KR101195880B1 - A refrigerator and the powder ice manufacture method - Google Patents

A refrigerator and the powder ice manufacture method Download PDF

Info

Publication number
KR101195880B1
KR101195880B1 KR1020050083474A KR20050083474A KR101195880B1 KR 101195880 B1 KR101195880 B1 KR 101195880B1 KR 1020050083474 A KR1020050083474 A KR 1020050083474A KR 20050083474 A KR20050083474 A KR 20050083474A KR 101195880 B1 KR101195880 B1 KR 101195880B1
Authority
KR
South Korea
Prior art keywords
ice
unit
powder
supply unit
manufacturing
Prior art date
Application number
KR1020050083474A
Other languages
Korean (ko)
Other versions
KR20060051088A (en
Inventor
안재국
Original Assignee
삼성전자주식회사
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 삼성전자주식회사 filed Critical 삼성전자주식회사
Priority to US11/235,292 priority Critical patent/US7340905B2/en
Publication of KR20060051088A publication Critical patent/KR20060051088A/en
Application granted granted Critical
Publication of KR101195880B1 publication Critical patent/KR101195880B1/en

Links

Images

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25CPRODUCING, WORKING OR HANDLING ICE
    • F25C5/00Working or handling ice
    • F25C5/02Apparatus for disintegrating, removing or harvesting ice
    • F25C5/04Apparatus for disintegrating, removing or harvesting ice without the use of saws
    • F25C5/046Ice-crusher machines
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25CPRODUCING, WORKING OR HANDLING ICE
    • F25C2400/00Auxiliary features or devices for producing, working or handling ice
    • F25C2400/04Ice guide, e.g. for guiding ice blocks to storage tank
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25CPRODUCING, WORKING OR HANDLING ICE
    • F25C2400/00Auxiliary features or devices for producing, working or handling ice
    • F25C2400/08Auxiliary features or devices for producing, working or handling ice for different type of ice
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25CPRODUCING, WORKING OR HANDLING ICE
    • F25C2400/00Auxiliary features or devices for producing, working or handling ice
    • F25C2400/10Refrigerator units

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Mechanical Engineering (AREA)
  • Thermal Sciences (AREA)
  • General Engineering & Computer Science (AREA)
  • Production, Working, Storing, Or Distribution Of Ice (AREA)
  • Devices That Are Associated With Refrigeration Equipment (AREA)

Abstract

본 발명은 냉장고 및 가루얼음 제조방법에 관한 것으로, 본 발명의 목적은 빙삭실로 얼음이 공급되는 시간을 제어하여 얼음량 과다로 인한 얼음 이탈 및 부품 파손 현상을 개선할 수 있는 냉장고 및 가루얼음 제조방법을 제공함에 있다.The present invention relates to a refrigerator and a method for manufacturing powdered ice, and an object of the present invention is to control a time for supplying ice to an ice cube room to improve ice breakout and component breakage due to excessive amount of ice. In providing.

또한 가루얼음 제조 후 빙삭기 내부에 남아있는 얼음의 양을 최소화하여 잔빙이 엉겨 붙거나 잔빙이 녹아 낙수가 발생하는 것을 방지할 수 있는 냉장고 및 가루얼음 제조방법을 제공함에 있다.In addition, to minimize the amount of ice remaining inside the ice machine after the manufacture of ice powder to provide a refrigerator and powder ice manufacturing method that can prevent the falling ice clings or melted ice after the falling ice.

이를 위해 본 발명은 냉동실에 마련된 얼음저장유닛내에 저장된 얼음을 얼음공급유닛을 통해 상기 얼음저장유닛의 배출구측에 마련된 가루얼음 제조유닛에 공급하여 가루얼음을 제조하는 냉장고의 가루얼음 제조방법에 있어서, 가루얼음 제조유닛의 구동시간을 얼음공급유닛의 구동시간보다 길게 설정하는 것을 특징으로 한다.To this end, the present invention provides a powder ice manufacturing method of a refrigerator for manufacturing powdered ice by supplying ice stored in an ice storage unit provided in a freezer compartment to a powdered ice manufacturing unit provided at an outlet side of the ice storage unit through an ice supplying unit. Characterized in that the drive time of the powder ice production unit is set longer than the drive time of the ice supply unit.

Description

냉장고 및 가루얼음 제조방법{A refrigerator and the powder ice manufacture method}A refrigerator and the powder ice manufacture method

도 1은 종래의 가루얼음 제조방법을 도시한 흐름도이다.1 is a flowchart illustrating a conventional powder ice manufacturing method.

도 2는 종래의 가루얼음제조모터와 얼음공급모터의 구동시간을 도시한 그래프이다2 is a graph showing the driving time of the conventional powder ice manufacturing motor and the ice supply motor.

도 3은 본 발명의 일실시예에 따른 냉장고의 대략적인 내부구조를 도시한 단면도이다.3 is a cross-sectional view illustrating an internal structure of a refrigerator according to an embodiment of the present invention.

도 4는 도 3에 도시한 냉장고의 구성요소를 도시한 블럭도이다.4 is a block diagram illustrating components of the refrigerator illustrated in FIG. 3.

도 5는 본 발명의 일실시예에 따른 가루얼음제조모터와 얼음공급모터의 구동시간을 도시한 그래프이다. 5 is a graph showing the driving time of the powder ice production motor and the ice supply motor according to an embodiment of the present invention.

도 6은 도 4에 도시한 냉장고의 가루얼음 제조방법을 도시한 흐름도이다.6 is a flowchart illustrating a powder ice manufacturing method of the refrigerator illustrated in FIG. 4.

* 도면의 주요 부분에 대한 부호의 설명 *Explanation of symbols on the main parts of the drawings

20 : 얼음 저장용기20: Ice storage container

30 : 가루얼음 제조유닛30: powder ice manufacturing unit

32 : 가루얼음 제조모터32: powder ice manufacturing motor

50 : 얼음공급유닛50: ice supply unit

51 : 얼음공급모터51: ice supply motor

60 : 제어유닛60 control unit

본 발명은 냉장고 및 가루얼음 제조방법에 관한 것으로, 더욱 상세하게는 얼음공급량을 조절하여 가루얼음제조에 필요한 최적의 양으로 얼음을 공급하는 냉장고 및 가루얼음 제조방법에 관한 것이다.The present invention relates to a refrigerator and a method for producing powdered ice, and more particularly, to a refrigerator and a method for producing powdered ice, by supplying ice in an optimum amount necessary for preparing the powdered ice by adjusting the amount of ice supply.

일반적으로, 냉장고는 온도차를 갖는 냉장실과 냉동실로 구획되어 있으며 냉동실의 증발기에서 제공되는 냉기의 일부를 냉장실로 공급하거나 또는 냉장실에 별도의 증발기를 설치하여 냉장실의 온도를 낮춘다. 이로 인해, 냉장고에 보관되는 식품이 신선도를 유지한다. In general, the refrigerator is divided into a refrigerator compartment and a freezer compartment having a temperature difference, and a part of the cold air provided by the evaporator of the freezer compartment is supplied to the refrigerator compartment or a separate evaporator is installed in the refrigerator compartment to lower the temperature of the refrigerator compartment. As a result, the food stored in the refrigerator maintains freshness.

최근에는 냉장고가 고급화 및 대용량화 되면서, 냉장고의 도어를 개방하지 않고도 냉장상태의 물이나 얼음을 인출할 수 있도록 하는 물/얼음 디스펜서가 구비된 냉장고가 증가추세에 있다. 또한 빙수를 제조하고자 할 경우 별도의 얼음 빙삭 유닛을 구비해야 하는 불편함이 있다. 이를 해소하기 위하여 냉동실에서 만들어진 각얼음(cubed ice)을 가루얼음(shaved ice)으로 빙삭하여 냉동실 외부로 토출 해주도록 빙삭기(ice shaver)가 구비된 냉장고 요구되는 실정이다.Recently, as refrigerators become more advanced and larger in capacity, refrigerators equipped with water / ice dispensers that can draw chilled water or ice without opening the doors of refrigerators are on the rise. In addition, if you want to produce ice water there is an inconvenience to have a separate ice ice unit. In order to solve this problem, a refrigerator equipped with an ice shaver is required to ice cubed ice made in a freezing compartment with shaved ice and discharge it to the outside of the freezing compartment.

이와 같이 냉장고의 빙삭기는 제빙기에서 제조된 각얼음을 저장하는 얼음저장실(ice bucket)의 배출구 하측에 위치하여서, 얼음저장실에서 토출된 얼음이 빙삭기를 통해 가루얼음으로 만들어진다. 얼음저장실에는 저장된 얼음을 배출구로 공 급하는 나선형상의 공급유닛이 구비되며, 이 공급유닛은 상기 저장실 후방에 배치된 얼음공급모터와 연결된다. 또한, 빙삭기 내부에는 빙삭 커터와 배출구를 갖는 빙삭실이 마련되어, 얼음저장실에서 배출된 각얼음을 빙삭커터를 이용하여 가루얼음으로 만들어 배출구를 통해 토출하게 된다. 이러한 빙삭기의 구동을 위해 가루얼음 제조용 모터가 연결된다. 도 1에 도시한 바와 같이 사용자가 빙수를 제조하기 위해 가루얼음 제조 버튼을 누르면 냉장고의 제어유닛에서는 가루얼음 제조 신호가 입력되었는지의 여부를 판단한다.(S10) 가루얼음 제조신호가 입력되었다고 판단되었으면 가루얼음 제조용 모터와 얼음 공급용 모터에 제어신호를 출력하여 각 모터의 구동을 시작한다.(S20, S30)In this way, the ice machine of the refrigerator is located below the outlet of the ice bucket for storing ice cubes manufactured by the ice maker, and the ice discharged from the ice reservoir is made into powder ice through the ice machine. The ice storage chamber is provided with a spiral supply unit for supplying the stored ice to the discharge port, which is connected to the ice supply motor disposed behind the storage chamber. In addition, the ice machine is provided with an ice cutter having an ice cutter and an outlet, making ice cubes discharged from the ice storage chamber into powder ice using the ice cutter to discharge through the outlet. Powder ice production motor is connected to drive the ice machine. As shown in Figure 1, when the user presses the powder ice production button to produce ice water, the control unit of the refrigerator determines whether the powder ice production signal is input. (S10) If it is determined that the powder ice production signal is input The control signal is output to the powder ice production motor and the ice supply motor to start driving of each motor. (S20, S30)

구동이 시작되면 얼음 공급용 모터는 얼음저장실에 있는 각얼음을 빙삭실로 공급 시키고, 빙삭실에서는 가루얼음 제조용 모터가 빙삭실 내부에 설치된 커터를 동작시켜 공급된 각얼음을 가루얼음으로 빙삭한 후 배출구를 통하여 토출 되도록 한다. When the drive is started, the ice supply motor supplies the ice cubes in the ice storage room to the ice cube room, and in the ice cube room, the motor for powder ice production operates the cutter installed inside the ice cube room to ice the supplied ice cubes with powdered ice Discharge through

제어유닛에서는 사용자가 설정한 양 만큼의 가루얼음 제조 사이클이 끝났는지의 여부를 판단하고,(S40) 가루얼음 제조가 끝났다고 판단될 경우 가루얼음 제조용 모터와 얼음 공급용 모터에 정지신호를 출력하여 각 모터의 구동을 정지 시킨다.(S50)The control unit determines whether the powder ice production cycle is finished by the amount set by the user (S40). If it is determined that the powder ice production is finished, the control unit outputs a stop signal to the powder ice manufacturing motor and the ice supply motor. Stop driving of the motor (S50)

이러한 종래의 가루얼음 제조방법은 도 2에 도시한 바와 같이 가루얼음 제조신호가 입력되면 가루얼음 제조용 모터와 얼음 공급용 모터가 동일한 시간에 동작을 시작하여 가루얼음 제조가 완료되면 동일한 시간에 동작이 정지되도록 제어한 다. In the conventional powder ice manufacturing method, as shown in FIG. 2, when the powder ice manufacturing signal is input, the powder ice manufacturing motor and the ice supply motor start operation at the same time, and when the powder ice production is completed, the operation is performed at the same time. Control to stop.

기타 냉장고의 빙삭기에 관해서는 대한민국 공개특허공보 1999-40637호, 대한민국 등록특허공보 10-360863호에 상세히 개시되어 있다.Other ice machines of the refrigerator are disclosed in detail in Korean Patent Laid-Open Publication No. 1999-40637 and Korean Patent Publication No. 10-360863.

그러나 이러한 종래의 가루얼음 제조방법은 가루얼음 제조용 모터 동작 시 얼음 공급용 모터도 동작하므로 빙삭실로 계속하여 얼음을 공급하게 되는데 그에 따라 얼음량이 과다하게 되어 얼음이 빙삭실 밖으로 이탈하거나 빙삭기가 파손되는 문제점이 있었다. However, the conventional powder ice manufacturing method is because the ice supply motor also operates during the operation of the powder ice production motor to continue to supply ice to the ice cube room, according to the amount of ice is excessive, the ice is out of the ice cube room or the ice breaker is broken There was this.

또한 가루얼음 제조가 끝나는 시점까지 얼음 공급이 계속되므로 가루얼음 제조 후 빙삭기 내부에 많은 양의 얼음이 남아있게 되어, 빙삭기 내에서 잔빙이 엉겨 붙거나 잔빙이 녹아 냉장고 외부로 물이 떨어지는 등의 문제점이 있었다. In addition, since the ice supply continues until the end of powder ice production, a large amount of ice remains inside the ice machine after the powder ice is manufactured, and after the ice is entangled in the ice machine or the ice is melted, the water falls out of the refrigerator. There was a problem.

본 발명은 전술한 문제점을 해결하기 위한 것으로, 본 발명의 목적은 빙삭기로 얼음이 공급되는 시간을 제어하여 얼음량 과다로 인한 얼음 이탈 및 부품 파손 현상을 개선할 수 있는 냉장고 및 가루얼음 제조방법을 제공하는 것이다.The present invention is to solve the above-mentioned problems, an object of the present invention is to provide a refrigerator and powder ice manufacturing method that can improve the ice breakout and parts breakage phenomenon due to the excessive amount of ice by controlling the time the ice is supplied to the ice machine To provide.

또한, 본 발명의 다른 목적은 가루얼음 제조 후 빙삭기 내부에 남아있는 얼음의 양을 최소화하여 잔빙이 엉겨 붙거나 잔빙이 녹아 낙수가 발생하는 것을 방지할 수 있는 냉장고 및 가루얼음 제조방법을 제공하는 것이다.In addition, another object of the present invention to provide a refrigerator and a method for producing powdered ice which can prevent the occurrence of falling water by minimizing the amount of ice remaining inside the ice machine after the production of powdered ice and the remaining ice melted. will be.

전술한 목적을 달성하기 위한 본 발명은 냉동실에 마련된 얼음저장유닛내에 저장된 각얼음을 얼음공급유닛을 통해 상기 얼음저장유닛의 배출구측에 마련된 가 루얼음 제조유닛에 공급하여 가루얼음을 제조하는 냉장고의 가루얼음 제조방법에 있어서, 상기 가루얼음 제조유닛의 구동시간을 상기 얼음공급유닛의 구동시간보다 길게 설정하는 것을 특징으로 한다.The present invention for achieving the above object of the refrigerator to supply the ice cubes stored in the ice storage unit provided in the freezer compartment to the powder ice production unit provided on the outlet side of the ice storage unit through the ice supply unit to produce powdered ice In the powder ice manufacturing method, it characterized in that the drive time of the powder ice production unit is set longer than the drive time of the ice supply unit.

상기 얼음공급유닛을 상기 가루얼음 제조유닛보다 먼저 정지시키는 것을 특징으로 한다.It characterized in that the ice supply unit is stopped before the powder ice production unit.

상기 얼음공급유닛이 정지된 후 미리 설정된 시간동안 상기 가루얼음 제조유닛을 더 구동 시키는 것을 특징으로 한다.It characterized in that for further driving the powder ice manufacturing unit for a predetermined time after the ice supply unit is stopped.

상기 가루얼음 제조유닛의 구동을 유지시키고, 상기 얼음공급유닛의 구동과 정지를 반복하여 가루얼음을 생성하는 것을 특징으로 한다.Maintaining the drive of the powder ice production unit, it characterized in that to generate the powder ice by repeating the drive and stop of the ice supply unit.

상기 가루얼음 제조유닛의 구동이 시작되면, 상기 얼음공급유닛을 미리 설정된 제 1 기준시간동안 구동 시킨 후 미리 설정된 제 2 기준시간동안 정지 시키는 과정을 반복하는 것을 특징으로 한다.When the driving of the powder ice manufacturing unit is started, the process of driving the ice supply unit for a predetermined first reference time and then stopping for a predetermined second reference time is repeated.

상기 얼음공급유닛의 구동횟수가 소정횟수이상이면, 상기 얼음공급유닛을 정지시키는 것을 특징으로 한다.When the driving frequency of the ice supply unit is a predetermined number or more, characterized in that the ice supply unit is stopped.

상기 미리 설정된 시간이 경과하면, 상기 가루얼음 제조유닛을 미리 설정된 제 3 기준시간동안 더 구동 시켜 가루얼음을 생성하는 것을 특징으로 한다.When the predetermined time elapses, the powder ice manufacturing unit may be further driven for a preset third reference time to generate powder ice.

또한, 본 발명은 냉동실에 마련된 얼음저장유닛내에 저장된 얼음을 얼음공급유닛을 통해 상기 얼음저장유닛의 배출구측에 마련된 가루얼음 제조유닛에 공급하여 가루얼음을 제조하는 냉장고의 가루얼음 제조방법에 있어서, 상기 가루얼음 제조유닛을 미리 설정된 시간동안 구동시키고, 상기 얼음공급유닛을 상기 미리 설정 된 시간동안 구동과 정지를 반복하도록 제어하는 것을 특징으로 한다.In addition, the present invention provides a powder ice manufacturing method of a refrigerator for manufacturing powder ice by supplying the ice stored in the ice storage unit provided in the freezer compartment to the powder ice manufacturing unit provided on the outlet side of the ice storage unit through the ice supply unit, The powder ice manufacturing unit is driven for a preset time, and the ice supply unit is controlled to repeat driving and stopping for the preset time.

상기 가루얼음 제조유닛의 구동이 시작되면, 상기 얼음공급유닛을 미리 설정된 제 1 기준시간동안 구동 시킨 후 미리 설정된 제 2 기준시간동안 정지 시키는 과정을 상기 미리 설정된 시간동안 반복하는 것을 특징으로 한다.When the driving of the powder ice manufacturing unit is started, the process of driving the ice supply unit for a predetermined first reference time and then stopping for a predetermined second reference time is repeated for the predetermined time.

상기 얼음공급유닛의 구동횟수가 소정횟수이상이면, 상기 얼음공급유닛을 상기 미리 설정된 제2 기준시간동안의 정지없이 즉시 정지시키는 것을 특징으로 한다.When the driving frequency of the ice supply unit is a predetermined number or more, the ice supply unit may be immediately stopped without stopping for the second preset reference time.

또한, 본 발명은 냉동실에 마련되어 얼음을 제조하는 제빙기와, 상기 제빙기에서 제빙된 얼음을 저장하는 얼음저장유닛과, 상기 얼음저장유닛내에 저장된 얼음을 외부로 공급하는 얼음공급유닛과, 상기 얼음공급유닛에 의해 공급된 얼음을 가루얼음으로 제조하는 가루얼음 제조유닛과, 상기 가루얼음 제조유닛을 상기 얼음공급유닛보다 오래 구동하도록 제어하는 제어유닛을 포함하는 것을 특징으로 한다.In addition, the present invention provides an ice maker provided in the freezer compartment for producing ice, an ice storage unit for storing the ice iced in the ice maker, an ice supply unit for supplying the ice stored in the ice storage unit to the outside, the ice supply unit It characterized in that it comprises a powder ice production unit for producing the ice supplied by the powder ice, and a control unit for controlling the powder ice production unit to drive longer than the ice supply unit.

상기 제어유닛은 상기 얼음공급유닛을 상기 가루얼음 제조유닛보다 먼저 정지시키는 것을 특징으로 한다.The control unit is characterized in that to stop the ice supply unit before the powder ice production unit.

상기 제어유닛은 상기 가루얼음 제조유닛의 구동이 시작되면, 상기 얼음공급유닛을 미리 설정된 제 1 기준시간동안 구동한 후 미리 설정된 제 2 기준시간동안 정지하는 과정을 반복시키는 것을 특징으로 한다.When the driving of the powder ice manufacturing unit is started, the control unit may repeat the process of driving the ice supply unit for a predetermined first reference time and then stopping for a preset second reference time.

상기 제어유닛은 상기 가루얼음 제조유닛을 미리 설정된 소정시간동안 구동시키고, 상기 얼음공급유닛을 미리 설정된 제 1 기준시간동안 구동 시킨 후 미리 설정된 제 2 기준시간동안 정지시키는 과정을 소정시간동안 반복하고, 상기 소정시 간이 경과하면 상기 가루얼음 제조유닛을 미리 설정된 제 3 기준시간동안 더 구동시키는 것을 특징으로 한다.The control unit drives the powder ice manufacturing unit for a predetermined time, and repeats the process of driving the ice supply unit for a predetermined first reference time and then stopped for a predetermined second reference time for a predetermined time, When the predetermined time has elapsed, the powder ice manufacturing unit is further driven for a preset third reference time.

이하에서는 본 발명의 바람직한 실시예를 본 도면을 참조하여 상세하게 설명하도록 한다.Hereinafter, preferred embodiments of the present invention will be described in detail with reference to the drawings.

도 3 및 도 4에 도시한 바와 같이 본 발명에 따른 냉장고는 전면이 개방된 하우징(1)과, 이 하우징(1)의 개방된 전면에 힌지 결합되는 냉동실 도어(2)와 냉장실 도어(미도시)를 구비하여 외관을 형성하게 되며, 하우징의 내부에는 각각 냉동실 도어(2)와 냉장실 도어(미도시)에 의해 개폐되는 냉동실(4)과 냉장실(미도시)이 서로 구획되어 마련된다.As shown in FIGS. 3 and 4, the refrigerator according to the present invention includes a housing 1 having an open front, a freezer door 2 hinged to an open front of the housing 1, and a refrigerator compartment door (not shown). ) To form an external appearance, and the freezer compartment 4 and the refrigerating compartment (not shown) which are opened and closed by the freezer compartment door 2 and the refrigerating compartment door (not shown) are respectively provided inside the housing.

하우징(1)의 후벽에는 냉기를 생성하는 증발기(5)가 설치되고, 하우징(1)의 하측 후방에는 냉매를 압축시키는 압축기(6)가 설치되며, 냉동실(4)의 상부에는 일정 크기의 각얼음을 자동으로 만들어서 공급하는 자동 제빙기(10)가 설치된다.An evaporator 5 for generating cold air is installed on the rear wall of the housing 1, and a compressor 6 for compressing a refrigerant is installed at the lower rear of the housing 1, and an upper portion of the freezing chamber 4 has a predetermined size. An automatic ice maker 10 for automatically making and supplying ice is installed.

자동 제빙기(10)는 물을 공급 받아서 얼음을 만드는 얼음 제조용기(11)와, 얼음 제조용기(11)의 하부에 배치되어 얼음 제조용기(11)에서 만들어진 각얼음을 저장하는 얼음 저장용기(20)와, 외부 급수원과 연결되며 얼음 제조용기(11)의 상부까지 연장되어 얼음 제조용기(11)로 얼음을 만들기 위한 물을 공급하는 급수관(12)을 구비한다.The automatic ice maker 10 is provided with an ice container 11 for making ice by supplying water, and an ice storage container 20 disposed under the ice container 11 to store ice cubes formed in the ice container 11. And a water supply pipe 12 connected to an external water supply source and extending to an upper portion of the ice production container 11 to supply water for making ice to the ice production container 11.

냉동실 도어(2)에는 얼음 저장용기(20)에서 공급된 각얼음을 가루얼음으로 만들어서 공급하는 가루얼음 제조유닛(30)가 설치되며, 가루얼음 제조유닛(30)가 설치되기 위한 리세스부(17) 및 가루얼음 배출구(13)가 형성되고, 얼음 저장용기 (20)에는 가루얼음 제조유닛(30)로 각얼음을 공급 시켜주는 각얼음 공급유닛(50)가 설치된다. 각얼음 공급유닛(50) 후방에는 얼음공급모터(51)가 설치되어 공급유닛(50)를 구동한다. The freezing chamber door 2 is provided with a powder ice manufacturing unit 30 for supplying the ice cubes supplied from the ice storage container 20 into powder ice, and a recess for installing the powder ice manufacturing unit 30. 17) and the powder ice outlet 13 is formed, the ice storage container 20 is provided with a cube ice supply unit 50 for supplying ice cubes to the powder ice production unit 30. An ice supply motor 51 is installed behind the ice supply unit 50 to drive the supply unit 50.

이와 같이 급수관(12)을 통해 얼음 제조용기(11)에 물이 채워지고 나서 일정시간이 경과하게 되면 냉동실(4)을 순환하는 냉기에 의해 얼음 제조용기(11) 내부의 물이 얼어서 각얼음이 만들어지게 되고, 이렇게 만들어진 각얼음은 얼음 저장용기(20)로 자동으로 전달되어 얼음 저장용기(20)를 채우게 된다.As described above, if a predetermined time elapses after the water is filled in the ice container 11 through the water supply pipe 12, the water inside the ice container 11 is frozen by cold air circulating in the freezing chamber 4, resulting in ice cubes. It is made, the ice cube is made is automatically delivered to the ice storage container 20 to fill the ice storage container (20).

이러한 상태에서 사용자가 가루얼음 제조 신호를 입력하면 얼음공급유닛(50)와 가루얼음 제조유닛(30)가 작동되어 가루얼음 배출구(13)를 통해 가루얼음이 냉동실 도어의 외측으로 배출되게 된다.In this state, when the user inputs the powder ice production signal, the ice supply unit 50 and the powder ice production unit 30 are operated so that the powder ice is discharged to the outside of the freezing chamber door through the powder ice outlet 13.

또한 얼음공급유닛(50)는 얼음 저장용기(20)의 일단에 설치된 얼음공급모터(51)에 연결되어 얼음 저장용기(20)에 저장된 각얼음을 냉동실 도어에 설치된 가루얼음 제조유닛(30)로 보내지게 된다.In addition, the ice supply unit 50 is connected to the ice supply motor 51 installed at one end of the ice storage container 20 to the powder ice manufacturing unit 30 installed in the freezing compartment door ice cubes stored in the ice storage container 20 Will be sent.

가루얼음 제조유닛(30)는 냉동실 도어의 내측에 마련되는데 가루얼음 배출구(13)와 연통된 리세스부(17)에 고정되며 냉동실 도어의 내부공간의 외측에 배치된 가루얼음 제조모터(32)와, 가루얼음 제조모터(32)의 상부에 배치되는 감속기어 조립체(33)와, 내부공간에 끼워져서 고정되는 케이스(34)와, 케이스(34)의 내부에 회전 가능하게 배치되는 회전통(35)을 구비한다.The powder ice manufacturing unit 30 is provided inside the freezer compartment door, which is fixed to the recess 17 in communication with the powder ice outlet 13 and disposed on the outside of the inner space of the freezer compartment door 32. And a reduction gear assembly 33 disposed on the powder ice manufacturing motor 32, a case 34 fixed to the inner space and a rotating cylinder rotatably disposed inside the case 34. 35).

가루얼음 제조모터(32)에 축 결합되는 감속기어 조립체(33)는 복수의 감속기어가 서로 치합되어 구성되어 가루얼음 제조모터(32)의 회전속도를 적절하게 감 속 시켜주게 된다. The reduction gear assembly 33 which is axially coupled to the powder ice production motor 32 is composed of a plurality of reduction gears engaged with each other to appropriately reduce the rotational speed of the powder ice production motor 32.

상부와 하부가 개방되어 형성된 회전통(35)은 그 내주면에서 나선형상으로 연장하여 형성된 나선날개(37)를 구비하고, 회전통(35)이 회전 가능하도록 끼워진 케이스(34)의 바닥에는 칼날(41)이 고정되어 있어 회전통(35)의 내주면에서 나선형상으로 형성된 나선날개(37)가 회전하여 가루얼음을 만들게 된다.The rotating cylinder 35 formed by opening the upper and lower portions has a spiral blade 37 formed extending in a spiral shape from the inner circumferential surface thereof, and a blade (cutter) is formed at the bottom of the case 34 in which the rotating cylinder 35 is rotatably fitted. 41 is fixed so that the spiral blade 37 formed in a spiral shape on the inner circumferential surface of the rotating cylinder 35 is rotated to make powder ice.

이 외에도 가루얼음 제조양이나 제조시간 등을 사용자가 선택할 수 있도록 하는 키 입력부(61)와, 냉장고의 각종 유닛들을 제어해주는 제어유닛(60)이 더 포함되어 있다.In addition to this, a key input unit 61 for allowing a user to select the amount of powdered ice, a production time, and the like, and a control unit 60 for controlling various units of the refrigerator are further included.

가루얼음 제조신호가 입력되면 제어유닛(60)은 가루얼음 제조모터(32)와 얼음공급모터(51)에 구동신호를 출력하게 되고, 신호를 입력 받은 가루얼음 제조모터(32)와 얼음공급모터(51)의 구동으로 가루얼음 제조가 시작되게 된다. 얼음공급모터(51)의 구동에 의해 얼음 저장용기(20)에 저장되어 있는 각얼음이 얼음공급유닛(50)를 통해 가루얼음 제조유닛(30)로 전달되게 되고, 각얼음이 가루얼음 제조유닛(30) 내부로 들어오게 되면 가루얼음 제조모터(32)의 구동에 의해 회전통(35)에 형성된 나선날개(37)에 의해 각얼음이 회전통(35) 내부에서 회전하면서 케이스(34)의 바닥에 배치된 칼날(41)에 의해 빙삭되어 가루얼음으로 만들어지게 된다. When the powder ice production signal is input, the control unit 60 outputs a driving signal to the powder ice production motor 32 and the ice supply motor 51, and receives the powder ice production motor 32 and the ice supply motor. The driving of the 51 causes powder ice production to start. The ice cubes stored in the ice storage container 20 are transferred to the powder ice manufacturing unit 30 through the ice supply unit 50 by the operation of the ice supply motor 51, and the ice cubes are powder ice manufacturing units. (30) When coming into the inside of the case (34) while rotating the ice inside the rotating cylinder 35 by the spiral blades 37 formed in the rotating cylinder 35 by the drive of the powder ice manufacturing motor 32 The blade is iced by the blade 41 disposed on the bottom to be made of powdered ice.

이와 같이 얼음공급모터(51)에 의해 공급된 각얼음이 가루얼음 제조모터(32)에 의해 가루얼음으로 만들어지는데, 가루얼음 제조유닛(30)로 각얼음이 계속하여 공급되면 가루얼음 제조유닛(30) 내에 있는 각얼음이 필요 이상으로 많아지게 되어 각얼음이 밖으로 이탈하거나 가루얼음 제조유닛(30)의 부품이 파손될 우려가 있으므로 가루얼음 제조모터(32)와 얼음공급모터(51)의 구동시간을 도 5에 도시한 바와 같이 제어해 주게 된다. Thus, the ice cubes supplied by the ice supply motor 51 are made into powdered ice by the powdered ice manufacturing motor 32. When the cubed ice is continuously supplied to the powdered ice manufacturing unit 30, the powdered ice manufacturing unit ( 30) The ice cubes in the powder ice manufacturing motor 32 and the ice supply motor 51 are driven more than necessary because the ice cubes may be more than necessary and the ice cubes may deviate outward or the parts of the powder ice manufacturing unit 30 may be damaged. It is controlled as shown in FIG.

가루얼음 제조신호 입력으로 가루얼음 제조모터(32)가 소정시간(TM1) 구동을 계속하는 동안 얼음공급모터(51)는 미리 설정된 제 1 기준시간(T1)동안 얼음공급모터(51)를 구동하여 각얼음을 가루얼음 제조유닛(30)로 공급해주고, 미리 설정된 제 2 기준시간(T2)동안 얼음공급모터(51)를 정지시킴으로써 적정량의 얼음을 가루얼음 제조유닛(30)에 공급하게 되며, 제 2 기준시간동안 얼음 공급이 중단되더라도, 제 1 기준시간(T1) 및 제 2 기준시간(T2) 계속하여 가루얼음이 제조되게 된다. 제 2 기준시간(T2)이 경과하면 다시 얼음공급모터(51)를 제 1 기준시간(T1)동안 구동 시켜 가루얼음 제조유닛(30) 내로 각얼음을 공급해주고 제 2 기준시간(T2) 동안 구동을 정지시키는 과정을 반복하게 된다.The ice supply motor 51 drives the ice supply motor 51 during the first reference time period T1 while the powder ice production motor 32 continues to drive the predetermined time T M1 by inputting the powder ice production signal. By supplying each ice to the powder ice manufacturing unit 30, by stopping the ice supply motor 51 for a predetermined second reference time (T2) to supply an appropriate amount of ice to the powder ice manufacturing unit 30, Even if the ice supply is stopped for the second reference time, the powder ice is produced continuously after the first reference time T1 and the second reference time T2. After the second reference time T2 has elapsed, the ice supply motor 51 is driven again for the first reference time T1 to supply ice cubes into the powdered ice manufacturing unit 30 and to drive for the second reference time T2. The process of stopping the operation is repeated.

소정 구동횟수(N)만큼 얼음공급모터(51)가 구동되었으면 얼음공급모터(51)를 완전히 정지시키고, 가루얼음 제조모터(32)를 미리 설정된 제 3 기준시간(T3)동안 더 구동하게 되는데, 이는 가루얼음 제조유닛(30) 내에 가루얼음으로 제조되어 배출되지 않고 남아있는 각얼음을 가루얼음 제조유닛 밖으로 배출시키기 위한 것이다.When the ice supply motor 51 has been driven by a predetermined number of driving times (N), the ice supply motor 51 is completely stopped, and the powdered ice manufacturing motor 32 is further driven for a third preset reference time T3. This is for discharging the remaining ice cubes out of the powder ice production unit, which is produced as powder ice in the powder ice production unit 30 and is not discharged.

제 1 기준시간 및 제 2 기준시간 및 제 3 기준시간 및 소정횟수는 사용자가 설정한 가루얼음 제조과정의 종류에 따라 달라지게 되는데, 그 값은 각 과정에 따라 미리 계산되어 제어유닛(60)에 저장되어 있다. 예를 들어 사용자가 가루얼음 을 팥빙수 1인분 분량만큼 제조하고자 하여 1인분 제조 버튼을 누르면, 가루얼음 제조모터가 52초 구동하게 되며, 이에 얼음공급모터(51)를 3초(T1)간 구동 시키고 4초(T2)간 정지시키는 과정에서 3초(T1) 구동을 8회(N) 4초(T2) 정지를 7회 반복 함으로써 52초간 얼음공급모터(51)가 구동 및 정지를 반복한다. 그리고, 마지막 4초(T3)간은 가루얼음 제조모터(32)만을 추가로 구동 시켜 가루얼음을 제조하게 된다.The first reference time, the second reference time, the third reference time, and the predetermined number of times vary according to the type of powder ice manufacturing process set by the user, and the value is calculated in advance according to each process to the control unit 60. It is stored. For example, if the user wants to produce powdered ice for 1 serving of red bean shaved ice, and presses the 1 serving button, the powdered ice manufacturing motor is driven for 52 seconds, and the ice supply motor 51 is driven for 3 seconds (T1). In the process of stopping for 4 seconds (T2), the ice supply motor 51 repeats driving and stopping for 52 seconds by repeating the driving of 3 seconds (T1) for 8 times (N) for 4 seconds (T2) for 7 times. And, during the last 4 seconds (T3) by driving only the powdered ice manufacturing motor 32 to produce the powdered ice.

이하 도 6을 참조하여 도 4에 도시한 냉장고의 가루얼음 제조방법을 설명한다.Hereinafter, a method of manufacturing powdered ice of the refrigerator shown in FIG. 4 will be described with reference to FIG. 6.

먼저 사용자가 키 입력부(61)를 통하여 가루얼음 제조과정을 선택하고 가루얼음 제조신호를 입력하면 제어유닛(60)에서는 가루얼음 제조신호가 키 입력부(61)를 통해 입력되었는지의 여부를 판단한다.(S100)First, when the user selects the powder ice manufacturing process through the key input unit 61 and inputs the powder ice production signal, the control unit 60 determines whether the powder ice production signal is input through the key input unit 61. (S100)

가루얼음 제조신호가 입력되었으면 사용자가 설정한 가루얼음 제조과정에 따라 제어유닛(60)에서는 가루얼음 제조모터(32)를 추가로 구동 시킬 제 3 기준시간(T3)을 설정하여 가루얼음 제조모터(32)로 전달해 준다.(S110) 그리고, 얼음공급모터(51)가 구동 되는 제 1 기준시간(T1)과 정지되는 제 2 기준시간(T2), 구동횟수(N)를 설정하여 얼음공급모터(51)로 전달해 준다.(S120) When the powder ice production signal is input, the control unit 60 sets the third reference time T3 to additionally drive the powder ice production motor 32 according to the powder ice manufacturing process set by the user. 32, the first reference time T1 at which the ice supply motor 51 is driven, the second reference time T2 at which the ice supply is stopped, and the driving frequency N are set. 51) (S120)

가루얼음 제조모터(32)와 얼음공급모터(51)의 제어방법 설정이 완료되었으면, 가루얼음제조모터(32)를 구동 시킨다.(S130) 그리고, 동시에 얼음공급모터(51)의 구동도 시작한다.(S140) 가루얼음 제조모터(32)와 얼음공급모터(51)의 구동이 시작되면 상기한 방법으로 가루얼음이 제조되게 되는데, 얼음공급모터(51)의 구동 시작 후 제 1 기준시간(T1)만큼의 시간이 경과하였는지의 여부를 판단하여 제 1 기준시간(T1)이 경과하였으면 얼음공급모터(51)를 정지시킨다.(S150, S160)When the control method setting of the powder ice production motor 32 and the ice supply motor 51 is completed, the powder ice production motor 32 is driven (S130). At the same time, the driving of the ice supply motor 51 is also started. (S140) When the driving of the powder ice manufacturing motor 32 and the ice supply motor 51 is started, the powder ice is manufactured by the above-described method, but after the start of the driving of the ice supply motor 51, the first reference time (T1). If the first reference time T1 has elapsed, the ice supply motor 51 is stopped (S150, S160).

그리고 얼음공급모터(51)의 구동이 소정횟수(N)만큼 반복되었는지의 여부를 판단하게 된다.(S170) 판단결과 얼음공급모터(51)가 1회 구동 하였으므로 얼음공급모터(51)가 정지된 후 제 2 기준시간(T2)만큼의 시간이 경과하였는지 여부를 판단한다.(S180) 얼음공급모터(51)가 제 2 기준시간(T2)만큼 정지한 경우는 다시 얼음공급모터(51)를 제 1 기준시간(T1)만큼 구동 시키고, 제 1 기준시간(T1)이 경과하면 얼음공급모터를 제 2 기준시간(T2)만큼 정지 시키는 과정을 반복한다.(S140, S150, S160, S170, S180) Then, it is determined whether the driving of the ice supply motor 51 is repeated by a predetermined number N. (S170) As a result of the determination, the ice supply motor 51 is driven once, so that the ice supply motor 51 is stopped. After that, it is determined whether the time for the second reference time T2 has elapsed. (S180) When the ice supply motor 51 stops for the second reference time T2, the ice supply motor 51 is removed again. The motor is driven by one reference time T1, and when the first reference time T1 elapses, the process of stopping the ice supply motor by the second reference time T2 is repeated. (S140, S150, S160, S170, and S180).

얼음공급모터(51)가 소정횟수(N)만큼 구동하였으면 얼음공급모터(51)는 완전히 정지 시키고 제 3 기준시간(T3)동안 가루얼음 제조모터(32)를 추가로 구동 시켜 가루얼음 제조유닛(30) 내에 남아 있는 얼음을 가루얼음으로 만들어 밖으로 배출 시킨다.(S190)When the ice supply motor 51 has been driven a predetermined number of times (N), the ice supply motor 51 is completely stopped and the powder ice production motor 32 is additionally driven for the third reference time T3. 30) make the ice remaining in the powdered ice and discharge it out. (S190)

이상에서 상세히 설명한 바와 같이, 본 발명은 얼음공급유닛이 구동과 정지를 반복함으로써 가루얼음 제조유닛으로 얼음이 과다하게 공급되는 것을 방지하여 얼음의 이탈현상 및 부품의 파손현상을 방지할 수 있다.As described in detail above, the present invention can prevent the excessive supply of ice to the powder ice manufacturing unit by repeating the drive and stop the ice supply unit can prevent the phenomenon of the separation of the ice and breakage of parts.

또한 얼음공급유닛이 정지된 후 가루얼음 제조유닛을 추가로 구동시킴으로써 가루얼음 제조유닛 내에 남아있는 얼음의 양을 최소화하여 잔빙끼리 엉겨 붙거나 잔빙이 녹아 낙수가 발생하는 것을 방지할 수 있다.In addition, by further driving the powder ice manufacturing unit after the ice supply unit is stopped, it is possible to minimize the amount of ice remaining in the powder ice manufacturing unit to prevent tangling of the remnants and melting of the remaining ice.

Claims (14)

냉동실에 마련된 얼음저장유닛 내에 저장된 각얼음을 얼음공급유닛을 통해 상기 얼음저장유닛의 배출구 측에 마련된 가루얼음 제조유닛에 공급하여 가루얼음을 제조하는 냉장고의 가루얼음 제조방법에 있어서,In the ice cube manufacturing method of the refrigerator for manufacturing powdered ice by supplying the ice cube stored in the ice storage unit provided in the freezer compartment to the powdered ice manufacturing unit provided on the outlet side of the ice storage unit through the ice supply unit, 상기 얼음저장유닛은 얼음공급유닛 구동시간 동안 상기 각얼음이 배출되도록 하고, 상기 얼음공급유닛 구동 시간이 경과하면 얼음공급유닛 정지시간 동안 상기 가루얼음 제조유닛이 구동 중이어도 상기 얼음저장유닛의 각얼음이 배출되지 않도록 하고,The ice storage unit discharges the ice cube during the ice supply unit driving time, and when the ice supply unit driving time elapses, even if the powder ice manufacturing unit is driven during the ice supply unit stop time, the ice cube of the ice storage unit Is not discharged, 상기 가루 얼음 제조 유닛은 상기 얼음공급유닛 구동시간과 상기 얼음공급유닛 정지 시간보다 더 긴 시간 동안 구동하는 것을 특징으로 하는 냉장고의 가루얼음 제조방법.The powder ice manufacturing unit is a powder ice manufacturing method of the refrigerator, characterized in that for operating longer than the ice supply unit driving time and the ice supply unit stop time. 제1항에 있어서, 상기 얼음공급유닛을 상기 가루얼음 제조유닛보다 먼저 정지시키는 것을 특징으로 하는 냉장고의 가루얼음 제조방법.The method of claim 1, wherein the ice supply unit is stopped before the powder ice production unit. 제 2항에 있어서, 상기 얼음공급유닛이 정지된 후 미리 설정된 시간동안 상기 가루얼음 제조유닛을 더 구동 시키는 것을 특징으로 하는 냉장고의 가루얼음 제조방법.The method of claim 2, wherein the powder ice manufacturing unit is further driven for a predetermined time after the ice supply unit is stopped. 제 1항에 있어서, The method of claim 1, 상기 가루얼음 제조유닛은 구동을 유지시키고, 상기 얼음공급유닛은 상기 얼음공급유닛 구동시간 동안의 구동과 상기 얼음공급유닛 정지 시간 동안의 정지를 반복하는 것을 특징으로 하는 냉장고의 가루얼음 제조방법.The powder ice manufacturing unit maintains driving, and the ice supply unit repeats the driving during the ice supply unit driving time and the stopping during the ice supply unit stop time. 삭제delete 제 4항에 있어서, 5. The method of claim 4, 상기 얼음공급유닛의 상기 얼음공급유닛 구동 시간 동안의 구동횟수가 소정횟수이상이면, 상기 얼음공급유닛을 정지시키는 것을 특징으로 하는 냉장고의 가루얼음 제조방법.And if the driving frequency of the ice supply unit during the driving time of the ice supply unit is greater than or equal to a predetermined number of times, stopping the ice supply unit. 제 6항에 있어서,The method according to claim 6, 상기 얼음공급유닛이 정지되면, 상기 가루얼음 제조유닛을 미리 설정된 제 3 기준시간 동안 더 구동시켜 가루얼음을 생성하는 것을 특징으로 하는 냉장고의 가루얼음 제조방법.When the ice supply unit is stopped, the powder ice manufacturing method of the refrigerator, characterized in that for further driving the powder ice manufacturing unit for a predetermined third reference time to generate powder ice. 냉동실에 마련된 얼음저장유닛내에 저장된 얼음을 얼음공급유닛을 통해 상기 얼음저장유닛의 배출구측에 마련된 가루얼음 제조유닛에 공급하여 가루얼음을 제조하는 냉장고의 가루얼음 제조방법에 있어서,In the powder ice manufacturing method of the refrigerator for manufacturing powder ice by supplying the ice stored in the ice storage unit provided in the freezer compartment to the powder ice production unit provided on the outlet side of the ice storage unit through the ice supply unit, 상기 가루얼음 제조유닛을 미리 설정된 시간동안 구동시키고,The powder ice manufacturing unit is driven for a preset time, 상기 얼음공급유닛을 상기 미리 설정된 시간동안 구동과 정지를 반복하도록 제어하는 것을 특징으로 하는 냉장고의 가루얼음 제조방법.And a method of controlling the ice supply unit to repeat driving and stopping for the predetermined time. 제 8항에 있어서, 상기 가루얼음 제조유닛의 구동이 시작되면, 상기 얼음공급유닛을 미리 설정된 제 1 기준시간동안 구동 시킨 후 미리 설정된 제 2 기준시간 동안 정지 시키는 과정을 상기 미리 설정된 시간동안 반복하는 것을 특징으로 하는 냉장고의 가루얼음 제조방법. 10. The method of claim 8, wherein when the driving of the powder ice manufacturing unit is started, the process of driving the ice supply unit for a preset first reference time and then stopping for the preset second reference time is repeated for the preset time. Powder ice manufacturing method of the refrigerator, characterized in that. 제9항에 있어서, 상기 얼음공급유닛의 구동횟수가 소정횟수이상이면, 상기 얼음공급유닛을 상기 미리 설정된 제2 기준시간동안의 정지없이 즉시 정지시키는 것을 특징으로 하는 냉장고의 가루얼음 제조방법.The method of claim 9, wherein if the driving frequency of the ice supply unit is greater than or equal to a predetermined number of times, the ice supply unit is immediately stopped without stopping for the second preset reference time. 냉동실에 마련되어 얼음을 제조하는 제빙기와,An ice machine provided in the freezer to make ice, 상기 제빙기에서 제빙된 얼음을 저장하는 얼음저장유닛과,An ice storage unit storing ice iced in the ice maker; 상기 얼음저장유닛의 얼음이 배출되는 얼음공급유닛 구동시간과, 가루얼음제조유닛이 구동되고 있는 동안 상기 얼음저장유닛의 얼음이 배출되는 얼음공급유닛 정지시간을 가지고, 상기 얼음저장유닛 내에 저장된 얼음을 외부로 공급하는 얼음공급유닛과,The ice supply unit driving time at which the ice of the ice storage unit is discharged, and the ice supply unit stop time at which the ice of the ice storage unit is discharged while the powder ice manufacturing unit is being driven, Ice supply unit to supply to the outside, 상기 얼음공급유닛에 의해 공급된 얼음을 가루얼음으로 제조하는 가루얼음 제조유닛과,Powdered ice manufacturing unit for manufacturing the ice supplied by the ice supply unit to the powdered ice, 가루 얼음 제조 시에 상기 가루얼음 제조유닛의 구동 시간이 상기 얼음공급유닛의 얼음공급유닛 구동시간과 얼음공급유닛 정지시간보다 길도록 제어하는 제어유닛을 포함하는 것을 특징으로 하는 냉장고.And a control unit for controlling the driving time of the powder ice manufacturing unit to be longer than the driving time of the ice supply unit and the stopping time of the ice supply unit during powder ice production. 제 11항에 있어서, 상기 제어유닛은 상기 얼음공급유닛을 상기 가루얼음 제조유닛보다 먼저 정지시키는 것을 특징으로 하는 냉장고.The refrigerator according to claim 11, wherein the control unit stops the ice supply unit before the powder ice manufacturing unit. 제 11항에 있어서, 상기 제어유닛은,The method of claim 11, wherein the control unit, 상기 가루얼음 제조유닛의 구동이 시작되면, 상기 얼음공급유닛의 얼음공급유닛 구동시간 동안의 구동과 얼음공급유닛 정지시간 동안의 정지를 반복 제어하는 것을 특징으로 하는 냉장고.When the driving of the powder ice manufacturing unit is started, the refrigerator characterized in that it is repeatedly controlled to drive during the ice supply unit driving time and the ice supply unit stop time of the ice supply unit. 제 13항에 있어서, 상기 제어유닛은,The method of claim 13, wherein the control unit, 상기 가루얼음 제조유닛을 미리 설정된 소정시간 동안 구동시키고, 상기 얼음공급유닛의 상기 반복 제어를 상기 소정 시간 동안 제어하고, 상기 소정시간이 경과하면 상기 가루얼음 제조유닛을 미리 설정된 시간 동안 더 구동시키는 것을 특징으로 하는 냉장고.Driving the powder ice manufacturing unit for a predetermined time, controlling the repetitive control of the ice supply unit for the predetermined time, and further driving the powder ice manufacturing unit for a predetermined time after the predetermined time elapses. Featured refrigerator.
KR1020050083474A 2004-09-30 2005-09-08 A refrigerator and the powder ice manufacture method KR101195880B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
US11/235,292 US7340905B2 (en) 2004-09-30 2005-09-27 Refrigerator and method of making shaved ice

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
KR1020040078096 2004-09-30
KR20040078096 2004-09-30

Publications (2)

Publication Number Publication Date
KR20060051088A KR20060051088A (en) 2006-05-19
KR101195880B1 true KR101195880B1 (en) 2012-10-30

Family

ID=36688748

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020050083474A KR101195880B1 (en) 2004-09-30 2005-09-08 A refrigerator and the powder ice manufacture method

Country Status (2)

Country Link
KR (1) KR101195880B1 (en)
CN (1) CN100501282C (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP2071258A1 (en) * 2007-12-14 2009-06-17 Bächler Top Track AG Nucleator nozzle, use of a nucleator nozzle, snow cannon, snow blower and method for producing ice nuclei and artificial snow

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11248317A (en) 1998-03-03 1999-09-14 Hoshizaki Electric Co Ltd Operation control method for ice maker

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11248317A (en) 1998-03-03 1999-09-14 Hoshizaki Electric Co Ltd Operation control method for ice maker

Also Published As

Publication number Publication date
KR20060051088A (en) 2006-05-19
CN100501282C (en) 2009-06-17
CN1755305A (en) 2006-04-05

Similar Documents

Publication Publication Date Title
KR101551167B1 (en) Refrigerator
EP2159516A2 (en) Refrigerator having multiple icemakers
EP2096384A2 (en) Method of controlling ice making assembly for refrigerator
US20060065008A1 (en) Refrigerator
JP5858678B2 (en) refrigerator
EP2808627B1 (en) Refrigerator
KR101555755B1 (en) Ice bin and ice crushing method using the same
KR100772214B1 (en) Manufacturing apparatus and method for transparent ice
US20080156025A1 (en) System and method for making ice
KR20100020897A (en) Ice maker and refrigerator having the same
KR100719024B1 (en) Refrigerator and controlling method thereof
KR20060053212A (en) Refrigerator
KR20060053211A (en) Refrigerator
US7340905B2 (en) Refrigerator and method of making shaved ice
KR100846890B1 (en) System and method for making ice
KR101195880B1 (en) A refrigerator and the powder ice manufacture method
KR20100027955A (en) Refrigerator
KR100565604B1 (en) ice-making apparatus in the refrigerator
KR20060029099A (en) Control method for refrigerator
EP2097695B1 (en) Refrigerator
JP2002310549A (en) Refrigerator with automatic ice maker
KR102498724B1 (en) Refrigerator and Control method of refrigerator
KR20090128906A (en) Ice maker controlling method of refrigerator
EP4273485A1 (en) Refrigerator
KR20000032977A (en) Ice dispenser of refrigerator

Legal Events

Date Code Title Description
A201 Request for examination
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
LAPS Lapse due to unpaid annual fee