KR101256425B1 - Draining pipe for bridge - Google Patents

Draining pipe for bridge Download PDF

Info

Publication number
KR101256425B1
KR101256425B1 KR1020120060661A KR20120060661A KR101256425B1 KR 101256425 B1 KR101256425 B1 KR 101256425B1 KR 1020120060661 A KR1020120060661 A KR 1020120060661A KR 20120060661 A KR20120060661 A KR 20120060661A KR 101256425 B1 KR101256425 B1 KR 101256425B1
Authority
KR
South Korea
Prior art keywords
tube
pipe
hook
diameter portion
drain pipe
Prior art date
Application number
KR1020120060661A
Other languages
Korean (ko)
Inventor
이지용
Original Assignee
이지용
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 이지용 filed Critical 이지용
Priority to KR1020120060661A priority Critical patent/KR101256425B1/en
Application granted granted Critical
Publication of KR101256425B1 publication Critical patent/KR101256425B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/08Damp-proof or other insulating layers; Drainage arrangements or devices ; Bridge deck surfacings
    • E01D19/086Drainage arrangements or devices

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

PURPOSE: A drainpipe for a bridge is provided to facilitate the connection of a first pipe with a second pipe by hooking the hanging member of the first pipe with the hook member of the second pipe through a one touch system. CONSTITUTION: A drainpipe(100) for a bridge comprises a first pipe(10), a hook member(30), a second pipe(20), and a hanging member(40). The hook members are mounted along the circumference of the first pipe with gaps in between. The hanging member comprises a body and a link. The body is fixed on the outer circumferential surface of the second pipe. The link is hanged to the hook members. The first pipe and the part in which the second pipe contacts is provided with a guide projection and a guide groove. The joint part of the first and second pipes is formed with a guide protrusion and a guide groove. The hook and the hanging member are positioned on the same line to improve the joining properties.

Description

교량용 배수관{draining pipe for bridge}Draining pipe for bridge

본 발명은 교량용 배수관에 관한 것이다.The present invention relates to a drain pipe for bridges.

일반적으로, 교량의 상판에는 오수가 집수되는 집수부가 간격을 두고 형성되어 있다. 그리고 교량의 하부에는 교량의 길이 방향을 따라 연속 연결된 배수관이 설치되어 있다. 집수부와 배수관은 수직관으로 연결되어 있다. 집수부에 집수된 오수는 수직관을 통하여 배수관으로 유입된 후 교량 외부로 배수된다.In general, a catchment part in which sewage is collected is formed at intervals on the upper plate of the bridge. And the lower part of the bridge is provided with a drain pipe continuously connected along the longitudinal direction of the bridge. The collecting part and the drain pipe are connected by vertical pipes. Sewage collected in the water collecting part is introduced into the drainage pipe through the vertical pipe and then drained out of the bridge.

상기 수직관과 배수관, 연속 연결된 배수관은 관 내부에 오물이 걸리면 이를 제거할 수 있도록 분리 가능하게 연결된다. 이때 밴드 따위를 이용하여 관을 연결한다. 밴드를 이용하여 관을 연결하게 되므로 공구를 필요로 하게 되었다.The vertical pipe and the drain pipe, the drain pipe connected in series is separably connected to remove the dirt if it is caught inside the pipe. At this time, connect the pipe using a band or the like. Since the pipe is connected using a band, a tool is required.

등록특허공보 제10-0684667호 (2007.02.13.)Patent Registration No. 10-0684667 (2007.02.13.) 등록특허공보 제10-1111727호 (2011.04.07.)Patent Registration No. 10-1111727 (2011.04.07.) 공개특허공보 제10-2010-0009113호 (2010.01.27.)Publication No. 10-2010-0009113 (2010.01.27.)

본 발명은 교량용 배수관을 간편하게 결합 및 분리할 수 있는 기술을 제공한다. The present invention provides a technique that can be easily coupled and separated for the bridge drain pipe.

본 발명의 한 실시예에 따른 교량용 배수관은 교량에 집수된 오수를 배수하는 것으로, 제1 관, 상기 제1 관의 원주 방향을 따라 간격을 두고 장착된 훅 부재들, 상기 제1 관과 연결된 제2 관, 그리고 일측이 상기 제2 관의 원주 방향을 따라 간격을 두고 장착되어 있고 타측이 상기 훅 부재들에 걸릴 수 있는 걸이 부재들을 포함한다.Bridge drain pipe according to an embodiment of the present invention is to drain the sewage collected in the bridge, hook members mounted at intervals along the circumferential direction of the first pipe, the first pipe, connected to the first pipe And a second tube, and hook members, one side of which is mounted at intervals along the circumferential direction of the second tube and the other side of which may be hooked to the hook members.

상기 제2 관은, 상기 제1 관의 직경보다 큰 직경을 가지며 상기 제1 관의 일측이 삽입되는 제1 직경부, 상기 제1 직경부와 연결되어 있고 상기 제1 직경부 보다 작은 직경을 갖는 제2 직경부, 그리고 상기 제1 직경부와 상기 제2 직경부를 연결하며 상기 제1 관의 단부가 걸리는 단차부를 포함할 수 있다.The second tube has a diameter larger than the diameter of the first tube and has a first diameter portion into which one side of the first tube is inserted, connected to the first diameter portion, and having a diameter smaller than the first diameter portion. It may include a second diameter portion, and a step portion connecting the first diameter portion and the second diameter portion and the end portion of the first pipe.

상기 제1 관의 일측과 상기 제1 직경부가 접하는 부분에는 가이드 돌기와 가이드 홈이 형성되어 있으며 상기 가이드 돌기가 상기 가이드 홈에 삽입되면서 상기 훅 부재들과 상기 걸이 부재들이 동일 선상에 위치할 수 있다.A guide protrusion and a guide groove may be formed at a portion where one side of the first tube contacts the first diameter part, and the hook members and the hook members may be positioned on the same line as the guide protrusion is inserted into the guide groove.

상기 교량용 집수관은 상기 제1 관의 일측 외부 둘레면과 상기 제1 직경부의 내부 둘레면 사이에 위치한 기밀 부재를 더 포함할 수 있다.The bridge collecting pipe may further include an airtight member positioned between an outer peripheral surface of one side of the first tube and an inner peripheral surface of the first diameter part.

상기 훅 부재들은 각각 일측이 상기 제1 관의 외부 둘레면에 고정되어 있고 타측은 상기 제1 관의 외부 둘레면에서 멀어지는 방향으로 구부러져 있을 수 있다.Each of the hook members may have one side fixed to the outer circumferential surface of the first tube, and the other side thereof may be bent in a direction away from the outer circumferential surface of the first tube.

상기 걸이 부재들은 각각, 상기 제1 직경부의 외부 둘레면에 적어도 일부분이 고정된 몸체, 상단부가 상기 몸체에 힌지 결합된 동작 부재, 그리고 일측이 상기 동작 부재의 하단부에 힌지 연결되어 있고 타측이 상기 훅 부재의 타측에 걸릴 수 있다.Each of the hook members may include a body fixed to at least a portion of an outer circumferential surface of the first diameter part, an operating member having an upper end hinged to the body, and one side of which is hinged to a lower end of the operating member and the other side of the hook It can be caught on the other side of the member.

상기 링크는, 일측이 상기 동작 부재의 하부측에 힌지 연결된 제1 부재, 일측이 상기 제1 부재의 타측과 겹쳐있고 타측이 상기 훅 부재에 걸리는 제2 부재, 그리고 상기 제1 부재와 상기 제2 부재의 겹쳐 있는 부분을 감싸고 있으며 상기 제2 부재가 상가 제1 부재를 향하도록 탄성력을 부여하는 링크 탄성체를 포함할 수 있다.The link may include a first member hinged to a lower side of the operation member, a second member overlapping the other side of the first member, and the other side of the link member being caught by the hook member, and the first member and the second member. It may include a link elastic body surrounding the overlapping portion of the member and imparts an elastic force to the malleable first member.

상기 몸체는, 상기 제1 직경부에 고정된 고정부, 상기 제1 직경부에 슬라이드 이동 가능하게 결합되어 있고 상기 동작 부재가 힌지 연결된 이동 부재, 그리고 상기 이동 부재의 슬라이드 위치를 설정하는 설정 부재를 포함할 수 있다.The body includes a fixed portion fixed to the first diameter portion, a movable member slidably coupled to the first diameter portion and hinged to the operation member, and a setting member for setting a slide position of the movable member. It may include.

본 발명의 실시예에 따르면, 제2 관에 결합된 걸이 부재들이 제1 관에 연결된 훅 부재에 걸리므로 제1 관과 제2 관을 원터치 방식으로 간편하게 연결할 수 있다. 이에 따라 교량의 길이 방향을 따라 연속 연결되는 교량용 배수관의 연결 작업성이 향상될 수 있다.According to the embodiment of the present invention, since the hook members coupled to the second tube are caught by the hook member connected to the first tube, the first tube and the second tube can be easily connected in a one-touch manner. Accordingly, the connection workability of the drain pipe for bridges continuously connected along the longitudinal direction of the bridge can be improved.

본 발명의 실시예에 따르면, 가이드 돌기가 가이드 홈에 위치하면 훅 부재와 걸이 부재가 동일 선상에 위치하게 되면서 걸이 부재와 훅 부재를 간편하게 일치시킬 수 있다. 이에 따라 걸이 부재와 훅 부재의 결합성이 향상된다.According to the embodiment of the present invention, when the guide protrusion is located in the guide groove, the hook member and the hook member are located on the same line, and the hook member and the hook member can be easily matched. This improves the coupling between the hook member and the hook member.

본 발명의 실시예에 따르면, 걸이 부재의 링크가 제1 부재 및 제2 부재로 구성되고, 훅 부재에 걸리는 제2 부재가 탄성체에 의하여 제1 부재 방향으로 탄성 지지되어 제2 부재의 걸림성이 향상된다. 이에 따라 제1 관 제2 관의 결합성이 증대되는 효과가 있다.According to the embodiment of the present invention, the link of the hook member is composed of the first member and the second member, and the second member caught by the hook member is elastically supported in the direction of the first member by the elastic member so that the locking property of the second member is Is improved. As a result, the bondability of the first tube and the second tube is increased.

본 발명의 실시예에 따르면, 걸이 부재의 동작 부재를 제2 관에 고정하는 몸체가 고정부, 고정부에 슬라이드 이동 가능한 이동 부재, 그리고 이동 부재의 슬라이드 위치를 설정하는 설정 부재에 의하여 링크의 제2 부재와 훅 부재의 간격을 조절할 수 있다. 이에 따라 훅 부재와 걸이 부재의 유격을 조절할 수 있다.According to an embodiment of the present invention, the body for fixing the operation member of the hook member to the second tube is formed by the fixing member, the movable member slidably movable to the fixing member, and the setting member for setting the slide position of the movable member. 2 The gap between the member and the hook member can be adjusted. Thereby, the play of a hook member and a hook member can be adjusted.

도 1은 본 발명의 교량용 배수관 설치 상태도.
도 2는 도 1에 도시한 A 부분 확대 사시도.
도 3은 도 2에 도시한 교량용 배수관 분해 사시도.
도 4는 도 2에 도시한 교량용 배수관 일 부분을 자른 단면도.
도 5는 도 3에 도시한 몸체의 다른 실시예를 나타낸 부분 정단면도.
1 is a state diagram of the bridge drain pipe installation of the present invention.
FIG. 2 is an enlarged perspective view of a portion A shown in FIG. 1; FIG.
Figure 3 is an exploded perspective view of the bridge drain pipe shown in FIG.
4 is a cross-sectional view of a portion of the bridge drain pipe illustrated in FIG. 2;
Figure 5 is a partial front cross-sectional view showing another embodiment of the body shown in FIG.

이하, 본 발명이 속하는 기술 분야에서 통상의 지식을 가진 자가 용이하게 실시할 수 있도록 본 발명의 실시예에 대하여 첨부한 도면을 참고로 하여 상세히 설명한다. 그러나 본 발명은 여러 가지 상이한 형태로 구현될 수 있으며 여기에서 설명하는 실시예에 한정되지 않는다. 명세서 전체를 통하여 유사한 부분에 대해서는 동일한 도면 부호를 붙였다.Hereinafter, embodiments of the present invention will be described in detail with reference to the accompanying drawings so that those skilled in the art can easily carry out the present invention. The present invention may, however, be embodied in many different forms and should not be construed as limited to the embodiments set forth herein. Like parts are designated with like reference numerals throughout the specification.

그러면 본 발명의 한 실시예에 따른 교량용 배수관에 대하여 도 1 내지 도 4를 참고하여 설명한다.Next, a bridge drain pipe according to an embodiment of the present invention will be described with reference to FIGS. 1 to 4.

도 1은 본 발명의 교량용 배수관 설치 상태도이고, 도 2는 도 1에 도시한 A 부분 확대 사시도이며, 도 3은 도 2에 도시한 교량용 배수관 분해 사시도이고, 도 4는 도 2에 도시한 교량용 배수관 일 부분을 자른 단면도이다.Figure 1 is a bridge drain pipe installation state diagram of the present invention, Figure 2 is an enlarged perspective view of the portion A shown in Figure 1, Figure 3 is an exploded perspective view of the bridge drain pipe shown in Figure 2, Figure 4 is shown in Figure 2 Sectional view of a portion of a bridge drain pipe.

도 1 내지 도 4를 참고하면, 본 실시예에 따른 교량용 배수관(100)은 연속되는 관을 간편하게 연결하고 분리할 수 있는 것으로, 제1 관(10), 훅 부재(30)들, 제2 관(20), 그리고 걸이 부재(40)들을 포함한다.1 to 4, the bridge drain pipe 100 according to the present embodiment can easily connect and disconnect a continuous pipe, the first pipe 10, the hook members 30, the second Coffin 20, and hanger members 40.

제1 관(10)과 제2 관(20)은 교량의 양측에 위치하여 교량의 길이 방향을 따라 배치된다. 제1 관(10)과 제2 관(20)은 교번적으로 배치된다. 제1 관(10)과 제2 관(20)은 행거(도시하지 않음) 따위로 교량에 현수되어 있다. 그러나 제2 관(20)에만 행거가 연결될 수 있다. 아울러, 제1 관(10)에는 교량(1)에 설치된 집수부(도시하지 않음)와 연결된 집수관(11)이 결합될 수 있다. 그러나 집수관(11)은 제2 관(20)에 연결될 수도 있다.The first tube 10 and the second tube 20 are located on both sides of the bridge and disposed along the longitudinal direction of the bridge. The first tube 10 and the second tube 20 are alternately arranged. The first tube 10 and the second tube 20 are suspended on the bridge such as a hanger (not shown). However, the hanger may be connected only to the second pipe 20. In addition, the first pipe 10 may be coupled to the water collecting pipe 11 connected to the water collecting unit (not shown) installed in the bridge (1). However, the collecting pipe 11 may be connected to the second pipe 20.

한편, 제1 관(10)의 일측은 제2 관(20) 내부로 삽입되어 있다. 그러나 제1 관(10) 양측에 제2 관(20)이 위치할 경우, 제1 관(10)의 일측과 타측은 이웃한 제2 관(20) 내부로 삽입될 수 있다.Meanwhile, one side of the first tube 10 is inserted into the second tube 20. However, when the second tube 20 is located on both sides of the first tube 10, one side and the other side of the first tube 10 may be inserted into the neighboring second tube 20.

아울러, 제2 관(20)은 제1 관(10)이 삽입되는 제1 직경부(21)와 제1 직경부(21) 보다 직경이 작은 제2 직경부(22), 그리고 제1 직경부(21)와 제2 직경부(22)를 연결하는 단차부(23)로 이루어져 있다. 단차부(23)에는 제1 직경부(21) 내부로 삽입되는 제1 관(10)의 단부가 걸릴 수 있다. 단차부(23)에 의하여 제1 관(10)은 제2 관(20) 내부로 더 이상 삽입되지 않는다.In addition, the second tube 20 has a first diameter portion 21 into which the first tube 10 is inserted, a second diameter portion 22 having a smaller diameter than the first diameter portion 21, and a first diameter portion. It consists of the step part 23 which connects 21 and the 2nd diameter part 22. As shown in FIG. An end of the first pipe 10 inserted into the first diameter part 21 may be caught by the stepped part 23. The first tube 10 is no longer inserted into the second tube 20 by the step portion 23.

한편, 제1 관(10)과 제2 관(20) 내부로 통과하는 오수가 제1 관(10)과 제2 관(20)이 연결된 부분에서 누수 되지 않도록 제1 관(10)의 일측 외부 둘레면과 제1 직경부(21)의 내부 둘레면 사이에는 기밀 부재(50)가 위치할 수 있다. 기밀 부재(50)는 고무 따위로 만들어질 수 있다. 제1 관(10)이 제1 직경부(21) 내부로 삽입될 때 기밀 부재(50)는 압축될 수 있다. 압축된 기밀 부재(50)는 제1 관(10)과 제1 직경부(21) 둘레면 사이에 틈새가 발생되지 않도록 한다. 그러나 제1 관(10)과 제2 직경부(22)가 정밀하게 결합되어 틈새가 발생되지 않는 구조라면 기밀 부재(50)는 생략될 수 있다.On the other hand, the outside of one side of the first tube 10 so that the sewage passing through the first tube 10 and the second tube 20 is not leaked at the portion where the first tube 10 and the second tube 20 is connected. An airtight member 50 may be positioned between the circumferential surface and the inner circumferential surface of the first diameter portion 21. The airtight member 50 may be made of rubber or the like. The airtight member 50 may be compressed when the first tube 10 is inserted into the first diameter portion 21. The compressed hermetic member 50 prevents a gap between the first tube 10 and the circumferential surface of the first diameter portion 21. However, the airtight member 50 may be omitted if the first tube 10 and the second diameter portion 22 are precisely coupled and do not generate a gap.

아울러, 제1 관(10)의 일측과 제1 직경부(21)가 접하는 부분에는 가이드 돌기(11a)와 가이드 홈(22a)이 형성되어 있다. 가이드 돌기(11a)가 가이드 홈(22a)에 결합되면서 제1 관(10)의 일측은 제1 직경부(21) 내부로 반듯하게 결합될 수 있다. 아울러, 가이드 돌기(11a)가 가이드 홈(22a)에 결합되면서 제1 관(10)의 외부 둘레면에 설치된 훅 부재(30)와 제2 관(20)의 외부 둘레면에 설치된 걸이 부재(40)가 동일 선상에 위치할 수 있다. 그러나 훅 부재(30)와 걸이 부재(40)를 정밀하게 일치 시킬 필요가 없다면 가이드 돌기(11a)와 가이드 홈(22a)은 생략될 수 있다.In addition, a guide protrusion 11a and a guide groove 22a are formed at a portion where one side of the first pipe 10 contacts the first diameter portion 21. As the guide protrusion 11a is coupled to the guide groove 22a, one side of the first pipe 10 may be smoothly coupled into the first diameter portion 21. In addition, the hook member 30 provided on the outer circumferential surface of the first tube 10 and the hook member 40 provided on the outer circumferential surface of the second tube 20 while the guide protrusion 11a is coupled to the guide groove 22a. ) May be on the same line. However, if it is not necessary to precisely match the hook member 30 and the hook member 40, the guide protrusion 11a and the guide groove 22a may be omitted.

훅 부재(30)는 제1 관(10)의 외부 둘레면에 위치하여 원주 방향을 따라 간격을 두고 장착되어 있다. 훅 부재(30)는 제1 관(10)의 일측에서 소정거리 떨어진 거리에 위치한다. 소정거리는 제1 관(10)이 제1 직경부(21) 내부로 삽입된 길이보다 더 길다.The hook member 30 is located in the outer peripheral surface of the 1st pipe | tube 10, and is attached at intervals along the circumferential direction. The hook member 30 is located at a distance away from the one side of the first tube 10 by a predetermined distance. The predetermined distance is longer than the length in which the first tube 10 is inserted into the first diameter portion 21.

훅 부재(30)는 소정의 길이로 형성되어 있다. 훅 부재(30)는 일측이 제1 관(10)의 외부 둘레면에 고정되어 있다. 이때 용접 방식으로 고정될 수 있다. 그러나 볼트 따위로 고정될 수도 있다. 훅 부재(30)의 타측은 제1 관(10)의 외부 둘레면에서 멀어지는 방향으로 구부러진 뒤 다시 수직하게 구부려져 제1 관(10)에 고정된 일측과 간격을 두고 마주할 수 있다.The hook member 30 is formed in predetermined length. One side of the hook member 30 is fixed to the outer peripheral surface of the first tube 10. At this time, it may be fixed by welding. But it can also be fixed by bolts. The other side of the hook member 30 may be bent in a direction away from the outer circumferential surface of the first tube 10 and then bend vertically again to face one side fixed to the first tube 10 at intervals.

걸이 부재(40)는 훅 부재(30)에 걸려 제1 관(10)과 제2 관(20)을 결합 하는 것으로 제2 관(20)의 제1 직경부(21) 외부 둘레면에 위치하여 원주 방향을 따라 간격을 두고 장착되어 있다. 걸이 부재(40)는, 몸체(41), 동작 부재(42), 그리고 링크(43)를 포함한다.The hook member 40 is hooked to the hook member 30 to join the first tube 10 and the second tube 20 to be located on the outer circumferential surface of the first diameter portion 21 of the second tube 20. It is mounted at intervals along the circumferential direction. The hook member 40 includes a body 41, an operation member 42, and a link 43.

몸체(41)는 제1 직경부(21)의 외부 둘레면에 고정되어 있다. 몸체(41)는 용접 따위의 방법으로 제1 직경부(21)에 고정될 수 있다. 그러나 볼트 따위로 고정될 수도 있다. 이때 몸체(41)의 일측만 제1 직경부(21)에 고정된다. 그리고 몸체(41)의 타측은 제1 직경부(21)의 단부로부터 돌출되어 있다. 이에 따라 몸체(41)의 타측은 제1 관(10)의 외부 둘레면과 간격을 두고 마주한다. 그리고 몸체(41)의 타측은 제1 관(10)의 외부 둘레면으로부터 멀어지는 방향으로 휘어져 있고, 휘어진 끝 부분은 동그랗게 말려 있다.The body 41 is fixed to the outer circumferential surface of the first diameter portion 21. The body 41 may be fixed to the first diameter portion 21 by welding or the like. But it can also be fixed by bolts. At this time, only one side of the body 41 is fixed to the first diameter portion (21). And the other side of the body 41 is protruded from the end of the first diameter portion (21). Accordingly, the other side of the body 41 faces the outer peripheral surface of the first tube 10 at intervals. And the other side of the body 41 is bent in a direction away from the outer circumferential surface of the first tube 10, the curved end is curled round.

한편, 몸체(41)는 단을 부재로 형성되지 않고 도 5에서 도시한 바와 같이, 고정부(411), 이동 부재(412), 그리고 설정 부재(413)로 구성될 수 있다.Meanwhile, as shown in FIG. 5, the body 41 may not be formed as a member and may include a fixing part 411, a moving member 412, and a setting member 413.

고정부(411)는 전면의 일부분이 길이 방향을 따라 개방되어 있다. 전면 일부분이 개방되면서 고정부(411)의 좌우 양측에는 가이드가 형성된다. 이러한 고정부(411)의 배면 부분이 제1 직경부(21)의 외부 둘레면에 용접 따위로 고정된다.A part of the front surface of the fixing part 411 is open along the longitudinal direction. As the front part is opened, guides are formed on both left and right sides of the fixing part 411. The back portion of the fixing part 411 is fixed to the outer circumferential surface of the first diameter portion 21 by welding.

이동 부재(412)는 개방된 고정부(411)의 전면에 상하 방향으로 슬라이드 이동 가능하게 결합되어 있다. 슬라이드 이동하는 이동 부재(412)는 고정부(411)의 가이드에 의하여 좌우 방향으로 흔들리지 않고 상하 방향으로 반듯하게 직선이동 할 수 있다. 이때 이동 부재(412)의 일측만 고정부(411)에 결합되며 타측은 제1 직경부(21)의 단부로부터 돌출되어 제1 관(10)의 외부 둘레면과 마주한다. 그리고 이동 부재(412)의 타측은 외측 방향으로 동그랗게 말려 있다.The moving member 412 is coupled to the front surface of the open fixing part 411 so as to be slidably movable in the vertical direction. The movable member 412 that slides may be linearly moved in the vertical direction without being shaken in the left and right directions by the guide of the fixing part 411. At this time, only one side of the moving member 412 is coupled to the fixing portion 411 and the other side protrudes from the end of the first diameter portion 21 to face the outer peripheral surface of the first tube (10). The other side of the moving member 412 is rolled up in an outward direction.

설정 부재(413)는 이동 부재(412)의 슬라이드 위치를 고정하는 것으로, 고정부(411)의 가이드와 이동 부재(412)를 관통한다. 가이드와 이동 부재(412)에는 설정 부재(413)가 관통하는 관통공이 형성되어 있다. 관통공은 상하 방향으로 간격을 두고 형성되어 있다. 설정 부재(413)는 볼트 형태로 형성되어 있다. 그리고 설정 부재(413)가 관통공에서 이탈하지 않도록 설정 부재(413)의 양측에는 너트 따위가 결합되어 있다.The setting member 413 fixes the slide position of the moving member 412 and penetrates the guide of the fixing part 411 and the moving member 412. The guide and the moving member 412 are formed with a through hole through which the setting member 413 penetrates. The through holes are formed at intervals in the vertical direction. The setting member 413 is formed in the form of a bolt. A nut or the like is coupled to both sides of the setting member 413 so that the setting member 413 does not leave the through hole.

몸체(41)가 단을 부재로 형성될 경우 고정부(411), 이동 부재(412), 그리고 설정 부재(413)는 생략될 수 있다.When the body 41 is formed of the end member, the fixing part 411, the moving member 412, and the setting member 413 may be omitted.

동작 부재(42)는 소정의 길이를 갖는다. 동작 부재(42)의 일측은 몸체(41)의 타측에 힌지 따위로 결합되어 있다. 동작 부재(42)는 힌지를 기준으로 회전할 수 있다. 동작 부재(42)의 타측은 몸체(41)의 일측 방향과 간격을 두고 마주한다. 동작 부재(42)의 일측에는 손잡이 따위가 형성되어 있다.The operation member 42 has a predetermined length. One side of the operation member 42 is coupled to the other side of the body 41, such as a hinge. The operating member 42 may rotate with respect to the hinge. The other side of the operation member 42 faces at one side of the body 41 at intervals. One side of the operation member 42 is formed such as a handle.

링크(43)는 동작 부재(42)와 훅 부재(30)를 연결한다. 링크(43)는 제1 부재(431), 제2 부재(432), 그리고 링크 탄성체(433)를 포함할 수 있다.The link 43 connects the operation member 42 and the hook member 30. The link 43 may include a first member 431, a second member 432, and a link elastic body 433.

제1 부재(431)는 소정의 길이를 가지며 일측이 동작 부재(42)의 타측에 힌지 연결되어 있다. 제1 부재(431)는 동작 부재(42)의 외측 방향으로 구부러진 후 동작 부재(42)의 일측 방향으로 돌출되어 있다. 제1 부재(431)의 타측에는 스토퍼가 형성되어 있다.The first member 431 has a predetermined length and one side is hingedly connected to the other side of the operation member 42. The first member 431 is bent in the outward direction of the operation member 42 and protrudes in one direction of the operation member 42. A stopper is formed on the other side of the first member 431.

제2 부재(432)는 소정의 길이를 가지며 일측이 상기 제1 부재(431)의 타측에 슬라이드 가능하게 겹쳐 있다. 제2 부재(432)의 일측에는 제1 부재(431)의 스토퍼와 간격을 두고 마주하는 스토퍼가 형성되어 있다. 제2 부재(432)의 타측은 제1 관(10)의 외부 둘레면과 마주한다. 한편, 제2 부재(432)의 타측은 동작 부재(42) 내측 방향으로 구부러진 후 훅 부재(30)에 걸릴 수 있다.The second member 432 has a predetermined length and one side of the second member 432 slidably overlaps the other side of the first member 431. One side of the second member 432 is formed with a stopper facing the stopper of the first member 431 at an interval. The other side of the second member 432 faces the outer circumferential surface of the first tube 10. On the other hand, the other side of the second member 432 may be caught by the hook member 30 after being bent in the inward direction of the operation member 42.

링크 탄성체(433)는 제1 부재(431)와 제2 부재(432)가 겹쳐 있는 부분에 위치하여 제1 부재(431)와 제2 부재(432)를 감싸고 있다. 즉, 링크 탄성체(433)는 제1 부재(431)의 스토퍼와 제2 부재(432)의 스토퍼 사이에 위치한다. 링크 탄성체(433)는 제2 부재(432)가 제1 부재(431)를 향하도록 탄성 지지한다. 링크 탄성체(433)의 탄성력에 의하여 제2 부재(432)의 타측이 훅 부재(30)와 탄력적으로 걸리 수 있다.The link elastic body 433 is positioned at the portion where the first member 431 and the second member 432 overlap each other, and surrounds the first member 431 and the second member 432. That is, the link elastic body 433 is positioned between the stopper of the first member 431 and the stopper of the second member 432. The link elastic body 433 elastically supports the second member 432 to face the first member 431. The other side of the second member 432 may be elastically engaged with the hook member 30 by the elastic force of the link elastic body 433.

한편, 몸체(41)가 이동 부재(412)를 포함하는 경우 이동 부재(412)의 슬라이드 위치에 따라 제2 부재(432)와 훅 부재(30)의 거리를 조절할 수 있다. 제2 부재(432)와 훅 부재(30)의 거리 조절로 제2 부재(432)가 훅 부재(30)에 걸리는 걸림 정도를 조절할 수 있다. 아울러, 제2 부재(432)의 길이 짧아 훅 부재(30)에 걸리 않을 경우 이동 부재(412)를 훅 부재(30) 방향으로 이동 시켜 제2 부재(432)를 훅 부재(30)에 쉽게 걸 수 있다.Meanwhile, when the body 41 includes the moving member 412, the distance between the second member 432 and the hook member 30 may be adjusted according to the slide position of the moving member 412. By adjusting the distance between the second member 432 and the hook member 30, the degree of engagement that the second member 432 is caught by the hook member 30 can be adjusted. In addition, when the length of the second member 432 is short and the hook member 30 is not caught, the moving member 412 is moved toward the hook member 30 to easily hook the second member 432 to the hook member 30. Can be.

이와 같은 걸이 부재(40)의 동작 부재(42)를 힌지를 기준으로 회전 시켜 몸체(41)로부터 수직으로 세워주거나 수평으로 눕혀주게 되면 제2 부재(432)의 타측과 훅 부재(30)의 유동거리가 조절 됨으로 훅 부재(30)와 링크(43)의 체결 또는 분리작업이 간편하게 이루어지게 된다.When the operation member 42 of the hook member 40 is rotated with respect to the hinge to stand vertically or horizontally down from the body 41, the other side of the second member 432 and the flow of the hook member 30 As the distance is adjusted, the fastening or detachment of the hook member 30 and the link 43 is easily performed.

이와 같이 구성된 교량용 배수관의 작용을 설명하면, 집수관(11)이 연결되어 있고 외부 둘레면에 훅 부재(30)가 장착된 제1 관(10)의 일측을 걸이 부재(40)가 외부 둘레면에 장착된 제2 관(20)의 제1 직경부(21) 내부로 결합한다. 이때 제1 관(10)이 단차부(23)에 접하게 되면 제1 관(10)은 제2 관(20) 내부로 더 이상 삽입되지 않는다.Referring to the operation of the bridge drain pipe configured in this way, the hook member 40 is connected to one side of the first pipe 10 is connected to the collecting pipe 11 and the hook member 30 is mounted on the outer peripheral surface Coupling into the first diameter portion 21 of the second tube 20 mounted on the surface. At this time, when the first tube 10 is in contact with the stepped portion 23, the first tube 10 is no longer inserted into the second tube 20.

제1 관(10)이 제1 직경부(21) 내부로 삽입될 때 가이드 돌기(11a)가 가이드 홈(22a)에 결합된 상태에서 제1 관(10)과 제2 관(20)이 연결되므로 제1 관(10)에 장착된 훅 부재(30)와 제2 관(20)에 장착된 걸이 부재(40)가 동일 선상에 위치할 수 있다.When the first tube 10 is inserted into the first diameter portion 21, the first tube 10 and the second tube 20 are connected with the guide protrusion 11a coupled to the guide groove 22a. Therefore, the hook member 30 mounted on the first tube 10 and the hook member 40 mounted on the second tube 20 may be positioned on the same line.

제1 관(10)과 제2 관(20)이 연결되면 걸이 부재(40)의 동작 부재(42)를 힌지를 기준으로 제1 관(10) 방향으로 회전 시켜 동작 부재(42)의 타측이 들릴 수 있도록 한다. 이때 링크(43)의 제2 부재(432)는 훅 부재(30)에 걸리게 된다.When the first tube 10 and the second tube 20 are connected, the other side of the operation member 42 is rotated by rotating the operation member 42 of the hook member 40 in the direction of the first tube 10 based on the hinge. Make it soundable. At this time, the second member 432 of the link 43 is caught by the hook member 30.

한편, 링크(43)의 길이가 짧아 제2 부재(432)의 타측이 훅 부재(30)에 걸리지 않게 되면 몸체(41)의 이동 부재(412)를 훅 부재(30) 방향으로 이동 시켜 설정 부재(413)로 위치를 고정하여 제2 부재(432)의 타측이 훅 부재(30)에 걸리도록 한다. 이때 제2 부재(432)의 타측은 훅 부재(30)에 헐겁게 걸린다.On the other hand, if the length of the link 43 is short so that the other side of the second member 432 is not caught by the hook member 30, the moving member 412 of the body 41 is moved in the hook member 30 direction to set the member. The position is fixed at 413 so that the other side of the second member 432 is caught by the hook member 30. At this time, the other side of the second member 432 is loosely caught by the hook member 30.

이렇게 링크(43)의 타측이 훅 부재(30)가 헐겁게 걸리면 들린 동작 부재(42)를 다시 힌지를 기준으로 제1 관(10)에서 멀어지는 방향 즉, 제2 관(20)의 외부 둘레면 방향으로 가압한다. 이때 링크 탄성체(433)가 압축되면서 제2 부재(432)의 타측이 훅 부재(30)의 표면에 밀착되면서 훅 부재(30)에 걸리게 된다.In this way, when the other side of the link 43 is loosely caught by the hook member 30, a direction away from the first tube 10 with respect to the hinge is lifted again, that is, the outer circumferential direction of the second tube 20. Pressurize At this time, while the link elastic body 433 is compressed, the other side of the second member 432 is caught by the hook member 30 while being in close contact with the surface of the hook member 30.

이와 같이 제2 부재(432)가 훅 부재(30)에 걸리므로서 제1 관(10)과 제2 관(20)의 연결을 공구사용 없이 간편하게 연결할 수 있다. 또한 제1 관(10)과 제2 관(20)을 분리 할 경우, 상기 동작 부재(42)의 동작을 역순으로 진행하면 제2 부재(432)의 타측이 훅 부재(30)에 손쉽게 분리되어 공구사용 없이 제1 관(10) 제2 관(20)을 분리할 수 있다.In this way, since the second member 432 is caught by the hook member 30, the connection of the first tube 10 and the second tube 20 can be easily connected without using a tool. In addition, when the first tube 10 and the second tube 20 are separated, when the operation of the operation member 42 is reversed, the other side of the second member 432 is easily separated from the hook member 30. The first tube 10 and the second tube 20 can be separated without using a tool.

다시 말해, 제2 관(20)에 결합된 걸이 부재(40)들이 제1 관(10)에 연결된 훅 부재(30)에 걸리므로 제1 관(10)과 제2 관(20)을 원터치 방식으로 간편하게 연결할 수 있다. 이에 따라 작업성이 교량의 길이 방향을 따라 연속 연결되는 배수관의 연결 작업성이 향상될 수 있다.In other words, since the hook members 40 coupled to the second tube 20 are caught by the hook member 30 connected to the first tube 10, the first tube 10 and the second tube 20 are one-touch. Easy to connect Accordingly, the workability of the connection of the drain pipe in which workability is continuously connected along the longitudinal direction of the bridge may be improved.

이상에서 본 발명의 바람직한 실시예에 대하여 상세하게 설명하였지만 본 발명의 권리범위는 이에 한정되는 것은 아니고 다음의 청구범위에서 정의하고 있는 본 발명의 기본 개념을 이용한 당업자의 여러 변형 및 개량 형태 또한 본 발명의 권리범위에 속하는 것이다.Although the preferred embodiments of the present invention have been described in detail above, the scope of the present invention is not limited thereto, and various modifications and improvements of those skilled in the art using the basic concepts of the present invention defined in the following claims are also provided. It belongs to the scope of rights.

1: 교량 100: 교량용 배수관
10: 제1 관 11: 집수관
11a: 가이드 돌기 20: 제2 관
21: 제1 직경부 22: 제2 직경부
22a: 가이드 홈 23: 단차부
30: 훅 부재 40: 걸이 부재
41: 몸체 411: 고정부
412: 이동 부재 413: 설정 부재
42: 동작 부재 43: 링크
431: 제1 부재 432: 제2 부재
433: 링크 탄성체 50: 기밀 부재
1: bridge 100: bridge drain pipe
10: Hall 1 11: Sump
11a: guide protrusion 20: second tube
21: first diameter portion 22: second diameter portion
22a: guide groove 23: stepped portion
30: hook member 40: hook member
41: body 411: fixed part
412: moving member 413: setting member
42: motion member 43: link
431: First member 432: Second member
433: link elastic body 50: airtight member

Claims (8)

제1 관,
상기 제1 관의 원주 방향을 따라 간격을 두고 장착된 훅 부재들,
상기 제1 관과 연결된 제2 관, 그리고
상기 제2관의 외부 둘레면에 적어도 일부분이 고정된 몸체와, 상단부가 상기 몸체에 힌지 결합된 동작 부재와 및 일측이 상기 동작 부재의 하단부에 힌지 연결되어 있고 타측이 상기 훅 부재에 걸리는 링크를 포함하는 걸이 부재들
을 포함하고,
상기 링크는,
일측이 상기 동작 부재의 하부측에 힌지 연결된 제1 부재,
일측이 상기 제1 부재의 타측과 겹쳐있고 타측이 상기 훅 부재에 걸리는 제2 부재, 그리고
상기 제1 부재와 상기 제2 부재의 겹쳐 있는 부분을 감싸고 있으며 상기 제2 부재가 상가 제1 부재를 향하도록 탄성력을 부여하는 링크 탄성체
를 포함하는
교량용 배수관.
1st tube,
Hook members spaced along the circumferential direction of the first tube,
A second pipe connected to the first pipe, and
A body having at least a portion fixed to an outer circumferential surface of the second tube, an operation member having an upper end hinged to the body, and one side of which is hinged to a lower end of the operation member, and the other side of which is connected to the hook member Hook members included
/ RTI >
The link,
A first member having one side hinged to a lower side of the operation member,
A second member having one side overlapping the other side of the first member and the other side being caught by the hook member, and
A link elastic body surrounding an overlapping portion of the first member and the second member and applying an elastic force to the malleable first member.
Containing
Bridge drain pipe.
제1항에서,
상기 제2 관은
상기 제1 관의 직경보다 큰 직경을 가지며 상기 제1 관의 일측이 삽입되는 제1 직경부,
상기 제1 직경부와 연결되어 있고 상기 제1 직경부 보다 작은 직경을 갖는 제2 직경부, 그리고
상기 제1 직경부와 상기 제2 직경부를 연결하며 상기 제1 관의 단부가 걸리는 단차부
를 포함하는
교량용 배수관.
In claim 1,
The second tube
A first diameter portion having a diameter larger than that of the first tube and into which one side of the first tube is inserted;
A second diameter portion connected to the first diameter portion and having a diameter smaller than the first diameter portion, and
A stepped portion connecting the first diameter portion and the second diameter portion and the end portion of the first pipe is caught.
Containing
Bridge drain pipe.
제2항에서,
상기 제1 관의 일측과 상기 제1 직경부가 접하는 부분에는 가이드 돌기와 가이드 홈이 형성되어 있으며 상기 가이드 돌기가 상기 가이드 홈에 삽입되면서 상기 훅 부재들와 상기 걸이 부재들이 동일 선상에 위치하는
교량용 배수관.
In claim 2,
A guide protrusion and a guide groove are formed at a portion where one side of the first tube contacts the first diameter part, and the hook members and the hook members are positioned on the same line as the guide protrusion is inserted into the guide groove.
Bridge drain pipe.
제2항에서,
상기 제1 관의 일측 외부 둘레면과 상기 제1 직경부의 내부 둘레면 사이에 위치한 기밀 부재를 더 포함하는 교량 배수관.
In claim 2,
And a hermetic member positioned between the outer peripheral surface of one side of the first tube and the inner peripheral surface of the first diameter portion.
제1항에서,
상기 훅 부재들은 각각 일측이 상기 제1 관의 외부 둘레면에 고정되어 있고 타측은 상기 제1 관의 외부 둘레면에서 멀어지는 방향으로 구부러져 상기 제2 부재가 걸리는 교량용 배수관.
In claim 1,
Each of the hook members is fixed to the outer circumferential surface of the first tube and the other side is bent in a direction away from the outer circumferential surface of the first tube bridge drain pipe for the second member.
삭제delete 삭제delete 제2항에서,
상기 몸체는,
상기 제1 관에 고정된 고정부,
상기 제1 관에 슬라이드 이동 가능하게 결합되어 있고 상기 동작 부재가 힌지 연결된 이동 부재, 그리고
상기 이동 부재의 슬라이드 위치를 설정하는 설정 부재
를 포함하는
교량용 배수관.
In claim 2,
The body,
A fixed part fixed to the first pipe,
A movable member slidably coupled to the first tube and to which the operating member is hinged;
A setting member for setting a slide position of the moving member
Containing
Bridge drain pipe.
KR1020120060661A 2012-06-05 2012-06-05 Draining pipe for bridge KR101256425B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020120060661A KR101256425B1 (en) 2012-06-05 2012-06-05 Draining pipe for bridge

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020120060661A KR101256425B1 (en) 2012-06-05 2012-06-05 Draining pipe for bridge

Publications (1)

Publication Number Publication Date
KR101256425B1 true KR101256425B1 (en) 2013-05-02

Family

ID=48665165

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020120060661A KR101256425B1 (en) 2012-06-05 2012-06-05 Draining pipe for bridge

Country Status (1)

Country Link
KR (1) KR101256425B1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106638286A (en) * 2017-01-10 2017-05-10 中铁大桥勘测设计院集团有限公司 Tension-resisting anti- beam-falling combined shock insulation device and construction method thereof
KR102118902B1 (en) * 2019-11-06 2020-06-04 이노블루산업 주식회사 Bridge drainage apparatus

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000212915A (en) * 1999-01-21 2000-08-02 Sanken Steel:Kk Drainage for bridge
KR200236237Y1 (en) * 2001-03-12 2001-10-06 신태성 Portable Multipurpose Thermos and Bento
KR100572510B1 (en) * 2004-01-16 2006-04-19 (주)석탑엔지니어링 Collecting appratus for drain pipe
KR100864678B1 (en) * 2007-05-31 2008-10-23 현빈개발 주식회사 Bridge drainpipe connector and method for connecting drainpipe using the same

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000212915A (en) * 1999-01-21 2000-08-02 Sanken Steel:Kk Drainage for bridge
KR200236237Y1 (en) * 2001-03-12 2001-10-06 신태성 Portable Multipurpose Thermos and Bento
KR100572510B1 (en) * 2004-01-16 2006-04-19 (주)석탑엔지니어링 Collecting appratus for drain pipe
KR100864678B1 (en) * 2007-05-31 2008-10-23 현빈개발 주식회사 Bridge drainpipe connector and method for connecting drainpipe using the same

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106638286A (en) * 2017-01-10 2017-05-10 中铁大桥勘测设计院集团有限公司 Tension-resisting anti- beam-falling combined shock insulation device and construction method thereof
KR102118902B1 (en) * 2019-11-06 2020-06-04 이노블루산업 주식회사 Bridge drainage apparatus

Similar Documents

Publication Publication Date Title
US5063616A (en) Flexible drainage trap
KR101256425B1 (en) Draining pipe for bridge
US20170089050A1 (en) Connector for bathtub tailpipe to drain pipe
JP4564857B2 (en) Drainage pipe structure, drainage pipe construction method and drainage pipe construction set
JP2009074337A (en) Water way opening/closing equipment and water way rehabilitation method
KR20110033720A (en) A fixing device for pipe line
KR100767964B1 (en) Connecting device for noise-reducing of drainpipe
KR101103420B1 (en) A bridge drainpipe for rubbish easy removal
JP5792547B2 (en) Bathroom unit washroom structure and construction method
FR3059520B3 (en) FIXING SYSTEM AGAINST THE SLIDING OF A NATURAL HOSE ON A SUPPORT MEMBER
KR200446654Y1 (en) Fire-retardant pipe clamp
KR100883534B1 (en) Piping box for lay slab of building
JP4794304B2 (en) Fire hydrant branch pipe
KR100936461B1 (en) Supporter of pipe for piping work
KR200465258Y1 (en) Awning combination device
KR100886209B1 (en) Safety bracket for balcony extension type
JP4408689B2 (en) Connection method of drainage members in bathtubs with separate washing places
JP2010101495A (en) Connection structure for equipment connection pipe
KR20240008107A (en) Pipe Hanger for Ceiling Plumbing
KR20170003164U (en) A drain for a bridge
JP5918029B2 (en) Rehabilitation method for existing pipes
CN208186797U (en) A kind of air-conditioning drainage mechanism
JP5694691B2 (en) Foundation buried drain pipe and method for detaching a downstream seal ring in the foundation buried drain pipe
KR100736709B1 (en) The connector connecting a branch pipe with a main pipe
JP2007120218A (en) Siphon drainage joint for connecting bellow pipe

Legal Events

Date Code Title Description
A201 Request for examination
A302 Request for accelerated examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20170418

Year of fee payment: 5

FPAY Annual fee payment

Payment date: 20180417

Year of fee payment: 6

FPAY Annual fee payment

Payment date: 20190415

Year of fee payment: 7