KR101243764B1 - Method for the prevention of the water spread of waterproof-sheet using multi-purpose metal bar - Google Patents

Method for the prevention of the water spread of waterproof-sheet using multi-purpose metal bar Download PDF

Info

Publication number
KR101243764B1
KR101243764B1 KR1020110078101A KR20110078101A KR101243764B1 KR 101243764 B1 KR101243764 B1 KR 101243764B1 KR 1020110078101 A KR1020110078101 A KR 1020110078101A KR 20110078101 A KR20110078101 A KR 20110078101A KR 101243764 B1 KR101243764 B1 KR 101243764B1
Authority
KR
South Korea
Prior art keywords
metal bar
waterproof sheet
sheet
polyethylene foam
foam tape
Prior art date
Application number
KR1020110078101A
Other languages
Korean (ko)
Other versions
KR20130015835A (en
Inventor
김승수
김대환
Original Assignee
강남이앤알(주)
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 강남이앤알(주) filed Critical 강남이앤알(주)
Priority to KR1020110078101A priority Critical patent/KR101243764B1/en
Publication of KR20130015835A publication Critical patent/KR20130015835A/en
Application granted granted Critical
Publication of KR101243764B1 publication Critical patent/KR101243764B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04DROOF COVERINGS; SKY-LIGHTS; GUTTERS; ROOF-WORKING TOOLS
    • E04D11/00Roof covering, as far as not restricted to features covered by only one of groups E04D1/00 - E04D9/00; Roof covering in ways not provided for by groups E04D1/00 - E04D9/00, e.g. built-up roofs, elevated load-supporting roof coverings
    • E04D11/02Build-up roofs, i.e. consisting of two or more layers bonded together in situ, at least one of the layers being of watertight composition
    • CCHEMISTRY; METALLURGY
    • C09DYES; PAINTS; POLISHES; NATURAL RESINS; ADHESIVES; COMPOSITIONS NOT OTHERWISE PROVIDED FOR; APPLICATIONS OF MATERIALS NOT OTHERWISE PROVIDED FOR
    • C09JADHESIVES; NON-MECHANICAL ASPECTS OF ADHESIVE PROCESSES IN GENERAL; ADHESIVE PROCESSES NOT PROVIDED FOR ELSEWHERE; USE OF MATERIALS AS ADHESIVES
    • C09J7/00Adhesives in the form of films or foils
    • C09J7/20Adhesives in the form of films or foils characterised by their carriers
    • C09J7/22Plastics; Metallised plastics
    • C09J7/24Plastics; Metallised plastics based on macromolecular compounds obtained by reactions involving only carbon-to-carbon unsaturated bonds
    • C09J7/241Polyolefin, e.g.rubber

Landscapes

  • Chemical & Material Sciences (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Organic Chemistry (AREA)
  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Building Environments (AREA)
  • Floor Finish (AREA)

Abstract

본 발명은 다목적 메탈바를 이용한 방수시트의 물 확산방지 시공방법에 관한 것으로서, 노출된 건물 옥상의 몰탈층 바닥면(1)으로부터 방수시트(10)를 이음 부착하여 방수처리하는 시공방법에 있어서,
깨끗이 정리된 옥상의 몰탈층 바닥면(1)으로부터 액상의 프라이머를 일정 간격으로 도포하여 프라이머 도포층(2)을 형성하는 단계(S101)와; 프라이머가 도포된 표면에 위한 띠 형의 양면 접착용 폴리에틸렌 발포테이프(3)를 부착하는 단계(S102)와; 폴리에틸렌 발포테이프(3)의 상부에는 한 면에 수지필름이 코팅되고, 일정간격으로 고정공(4a)이 형성된 메탈바(4)를 부착하여 몰탈층 바닥면으로부터 폴리에틸렌 발포테이프와 함께 일정높이를 갖도록 몰탈층 바닥면(1) 면적을 구획하는 단계(S103)와; 메탈바(4)의 고정공(4a)을 통해 나사못(S)을 박아 바닥면에 대해 메탈바(4)를 포함한 폴리에틸렌 발포테이프(3)를 고정하는 단계(S104)와; 일정간격으로 부착된 메탈바(4) 사이에 몰탈층 바닥면(1)으로부터 메탈바(4)의 높이에 위치하는 두께의 부직포시트(5)를 안내시켜 메탈바 상부표면과 동일하게 평탄화하는 단계(S105)와; 방수시트(10)를 부직포시트(5), 메탈바(4)의 상면에 깔아 열풍 융착으로 방수시트(10)의 가장자리를 겹쳐 부착하도록 하는 한편, 메탈바(4)의 상면과 접하는 방수시트(10)의 표면을 부착시공하는 단계(S106);로 이루어진 것을 특징으로 하는바, 본 발명에 따른 방수시트 시공방법은 노출된 옥상 면적을 폴리에틸렌 발포테이프 및 메탈바로 구획을 나눈 다음. 부직포시트를 메탈바 사이의 영역에 채워 놓고, 그 상부에 방수시트를 연이어 부착 시공함으로써, 어느 특정부위의 손상에 의해 빗물이 침투하더라도 물이 확산되는 현상을 최소화시켜 방수 유지에 따른 보수비용을 최소화함은 물론, 구획된 메탈바에 방수시트의 열 부착에 의한 풍압에도 견딜 수 있도록 하여 방수시트를 이용한 시공의 신뢰성을 높일 수 있는 효과가 있다.
The present invention relates to a water diffusion preventing construction method of the waterproof sheet using a multi-purpose metal bar, in the construction method for the waterproofing by attaching the waterproof sheet 10 from the bottom surface (1) of the mortar layer on the exposed roof of the building,
Forming a primer coating layer (2) by applying a liquid primer at regular intervals from the cleanly arranged rooftop mortar layer bottom surface (1); Attaching a strip-shaped double-sided adhesive polyethylene foam tape 3 to the surface to which the primer is applied (S102); A resin film is coated on one side of the polyethylene foam tape 3, and a metal bar 4 having a fixed hole 4a is attached at a predetermined interval so as to have a predetermined height together with the polyethylene foam tape from the bottom surface of the mortar layer. Partitioning the mortar layer bottom surface (1) area (S103); Fixing the polyethylene foam tape 3 including the metal bar 4 to the bottom surface by driving the screw S through the fixing holes 4a of the metal bar 4 (S104); Guide the non-woven fabric sheet 5 having a thickness located at the height of the metal bar 4 from the bottom surface of the mortar layer 1 between the metal bars 4 attached at regular intervals and flattening the same as the upper surface of the metal bars. (S105); The waterproof sheet 10 is laid on the upper surface of the nonwoven fabric sheet 5 and the metal bar 4 so as to overlap the edges of the waterproof sheet 10 by hot air fusion, while the waterproof sheet is in contact with the upper surface of the metal bar 4 ( The step of attaching the surface of 10) (S106); characterized in that consisting of, the waterproof sheet construction method according to the present invention divided the exposed rooftop area by polyethylene foam tape and metal bars. By filling the nonwoven fabric sheet in the area between the metal bars and attaching the waterproof sheet on top of it, it minimizes the diffusion of water even if rainwater penetrates due to damage to any specific part, thereby minimizing the maintenance cost of maintaining the waterproofing. Of course, it is possible to withstand the wind pressure due to the heat attachment of the waterproof sheet to the partitioned metal bar has the effect of increasing the reliability of the construction using the waterproof sheet.

Description

다목적 메탈바를 이용한 방수시트의 물 확산방지 시공방법{Method for the prevention of the water spread of waterproof-sheet using multi-purpose metal bar}Method for the prevention of the water spread of waterproof-sheet using multi-purpose metal bar}

본 발명은 노출된 건물의 옥상 바닥에 방수시트를 시공하는 방법에 관한 것으로, 좀더 상세하게는 한 면에 수지 코팅된 메탈바(metal bar)를 이용하여 옥상 면적을 영역별로 구획함과 동시에, 구획된 부분 중 어느 한 곳으로부터 빗물침투에 의한 물 확산을 방지하여 경제적인 부분 보수가 용이하도록 함은 물론, 메탈바와의 열풍 융착을 통해 방수시트를 바닥에 고정함으로써 풍하중(風荷重)에 대한 저항력을 강화하는 효과를 제공하는 다목적 메탈바를 이용한 방수시트의 물 확산방지 시공방법에 관한 것이다.
The present invention relates to a method of constructing a waterproof sheet on a rooftop floor of an exposed building, and more particularly, by partitioning the rooftop area by area using a resin coated metal bar on one side. It prevents water diffusion by rainwater infiltration from any one of the damaged parts, and facilitates economical repair of parts. Also, by fixing the waterproof sheet to the floor through hot air fusion with the metal bar, resistance to wind load is increased. The present invention relates to a method for preventing water diffusion of a waterproof sheet using a multi-purpose metal bar that provides a reinforcing effect.

일반적으로 빌딩 구조물의 옥상이나 주차장의 상부면 등에는 강우, 폭우 등으로 인한 누수를 방지하기 위한 방수 공사가 필수적이다. 현재 여러 종류의 방수 공법이 사용되고 있으며, 주로 몰탈 액체방수, 수용성 또는 유용성의 도막 방수, 아스팔트 방수 및 방수시트 등이 이용되고 있다.In general, a waterproof construction is necessary for the roof of a building structure or the upper surface of a parking lot to prevent leakage due to rainfall and heavy rain. Currently, various kinds of waterproofing methods are used, and mainly, mortar liquid waterproofing, water-soluble or oil-soluble coating waterproofing, asphalt waterproofing, and waterproof sheet are used.

이중 시트를 이용한 방수시공은 신축성이 우수한 합성 고무나 합성수지 또는 고무화 아스팔트 등을 주원료로 하여 일정 규격의 방수시트를 제작하여 바닥이나 벽면에 견고하게 밀착시켜 부착함으로써, 외부로부터 강우에 대처할 수 있도록 하였다. In the waterproof construction using double sheets, waterproof rubber sheets of a certain standard are made of synthetic rubber, synthetic resin or rubberized asphalt with excellent elasticity, and firmly adhered to the floor or wall to cope with rainfall from the outside. .

이러한 방수시트는 시트 형상의 방수재를 방수 공사를 하고자 하는 바닥면에 펼쳐 설치함으로써 방수층을 형성하는 방수공법으로서, 시공이 비교적 간편하고 공사기간이 단축되는 장점이 있기 때문에 오늘날 널리 이용되고 있는 방수 공법 중 하나이다.This waterproof sheet is a waterproof method to form a waterproof layer by spreading the sheet-shaped waterproof material on the floor to be waterproofed construction, because the construction is relatively easy and the construction period is shortened, which is widely used today. One.

이러한 시트 방수에 사용되는 방수시트는 현장에서의 시공 및 취급이 용이하도록 미리 공장에서 일정한 폭 및 길이(통상 폭 1.0~2.0m, 길이 15m)를 갖는 롤(roll) 형의 시트의 형태로 제작되며, 이를 바닥면 위에 일정 간격으로 펼쳐 설치하게 된다.The waterproof sheet used for waterproofing the sheet is manufactured in the form of a roll-type sheet having a predetermined width and length (usually 1.0-2.0 m in width and 15 m in length) at the factory to facilitate construction and handling in the field. This will be installed at regular intervals on the floor.

통상적으로 고무화 아스팔트 방수시트의 경우에는 겹침 부위를 토오치 등의 열 기구를 사용하여 방수시트가 접하는 표면을 가열시켜 열풍 융착하는 방식을 취하고 있고, 합성수지 또는 합성 고무 방수시트의 경우에는 접착제 또는 접착 테이프를 사용하여 접착하거나(EPDM시트, PVC시트, TPO시트 등), 용제를 사용하여 용착한다든지(PVC 시트) 혹은 열풍 융착기를 사용하여 열풍 융착하는 방법을 사용하고 있다(PVC시트, TPO시트, ECV시트, HDPE시트 등).In general, in the case of rubberized asphalt waterproof sheet, the overlapped portion is heated by heating the surface of the waterproof sheet by using a heat mechanism such as a torch. Either by using a tape (EPDM sheet, PVC sheet, TPO sheet, etc.), by using a solvent (PVC sheet), or by using a hot air fusion machine, a hot air fusion method (PVC sheet, TPO sheet, ECV sheet, HDPE sheet, etc.)

상기와 같은 방수시공은 건물의 노출된 옥상과 같이 바닥면을 이루는 장소에 먼저, 바닥 방수시트 시공이 완료된 상태에서 벽면측에도 방수시트가 시공된다.In the waterproof construction as described above, the waterproof sheet is constructed on the wall side in a state where the floor waterproof sheet construction is completed in a place forming a floor surface such as an exposed rooftop of a building.

통상적인 옥상의 바닥 방수시공은 물 배수를 위해 옥상 중앙을 기준하거나 또는 전반적으로 어느 한쪽을 기준하여 구배된 바닥면에 대해 방수시트의 연결 이음 접착으로서 시공된다.Conventional roof top waterproofing is constructed as a joint joint bond of a waterproof sheet to a bottom surface that is graded either relative to the roof center for water drainage or generally on either side.

방수시트의 겹이음 접착은 방수시트의 상부에 중앙에 고정공이 형성된 원판형의 플레이트와, 상기 고정공을 통해 나사못을 방수시트 및 옥상의 바닥면을 이루는 몰탈층, 콘트리트층 내부까지 박아 고정한 다음, 상기 플레이트의 상부에는 이음하고자 하는 방수시트를 덧대어 열 접착하는 방식으로 방수시공하였다.Lamination bonding of the waterproof sheet is fixed to the disk-shaped plate formed with a fixing hole in the center of the upper part of the waterproof sheet, and through the fixing hole to the inside of the mortar layer and the concrete layer forming the waterproof sheet and the bottom of the roof, The upper part of the plate was waterproofed by attaching a waterproof sheet to be bonded by heat bonding.

상기와 같은 방수시공은 계절이 지남에 따라 어느 특정부위의 손상으로 하여금 우기시 빗물이 침투되는 현상이 발생할 수 있으며, 이때 침투된 빗물은 전반적으로 방수시트와 몰탈층 사이에 확산되는 문제점으로 이어지기 때문에 옥상에 시공된 방수시트에서 가장 취약점으로 나타난다.The waterproof construction as described above may cause the rainwater to penetrate during the rainy season due to damage to a specific part, and the rainwater that is infiltrated generally leads to a problem of spreading between the waterproof sheet and the mortar layer. Therefore, it is the most vulnerable in the waterproof sheet installed on the roof.

이러한 점을 해결하기 위해서 방수시트를 전반적으로 걷어내야 하는 작업과 더불어 재시공해야 하나, 비교적 면적이 넓은 옥상면적은 방수시공에 따른 보수비용이 경제적인 부담감이 따른다.In order to solve this problem, it is necessary to re-install the waterproof sheet as well as the overall work, but the relatively large rooftop area has an economic burden on the repair cost due to the waterproof construction.

상기와 같이 빗물유입에 대한 부담감만큼 비교적 넓은 면적의 옥상에 시공된 방수시트는 풍압에 의한 손상률 또한 크기 때문에 풍하중에 대한 설계도 고려하여야 하는 실정이다.
As described above, the waterproof sheet constructed on the roof of a relatively large area as a burden on rainwater inflow is also considered to be designed for wind load because the damage rate due to wind pressure is also large.

본 발명은 상기와 같이 제반되는 종래의 문제점을 해결하기 위하여 발명한 것으로서, 그 목적은 한 면에 수지 코팅된 메탈바를 이용하여 옥상 면적을 영역별로 구획함과 동시에, 구획된 부분 중 어느 한곳으로부터 빗물침투에 의한 물 확산을 방지하여 경제적인 부분 보수가 용이하도록 함은 물론, 메탈바와의 융착을 통해 방수시트를 바닥에 고정함으로써 풍하중에 대한 저항력을 강화하는 효과를 제공하는 다목적 메탈바를 이용한 방수시트의 물 확산방지 시공방법을 제공함에 있다.
The present invention has been invented to solve the conventional problems as described above, the object is to partition the rooftop area by area using a resin-coated metal bar on one side, at the same time, rain water from any one of the partitioned portion It prevents the diffusion of water by penetration and facilitates the economical repair of parts, and also secures the waterproof sheet to the floor through fusion with the metal bar to provide the effect of strengthening resistance to wind load. The present invention provides a method for preventing water diffusion.

상기 목적을 달성하기 위한 본 발명에 의하면, 노출된 건물 옥상의 몰탈층 바닥면으로부터 방수시트를 이음 부착하여 방수처리하는 시공방법에 있어서,According to the present invention for achieving the above object, in the construction method of the waterproofing by attaching a waterproof sheet from the bottom surface of the mortar layer exposed on the roof of the building,

깨끗이 정리된 옥상의 몰탈층 바닥면으로부터 액상의 프라이머를 일정 간격으로 도포하여 프라이머 도포층을 형성하는 단계와; 프라이머가 도포된 표면에 위한 띠 형의 양면 접착용 폴리에틸렌 발포테이프(PE foam tape)를 부착하는 단계와; 폴리에틸렌 발포테이프의 상부에는 한 면에 수지필름이 코팅되고, 일정간격으로 고정공이 형성된 메탈바를 부착하여 몰탈층 바닥면으로부터 폴리에틸렌 발포테이프와 함께 일정높이를 갖도록 몰탈층 바닥면 면적을 구획하는 단계와; 메탈바에 나사못을 박아 메탈바를 포함한 폴리에틸렌 발포테이프를 고정하는 단계와; 일정간격으로 부착된 메탈바 사이에 몰탈층 바닥면으로부터 메탈바의 높이에 위치하는 두께의 부직포시트를 안내시켜 메탈바 상부표면과 동일하게 평탄화하는 단계와; 방수시트를 부직포시트, 메탈바의 상면에 깔아 열풍 융착으로 방수시트의 가장자리를 겹쳐 부착하도록 하는 한편, 메탈바의 상면과 접하는 방수시트의 표면을 부착시공하는 단계;로 이루어진 것을 특징으로 한다.Forming a primer coating layer by applying a liquid primer at regular intervals from the bottom surface of the cleaned mortar layer; Attaching a strip-shaped double-sided adhesive polyethylene polyethylene PE tape to the primer-coated surface; A resin film is coated on one side of the polyethylene foam tape, and attaching a metal bar having a fixed hole formed at a predetermined interval to partition the mortar layer bottom surface area from the mortar layer bottom surface to have a predetermined height with the polyethylene foam tape; Fixing a polyethylene foam tape including a metal bar by screwing the metal bar; Guiding the nonwoven fabric sheet having a thickness located at the height of the metal bar from the bottom surface of the mortar layer between the metal bars attached at regular intervals and flattening the same as the upper surface of the metal bar; The nonwoven fabric sheet, spread on the upper surface of the metal bar to attach the edges of the waterproof sheet by hot air fusion, while attaching the surface of the waterproof sheet in contact with the upper surface of the metal bar; characterized in that consisting of.

본 발명에 따른 상기 메탈바는 일면에 폴리에틸렌 발포테이프가 부착 처리되어 프라이머(primer) 도포층에 직접 부착시공하도록 한 것을 특징으로 한다.
The metal bar according to the present invention is characterized in that the polyethylene foam tape is attached to one surface to be directly attached to the primer coating layer.

본 발명에 따른 방수시트 시공방법은 노출된 옥상 면적을 폴리에틸렌 발포테이프 및 메탈바로 구획을 나눈 다음. 부직포를 메탈바 사이의 영역에 채워 놓고, 그 상부에 방수시트를 연이어 부착 시공함으로써, 어느 특정부위의 손상에 의해 빗물이 침투하더라도 물이 확산되는 현상을 최소화시켜 방수 유지에 따른 보수비용을 최소화함은 물론, 구획된 메탈바에 방수시트의 열 부착에 의한 풍압에도 견딜 수 있도록 하여 방수시트를 이용한 시공의 신뢰성을 높일 수 있는 효과가 있다.
Waterproof sheet construction method according to the invention divided the exposed rooftop area by polyethylene foam tape and metal bars. By filling the non-woven fabric in the area between the metal bars and attaching the waterproof sheet on top of it, it minimizes the diffusion of water even if rainwater penetrates due to damage to any specific part, thereby minimizing the maintenance cost of waterproofing. Of course, it is possible to withstand the wind pressure due to the heat attachment of the waterproof sheet to the partitioned metal bar has the effect of increasing the reliability of the construction using the waterproof sheet.

도 1은 본 발명인 방수시트의 물 확산방지 시공방법을 단계적으로 도시한 블록흐름도,
도 2a 및 도 2b는 본 발명에 따른 프라이머 도포층 내지 방수시트의 시공단계를 순차적으로 도시한 단면도,
도 3은 본 발명에 따른 메탈바에 폴리에틸렌 발포테이프가 일체로 적용된 예를 도시한 사시도,
도 4는 본 발명에 따른 방수시트의 시공상태를 보여주는 사시도이다.
Figure 1 is a block flow diagram showing the water diffusion prevention construction method step of the inventor waterproof sheet,
Figure 2a and Figure 2b is a cross-sectional view sequentially showing the construction step of the primer coating layer to the waterproof sheet according to the present invention,
3 is a perspective view showing an example in which polyethylene foam tape is integrally applied to a metal bar according to the present invention;
4 is a perspective view showing a construction state of the waterproof sheet according to the present invention.

이하, 본 발명을 첨부된 도 1 내지 도 4를 참조하여 더욱 상세하게 설명하면 다음과 같다.Hereinafter, the present invention will be described in more detail with reference to FIGS. 1 to 4.

본 발명은, 프라이머 액, 폴리에틸렌 발포테이프(3), 메탈바(4), 나사못(S), 방수시트(10)의 구성요소로 시공이 이루어지고, 상기 방수시트의 이음부착은 열 용융접착기를 통해 작업이 이루어진다.The present invention, the construction is made of components of the primer solution, polyethylene foam tape (3), metal bar (4), screw (S), waterproof sheet 10, the joint of the waterproof sheet is a hot melt adhesive Work is done through.

이는 노출된 건물 옥상의 몰탈층 바닥면(1)으로부터 방수시트(10)를 이음 부착하여 방수처리하는 시공방법에 있어서,This is a construction method of waterproofing by attaching the waterproof sheet 10 from the mortar layer bottom surface 1 of the exposed roof of the building,

깨끗이 정리된 옥상의 몰탈층 바닥면(1)으로부터 액상의 프라이머를 일정 간격으로 도포하여 프라이머 도포층(2)을 형성한다. 여기서 프라이머 도포층(2)은 페인트용 붓을 이용하여 도포한다.A liquid primer is applied at regular intervals from the neatly arranged rooftop mortar layer bottom surface 1 to form a primer coating layer 2. Here, the primer coating layer 2 is applied using a paint brush.

상기와 같이 프라이머가 도포된 표면에 위한 띠 형의 양면 접착용 폴리에틸렌 발포테이프(3)를 부착한다.A band-shaped double-sided polyethylene foam tape 3 is attached to the surface to which the primer is applied as described above.

상기 폴리에틸렌 발포테이프(3)의 상부에는 한 면에 수지필름(도면에서 생략함)이 코팅되고, 일정간격으로 고정공(4a)이 형성된 메탈바(4)를 부착한다.A resin film (not shown in the figure) is coated on one surface of the polyethylene foam tape 3, and a metal bar 4 having a fixed hole 4a formed thereon is attached at a predetermined interval.

상기 메탈바(4)의 한 면에 수지 코팅된 부분은 상향으로 위치되도록 하여 향후 방수시트(10)와의 열풍 부착이 이루어질 수 있도록 한다.The resin-coated portion on one side of the metal bar 4 is positioned upward so that the hot air can be attached to the waterproof sheet 10 in the future.

상기 메탈바(4)의 부착은 몰탈층 바닥면(1)으로부터 폴리에틸렌 발포테이프(3)와 함께 일정높이를 갖도록 하는 것이며, 이로 인해 옥상의 몰탈층 바닥면(1) 면적을 구획한다.The attachment of the metal bar 4 is to have a certain height from the mortar layer bottom surface 1 together with the polyethylene foam tape 3, thereby partitioning the area of the mortar layer bottom surface 1 on the roof.

상기와 같이 구획된 메탈바(4)의 고정공(4a)으로부터는 첨부된 도 2에서와 같이 나사못(S)을 박아 메탈바(4)를 포함한 폴리에틸렌 발포테이프(3)를 바닥면에 고정시켜 준다.From the fixing hole (4a) of the partitioned metal bar (4) as described above, by screwing the screw (S) as shown in Figure 2 to fix the polyethylene foam tape 3 including the metal bar (4) to the bottom surface give.

이와 같이 일정간격으로 부착된 메탈바(4) 사이에 몰탈층 바닥면(1)으로부터 메탈바의 높이에 위치하는 두께의 부직포시트(5)를 안내시켜 메탈바 상부표면과 동일하게 평탄화시켜준다. 이와 같은 작업은 방수시트(10)를 깔기 이전까지의 바닥작업이 완료된 상태이다.As such, the nonwoven fabric sheet 5 having a thickness located at the height of the metal bar is guided from the bottom surface 1 of the mortar layer between the metal bars 4 attached to each other to be flattened in the same manner as the upper surface of the metal bar. Such work is a state in which the floor work until the waterproof sheet 10 is laid.

상기 방수시트(10)는 부직포시트(5), 메탈바(4)의 상면에 깔되, 각 이음부분을 열풍에 의한 융착으로 방수시트의 가장자리를 겹쳐 부착하도록 한다.The waterproof sheet 10 is laid on the upper surface of the non-woven fabric sheet 5, the metal bar 4, so that each joint portion is attached to overlap the edge of the waterproof sheet by fusion by hot air.

참고로 상기 방수시트(10)의 이음 부분은 도 2b에서 도시한 바와 같이 호스너를 이용하여 아래에 위치한 방수시트를 바닥면으로 고정하고, 상측에 덮이는 방수시트는 열풍 융착기로서 겹치는 방수시트의 접촉면을 상호 열풍 융착하여 부착하여 이음시켜 준다. For reference, the joint portion of the waterproof sheet 10 is fixed to the bottom of the waterproof sheet located on the bottom surface using a hosener, as shown in Figure 2b, the waterproof sheet covered on the upper side of the waterproof sheet overlapping as a hot air fusion machine The contact surface is bonded by hot air fusion.

또한, 메탈바(4)의 상면과 접하는 방수시트(10)의 표면에도 열을 가하면, 수지 코팅된 메탈바의 표면과 방수시트의 표면을 용융시키면서 이들의 부착을 견고하게 할 수 있게 되며, 이러한 작업으로서 방수시트의 시공을 완성한다.In addition, when heat is applied to the surface of the waterproof sheet 10 in contact with the upper surface of the metal bar 4, the surface of the resin-coated metal bar and the surface of the waterproof sheet can be melted and firmly attached thereto. As a work, the construction of the waterproof sheet is completed.

상기 메탈바(4)는 0.6 내지 0.8mm두께의 플레이트로서 그 한 면에 방수시트(10)의 소재와 동일한 소재인 PVC수지가 코팅처리되며, 그 폭은 50mm의 띠 형상으로 감겨 사용시 현장에서 일정길이로 절단하여 사용된다.The metal bar 4 is a plate having a thickness of 0.6 to 0.8 mm and coated on one side thereof with a PVC resin, which is the same material as that of the waterproof sheet 10, and the width of the metal bar 4 is wound in a strip shape of 50 mm. Used to cut to length.

상기 폴리에틸렌 발포테이프(3)는 메탈바(4)와 동일한 폭으로 그 두께는 2mm전후의 두께로 양면을 사용할 수 있도록 일면에는 이형지가 부착된 롤 형태의 테이프를 이용하여 시공되는 것이며, 첨부된 도 3에서와 같이 별도로 일정길이로 재단된 메탈바(4)의 일면에 폴리에틸렌 발포테이프(3)를 부착한 상태에서 간편하게 시공할 수도 있다.The polyethylene foam tape (3) is the same width as the metal bar (4) and its thickness is to be constructed using a tape in the form of a roll with a release paper attached to one side so as to use both sides around the thickness of 2mm, As in 3, it may be easily installed in a state in which the polyethylene foam tape 3 is attached to one surface of the metal bar 4 cut to a predetermined length separately.

참고로 폴리에틸렌 발포테이프(3)는 통상 자동차 타이어, 튜브, 전자제품의 방진, 방수재, 건축용의 방진, 방수재로 널리 사용되고 있는 합성고무로서 시간이 경과할 수로 부착능력이 향상되고, 균열 추종성(틈이나 홈이 있으며 파고들어가려는 성질)이 있기 때문에 각종 방수관련 보수재로 널리 사용되고 있다.For reference, polyethylene foam tape (3) is a synthetic rubber that is widely used for dustproofing, waterproofing, building construction, and waterproofing of tires, tubes, and electronics, and is widely used as time passes. It is widely used as a water-repellent repairing material because of its groove and its ability to dig into it.

따라서 상기와 같은 폴리에틸렌 발포테이프(3)의 양면접착은 몰탈층 바닥면(1)으로 접착강도를 더 향상시킬 수 있는 프라이머 도포층(2)과 메탈바(4)의 사이에 부착되어 메탈바와 함께 옥상 바닥면의 면적을 구획함과 동시에 구획된 사이사이에서 물 확산을 방지할 수 있는 것이다.Therefore, the double-sided adhesion of the polyethylene foam tape (3) as described above is attached between the primer coating layer (2) and the metal bar (4) which can further improve the adhesive strength to the bottom surface of the mortar layer (1) and together with the metal bar It is possible to partition the area of the rooftop surface and to prevent water diffusion between the partitions.

옥상으로부터 시공된 방수시트(10)는 시공 후 오랜 시간이 경과 함에 따라 외압조건에 의해 발생할 수 있는 빗물이 방수시트 내부로 침투되더라도 메탈바(4)와 메탈바(4) 사이에서만 물 확산이 이루어짐으로 향후 해당하는 물이 침투되어 확산된 영역만을 찾아 방수시트(10)를 다시 보수해 줌으로써, 기존과 같이 전반적으로 방수시트를 재시공하는 비용을 절약할 수 있게 된다.The waterproof sheet 10 constructed from the rooftop has water diffusion only between the metal bar 4 and the metal bar 4 even if rainwater, which may be generated due to external pressure conditions, penetrates into the waterproof sheet after a long time after construction. In the future, by refinancing the waterproof sheet 10 to find only the area where the corresponding water infiltrated and diffused, it is possible to save the cost of re-installing the waterproof sheet as a whole.

특히, 옥상 면적을 구획함에 있어, 옥상 바닥면은 첨부된 도 4에서 화살표방향과 같이 어느 한쪽으로 슬로프상태를 이루고 있기 때문에 물이 방수시트를 통해 유입된 구역을 쉽게 찾을 수 있게 된다.In particular, in partitioning the rooftop area, since the rooftop surface is sloped to either side as shown in the arrow direction in FIG. 4, it is easy to find a region in which water is introduced through the waterproof sheet.

한편, 부직포시트(5)의 상면에는 미접착되고, 상기 메탈바(4)의 상부 표면과 방수시트(10)의 해당부위에 열을 가한 후 부착시공된 상태는 방수시트를 지지하는 메탈바(4)의 견고한 부착력으로 풍압에 의해 방수시트의 손상을 억제하는 효과를 기대할 수 있어 풍압에 대한 방수시트의 견고성이 유지되는 특징이 있다.
On the other hand, the non-bonded to the upper surface of the non-woven fabric sheet 5, after applying heat to the upper surface of the metal bar 4 and the corresponding portion of the waterproof sheet 10 is attached to the metal bar supporting the waterproof sheet ( The strong adhesion of 4) can be expected to suppress the damage of the waterproof sheet by the wind pressure, so that the durability of the waterproof sheet against the wind pressure is maintained.

1: 몰탈층 바닥면 2: 프라이머 도포층
3: 폴리에틸렌 발포테이프 4: 메탈바
4a: 고정공 5: 부직포시트
10: 방수시트 S: 나사못
1: mortar layer bottom surface 2: primer coating layer
3: polyethylene foam tape 4: metal bar
4a: fixing hole 5: nonwoven sheet
10: waterproof sheet S: screw

Claims (2)

노출된 건물 옥상의 몰탈층 바닥면(1)으로부터 방수시트(10)를 이음 부착하여 방수처리하는 시공방법에 있어서,
깨끗이 정리된 옥상의 몰탈층 바닥면(1)으로부터 액상의 프라이머를 일정 간격으로 도포하여 프라이머 도포층(2)을 형성하는 단계(S101)와;
프라이머가 도포된 표면에 위한 띠 형의 양면 접착용 폴리에틸렌 발포테이프(3)를 부착하는 단계(S102)와;
폴리에틸렌 발포테이프(3)의 상부에는 한 면에 수지필름이 코팅되고, 일정간격으로 고정공(4a)이 형성된 메탈바(4)를 부착하여 몰탈층 바닥면으로부터 폴리에틸렌 발포테이프와 함께 일정높이를 갖도록 몰탈층 바닥면(1) 면적을 구획하는 단계(S103)와;
메탈바(4)의 고정공(4a)을 통해 나사못(S)을 박아 바닥면에 대해 메탈바(4)를 포함한 폴리에틸렌 발포테이프(3)를 고정하는 단계(S104)와;
일정간격으로 부착된 메탈바(4) 사이에 몰탈층 바닥면(1)으로부터 메탈바(4)의 높이에 위치하는 두께의 부직포시트(5)를 안내시켜 메탈바 상부표면과 동일하게 평탄화하는 단계(S105)와;
바닥용 방수시트(10)를 부직포시트(5), 메탈바(4)의 상면에 깔아 열풍 융착으로 방수시트(10)의 가장자리를 겹쳐 부착하도록 하는 한편, 메탈바(4)의 상면과 접하는 방수시트(10)의 표면을 부착시공하는 단계(S105);로 이루어진 것을 특징으로 하는 다목적 메탈바를 이용한 방수시트의 물 확산방지 시공방법.
In the construction method of the waterproofing by attaching the waterproof sheet 10 from the bottom surface (1) of the mortar layer on the exposed roof of the building,
Forming a primer coating layer (2) by applying a liquid primer at regular intervals from the cleanly arranged rooftop mortar layer bottom surface (1);
Attaching a strip-shaped double-sided adhesive polyethylene foam tape 3 to the surface to which the primer is applied (S102);
A resin film is coated on one side of the polyethylene foam tape 3, and a metal bar 4 having a fixed hole 4a is attached at a predetermined interval so as to have a predetermined height together with the polyethylene foam tape from the bottom surface of the mortar layer. Partitioning the mortar layer bottom surface (1) area (S103);
Fixing the polyethylene foam tape 3 including the metal bar 4 to the bottom surface by driving the screw S through the fixing holes 4a of the metal bar 4 (S104);
Guide the non-woven fabric sheet 5 having a thickness located at the height of the metal bar 4 from the bottom surface of the mortar layer 1 between the metal bars 4 attached at regular intervals and flattening the same as the upper surface of the metal bars. (S105);
The bottom waterproof sheet 10 is laid on the upper surface of the nonwoven fabric sheet 5 and the metal bar 4 so as to overlap the edges of the waterproof sheet 10 by hot air welding, and the watertight contact with the upper surface of the metal bar 4. Attaching the surface of the sheet 10 (S105); Water diffusion prevention construction method of the waterproof sheet using a multi-purpose metal bar, characterized in that consisting of.
제1항에 있어서,
상기 메탈바(4)는 일면에 폴리에틸렌 발포테이프(3)가 직접 부착 처리되어 프라이머 도포층(2)에 직접 부착시공하도록 한 것을 특징으로 하는 다목적 메탈바를 이용한 방수시트의 물 확산방지 시공방법.
The method of claim 1,
The metal bar (4) is a polyethylene foam tape (3) is directly attached to one surface of the primer coating layer (2) to be applied directly to the water coating preventive construction method of the waterproof sheet using a multi-purpose metal bar.
KR1020110078101A 2011-08-05 2011-08-05 Method for the prevention of the water spread of waterproof-sheet using multi-purpose metal bar KR101243764B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020110078101A KR101243764B1 (en) 2011-08-05 2011-08-05 Method for the prevention of the water spread of waterproof-sheet using multi-purpose metal bar

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020110078101A KR101243764B1 (en) 2011-08-05 2011-08-05 Method for the prevention of the water spread of waterproof-sheet using multi-purpose metal bar

Publications (2)

Publication Number Publication Date
KR20130015835A KR20130015835A (en) 2013-02-14
KR101243764B1 true KR101243764B1 (en) 2013-03-13

Family

ID=47895565

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020110078101A KR101243764B1 (en) 2011-08-05 2011-08-05 Method for the prevention of the water spread of waterproof-sheet using multi-purpose metal bar

Country Status (1)

Country Link
KR (1) KR101243764B1 (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4374687A (en) * 1979-06-01 1983-02-22 Tajima Roofing Co., Ltd. Process for making a built-up thermal insulating and bituminous waterproofing assembly
KR20050120222A (en) * 2004-06-18 2005-12-22 극동크리트 주식회사 Pvc waterproofing sheet with foaming layer and insulation-type joint structure of waterproofing sheet
KR100757331B1 (en) 2007-01-15 2007-09-11 주식회사 젠트로 Waterproof structure and constructing method of the same
KR100837672B1 (en) 2008-01-18 2008-06-13 현흥창 Waterproof constructing method

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4374687A (en) * 1979-06-01 1983-02-22 Tajima Roofing Co., Ltd. Process for making a built-up thermal insulating and bituminous waterproofing assembly
KR20050120222A (en) * 2004-06-18 2005-12-22 극동크리트 주식회사 Pvc waterproofing sheet with foaming layer and insulation-type joint structure of waterproofing sheet
KR100757331B1 (en) 2007-01-15 2007-09-11 주식회사 젠트로 Waterproof structure and constructing method of the same
KR100837672B1 (en) 2008-01-18 2008-06-13 현흥창 Waterproof constructing method

Also Published As

Publication number Publication date
KR20130015835A (en) 2013-02-14

Similar Documents

Publication Publication Date Title
US8104245B2 (en) Method for waterproofing a structural surface
US7776177B2 (en) Method for installing a roofing membrane
CA2885144C (en) Peel and stick waterproofing material
US10857759B2 (en) Peel and stick waterproofing material
US9404268B2 (en) Thermoplastic flashing laminate
KR100875893B1 (en) The waterproof construct method with waterproof-sheet
KR102239566B1 (en) Waterproofing structure
KR101035909B1 (en) Fixing and finishing method for single-ply waterproofing sheet to parepet wall
KR100875897B1 (en) The waterproof construction using waterproof with lmf nonwoven both sides of synthetic resin sheet
KR101243764B1 (en) Method for the prevention of the water spread of waterproof-sheet using multi-purpose metal bar
JP5618487B2 (en) Outside insulation waterproof structure
JP2005090161A (en) Joint portion connecting structure for waterproof sheets
KR20100030419A (en) Waterproofing material and its manufacturing method and waterproofing method using the same
KR101216662B1 (en) Construction structure of double insulation water proof and root proof and the method thereof
KR100783116B1 (en) A fixing structure of a waterproof sheet and a fixing method using the same
JP5686337B2 (en) Fireproof / waterproof exterior construction method
KR101178156B1 (en) Waterproof sheet fixing method for the floor
CA2598886C (en) Self-adhering waterproofing membrane
CA2720952A1 (en) Self-adhered termination bar
JP2010106595A (en) Joint structure and joint construction method for floor covering material
JP5652754B2 (en) Waterproof surface structure and construction method thereof
JP4113789B2 (en) Parting material for greening and its construction method
KR101053082B1 (en) Waterproof sheet attaching method
JP2001020467A (en) Frp waterproof cover structure for existing roof and method for constructing the same
KR101421002B1 (en) Construction method for waterproof of mesh structure using the wire

Legal Events

Date Code Title Description
A201 Request for examination
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20170720

Year of fee payment: 5

FPAY Annual fee payment

Payment date: 20180305

Year of fee payment: 6

FPAY Annual fee payment

Payment date: 20181224

Year of fee payment: 7

FPAY Annual fee payment

Payment date: 20200302

Year of fee payment: 8