KR101203627B1 - Composite pile connected inner connecting member and composite construction method using the same - Google Patents

Composite pile connected inner connecting member and composite construction method using the same Download PDF

Info

Publication number
KR101203627B1
KR101203627B1 KR1020110111510A KR20110111510A KR101203627B1 KR 101203627 B1 KR101203627 B1 KR 101203627B1 KR 1020110111510 A KR1020110111510 A KR 1020110111510A KR 20110111510 A KR20110111510 A KR 20110111510A KR 101203627 B1 KR101203627 B1 KR 101203627B1
Authority
KR
South Korea
Prior art keywords
pile
hollow
steel pipe
concrete
composite
Prior art date
Application number
KR1020110111510A
Other languages
Korean (ko)
Inventor
안창일
Original Assignee
안창일
(주)서현컨스텍
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 안창일, (주)서현컨스텍 filed Critical 안창일
Priority to KR1020110111510A priority Critical patent/KR101203627B1/en
Application granted granted Critical
Publication of KR101203627B1 publication Critical patent/KR101203627B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/24Prefabricated piles
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/52Piles composed of separable parts, e.g. telescopic tubes ; Piles composed of segments
    • E02D5/523Piles composed of separable parts, e.g. telescopic tubes ; Piles composed of segments composed of segments
    • E02D5/526Connection means between pile segments
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/58Prestressed concrete piles
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2200/00Geometrical or physical properties
    • E02D2200/16Shapes
    • E02D2200/1607Shapes round, e.g. circle
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2300/00Materials
    • E02D2300/0004Synthetics
    • E02D2300/0018Cement used as binder
    • E02D2300/002Concrete

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

PURPOSE: A composite pile using a hollow pipe connector and a construction method thereof are provided to effectively guide load transfer and to easily control quality of connection. CONSTITUTION: A composite pile(100) using a hollow pipe connector comprises a steel pipe pile(120), a hollow pipe connector(130), concrete(121), and a head reinforcement unit(140). The steel pipe pile is welded to the outer top surface of a hollow head protection plate formed on the top of a hollow concrete pile(110). The bottom of the hollow pipe connector is welded to the top surface of the hollow head protection plate and is extended to the top of the steel pipe pile. The inner space formed by the hollow pipe connector and the steel pipe pile is filled with the concrete, and the filled concrete connects the hollow pipe connector and the steel pipe pile to each other. The head reinforcement unit is installed on the top end of the steel pipe pile. [Reference numerals] (AA) Connection 2; (BB) Connection 3; (CC) Connection 1

Description

중공관연결구를 이용하여 연결된 중굴형 복합말뚝 및 이를 이용한 중굴형 복합말뚝 시공방법{COMPOSITE PILE CONNECTED INNER CONNECTING MEMBER AND COMPOSITE CONSTRUCTION METHOD USING THE SAME}Construction method of the hollow fiber composite pile connected using the hollow tube connector and the construction method of the hollow fiber composite pile using the same {COMPOSITE PILE CONNECTED INNER CONNECTING MEMBER AND COMPOSITE CONSTRUCTION METHOD USING THE SAME}

본 발명은 중공관연결구를 이용하여 연결된 중굴형 복합말뚝 및 이를 이용한 중굴형 복합말뚝 시공방법에 관한 것이다. 더욱 구체적으로 강관말뚝과 중공 콘크리트말뚝을 서로 연결시킴에 있어서 중공관연결구 설치로 연결부위를 확장시켜 보다 안정적으로 강관말뚝과 중공 콘크리트말뚝을 연결시킬 수 있고 효과적인 하중전달이 가능하며, 간단하게 두부보강수단 설치가 가능하고, 지반을 굴착하면서 시공할 수 있는 중공관연결구를 이용하여 연결된 중굴형 복합말뚝 및 이를 이용한 중굴형 복합말뚝 시공방법에 관한 것이다.The present invention relates to a mezzanine-type composite pile and a method for constructing a mid-curve compound pile using the hollow tube connector. More specifically, in connecting the steel pipe pile and the hollow concrete pile to each other, it is possible to connect the steel pipe pile and the hollow concrete pile more stably by expanding the connection part by installing the hollow pipe connector, and to effectively carry the load and to strengthen the head simply. Means can be installed, and relates to the construction of the middle-curve compound piles connected using the hollow pipe connector that can be constructed while excavating the ground and the method of constructing the middle-curve compound piles using the same.

종래 복합말뚝을 살펴보면 다음과 같다.Looking at the conventional composite pile as follows.

일반적으로 지반의 상부에 소정의 상재 구조물을 설치하기 위해서는 그 지반이 상재 구조물의 하중에 대한 충분한 지지력이 확보되어야 한다.In general, in order to install a predetermined floor structure on top of the ground, the ground must have sufficient bearing capacity for the load of the floor structure.

이러한 지반 조건이나 상재 구조물의 하중 조건에 대응하여 충분한 지지력이 확보되지 않는 지반을 연약지반이라 한다.Soft ground is a ground that does not have sufficient bearing capacity in response to such ground conditions or load conditions of the flooring structure.

연약지반은 상재 구조물의 안정성과 침하 문제에 대한 대책이 상재 구조물 설치 이전에 마련되어야 하며, 이러한 사전 대책 중에 가장 보편적으로 사용되고 있는 방법으로써, 향후 예측되는 상재 구조물의 하중을 지지층에 균등하고 안전하게 도달시키고자 선 시공하는 말뚝공법이 있다.The soft ground should be prepared before the installation of the structural structure, and the countermeasures for stability and settlement of the structural material should be prepared before installation of the structural material. There is a piling method for charity construction.

말뚝공법은 미리 공장에서 생산된 기성의 중공 콘크리트말뚝이나 강관말뚝을 디젤해머 또는 유압해머 등으로 타격하여 시공하거나, 지반을 천공한 후 매입 시공하는 방법을 말한다.The pile method refers to a method of constructing a hollow concrete pile or a steel pipe pile produced in a factory by hitting it with a diesel hammer or a hydraulic hammer or drilling a ground and then buying it.

말뚝공법에 사용되는 말뚝의 종류는 구조물에 가해지는 하중조건과 내진설계 여부, 기타 충격응력 등을 고려하여 선정하게 되는데, 현재 건축현장에서는 고강도 중공 콘크리트말뚝이 보편적으로 사용되고 있으며, 한국 산업규격(KS)따르면, 원심력을 응용하여 제조된 콘크리트의 압축 강도가 78.5N/㎟(800㎏f/㎠) 이상의 프리텐션 방식에 의한 고강도 중공 콘크리트말뚝(이하, “중공 콘크리트말뚝”이라 함)이라 규정하고 있다.The type of pile used in the pile construction method is selected in consideration of the load condition applied to the structure, seismic design, and other impact stress.In the current construction site, high-strength hollow concrete piles are commonly used, and Korean Industrial Standards (KS) According to the present invention, the compressive strength of concrete manufactured by applying centrifugal force is defined as a high strength hollow concrete pile (hereinafter referred to as “hollow concrete pile”) by a pretension method of 78.5 N / mm 2 (800 kgf / cm 2) or more.

한편, 도로 및 상기 교량 등 토목현장에서는 건축물에 비하여 하중조건이 복잡하고 다양하여 중공 콘크리트말뚝으로는 설계조건을 만족하지 못하는 경우가 많아 대신 강관말뚝을 많이 사용하고 있으며, 이 강관말뚝에 대해서도 그 규격이 한국 산업규격(KS)에 규정되어 있다.On the other hand, in civil engineering sites such as roads and bridges, the load conditions are more complicated and diverse than those of buildings, and hollow concrete piles often do not satisfy the design conditions, and many steel pipe piles are used instead. This is specified in Korean Industrial Standard (KS).

또한 지지 지반의 깊이에 따라 시공되는 말뚝의 길이는 선택적으로 사용할 수 있으나, 중공 콘크리트말뚝 및 강관말뚝은 공장에서 기성제품으로 제작되며, 일정길이 이상의 제품은 운반이 곤란하기 때문에 중공 콘크리트말뚝 및 강관말뚝은 15m를 최대 길이로 생산되고 있다. 그러나 각종 시공현장에서는 지반조건에 따라 15m를 초과하여 수십m의 말뚝 길이를 요하는 경우도 많다.In addition, the length of the pile can be selectively used according to the depth of the support ground, but the hollow concrete piles and steel pipe piles are made as ready-made products in the factory, and the hollow concrete piles and steel pipe piles are difficult to transport because the products over a certain length are difficult to transport. Is produced in a maximum length of 15m. However, many construction sites require pile lengths of several tens of meters exceeding 15m depending on the ground conditions.

이에 시공하는 말뚝의 길이가 일정길이를 초과하는 경우 2본 이상의 말뚝을 연결하여 시공하는 것은 필연적이다.Therefore, when the length of the pile to be installed exceeds a certain length, it is inevitable to connect two or more piles.

종래의 말뚝 이음장치를 이용하여 두 개의 말뚝을 연결하는 대표적인 방법으로서, 중공 콘크리트말뚝의 경우 말뚝의 일단에 말뚝과 일체로 설치된 철제 조인트 판(중공 두부보호판)에 형성된 용접 홈을 이용하여 상, 하 말뚝을 맞이음 용접하는 시공방법이 사용되고 있다. As a representative method of connecting two piles using a conventional pile joint device, in the case of hollow concrete piles, the upper and lower welding holes formed in the steel joint plate (hollow head protection plate) installed integrally with the pile at one end of the pile A construction method of butt welding a pile is used.

그리고, 강관말뚝의 경우 말뚝과 말뚝을 맞대어 말뚝의 단부에 형성된 용접 홈을 이용하여 상, 하 말뚝을 맞이음 용접한다.And, in the case of steel pipe pile, butt welding the upper and lower piles by using the welding groove formed in the end of the pile to face the pile and the pile.

그런데, 상재 구조물 및 지진 등에 의하여 말뚝에 가해지는 수평력과 모멘트는 지표면으로부터 약 10m 이내에서 최대가 되는 특성이 있다.By the way, the horizontal force and the moment applied to the pile due to the earthquake structure and earthquake, etc., has a maximum characteristic within about 10m from the ground surface.

이에 지지 지반까지의 깊이가 깊어서 말뚝의 길이를 길게 해야 하는 경우에 말뚝의 아래부분은 상대적으로 휨강도는 약하나 압축강도는 높은 중공 콘크리트말뚝으로도 충분한 내력을 발휘할 수 있는 반면, 지표면에 가까운 상부는 휨강도와 압축강도가 높은 강관 말뚝을 사용함으로써 충분한 내력을 발휘할 수 있도록 한다.Therefore, when the length of the pile is long because the depth to the supporting ground is long, the lower portion of the pile is relatively weak in flexural strength, but it is able to exert sufficient strength even with the hollow concrete pile with high compressive strength, while the upper portion near the ground surface is flexural strength. By using steel pipe piles with high compressive strength and sufficient strength.

상기와 같이 상부와 하부 말뚝의 종류가 다른 말뚝을 복합말뚝이라 칭한다.As described above, piles having different kinds of upper and lower piles are called composite piles.

종래에는 상기와 같이 복합말뚝을 연결하기 위해 용접 이음방법을 사용하기도 하였고, 근래에는 용접 이음 외에 무용접 이음방법이 사용되고 있다.Conventionally, a welding joint method has been used to connect a composite pile as described above, and in recent years, a welding joint method has been used in addition to a welding joint.

도 1의 종래기술에 따른 용접이음 방법에 의한 강관말뚝(2)과 중공 콘크리트말뚝(3) 사이의 연결부 구조를 보여주는 분해 사시도 및 종래 기술에 따른 강관말뚝(2)과 중공 콘크리트말뚝(3)이 연결된 상태의 연결부 단면 구조를 보여주는 개략적인 단면 사시도이다.1 is an exploded perspective view showing the connection structure between the steel pipe pile 2 and the hollow concrete pile 3 by the welding method according to the prior art of the prior art and the steel pipe pile 2 and the hollow concrete pile 3 according to the prior art It is a schematic cross-sectional perspective view showing the structure of the connection section in the connected state.

즉, 종래기술에 따른 복합 말뚝(1)은, 하부는 중공 콘크리트말뚝(3)으로 이루어지고 상부는 강관말뚝(2)으로 이루어져 있으며, 상기 강관말뚝(2)과 중공 콘크리트말뚝(3)은 다음과 같은 구조를 가진 연결부를 통하여 일체를 이루고 있다.That is, the composite pile 1 according to the prior art, the lower portion is made of a hollow concrete pile (3) and the upper portion is made of a steel pipe pile (2), the steel pipe pile (2) and hollow concrete pile (3) Through the connecting portion having a structure such as to form an integral.

먼저, 상기 중공 콘크리트말뚝(3)의 두부에는 말뚝 제조 시부터 소정 두께의 강재로 이루어진 원형의 중공 두부보호판(31)이 일체로 설치되어 있다. 상기 중공 두부보호판(31)의 아래쪽으로 상기 중공 콘크리트말뚝(3)에는 보강 밴드(32)가 더 구비될 수도 있다. 상기 중공 콘크리트말뚝(3)의 두부와 연결되는 상기 강관말뚝(2)의 하단부에는 접합보강부재(4)가 구비된다.First, the hollow hollow head protection plate 31 made of steel of a predetermined thickness is integrally installed on the head of the hollow concrete pile 3. A reinforcing band 32 may be further provided on the hollow concrete pile 3 below the hollow head protection plate 31. A joint reinforcing member 4 is provided at the lower end of the steel pipe pile 2 connected to the head of the hollow concrete pile 3.

상기 접합보강부재(4)는, 중공 콘크리트말뚝(3)의 두부 형상에 대응되는 원형의 강재로 이루진 보강판(41)과, 상기 보강판(41)에 수직하게 설치되는 하나 이상의 수직리브(42)를 포함하여 구성된다.The joint reinforcing member 4 is a reinforcing plate 41 made of a circular steel material corresponding to the head shape of the hollow concrete pile (3), and one or more vertical ribs installed perpendicular to the reinforcing plate 41 ( 42).

상기 보강판(41)과 수직리브(42)를 포함하는 상기 접합보강부재(4)는, 강관말뚝(2)의 하단부가 상기 보강판(41)에 접하여 용접되고, 상기 수직 리브(42)는 강관말뚝(2)의 내부로 삽입되어 강관말뚝(2)의 내면에 밀착되는 형태로 상기 강관말뚝(2)의 하단부에 결합된다.The joint reinforcing member 4 including the reinforcing plate 41 and the vertical ribs 42 is welded in contact with the lower end of the steel pipe pile 2 in contact with the reinforcing plate 41, and the vertical ribs 42 are welded. Inserted into the inside of the steel pipe pile (2) is coupled to the lower end of the steel pipe pile (2) in the form of being in close contact with the inner surface of the steel pipe pile (2).

또한, 상기 접합보강부재(4)는 중공 두부보호판(31)과도 일체로 결합하게 되는데, 상기 접합보강부재(4)의 하면이 중공 콘크리트말뚝(3)의 중공 두부보호판(31)에 밀착된 상태로 그 테두리가 용접됨으로써, 상기 접합보강부재(4)와 중공 두부보호판(31)이 견고하게 결합된다.In addition, the joint reinforcing member 4 is also integrally coupled with the hollow head protection plate 31, the lower surface of the joint reinforcing member 4 is in close contact with the hollow head protection plate 31 of the hollow concrete pile (3) As the edge of the log is welded, the joint reinforcing member 4 and the hollow head protection plate 31 are firmly coupled.

하지만 이러한 종래 기술의 경우는 중공 콘크리트말뚝(3)을 강관말뚝(2)에 용접하여 접착하는 작업을 거치게 되어 시공현장에 필수적으로 용접인원 및 설비가 필요하여 시공절차가 복잡해지고 시공을 위한 설비 가동시간이 증가되며 악천 후 등 주위 환경에 따라 시공자체가 힘들어 지는 등의 문제점도 있었다.However, in the case of the prior art, the hollow concrete pile 3 is welded to the steel pipe pile 2 to be bonded to each other, and thus the construction site is mandatory for the construction site. Increasing the time, there was also a problem such as the construction itself becomes difficult depending on the surrounding environment, such as bad weather.

또한, 위와 같이 상기 접합보강부재(4)의 하면이 중공 콘크리트말뚝(3)의 중공 두부보호판(31)에 밀착된 상태로 그 테두리가 용접되는데, 이러한 테두리 용접만에 의해서는 접합보강부재(4)와 중공 두부보호판(31)이 완전하게 결합되는데는 한계가 있을 수 밖에 하중전달에 효율적이지 못하다는 문제점이 있었다.In addition, the edge of the joint reinforcing member (4) is welded in the state that the edge is in close contact with the hollow head protection plate 31 of the hollow concrete pile (3), the joint reinforcing member (4) only by the edge welding ) And the hollow head protection plate 31, but there is a limit to the complete coupling there is a problem that it is not efficient in load transfer.

또한 상기 용접부의 품질관리가 매우 중요하게 되지만 실제 현장에서 이를 일일이 확인하는 것을 쉽지 않아 하자발생요인이 될 수 있다는 문제점이 있었다.In addition, the quality control of the weld is very important, but there is a problem that it may be a cause of defects because it is not easy to check this on a real site.

또한, 상기 복합말뚝 내부에는 즉 강관말뚝 내부에는 콘크리트가 충전되어 강관말뚝과 콘크리트가 서로 합성되도록 하는 것이 효과적인데 충전된 콘크리트와 강관말뚝이 서로 확실하게 일체화되도록 스터드를 설치하려해도 다수의 수직리브(42)에 의하여 강관말뚝 내측면에 스터드 설치가 용이하지 않으며, 내부에 막음판이 설치되지 않아 강관 내부에 콘크리트를 충진하기 어려운 문제점이 있었다.In addition, it is effective that the composite pile is filled inside the concrete pile, that is, inside the steel pipe pile, so that the steel pipe pile and the concrete are synthesized with each other. The stud is not easy to install on the inner side of the steel pipe pile, there is a problem that it is difficult to fill the concrete inside the steel pipe because the blocking plate is not installed inside.

또한 이러한 복합말뚝은 지반에 시공할 때, 항타 등을 통하여 지반에 설치하게 되는데 천공홀을 먼저 시공하고 복합말뚝을 삽입하는 방식으로 설치할 수 있지만, 경우에 따라서는 복합말뚝을 지반에 세팅하고 복합말뚝 내부중공을 이용하여 오거링하면서 시공할 필요가 있다. 이러한 오거링을 위해서는 복합말뚝을 구성하는 강관말뚝과 중공 콘크리트말뚝에 연통된 중공부가 형성되어야 한다. 하지만 강관말뚝 내부에 콘크리트가 충진됨에 따라 이러한 중공부 확보가 어렵다는 문제점이 있었다.In addition, when the composite pile is installed on the ground, it is installed on the ground through driving, etc. The drilling hole may be installed first, and the composite pile may be installed by inserting the composite pile, but in some cases, the composite pile is set on the ground and the composite pile It needs to be constructed while augering using internal hollow. For such augering, a hollow portion communicating with the steel pipe pile and the hollow concrete pile constituting the composite pile should be formed. However, there was a problem that it is difficult to secure such a hollow part as concrete is filled in the steel pipe pile.

이에 본 발명은 강관말뚝과 중공 콘크리트말뚝의 연결부에 있어서, 하중전달 흐름을 보다 효과적으로 유도하도록 하면서도, 강관말뚝과 중공 콘크리트말뚝의 연결성능을 충분히 확보할 수 있도록 하고, 강관말뚝 내부에 충진되는 콘크리트와의 합성능력도 충분히 확보할 수 있으며, 복합말뚝의 중공부를 통하여 지반을 굴착하면서 복합말뚝을 시공할 수 있는 복합말뚝 연결방법 및 시공방법 제공을 그 해결하고자 하는 기술적 과제로 한다.Therefore, the present invention is to connect the steel pipe pile and the hollow concrete pile, to more effectively induce the load transfer flow, to ensure a sufficient connection performance between the steel pipe pile and the hollow concrete pile, and the concrete and filled inside the steel pipe pile It is also a technical problem to solve the problem of providing a composite pile connection method and a construction method to be able to construct a composite pile while excavating the ground through the hollow portion of the composite pile.

상기 기술적과제를 달성하기 위하여 본 발명은The present invention to achieve the above technical problem

첫째, 복합말뚝의 연결부에 있어서 강관말뚝과 중공 콘크리트말뚝의 연결을 기본적으로는 용접에 의하지만 이러한 용접부위를 종래에는 연결부 테두리만에 한정되었으나 이러한 연결부 용접부위를 보다 확장될 수 있도록 함으로서 보다 확실한 복합말뚝 연결시공이 가능하도록 하였다.First, in the connection part of the composite pile, the connection between the steel pipe pile and the hollow concrete pile is basically made by welding, but such a welding part is limited to only the edge of the connection part in the related art, but it is possible to expand the welding part of the connection part more clearly. The pile connection construction was made possible.

이를 위해 본 발명은 상기 연결부에 있어 강관과 같은 중공관연결구를 이용하되, 상기 중공관연결구의 하단부가 중공 콘크리트말뚝의 상부에 형성된 중공 두부보호판의 중공 내측상면(B)에 용접되도록 하고, 강관말뚝의 하단부는 중공 콘크리트말뚝의 중공 두부보호판 외측상면(A)에 테두리 용접되도록 함으로서 강관말뚝과 중공 콘크리트말뚝의 연결성능을 충분히 확보할 수 있도록 하였다.To this end, the present invention uses a hollow pipe connector such as a steel pipe in the connection portion, the lower end of the hollow pipe connector to be welded to the hollow inner upper surface (B) of the hollow head protection plate formed on the top of the hollow concrete pile, steel pipe pile The lower end of the hollow head protection plate was to be welded to the outer edge (A) of the hollow head protection plate of the hollow concrete pile to ensure sufficient connection performance between the steel pipe pile and the hollow concrete pile.

이러한 중공관연결구는 강관의 연장길이에 해당하는 연장길이를 가지기 때문에 강관말뚝은 내부에 직경이 작은 강관인 중공관연결구가 더 설치되는 구조가 됨을 알 수 있다.Since the hollow pipe connector has an extension length corresponding to the extension length of the steel pipe can be seen that the steel pipe pile has a structure in which the hollow pipe connector is a small diameter steel pipe installed therein.

또한, 중공 콘크리트말뚝의 상면에는 중공 두부보호판에 형성된 관통홀과 연통된 체결홀이 더 형성되도록 하여 상기 관통홀과 체결홀에 체결된 연결스터드가 설치되도록 하고, 상기 연결스터드는 콘크리트에 매립되도록 하였다.In addition, a fastening hole communicating with a through hole formed in the hollow head protection plate is further formed on the upper surface of the hollow concrete pile to install a connection stud fastened to the through hole and the fastening hole, and the connection stud is embedded in concrete. .

이에 본 발명에 의한 강관말뚝과 중공 콘크리트말뚝은The steel pipe pile and hollow concrete pile according to the present invention

강관말뚝와 중공 콘크리트 말뚝의 두부보호판이 서로 연결부 테두리용접에 의한 연결(연결1)에 더하여 중공관연결구에 의한 용접연결(연결2)과 연결스터드에 의한 콘크리트와의 합성연결(연결3)이 더해져 보다 효과적인 연결성능 확보(연결부위 확장)가 가능하도록 하였다.The head protection plate of the steel pipe pile and the hollow concrete pile is connected to each other by the joint edge welding (connection 1) in addition to the joint connection (connection 2) by the hollow tube connector and the composite connection (connection 3) with the concrete by the connection stud. Effective connection performance is secured (connection area expansion).

둘째, 상기 중공관연결구에 의하여 충전되는 콘크리트는 중공관연결구와 강관말뚝 사이의 공간이므로 중공 콘크리트말뚝의 중공부에는 콘크리트 누출없이 강관말뚝 내부에 콘크리트를 용이하게 충전시킴에 있으며 강관말뚝과 콘크리트의 합성능력을 증진할 수 있는 스터드를 상기 중공관연결구 표면에 다수가 용이하게 형성되도록 하여 강관말뚝과 중공관연결구의 일체화가 충분히 이루어질 수 있도록 하였다.Second, since the concrete filled by the hollow pipe connector is a space between the hollow pipe connector and the steel pipe pile, the hollow part of the hollow concrete pile easily fills the concrete inside the steel pipe pile without leaking concrete. Studs that can enhance the ability to easily form a large number on the surface of the hollow tube connector so that the integration of the steel pipe pile and the hollow tube connector can be made sufficiently.

이로서 본 발명에 의한 복합말뚝은 중공관연결구에 형성된 스터드와 중공 콘크리트말뚝의 두부보호판에 형성된 연결스터드에 의하여 강관말뚝과 중공 콘크리트 말뚝의 일체성을 보다 효과적으로 확보할 수 있게 된다.As a result, the composite pile according to the present invention can more effectively secure the integrity of the steel pipe pile and the hollow concrete pile by the stud formed in the hollow pipe connector and the connection stud formed in the head protection plate of the hollow concrete pile.

셋째, 상기 중공관연결구와 중공 콘크리트말뚝은 서로 연통되는 중공부가 형성되어 있으므로 본 발명의 합성말뚝은 상기 중공부에 삽입 설치되는 오거링장치를 통해 지반을 오거링 하여 굴착하면서 복합말뚝을 지반에 시공할 수 있게 된다.Third, since the hollow pipe connector and the hollow concrete pile is formed in communication with each other, the composite pile of the present invention constructs the composite pile on the ground while auging the ground through an auger device installed in the hollow portion You can do it.

본 발명의 범위는 상기 상세한 설명보다는 후술하는 특허청구범위에 의하여 나타내어지며, 특허청구범위의 의미 및 범위 그리고 그 균등 개념으로부터 도출되는 모든 변경 또는 변형된 형태가 본 발명의 범위에 포함되는 것으로 해석되어야 한다.The scope of the present invention is shown by the following claims rather than the above description, and all changes or modifications derived from the meaning and scope of the claims and their equivalents should be construed as being included in the scope of the present invention. do.

본 발명에 의하여 종래 강관말뚝과 중공 콘크리트말뚝의 연결부를 설치함에 있어 종래 접합보강부재를 이용함에 따른 다수의 수직리브를 용접하는 등의 번거로움을 덜 수 있으며, 상기 연결부의 성능을 획기적으로 높일 수 있고 간단하게 두부보강수단을 설치할 수 있어 복합말뚝의 연결시공의 품질관리가 매우 용이해지게 된다.According to the present invention, in installing the connection part of the conventional steel pipe pile and the hollow concrete pile, it is possible to reduce the inconvenience of welding a plurality of vertical ribs by using the conventional joint reinforcing member, and dramatically increase the performance of the connection part. And it is easy to install the head reinforcement means, it becomes very easy to control the quality of the construction of the composite pile.

또한, 지반에 천공홀을 형성시킨 후 본 발명의 복합말뚝을 시공할 수도 있지만 본 발명에 의한 복합말뚝은 중공부가 복합말뚝 전체 연장길이에 걸쳐 내부에 형성되어 있으므로 지반을 굴착하면서 복합말뚝을 시공할 수 있다.In addition, the composite pile according to the present invention may be constructed after the drilling holes are formed in the ground, but the composite pile according to the present invention may be constructed while drilling the ground because the hollow part is formed inside the entire extension length of the composite pile. Can be.

도 1은 종래 복합말뚝의 연결부에 대한 분해 사시도 및 단면 사시도,
도 2a는 본 발명에 의한 복합말뚝의 분해사시도,
도 2b는 본 발명에 의한 복합말뚝의 결합 사시도,
도 2c는 본 발명에 이용되는 강관말뚝의 사시도 및 단면도,
도 2d는 본 발명의 강관말뚝과 중공 콘크리트말뚝의 연결부 발췌사시도,
도 3a, 도 3b 및 도 3c는 본 발명의 강관말뚝의 시공순서도,
도 4a는 본 발명에 이용되는 다른 강관말뚝의 사시도 및 단면도,
도 4b는 도 4a에 의한 강관말뚝과 중공 콘크리트말뚝의 연결부 발췌사시도이다.
1 is an exploded perspective view and a cross-sectional perspective view of a connection part of a conventional composite pile,
Figure 2a is an exploded perspective view of a composite pile according to the present invention,
Figure 2b is a combined perspective view of the composite pile according to the present invention,
Figure 2c is a perspective view and a cross-sectional view of the steel pipe pile used in the present invention,
Figure 2d is a perspective view of the connection portion of the steel pipe pile and hollow concrete pile of the present invention,
3a, 3b and 3c is a construction sequence diagram of the steel pipe pile of the present invention,
4a is a perspective view and a cross-sectional view of another steel pipe pile used in the present invention,
Figure 4b is an exploded perspective view of the connection portion of the steel pipe pile and hollow concrete pile according to Figure 4a.

아래에서는 첨부한 도면을 참조하여 본 발명이 속하는 기술분야에서 통상의 지식을 가진 자가 용이하게 실시할 수 있도록 본 발명의 실시예를 상세히 설명한다. 그러나 본 발명은 여러 가지 상이한 형태로 구현될 수 있으며 여기에서 설명하는 실시예에 한정되지 않는다. 그리고 도면에서 본 발명을 명확하게 설명하기 위해서 설명과 관계없는 부분은 생략하였으며, 명세서 전체를 통하여 유사한 부분에 대해서는 유사한 도면 부호를 붙였다.DETAILED DESCRIPTION Hereinafter, exemplary embodiments of the present invention will be described in detail with reference to the accompanying drawings so that those skilled in the art may easily implement the present invention. The present invention may, however, be embodied in many different forms and should not be construed as limited to the embodiments set forth herein. In the drawings, parts irrelevant to the description are omitted in order to clearly describe the present invention, and like reference numerals designate like parts throughout the specification.

본 발명의 복합말뚝은 실시예 1과 실시예 2로 구분할 수 있다.Composite pile of the present invention can be divided into Example 1 and Example 2.

상기 실시예 1과 실시예 2의 차이는 강관말뚝의 차이로 인하여 구분되는데 실시예 1에 의한 강관말뚝은 내부에 충전되는 콘크리트에 있어 달리 철근이 배근되지 않도록 하는 반면, 실시예 2에 의한 강관말뚝은 내부에 철근조립망(125)이 더 설치되어 강관말뚝에 충전되는 콘크리트(121)가 철근콘크리트 구조로 형성되도록 함에 차이가 있다.The difference between Example 1 and Example 2 is distinguished due to the difference in the steel pipe pile, the steel pipe pile according to Example 1 to prevent the reinforcing steel bars in the concrete filled inside, whereas the steel pipe pile according to Example 2 There is a difference in that the reinforced steel assembly network 125 is installed inside the concrete 121 to be filled in the steel pipe pile is formed in a reinforced concrete structure.

< 실시예 1에 의한 복합말뚝 ><Compound Pile according to Example 1>

[ 복합말뚝(100) ][Composite Pile (100)]

도 2a 및 도 2b는 본 발명의 복합말뚝의 분해사시도 및 결합사시도이다.2a and 2b is an exploded perspective view and a combined perspective view of the composite pile of the present invention.

본 발명의 복합말뚝(100)은 도 2a 및 도 2b와 같이 중공 콘리리트말뚝(110), 강관말뚝(120), 중공관연결구(130) 및 두부보강수단(140)을 포함하여 구성된다.Composite pile 100 of the present invention comprises a hollow concrete pile 110, steel pipe pile 120, hollow pipe connector 130 and the head reinforcing means 140 as shown in Figure 2a and 2b.

먼저, 상기 중공 콘크리트말뚝(110)은 원심력을 응용하여 제조된 프리텐션 방식에 의한 고강도 중공 콘크리트말뚝(PHC 말뚝)이다.First, the hollow concrete pile 110 is a high-strength hollow concrete pile (PHC pile) by a pretension method manufactured by applying centrifugal force.

이러한 중공 콘크리트말뚝(110)은 중공말뚝의 형태로 제작되며 두부에는 소정 두께의 강재로 이루어진 원형의 중공 두부보호판(111)이 일체로 설치되어 있으며 중공 두부보호판(111)의 아래쪽으로 보강밴드(112)가 더 구비되어 된다.The hollow concrete pile 110 is manufactured in the form of a hollow pile and the head is integrally provided with a circular hollow head protection plate 111 made of steel of a predetermined thickness and the reinforcing band 112 below the hollow head protection plate 111. ) Is further provided.

이러한 중공 콘크리트말뚝(110)은 공장에서 상기 중공 두부보호판(111)과 보강밴드(112)를 중공 콘크리트말뚝(110) 두부에 일체로 형성되도록 제작되고 통상 원형 중공말뚝 형태로서 중앙부에는 중공부(S1)가 형성되어 있다.The hollow concrete pile 110 is manufactured so that the hollow head protection plate 111 and the reinforcing band 112 is integrally formed on the head of the hollow concrete pile 110 in the factory and is usually in the form of a circular hollow pile in the center portion S1. ) Is formed.

또한 상기 중공 두부보호판(111)은 관통공(113)이 형성되어 있으며 중공 콘크리트말뚝(110) 두부 상면에 나사부가 형성된 슬리브(미도시)가 형성된 체결홀(115)이 형성되도록 하고, 상기 관통공(113)과 연통되도록 하여 연결스터드(114)가 상기 체결홀(115)에 체결되도록 하게 된다.In addition, the hollow head protection plate 111 has a through hole 113 formed therein, and a fastening hole 115 having a sleeve (not shown) having a threaded portion formed on an upper surface of the head of the hollow concrete pile 110 is formed. The connection stud 114 is connected to the fastening hole 115 by communicating with the 113.

즉, 중공 콘크리트말뚝에 형성시킨 연결스터드(114)는 도 2b와 같이 강관말뚝(120)과 후술되는 중공관연결구(130) 사이에 충전되는 콘크리트(121)에 매립되어 강관말뚝과 중공 콘크리트 말뚝의 일체성을 보다 효과적으로 확보할 수 있도록 하게 된다.That is, the connection stud 114 formed in the hollow concrete pile is embedded in the concrete 121 is filled between the steel pipe pile 120 and the hollow pipe connector 130 described later, as shown in Figure 2b of the steel pipe pile and the hollow concrete pile It will be able to secure the integrity more effectively.

상기 강관말뚝(120)은 도 2a, 2b 및 도 2c와 같이 중공 콘크리트말뚝(110)의 두부에 일체로 연결되는 것으로서 소정의 직경을 가진 강관(122)을 포함하여 제작된다.The steel pipe pile 120 is manufactured to include a steel pipe 122 having a predetermined diameter as being integrally connected to the head of the hollow concrete pile 110 as shown in Figures 2a, 2b and 2c.

이러한 강관말뚝(120)의 하단부는 상기 중공 콘크리트말뚝(110)의 중공 두부보호판(111)의 외측상면(A)을 따라 접하도록 한 상태에서 테두리 용접(연결1)에 의하여 중공 콘크리트말뚝(110)과 서로 연결된다.The lower end of the steel pipe pile 120 is in contact with the outer upper surface (A) of the hollow head protection plate 111 of the hollow concrete pile 110 by the hollow concrete pile 110 by the edge welding (connection 1). And are connected to each other.

또한 강관말뚝의 상단부에는 복합말뚝의 두부보강수단(140)이 설치된다.In addition, the head reinforcing means 140 of the composite pile is installed at the upper end of the steel pipe pile.

이러한 두부보강수단(140)은 강관말뚝(120) 상단부에 내측에 형성된 원형링 형태로서 상하로 이격된 상단 및 하단보강판(141,144)이 설치된다.The head reinforcement means 140 is installed in the upper end of the steel pipe pile 120, the upper and lower spaced up and down reinforcing plate (141,144) spaced up and down.

이러한 상단 및 하단보강판(141,144)에는 후술되는 두부보강철근(143)이 관통 설치될 수 있도록 관통공(142,145)들이 형성되어 있다.Through-holes 142 and 145 are formed in the upper and lower reinforcing plates 141 and 144 so that the head reinforcing bars 143 to be described later are installed therethrough.

또한 상기 관통공(142,145)를 관통하여 상단이 상방으로 연장되고, 하단이 하단보강판(144)의 하부로 연장되도록 설치된 두부보강철근(143)이 설치된다.In addition, the head reinforcement 143 is installed so that the upper end is extended upward through the through holes (142, 145), the lower end is extended to the lower portion of the lower reinforcing plate 144.

이러한 두부보강철근(143)에 의하여 복합말뚝(100)은 복합말뚝 상부에 형성되는 기초부와 서로 연결되어 일체성을 확보할 수 있게 된다.By the head reinforcing reinforcing bars 143, the composite pile 100 is connected to each other and the foundation formed on the composite pile to ensure the integrity.

이러한 두부보강철근(143)은 도 2a 및 도 2b와 같이 중간부가 절곡되도록 하여 관통공(142,145)에 용이하게 삽입 및 거치가 될 수 있도록 하면서 두부보강철근(143)의 외측면에 설치되는 띠철근(미도시)이 복합말뚝의 직경과 동일해지거나 더 커지도록 하여 일체성 확보에 유리하도록 하는 것이 바람직하다.The head reinforcing bar 143 is a band reinforcing bar is installed on the outer surface of the head reinforcing bar 143 while being easily inserted and mounted in the through-holes (142, 145) so that the middle portion is bent as shown in Figures 2a and 2b It is preferable that (not shown) be equal to or larger than the diameter of the composite pile so that it is advantageous to secure the integrity.

또한, 상기 강관말뚝(120)과 중공관연결구(130) 사이의 공간에는 콘크리트(121)가 도 2b와 같이 충전된다.In addition, the concrete 121 is filled in the space between the steel pipe pile 120 and the hollow pipe connector 130 as shown in Figure 2b.

즉, 중공관연결구(130)와 강관말뚝(120) 사이의 내부공간에 콘크리트가 충전되는데 이를 통해 콘크리트(121)와 강관말뚝(120)이 서로 합성되어 일체화(합성연결)될 수 하게 된다.That is, concrete is filled in the inner space between the hollow pipe connector 130 and the steel pipe pile 120 through which the concrete 121 and the steel pipe pile 120 are synthesized with each other to be integrated (synthetic connection).

이를 위하여 본 발명은 앞서 살펴본 연결스트더(114)가 콘크리트(121)와 합성되어 중공 콘크리트말뚝과 강관말뚝이 서로 효과적으로 일체화될 수 있도록 하게 된다.To this end, in the present invention, the connection stud 114 described above is synthesized with the concrete 121 so that the hollow concrete pile and the steel pipe pile can be effectively integrated with each other.

이때 상기 본 발명의 중공관연결구(130)는 도 2a, 도 2b 및 도2d와 같이 복합말뚝의 연결에 있어 At this time, the hollow pipe connector 130 of the present invention in the connection of the composite pile as shown in Figures 2a, 2b and 2d

강관말뚝(120)과 중공 콘크리트말뚝(110)의 용접부위를 확장시키는 기능과 And to expand the welded portion of the steel pipe pile 120 and hollow concrete pile 110 and

강관말뚝의 내부에 충전되는 콘크리트(121)가 중공 콘크리트말뚝의 중공부로 빠지지 않도록 하는 기능과 The concrete 121 is filled inside the steel pipe pile to prevent falling into the hollow portion of the hollow concrete pile and

강관말뚝에 전달되는 하중이 중공 콘크리트말뚝에 원할하게 유도될 수 있도록 하는 기능을 가진다.The load transmitted to the steel pipe pile has a function to smoothly guide the hollow concrete pile.

이를 위해 상기 중공관연결구(130)는 도 2a와 같이 강관을 이용하게 된다.To this end, the hollow tube connector 130 is to use a steel pipe as shown in Figure 2a.

이러한 강관인 중공관연결구(130)은 중공 콘크리트말뚝(110)의 중공부(S1) 직경과 동일한 직경의 중공부(S2)을 가지도록 형성된 것이 이용된다.Hollow pipe connector 130 is a steel pipe is used to have a hollow portion (S2) of the same diameter as the hollow portion (S1) diameter of the hollow concrete pile (110).

이는 중공관연결구(130)의 중공부와 중공 콘크리트말뚝의 중공부가 서로 연통되어 연통된 중공부(S1,S2)를 따라 도 3b와 같이 오거링장치가 복합말뚝을 전체 연장길이를 따라 삽입되면서 지반을 굴착할 수 있도록 하기 위함이다.The hollow part of the hollow pipe connector 130 and the hollow portion of the hollow concrete pile is in communication with each other along the hollow portion (S1, S2) communicated as shown in Figure 3b as the auger device is inserted into the composite pile along the entire extension length To be able to excavate.

이에 본 발명의 복합말뚝(100)은 지반을 굴착하기 위한 연통된 중공부(S1,S2)를 구비하고 있다는 점에서 중굴형 복합말뚝이라고 한다.The composite pile 100 of the present invention is called a mid-curve composite pile in that it is provided with communicating hollow parts (S1, S2) for excavating the ground.

또한 상기 중공관연결구(130)와 강관말뚝(120)의 사이에 충전된 콘크리트(121)은 중공 콘크리트말뚝(110)의 상부에 지지되도록 형성되어 강관말뚝으로부터 전달되는 하중이 중공 콘크리트말뚝으로 직접 유도시키는 역할을 하게 된다.In addition, the concrete 121 filled between the hollow pipe connector 130 and the steel pipe pile 120 is formed to be supported on the hollow concrete pile 110 to direct the load transferred from the steel pipe pile to the hollow concrete pile It will play a role.

이에 상기 중공관연결구(130)는 중공 두부보호판(111)의 중공 내측상면(B)에 용접에 의하여 연결되어 강관말뚝 내부 상방으로 연장되도록 설치됨을 알 수 있으며 강관말뚝(120)의 상부면까지 연장되도록 하고, 두부보강수단(140)과 연결 또는 하부까지 연장되도록 한다.The hollow tube connector 130 is connected to the hollow inner upper surface (B) of the hollow head protection plate 111 by welding it can be seen that it is installed to extend upwards in the steel pipe pile and extends to the upper surface of the steel pipe pile 120 And extends to the head reinforcing means 140 or the connection or lower portion thereof.

또한 상기 중공관연결구(130)의 표면에는 스터드(133)가 다수 형성되도록 하여 콘크리트(121)과의 합성이 용이하도록 하게 된다.In addition, a plurality of studs 133 are formed on the surface of the hollow tube connector 130 to facilitate synthesis with the concrete 121.

이로서, 강관말뚝(120)과 중공 콘크리트말뚝(110)은 테두리 용접에 의한 연결1과 더불어 As such, the steel pipe pile 120 and the hollow concrete pile 110 is coupled with the connection 1 by the rim welding

중공관연결구(130)에 의한 강관말뚝(120)과 중공 콘크리트말뚝(110)의 용접에 의한 연결2에 의한 연결부위 확장을 통해 보다 효율적인 말뚝 연결이 가능하도록 하게 됨을 알 수 있으며,It can be seen that more efficient pile connection is possible through the expansion of the connection part by the connection 2 by the welding of the steel pipe pile 120 and the hollow concrete pile 110 by the hollow pipe connector 130,

연결스터드(114)와 콘크리트(121)에 의하여 강관말뚝(120)과 중공 콘크리트말뚝(110)이 서로 일체화되어 합성되도록 하는 연결3에 의하여 연결부위 확장에 따른 강관말뚝와 중공 콘크리트 말뚝의 보다 효과적인 연결성능을 확보할 수 있게 됨을 알 수 있다.Steel pipe pile 120 and the hollow concrete pile 110 by the connection stud 114 and the concrete 121 is connected to each other to integrate the composite pipe 3 and the more effective connection performance of the steel pipe pile and hollow concrete pile according to the expansion of the connection portion It can be seen that can be obtained.

즉, 강관말뚝에 콘크리트(121)가 충전되면 콘크리트(121)는 중공관연결구(130)와 스터드(미도시)에 의하여 일체화되어 있고, 중공관연결구(130)는 중공 콘크리트말뚝(110)의 중공 두부보호판과 용접되어 있으므로 종래와 달리 본 발명의 강관말뚝은 콘크리트(121)과 중공관연결구(130)에 의하여 용접부위가 확장되어 중공 콘크리트말뚝(110)과의 연결성능을 보다 확실하게 확보할 수 있게 되는 것이다.That is, when the concrete 121 is filled in the steel pipe pile, the concrete 121 is integrated by the hollow tube connector 130 and the stud (not shown), the hollow tube connector 130 is hollow of the hollow concrete pile 110 The steel pipe pile of the present invention is different from the prior art because it is welded with the head protection plate, the welded portion is expanded by the concrete 121 and the hollow pipe connector 130 to secure the connection performance with the hollow concrete pile 110 more reliably. Will be.

이러한 중공관연결구(130)는 공장에서 미리 중공 콘크리트말뚝(110)의 중공 두부보호판(111)에 용접시키는 방식으로 설치하고, 강관말뚝과 중공 콘크리트말뚝의 중공 두부보호판(111)은 현장에서 용접하는 방식으로 연결시키게 된다.The hollow pipe connector 130 is installed in the factory by welding the hollow head protection plate 111 of the hollow concrete pile 110 in advance, the hollow head protection plate 111 of the steel pipe pile and the hollow concrete pile is welded in the field In the same way.

이와 같은 복합말뚝(100)은 도 2b와 같이 서로 연결되어 소정의 길이를 가진 복합말뚝(100)으로서 제작된다.Such composite pile 100 is connected to each other as shown in Figure 2b is produced as a composite pile 100 having a predetermined length.

이에 최종 본 발명의 복합말뚝(100)의 하부는 중공 콘크리트말뚝(110)으로 형성되어 있고 강관말뚝(120)은 본 발명의 중공관연결구(130)와 종래와 같은 테두리 용접에 의하여 중공 콘크리트말뚝(110)에 연결되어 있음을 알 수 있으며, 상기 강관말뚝의 상단부에는 두부보강철근(143)을 포함한 두부보강수단(140)이 형성되어 있음을 알 수 있다.Accordingly, the lower end of the composite pile 100 of the present invention is formed of a hollow concrete pile 110 and the steel pipe pile 120 is a hollow concrete pile by the hollow pipe connector 130 and the conventional edge welding of the present invention ( It can be seen that it is connected to the 110, it can be seen that the head reinforcing means 140 including the head reinforcing reinforcing bars 143 is formed on the upper end of the steel pipe pile.

[ 복합말뚝(100)을 이용한 시공방법 ][Construction method using composite pile (100)]

중공관연결구(130)를 이용하여 연결된 복합말뚝(100)를 이용한 복합말뚝 시공방법을 도 3a 내지 도 3c를 기준으로 살펴본다.The composite pile construction method using the composite pile 100 connected using the hollow tube connector 130 will be described with reference to FIGS. 3A to 3C.

먼저 도 3a와 같이 본 발명의 복합말뚝(100)은 지반에 천공홀을 형성시키면서 복합말뚝을 설치하고, 상기 천공홀과 복합말뚝 사이를 모르타르로 충전시키는 방식으로 시공할 수 있다.First, as shown in FIG. 3a, the composite pile 100 of the present invention may be installed by forming a composite pile while forming a perforated hole in the ground and filling the mortar between the perforated hole and the composite pile.

즉, 먼저, 복합말뚝(100)은 도 3a와 같이 중공 콘크리트말뚝(110)과 중공관연결구(130)를 미리 일체로 제작하게 된다.That is, first, the composite pile 100 is made in advance to the hollow concrete pile 110 and the hollow pipe connector 130 in advance as shown in Figure 3a.

이는 공장에서 미리 이루어지게 되는데 중공관연결구(130)를 중공 콘크리트말뚝의 중공 두부보호판(111)의 중공 내측상면(B)에 용접(연결2)하여 간단하게 이루어지게 된다.This is done in advance in the factory, the hollow pipe connector 130 is simply made by welding (connection 2) to the hollow inner upper surface (B) of the hollow head protection plate 111 of the hollow concrete pile.

다음으로는 도 3b와 같이 상기 중공관연결구(130)와 일체화된 중공 콘크리트말뚝(110)을 현장에 반입하여 강관말뚝(120)을 상기 중공 콘크리트말뚝의 중공 두부보호판의 외측상면(A)에 용접에 의하여 일체화(연결1)시키게 된다.Next, as shown in FIG. 3B, the hollow concrete pile 110 integrated with the hollow pipe connector 130 is brought into the field to weld the steel pipe pile 120 to the outer upper surface A of the hollow head protection plate of the hollow concrete pile. By the integration (connection 1).

즉, 도 2a 및 도 2d와 같이 강관말뚝의 하단부를 중공 콘크리트말뚝의 중공 두부보호판의 외측상면(A)에 용접(테두리용접)시켜 강관말뚝을 중공 콘크리트말뚝에 연결시키게 된다.That is, as shown in Figures 2a and 2d by welding (border welding) the lower end of the steel pipe pile to the outer upper surface (A) of the hollow head protection plate of the hollow concrete pile to connect the steel pipe pile to the hollow concrete pile.

이에 도 3b와 같이 상기 복합말뚝(100)을 지중에 세팅하고, 복합말뚝의 중공부(S1,S2)에 미도시된 오거링장치(400)를 통해 지반을 굴착하면서 소정의 깊이까지 지반을 천공하면서 본 발명의 복합말뚝(100)을 지중에 삽입시키게 된다.Accordingly, as shown in FIG. 3B, the composite pile 100 is set in the ground, and the ground is drilled to a predetermined depth while digging the ground through the augering device 400 not shown in the hollow parts S1 and S2 of the composite pile. While inserting the composite pile 100 of the present invention in the ground.

복합말뚝의 연장길이는 다양하게 변할 수 있는데 바람직하게는 지표면으로부터 모멘트가 크게 작용하는 구간은 강관말뚝이 배치되도록 함이 바람직하며, 이를 위해 중공 콘크리트말뚝을 서로 연결시킨 상태에서 복합말뚝의 상부에 강관말뚝이 배치되도록 함이 바람직하다.The extension length of the composite pile can be changed in various ways. Preferably, the section in which the moment acts largely from the ground surface is preferably arranged so that the steel pipe piles are arranged. It is preferred to be arranged.

다음으로는 상기 지중에 시공된 복합말뚝의 강관말뚝 내부에 콘크리트(121)를 충진시켜 콘크리트(121)에 의하여 강관말뚝(120)과 중공 콘크리트말뚝(110)이 서로 일체화(연결3)되도록 하게 된다.Next, the steel pipe pile 120 and the hollow concrete pile 110 are integrated with each other by filling the concrete 121 inside the steel pipe pile of the composite pile constructed in the ground. .

이러한 콘크리트(121)는 중공관연결구(130)에 의하여 중공 콘크리트말뚝의 중공부(S1)로 누출되지 않게 된다.The concrete 121 is not leaked to the hollow portion (S1) of the hollow concrete pile by the hollow pipe connector (130).

다음으로는 상기 복합말뚝(100)의 상부에 본 발명의 두보보강수단(140)을 설치하게 된다.Next, the two reinforcing means 140 of the present invention is installed on the composite pile 100.

이에 복합말뚝(100)의 시공이 완료되면 상부에 기초콘크리트를 타설하여 두부보강수단이 매립되도록 함으로서 기초부(200)와 복합말뚝(100)의 일체화가 이루어지도록 하게 된다.When the construction of the composite pile 100 is completed, the foundation concrete is placed on the upper portion so that the head reinforcing means is embedded so that the foundation 200 and the composite pile 100 are integrated.

이로서 기초부부터 전달되는 하중은 복합말뚝의 강관말뚝(120)으로 전달되는데 중공관연결구(130)에 의하여 하중은 중공 콘크리트말뚝의 상부로 직접 유도되어 최종 복합말뚝을 통해 지반으로 효과적으로 전달됨을 알 수 있다.As a result, the load transmitted from the foundation portion is transferred to the steel pipe pile 120 of the composite pile, and the load is directly induced by the hollow pipe connector 130 to the upper portion of the hollow concrete pile, and effectively transferred to the ground through the final composite pile. have.

< 실시예 2에 의한 복합말뚝 ><Compound Pile according to Example 2>

실시예 2에 의한 복합말뚝은 이용되는 강관말뚝(120) 내부에 연결판에 설치된 전단연결재(123) 및 철근조립망(125)이 더 설치되어 콘크리트(121)와 강관말뚝의 합성성능을 보다 확실하게 확보하는 한편, 강관말뚝(120)의 강성을 상기 철근조립망에 의하여 효과적으로 증진시키기 위한 것이다.In the composite pile according to the second embodiment, the shear connecting member 123 and the reinforcing bar assembly 125 installed on the connecting plate are further installed inside the steel pipe pile 120 to be used to more reliably synthesize the concrete 121 and the steel pipe pile. While ensuring securely, it is to effectively increase the rigidity of the steel pipe pile 120 by the reinforcing bar assembling network.

그 이외에 앞서 살펴본 강관말뚝(120)과 중공 콘크리트말뚝(110)의 연결 1,2,3에 의한 연결시공, 시공방법은 실시예 1과 동일하다.In addition, the connection construction, construction method by the connection 1,2,3 of the steel pipe pile 120 and the hollow concrete pile 110 described above is the same as in Example 1.

이에 도 4a를 기준으로 실시예 2에 사용되는 강관말뚝(120)과 도 4b에 의한 강관말뚝과 중공 콘크리트말뚝과의 연결구성을 살펴보면 다음과 같다.Thus, the connection configuration between the steel pipe pile 120 used in Example 2 and the steel pipe pile and the hollow concrete pile according to FIG. 4B will be described below with reference to FIG. 4A.

먼저, 상기 강관말뚝(120)에 설치되는 전단연결재와 철근조립망을 살펴보면 다음과 같다.First, looking at the shear connector and the reinforcing bar assembly network is installed on the steel pipe pile 120 as follows.

즉, 도 4a와 같이 강관말뚝(120)을 구성하는 강관(122) 내측면에 트러스근 형태의 전단연결재(123)가 미리 형성된 연결판(124)을 설치하고, 상기 연결판의 전단연결재에 접하면서 슬라이딩 되어 강관(122) 내부에 삽입 설치되는 철근조립망(125)이 설치되도록 하여 상기 전단연결재(123)가 미리 형성된 연결판(124)과 철근조립망(125)이 설치된 상태에서 콘크리트(121)가 타설되도록 하게 된다.That is, as shown in FIG. 4a, a connecting plate 124 having a truss-shaped shear connecting member 123 is pre-installed on the inner surface of the steel pipe 122 constituting the steel pipe pile 120, and contacting the shear connecting member of the connecting plate. While the steel plate 122 is inserted into the reinforced steel assembly network 125 is installed so that the shear connecting member 123 is formed in the state in which the connecting plate 124 and the prefabricated reinforcing network 125 is installed in the concrete (121) ) Will be poured.

이때 상기 트러스근 형태의 전단연결재(123)는 At this time, the truss muscle shear connector 123 is

연결판(124) 일측면에 서로 이격되어 강관(122)의 길이방향으로 연장되도록 배치된 하부트러스근(123a);A lower truss root 123a spaced apart from each other on one side of the connecting plate 124 and extending in the longitudinal direction of the steel pipe 122;

상기 하부트러스근(123a) 사이 중앙 상부에 형성되며 강관(122)의 길이방향으로 연장되도록 배치된 상부트러스근(123b); 및 An upper truss root (123b) formed at a central upper portion between the lower truss roots (123a) and disposed to extend in a longitudinal direction of the steel pipe (122); And

상기 상부트러스근(123b)을 꼭지점으로 하여 각각의 하부트러스근(123a)과 상부트러스근(123b) 사이에 강관(122)의 길이방향으로 파형 형태로 연장되어 상부트러스근과 2개의 하부트러스근을 서로 구속하는 파형철근을 포함하는 파형트러스근(123c);을 포함하여 With the upper truss root 123b as a vertex, the lower truss root 123a and the upper truss root 123b extend in a corrugated shape in the longitudinal direction of the steel pipe 122 to form the upper truss root and two lower truss roots. Including; truss bars 123c including corrugated bars that constrain each other;

상기 2개의 하부트러스근(123a)와 상부트러스근(123b)에 의한 전단연결재의 형상이 전체적으로 삼각 트러스 형태로 형성되도록 하는 것을 이용하게 된다.The shape of the shear connecting member formed by the two lower truss roots 123a and the upper truss roots 123b is used to form a triangular truss as a whole.

이로서 강관말뚝(120)은 콘크리트(121)에 상기 연결판(124), 트러스근 형태의 전단연결재(123), 철근조립망(125)이 매립되면서 강관말뚝의 강성을 증진시키는 역할을 하게 됨을 알 수 있다.As a result, the steel pipe pile 120 serves to enhance the rigidity of the steel pipe pile as the connection plate 124, the truss-shaped shear connector 123, and the reinforcing bar assembly 125 are embedded in the concrete 121. Can be.

또한 도 4b에 의하면 실시예 2에 의한 강관말뚝과 중공 콘크리트말뚝의 연결 발췌사시도를 확인할 수 있는데,In addition, according to Figure 4b can be confirmed the excerpt perspective view of the connection between the steel pipe pile and the hollow concrete pile according to Example 2,

상기 연결판(124), 트러스근 형태의 전단연결재(123), 철근조립망(125)이 콘크리트(121)에 의하여 매립되면서 연결부위 보강효과를 효과적으로 증진시킬 수 있게 됨을 알 수 있다.It can be seen that the connecting plate 124, the truss-type shear connecting member 123, the reinforcing bar assembly 125 is effectively embedded by the concrete 121 can effectively enhance the connection site reinforcement effect.

또한, 상기 연결스터드(114)는 상방으로 더 연장되도록 하여 콘크리트와의 일체화를 보다 확실하게 발휘할 수 있도록 할 수 도 있다.In addition, the connection stud 114 may be further extended upwards to more reliably exhibit the integration with the concrete.

100: 본 발명의 복합말뚝
110: 중공 콘크리트말뚝 111: 중공 두부보호판
112: 보강밴드 113: 관통공
114: 연결스터드 115: 체결홀
120: 강관말뚝
121: 콘크리트 122: 강관
123: 전단연결재
123a:하부트러스근 123b:상부트러스근
123c:파형트러스근
124: 연결판
130: 중공관연결구
133: 스터드
140: 두부보강수단
141: 상단보강판 142,145: 관통공
143: 두부보강철근
200: 기초부
100: composite pile of the present invention
110: hollow concrete pile 111: hollow head protection plate
112: reinforcing band 113: through hole
114: connection stud 115: fastening hole
120: steel pipe pile
121: concrete 122: steel pipe
123: shear connector
123a: lower truss muscle 123b: upper truss muscle
123c: waveform truss muscle
124: connecting plate
130: hollow tube connector
133: stud
140: tofu reinforcement means
141: upper reinforcing plate 142,145: through hole
143: tofu reinforcement
200: foundation

Claims (8)

중공 콘크리트말뚝(110)의 상부에 형성된 중공 두부보호판(111)의 외측상면(A)에 용접에 의하여 연결된 강관말뚝(120); 상기 중공 두부보호판(111)의 중공외측상면(B)에 용접에 의하여 하부가 연결되며 강관말뚝 내부 상방으로 돌출되어 강관말뚝(120) 상부까지 연장되도록 설치된 중공관연결구(130); 및 상기 중공관연결구(130)와 강관말뚝(120)에 의하여 형성된 강관말뚝 내부 공간에 충전되어 중공관연결구(130)와 강관말뚝(120)을 연결시키는 콘크리트(121);를 포함하여, 상기 중공 콘크리트말뚝과 중공관연결구의 중공부(S1,S2)가 서로 연통되며,
상기 강관말뚝(120)의 상단부에는 복합말뚝의 두부보강수단(140)이 설치될 수 있도록 하되, 상기 두부보강수단(140)은 강관말뚝(120) 상단부에 내측에 형성된 원형링 형태로서 상하로 이격된 상단 및 하단보강판(141,144); 상기 상단 및 하단보강판(141,144)에 각각 형성된 관통공(142,145); 및 상기 관통공(142,145)를 관통하여 상단이 상방으로 연장되고, 하단이 하단보강판(144)의 하부로 연장되도록 설치된 두부보강철근(143):을 포함하는 것을 특징으로 하는 중공관연결구를 이용하여 연결된 복합말뚝.
Steel pipe pile 120 connected by welding to the outer upper surface (A) of the hollow head protection plate 111 formed on the hollow concrete pile 110; A hollow pipe connector 130 installed at a lower portion of the hollow head protection plate 111 by a hollow outer upper surface B and protruding upward from the inside of the steel pipe pile to extend up to an upper portion of the steel pipe pile 120; And concrete 121 filling the inner space of the steel pipe pile formed by the hollow pipe connector 130 and the steel pipe pile 120 to connect the hollow pipe connector 130 and the steel pipe pile 120. The hollow part (S1, S2) of the concrete pile and the hollow pipe connector communicate with each other,
The head reinforcing means 140 of the composite pile to be installed on the upper end of the steel pipe pile 120, the head reinforcing means 140 is spaced up and down in the form of a circular ring formed inside the upper end of the steel pipe pile (120) Upper and lower reinforcement plates 141 and 144; Through-holes 142 and 145 formed in the upper and lower reinforcing plates 141 and 144, respectively; And a head reinforcing reinforcing bar 143 installed to penetrate the through-holes 142 and 145 so that an upper end is extended upward and a lower end is extended to a lower part of the lower reinforcing plate 144. Connected to the pile.
제 1항에 있어서, 상기 중공 두부보호판(111)은
중공 콘크리트말뚝(110)의 상면에는 중공 두부보호판(111)에 형성된 관통공(113)과 연통된 체결홀(115)이 더 형성되도록 하여 상기 관통공(113)과 체결홀(115)에 체결된 연결스터드(114)가 설치되도록 하고, 상기 연결스터드(114)는 콘크리트(121)에 매립되도록 하는 것을 특징으로 하는 중공관연결구를 이용하여 연결된 복합말뚝.
The method of claim 1, wherein the hollow head protection plate 111 is
The fastening hole 115 communicated with the through hole 113 formed in the hollow head protection plate 111 is further formed on the upper surface of the hollow concrete pile 110 to be fastened to the through hole 113 and the fastening hole 115. Connection stud 114 is to be installed, the connection stud 114 is connected to the composite pile using a hollow pipe connector, characterized in that to be embedded in the concrete (121).
제 1항에 있어서, 상기 중공관연결구(130)는 강관으로서 표면에 형성된 스터드(133);를 포함하는 것을 특징으로 하는 중공관연결구를 이용하여 연결된 복합말뚝.The composite pile of claim 1, wherein the hollow tube connector (130) comprises a stud (133) formed on the surface as a steel pipe. 삭제delete 중공 콘크리트말뚝(110)의 상부에 형성된 중공 두부보호판(111)의 중공외측상면(B)에 용접에 의하여 연결되며 강관말뚝 내부 상방으로 돌출되어 강관말뚝(120) 상부까지 연장되도록 설치된 중공관연결구(130)가 구비된 중공 콘크리트말뚝(110)을 준비하고, 상기 중공관연결구(130)가 설치된 중공 콘크리트말뚝(110)을 현장에 반입한 후 상기 중공 두부보호판(111)의 외측상면(B)에 테두리용접에 의하여 강관말뚝(120)을 용접하여 복합말뚝(100)을 준비하여 상기 중공 콘크리트말뚝과 중공관연결구의 중공부(S1,S2)가 서로 연통되도록 하고, 지반에 상기 복합말뚝(100)을 설치하고, 상기 강관말뚝(120) 내부에 콘크리트(121)를 충전하는 단계를 포함하며,
상기 강관말뚝(120)의 상단부에는 복합말뚝의 두부보강수단(140)이 설치될 수 있도록 하되, 상기 두부보강수단(140)은 강관말뚝(120) 상단부에 내측에 형성된 원형링 형태로서 상하로 이격된 상단 및 하단보강판(141,144); 상기 상단 및 하단보강판(141,144)에 각각 형성된 관통공(142,145); 및 상기 관통공(142,145)를 관통하여 상단이 상방으로 연장되고, 하단이 하단보강판(144)의 하부로 연장되도록 설치된 두부보강철근(143):을 포함하도록 하여 상기 두부보강수단이 기초부에 매립되도록 하는 것을 특징으로 하는 중공관연결구를 이용하여 연결된 복합말뚝을 이용한 복합말뚝 시공방법.
The hollow pipe connector is connected to the hollow outer upper surface (B) of the hollow head protection plate 111 formed in the upper portion of the hollow concrete pile 110 and protrudes upwards inside the steel pipe pile to extend up to the upper portion of the steel pipe pile 120 ( 130 is provided with a hollow concrete pile 110, and the hollow concrete pile 110 is installed on the site after the hollow pipe connector 130 is installed on the outer upper surface (B) of the hollow head protection plate 111 By welding the steel pipe pile 120 by the rim welding to prepare a composite pile 100 so that the hollow concrete pile and the hollow portion (S1, S2) of the hollow pipe connector communicate with each other, the composite pile 100 on the ground To install, and the step of filling the concrete 121 in the steel pipe pile 120,
The head reinforcing means 140 of the composite pile to be installed on the upper end of the steel pipe pile 120, the head reinforcing means 140 is spaced up and down in the form of a circular ring formed inside the upper end of the steel pipe pile (120) Upper and lower reinforcement plates 141 and 144; Through-holes 142 and 145 formed in the upper and lower reinforcing plates 141 and 144, respectively; And a head reinforcing bar 143 installed to penetrate the through holes 142 and 145 so that an upper end thereof extends upward and a lower end extends to a lower part of the lower reinforcing plate 144. Composite pile construction method using a composite pile connected by using a hollow pipe connector, characterized in that to be embedded.
삭제delete 제 5항에 있어서,상기 중공 두부보호판(111)은
중공 콘크리트말뚝(110)의 상면에는 중공 두부보호판(111)에 형성된 관통공(113)과 연통된 체결홀(115)이 더 형성되도록 하여 상기 관통공(113)과 체결홀(115)에 체결된 연결스터드(114)가 설치되도록 하고, 상기 연결스터드(114)는 충전된 콘크리트(121)에 매립되도록 하는 것을 특징으로 하는 중공관연결구를 이용하여 연결된 복합말뚝을 이용한 복합말뚝 시공방법.
According to claim 5, The hollow head protection plate 111 is
The fastening hole 115 communicated with the through hole 113 formed in the hollow head protection plate 111 is further formed on the upper surface of the hollow concrete pile 110 to be fastened to the through hole 113 and the fastening hole 115. The connection stud 114 is installed, the connection stud 114 is a composite pile construction method using a composite pile connected using a hollow pipe connector, characterized in that to be embedded in the filled concrete 121.
삭제delete
KR1020110111510A 2011-10-28 2011-10-28 Composite pile connected inner connecting member and composite construction method using the same KR101203627B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020110111510A KR101203627B1 (en) 2011-10-28 2011-10-28 Composite pile connected inner connecting member and composite construction method using the same

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020110111510A KR101203627B1 (en) 2011-10-28 2011-10-28 Composite pile connected inner connecting member and composite construction method using the same

Publications (1)

Publication Number Publication Date
KR101203627B1 true KR101203627B1 (en) 2012-11-21

Family

ID=47565119

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020110111510A KR101203627B1 (en) 2011-10-28 2011-10-28 Composite pile connected inner connecting member and composite construction method using the same

Country Status (1)

Country Link
KR (1) KR101203627B1 (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101394235B1 (en) 2013-05-23 2014-05-14 (주)대우건설 Method for constructing complex pile for great soft ground
KR101465480B1 (en) * 2013-06-07 2014-11-26 (주)에스앤씨산업 Prestressed Steel and Concrete Composite pile construction methods
KR101665361B1 (en) * 2016-02-23 2016-10-12 이상현 Composite PHC Pile and Manufacturing Method thererof
KR101847904B1 (en) * 2016-03-10 2018-04-11 (주)에스앤제이케이 Prestressed concrete-steel composite pile, form of prestressed concrete-steel composite pile and construction method using same
CN108130905A (en) * 2018-02-23 2018-06-08 中铁十局集团有限公司 Steel-pipe pile
CN108221973A (en) * 2017-09-22 2018-06-29 上海市政工程设计研究总院(集团)有限公司 A kind of PHC pile piles make the connector of support system lattice column
KR20200118681A (en) * 2019-04-08 2020-10-16 주식회사 포스코 Pier structure and construction method thereof

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200382590Y1 (en) * 2004-12-02 2005-05-04 김사현 Device for concrete pile accouplement
KR100938394B1 (en) * 2009-04-17 2010-01-22 (주)서현컨스텍 Phc pile with imbeded steel pipe
KR101071958B1 (en) * 2008-10-20 2011-10-12 이동희 underground excuvation pile construction method using percussion rotary drill

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200382590Y1 (en) * 2004-12-02 2005-05-04 김사현 Device for concrete pile accouplement
KR101071958B1 (en) * 2008-10-20 2011-10-12 이동희 underground excuvation pile construction method using percussion rotary drill
KR100938394B1 (en) * 2009-04-17 2010-01-22 (주)서현컨스텍 Phc pile with imbeded steel pipe

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101394235B1 (en) 2013-05-23 2014-05-14 (주)대우건설 Method for constructing complex pile for great soft ground
KR101465480B1 (en) * 2013-06-07 2014-11-26 (주)에스앤씨산업 Prestressed Steel and Concrete Composite pile construction methods
KR101665361B1 (en) * 2016-02-23 2016-10-12 이상현 Composite PHC Pile and Manufacturing Method thererof
KR101847904B1 (en) * 2016-03-10 2018-04-11 (주)에스앤제이케이 Prestressed concrete-steel composite pile, form of prestressed concrete-steel composite pile and construction method using same
CN108221973A (en) * 2017-09-22 2018-06-29 上海市政工程设计研究总院(集团)有限公司 A kind of PHC pile piles make the connector of support system lattice column
CN108221973B (en) * 2017-09-22 2024-01-26 上海市政工程设计研究总院(集团)有限公司 Connector with PHC pipe pile as supporting system lattice column
CN108130905A (en) * 2018-02-23 2018-06-08 中铁十局集团有限公司 Steel-pipe pile
KR20200118681A (en) * 2019-04-08 2020-10-16 주식회사 포스코 Pier structure and construction method thereof
KR102218271B1 (en) * 2019-04-08 2021-02-22 주식회사 포스코 Pier structure and construction method thereof

Similar Documents

Publication Publication Date Title
KR101203627B1 (en) Composite pile connected inner connecting member and composite construction method using the same
KR101058520B1 (en) Earth retaining wall using phc pile and construction method of the same
JP4812324B2 (en) Retaining wall and its construction method
JP2011157812A (en) Retaining wall and construction method therefor
KR101466068B1 (en) Complex pile with improved end bearing capacity and piling method of complex pile using the same
KR101148815B1 (en) Composite pile connected inner connecting member and composite construction method using the same
JP5092705B2 (en) Support structure of structure, construction method of underground structure, replacement method of foundation load
JP2007146399A (en) Soil cement pile and construction method of the soil cement pile
JP5077865B2 (en) Ready-made pile and foundation pile structure
KR101775844B1 (en) Precast reinforced concrete pile and Retaining Wall Methods Using wall construction work
KR20120102480A (en) Phc pile with improved end bearing capacity and piling method of phc pile using the same
KR20110016846A (en) The iron frame which has the senior means which is strong being empty
JP2013040447A (en) Combined footing pile and structuring method for combined footing pile
JP2006316495A (en) Foundation structure of bridge pier and its construction method
KR101727206B1 (en) The smart front end cap for adjusting phc file length and the method using thereof
JP5456627B2 (en) Connection structure and method of connection between pile and steel column
JP5008683B2 (en) Pile head reinforcement member and pile head reinforcement structure using it
KR101124203B1 (en) Pile structure
KR100984040B1 (en) Method of reinforced earth retaining wall for cutting face through double reinforcing execution
JP3641783B2 (en) Rigidity suppression steel pipe pile head rigid binding material
JP5169638B2 (en) Construction method of underground structure
JP3963326B2 (en) Seismic reinforcement structure for bridge pier and its construction method
KR101452185B1 (en) Concrete Composite Steel Pile and Its Manufacturing Apparatus and Method
JP2004027727A (en) Foundation pile and construction method for foundation pile
JP3138317U (en) Building

Legal Events

Date Code Title Description
A201 Request for examination
A302 Request for accelerated examination
E902 Notification of reason for refusal
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20151109

Year of fee payment: 4

FPAY Annual fee payment

Payment date: 20161110

Year of fee payment: 5

FPAY Annual fee payment

Payment date: 20181031

Year of fee payment: 7

FPAY Annual fee payment

Payment date: 20191031

Year of fee payment: 8