S)에 세워져 설치된다.Each of the support members 200 has a predetermined length and is installed standing on the interlayer reference plane S of the building.

상기 지지 부재들(200) 각각은, 하부 지지 플레이트(210)와, 상기 하부 지지 플레이트(210)에 하단이 고정되는 지지 로드(220)와, 상기 지지 로드(220)의 상단에 설치되는 상부 지지 플레이트(230)로 구성된다. 상기Each of the support members 200 may include a lower support plate 210, a support rod 220 having a lower end fixed to the lower support plate 210, and an upper support installed at an upper end of the support rod 220. It consists of a plate 230. remind

상기 하부 지지 플레이트(210)는 판 상으로 형성되며, 상기 기준면(S)에 고정 설치되며, 상기 기준면(S)에 볼트 결합되어 고정된다. 바람직하게, 상기 하부 지지 플레이트(210)는 하기에 기술되는 채널 플레이트(400)의 하단 벤딩되는 부분 내측 상면에 안착되어 상기 기준면(S)에 볼트 결합되는 것이 좋다.The lower support plate 210 is formed in a plate shape, is fixedly installed on the reference surface (S), it is fixed by bolted to the reference surface (S). Preferably, the lower support plate 210 may be seated on the upper inner surface of the lower portion of the channel plate 400 to be described below and bolted to the reference surface (S).

상기 지지 로드(220)의 하단은 상기 하부 지지 플레이트(210)의 상단면에 고정되며 상기 기준면(S)을 기준으로 세워져 설치된다. 물론, 상기 하부 지지 플레이트(210)와 상기 지지 로드(220)는 서로 하나의 몸체로 이루어질 수도 있다.The lower end of the support rod 220 is fixed to the upper end surface of the lower support plate 210 and is installed upright with respect to the reference surface (S). Of course, the lower support plate 210 and the support rod 220 may be formed of one body with each other.

상기 상부 지지 플레이트(230)는 상기 지지 로드(220)의 상단에 고정 설치되되, 그 하단에 일정 길이로 돌출 형성되는 나사부(231)를 갖는다. 그리고, 상기 지지 로드(220)의 상단부에는 일정 깊이의 끼움홀(231)이 형성된다.The upper support plate 230 is fixedly installed on the upper end of the support rod 220, has a screw portion 231 protruding to a predetermined length at the lower end. In addition, a fitting hole 231 having a predetermined depth is formed at an upper end of the support rod 220.

따라서, 상기 나사부(221)는 상기 끼움홀(231)에 나사 끼움 형식으로 끼워져 결합될 수 있고, 이에 따라 상기 나사부(221)와 상기 끼움홀(231)의 결합 회전 방향에 따라 상기 상부 지지 플레이트(230)는 상하로의 높이 조절이 가능할 수 있다.Accordingly, the screw portion 221 may be coupled to the fitting hole 231 in the form of screw fitting, and accordingly, the upper support plate according to the coupling rotation direction of the screw portion 221 and the fitting hole 231. 230 may be capable of adjusting the height up and down.

이에 따라, 본 발명에서는 상기 바닥부(1)의 내부 공간 높이, 즉, 기준면(S)과 바닥 패널(100)의 저면 사이의 높이에 용이하게 대응할 수 있다.Accordingly, in the present invention, it is possible to easily correspond to the height of the inner space of the bottom 1, that is, the height between the reference plane S and the bottom of the bottom panel 100.

상기 고정 부재(300)는 상기 상부 지지 플레이트(230)의 상단에 고정되는 부재이다.The fixing member 300 is a member fixed to an upper end of the upper support plate 230.

상기 고정 부재(300)는 제 1고정 부재 몸체(310)와, 상기 제 1고정 부재 몸 체(310)의 외주로부터 일정 길이 연장되고 끝단에서 하방으로 벤딩되는 형상을 이루는 제 2고정 부재 몸체(320)로 이루어진다.The fixing member 300 includes a first fixing member body 310 and a second fixing member body 320 extending in a predetermined length from the outer circumference of the first fixing member body 310 and bent downward at an end thereof. )

바람직하게는, 상기 제 1고정 부재 몸체(310)는 바닥 패널(100)의 하단에 형성되는 끼움홈(110)에 끼워지는 부재이다.Preferably, the first fixing member body 310 is a member fitted to the fitting groove 110 formed at the lower end of the bottom panel 100.

상기 제 1고정 부재 몸체(310)는 '

Figure 112009080954627-pat00002
' 형상으로 형성되며 상단에 상하를 관통하는 제 1체결홀(311)이 형성된다. 여기서, 상기 제 1고정 부재 몸체(310)는 상기에 언급된 바닥 패널(100)의 하부에 결합된다.The first fixing member body 310 is'
Figure 112009080954627-pat00002
The first fastening hole 311 is formed in the shape and penetrates up and down at the top. Here, the first fixing member body 310 is coupled to the lower portion of the bottom panel 100 mentioned above.

바람직하게는, 상기 바닥 패널(100)의 하단에 형성되는 일정 길이의 끼움홈(110)에 끼워져 결합되는 것이 좋다.Preferably, it is preferable to be fitted in the fitting groove 110 of a predetermined length formed on the bottom of the bottom panel 100.

따라서, 상기 제 1고정 부재 몸체(310)는 상기 바닥 패널(100)의 끼움홈(110)에 끼워져 레일 형식의 결합을 이룰 수 있다.Therefore, the first fixing member body 310 may be fitted into the fitting groove 110 of the bottom panel 100 to form a rail-type coupling.

그리고, 상기 제 2고정 부재 몸체(320)는 양측부에서 서로 마주보도록 'ㄱ'형상으로 벤딩되는 즉, '

Figure 112009080954627-pat00003
'형상으로 형성된다.In addition, the second fixing member body 320 is bent in a 'b' shape to face each other at both sides, that is, '
Figure 112009080954627-pat00003
'Shape.

여기서, 상기 제 2고정 부재 몸체(320)는 상부 지지 플레이트(230)의 상면 및 양측부를 에워싸도록 배치될 수 있다.Here, the second fixing member body 320 may be disposed to surround the upper surface and both sides of the upper support plate 230.

그리고, 상기 제 2고정 부재 몸체(320)의 상단 저면은 상기 상부 지지 플레이트(230)의 상면에 밀착될 수 있다.In addition, an upper bottom surface of the second fixing member body 320 may be in close contact with an upper surface of the upper support plate 230.

한편, 상기 상부 지지 플레이트(230)와 상기 지지 로드(220)의 상단을 관통하는 제 2체결홀(312)이 형성되는데, 상기 제 2체결홀(312)은 상기에 언급된 제 1 고정 부재 몸체(310)에 형성되는 제 1체결홀(311)과 위치가 일치된다.Meanwhile, a second fastening hole 312 penetrating the upper ends of the upper support plate 230 and the support rod 220 is formed, and the second fastening hole 312 is the first fixing member body mentioned above. The position coincides with the first fastening hole 311 formed in the 310.

따라서, 상기 제 1체결홀(311)과 상기 제 2체결홀(312)에 체결 볼트(330)가 끼워져 체결됨으로써, 상기 고정 부재(300)와 상기 상부 지지 플레이트(230)는 서로 결합되어 고정될 수 있다.Accordingly, the fastening bolt 330 is inserted into and fastened to the first fastening hole 311 and the second fastening hole 312 so that the fixing member 300 and the upper support plate 230 are coupled to each other to be fixed. Can be.

또 한편, 상기 제 1고정 부재 몸체(310)와 상기 바닥 패널(100)에 형성되는 끼움홈(110)의 사이에는 상기 끼움홈(110)의 길이를 따르는 가스켓(500)이 더 개재될 수 있다.On the other hand, a gasket 500 along the length of the fitting groove 110 may be further interposed between the first fixing member body 310 and the fitting groove 110 formed in the bottom panel 100. .

여기서, 상기 가스켓(500)은 상기 체결 볼트(330)의 상면에 위치되는 상태로 상기 제 1고정 부재 몸체(310)의 상면에 밀착될 수 있다.Here, the gasket 500 may be in close contact with the upper surface of the first fixing member body 310 in a state that is located on the upper surface of the fastening bolt 330.

따라서, 상기 가스켓(500)은 상기 체결 볼트(330)와 상기 제 1,2체결홀(311,312)의 사이에서 형성되는 갭을 기밀시키는 역할을 할 수 있다.Therefore, the gasket 500 may serve to seal a gap formed between the fastening bolt 330 and the first and second fastening holes 311 and 312.

또 한편, 상기의 지지 부재(200)의 양측부에는 일정 폭과 너비를 갖는 채널 플레이트들(400)이 설치된다.On the other hand, both sides of the support member 200 are provided with channel plates 400 having a predetermined width and width.

상기 채널 플레이트(400)의 하단은 상기 기준면(S)에 고정 설치된다. 여기서, 상기 체널 플레이트(400)의 하단은 상기 기준면(S)에 밀착될 수 있도록 '

Figure 112009080954627-pat00004
'형상으로 벤딩되는 것이 좋다.The lower end of the channel plate 400 is fixed to the reference plane (S). Here, the lower end of the channel plate 400 can be in close contact with the reference surface (S) '
Figure 112009080954627-pat00004
It is better to bend in shape.

그리고, 상기 채널 플레이트(400)의 상단은 상기 상부 지지 플레이트(230)의 양측부와 상기 제 2고정 부재 몸체(320)의 사이 공간에 위치될 수 있다.In addition, an upper end of the channel plate 400 may be located in a space between both sides of the upper support plate 230 and the second fixing member body 320.

이때, 상기 채널 플레이트(400)는 상기 제 2고정 부재 몸체(320)의 벤딩된 부분과 볼트 결합될 수 있다.In this case, the channel plate 400 may be bolted to the bent portion of the second fixing member body 320.

여기서, 상기 채널 플레이트(400)의 상단부에는 제 1고정홀(410)이 형성되고, 상기 제 2고정 부재 몸체(320)의 벤딩된 부분에는 제 2고정홀(321)이 형성되며, 상기 제 1,2고정홀(410,321)은 고정 볼트(20)에 의하여 서로 결합될 수 있다. 이에 따라, 상기 채널 플레이트들(400)은 상기 고정 부재(300)에 결합되어 고정될 수 있다.Here, a first fixing hole 410 is formed at the upper end of the channel plate 400, a second fixing hole 321 is formed at the bent portion of the second fixing member body 320, and the first fixing hole 321 is formed. The two fixing holes 410 and 321 may be coupled to each other by fixing bolts 20. Accordingly, the channel plates 400 may be coupled to and fixed to the fixing member 300.

이때, 상기 체널 플레이트(400)의 상단과 상기 제 2고정 부재 몸체(320)의 사이에는 일정의 갭이 형성될 수 있는데, 이는 금속 호일로 이루어지는 기밀 테이프(600)에 의하여 기밀될 수 있다. 즉, 상기 기밀 테이프(600)가 상기 제 2고정 부재 몸체(320)의 상면과 상기 채널 플레이트(400)의 외면을 잇도록 부착됨으로써, 상기 갭의 기밀은 유지될 수 있다.In this case, a predetermined gap may be formed between the upper end of the channel plate 400 and the second fixing member body 320, which may be hermetically sealed by an airtight tape 600 made of metal foil. That is, the airtight tape 600 is attached to connect the upper surface of the second fixing member body 320 and the outer surface of the channel plate 400, so that the airtightness of the gap may be maintained.

또 한편, 상기에 미리 언급하였지만, 본 발명에 따르는 바닥 패널(100)의 설치 위치는 상기 바닥 패널(100)의 하단에 형성되는 끼움홈(110)이 고정 부재(300)의 제 1고정 부재 몸체(310)에 끼워짐으로써 고정될 수 있다.On the other hand, as mentioned above, the installation position of the bottom panel 100 according to the present invention is the fitting groove 110 formed on the bottom of the bottom panel 100 is the first fixing member body of the fixing member 300 It can be fixed by fitting to (310).

여기서, 상기 바닥 패널(100)에는 제 1홀들(120)이 형성되고, 상기 제 2고정 부재 몸체(320)에는 상기 제 1홀들(120)과 위치가 일치되는 제 2홀들(321)이 형성되며, 상기 제 1,2홀들(120,321)에는 볼트들(10)이 끼워져 고정될 수 있다.Here, first holes 120 are formed in the bottom panel 100, and second holes 321 are formed in the second fixing member body 320 to coincide with the first holes 120. The bolts 10 may be inserted into and fixed to the first and second holes 120 and 321.

이에 따라, 상기 바닥 패널(100)은 상기 고정 부재(300)와 결합될 수 있다. 이러한 경우에, 상기 제 1,2홀들(120,321)과 결합되는 볼트들(10)의 하단은 상기 상부 지지 플레이트(230)의 상면을 일정 힘으로 가방하여 눌러 고정할 수도 있고, 상기 제 1,2홀들(120,321)과 일치되어 상기 볼트들(10)이 끼워져 결합되는 제 3홀 들(미도시)을 상기 상부 지지 플레이트에 형성하여 이루게 할 수도 있다.Accordingly, the bottom panel 100 may be coupled to the fixing member 300. In this case, the lower ends of the bolts 10 coupled to the first and second holes 120 and 321 may be fixed by pressing the upper surface of the upper support plate 230 with a predetermined force. Matching holes 120 and 321 may be formed by forming third holes (not shown) in the upper support plate to which the bolts 10 are fitted and coupled.

본 발명에서의 공기 유로 설비(2)는 건출물의 바닥부(1)의 내부에 설치되어 다수의 공기 유로인 채널들(c)을 형성할 수 있다. 상기 채널들(c)은 상기에 언급되는 채널 플레이트들(400)의 사이 공간을 통하여 이루어질 수 있다.The air flow path facility 2 in the present invention may be installed inside the bottom portion 1 of the building to form channels c which are a plurality of air flow paths. The channels c may be formed through a space between the channel plates 400 mentioned above.

이에 더하여, 도면에 도시되지는 않았지만, 상기 바닥 패널(100)에 공기 조화에 요구되는 다양한 장치들이 삽입 설치될 수 있도록 일정 영역을 절개할 수 있도록 할 수 있다. 따라서, 상기 장치들은 상기 절개된 영역에 고정 설치될 수 있음과 아울러, 유지 보수시 수리 및 교체를 용이하게 할 수 있다.In addition, although not shown in the drawing, it is possible to cut a predetermined area so that various devices required for air conditioning may be inserted into the floor panel 100. Thus, the devices can be fixedly installed in the cut out area and can be easily repaired and replaced during maintenance.

한편, 상기 다수의 채널들(c)을 이루는 채널 플레이트들(400)의 하단부에는 이들을 관통하여 설치되는 배선 설치 유로(700)가 더 설치될 수 있다.On the other hand, the lower end of the channel plates 400 constituting the plurality of channels (c) may be further provided with a wiring installation flow path 700 installed therethrough.

상기 배선 설치 유로(700)는 일정의 관 형상으로 형성되며 상기 채널 플레이트들(400)과 공간이 서로 격리되도록 설치되고, 상기 채널 플레이트들(400)을 가로지르도록 설치되는 것이 바람직하다. 이에 따라, 상기 배선 설치 유로(700)는 다수의 채널들에 필요한 배선 설치 경로를 제공할 수도 있다.The wiring installation flow path 700 is formed in a predetermined tubular shape and is installed to separate the channel plates 400 and the space from each other, and is installed to cross the channel plates 400. Accordingly, the wiring installation flow path 700 may provide a wiring installation path required for a plurality of channels.

이상 설명한 바와 같이, 본 발명의 상세한 설명에서는 본 발명의 바람직한 실시예에 관하여 설명하였으나, 본 발명이 속하는 기술 분야에서 통상의 지식을 가진 자라면 본 발명의 범주에서 벗어나지 않는 한도 내에서 여러 가지 변형 가능함은 물론이다.Although the preferred embodiments of the present invention have been disclosed for illustrative purposes, those skilled in the art will appreciate that various modifications, additions and substitutions are possible, without departing from the scope and spirit of the invention as disclosed in the accompanying claims. Of course.

따라서 본 발명의 권리 범위는 설명된 실시 예에 국한되어 정해져서는 아니되며, 후술하는 특허 청구 범위뿐만 아니라, 이 특허 청구 범위와 균등한 것들에 의해 정해져야 한다.Therefore, the scope of the present invention should not be limited to the described embodiments, but should be determined by the scope of the appended claims, as well as the appended claims.

도 1은 본 발명의 건축물용 바닥부 공기 유로 설비를 보여주는 분해 사시도이다.1 is an exploded perspective view showing a floor air flow path for a building of the present invention.

도 2는 도 1의 건축물용 바닥부 공기 유로 설비를 따르는 단면도이다.FIG. 2 is a cross-sectional view of the building bottom air flow path of FIG. 1.

도 3은 본 발명의 건축물용 바닥부 공기 유로 설비를 보여주는 다른 분해 사 시도이다.Figure 3 is another exploded attempt showing a building bottom air flow path installation of the present invention.

도 4는 도 3의 건축물용 바닥부 공기 유로 설비를 따르는 다른 단면도이다.4 is another cross-sectional view of the building bottom air flow path installation of FIG. 3.

*도면의 주요부분에 대한 부호설명*Description of the Related Art [0002]

100 : 바닥 패널 200 : 지지 부재100: bottom panel 200: support member

210 : 하부 지지 플레이트 220 : 지지 로드210: lower support plate 220: support rod

230 : 상부 지지 플레이트 300 : 고정 부재230: upper support plate 300: fixing member

310 : 제 1고정 부재 몸체 320 : 제 2고정 부재 몸체310: first fixing member body 320: second fixing member body

330 : 체결 볼트 400 : 채널 플레이트330: fastening bolt 400: channel plate

500 : 가스켓 600 : 기밀 테이프500: gasket 600: airtight tape

700 : 배선 설치 유로700: wiring installation flow path

Claims (8)

일정 길이를 갖고 건축물의 층간 기준면에 세워져 설치되는 다수의 지지 부재들;A plurality of support members having a predetermined length and installed on an interlayer reference plane of the building; 상기 지지 부재들의 상부에 배치되는 바닥 패널;A bottom panel disposed on the support members; 상기 지지 부재들 각각의 상단과 상기 바닥 패널의 사이에 설치되며, 상기 바닥 패널을 고정하는 고정 부재;A fixing member installed between an upper end of each of the supporting members and the bottom panel, and fixing the bottom panel; 상기 지지 부재들 각각의 양측부에 배치되며, 하단이 상기 기준면에 고정되고 상단이 상기 고정 부재의 양측부에 체결 고정되어 공기의 유로를 형성하는 다수의 채널 플레이트들을 포함하는 것을 특징으로 하는 건축물용 바닥부 공기 유로 설비.And a plurality of channel plates disposed on both sides of each of the supporting members, and having a lower end fixed to the reference surface and an upper end fastened and fixed to both sides of the fixing member to form an air flow path. Bottom air flow path equipment. 제 1항에 있어서,The method according to claim 1, 상기 지지 부재들 각각은,Each of the support members, 상기 기준면에 고정 설치되는 하부 지지 플레이트와, 일정 길이를 갖고 하단이 상기 고정 플레이트에 고정되는 지지 로드와, 상기 지지 로드의 상단에 설치되는 상부 지지 플레이트를 구비하는 것을 특징으로 하는 건축물용 바닥부 공기 유로 설비.A bottom support plate fixed to the reference surface, a support rod having a predetermined length and a lower end fixed to the fixed plate, and an upper support plate installed on an upper end of the support rod. Euro fittings. 제 2항에 있어서,3. The method of claim 2, 상기 상부 지지 플레이트의 하단면에는 돌출 형성되는 나사부가 마련되고,The lower end surface of the upper support plate is provided with a threaded portion protruding, 상기 지지 로드의 상단부에는 상기 나사부가 나사 끼움되는 끼움홀이 형성되는 것을 특징으로 하는 건축물용 바닥부 공기 유로 설비.The upper portion of the support rod is a building bottom air passage facility characterized in that the fitting hole is formed in which the screw is screwed. 제 2항에 있어서,3. The method of claim 2, 상기 고정 부재는,Wherein: '
Figure 112009080954627-pat00005
' 형상으로 형성되며 상단에 제 1체결홀이 형성되는 제 1고정 부재 몸체와, 상기 제 1고정 부재 몸체의 양측 하단으로부터 상기 상부 지지 플레이트의 상면에 밀착됨과 아울러 끝단이 상기 상부 지지 플레이트의 외주를 커버하도록 하방으로 벤딩되는 제 2고정 부재 몸체를 구비하는 것을 특징으로 하는 건축물용 바닥부 공기 유로 설비.
'
Figure 112009080954627-pat00005
And a first fixing member body having a shape and having a first fastening hole formed at an upper end thereof, and being closely adhered to an upper surface of the upper supporting plate from both lower ends of the first fixing member body, and having an end of the upper fixing plate. And a second fixing member body bent downward to cover the building floor air flow path installation.
제 4항에 있어서,5. The method of claim 4, 상기 제 1체결홀에는 체결 볼트가 끼워지고, 상기 체결 볼트는 상기 상부 지지 플레이트와 상기 지지 로드의 상단을 관통하도록 형성되는 제 2체결홀에 끼워져, 상기 고정 부재와 상기 지지 부재는 서로 체결되는 것을 특징으로 하는 건축물용 바닥부 공기 유로 설비.A fastening bolt is fitted into the first fastening hole, and the fastening bolt is fitted into a second fastening hole formed to penetrate the upper end of the upper support plate and the support rod, so that the fixing member and the support member are fastened to each other. An air flow path installation for a floor portion for a building. 제 5항에 있어서,6. The method of claim 5, 상기 바닥 패널의 하단부에는 상기 제 1고정 부재 몸체가 끼워지는 일정 길 이의 끼움홈이 형성되고,The lower end of the bottom panel is formed with a certain length of the fitting groove is fitted into the first fixing member body, 상기 끼움홈과 상기 체결 볼트의 사이에는 가스켓이 개재되는 것을 특징으로 하는 건축물용 바닥부 공기 유로 설비.A building bottom air passage facility, characterized in that a gasket is interposed between the fitting groove and the fastening bolt. 제 6항에 있어서,The method according to claim 6, 상기 바닥 패널과 상기 제 2고정 부재 몸체와 상기 상부 지지 플레이트는 서로 볼트 결합되는 것을 특징으로 하는 건축물용 바닥부 공기 유로 설비.And the bottom panel, the second fixing member body and the upper support plate are bolted to each other. 제 4항에 있어서,5. The method of claim 4, 상기 제 2고정 부재 몸체의 양측부는 상기 채널 플레이트들의 내측에 위치되어 서로 볼트 결합되며,Both sides of the second fixing member body are located inside the channel plates and bolted to each other, 상기 제 2고정 부재 몸체와 상기 채널 플레이트들의 사이 공간을 기밀 시키도록 상기 제 2고정 부재 몸체의 상면과 상기 채널 플레이트들의 외주를 잇도록 부착되는 기밀 테이프를 더 구비하는 것을 특징으로 하는 건축물용 바닥부 공기 유로 설비.And an airtight tape attached to connect the upper surface of the second fixing member body to the outer circumference of the channel plates to seal the space between the second fixing member body and the channel plates. Air flow path equipment.
KR1020090132268A 2009-12-29 2009-12-29 Air flow equipment of floor for construction KR101373655B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020090132268A KR101373655B1 (en) 2009-12-29 2009-12-29 Air flow equipment of floor for construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020090132268A KR101373655B1 (en) 2009-12-29 2009-12-29 Air flow equipment of floor for construction

Publications (2)

Publication Number Publication Date
KR20110075734A KR20110075734A (en) 2011-07-06
KR101373655B1 true KR101373655B1 (en) 2014-03-13

Family

ID=44915691

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020090132268A KR101373655B1 (en) 2009-12-29 2009-12-29 Air flow equipment of floor for construction

Country Status (1)

Country Link
KR (1) KR101373655B1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101430179B1 (en) * 2014-05-07 2014-08-13 세민텍크 주식회사 Device for supporting floor

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102306073B (en) * 2011-09-19 2013-07-24 深圳莱宝高科技股份有限公司 Capacitive touch panel and manufacturing method thereof
KR101279616B1 (en) * 2012-09-12 2013-06-27 주식회사 안성테크 Sealed type floor panel structure
KR101428029B1 (en) * 2013-01-28 2014-08-12 아주대학교산학협력단 Airtight access floor

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200160250Y1 (en) 1997-06-23 1999-11-01 박기석 Floor structure of collection room of museum
JP2000303678A (en) 1999-04-23 2000-10-31 Nippon Sheet Glass Kankyo Amenity Kk Floating-floor facility
JP2006104891A (en) 2004-10-08 2006-04-20 Hitachi Metals Techno Ltd Supporting leg for free access floor
KR100919686B1 (en) 2008-08-26 2009-10-06 (주)원광티에프에스 Access floor

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200160250Y1 (en) 1997-06-23 1999-11-01 박기석 Floor structure of collection room of museum
JP2000303678A (en) 1999-04-23 2000-10-31 Nippon Sheet Glass Kankyo Amenity Kk Floating-floor facility
JP2006104891A (en) 2004-10-08 2006-04-20 Hitachi Metals Techno Ltd Supporting leg for free access floor
KR100919686B1 (en) 2008-08-26 2009-10-06 (주)원광티에프에스 Access floor

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101430179B1 (en) * 2014-05-07 2014-08-13 세민텍크 주식회사 Device for supporting floor

Also Published As

Publication number Publication date
KR20110075734A (en) 2011-07-06

Similar Documents

Publication Publication Date Title
US7287733B2 (en) Ceiling suspension structure
US7937895B2 (en) Air handling chamber
US8156702B2 (en) Waterproof ceiling
KR101373655B1 (en) Air flow equipment of floor for construction
US20090277122A1 (en) No-Through-Metal Structural Panelized Housing System for Buildings and Enclosures and Economical Process for Manufacture of Same
EP3486574A1 (en) Compressor cover for air treatment device
EP2880370B1 (en) Practical flexible connecting apparatus for ventilation duct
JP2012172437A (en) Thermal insulation structure of building
KR101132617B1 (en) Window frame insertion airconditioner
KR20150004021A (en) Duct structure of air conditioning system for deck house
WO2013138367A1 (en) Hvac base and return air system
US20070254585A1 (en) Block wall vent and method
JP4956208B2 (en) Ceiling structure for underground facilities
KR101310406B1 (en) Dry type curtain wall unit having horizontal and vertical drain means
KR101715430B1 (en) Underfloor air-conditioning duct structure
JP6393605B2 (en) Joint structure
CA2865781C (en) Removable access panels and transitions in hvac systems
JP5693937B2 (en) Unit type building ventilation blockage
PL202775B1 (en) Underfloor plug-in socket
KR101129967B1 (en) Structure of manufacturing the exhaust duct for use of building
US11939764B2 (en) Ventilation member and wall material construction structure
JP6958224B2 (en) Wall ventilation structure
KR102031114B1 (en) Ceiling panel having sectional joining structure
JP5495842B2 (en) Ventilation fan
JP6285646B2 (en) Building drainage structure

Legal Events

Date Code Title Description
A201 Request for examination
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20170221

Year of fee payment: 4

FPAY Annual fee payment

Payment date: 20180221

Year of fee payment: 5

FPAY Annual fee payment

Payment date: 20190305

Year of fee payment: 6

FPAY Annual fee payment

Payment date: 20200225

Year of fee payment: 7