KR101260798B1 - Device for removing the condense water of deodorization of foul smell in sewage treatmant plant - Google Patents

Device for removing the condense water of deodorization of foul smell in sewage treatmant plant Download PDF

Info

Publication number
KR101260798B1
KR101260798B1 KR1020120055242A KR20120055242A KR101260798B1 KR 101260798 B1 KR101260798 B1 KR 101260798B1 KR 1020120055242 A KR1020120055242 A KR 1020120055242A KR 20120055242 A KR20120055242 A KR 20120055242A KR 101260798 B1 KR101260798 B1 KR 101260798B1
Authority
KR
South Korea
Prior art keywords
base element
valve
condensate
housing
valve seat
Prior art date
Application number
KR1020120055242A
Other languages
Korean (ko)
Inventor
위규백
Original Assignee
(주)태광엔텍
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by (주)태광엔텍 filed Critical (주)태광엔텍
Priority to KR1020120055242A priority Critical patent/KR101260798B1/en
Application granted granted Critical
Publication of KR101260798B1 publication Critical patent/KR101260798B1/en

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01DSEPARATION
    • B01D5/00Condensation of vapours; Recovering volatile solvents by condensation
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01DSEPARATION
    • B01D46/00Filters or filtering processes specially modified for separating dispersed particles from gases or vapours
    • B01D46/42Auxiliary equipment or operation thereof
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01DSEPARATION
    • B01D53/00Separation of gases or vapours; Recovering vapours of volatile solvents from gases; Chemical or biological purification of waste gases, e.g. engine exhaust gases, smoke, fumes, flue gases, aerosols
    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F1/00Treatment of water, waste water, or sewage
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01DSEPARATION
    • B01D2257/00Components to be removed
    • B01D2257/70Organic compounds not provided for in groups B01D2257/00 - B01D2257/602
    • B01D2257/708Volatile organic compounds V.O.C.'s
    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F2303/00Specific treatment goals
    • C02F2303/02Odour removal or prevention of malodour

Landscapes

  • Chemical & Material Sciences (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Engineering & Computer Science (AREA)
  • Analytical Chemistry (AREA)
  • General Chemical & Material Sciences (AREA)
  • Oil, Petroleum & Natural Gas (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Hydrology & Water Resources (AREA)
  • Environmental & Geological Engineering (AREA)
  • Water Supply & Treatment (AREA)
  • Organic Chemistry (AREA)
  • Sink And Installation For Waste Water (AREA)

Abstract

PURPOSE: An automatic draining apparatus of condensed water for an odor prevention facility in a sewage treatment plant is provided to prevent the inflow of external air and a freezing phenomenon in winter, to improve facility performance and product quality by conducting the valve closing operation more stably and firmly. CONSTITUTION: An automatic draining apparatus of condensed water for an odor prevention facility in a sewage treatment plant comprises a base element(20), a cylindrical valve sheet(30), a cylindrical housing(40), a cone-shape valve(50), and a protection component(70). The base element is continuously installed on the end of a drainpipe(12) in a flange coupling type. In the center of the base element, a vertical penetration hole(20a) is equipped. The valve sheet is installed to pass through the penetration hole from the upper part of the base element. A gradient part(32) is on an inner lower side wall of the valve sheet. The housing is continuously installed in the lower part of the base element, and partially contains the lower end of the valve sheet. Sidewalls of the housing are opened. The valve is interlocked between the valve sheet and the housing using a guide rod and a recovery element in a freely ascendable manner.

Description

종말처리장 악취방지설비의 응축수 자동 배수장치{Device for removing the condense water of deodorization of foul smell in sewage treatmant plant}Device for removing the condense water of deodorization of foul smell in sewage treatmant plant}

본 발명은 상ㆍ하수 또는 폐수 등의 종말처리장 악취방지설비에 관한 것으로, 특히 악취방지설비의 탈취관로에서 외부와의 온도차이로 발생하는 응축수를 자동적으로 배수처리시킬 수 있게한 종말처리장 악취방지설비의 응축수 자동 배수장치에 관한 것이다.The present invention relates to an odor prevention facility for terminal treatment plants such as water, sewage or waste water, and particularly, an odor prevention facility for terminal treatment plants capable of automatically draining condensate generated due to a temperature difference from the outside in a deodorization pipe of the odor prevention system. Relates to the automatic drainage of condensate.

생활 오수나 산업 폐수 등의 정화는 여러 단계의 처리, 즉 유기물과의 작용으로 폭기 및 호기성 미생물에 의한 호기성 작용을 거치게 하고, 혐기성 미생물에 의한 혐기성 작용 및 산소가 공급되지 않는 무산소작용 등의 여러 처리조들을 거치게되는 것으로서, 그러한 수 처리장에서는 각종 세균의 작용에 의해 부패와 유해가스로 인한 악취가 발생하고 있는 것이다.Purification of domestic sewage and industrial wastewater is carried out at various stages of treatment, namely, aerobic action by aerobic and aerobic microorganisms through interaction with organic matters, and various treatments such as anaerobic action by anaerobic microorganisms and oxygen-free operation without oxygen supply. As it goes through the tanks, such water treatment plants are causing odors due to decay and harmful gases by the action of various bacteria.

이러한 수 처리장에서는 그 악취처리를 위해 악취방지설비가 부대적으로 시설되고 있는데, 그러한 악취방지설비는 대략 수 처리장에서의 여러 단계 처리조들 각기에서 발생하는 악취를 포집하고, 이렇게 포집된 악취를 각 처리조로부터 탈취관로들을 이용하여 압송해 소정의 장소에 시설되는 탈취장치로 정화시키어 대기로 방출되게 하고 있다.In such a water treatment plant, a malodor prevention facility is additionally provided for the treatment of the malodor. Such a malodor prevention system collects the odor generated from each of the various stage treatment tanks in the water treatment plant and collects the odors thus collected. It is pumped by deodorizing pipes from the treatment tank and purified by a deodorizing device installed at a predetermined place to be released into the atmosphere.

그런데 이러한 수 처리장의 악취방지설비에서 처리조들로부터 포집된 악취의 압송을 안내하는 각 탈취관로들의 배관은 수 처리장의 주위 시설물에 따라 수평 또는 수직배열을 가지게 된다. However, the pipes of the deodorizing pipes that guide the feeding of the odor collected from the treatment tanks in the odor prevention facility of the water treatment plant have a horizontal or vertical arrangement according to the surrounding facilities of the water treatment plant.

이렇게 수평 또는 수직배열을 가지는 탈취관로들은 악취의 압송과정에서 외부와의 온도 차로 그 관로내에 응축수가 필연적으로 발생하게 되어 비교적 낮은 탈취관로 측에서 응축수가 집수되는 현상이 일어나고 있다. The deodorizing pipes having horizontal or vertical arrangements inevitably generate condensate in the pipe due to a temperature difference from the outside during the odor feeding process, so that condensate is collected on a relatively low deodorizing pipe side.

따라서, 상기에서와 같은 악취방지설비의 탈취관로들은 응축수가 집수되는 예상 위치에 적어도 하나 이상의 배수구조들을 구비하여서 응축수가 소정량 집수되면 배수시키게 하고 있는데, 이러한 배수구조는 탈취관로에 배수관을 하향으로 연결하고 그 배수관의 단부에서 수공적인 조작으로 개폐되는 밸브를 이용하여 시설 관리자가 주기적으로 응축수의 배수작업을 이루게 하고 있는 것이다.Therefore, the deodorization pipe passages of the odor prevention equipment as described above are provided with at least one drainage structure at an expected position where the condensate water is collected to drain when a predetermined amount of condensate water is collected. The facility manager periodically drains the condensate by using a valve that is connected and manually opened and closed at the end of the drain.

그러나 이러한 수 처리장 악취방지설비에서의 응축수 배수관리가 용이하지 않은, 즉 악취방지설비의 탈취관로들이 대체적으로 넓은 수 처리장의 전 면적에 걸치어 설치되고 있는 것으로, 그 탈취관로들의 응축수 배수작업을 위한 작업자의 작업동선이 길어지고 따라 응축수의 배수 관리가 용이하지 않았다.However, condensate drainage management in such a water treatment plant odor prevention facility is not easy, that is, the deodorization pipes of the odor prevention facility are generally installed over the entire area of the large water treatment plant. As the worker's working route was longer, condensate drainage was not easy to manage.

그리하여 근래에 와서는 각 탈취관로들 내에서의 응축수가 일정량 집수되면 일 측을 지축으로하여 여닫이식으로 개폐되는 평판형의 차폐판이 관형상의 배수구 단부와 평면적에서 면접촉하는 것으로 폐쇄작용을 이루는 배수장치를 이용해 자동적으로 배수작업을 이루게하고 있으나, 이러한 응축수 자동 배수장치에서는 집수된 응축수의 배출 후 차폐판의 닫힘이 무게추를 이용한 복원력을 이용해 관형상의 배수구 단부 둘레에서 부분적으로 이루어 그 폐쇄상태가 확고하지 못하고 불안정한, 즉 배수구의 단부와 차폐판이 균일하게 면접촉되지 못하고 부분적으로 들뜨는 현상이 일어나고 있는 것이다.Thus, in recent years, when a certain amount of condensate in each deodorizing pipe is collected, a flat shielding plate which is opened and closed on one side with a support axis is in close contact with the tubular drain end in plane contact. In the automatic condensate drainage system, the closure of the shielding plate after the discharge of the collected condensate is partially formed around the end of the tubular drain using the restoring force using the weight. It is unstable and unstable, that is, the end of the drain hole and the shielding plate are not uniformly in contact with the surface and partially lifted up.

이러한 자동 배수장치에서의 불안정한 닫힘은 압송을 이루는 탈취관로 내로 외기의 유입이 발생하게 되어 특히 동절기 관로의 내벽에 결빙현상이 일어나고 있으며, 또 관로의 기밀을 유지하지 못함으로서 압송력이 떨어지게 되어 악취방지설비의 성능을 저하시키는 주 요인이 되고, 또한 상기에서와 같은 설비의 성능 저하는 불필요한 전력소비가 낭비되어 시설운영비가 증가하는 등의 많은 문제점이 따르고 있는 것이다. The unstable closing of the automatic drainage system results in the inflow of outside air into the deodorizing pipe, which forms the pressure, and freezing occurs in the inner wall of the winter pipe, and the pressure of the pipe is lowered by not maintaining the airtightness. It is a major factor to deteriorate the performance of the facility, and also the performance degradation of the facility as described above is accompanied by a number of problems, such as unnecessary power consumption was wasted to increase the operating cost of the facility.

본 발명은 상기에서와 같은 사정을 고려하여 이루어진 것으로, 그 목적은 배수관의 단부에 그 배수관의 길이방향에서 폐쇄를 위한 면적을 가능한 크게 제공하는 구배부를 갖는 관형상의 밸브시트를 배치하고, 측면이 개방된 하우징에 의해 승강 안내되며 탈취관로 내의 압송력에 의한 흡인력으로 밸브시트의 구배부와 넓은 면적으로 접촉되어 확고한 폐쇄를 이루고 배수관 내에서의 집수된 응축수 자중에 의해 개방되는 원추형상의 밸브를 갖춤으로써, 탈취관로 내의 기밀상태가 확고하게 유지되어 외기의 유입을 방지하고, 따라서 동절기 결빙현상 방지와 설비의 성능을 향상시킬 수 있는 종말처리장 악취방지설비의 응축수 자동 배수장치를 제공함에 있다.SUMMARY OF THE INVENTION The present invention has been made in view of the above circumstances, and an object thereof is to arrange a tubular valve seat having a gradient portion at the end of the drain pipe as large as possible to provide an area for closing in the longitudinal direction of the drain pipe. It is guided up and down by the open housing, and it has a conical valve which is opened by the self-condensed weight collected in the drain pipe by making contact with the area of the valve seat with the suction area by the pressure force in the deodorizing pipe to make a large closure. In addition, the airtightness in the deodorization pipe is firmly maintained to prevent the inflow of outside air, and thus to provide the automatic condensate drainage device of the end treatment plant odor prevention equipment to prevent the freezing of winter and improve the performance of the facility.

본 발명의 다른 목적은 원추형상의 밸브에 그 밸브를 탈취관로 내에서의 압송력에 의한 흡인력에 더 하여 배수관 단부 측으로 복귀시키는 복원요소를 갖춤으로써, 밸브의 폐쇄작동이 보다 안정되고 확고한 종말처리장 악취방지설비의 응축수 처리장치를 제공하는 것이다.Another object of the present invention is to provide a conical valve with a restoring element for returning the valve to the end side of the drain pipe in addition to the suction force by the pressure in the deodorizing pipe, whereby the closing operation of the valve is more stable and firm end treatment prevention It is to provide a condensate treatment device of the facility.

이러한 본 발명의 목적은 상ㆍ하수 또는 폐수 등의 종말처리장 악취방지설비의 탈취관로에서 외부와의 온도차이로 발생하는 응축수를 자동적으로 배수처리시킬 수 있게한 종말처리장 악취방지설비의 응축수 자동 배수장치를 제공함에 의해 달성되게 되는데, 이 자동 배수장치는 수 처리장의 여러 단계 처리조들 각기에서 발생하는 악취를 포집하고, 이렇게 포집된 악취를 정화 배출시키기 위해 탈취장치로 압송하는 탈취관로에서 적어도 하나 이상의 배수관들을 구비하여 외기와의 온도차이로 발생하는 응축수를 처리하는 배수장치로써, 배수관의 단부에 플랜지이음식으로 연이어 설치되고, 중앙에는 상하로 통하는 관통공이 구비되는 기저요소와, 기저요소의 상측에서 관통공을 통과하여 설치되고, 하부 내 벽에는 구배부를 가지는 관형상의 밸브시트와 기저요소의 하측에 연이어 설치되어 밸브시트 하단이 부분적으로 수용되고, 측벽이 개방된 관형상의 하우징 및 밸브시트와 하우징 사이에서 자유로이 승강가능하게 개재되어 탈취관로에서의 압송력에 의한 흡인력으로 밸브시트와 관계하며 폐쇄 또는 배수관 내에서 집수되는 응축수의 자중에 의해 개방을 이루는 원추형상의 밸브를 포함하여서, 탈취관로의 기밀성 유지를 보다 안정되고 확고하게 이루게 된다.The object of the present invention is to automatically drain the condensate generated by the temperature difference from the outside in the deodorization pipe of the terminal treatment plant odor prevention equipment, such as water, sewage or waste water, automatic condensate drainage equipment of the terminal treatment plant odor prevention equipment This automatic drainage system collects odor generated in each of the various stage treatment tanks of the water treatment plant, and at least one or more in the deodorization pipe line which is sent to the deodorizer to purify and discharge the collected odors. A drainage device for treating condensate caused by a temperature difference between the outside air and having drainage pipes, the flange of which is installed at the end of the drainage pipe as a series of foods, with a base element provided with a through hole passing up and down in the center, and penetrating from above the base element. When the tubular valve is installed through the ball and has a gradient on the lower inner wall The lower part of the valve seat is installed in the lower part of the valve and the base element, and the lower part of the valve seat is partially accommodated. The tubular housing having the side wall is freely interposed between the valve seat and the housing to be freely lifted and lowered by suction force by the pressure force in the deodorizing pipe. Containing a valve seat and a conical valve opened by the self-weight of the condensate collected in the closed or drain pipe, it is more stable and secure to maintain the airtightness of the deodorization pipe.

본 발명에 따른 종말처리장 악취방지설비의 응축수 자동 배수장치에 의하면, 기저요소를 중앙에 두고 상하 측에서 밸브시트와 하우징, 그리고 원추형상의 밸브을 이용한 구조개선을 이룸으로서, 탈취관로 내의 기밀상태가 보다 확고하게 유지되어 외기의 유입을 방지하고, 동절기 결빙현상 방지와 설비의 성능을 향상시킬 수 있는 효과가 있다.According to the automatic condensate drainage device of the odor prevention facility of the terminal treatment plant according to the present invention, by improving the structure using the valve seat, the housing, and the conical valve on the upper and lower sides with the base element in the center, the airtight state in the deodorization pipe is more firm. It is maintained to prevent the inflow of outside air, and there is an effect to prevent the freezing of winter and improve the performance of the facility.

또 본 발명은 원추형상의 밸브에 그 밸브를 탈취관로 내에서의 압송력에 의한 흡인력에 더 하여 배수관 단부 측으로 복귀시키는 복원요소를 갖춤으로써, 밸브의 폐쇄작동을 보다 안정되고 확고하게 이루어 제품성을 향상시키게 된다.In addition, the present invention has a conical valve having a restoring element for returning the valve to the end side of the drain pipe in addition to the suction force of the pressure in the deodorizing pipe, thereby improving the productability by making the valve closing operation more stable and firm. Let's go.

도 1은 본 발명 응축수 자동 배수장치가 적용된 종말처리장 악취방지설비의 탈취관로를 부분적으로 발췌하여 보여 주는 도면.
도 2의 (a)(b)는 도 1의 A부분 확대 단면도로서,
도 2의 (a)는 배수장치가 폐쇄된 모습을 보여 주는 설명도이고,
도 2의 (b)는 배수장치가 개방되어 집수된 응축수를 배수하는 과정을 보여 주는 설명도이다.
도 3은 본 발명 자동 배수장치의 하우징을 보여 주는 사시도.
1 is a view showing a partial extract of the deodorization pipe of the terminal treatment plant malodor prevention equipment to which the automatic condensate drainage device is applied.
FIG. 2A and FIG. 2B are enlarged cross-sectional views of portion A of FIG. 1;
2 (a) is an explanatory diagram showing a state in which the drainage device is closed,
2 (b) is an explanatory diagram showing a process of draining the collected condensate by opening the drainage device.
Figure 3 is a perspective view showing a housing of the present invention automatic drainage.

다음 본 발명의 일 실시 예에관해 설명하겠다. 도 1에는 본 발명에 따른 응축수 자동 배수장치가 적용된 종말처리장 악취방지설비의 탈취관로를 부분적으로 보여 주고 있다.Next, an embodiment of the present invention will be described. Figure 1 partially shows the deodorization pipe of the terminal treatment plant malodor prevention equipment to which the automatic condensate drainage system according to the present invention is applied.

본 발명은 수 처리장의 여러 단계 처리조들 각기에서 포집된 악취를 정화 배출시키기 위해 탈취장치로 압송하는 탈취관로들(10)에서 비교적 낮은 측, 즉 악취의 압송과정에서 외기와의 온도 차이로 발생하는 응축수가 집수되는 탈취관로들(10)에 적어도 하나 이상의 배수관들(12)을 구비하여 집수된 응축수를 처리하는 배수장치를 제공하는 것이다.The present invention occurs due to the temperature difference between the relatively low side, that is, in the process of conveying the odor in the deodorization pipe passage 10 that is sent to the deodorizer to purify and discharge the odor collected in each of the various stage treatment tanks of the water treatment plant It is to provide a drainage device for treating the condensed water collected by having at least one or more drainage pipes (12) in the deodorization pipe paths 10 to which the condensate is collected.

도 2에는 본 발명 응축수의 자동 배수장치가 상세하게 도시되어 있는데, 본 발명 응축수의 자동 배수장치는 배수관(12)의 단부에서 플랜지이음식으로 설치되는 기저요소(20)를 동체로 하여 설치된다. 이때 배수관(12)은 응축수의 배수와 집수를 위한 저수공간을 제공한다.Figure 2 shows in detail the automatic drainage of the condensate of the present invention, the automatic drainage of the condensate of the present invention is installed with the base element 20 is installed as a fuselage in the fuselage at the end of the drain pipe (12). At this time, the drain pipe 12 provides a storage space for draining and collecting the condensate.

이렇게 설치되는 기저요소(20)의 중앙에는 배수관(12)과 직결되어 집수된 응축수의 배수통로와 이후에 설명할 밸브시트가 통과하는 관통공(20a)이 구비되어 있다.In the center of the base element 20 installed in this way is provided with a through hole 20a through which the drain passage of the condensate collected and directly connected to the drain pipe 12 and a valve seat to be described later.

또 기저요소(20)의 상측에는 관형상으로 이루는 밸브시트(30)가 탑재되어 플랜지이음식으로 결합되고, 그 하부가 기저요소(20)의 관통공(20a)을 통과하여 저면에 걸치어 설치된다.In addition, the valve seat 30 having a tubular shape is mounted on the upper side of the base element 20, and the flange is coupled to the food, and the lower part thereof is installed across the bottom surface through the through hole 20a of the base element 20. .

또한 밸브시트(30)의 내벽 하부 측에는 배수관(12)의 길이방향으로 이후에 설명할 밸브와의 관계에서 가능한 폐쇄를 위한 접촉면적으로 넓게 제공하는 구배부(32)를 갖는다.In addition, the lower side of the inner wall of the valve seat 30 has a gradient portion 32 that provides a wide contact area for possible closing in relation to the valve, which will be described later in the longitudinal direction of the drain pipe 12.

그리고 기저요소(20)의 하측에는 밸브시트(30) 하단이 부분적으로 수용되고, 측벽이 개방된 관형상의 하우징(40)이 플랜지이음식으로 연이어 설치된다.A lower portion of the valve seat 30 is partially received at the lower side of the base element 20, and a tubular housing 40 having open sidewalls is successively installed with a flange.

이렇게 기저요소(20)을 중앙에 두고 상하 측으로 설치되는 밸브시트(30)와 하우징(40) 사이의 내에는 원추형상의 밸브(50)가 자유로이 승강가능하게 개재되어 있다. 이러한 밸브(50)는 탈취관로(10)에서의 압송력에 의한 흡인력으로 밸브시트(30) 구배부(32)와 접촉을 이루어 배수관(12) 출구를 폐쇄시키며, 그리고 배수관(12) 내에서 응축수가 소정 량 집수되면 그 저수량의 자중(탈취관로(10)에서의 흡인력보다 크다)에 의해 밸브시트(30)의 구배부(32)로부터 이탈되어 배수관(12)이 개방되어 집수되어 있던 응축수를 배수처리하게 된다. In this way, a conical valve 50 is interposed freely in the space between the valve seat 30 and the housing 40 which are installed up and down with the base element 20 at the center. The valve 50 is in contact with the valve seat 30, the gradient portion 32 by the suction force by the suction force in the deodorizing pipe 10 to close the outlet of the drain pipe 12, and condensate in the drain pipe 12 When a predetermined amount of water is collected, it is separated from the gradient part 32 of the valve seat 30 by the low amount of self-weight (greater than the suction force in the deodorization pipe 10), and the drain pipe 12 is opened to drain the condensed water that has been collected. Will be processed.

또 밸브(50)는 그 몸체로부터 하향으로 일정길이 연장되어 설치되는 가이봉(52)을 이용하여 하우징(40)과 결합되어 승강 안내되는데, 이렇게 가이드봉 (52)을 이용한 밸브(50)는 밸브시트(30)와의 접촉ㆍ이탈작용을 안정되게 이루게 될 것이다.In addition, the valve 50 is coupled to the housing 40 by using a guide rod 52 which is installed to extend downward from the body by a predetermined length. Thus, the valve 50 using the guide rod 52 is a valve. The contact / release action of the sheet 30 will be made stable.

또한 밸브(50)와 하우징(40)의 사이에는 탈취관로(10) 측에서 작용하는 흡인력에 더하여 밸브(50)가 밸브시트(30) 측에 확고하게 복귀되도록 도우는 복원요소를(60) 더 포함하고 있다.In addition, between the valve 50 and the housing 40, in addition to the suction force acting on the deodorization pipe 10 side, a restoring element 60 which helps the valve 50 to be firmly returned to the valve seat 30 side is further provided. It is included.

한편 기저요소(20)의 하부에는 그 기저요소(20)의 저면으로부터 별도 하향으로 연장 설치되어 하우징(40) 주위를 감싸 은폐시키어서 응축수의 배수구조가 외력에 의해 파손되는 것을 방지하는 관형상의 보호요소(70)를 더 포함하고 있다.On the other hand, the lower portion of the base element 20 is installed in a downward downward direction from the bottom of the base element 20 is wrapped around the housing 40 to conceal the tubular shape to prevent the drainage structure of the condensate water is damaged by external force It further comprises a protective element 70.

도 2의 (a)(b)는 본 발명 응축수의 자동 배수장치 작동과정을 보여 주고 있는데, 도 2의 (a)는 배수장치 밸브시트(30)의 구배부(32)를 밸브(50)가 탈취관로(10)에서의 흡인력 작용으로 폐쇄시키고 있는 모습을 보이고 있다.Figure 2 (a) (b) shows the operation of the automatic drainage device of the condensate of the present invention, Figure 2 (a) is the valve 50 of the drain valve seat 30 of the drain valve seat 30 It has been shown to be closed by the suction force action in the deodorizing pipe (10).

도 2의 (b)는 배수관(12) 내에 탈취관로(10)에서 발생하는 응축수가 집수 된 저수량이 밸브(50)에 작용하는 흡인력보다 커져 그 응축수 저수량의 자중에 의해 밸브(50)가 개방되어 배수관(12)에 집수 된 응축수를 배수시키는 모습을 보이고 있다.2 (b) shows that the amount of condensate generated in the deodorization pipe line 10 in the drain pipe 12 is greater than the suction force acting on the valve 50 so that the valve 50 is opened by the self-weight of the condensate storage water. The condensate collected in the drain pipe 12 is shown to drain.

이와 같은 본 발명 배수장치를 이용해 배수관(12)의 폐쇄와 개방을 정확하고 안정되게 이루어 탈취관로들(10)의 외기 유입을 완전차단하여 결빙현상과 시설성능을 유지시킨다.By using the present invention drainage device, the closing and opening of the drainage pipe 12 are made accurate and stable to completely block the inflow of the outside air of the deodorization pipe paths 10 to maintain the freezing phenomenon and facility performance.

또 본 발명은 배수관(12) 내에 응축수가 집수되어 그 저수량이 소정의 설계 값 이상으로 저수되면 밸브(50)가 응축수의 저수량 자중에 의해 자동적으로 개방되어 응축수의 배수를 자동적으로 이루어 악취방지시설의 관리성을 향상시키게 될 것이다.In addition, in the present invention, when the condensate is collected in the drain pipe 12 and the reservoir is stored above a predetermined design value, the valve 50 is automatically opened by the low-capacity self-weight of the condensate, thereby automatically draining the condensate. It will improve manageability.

이상에서와 같이 본 발명의 일 실시 예에 관해 설명하였으나, 본 발명은 이에 국한되지 않고 청구범위에 기재된 범위 내에서 변경이 가능할 것이다.
While the present invention has been described in connection with certain exemplary embodiments, it is to be understood that the invention is not limited to the disclosed exemplary embodiments.

10 :탈취관로 12 :배수관
20 :기저요소 20a :관통공
30 :밸브시트 32 :구배부
40 :하우징 50 :밸브
60 :복원요소 70 :보호요소
10: deodorization pipe 12: drainage pipe
20: Base element 20a: Through hole
30: valve seat 32: gradient
40: housing 50: valve
60: restoration element 70: protection element

Claims (4)

삭제delete 삭제delete 삭제delete 수 처리장의 여러 단계 처리조들 각기에서 발생하는 악취를 포집하고, 이렇게 포집된 악취를 정화 배출시키기 위해 탈취장치로 압송하는 탈취관로에서 적어도 하나 이상의 배수관들을 구비하여 외기와의 온도차이로 발생하는 응축수를 처리하는 배수장치로써, 다음을 포함하는 것:
상기 배수관의 단부에 플랜지이음식으로 연이어 설치되고, 중앙에는 상하로 통하는 관통공이 구비되는 기저요소;
상기 기저요소의 상측에서 상기 관통공을 통과하여 설치되고, 하부 내 벽에는 구배부를 가지는 관형상의 밸브시트;
상기 기저요소의 하측에 연이어 설치되어 상기 밸브시트 하단이 부분적으로 수용되고, 측벽이 개방된 관형상의 하우징;
상기 밸브시트와 상기 하우징 사이에서 가이드봉과 복원요소를 이용해 자유로이 승강가능하게 개재되어 상기 밸브시트와 접촉ㆍ이탈하며 폐쇄 또는 상기 배수관 내에서 집수되는 응축수의 자중에 의해 개방을 이루는 원추형상의 밸브; 및
상기 기저요소의 저면에 플랜지이음으로 연결되어 상기 응축수 배수구조 주위를 감싸는 보호요소를 포함하여서된 것을 특징으로 하는 종말처리장 악취방지설비의 응축수 자동 배수장치.


Condensate generated by the temperature difference from outside air by collecting at least one odor from each stage treatment tank of the water treatment plant and having at least one drain pipe in the deodorization pipe that is sent to the deodorizer to purify and discharge the collected odor. Drainage for the treatment of, including:
A base element having a flange connected to the end of the drain pipe in a row, and having a through hole in the center of the drain pipe;
A tubular valve seat installed through the through hole at an upper side of the base element and having a gradient portion at a lower inner wall thereof;
A tubular housing disposed successively below the base element, the lower end of the valve seat being partially received, and the sidewall being opened;
A conical valve interposed freely by a guide rod and a restoring element between the valve seat and the housing to be in contact with and disengaged from the valve seat and to be opened by self-weight of condensate collected in the drain pipe; And
Condensate automatic drainage of the terminal treatment plant malodor prevention equipment characterized in that it comprises a protective element that is connected to the bottom surface of the base element by a flange joint wrapped around the condensate drainage structure.


KR1020120055242A 2012-05-24 2012-05-24 Device for removing the condense water of deodorization of foul smell in sewage treatmant plant KR101260798B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020120055242A KR101260798B1 (en) 2012-05-24 2012-05-24 Device for removing the condense water of deodorization of foul smell in sewage treatmant plant

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020120055242A KR101260798B1 (en) 2012-05-24 2012-05-24 Device for removing the condense water of deodorization of foul smell in sewage treatmant plant

Publications (1)

Publication Number Publication Date
KR101260798B1 true KR101260798B1 (en) 2013-05-20

Family

ID=48665503

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020120055242A KR101260798B1 (en) 2012-05-24 2012-05-24 Device for removing the condense water of deodorization of foul smell in sewage treatmant plant

Country Status (1)

Country Link
KR (1) KR101260798B1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101860794B1 (en) * 2018-01-31 2018-05-25 탑원이앤씨(주) Water drain control valve
KR102154031B1 (en) 2019-06-20 2020-09-09 심원두 Condensate drainage interrupter of the malodor prevention facility of the terminal treatment plant

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001029736A (en) * 1999-07-22 2001-02-06 Nec Environment Eng Ltd Apparatus and method for deodorizing treatment of exhaust gas
KR101091580B1 (en) * 2009-08-10 2011-12-13 (주)문명에이스 Condensation water draining device of air conditioner with back-flow preventing means

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001029736A (en) * 1999-07-22 2001-02-06 Nec Environment Eng Ltd Apparatus and method for deodorizing treatment of exhaust gas
KR101091580B1 (en) * 2009-08-10 2011-12-13 (주)문명에이스 Condensation water draining device of air conditioner with back-flow preventing means

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101860794B1 (en) * 2018-01-31 2018-05-25 탑원이앤씨(주) Water drain control valve
KR102154031B1 (en) 2019-06-20 2020-09-09 심원두 Condensate drainage interrupter of the malodor prevention facility of the terminal treatment plant

Similar Documents

Publication Publication Date Title
KR100793115B1 (en) Waste treatment device
CN204233940U (en) A kind of odor removal for sewage disposal
KR101260798B1 (en) Device for removing the condense water of deodorization of foul smell in sewage treatmant plant
CN112850821A (en) Odor blocking and bacteria inhibiting equipment capable of blocking odor volatilized from underwater odor source
CN107572721A (en) The sewage-treatment plant of heavy metal ion
CN207392354U (en) Air purification deodorizing closet
CN205340474U (en) High -efficient deodorizing device
KR101968679B1 (en) Deodorizing apparatus for food waste treatment
CN205650044U (en) Landfill foul smell collecting and processing system
CN205323529U (en) Volatile organic compounds and hazardous gas's device is handled to microorganism method
CN106693687B (en) Deodorization system for organic fertilizer production
CN204310920U (en) A kind of piggery wastewater recycling treatment system
KR100894038B1 (en) A bad smell remover compensating temperature
CN209771801U (en) Deodorizing device for negative-pressure air draft collection
CN211367272U (en) Concave greenbelt of town road receives water purifier
CN208829521U (en) One breeding stock agriculture is wholesale and raises the foul smell Integrated Processing Unit of agriculture cultivation diadactic structure
KR102154031B1 (en) Condensate drainage interrupter of the malodor prevention facility of the terminal treatment plant
CN201241377Y (en) Ecological toilet system
CN2777084Y (en) Sanitary ware specially used for environmental protection toilet
CN105457482A (en) Biological deodorization apparatus and deodorization method
CN106670212B (en) Between a kind of closed free from extraneous odour rubbish storage
CN205235730U (en) Landfill odor treatment device
CN203170200U (en) Septic tank odor purification system
CN214611608U (en) Odor blocking and bacteria inhibiting equipment capable of blocking odor volatilized from underwater odor source
KR200334073Y1 (en) Sanitary landfill reduced waste leachate

Legal Events

Date Code Title Description
A201 Request for examination
A302 Request for accelerated examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
N231 Notification of change of applicant
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20170427

Year of fee payment: 5

FPAY Annual fee payment

Payment date: 20180705

Year of fee payment: 6

FPAY Annual fee payment

Payment date: 20190429