KR101356816B1 - Structure of reinforced for retainaing wall - Google Patents

Structure of reinforced for retainaing wall Download PDF

Info

Publication number
KR101356816B1
KR101356816B1 KR1020120079859A KR20120079859A KR101356816B1 KR 101356816 B1 KR101356816 B1 KR 101356816B1 KR 1020120079859 A KR1020120079859 A KR 1020120079859A KR 20120079859 A KR20120079859 A KR 20120079859A KR 101356816 B1 KR101356816 B1 KR 101356816B1
Authority
KR
South Korea
Prior art keywords
reinforcement
fixing
block
retaining wall
mesh
Prior art date
Application number
KR1020120079859A
Other languages
Korean (ko)
Inventor
백연진
Original Assignee
백연진
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 백연진 filed Critical 백연진
Priority to KR1020120079859A priority Critical patent/KR101356816B1/en
Application granted granted Critical
Publication of KR101356816B1 publication Critical patent/KR101356816B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/02Retaining or protecting walls
    • E02D29/0225Retaining or protecting walls comprising retention means in the backfill
    • E02D29/0233Retaining or protecting walls comprising retention means in the backfill the retention means being anchors
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/20Securing of slopes or inclines
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/02Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls built-up from layers of building elements
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2200/00Geometrical or physical properties
    • E02D2200/13Geometrical or physical properties having at least a mesh portion
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2300/00Materials
    • E02D2300/0084Geogrids

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Structural Engineering (AREA)
  • Civil Engineering (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Environmental & Geological Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)

Abstract

The present invention relates to a reinforcing material fixating structure for a retaining wall which makes reinforcing materials, which multiple meshes are formed inside, to fixate each other for preventing collapse of the retaining wall in between a plurality of blocks arranged step by step on top of each other and a cut slope and which comprises a fixating plate and a fixating cap. The fixating plate has a plate shape which is extended to be located on the lower parts of the mutually fixating reinforcing materials in the longitudinal direction of the reinforcing materials, and makes a plurality of insertion projections, which have the same shapes as the mesh shapes formed on the reinforcing materials in the direction of the extended fixating plate for the insertion projections to be inserted into the meshes of the reinforcing materials, to be inserted into the meshes of the end of the reinforcing materials. The fixating cap is made of synthetic resin for being transformed, composed of a plate shape extending to the length of the fixating plate, and has a plurality of fitting holes in which protruding insertion projections inserted into the end of the mutually fixating reinforcing materials in the extending direction of the fixating cap are fastened. Therefore, the reinforcing material fixating structure for a retaining wall has the effect of improving the installation workability of the reinforcing materials by facilitating a connection work for connecting the reinforcing materials, wherein the connection work uses the insertion projection of the fixating plate and the fitting holes of the fixating cap for fixating the mutually connected reinforcing materials for being disposed inside a retaining wall. [Reference numerals] (S100) Spreading step; (S200) Settling step; (S300) Extending step; (S400) First connecting step; (S500) Second connecting step; (S600) Third connecting step

Description

옹벽용 보강재의 고정방법{Structure of reinforced for retainaing wall}Fixing method of retaining material for retaining wall {Structure of reinforced for retainaing wall}

본 발명은 옹벽의 내부에서 지반 붕괴를 방지하는 옹벽용 보강재의 고정방법에 관한 것으로서, 특히 옹벽 내에 인입되어 토압력에 의해 옹벽을 지지하는 보강재 및 고정보강재를 고정판과 고정캡으로 각각 고정하여 옹벽의 설치를 용이하게 하면서도 견고한 구조를 가지는 옹벽용 보강재의 고정방법에 관한 것이다.The present invention relates to a method for fixing a retaining wall reinforcement to prevent ground collapse inside the retaining wall, and in particular, a reinforcing member and a high information steel which are introduced into the retaining wall to support the retaining wall by earth pressure, respectively, are fixed by a fixing plate and a fixing cap, respectively. The present invention relates to a method for fixing a retaining wall reinforcement having a rigid structure while facilitating installation.

일반적으로 옹벽은 토압력에 저항하여 토사의 무너짐을 방지하는 벽체로써, 지표지반의 비탈면으로부터 발생하게 되는 외력에 의한 지반 붕괴를 막기 위한 구조물이다.In general, the retaining wall is a wall that prevents soil from collapsing by resisting soil pressure, and is a structure for preventing ground collapse due to external force generated from the slope of the ground surface.

상기 옹벽의 형태는 내부에 단계별로 다수의 블록이 적층되고 상기 블록에 보강재의 일측을 안착함과 동시에 타측의 보강재를 절토면 측으로 수평방향으로 연장시켜 매립하는 형태로 이루어져 옹벽 내에 매립된 보강재는 옹벽의 내부에 지지되어 자갈 및 흙과 같은 채움재의 토압력에 의해 그 위치가 고정되므로 블록들로 축조된 옹벽을 절토면측으로 인장하게 되어 측방 토압에 의한 옹벽의 전도를 방지할 수 있도록 구성된 것이다.The retaining wall has a shape in which a plurality of blocks are stacked in stages therein, and one side of the reinforcement is seated on the block, and at the same time, the reinforcing material embedded in the retaining wall extends horizontally to the cut surface side and is embedded in the retaining wall. Since the position is fixed by the earth pressure of the filling material such as gravel and soil, the retaining wall constructed with blocks is tensioned to the cut surface side to prevent the fall of the retaining wall by lateral earth pressure.

상기 보강재는 통상 폴리에스테르 섬유를 이용하여 격자형태로 제직 또는 배열되는 형태로 구성되며 이러한 보강재는 옹벽에 인입될 때 보강재가 길이방향으로 다수 연장되어 옹벽 내부에 설치되는데 다수 연장되는 보강재는 보통 보강재의 단부를 상호 용착 또는 접착하여 연결하여 설치된다.The reinforcement is usually constructed in the form of weaving or arranging in the form of a grid using polyester fibers, such a reinforcement is installed in the retaining wall is a plurality of reinforcement is extended in the longitudinal direction when the reinforcement is drawn into the retaining wall is usually of the reinforcement The ends are welded or glued together.

하지만 상기와 같이 보강재를 옹벽 내에 인입되어 설치하기 위해서는 필수적으로 보강재의 단부를 상호 용착 또는 접착하는데 작업시간이 오래 걸릴 뿐만 아니라 작업이 번거로워 생산성이 저하되는 단점이 있어왔다.However, in order to install the reinforcement in the retaining wall as described above, it is necessary to take a long time to weld or bond the ends of the reinforcement to each other, as well as to have a disadvantage in that productivity is reduced.

이와 같은 단점을 보완하기 위해 상호 연결되는 보강재의 양단부의 메쉬에 강한 인장력을 가지는 리브를 각각 엇갈리도록 삽입되어 보강재를 고정하도록 하였으나, 이 또한 작업이 번거로워 생산성이 저하되며 리브를 메쉬에 엇갈리게 고정함으로서 옹벽의 압력에 의해 보강재를 고정한 리브가 이탈되어 보강재의 역활을 수행하지 못하는 단점이 있어왔다.In order to make up for this drawback, ribs having strong tension are inserted into the meshes at both ends of the reinforcing materials to be interconnected to fix the reinforcing materials. However, the work is cumbersome and the productivity is reduced, and the retaining wall is fixed by staggering the ribs to the mesh. Ribs holding the reinforcement are separated by the pressure of the has been a disadvantage that can not perform the role of the reinforcement.

상기한 문제점을 해소하기 위해 안출된 본 발명의 목적은, 옹벽 내에 인입되어 토압력에 의해 옹벽을 지지하는 보강재 및 고정보강재를 고정판과 고정캡으로 각각 고정하여 옹벽의 설치를 용이하게 하면서도 견고한 구조를 가지는 옹벽용 보강재의 고정방법에 관한 것이다.An object of the present invention devised to solve the above problems is to fix the reinforcement and the high-information steel, which is introduced into the retaining wall to support the retaining wall by earth pressure, respectively, by fixing the retaining plate and the fixing cap to facilitate the installation of the retaining wall. Eggplant relates to a method of fixing the retaining material for the retaining wall.

상기한 목적은, 본 발명에서 제공되는 하기 구성에 의해 달성된다.The above object is achieved by the following constitutions provided in the present invention.

본 발명에 의한 옹벽용 보강재의 고정방법은, 지반에 절토작업 및 터파기작업 후 터파기작업이 완료된 지반에 보강재를 단계적으로 설치하고 설치된 보강재에 자갈 및 흙으로 이루어지는 채움재가 채워져 이루어지는 옹벽설치작업에서 옹벽 내부에 설치된 보강재를 고정하는 옹벽용 보강재의 고정방법에 있어서, 상기 터파기작업이 완료된 지반에 블록을 일단으로 안착하고 상기 안착된 블록의 후측으로 자갈 및 흙으로 이루어지는 채움재를 채우는 포설단계; 채움재가 채워지도록 다수의 메쉬가 형성되는 그리드 형태로 이루어지는 보강재의 중단을 블록에 고정하고 보강재의 양단부를 절토면측으로 연장하여 채움재의 상측에 펼친 상태로 안착하는 안착단계; 보강재와 동일하게 채움재가 채워지도록 다수의 메쉬가 형성되는 그리드 형태로 이루어지는 고정보강재를 이용하여 보강재의 단부와 결합되도록 고정보강재의 일측의 메쉬를 보강재의 단부의 메쉬와 수직선상으로 일치시키고 타측은 고정보강재가 반원형태로 유지되도록 연장시키는 연장단계; 상기 보강재와 고정보강재의 메쉬 형태와 동일한 인입돌기가 다수 형성된 고정판을 보강재와 고정보강재의 단부가 수직선상으로 일치하는 메쉬에 인입시키고, 상기 고정판과 동일하게 연장되는 판의 형태로 구성되며 연장되는 방향으로 인입돌기에 끼움되는 끼움공이 다수 형성되는 고정캡을 보강재와 고정보강재의 메쉬에 인입되어 돌출된 인입돌기를 끼움공에 끼움시켜 보강재와 고정보강재를 연결하는 제1연결단계; 상기 블록의 상부로 별도의 블록을 적층하고 적층된 블록에 별도의 보강재의 중단을 고정한 후 양단부를 절토면측으로 연장하고 연장된 보강재 단부측의 메쉬를 제1연결단계에서 일측이 보강재와 연결된 고정보강재 타측의 메쉬와 수직선상으로 일치시키고 제1연결단계와 동일하게 고정판 및 고정캡을 이용하여 별도의 보강재와 고정보강재를 연결하는 제2연결단계;가 포함됨을 특징으로 한다.The method of fixing the retaining wall reinforcing material according to the present invention, in the retaining wall installation work consisting of the filling material consisting of gravel and soil in the reinforcing material is installed in the ground step by step after installing the reinforcing material in the ground after the excavation work and excavation work in the ground is completed A method for fixing a retaining wall reinforcement for fixing a reinforcing material installed in a retaining wall, the method comprising: a laying step of seating a block on one side of the ground in which the excavation work is completed and filling a filler made of gravel and soil to the rear of the seated block; A seating step of fixing the interruption of the reinforcement having a grid shape in which a plurality of meshes are formed in the block to be filled with the block, and extending both ends of the reinforcement to the cut surface side and spreading the upper portion of the filler; The mesh of one side of the high information steel is aligned vertically with the mesh of the end of the reinforcing material so that it is combined with the end of the reinforcing material by using a high information steel having a grid form in which a plurality of meshes are formed to fill the filling material in the same way as the reinforcing material. Extending the reinforcement to maintain the semicircular shape; The fixed plate formed with a plurality of inlet projections having the same shape as the mesh of the reinforcing material and the high-information steel is introduced into the mesh where the ends of the reinforcing material and the high-information steel coincide in a vertical line, and are formed in the form of a plate extending in the same manner as the fixing plate and extending in the direction A first connection step of connecting the reinforcement and the high information steel by inserting a fixed cap having a plurality of fitting holes fitted into the inlet projection into the reinforcement and the mesh of the high information steel and fitting the protruding inlet protrusion into the fitting hole; After stacking separate blocks to the top of the block and fixing the interruption of the separate reinforcement to the stacked blocks, both ends are extended to the cut surface side and the other side of the high information steel connected to the reinforcement one side in the first connection step of the mesh of the extended reinforcement end side And a second connection step of connecting the reinforcement and the high information steel using a fixing plate and a fixing cap in the same manner as the first connection step and matching the mesh with the vertical line.

또한 상기 안착단계 및 제2연결단계에서 블록으로 하여금 보강재의 중단을 고정하는 것은, 블록에 형성된 인입홈으로 보강재의 중단을 인입하여 이루어짐을 특징으로 한다.In addition, the fixing of the interruption of the reinforcement by the block in the seating step and the second connection step, characterized in that made by introducing the interruption of the reinforcement into the inlet groove formed in the block.

또한 상기 안착단계 및 제2연결단계에서 블록으로 하여금 보강재의 중단을 고정하는 것은, 블록에 형성된 수용홈으로 고정판을 고정시키고 상기 블록의 수용홈에 고정된 고정판에 형성된 인입돌기에 보강재 중단의 메쉬를 수용시킨 후 메쉬에 수용되어 돌출된 인입돌기를 고정캡의 끼움공에 끼움시켜 이루어짐을 특징으로 한다.In addition, fixing the interruption of the reinforcement by the block in the seating step and the second connection step, fixing the fixing plate with the receiving groove formed in the block and the mesh of the reinforcement interruption to the inlet projection formed in the fixed plate fixed to the receiving groove of the block It is characterized in that it is made by fitting the insertion projections projected in the mesh and then received in the fitting hole of the fixing cap.

또한 상기 제2연결단계가 완료된 블록 옆으로 상, 하로 구분되게 연장된 보강재의 메쉬에 별도의 고정보강재를 반원형태로 연장되게 고정보강재 양단부의 메쉬를 각각 수직선상으로 일치시킨 후 고정판 및 고정캡을 이용하여 블록 옆으로 상, 하로 구분되게 연장된 보강재 부위와 별도의 고정보강재를 연결하는 제3연결단계;가 포함됨을 특징으로 한다.In addition, to match the mesh of the both ends of the high-information steel in the vertical line to separate the high-information steel in a semi-circular shape to the mesh of the reinforcement is divided into the upper and lower sides next to the block is completed, the fixing plate and the fixed cap And a third connection step of connecting separate high information steels and the reinforcement portion extended to be divided into upper and lower sides of the block by using the same.

전술한 바와 같이 본 발명에 따르면, 고정판 및 고정캡을 이용하여 이용하여 보강재와 고정보강재를 연결고정함으로서 보강재와 고정보강재의 연결을 용이하게 수행할 수 있어 작업성을 향상시키는 효과가 있다.As described above, according to the present invention, by connecting and fixing the reinforcement and the high information steel by using the fixing plate and the fixing cap, it is possible to easily perform the connection of the reinforcement and the high information steel, thereby improving workability.

또한 고정판 및 고정캡에 의해 보강재와 고정보강재의 연결구조가 옹벽 내부에서 견고하게 유지되어 옹벽 내부의 토압이 발생되더라도 옹벽을 안정적으로 완화 또는 지지하여 옹벽의 안정성을 현저하게 높여주어 견고한 옹벽을 구축할 수 있는 효과가 있다.In addition, the connection structure between the reinforcement and the high-information steel is firmly maintained in the retaining wall by the fixing plate and the fixed cap, so that even if earth pressure is generated inside the retaining wall, the retaining wall can be reliably relaxed or supported to significantly increase the stability of the retaining wall. It can be effective.

또한 블록의 형태에 따라 보강재안착단계 및 제2연결단계에서 보강재가 블록에 고정되는 것은 제1, 2형태로 구분됨으로서 보강재의 고정작업이 용이하게 수행되어 보강재의 설치작업성을 향상시키는 효과가 있다.In addition, the reinforcement is fixed to the block in the reinforcement seating step and the second connection step according to the shape of the block is divided into the first and second forms, so that the fixing work of the reinforcement is easily performed, thereby improving the installation workability of the reinforcement. .

또한 제3연결단계에서 별도의 고정보강재를 블록의 옆에서 보강재와 연결함으로서 블록 방향으로 진행되는 토압을 고정보강재가 막아주어 블록이 옹벽에 안정적으로 유지되어 옹벽이 견고하게 설치되는 효과가 있다.In addition, by connecting a separate high information steel in the third connection step with the reinforcement next to the block, the high information steel prevents the earth pressure that proceeds in the block direction, so that the block is stably maintained on the retaining wall, so that the retaining wall is firmly installed.

도 1은 본 발명에 따른 옹벽용 보강재의 고정방법을 나타내는 순서도,
도 2는 본 발명의 옹벽용 보강재의 고정방법에 의해 보강재와 고정보강재가 연결되는 바람직한 형태를 나타내는 예시도,
도 3은 본 발명의 옹벽용 보강재의 고정방법에 의해 보강재와 고정보강재가 연결되는 바람직한 형태를 나타내는 분해사시도,
도 4는 본 발명의 옹벽용 보강재의 고정방법에 의해 보강재와 고정보강재가 연결되는 바람직한 형태를 나타내는 단면도,
도 5는 본 발명의 옹벽용 보강재의 고정방법에 의해 보강재와 고정보강재가 연결되어 옹벽을 구축하는 바람직한 형태를 나타내는 예시도,
도 6은 본 발명의 블록의 형태에 따라 보강재가 블록에 고정되는 제1형태의 바람직한 실시의 예를 나타내는 예시도,
도 7은 본 발명의 블록의 형태에 따라 보강재가 블록에 고정되는 제2형태의 바람직한 실시의 예를 나타내는 예시도,
도 8은 본 발명의 블록의 형태에 따라 보강재가 블록에 고정되는 제2형태의 바람직한 실시의 예를 나타내는 예시도,
도 9는 본 발명의 옹벽용 보강재의 고정방법의 제3연결단계의 바람직한 형태를 나타내는 예시도.
1 is a flow chart showing a fixing method of the retaining material for the retaining wall according to the present invention,
Figure 2 is an exemplary view showing a preferred form in which the reinforcement and the high information steel is connected by the method of fixing the retaining material for the retaining wall of the present invention,
3 is an exploded perspective view showing a preferred form in which the reinforcing material and the high information steel is connected by the method of fixing the retaining material for the retaining wall of the present invention,
4 is a cross-sectional view showing a preferred form in which the reinforcing material and the high information steel is connected by the method of fixing the retaining material for the retaining wall of the present invention,
Figure 5 is an exemplary view showing a preferred form of building the retaining wall is connected to the reinforcing material and high information steel by the fixing method of the retaining wall reinforcing material of the present invention,
6 is an exemplary view showing a preferred embodiment of the first aspect in which the reinforcing material is fixed to the block according to the form of the block of the present invention;
7 is an exemplary view showing an example of a preferred embodiment of the second aspect in which the reinforcing material is fixed to the block according to the form of the block of the present invention;
8 is an exemplary view showing a preferred embodiment of the second aspect in which the reinforcing material is fixed to the block according to the form of the block of the present invention;
9 is an exemplary view showing a preferred form of the third connection step of the fixing method of the retaining wall reinforcement material of the present invention.

이하 본 발명의 바람직한 실시예를 첨부한 도면에 의거하여 더욱 상세하게 설명한다.Hereinafter, preferred embodiments of the present invention will be described in more detail with reference to the accompanying drawings.

도 1은 본 발명에 따른 옹벽용 보강재의 고정방법을 나타내는 순서도이고, 도 2는 본 발명의 옹벽용 보강재의 고정방법에 의해 보강재와 고정보강재가 연결되는 바람직한 형태를 나타내는 예시도로서 본 발명에 적용되는 옹벽은 건설의 목적으로 도로, 철도의 사면, 공원지역의 비탈면, 하천제방, 해안도로 등에 절토작업이 이루어진 절토면의 붕괴를 방지하기 위해 형성된 것이다.1 is a flow chart showing a method of fixing the retaining wall reinforcement for the retaining wall according to the present invention, Figure 2 is an exemplary view showing a preferred form in which the reinforcement and high information steel is connected by the method of fixing the retaining wall reinforcing material of the present invention applied to the present invention. Retaining walls are formed to prevent the collapse of cut surfaces that have been cut for roads, railway slopes, park slopes, river banks, and coastal roads for construction purposes.

즉 본 발명은 지반에 절토작업 및 터파기작업 후 터파기작업이 완료된 지반에 보강재를 단계적으로 설치하고 설치된 보강재에 자갈 및 흙으로 이루어지는 채움재가 채워져 이루어지는 옹벽설치작업에서 옹벽 내부에 설치된 보강재를 고정하는 옹벽용 보강재의 고정방법에 관한 것이다.In other words, the present invention is to install the reinforcement step by step in the ground after the excavation work and excavation work on the ground and to fix the reinforcement installed inside the retaining wall in the retaining wall installation work is filled with a filling material consisting of gravel and soil to the installed reinforcement A method for fixing a retaining material for a retaining wall.

여기서 본 발명에 따른 옹벽용 보강재의 고정방법은, 도 1 내지 도 5에 도시된 바와 같이 포설단계(S100) - 안착단계(S200) - 연장단계(S300) - 제1연결단계(S400) - 제2연결단계(S500)가 순차적으로 수행되어 이루어진다.Here, the fixing method of the retaining material for the retaining wall according to the present invention, as shown in Figures 1 to 5 laying step (S100)-seating step (S200)-extension step (S300)-first connection step (S400)-first The two connection step (S500) is performed sequentially.

포설단계(S100)는 터파기작업이 완료된 지반에 블록을 일단으로 안착하고 블록(10)의 높이에 맞춰 블록(10)의 후측 일부에 배수를 위한 자갈을 깔아 자갈층을 형성하고 자갈층의 후부에서 절토면에 이르기까지 흙을 쌓아두어 채움재(1)를 포설하는 단계이다.In the laying step (S100), a block is settled on one side of the ground in which the excavation work is completed, and a gravel layer is formed by laying gravel for drainage on the rear part of the block 10 according to the height of the block 10 to form a gravel layer. Stacking the soil until the step of laying the filling material (1).

안착단계(S200)는 보강재(20)를 블록(10)에 고정함과 동시에 절토면측으로 연장하도록 안착하는 단계로서 채움재(1)가 채워지도록 다수의 메쉬가 형성되는 그리드 형태로 이루어지는 보강재(20)의 중단을 블록(10)에 고정하고 보강재(20)의 양단부를 절토면측으로 연장하여 채움재(1)의 상측에 펼친 상태로 안착하는 단계이다.Seating step (S200) is a step of seating so as to secure the reinforcement 20 to the block 10 at the same time to extend to the cut surface side of the reinforcement 20 made of a grid form in which a plurality of mesh is formed to fill the filler (1). Fixing the interruption to the block 10 and extending both ends of the reinforcing material 20 to the cut surface side is seated in the unfolded state on the upper side of the filling material (1).

연장단계(S300)는 보강재(20)와 동일하게 채움재(1)가 채워지도록 다수의 메쉬가 형성되는 그리드 형태로 이루어지는 고정보강재(30)를 이용하여 상기 안착단계(S200)에서 절토면으로 연장되는 보강재(20)의 단부와 결합되도록 고정보강재(30)의 일측의 메쉬를 보강재(20)의 단부의 메쉬와 수직선상으로 일치시키고 타측은 고정보강재(30)가 반원형태로 유지되도록 연장시켜 후술되는 제1, 2연결단계(S400, S500)계에서 보강재(20)와의 연결이 이루어지도록 하는 단계이다.Extension step (S300) is a reinforcing material extending to the cut surface in the mounting step (S200) by using a high information steel material 30 made of a grid form in which a plurality of meshes are formed so as to fill the filler (1) in the same way as the reinforcement (20) The mesh of one side of the high-information steel 30 to be aligned with the end of the reinforcing material 20 in a vertical line with the mesh of the end of the reinforcing material 20 to be coupled to the end of the 20, and the other side is extended to maintain the high-information steel 30 in a semicircular form 1, 2 is a step to be connected with the reinforcing material 20 in the connection step (S400, S500) system.

제1연결단계(S400)는 상기 연장단계(S300)에서 연장된 보강재(20) 및 고정보강재(30)를 상호 연결하기 위한 단계로서, 상기 보강재(20)와 고정보강재(30)에 형성된 메쉬 형태와 동일한 인입돌기(41)가 다수 형성된 고정판(40)을 준비하여 준비된 고정판(40)의 인입돌기(41)를 연장단계(S300)에서 보강재(20)와 고정보강재(30)의 단부가 수직선상으로 일치되어진 메쉬에 인입시킨다.The first connection step (S400) is a step for interconnecting the reinforcement 20 and the high information steel 30 extended in the extension step (S300), the mesh form formed on the reinforcement 20 and the high information steel (30) The end of the reinforcing material 20 and the high-information steel 30 in the step (S300) extending the inlet projection 41 of the fixed plate 40 prepared by preparing a fixed plate 40 formed with a plurality of inlet projection 41 is the same as the vertical line Insert into mesh matched with.

또한 상기 고정판(40)과 동일하게 연장되는 판의 형태로 구성되며 연장되는 방향으로 인입돌기(41)에 끼움되는 끼움공(51)이 다수 형성되는 고정캡(50)을 준비하고 보강재(20)와 고정보강재(30)의 메쉬에 인입되어 돌출된 인입돌기(41)를 준비된 고정캡(50)의 끼움공(51)에 끼움시켜 보강재(20)와 고정보강재(30)를 연결하는 단계이다.In addition, the fixing plate 40 is configured in the form of a plate extending in the same manner as the fixing plate 40 and prepares the fixing cap 50 is formed with a plurality of fitting holes 51 to be fitted to the inlet projection 41 and the reinforcing material 20 And it is a step of connecting the reinforcing material 20 and the high information steel 30 by fitting the retracting protrusion 41 is inserted into the mesh of the high information steel 30 to the fitting hole 51 of the prepared fixed cap 50.

제2연결단계(S500)는 상기 블록(10)의 상부로 별도의 블록(10)을 적층하고 적층된 블록(10)에 별도의 보강재(20)의 중단을 고정한 후 양단부를 절토면측으로 연장한다.In the second connection step S500, a separate block 10 is stacked on top of the block 10, and the ends of the separate reinforcement 20 are fixed to the stacked blocks 10, and both ends thereof are extended to the cut surface side.

그리고 상기 연장된 보강재(20) 단부측의 메쉬를 제1연결단계(S400)에서 일측이 보강재(20)와 연결된 고정보강재(30) 타측의 메쉬와 수직선상으로 일치시키고 제1연결단계(S400)와 동일하게 고정판(40) 및 고정캡(50)을 이용하여 별도의 보강재(20)와 고정보강재(30)를 연결하는 단계이다.Then, the mesh of the end of the extended reinforcing material 20 is matched in a vertical line with the mesh of the other side of the high information steel 30 connected to the reinforcing material 20 in the first connection step (S400) and the first connection step (S400). In the same manner as in the step of connecting the separate reinforcement 20 and the high information steel 30 by using the fixing plate 40 and the fixing cap 50.

따라서 상기 고정판(40) 및 고정캡(50)을 이용하여 보강재(20)와 고정보강재(30)를 연결고정함으로서 보강재(20)와 고정보강재(30)의 연결을 용이하게 수행할 수 있어 작업성을 향상시키면서도 보강재(20)와 고정보강재(30)의 연결구조가 옹벽 내부에서 견고하게 유지되어 옹벽 내부의 토압이 발생되더라도 옹벽을 안정적으로 완화 또는 지지하여 옹벽의 안정성을 현저하게 높여주어 견고한 옹벽을 구축할 수 있는 효과가 있게 되는 것이다.Therefore, by connecting and fixing the reinforcement 20 and the high information steel 30 by using the fixing plate 40 and the fixing cap 50 can easily perform the connection of the reinforcement 20 and the high information steel (30) workability Although the connection structure of the reinforcement 20 and the high-information steel 30 is firmly maintained inside the retaining wall, even if earth pressure is generated inside the retaining wall, the retaining wall is stably alleviated or supported to significantly increase the stability of the retaining wall. There is an effect that can be built.

여기서 블록(10)의 형태에 따라 안착단계(S200) 및 제2연결단계(S500)에서 보강재(20)가 블록(10)에 고정되는 것은 제1, 2형태로 구분되어진다.Here, the fixing of the reinforcing material 20 to the block 10 in the seating step (S200) and the second connection step (S500) according to the shape of the block 10 is divided into first and second forms.

상기 제1형태는 도 6에 도시된 바와 같이 블록(10)에 수평방향으로 절개되는 인입홈(11)이 형성되며 상기 블록(10)에 형성된 인입홈(11)으로 보강재(20)의 중단을 인입하여 이루어지게 된다.In the first form, as shown in FIG. 6, an inlet groove 11 is formed in the block 10 to be cut in the horizontal direction and the interruption of the reinforcement 20 is stopped by the inlet groove 11 formed in the block 10. It is made by pulling in.

상기 제2형태는 도 7, 8에 도시된 바와 같이 블록(10)의 상측으로 고정판(40)이 수용될 수 있는 수용홈(13)이 형성되며 상기 블록(10)에 형성된 수용홈(13)으로 고정판(40)을 인입고정시키고 상기 고정판(40)에 형성된 인입돌기(41)에 보강재(20) 중단의 메쉬를 수용시킨 후 메쉬에 수용되어 돌출된 인입돌기(41)를 고정캡(50)의 끼움공(51)에 끼움시켜 이루어지게 된다.As shown in FIG. 7 and FIG. 8, the second shape includes an accommodation groove 13 through which the fixing plate 40 can be accommodated, and an accommodation groove 13 formed in the block 10. Fixing the fixed plate 40 by the receiving and receiving the mesh of the reinforcing material 20 suspended in the inlet projection 41 formed in the fixing plate 40 and then received in the mesh the projection projection 41 is projected into the fixed cap 50 It is made by fitting in the fitting hole (51).

한편 도 9에 도시된 바와 같이 상기 제2연결단계(S500)가 완료된 블록(10) 옆으로 상, 하로 구분되게 연장된 보강재(20)의 메쉬에 별도의 고정보강재(30)를 반원형태로 연장되게 고정보강재(30)의 양단부의 메쉬를 각각 수직선상으로 일치시킨 후 고정판(40) 및 고정캡(50)을 이용하여 블록(10) 옆으로 상, 하로 구분되게 연장된 보강재(20) 부위와 별도의 고정보강재(30)를 연결하는 제3연결단계(S600)가 포함된다.Meanwhile, as shown in FIG. 9, a separate high information steel 30 is extended in a semicircle to a mesh of the reinforcement 20 which is divided into upper and lower sides next to the block 10 in which the second connection step S500 is completed. After matching the mesh of both ends of the high-information steel 30 in a vertical line, respectively, using the fixing plate 40 and the fixing cap 50 and the reinforcing member 20 extended to be divided into the upper and lower sides next to the block 10 and A third connection step (S600) for connecting the separate high information steel 30 is included.

따라서 상기 제3연결단계(S600)에서 별도의 고정보강재(30)를 블록(10)의 옆에서 보강재(20)와 연결함으로서 블록(10) 방향으로 진행되는 토압을 보강재(20)에 연결된 고정보강재(30)가 막아주어 블록(10)이 옹벽에 안정적으로 유지되어 옹벽이 견고하게 설치되는 효과를 가지게 되는 것이다.Therefore, in the third connection step (S600) by connecting a separate high information steel 30 to the reinforcement 20 by the side of the block 10, the high information steel connected to the reinforcement 20 to the earth pressure that proceeds in the direction of the block 10 Block 30 prevents the block 10 from being stably retained on the retaining wall, so that the retaining wall is firmly installed.

그리고 도 5에 도시된 비와 같이 상기 고정판(40) 및 고정캡(50)을 이용하여 보강재(20) 및 고정보강재(30)가 옹벽 내부에 설치되는 형태는 고정보강재(30)가 수직방향으로 지그재그 형태로 형성하여 채움재(1)가 지그재그 형태로 설치된 고정보강재(30)에 채워짐으로서 토압에 의하여 파괴되는 파괴선이 지그재그 형태로 유지되어 옹벽 내부에서 토압이 부분적으로 발생됨으로서 보다 안정적인 옹벽을 설치하는 효과가 있게 되는 것이다.As shown in FIG. 5, the reinforcing material 20 and the high information steel material 30 are installed in the retaining wall by using the fixing plate 40 and the fixing cap 50, and the high information steel material 30 is in the vertical direction. Formed in a zigzag form, the filling material 1 is filled in the high-information steel 30 installed in a zigzag form, so that a fracture line which is destroyed by earth pressure is maintained in a zigzag form, and earth pressure is partially generated inside the retaining wall, thereby providing a more stable retaining wall. It will work.

1 : 채움재 10 : 블록
11 : 인입홈 13 : 수용홈
20 : 보강재 30 : 고정보강재
40 : 고정판 41 : 인입돌기
43 : 슬라이딩부 44 : 걸림턱
45 : 제1채움공 50 : 고정캡
51 : 끼움공 52 : 절개홈
55 : 제2채움공
S100 : 포설단계 S200 : 안착단계
S300 : 연장단계 S400 : 제1연결단계
S500 : 제2연결단계 S600 : 제3연결단계
1: Filler 10: Block
11: Receiving Home 13: Receiving Home
20: reinforcing material 30: high information steel
40: fixed plate 41: inlet projection
43: sliding part 44: locking jaw
45: the first filling hole 50: fixed cap
51: fitting hole 52: incision groove
55: second filling ball
S100: laying step S200: settling step
S300: extension step S400: first connection step
S500: second connection step S600: third connection step

Claims (4)

지반에 절토작업 및 터파기작업 후 터파기작업이 완료된 지반에 보강재를 단계적으로 설치하고 설치된 보강재에 자갈 및 흙으로 이루어지는 채움재가 채워져 이루어지는 옹벽설치작업에서 옹벽 내부에 설치된 보강재를 고정하는 옹벽용 보강재의 고정방법에 있어서,
상기 터파기작업이 완료된 지반에 블록을 일단으로 안착하고 상기 안착된 블록(10)의 후측으로 자갈 및 흙으로 이루어지는 채움재를 채우는 포설단계(S100);
채움재(1)가 채워지도록 다수의 메쉬가 형성되는 그리드 형태로 이루어지는 보강재(20)의 중단을 블록(10)에 고정하고 보강재(20)의 양단부를 절토면측으로 연장하여 채움재(1)의 상측에 펼친 상태로 안착하는 안착단계(S200);
보강재(20)와 동일하게 채움재(1)가 채워지도록 다수의 메쉬가 형성되는 그리드 형태로 이루어지는 고정보강재(30)를 이용하여 보강재(20)의 단부와 결합되도록 고정보강재(30)의 일측의 메쉬를 보강재(20)의 단부의 메쉬와 수직선상으로 일치시키고 타측은 고정보강재(30)가 반원형태로 유지되도록 연장시키는 연장단계(S300);
상기 보강재(20)와 고정보강재(30)의 메쉬 형태와 동일한 인입돌기(41)가 다수 형성된 고정판(40)을 보강재(20)와 고정보강재(30)의 단부가 수직선상으로 일치하는 메쉬에 인입시키고, 상기 고정판(40)과 동일하게 연장되는 판의 형태로 구성되며 연장되는 방향으로 인입돌기(41)에 끼움되는 끼움공(51)이 다수 형성되는 고정캡(50)을 보강재(20)와 고정보강재(30)의 메쉬에 인입되어 돌출된 인입돌기(41)를 끼움공(51)에 끼움시켜 보강재(20)와 고정보강재(30)를 연결하는 제1연결단계(S400);
상기 블록(10)의 상부로 별도의 블록을 적층하고 적층된 블록에 별도의 보강재의 중단을 고정한 후 양단부를 절토면측으로 연장하고 연장된 보강재 단부측의 메쉬를 제1연결단계(S400)에서 일측이 보강재와 연결된 고정보강재 타측의 메쉬와 수직선상으로 일치시키고 제1연결단계(S400)와 동일하게 고정판 및 고정캡을 이용하여 별도의 보강재와 고정보강재를 연결하는 제2연결단계(S500);
가 포함됨을 특징으로 하는 옹벽용 보강재의 고정방법.
Reinforcement material for retaining wall to fix reinforcement installed inside retaining wall in retaining wall installation work in which reinforcement is installed step by step after cutting work and excavation work on ground and filling material consisting of gravel and soil is filled in installed reinforcement material. In the fixing method,
A laying step (S100) of seating the block in one end on the ground in which the excavation work is completed and filling a filling material consisting of gravel and soil to the rear side of the seated block 10;
The interruption of the reinforcement 20, which is formed in a grid form in which a plurality of meshes are formed to fill the filling material 1, is fixed to the block 10, and both ends of the reinforcing material 20 are extended to the cut surface side, and the upper portion of the filling material 1 is expanded. A seating step of seating in a state (S200);
The mesh of one side of the high information steel material 30 to be coupled to the end of the reinforcing material 20 by using the high information steel material 30 of the grid form in which a plurality of meshes are formed to fill the filling material 1 in the same manner as the reinforcing material 20 Matching in a vertical line with the mesh of the end of the reinforcing material 20 and the other side is extended (S300) for extending the high information steel 30 to be maintained in a semi-circular shape;
The reinforcing material 20 and the fixed plate 40 formed with a plurality of inlet protrusions 41 having the same shape as the mesh of the high-information steel 30 are drawn into the mesh where the ends of the reinforcing material 20 and the high-information steel 30 coincide in a vertical line. And a fixing cap 50 having a plurality of fitting holes 51 formed in the shape of a plate extending in the same manner as the fixing plate 40 and fitted into the inlet protrusion 41 in the extending direction. A first connection step S400 for connecting the reinforcing material 20 and the high information steel material 30 by fitting the inlet protrusion 41 protruding into the mesh of the high information steel material 30 into the fitting hole 51;
After stacking a separate block to the top of the block 10 and fixing the interruption of the separate reinforcement to the stacked blocks, both ends are extended to the cut surface side and one side of the mesh of the end of the extended reinforcement end side in the first connection step (S400) A second connecting step (S500) of connecting the high reinforcing steel connected to the reinforcing material and connecting the other reinforcing material and the high information steel by using a fixing plate and a fixing cap in the same way as the first line (S400) and the other information mesh connected to the reinforcing material;
Method of fixing the retaining wall reinforcement, characterized in that it is included.
제1항에 있어서,
상기 안착단계(S200) 및 제2연결단계(S500)에서 블록(10)으로 하여금 보강재의 중단을 고정하는 것은, 블록(10)에 형성된 인입홈(11)으로 보강재(20)의 중단을 인입하여 이루어짐을 특징으로 하는 옹벽용 보강재의 고정방법.
The method of claim 1,
Fixing the interruption of the reinforcement by the block 10 in the seating step (S200) and the second connection step (S500), by pulling the interruption of the reinforcement 20 into the inlet groove 11 formed in the block 10 Fixing method for the retaining wall reinforcement, characterized in that made.
제1항에 있어서,
상기 안착단계(S200) 및 제2연결단계(S500)에서 블록(10)으로 하여금 보강재(20)의 중단을 고정하는 것은, 블록(10)에 형성된 수용홈(13)으로 고정판(40)을 고정시키고 상기 블록(10)의 수용홈(13)에 고정된 고정판(40)에 형성된 인입돌기(41)에 보강재(20) 중단의 메쉬를 수용시킨 후 메쉬에 수용되어 돌출된 인입돌기(41)를 고정캡(50)의 끼움공(51)에 끼움시켜 이루어짐을 특징으로 하는 옹벽용 보강재의 고정방법.
The method of claim 1,
Fixing the interruption of the reinforcement 20 by the block 10 in the seating step (S200) and the second connection step (S500), the fixing plate 40 is fixed to the receiving groove 13 formed in the block 10 After receiving the mesh of the reinforcing material 20 suspended in the inlet projection 41 formed in the fixed plate 40 fixed to the receiving groove 13 of the block 10 and received the projection projection 41 is received in the mesh Fixing method for the retaining wall reinforcement, characterized in that made by fitting to the fitting hole (51) of the fixing cap (50).
제1항 또는 제3항 중 어느 한 항에 있어서,
상기 제2연결단계(S500)가 완료된 블록(10) 옆으로 상, 하로 구분되게 연장된 보강재(20)의 메쉬에 별도의 고정보강재(30)를 반원형태로 연장되게 고정보강재(30) 양단부의 메쉬를 각각 수직선상으로 일치시킨 후 고정판(40) 및 고정캡(50)을 이용하여 블록(10) 옆으로 상, 하로 구분되게 연장된 보강재(20) 부위와 별도의 고정보강재(30)를 연결하는 제3연결단계(S600);
가 포함됨을 특징으로 하는 옹벽용 보강재의 고정방법.
4. The method according to any one of claims 1 to 3,
Both ends of the high information steel (30) to extend the semi-circular form of a separate high information steel 30 to the mesh of the reinforcement 20 is divided into the upper and lower sides next to the block 10, the second connection step (S500) is completed After matching the mesh in a vertical line, respectively, using the fixing plate 40 and the fixing cap 50 to connect the portion of the reinforcing material 20 extended to be divided into the upper and lower sides next to the block 10 and a separate high information steel 30 A third connection step S600;
Method of fixing the retaining wall reinforcement, characterized in that it is included.
KR1020120079859A 2012-07-23 2012-07-23 Structure of reinforced for retainaing wall KR101356816B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020120079859A KR101356816B1 (en) 2012-07-23 2012-07-23 Structure of reinforced for retainaing wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020120079859A KR101356816B1 (en) 2012-07-23 2012-07-23 Structure of reinforced for retainaing wall

Publications (1)

Publication Number Publication Date
KR101356816B1 true KR101356816B1 (en) 2014-01-29

Family

ID=50146641

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020120079859A KR101356816B1 (en) 2012-07-23 2012-07-23 Structure of reinforced for retainaing wall

Country Status (1)

Country Link
KR (1) KR101356816B1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR102249603B1 (en) 2020-10-28 2021-05-10 주식회사 삼화켐 Retaining wall construction method

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07310323A (en) * 1994-05-19 1995-11-28 Ohbayashi Corp Joining structure of reinforcing material for filling and joining method thereof
JP2000027191A (en) * 1998-07-06 2000-01-25 Taiyo Kogyo Kk Joint structure of ground reinforcing grid material
KR100426345B1 (en) * 2000-12-12 2004-04-08 공학봉 Geogrid
KR100981913B1 (en) * 2010-01-29 2010-09-13 일양산업 주식회사 Rib using geogrid joint binding method

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07310323A (en) * 1994-05-19 1995-11-28 Ohbayashi Corp Joining structure of reinforcing material for filling and joining method thereof
JP2000027191A (en) * 1998-07-06 2000-01-25 Taiyo Kogyo Kk Joint structure of ground reinforcing grid material
KR100426345B1 (en) * 2000-12-12 2004-04-08 공학봉 Geogrid
KR100981913B1 (en) * 2010-01-29 2010-09-13 일양산업 주식회사 Rib using geogrid joint binding method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR102249603B1 (en) 2020-10-28 2021-05-10 주식회사 삼화켐 Retaining wall construction method

Similar Documents

Publication Publication Date Title
KR101640795B1 (en) Furlable earth retaining structure for provisional facilities and construction method thereof
KR101023660B1 (en) Retaining Wall using Anchor and Concrete Panel and its Construction Method
KR101590032B1 (en) Column wall using pile and structure construction method therewith
KR101378793B1 (en) Retaining wall system for planting and the construction method
KR101103142B1 (en) Retaining wall structure and construction method of the retaining wall structure
KR100870150B1 (en) A multi-function block for retaining wall and constructing method using the same
KR101077949B1 (en) Block for reinforcement and construction method
KR101219570B1 (en) Plantable retaining wall block laying structureusing the block
KR101126666B1 (en) Vertical drain induction type retaining wall reinforced by nailing
KR100665022B1 (en) The breast wall-block and connecting instrument
KR102127377B1 (en) Construction Method of Reinforced Earth Retaining Wall
KR101356816B1 (en) Structure of reinforced for retainaing wall
KR101007566B1 (en) Structure of reinforcing cut-slope using nailing and anchoring device and the method of constructing the same
KR101390683B1 (en) Retaining wall using precast concrete panel and construction method of the same
KR101325826B1 (en) Structure of reinforced for retainaing wall
KR101552065B1 (en) Apparatus for connecting block with stiffener in retaining wall
KR101238016B1 (en) Construction method of retaing wall block
KR101218722B1 (en) Anchor nut for connecting reinforcing strip of slope wall
US20160289952A1 (en) Bridge System For Multi-Stage Walls
KR101175122B1 (en) Structure of reinforced for retaining wall and method for manufacturing of method install reinforced for retaining wall
KR101024064B1 (en) The block construction method for inclined cut embankment
KR101527703B1 (en) Revetment Block and Installation Method Thereof
KR101434594B1 (en) Retaining wall frame and construction method of retaining wall
KR100745010B1 (en) Ferroconcrete breast wall
KR102652914B1 (en) Reinforced soil retaining wall block fixing device

Legal Events

Date Code Title Description
A201 Request for examination
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20161110

Year of fee payment: 4

FPAY Annual fee payment

Payment date: 20180908

Year of fee payment: 5

R401 Registration of restoration
FPAY Annual fee payment

Payment date: 20190102

Year of fee payment: 6