KR101354783B1 - Method of check for electronic delayed self-destruct fuse of submunition - Google Patents

Method of check for electronic delayed self-destruct fuse of submunition Download PDF

Info

Publication number
KR101354783B1
KR101354783B1 KR1020130113528A KR20130113528A KR101354783B1 KR 101354783 B1 KR101354783 B1 KR 101354783B1 KR 1020130113528 A KR1020130113528 A KR 1020130113528A KR 20130113528 A KR20130113528 A KR 20130113528A KR 101354783 B1 KR101354783 B1 KR 101354783B1
Authority
KR
South Korea
Prior art keywords
self
control unit
fuse
test
mode
Prior art date
Application number
KR1020130113528A
Other languages
Korean (ko)
Inventor
구자춘
Original Assignee
주식회사 한화
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 주식회사 한화 filed Critical 주식회사 한화
Priority to KR1020130113528A priority Critical patent/KR101354783B1/en
Application granted granted Critical
Publication of KR101354783B1 publication Critical patent/KR101354783B1/en

Links

Images

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F42AMMUNITION; BLASTING
    • F42CAMMUNITION FUZES; ARMING OR SAFETY MEANS THEREFOR
    • F42C21/00Checking fuzes; Testing fuzes
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F42AMMUNITION; BLASTING
    • F42CAMMUNITION FUZES; ARMING OR SAFETY MEANS THEREFOR
    • F42C19/00Details of fuzes
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F42AMMUNITION; BLASTING
    • F42CAMMUNITION FUZES; ARMING OR SAFETY MEANS THEREFOR
    • F42C9/00Time fuzes; Combined time and percussion or pressure-actuated fuzes; Fuzes for timed self-destruction of ammunition
    • F42C9/14Double fuzes; Multiple fuzes
    • F42C9/16Double fuzes; Multiple fuzes for self-destruction of ammunition

Abstract

The present invention relates to a method for inspecting an electronic self-destruct fuse for a submunition and, more specifically, to a method for inspecting an electronic self-destruct fuse for a submuntion which can allow a self-destruct fuse to operate after a shorter delay time than a delay time in a normal mode by switching a control unit into a test mode when the operation of the self-destruct fuse is inspected by the control unit by selecting a mode of the control unit controlling the electronic self-destruct fuse among a test mode and a normal mode, thereby shortening a time for inspecting a self-destruct fuse. In order to achieve this, the method for inspecting an electronic self-destructive fuse for a submunition comprises the following steps of: a) selecting a test mode as a mode of a control unit controlling an electronic self-destruct fuse; b) operating the self-destruct fuse by the control unit which is in a test mode by inputting a ground signal to the control unit, wherein the self-destruct fuse is set to operate when a predetermined test delay time passes since the ground signal has been inputted; and c) selecting a normal mode as a mode of the control unit if the self-destruct fuse normally operates after the predetermined time passes in the step b). [Reference numerals] (AA) Start; (BB) End; (S100) Switch a control unit into a test mode; (S200) Operate a self-destruct fuse after a test delay time; (S300) Switch the control unit into a normal mode

Description

자탄용 전자식 자폭신관을 검사하는 방법{METHOD OF CHECK FOR ELECTRONIC DELAYED SELF-DESTRUCT FUSE OF SUBMUNITION}METHOD OF CHECK FOR ELECTRONIC DELAYED SELF-DESTRUCT FUSE OF SUBMUNITION}

본 발명은 자탄용 전자식 자폭신관을 검사하는 방법에 관한 것으로, 보다 상세하게는, 전자식 자폭신관을 제어하는 제어부를 시험모드 및 정상모드 중 하나로 선택할 수 있어서 상기 제어부에 의한 자폭신관의 작동 여부를 검사하는 공정에서 상기 제어부를 시험모드로 전환하여 정상모드 보다 더 짧은 지연시간 경과 후 자폭신관이 작동하도록 할 수 있어 자폭신관의 검사에 소요되는 시간을 단축하는 자탄용 전자식 자폭신관에 관한 것이다.The present invention relates to a method for inspecting an electronic self-explosion fuse for bombs, and more particularly, a control unit for controlling the electronic self-explosion fuse can be selected from a test mode and a normal mode to check whether the self-explosion pipe is operated by the control unit. In the process of switching to the control mode to the test mode, the self-explosion fuse for bullet bombs that can reduce the time required for the self-explosion fuse after the delay time elapses than the normal mode.

일반적으로 자탄은 지상에서 포에 의해 발사되는 탄 또는 로켓 등의 이송체를 통해 이송된 후 공중에서 방출되어 지상으로 낙하된다.In general, bullets are transported through a vehicle such as a bullet or a rocket that is fired by an artillery on the ground and then released from the air to fall to the ground.

이때, 상기 이송체는 회전될 수도 있고 회전되지 않을 수도 있다. 이러한 통상의 자탄은 그 내부에 탄체를 폭발시키기 위한 고폭화약이 충전되어 있고, 그 하부에는 장갑차나 탱크 등의 장갑을 관통하기 위한 관통자가 장착되어 있어, 탄체 폭발에 따른 파편에 의한 인마 살상과 관통자에 의한 장갑 관통 등과 같은 이중목적으로 사용되고 있다.At this time, the conveying body may or may not be rotated. Such ordinary bullets are filled with high explosives to explode the carcass inside, and a lower part is equipped with a penetrator for penetrating armor such as an armored car or a tank. It is used for dual purposes such as armor penetration.

이러한 자탄들은 발사된 이송체가 미리 지정된 상공에 도달하여 이송체 내부의 방출장약이 폭발함에 따라 발생된 폭발압력에 의해 대기중으로 방출되면서 지상으로 낙하된다. 이때, 각 자탄들은 방출시 가지고 있던 관성에 의해 사방으로 흩어지면서 낙하되고, 지상에 떨어져 폭발되는 것이다. 이를 위하여 상기 자탄에는 상기 고폭화약을 기폭시키기 위한 신관이 장착되어 있는데, 이러한 신관은 대부분 자탄이 목표물이나 지면 등에 충돌할 때 발생하는 충격력에 의해 폭발이 이루어지는 기계식 신관이다.These bullets fall to the ground as they are released into the atmosphere by the explosion pressure generated as the discharged carrier reaches a predetermined airspace and the discharge charge inside the carrier explodes. At this time, the individual bombs are scattered in all directions by the inertia of the discharge, falling and exploding on the ground. To this end, the fuse is equipped with a fuse for detonating the high explosives, which is mostly a mechanical fuse that is exploded by the impact force generated when the bomb hits a target or the ground.

그런데, 상기한 종래의 자탄은 공중에서 방출된 후 지상의 구조물에 부딪히는 순간에 충분한 충격력을 얻지 못하면 기폭이 이루어지지 않아 폭발되지 못하게 된다. 즉, 자탄이 숲, 눈, 사막, 나무 등과 같은 완충지대에 떨어지게 되는 경우에는 상기 기계적 신관에 충분한 충격력이 가해지지 않게 되므로, 상기 기계식 신관이 작동 불능이 되어 고폭화약을 기폭시킬 수 없게 되는 것이다.However, the above-described conventional jatan is not detonated because it does not get enough impact force at the moment of hitting the ground structure after being released from the air will not be exploded. In other words, when the jatan falls in a buffer zone such as forest, snow, desert, tree, etc., since the impact force is not sufficiently applied to the mechanical fuse, the mechanical fuse becomes inoperable and the high explosives cannot be detonated.

이러한 기폭 불능의 자탄은 공격력의 약화를 초래함은 물론 아군이 해당 지역에서 작전을 진행하는 도중에 폭발하여 물적 피해를 유발하게 된다. 따라서, 대부분의 자탄에는 상기 기계식 신관이 작동하지 않을 경우에 자탄을 자폭시키는 지연신관이 추가로 장착되어 있다. 이러한 지연신관은, 기계식 신관에 화약을 점화시켜서 일정 시간이 경과하면 자폭이 이루어지도록 하는 화공식 지연 자폭신관과, 전원회로와 충전회로 및 타이머를 이용하여 자폭이 이루어지도록 하는 전자식 지연 자폭신관으로 구분되고 있다.This incapacitating bomb will not only cause damage but also explode during friendly operations in the area, causing property damage. Therefore, most of the bullets are additionally equipped with a delayed fuse that self-detonates when the mechanical fuse does not work. This delay fuse is divided into a chemical delay self-explosion fuse that ignites the gunpowder in a mechanical fuse so that a self-destruction occurs after a certain time elapses, and an electronic delay self-explosion fuse that uses a power circuit, a charging circuit, and a timer to self-detonate. It is becoming.

한편, 상기한 자탄의 불발문제를 해결하기 위한 수단으로서, 자탄이 불발되는 것을 방지하고자 하는 기술이 소개된 바 있다. 이는, 화공식지연 자폭신관과 관련한 것으로, 점화화약, 지연화약, 연결화약을 자탄의 방출과정에서 발생하는 회전관성력을 이용한 타격장치(스트라이커)를 통해 순서대로 기폭 시키고 이에 따라 최종적으로 고폭화약을 폭발시켜 자탄을 무력화 시키는 구조로 되어 있다. 그리고, 전자식지연 자폭신관과 관련한 경우에는 전원소자인 리저브 배터리와 전기식 기폭관, 타이머회로, 충전회로, 저항소자, 전자스위치, 풍력감지장치 등을 포함하며, 자탄의 방출 과정에서 발생하는 관성이나 낙하과정에서 발생하는 공기저항에 의해 작동되는 타격장치를 통해 리저브 배터리를 활성화시켜 상기 설명한 부품들로 구성된 인쇄회로기판을 작동시키고 전기식기폭관을 폭발시켜 자탄을 무력화 시키는 구조로 되어 있다.
On the other hand, as a means to solve the problem of incidence of the above-described chattan, a technique for preventing the chattan has been introduced. This is related to chemical delayed self-expanding fuses, which explode the ignition gunpowder, delayed gunpowder, and connecting gunpowder in sequence through the strike device (striker) using the rotational inertia force generated during the release of the shot. It is structured to neutralize chatan. In addition, in the case of an electronic delayed self-expanding tube, it includes a reserve battery which is a power element, an electric detonating tube, a timer circuit, a charging circuit, a resistance element, an electronic switch, a wind sensing device, and the like. It activates the reserve battery through the striking device operated by the air resistance generated in the process to operate the printed circuit board composed of the above-described components and explode the electric explosion tube to disable the bullet.

이와 관련한 선행기술로, 국내등록특허공보 제0306357호(유탄의 자폭장치, 2001.08.08. 등록)가 있다.As a related art in this regard, Korean Patent Publication No. 0306357 (the grenade self-destructing device, registered on August 8, 2001).

본 발명은, 자폭신관의 신뢰성 검사 수행시 상기 자폭신관을 작동시키는 제어부를 시험모드로 전환하여 상기 제어부가 자폭신관을 작동시키는 지연시간을 단축함으로써 상기 자폭신관의 신뢰성 검사에 소요되는 시간을 현저히 단축할 수 있는 자탄용 전자식 자폭신관을 검사하는 방법을 제공하는데 목적이 있다.The present invention significantly reduces the time required for the reliability test of the self-explosion pipe by reducing the delay time for the control unit to operate the self-explosion pipe by switching the control unit for operating the self-explosion pipe to the test mode when performing the reliability test of the self-explosion pipe. It is an object of the present invention to provide a method of inspecting an electronic self-explosion fuse for bullets.

본 발명의 다른 목적은, 상기 제어부의 설정을 시험모드 또는 정상모드로 전환하는 시험단자에 점퍼를 연결하면 시험모드로 전환되고, 점퍼를 분리하면 정상모드로 전환되도록 함으로써 상기 제어부가 정상모드로 작동하는 데 있어서 발생할 수 있는 상기 점퍼에 의한 문제를 최소화 하는데 있다.Another object of the present invention, by connecting the jumper to the test terminal for changing the setting of the control unit to the test mode or the normal mode is switched to the test mode, when the jumper is removed to operate the control unit in the normal mode To minimize the problems caused by the jumper.

상기와 같은 과제를 해결하기 위하여,In order to solve the above problems,

본 발명은, 자탄용 전자식 자폭신관을 검사하는 방법에 있어서,The present invention is a method for inspecting an electronic self-expanding tube for bullet bombs,

a) 상기 자폭신관의 작동을 제어하는 제어부의 설정을 시험모드로 선택하는 단계와, b) 상기 제어부에 그라운드 신호를 입력하여 시험모드로 설정된 상기 제어부가 상기 자폭신관을 작동시키도록 하되, 상기 그라운드 신호가 입력된 시간으로부터 기설정된 시험지연시간 동안 지연된 후에 상기 자폭신관이 작동되도록 하는 단계 및 c) 상기 b) 단계에서 상기 자폭신관이 설정시간 동안 지연된 후에 정상작동된 경우 상기 제어부의 설정을 정상모드로 선택하는 단계를 포함한다.a) selecting a setting of a control unit for controlling the operation of the self-expanding fuse as a test mode, and b) inputting a ground signal to the control unit so that the control unit set to the test mode operates the self-expanding fuse, wherein the ground The self-expansion tube is operated after a signal is delayed for a predetermined test delay time from the input time; and c) if the self-expansion tube is normally operated after being delayed for a set time in step b), the controller sets the normal mode. The step of selecting.

상기 a) 단계는, 상기 제어부에 설정을 전환하는 시험단자를 구비하는 제1과정과, 상기 시험단자에 점퍼를 연결하여 상기 시험단자의 회로를 닫힌 상태가 되도록 하는 제2과정 및 상기 시험단자의 회로가 닫히면 상기 제어부가 시험모드로 전환되도록 하는 제3과정으로 이루어진다.In the step a), the first process includes a test terminal for changing a setting of the control unit, a second process for connecting a jumper to the test terminal to close the circuit of the test terminal, and the test terminal. When the circuit is closed, a third process is performed in which the control unit is switched to the test mode.

상기 b) 단계의 시험지연시간은, 정상모드인 상기 제어부에 그라운드 신호가 입력되었을 때 그라운드 신호가 입력된 시간으로부터 기설정된 일정시간 동안 지연된 후에 상기 자폭신관이 작동하는 정상지연시간보다 더 짧게 설정된다.The test delay time of step b) is set to be shorter than the normal delay time when the self-expanding fuse is operated after the ground signal is delayed for a predetermined time from the time when the ground signal is input to the controller in the normal mode. .

상기 b) 단계의 시험지연시간은, 1 내지 3초인 것을 특징으로 한다.The test delay time of step b) is characterized in that 1 to 3 seconds.

상기 c) 단계는, 상기 제어부의 시험단자에 연결된 상기 점퍼를 분리하여 상기 시험단자의 회로가 열린 상태가 되도록 하는 제ⅰ과정과, 상기 시험단자의 회로가 열리면 상기 제어부가 정상모드로 전환되도록 하는 제ⅱ과정으로 이루어진다.In step c), the step of removing the jumper connected to the test terminal of the control unit to open the circuit of the test terminal, and when the circuit of the test terminal is opened, the control unit is switched to the normal mode The second step is made.

상기와 같은 과제의 해결 수단에 의하여,According to the solution of the above problems,

본 발명은, 상기 자폭신관의 신뢰성 검사에 소요되는 시간을 현저히 단축할 수 있는 효과가 있다.The present invention has an effect that can significantly shorten the time required for the reliability test of the self-explosion fuse.

그리고, 상기 제어부의 설정을 시험모드 또는 정상모드로 전환하는 시험단자에 점퍼를 연결하면 시험모드로 전환되고, 점퍼를 분리하면 정상모드로 전환되도록 함으로써 상기 제어부가 정상모드로 작동하는 데 있어서 발생할 수 있는 상기 점퍼에 의한 문제를 최소화 하는 효과도 있다.In addition, when a jumper is connected to a test terminal for changing the setting of the control unit to the test mode or the normal mode, the control unit switches to the test mode, and when the jumper is disconnected, the control unit is switched to the normal mode. There is also an effect to minimize the problems caused by the jumper.

도 1은, 본 발명에 따른 자탄용 전자식 자폭신관을 검사하는 방법을 도시한 순서도.
도 2는, 제어부를 시험모드로 전환하는 과정을 도시한 도면.
도 3은, 제어부를 정상모드로 전환하는 과정을 도시한 도면.
1 is a flow chart illustrating a method for inspecting an electronic self explosive fuse for a bullet in accordance with the present invention.
2 is a diagram illustrating a process of switching a control unit to a test mode.
3 is a diagram illustrating a process of switching a control unit to a normal mode.

본 발명을 첨부된 도면을 참조하여 상세히 설명하면 다음과 같다.The present invention will now be described in detail with reference to the accompanying drawings.

여기서, 반복되는 설명과 본 발명의 요지를 불필요하게 흐릴 수 있는 공지 기능 및 구성에 대한 상세한 설명은 생략한다.Hereinafter, a detailed description of known functions and configurations that may unnecessarily obscure the subject matter of the present invention will be omitted.

그리고 본 발명의 실시형태는 당 업계에서 평균적인 지식을 가진 자에게 본 발명을 보다 완전하게 설명하기 위해 제공되는 것이다.And embodiments of the present invention are provided to more fully describe the present invention to those skilled in the art.

따라서, 도면에서의 요소들의 형상 및 크기 등은 보다 명확한 설명을 위해 과장될 수 있다.
Accordingly, the shapes and sizes of the elements in the drawings and the like can be exaggerated for clarity.

본 발명은 자탄용 전자식 자폭신관의 생산공정 중에서 상기 자폭신관이 정상적으로 작동하는지에 대한 검사를 실시하는 공정에 관한 것으로서, 통상적으로 상기 자폭신관은, 상기 자탄이 비행탄체로부터 분리된 이후 일정시간이 경과하면 제어부에 의해 상기 자폭신관이 작동도록 설정되어 있다.The present invention relates to a process for inspecting whether or not the self-explosion fuse is operating normally in the production process of the electronic self-explosion fuse for bombs, typically the self-explosion tubes, a predetermined time has elapsed after the chattan is separated from the flying bullet body The control unit is set to operate the self-expanding tube.

상기 제어부에 의해 상기 자폭신관이 작동하기까지의 지연시간은 통상적으로 60초 전후로 설정되어 있어 상기 자폭신관이 정상적으로 작동하는지 검사를 하기 위해서는 1개의 자폭신관 당 최소 60초의 시간이 소요된다.The delay time until the self-explosion fuse is operated by the control unit is typically set to about 60 seconds, so that at least 60 seconds are required for each self-explosion fuse to check whether the self-explosion fuse is normally operated.

본 발명은 상기 자폭신관의 정상작동 여부에 대한 검사를 실시하는데 소요되는 시간을 단축하는데 주요 기술적 특징이 있다.
The present invention has a major technical feature to shorten the time required to perform a test for the normal operation of the self-explosion fuse.

도 1은, 본 발명에 따른 자탄용 전자식 자폭신관을 검사하는 방법을 도시한 순서도이고, 도 2는, 제어부를 시험모드로 전환하는 과정을 도시한 도면이며, 도 3은, 제어부를 정상모드로 전환하는 과정을 도시한 도면이다.1 is a flowchart illustrating a method for inspecting an electronic bomb blast fuse for bullets according to the present invention, FIG. 2 is a diagram illustrating a process of switching a control unit to a test mode, and FIG. 3 is a diagram illustrating a control unit in a normal mode. A diagram illustrating a process of switching.

도 1을 참조하여 본 발명에 따른 자탄용 전자식 자폭신관을 검사하는 방법을 설명하면, a) 상기 자폭신관의 작동을 제어하는 제어부의 설정을 시험모드로 선택하는 단계(S100)와, b) 상기 제어부에 그라운드 신호를 입력하여 시험모드로 설정된 상기 제어부가 상기 자폭신관을 작동시키도록 하되, 상기 그라운드 신호가 입력된 시간으로부터 기설정된 시험지연시간 동안 지연된 후에 상기 자폭신관이 작동되도록 하는 단계(S200) 및 c) 상기 b) 단계(S200)에서 상기 자폭신관이 설정시간 동안 지연된 후에 정상작동된 경우 상기 제어부의 설정을 정상모드로 선택하는 단계(S300)를 포함한다.Referring to Figure 1 describes a method for inspecting the electronic bomb explosion bomb for the bullet according to the present invention, a) selecting the setting of the control unit for controlling the operation of the self-expanding pipe in the test mode (S100), and b) the Inputting a ground signal to a control unit to allow the control unit set to the test mode to operate the self-expanding pipe, and to operate the self-expanding pipe after being delayed for a predetermined test delay time from the time at which the ground signal is input (S200). And c) selecting the setting of the controller to the normal mode when the self-expanding fuse is normally operated after a delay for a set time in step S200 (S300).

상기 a) 단계(S100)는, 자폭신관을 생산하는 과정 중 상기 자폭신관이 정상적으로 작동하는지 보다 신속히 검사를 수행하기 위하여 상기 자폭신관이 작동하기까지의 지연시간이 정상지연시간보다 단축되도록 설정하는 단계이다.The a) step (S100), the step of setting the delay time until the operation of the self-explosion pipe is shorter than the normal delay time to perform a more rapid test whether the self-explosion pipe during the process of producing the self-explosion fuse to be.

이를 위하여, 상기 a) 단계(S100)는 도 2에 도시된 바와 같이, 상기 자폭신관을 작동시킬 수 있는 상기 제어부에 설정을 전환하는 시험단자를 구비하는 제1과(S110)정과, 상기 시험단자에 점퍼를 연결하여 상기 시험단자의 회로를 닫힌 상태가 되도록 하는 제2과정(S120) 및 상기 시험단자의 회로가 닫히면 상기 제어부가 시험모드로 전환되도록 하는 제3과정(S130)으로 이루어진다.To this end, step a) (S100) is as shown in Figure 2, the first terminal (S110) and the test terminal having a test terminal for changing the setting in the control unit capable of operating the self-expanding tube, and the test terminal A second process (S120) for connecting the jumper to the circuit of the test terminal to the closed state and a third process (S130) for switching the control unit to the test mode when the circuit of the test terminal is closed.

본 발명에 따른 상기 제어부에는 상기 자폭신관의 지연시간을 단축하도록 설정할 수 있는 상기 시험단자가 구비되며, 상기 시험단자에 상기 점퍼를 연결하면 상기 시험단자의 회로가 닫힌상태가 되고, 이로써 상기 제어부는 시험모드로 설정이 전환되어 상기 자폭신관을 시험모드로 제어할 수 있게 된다.The control unit according to the present invention is provided with the test terminal which can be set to shorten the delay time of the self-expanding tube, and when the jumper is connected to the test terminal, the circuit of the test terminal is closed, whereby the control unit The setting is switched to the test mode so that the self-expanding tube can be controlled in the test mode.

이후, 상기 b) 단계(S200)에서 상기 제어부에 그라운드 신호, 즉 상기 제어부로 하여금 상기 자폭신관을 작동시키도록 하는 신호를 입력하면 상기 제어부가 자폭신관을 작동시키게 되며, 이 때 상기 자폭신관은 상기 제어부에 의해 일정시간이 경과된 후에 작동(S200)하도록 제어된다.Subsequently, when b) in step S200, a ground signal is input to the control unit, that is, a signal for causing the control unit to operate the self-expanding fuse, the control unit operates the self-expanding fuse. The controller is controlled to operate (S200) after a predetermined time has elapsed.

여기에서 상기 일정시간은, 상기 제어부에 기설정된 시간으로써, 상기 자폭신관이 즉시 작동되지 않고 일정시간이 경과된 후에 작동되도록 하는 지연시간을 말한다.Here, the predetermined time is a time preset to the control unit, and refers to a delay time for operating the self-expanding fuse after a predetermined time has elapsed.

본 발명에서는 상기 제어부가 시험모드로 설정된 상태에서 자폭신관을 제어하게 되면 상기 제어부에 기설정된 지연시간, 즉 시험지연시간이 경과된 후에 자폭신관이 작동하게 된다.In the present invention, when the control unit is controlled to the self-explosion fuse in the state set to the test mode, the self-explosion fuse is operated after the delay time, that is, the test delay time set in the control unit.

특히, 상기 시험지연시간은 상기 제어부가 정상모드로 설정된 경우 상기 그라운드 신호가 입력되었을 때 그라운드 신호가 입력된 시간으로부터 기설정된 일정시간 동안 지연된 후에 상기 자폭신관이 작동하는 정상지연시간보다 더 짧게 설정된다.In particular, when the control unit is set to the normal mode, the test delay time is set to be shorter than the normal delay time when the self explosive fuse is operated after the ground signal is delayed for a predetermined time from the time when the ground signal is input. .

본 발명에서 상기 시험지연시간은 1 내지 3초로써, 본 발명의 바람직한 일실시예로, 상기 정상지연시간은 60초로 설정되어 상기 자탄을 실전에서 사용시에는 비행탄체로부터 분리되면 60초 경과후 상기 자폭신관이 작동하도록 하고, 상기 시험지연시간은 1초로 설정되어 상기 자폭신관을 시험하는 공정에서 1초 경과후 상기 자폭신관이 작동하는지에 대한 검사를 수행함으로써 상기 자폭신관의 품질검사를 수행하는데 소요되는 공정시간을 현저히 단축할 수 있다.
In the present invention, the test delay time is 1 to 3 seconds, and in one preferred embodiment of the present invention, the normal delay time is set to 60 seconds and when the bullet is separated from the flying carcass when used in practice, the self-destruction 60 seconds later. The fuse is operated, and the test delay time is set to 1 second, which is required to perform the quality test of the detonation fuse by performing a test on whether the detonation fuse is operated after 1 second in the process of testing the detonation fuse. Process time can be significantly shortened.

상기 c) 단계(S300)는, 상기 자폭신관이 설정시간 동안 정상적으로 지연된 후에 작동하는지 검사를 수행한 후에 상기 자폭신관을 자탄에 탑재하기에 앞서 정상지연시간 후에 자폭신관이 작동하도록 상기 제어부를 다시 정상모드로 전환시키는 단계이다.C) in step S300, the control unit is returned to normal operation so that the self-expanding pipe is operated after the normal delay time before the self-expanding pipe is mounted in the shell after performing the test whether the self-expanding pipe is normally delayed for a predetermined time. This step is to switch to the mode.

이를 위하여 상기 c) 단계(S300)는 도 3에 도시된 바와 같이, 상기 a) 단계(S100)의 제2과정(S120)에서 상기 제어부의 시험단자에 연결하였던 상기 점퍼를 분리함으로써 상기 시험단자의 회로가 열린 상태가 되도록 하는 제ⅰ과정(S310)과, 상기 제ⅰ과정(S310)에 의해 상기 제어부가 정상모드로 전환되는 제ⅱ과정(S320)으로 이루어진다.
To this end, c) step S300 is performed by removing the jumper connected to the test terminal of the controller in the second step S120 of step S100, as shown in FIG. 3. A process S310 for allowing the circuit to be in an open state is performed, and a process SII in which the controller is switched to the normal mode by the process S310.

본 발명에서는 상기 시험단자에 상기 점퍼가 연결(S120)되면 상기 제어부가 시험모드로 전환(S130)되고, 상기 시험단자에서 상기 점퍼를 분리(S310)하면 상기 제어부가 정상모드로 전환(S320)되도록 하는 것이 바람직하다.In the present invention, when the jumper is connected to the test terminal (S120), the control unit switches to the test mode (S130), and when the jumper is removed from the test terminal (S310), the control unit switches to the normal mode (S320). It is desirable to.

이에 따라, 상기 자폭신관을 검사하는데 소요되는 시간을 단축하기 위하여 상기 시험단자에 점퍼를 연결하되, 상기 점퍼에 의하여 상기 제어부와 자폭신관이 정상작동하는데 있어서 영향을 받으면 안전사고의 우려가 있으므로, 상기 시험단자에서 점퍼를 분리했을 때 상기 시험단자회로가 닫히는 가능성 보다 상기 점퍼를 시험단자에 연결했을 때 상기 점퍼의 접촉불량이나 납땜불량 등으로 인하여 상기 시험단자회로가 닫히지 않을 가능성이 조금이라도 더 높음으로 상술한 바와 같이 점퍼 연결시 시험모드, 점퍼 분리시 정상모드로 전환되도록 하는 것이 안정상 더 바람직하게 된다.
Accordingly, a jumper is connected to the test terminal in order to shorten the time required to inspect the self-explosion pipe, but if the control unit and the self-explosion pipe are affected by the normal operation by the jumper, there is a risk of a safety accident. When the jumper is connected to the test terminal when the jumper is disconnected from the test terminal, it is more likely that the test terminal circuit is not closed due to poor contact or poor soldering of the jumper. As described above, it is more preferable to stably change the test mode when the jumper is connected and the normal mode when the jumper is disconnected.

상술한 바와 같이, 본 발명에 따른 자탄용 전자식 자폭신관을 검사하는 방법을 이용함으로써, 상기 자폭신관이 정상적으로 작동하는지에 대한 품질검사를 수행하는데 소요되는 검사시간을 현저히 단축할 수 있게 된다.As described above, by using the method for inspecting the electronic bomb blast fuse for the bullet in accordance with the present invention, it is possible to significantly reduce the inspection time required to perform a quality test for the normal operation of the blast bomb fuse.

이에 따라, 공정효율 및 자탄의 생산속도를 향상할 수 있는 효과가 있다.
Accordingly, there is an effect that can improve the process efficiency and the production speed of the charcoal.

이상 본 발명의 특정 실시예를 도시하고 설명하였으나, 본 발명의 기술사상은 첨부된 도면과 상기한 설명내용에 한정하지 않으며 본 발명의 사상을 벗어나지 않는 범위 내에서 다양한 형태의 변형이 가능함은 이 분야의 통상의 지식을 가진 자에게는 자명한 사실이며, 이러한 형태의 변형은 본 발명의 정신에 위배되지 않는 범위 내에서 본 발명의 특허청구범위에 속한다고 볼 것이다.While the present invention has been particularly shown and described with reference to exemplary embodiments thereof, it is to be understood that the invention is not limited to the disclosed exemplary embodiments, It will be understood by those skilled in the art that various changes in form and details may be made therein without departing from the spirit and scope of the invention as defined by the appended claims.

Claims (5)

자탄용 전자식 자폭신관을 검사하는 방법에 있어서,
a) 상기 자폭신관의 작동을 제어하는 제어부의 설정을 시험모드로 선택하는 단계;
b) 상기 제어부에 그라운드 신호를 입력하여 시험모드로 설정된 상기 제어부가 상기 자폭신관을 작동시키도록 하되, 상기 그라운드 신호가 입력된 시간으로부터 기설정된 시험지연시간 동안 지연된 후에 상기 자폭신관이 작동되도록 하는 단계; 및
c) 상기 b) 단계에서 상기 자폭신관이 설정시간 동안 지연된 후에 정상작동된 경우 상기 제어부의 설정을 정상모드로 선택하는 단계;를 포함하는 것을 특징으로 하는 자탄용 전자식 자폭신관을 검사하는 방법.
In the method of inspecting the electronic self-explosion fuse for bullets,
a) selecting a setting of a control unit for controlling the operation of the self-expanding tube as a test mode;
b) inputting a ground signal to the control unit so that the control unit set to the test mode operates the self-expanding pipe, and the self-expanding pipe is operated after the ground signal is delayed for a predetermined test delay time from the input time. ; And
c) selecting the setting of the control unit in the normal mode when the self-explosion fuse is delayed for a set time in step b).
청구항 1에 있어서,
상기 a) 단계는,
상기 제어부에 설정을 전환하는 시험단자를 구비하는 제1과정;
상기 시험단자에 점퍼를 연결하여 상기 시험단자의 회로를 닫힌 상태가 되도록 하는 제2과정; 및
상기 시험단자의 회로가 닫히면 상기 제어부가 시험모드로 전환되도록 하는 제3과정;으로 이루어지는 것을 특징으로 하는 자탄용 전자식 자폭신관을 검사하는 방법.
The method according to claim 1,
The step a)
A first step of including a test terminal for switching settings in the control unit;
Connecting a jumper to the test terminal to close the circuit of the test terminal; And
And a third step of causing the control unit to switch to the test mode when the circuit of the test terminal is closed.
청구항 1에 있어서,
상기 b) 단계의 시험지연시간은,
정상모드인 상기 제어부에 그라운드 신호가 입력되었을 때 그라운드 신호가 입력된 시간으로부터 기설정된 일정시간 동안 지연된 후에 상기 자폭신관이 작동하는 정상지연시간보다 더 짧게 설정되는 것을 특징으로 하는 자탄용 전자식 자폭신관을 검사하는 방법.
The method according to claim 1,
The test delay time of step b) is,
When the ground signal is input to the control unit in the normal mode, the electronic self-explosion fuse for bullets characterized in that it is set shorter than the normal delay time that the self-explosion fuse is operated after a predetermined time delay from the time the ground signal is input. How to check.
청구항 3에 있어서,
상기 b) 단계의 시험지연시간은,
1 내지 3초인 것을 특징으로 하는 자탄용 전자식 자폭신관을 검사하는 방법.
The method according to claim 3,
The test delay time of step b) is,
Method for testing an electronic self-explosion fuse for bullets, characterized in that 1 to 3 seconds.
청구항 2에 있어서,
상기 c) 단계는,
상기 제어부의 시험단자에 연결된 상기 점퍼를 분리하여 상기 시험단자의 회로가 열린 상태가 되도록 하는 제ⅰ과정; 및
상기 시험단자의 회로가 열리면 상기 제어부가 정상모드로 전환되도록 하는 제ⅱ과정;으로 이루어지는 것을 특징으로 하는 자탄용 전자식 자폭신관을 검사하는 방법.
The method according to claim 2,
The step c)
Removing the jumper connected to the test terminal of the control unit to open the circuit of the test terminal; And
And a second step of causing the control unit to switch to a normal mode when the circuit of the test terminal is opened.
KR1020130113528A 2013-09-24 2013-09-24 Method of check for electronic delayed self-destruct fuse of submunition KR101354783B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020130113528A KR101354783B1 (en) 2013-09-24 2013-09-24 Method of check for electronic delayed self-destruct fuse of submunition

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020130113528A KR101354783B1 (en) 2013-09-24 2013-09-24 Method of check for electronic delayed self-destruct fuse of submunition

Publications (1)

Publication Number Publication Date
KR101354783B1 true KR101354783B1 (en) 2014-01-23

Family

ID=50146284

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020130113528A KR101354783B1 (en) 2013-09-24 2013-09-24 Method of check for electronic delayed self-destruct fuse of submunition

Country Status (1)

Country Link
KR (1) KR101354783B1 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104180728A (en) * 2014-09-04 2014-12-03 中国兵器工业集团第二一四研究所苏州研发中心 Instruction self-inspection method for improving reliability of electronic time fuse
KR101967553B1 (en) * 2017-11-10 2019-04-09 주식회사 한화 System for checking safety and arming device, Method thereof, and Computer readable storage medium having the same method
CN109633322A (en) * 2018-12-24 2019-04-16 苏州烽燧电子有限公司 Electronic fuse testboard control circuit

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR0148113B1 (en) * 1996-01-20 1998-10-15 김용구 Non-electric detonator testing apparatus
JP2003526074A (en) 2000-03-10 2003-09-02 ダイノ・ノベル・スウエーデン・アー・ベー Electronic detonator system
KR101293801B1 (en) 2013-01-30 2013-08-06 주식회사 한화 Method for counting delay time of electronic detonator

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR0148113B1 (en) * 1996-01-20 1998-10-15 김용구 Non-electric detonator testing apparatus
JP2003526074A (en) 2000-03-10 2003-09-02 ダイノ・ノベル・スウエーデン・アー・ベー Electronic detonator system
KR101293801B1 (en) 2013-01-30 2013-08-06 주식회사 한화 Method for counting delay time of electronic detonator

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104180728A (en) * 2014-09-04 2014-12-03 中国兵器工业集团第二一四研究所苏州研发中心 Instruction self-inspection method for improving reliability of electronic time fuse
KR101967553B1 (en) * 2017-11-10 2019-04-09 주식회사 한화 System for checking safety and arming device, Method thereof, and Computer readable storage medium having the same method
CN109633322A (en) * 2018-12-24 2019-04-16 苏州烽燧电子有限公司 Electronic fuse testboard control circuit
CN109633322B (en) * 2018-12-24 2024-03-01 苏州烽燧电子有限公司 Control circuit of electronic fuze test board

Similar Documents

Publication Publication Date Title
CN109506527B (en) Electromechanical time fuse for antiaircraft gun hail suppression and rain enhancement bomb
KR101078153B1 (en) Self-destruct fuze of submunition
TW200409903A (en) Dual mode fuze
JP2005214619A (en) Detonator for detonation-controlled shell
KR101354783B1 (en) Method of check for electronic delayed self-destruct fuse of submunition
KR20070101675A (en) Fire extinguishing rocket bomb for long distance fire extinguish
RU2540987C1 (en) Fuse for missile projectiles and method of its application
KR20070101676A (en) Grenade for medium distance fire extinguish
US9103643B2 (en) Fuse having self-destruct function and impact resistance
CN112444166A (en) Timing accurate safe and reliable passive digital rain-increasing hail-suppression rocket
KR101331360B1 (en) fuse and method for self-destruct for sub-munition
RU2751328C1 (en) Projectile with a pyrotechnical battle charge
US10845175B2 (en) Electromechanical contact fuse for multipurpose aircraft ammunition
KR101016834B1 (en) Electronic Delayed Self-Destruct Fuse of Submunition
KR101519782B1 (en) Bomblet unit for test that possess withdrawal and blind shell confirmation function
RU2456537C2 (en) Firing mechanism for shells of multiple artillery rocket systems
KR101768823B1 (en) Submunition for Cluster Bomb having the Forced Arming Device for the Slider Assembly
KR100959359B1 (en) Explosive bullet having multiple warhead and multi-directional fuze
RU2309371C2 (en) Fragmentation-bundle, projectile "rtibot"
KR101600990B1 (en) The shock-sensing and unlocking circuits of the safety and arming device for the missile fuze
CN206818072U (en) A kind of rainfall bullet initiator flight recovery test device
RU2363920C1 (en) "vertyazin" splinter-in-beam projectile
RU2768210C1 (en) Incendiary fragmentation ammunition
SE516247C2 (en) Segmented projectile
KR20150077504A (en) Submunition have delayed self-destruct with independent pyrotechnic

Legal Events

Date Code Title Description
A201 Request for examination
A302 Request for accelerated examination
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20170117

Year of fee payment: 6