KR101193896B1 - Pc wall with ancher wire for structrue - Google Patents
Pc wall with ancher wire for structrue Download PDFInfo
- Publication number
- KR101193896B1 KR101193896B1 KR1020120057592A KR20120057592A KR101193896B1 KR 101193896 B1 KR101193896 B1 KR 101193896B1 KR 1020120057592 A KR1020120057592 A KR 1020120057592A KR 20120057592 A KR20120057592 A KR 20120057592A KR 101193896 B1 KR101193896 B1 KR 101193896B1
- Authority
- KR
- South Korea
- Prior art keywords
- wall
- panel
- soil
- earth
- integrated
- Prior art date
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/20—Bulkheads or similar walls made of prefabricated parts and concrete, including reinforced concrete, in situ
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D17/00—Excavations; Bordering of excavations; Making embankments
- E02D17/02—Foundation pits
- E02D17/04—Bordering surfacing or stiffening the sides of foundation pits
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D17/00—Excavations; Bordering of excavations; Making embankments
- E02D17/06—Foundation trenches ditches or narrow shafts
- E02D17/08—Bordering or stiffening the sides of ditches trenches or narrow shafts for foundations
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D29/00—Independent underground or underwater structures; Retaining walls
- E02D29/02—Retaining or protecting walls
- E02D29/0225—Retaining or protecting walls comprising retention means in the backfill
- E02D29/0233—Retaining or protecting walls comprising retention means in the backfill the retention means being anchors
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D29/00—Independent underground or underwater structures; Retaining walls
- E02D29/02—Retaining or protecting walls
- E02D29/0258—Retaining or protecting walls characterised by constructional features
- E02D29/0275—Retaining or protecting walls characterised by constructional features cast in situ
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2300/00—Materials
- E02D2300/0001—Rubbers
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Structural Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Environmental & Geological Engineering (AREA)
- Underground Structures, Protecting, Testing And Restoring Foundations (AREA)
Abstract
Description
본 발명은 옹벽 또는 우수 저류조, 지하주차장, 병원, 대형마트 등을 포함한 각종 구조물을 시공함에 있어서, 이격된 복수의 피씨 패널과 상기 피씨 패널 사이에 현장타설 콘크리트가 충진되어 벽체를 이루도록 하는 피씨 월에 관한 것으로, 상기 피씨 월은 내부에 앵커 브라켓이 형성되고, 상기 앵커 브라켓의 단부에는 토사 매립용 와이어의 일단이 결합되며, 상기 와이어의 타단은 피씨 월의 외벽측으로 분기된 후 토사 내로 매립되도록 함으로써, 상기 피씨 월과 토사가 일체화된 합벽구조를 이루어 토압으로부터 구조물의 지지를 보강할 수 있도록 함은 물론 구조물의 벽체를 이루기 위한 각 피씨 패널의 이음부에는 U자형 조인트와 지수재가 형성되어 이웃한 피씨 패널간 단부를 방수 처리하면서 서로 결속하도록 하는 한편 구조 일체성을 확보하도록 형성되고, 상기 복수의 피씨 패널은 폭방향으로 직교된 다수개의 타이볼트가 매입 후 조임너트에 의해 체결되도록 형성되어 내부 현장콘크리트와 합성시 벽체 구조 강성을 보강하도록 형성되며, 이에 구조의 외벽 중 각 코너(모서리) 접합시에는 별도의 앵글 브라켓을 이용하여 해당 부분을 용이하게 연결할 수 있도록 형성되는 것을 특징으로 한다.The present invention in the construction of various structures including retaining walls or rainwater storage tanks, underground parking, hospitals, large marts, etc., in the PC wall to form a wall by filling the cast-in-place concrete between the plurality of spaced apart PC panels Regarding, the PC wall is formed with an anchor bracket therein, one end of the earth-filling wire is coupled to the end of the anchor bracket, and the other end of the wire is branched to the outer wall side of the PC wall to be embedded in the earth and sand, The PC wall and the earth and sand are made of a united wall structure to reinforce the support of the structure from the earth pressure, as well as the joints of each PC panel for forming the wall of the structure, U-shaped joints and the index member is formed to form a neighboring PC panel To ensure the integrity of the structure The plurality of PC panels are formed such that a plurality of tie bolts orthogonal in the width direction are fastened by tightening nuts after embedding so as to reinforce the wall structure rigidity when combined with the internal site concrete. When corner (corner) bonding is characterized in that it is formed to be easily connected to the corresponding portion using a separate angle bracket.
또한, 본 발명은 일방향으로 연결되는 각 피씨 패널의 연결부에 암수 조립형 끼움돌기와 끼움홈이 형성되어 피씨 조립에 따른 작업성과 접합성을 개선하도록 형성되고, 이에 피씨 패널의 종방향 연결부(기초 및 각 층간) 마다에는 방수용 지수판이 매립되도록 형성되는 것을 특징으로 한다.In addition, the present invention is formed to improve the workability and bonding properties of the male and female assembly type fitting projection and the fitting groove is formed in the connection portion of each PC panel that is connected in one direction, the longitudinal connection of the PC panel (base and each layer) Each time) is characterized in that the waterproof index plate is embedded.
이때, 상기 구조물은 외벽체를 기준으로 그 내부에서 종횡방향으로 구획되어 연결되는 내벽체가 형성되되, 상기 내벽체는 외벽체와 직교되어 연결되는 T자형 존이 현장타설 콘크리트로부터 연장되어 성형된 RC벽체이거나, 복수의 피씨 패널 및 현장타설 콘크리트의 연결로 형성되는 합성벽체 중 어느 하나로 형성됨은 물론 상기 외벽체 내에서 종횡으로 구획되는 내벽체의 교차구간에는 L자형 피씨 패널이 4방향의 내벽체용 피씨 패널과 각각 연결되도록 형성되어 현장타설 콘크리트에 의해 타설 양생시 십자형 일체화 내부 교차구간을 이루도록 하는 것을 특징으로 한다.At this time, the structure is formed on the inner wall based on the outer wall is formed in the inner wall is connected in the longitudinal direction, the inner wall is an RC wall formed by extending from the cast-in-place concrete T-shaped zone orthogonally connected to the outer wall or In addition, the L-shaped PC panel is formed of any one of the composite walls formed by the connection of the plurality of PC panels and the cast-in-place concrete, as well as the PC panels for the inner wall bodies in four directions, respectively, at the cross section of the inner walls partitioned vertically and horizontally in the outer wall. It is formed so as to be connected to form a cross-shaped integrated internal cross section during the casting curing by the cast-in-place concrete.
이에 본 발명의 피씨 패널은 지하구조물의 시공시 측면 토사에 의해 벽체 구조가 붕괴되는 것을 미연에 방지하도록 토사측 지지체인 H-형강과 직교되면서 버팀구조를 갖는 Y-자형 스트럿(STRUT)이 가설 후 제거되는 것을 특징으로 한다.Accordingly, in the PC panel of the present invention, after the construction of the underground structure, the Y-shaped strut having the support structure is orthogonal to orthogonal to the H-shaped steel, which is the soil support, to prevent the wall structure from collapsing by the side soil. Characterized in that it is removed.
이때, 상기 피씨 패널로 형성된 벽체의 일측에는 배수관이 시공되도록 하되, 상기 배수관은 링 형태의 탈부착식 거푸집에 의해 피씨 패널의 관통공으로 배관된 후 무수축 몰탈 또는 그라우트에 의해 양생 및 고정되면 거푸집을 제거하여 피씨 패널과 일체로 합성되도록 하는 것을 특징으로 한다.At this time, the drain pipe is to be installed on one side of the wall formed of the PC panel, the drain pipe is piped through the through-hole of the PC panel by a ring-shaped detachable formwork, and after curing and fixed by non-shrink mortar or grout to remove the formwork It is characterized in that to be synthesized integrally with the PC panel.
아울러, 본 발명은 층간 결합시 각층 피씨 패널의 하단부에 슬리브가 형성되어 각층 결합용 연결근에 의해 끼움 조립된 후 토핑콘크리트로 하여금 각 층 외벽 구조를 이루도록 하되, 상기 슬리브와 연결근은 조립 후 무수축 몰탈에 의해 양생되어 일체화되도록 하며, 상기 연결된 슬리브와 연결근의 이음부에는 PVC지수판에 의해 방수 처리되도록 한 뒤 토핑콘크리트와 함께 벽체와 층간 플로워가 일체로 합성되도록 하는 것을 특징으로 한다.In addition, in the present invention, the sleeve is formed at the lower end of each layer PC panel when the interlayer bonding is fitted by the connecting muscles for each layer, and then the topping concrete forms the outer wall structure of each layer. It is cured by shrinkage mortar to be integrated, and the joints of the connected sleeve and the connecting muscle are waterproofed by a PVC index plate, and the wall and the interlayer floor together with the topping concrete are characterized in that they are integrally synthesized.
통상적으로 옹벽은 토압에 저항하는 가장 일반적인 구조물로써, 저류조, 아파트, 주차장, 도로, 철도, 항만, 방조제, 교대, 재개발 아파트 등 용지의 제한에 따른 토지의 최적 이용을 목적으로 사용하며, 주위에서 자주 볼 수 있는 옹벽 구조물로는 도로와 경계를 이루는 주택부지, 산기슭 등의 경사면에 설치되어, 토압 및 우수 등의 자연조건에 의해 이들이 붕괴를 막는 기능을 담당한다.Retaining walls are the most common structure that resists earth pressure and are used for the optimal use of land due to land limitations such as storage tanks, apartments, parking lots, roads, railways, ports, dike, shifts, and redevelopment apartments. Retaining wall structures that can be seen are installed on the slopes of residential sites and foothills that border the road, and are responsible for preventing them from collapsing due to natural conditions such as earth pressure and storm water.
이러한 종래의 옹벽 구조물의 경우, 설치 높이 만큼 거푸집을 설치하여, 철근을 배근하고, 콘크리트를 타설하는 시공법이 있었으나, 최근에는 콘크리트로 미리 단위 크기로 제조한 옹벽블록을 이용한 조립식 옹벽 공법이 다양하게 개발되고 있다.In the case of the conventional retaining wall structure, there was a construction method in which formwork was installed as much as the installation height, reinforcing reinforcing bars, and concrete was poured. However, in recent years, various prefabricated retaining wall methods using retaining wall blocks manufactured in unit sizes of concrete have been developed. It is becoming.
그리고 옹벽블록을 이용한 시공 예로는, 국내특허등록 제0648110호에는 보강토 블록과 지오그리드를 이용한 앵커바에 의하여 결속된 보강토 블록 및 이를 이용한 설치각도 조절이 가능한 보강토 블록 설치구조 및 방법에 대한 내용이 게시되어 있고, 국내특허등록 제0386406호에는 옹벽 축조용 옹벽과 지오그리드 및 연결쇠를 이용한 조적식 옹벽 축조용 블럭구조 및 이를 이용한 옹벽 축조방법에 대한 내용이 게시되어 있다.And as an example of construction using retaining wall blocks, Korean Patent Registration No. 0648110 discloses the reinforcement earth block bound by the anchor bar using the reinforcement earth block and geogrid, and the structure and method of installing the reinforcement earth block that can adjust the installation angle using the same. , Korean Patent Registration No. 0386406 discloses the structure of the retaining wall for the retaining wall construction, the masonry retaining wall structure using the geogrid and the hinge and the retaining wall construction method using the same.
그러나, 종래의 옹벽구조는 토압을 견디기 위해 부피와 체적이 큰 형태로 대형 피씨 블럭을 제조하여야만 하는 바, 이는 콘크리트 사용량이 증대되어 생산성 저하 및 설치 및 작업비용이 과다하게 발생되는 문제가 계속되고 있는 실정이다.
However, the conventional retaining wall structure has to manufacture a large PC block in the form of a large volume and volume in order to withstand the earth pressure, which is a problem that the increase in the amount of concrete is used, resulting in a decrease in productivity and excessive installation and operation costs. It is true.
본 발명은 상술한 문제점을 해결하기 위한 것으로, 그 기술적 요지는 옹벽 또는 우수 저류조, 지하주차장, 병원, 대형마트 등을 포함한 각종 구조물을 시공함에 있어서, 이격된 복수의 피씨 패널과 상기 피씨 패널 사이에 현장타설 콘크리트가 충진되어 벽체를 이루도록 하는 피씨 월에 관한 것으로, 상기 피씨 월은 내부에 앵커 브라켓이 형성되고, 상기 앵커 브라켓의 단부에는 토사 매립용 와이어의 일단이 결합되며, 상기 와이어의 타단은 피씨 월의 외벽측으로 분기된 후 토사 내로 매립되도록 함으로써, 상기 피씨 월과 토사가 일체화된 합벽구조를 이루어 토압으로부터 구조물의 지지를 보강할 수 있도록 함은 물론 구조물의 벽체를 이루기 위한 각 피씨 패널의 이음부에는 U자형 조인트와 지수재가 형성되어 이웃한 피씨 패널간 단부를 방수 처리하면서 서로 결속하도록 하는 한편 구조 일체성을 확보하도록 형성되고, 상기 복수의 피씨 패널은 폭방향으로 직교된 다수개의 타이볼트가 매입 후 조임너트에 의해 체결되도록 형성되어 내부 현장콘크리트와 합성시 벽체 구조 강성을 보강하도록 형성되며, 이에 구조의 외벽 중 각 코너(모서리) 접합시에는 별도의 앵글 브라켓을 이용하여 해당 부분을 용이하게 연결할 수 있도록 형성되는 것을 특징으로 하는 토사 일체화 합벽구조를 갖는 구조물용 피씨 월을 제공함에 그 목적이 있다.The present invention is to solve the above-described problems, the technical gist of the construction of various structures including the retaining wall or rainwater storage tank, underground parking lot, hospital, large mart, etc., between the plurality of PC panels and the PC panel spaced apart Regarding the PC wall to be filled with the cast-in-place concrete to form a wall, the PC wall is formed with an anchor bracket, the end of the anchor bracket is coupled to one end of the earth-filling wire, the other end of the PC By branching to the outer wall side of the wall and buried into the soil, the PC wall and the soil are formed in the integral wall structure to reinforce the support of the structure from the earth pressure, as well as the joints of each PC panel to form the wall of the structure The U-shaped joint and the index member are formed on the surface to waterproof the ends between neighboring PC panels. The plurality of PC panels are formed so as to be fastened by fastening nuts after embedding a plurality of tie bolts orthogonal in the width direction so as to secure structural integrity. It is formed to reinforce, and the PC wall for the structure having a soil-integrated plywood structure, characterized in that when the corner (corner) of the outer wall of the structure is connected so that the corresponding portion is easily connected using a separate angle bracket The purpose is to provide.
또한, 본 발명은 일방향으로 연결되는 각 피씨 패널의 연결부에 암수 조립형 끼움돌기와 끼움홈이 형성되어 피씨 조립에 따른 작업성과 접합성을 개선하도록 형성되고, 이에 피씨 패널의 종방향 연결부(기초 및 각 층간) 마다에는 방수용 지수판이 매립되도록 형성되며, 상기 구조물은 외벽체를 기준으로 그 내부에서 종횡방향으로 구획되어 연결되는 내벽체가 형성되되, 상기 내벽체는 외벽체와 직교되어 연결되는 T자형 존이 현장타설 콘크리트로부터 연장되어 성형된 RC벽체이거나, 복수의 피씨 패널 및 현장타설 콘크리트의 연결로 형성되는 합성벽체 중 어느 하나로 형성됨은 물론 상기 외벽체 내에서 종횡으로 구획되는 내벽체의 교차구간에는 L자형 피씨 패널이 4방향의 내벽체용 피씨 패널과 각각 연결되도록 형성되어 현장타설 콘크리트에 의해 타설 양생시 십자형 일체화 내부 교차구간을 이루도록 형성되는 것을 제공함에 그 목적이 있다.In addition, the present invention is formed to improve the workability and bonding properties of the male and female assembly type fitting projection and the fitting groove is formed in the connection portion of each PC panel that is connected in one direction, the longitudinal connection of the PC panel (base and each layer) ) Is formed so that the waterproof index plate is buried, and the structure is formed with an inner wall that is partitioned and connected in the longitudinal direction from the inside with respect to the outer wall, the inner wall is a T-shaped zone that is orthogonal to the outer wall connected to the site cast L-shaped PC panels are formed in the RC wall which is formed by extending from concrete, or formed of any one of a composite wall formed by connecting a plurality of PC panels and cast-in-place concrete. It is formed to be connected to PC panels for inner wall in four directions, It is an object of the present invention to provide what is formed to form a cross-shaped integrated internal cross section during pouring curing.
이에 본 발명의 피씨 패널은 지하구조물의 시공시 측면 토사에 의해 벽체 구조가 붕괴되는 것을 미연에 방지하도록 토사측 지지체인 H-형강과 직교되면서 버팀구조를 갖는 Y-자형 스트럿(STRUT)이 가설 후 제거되는 한편, 상기 피씨 패널로 형성된 벽체의 일측에는 배수관이 시공되도록 하되, 상기 배수관은 링 형태의 탈부착식 거푸집에 의해 피씨 패널의 관통공으로 배관된 후 무수축 몰탈 또는 그라우트에 의해 양생 및 고정되면 거푸집을 제거하여 피씨 패널과 일체로 합성되도록 하는 것을 제공함에 그 목적이 있다.Accordingly, in the PC panel of the present invention, after the construction of the underground structure, the Y-shaped strut having the support structure is orthogonal to orthogonal to the H-shaped steel, which is the soil support, to prevent the wall structure from collapsing by the side soil. Meanwhile, one side of the wall formed of the PC panel allows the drainage pipe to be constructed, and the drainage pipe is piped to the through-hole of the PC panel by a ring-shaped detachable formwork and then cured and fixed by non-contraction mortar or grout. The purpose is to provide a composite to be integrated with the PC panel by removing the.
아울러, 본 발명은 층간 결합시 각층 피씨 패널의 하단부에 슬리브가 형성되어 각층 결합용 연결근에 의해 끼움 조립된 후 토핑콘크리트로 하여금 각 층 외벽 구조를 이루도록 하되, 상기 슬리브와 연결근은 조립 후 무수축 몰탈에 의해 양생되어 일체화되도록 하며, 상기 연결된 슬리브와 연결근의 이음부에는 PVC지수판에 의해 방수 처리되도록 한 뒤 토핑콘크리트와 함께 벽체와 층간 플로워가 일체로 합성되도록 하는 것을 제공함에 그 목적이 있다.
In addition, in the present invention, the sleeve is formed at the lower end of each layer PC panel when the interlayer bonding is fitted by the connecting muscles for each layer, and then the topping concrete forms the outer wall structure of each layer. The purpose of the present invention is to provide curing and consolidation by shrinkage mortar, and to provide a composite of the wall and the interlayer floor together with the topping concrete after being waterproofed by PVC index plate at the joint of the sleeve and the connecting muscle. .
이러한 목적을 달성하기 위해 본 발명은 복수의 피씨 패널(100)이 서로 마주보면서 기립하도록 형성되되, 상기 마주보는 양 피씨 패널(100) 사이에는 공간부가 형성되어 현장타설 콘크리트(200)에 의해 합성되도록 형성되는 구조물용 피씨 월에 있어서, In order to achieve the object of the present invention, the plurality of
상기 공간부에는 체결공이 형성되는 앵커 브라켓(300)이 내장되고, 상기 앵커 브라켓의 체결공에는 토사 매립용 와이어(400)의 일단이 결합되며 연장된 타단은 외벽측 피씨 패널을 관통한 후 토사(G)에 매립되도록 하되, 상기 패널(100)은 서로 마주보는 측면에 현장타설 콘크리트(200)에 의해 매립되도록 트러스 보강근(110)이 형성되되, 상기 마주보는 패널은 다수개의 타이볼트(120)가 관통된 후 조임너트(130)에 의해 체결되도록 형성되며, 기초로부터 분기된 다수개의 주근(12)은 상기 현장타설 콘크리트(200) 하부 내로 상향 돌출되어 매립됨으로써, 벽체로서의 구조 보강이 크게 확보되도록 함은 물론, 상기 패널(100)은 이웃한 패널과의 연결시 맞닿는 단부에 U자형 조인트가 형성되되, 상기 U자형 조인트는 이웃한 패널과 서로 겹쳐진 상태에서 연결근으로 하여금 조립된 후 이음된 부분이 지수재(코킹 또는 백업제)로 마감되도록 형성되며, 상기 복수의 피씨 패널(100) 중 내측 피씨 패널(100-1)은 상단부에 걸림턱(140)이 형성되되, 상기 걸림턱(140) 상부에는 PC슬래브가 안착된 뒤, 상기 PC슬래브의 상면으로 철근 콘트리트(200)가 타설되어 지하층의 천정 또는 지상층의 바닥을 이루되, 패널의 공간부로 상기 현장타설 콘크리트(200)가 유입 타설되어 일체형의 층간 및 외벽을 이루도록 구성된다.An
이때, 상기 토사 매립용 와이어(400)는 앵커 브라켓(300)을 기준으로 피시 패널의 외벽체를 관통하여 토사에 매립되도록 하되, 상기 분기된 와이어(400)는 하나의 앵커 브라켓(300)을 기준으로 다수의 와이어가 방사형으로 분기되어 매립될 수 있도록 하는 것이 바람직하다.At this time, the earth-filling
또한, 상기 기초(10)의 상부면에 형성된 벽체 기립용 홈(11)에 끼워져 기립되는 것으로, 상기 기립용 홈(11)은 상면으로부터 식각된 홈의 깊이가 200~300mm 인 것이 바람직하다.In addition, it is to be standing in the
이에, 상기 토사 매립용 와이어(400)는 토사(G)를 향해 분기된 단부가 하향으로 기울어지면서 매립되도록 하여 피씨 패널(100)의 기립 지지력이 더 확보되도록 하는 것이 바람직하다.Thus, it is preferable that the earth-filling
또한, 상기 피씨 월은 저류조, 아파트, 주차장 시공시 굴삭된 지하층에 설치되되, 상기 토사 매립용 와이어(400)는 굴삭된 지하층의 가시설(H-빔 골조)을 관통하며 토사(G)에 매립되도록 하는 것이 바람직하다.In addition, the PC wall is installed in the basement excavated during the storage tank, apartment, parking lot construction, the
이때, 상기 U자형 조인트(500)는 일측 선단이 피씨 패널(100) 내에 매립되고, 타측 선단이 양 피씨 패널의 사이 공간부에 배치되어 현장타설 콘크리트(200)에 의해 매립되도록 하는 것이 바람직하다.In this case, the U-shaped
이때, 상기 타이볼트(120)와 조임너트(130) 사이에는 고무패킹(150)과 와셔(160)가 체결 결합되는 것이 바람직하다.At this time, it is preferable that the rubber packing 150 and the
이에, 상기 피씨 패널(100)은 구조물의 모서리(코너) 접합시 서로 맞닿는 경사면(170)을 형성하되, 상기 경사면 측에 직교되는 피씨 패널의 단부에는 기 양생된 접합판(180)이 형성되고, 상기 접합판의 외측에는 앵글 브라켓(190)의 절곡된 양단부가 서로 대응되어 용접 결합되도록 하는 것이 바람직하다.Accordingly, the
또한, 상기 피씨 패널(100)은 서로 이웃한 피씨 패널과 결합시 맞닿는 단부에 끼움돌기(600) 및 끼움홈(700)이 형성되어 암수 요철 형상으로 조립 및 접합될 수 있도록 한 것이 바람직하다.In addition, the
이때, 상기 피씨 패널(100)은 기초(10)의 상부면에 형성된 벽체 기립용 홈(11)에 끼워져 기립시 현장타설 콘크리트가 타설되는 중앙 공간부와 기립용 홈의 중앙에 지수판(800)이 결합되는 것이 바람직하다.At this time, the
이에, 상기 피씨 월은 외벽체(W-1)를 기준으로 그 내부에서 종횡방향으로 구획되어 연결되는 내벽체(W-2)가 형성되되, 상기 내벽체는 외벽체와 직교되어 연결되는 T자형 존이 현장타설 콘크리트로부터 연장되어 성형된 RC벽체이거나, 복수의 피씨 패널 및 현장타설 콘크리트의 연결로 형성되는 합성벽체 중 어느 하나로 형성되는 것이 바람직하다.Accordingly, the PC wall is formed with an inner wall (W-2) which is partitioned and connected in the longitudinal direction in the interior of the outer wall (W-1), the inner wall is a T-shaped zone connected orthogonally to the outer wall It is preferable to be formed of any one of the RC wall formed by extending from the cast concrete, or a composite wall formed by the connection of a plurality of PC panels and cast concrete.
또한, 상기 피씨 월은 외벽체 내에서 종횡으로 구획되는 내벽체의 교차구간에 L자형 피씨 패널(100-3)이 4방향의 내벽체용 피씨 패널과 각각 연결되도록 형성되어 현장타설 콘크리트에 의해 타설 양생시 십자형 일체화 내부 교차구간을 이루도록 형성되는 것이 바람직하다.In addition, the PC wall is formed so that the L-shaped PC panel (100-3) is connected to the PC panel for the inner wall body in four directions at the intersection section of the inner wall partitioned vertically and horizontally in the outer wall body when curing by in-place casting concrete It is preferably formed to form a cross-shaped integrated internal cross section.
이때, 상기 피씨 패널은 면상에 내외부가 관통된 관통공(150)이 형성되어 지하구조물의 시공시 측면 토사에 의해 벽체 구조가 붕괴되는 것을 미연에 방지하도록 토사측 지지체인 H-형강과 직교되면서 버팀구조를 갖는 Y-자형 스트럿(900: STRUT)이 가설 후 제거되도록 하는 것이 바람직하다.At this time, the PC panel is formed with a
또한, 상기 피씨 패널은 어느 일측에 배수관(50)이 시공되도록 배수관용 통공(160)이 형성되되, 상기 배수관은 링 형태의 탈부착식 거푸집(60)에 의해 피씨 패널의 통공(160)으로 배관된 후 무수축 몰탈 또는 그라우트에 의해 양생 및 고정되면 상기 거푸집(60)을 제거하여 피씨 패널과 일체로 합성되도록 하는 것이 바람직하다.In addition, the PC panel is formed on the one side of the
아울러, 상기 피씨 패널은 층간 결합시 각층 피씨 패널의 하단부에 슬리브(170)가 형성되어 각층 결합용 연결근(180)에 의해 끼움 조립된 후 토핑콘크리트로 하여금 각 층 외벽 구조를 이루도록 하되, 상기 슬리브와 연결근은 조립 후 무수축 몰탈에 의해 양생되어 일체화되도록 하며, 상기 연결된 슬리브와 연결근의 이음부에는 PVC지수판(190)에 의해 방수 처리되도록 한 뒤 토핑콘크리트와 함께 벽체와 층간 플로워가 일체로 합성되도록 하는 것이 바람직하다.
In addition, the PC panel has a
이와 같이, 본 발명은 옹벽 또는 우수 저류조, 지하주차장, 병원, 대형마트 등을 포함한 각종 구조물을 시공함에 있어서, 이격된 복수의 피씨 패널과 상기 피씨 패널의 사이에 현장타설 콘크리트가 충진되어 벽체를 이루도록 하는 피씨 월에 관한 것으로, 상기 피씨 월은 내부에 앵커 브라켓이 형성되고, 상기 앵커 브라켓의 단부에는 토사 매립용 와이어의 일단이 결합되며, 상기 와이어의 타단은 피씨 월의 외벽측으로 분기된 후 토사 내로 매립되도록 함으로써, 상기 피씨 월과 토사가 일체화된 합벽구조를 이루어 토압으로부터 구조물의 지지를 보강할 수 있도록 하는 효과가 있다.As described above, the present invention, when constructing a variety of structures including a retaining wall or rainwater storage tank, underground parking lot, hospital, large mart, etc., so that the cast-in-place concrete is filled between the plurality of PC panels and the PC panels spaced apart to form a wall. Regarding the PC wall, the anchor wall is formed inside the anchor bracket, the end of the anchor bracket is coupled to one end of the earth-filling wire, the other end of the wire branched to the outer wall side of the PC wall and then into the soil By embedding, the PC wall and the earth and sand to form an integrated wall structure has the effect of reinforcing the support of the structure from the earth pressure.
이에, 본 발명은 구조물의 벽체를 이루기 위한 각 피씨 패널의 이음부에 U자형 조인트와 지수재가 형성되어 이웃한 피씨 패널간 단부를 방수 처리하면서 서로 결속하도록 하는 한편 구조 일체성을 확보하도록 형성되고, 상기 복수의 피씨 패널은 폭방향으로 직교된 다수개의 타이볼트가 매입 후 조임너트에 의해 체결되도록 형성되어 내부 현장콘크리트와 합성시 벽체 구조 강성을 보강하도록 형성되며, 이에 구조물 구조의 외벽 중 각 코너(모서리) 접합시에는 별도의 앵글 브라켓을 이용하여 해당 부분을 용이하게 연결할 수 있도록 하는 효과가 있다.Thus, the present invention is formed to form a U-shaped joint and the index member at the joint of each PC panel for forming the wall of the structure to ensure the structural integrity while binding to each other while waterproofing the end between neighboring PC panels, The plurality of PC panels are formed so that a plurality of tie bolts orthogonal in the width direction are fastened by tightening nuts after embedding so as to reinforce the wall structure rigidity when combined with the internal site concrete, and thus each corner of the outer wall of the structure structure ( Corners) When joining, there is an effect of easily connecting the corresponding parts using a separate angle bracket.
또한, 본 발명은 일방향으로 연결되는 각 피씨 패널의 연결부에 암수 조립형 끼움돌기와 끼움홈이 형성되어 피씨 조립에 따른 작업성과 접합성을 개선하도록 형성되고, 이에 피씨 패널의 종방향 연결부(기초 및 각 층간) 마다에는 방수용 지수판이 매립되도록 형성되며, 상기 구조물은 외벽체를 기준으로 그 내부에서 종횡방향으로 구획되어 연결되는 내벽체가 형성되되, 상기 내벽체는 외벽체와 직교되어 연결되는 T자형 존이 현장타설 콘크리트로부터 연장되어 성형된 RC벽체이거나, 복수의 피씨 패널 및 현장타설 콘크리트의 연결로 형성되는 합성벽체 중 어느 하나로 형성됨은 물론 상기 외벽체 내에서 종횡으로 구획되는 내벽체의 교차구간에는 L자형 피씨 패널이 4방향의 내벽체용 피씨 패널과 각각 연결되도록 형성되어 현장타설 콘크리트에 의해 타설 양생시 십자형 일체화 내부 교차구간을 이루도록 하는 효과가 있다.In addition, the present invention is formed to improve the workability and bonding properties of the male and female assembly type fitting projection and the fitting groove is formed in the connection portion of each PC panel that is connected in one direction, the longitudinal connection of the PC panel (base and each layer) ) Is formed so that the waterproof index plate is buried, and the structure is formed with an inner wall that is partitioned and connected in the longitudinal direction from the inside with respect to the outer wall, the inner wall is a T-shaped zone that is orthogonal to the outer wall connected to the site cast L-shaped PC panels are formed in the RC wall which is formed by extending from concrete, or formed of any one of a composite wall formed by connecting a plurality of PC panels and cast-in-place concrete. It is formed to be connected to PC panels for inner wall in four directions, It is effective to achieve cross-integrated internal cross section when pouring.
이에 본 발명의 피씨 패널은 지하구조물의 시공시 측면 토사에 의해 벽체 구조가 붕괴되는 것을 미연에 방지하도록 토사측 지지체인 H-형강과 직교되면서 버팀구조를 갖는 Y-자형 스트럿(STRUT)이 가설 후 제거되는 한편, 상기 피씨 패널로 형성된 벽체의 일측에는 배수관이 시공되도록 하되, 상기 배수관은 링 형태의 탈부착식 거푸집에 의해 피씨 패널의 관통공으로 배관된 후 무수축 몰탈 또는 그라우트에 의해 양생 및 고정되면 거푸집을 제거하여 피씨 패널과 일체로 합성되도록 하는 효과가 있다.Accordingly, in the PC panel of the present invention, after the construction of the underground structure, the Y-shaped strut having the support structure is orthogonal to orthogonal to the H-shaped steel, which is the soil support, to prevent the wall structure from collapsing by the side soil. Meanwhile, one side of the wall formed of the PC panel allows the drainage pipe to be constructed, and the drainage pipe is piped to the through-hole of the PC panel by a ring-shaped detachable formwork and then cured and fixed by non-contraction mortar or grout. It is effective to be synthesized integrally with the PC panel by removing the.
아울러, 본 발명은 층간 결합시 각층 피씨 패널의 하단부에 슬리브가 형성되어 각층 결합용 연결근에 의해 끼움 조립된 후 토핑콘크리트로 하여금 각 층 외벽 구조를 이루도록 하되, 상기 슬리브와 연결근은 조립 후 무수축 몰탈에 의해 양생되어 일체화되도록 하며, 상기 연결된 슬리브와 연결근의 이음부에는 PVC지수판에 의해 방수 처리되도록 한 뒤 토핑콘크리트와 함께 벽체와 층간 플로워가 일체로 합성되도록 하는 효과가 있다.
In addition, in the present invention, the sleeve is formed at the lower end of each layer PC panel when the interlayer bonding is fitted by the connecting muscles for each layer, and then the topping concrete forms the outer wall structure of each layer. It is cured by shrinkage mortar to be integrated, and the joint of the sleeve and the connecting muscle has the effect of being waterproofed by PVC index plate and then composited with the wall and the interlayer floor together with the topping concrete.
도 1은 본 발명에 따른 일체화 합벽구조를 갖는 피씨 월의 일 실시예를 나타낸 예시도,
도 2 내지 3은 본 발명에 따른 일체화 합벽구조를 갖는 피씨 월의 다른 실시예를 나타낸 예시도,
도 4는 본 발명에 따른 타이볼트와 조임너트 사이에 고무패킹과 와셔가 체결된 것을 나타낸 예시도,
도 5 내지 도 6은 본 발명에 따른 피씨 패널이 구조물의 모서리부에 적용된 것을 나타낸 실시예시도,
도 7은 본 발명의 다른 실시예로서, 피씨 패널이 서로 이웃한 피씨 패널과 결합되는 상태를 나타낸 예시도,
도 8은 본 발명의 또 다른 실시예로서, 피씨 패널과 기초 사이에 지수판이 결합된 것을 나타낸 예시도,
도 9는 본 발명에 따른 구조물의 외벽체와 내벽체의 결합구조를 나타낸 예시도,
도 10은 본 발명에 따른 구조물의 내벽체 시공 중 교차 구간을 결합하기 위해 L자형 피씨 패널이 사용되는 것을 나타낸 예시도,
도 11은 본 발명에 따른 피씨 패널이 토사로부터 붕괴되는 것을 방지하기 위해 스트럿 구조가 사용된 것을 나타낸 예시도,
도 12는 본 발명에 따른 피씨 패널의 일측에 배수관이 시공 결합되는 것을 나타낸 예시도,
도 13은 본 발명에 다른 피씨 패널의 층간 구조를 나타낸 예시도이다.1 is an exemplary view showing an embodiment of a PC wall having an integrated plywood structure according to the present invention,
2 to 3 is an exemplary view showing another embodiment of the PC wall having an integrated plywood structure according to the present invention,
4 is an exemplary view showing that a rubber packing and a washer are fastened between a tie bolt and a fastening nut according to the present invention.
5 to 6 is an embodiment showing that the PC panel according to the present invention is applied to the corner portion of the structure,
7 is a diagram illustrating a state in which PC panels are coupled with neighboring PC panels as another embodiment of the present invention;
8 is an exemplary view showing that the index plate is coupled between the PC panel and the base as another embodiment of the present invention.
9 is an exemplary view showing a coupling structure of the outer wall and the inner wall of the structure according to the present invention;
10 is an exemplary view showing that the L-shaped PC panel is used to join the cross section of the inner wall construction of the structure according to the present invention,
11 is an exemplary view showing that a strut structure is used to prevent the PC panel from collapsing from the soil according to the present invention;
12 is an exemplary view showing that the drain pipe is coupled to the construction of one side of the PC panel according to the present invention,
13 is an exemplary view showing the interlayer structure of a PC panel according to the present invention.
다음은 첨부된 도면을 참조하며 본 발명을 보다 상세히 설명하겠다.DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS The present invention will be described in detail below with reference to the accompanying drawings.
먼저 도 1 내지 도 13에 도시된 바와 같이, 본 발명은 피씨 월 내에 앵커 브라켓을 형성하되, 상기 앵커 브라켓으로부터 분기된 인장력이 큰 강재 즉, 토사 매립용 와이어를 연결한 후 그 와이어의 연장된 부분을 토사 다짐층 속에 매립하여 자중이나 외력에 의한 토사의 유동이 와이어와 토사 간의 마찰력에 의하여 횡방향 변위를 구속함으로써 점착력을 가지도록 한 것으로, First, as shown in FIGS. 1 to 13, the present invention forms an anchor bracket in a PC wall, and connects a steel material having a high tensile force branched from the anchor bracket, that is, an earth and sand embedding wire, and then an extended portion of the wire. Is embedded in the soil compaction layer so that the flow of the soil by self weight or external force has adhesive force by restraining the lateral displacement by the friction force between the wire and the soil.
이는 복수의 피씨 패널(100)이 서로 마주보면서 기립하도록 형성되되, 상기 마주보는 양 피씨 패널(100) 사이에는 공간부가 형성되어 현장타설 콘크리트(200)에 의해 합성되도록 형성되는 구조물용 피씨 월에 있어서, The plurality of
상기 공간부에는 체결공이 형성되는 앵커 브라켓(300)이 내장되고, 상기 앵커 브라켓의 체결공에는 토사 매립용 와이어(400)의 일단이 결합되며 연장된 타단은 외벽측 피씨 패널을 관통한 후 토사(G)에 매립되도록 하되, 상기 패널(100)은 서로 마주보는 측면에 현장타설 콘크리트(200)에 의해 매립되도록 트러스 보강근(110)이 형성되되, 상기 마주보는 패널은 다수개의 타이볼트(120)가 관통된 후 조임너트(130)에 의해 체결되도록 형성되며, 기초로부터 분기된 다수개의 주근(12)은 상기 현장타설 콘크리트(200) 하부 내로 상향 돌출되어 매립됨으로써, 벽체로서의 구조 보강이 크게 확보되도록 함은 물론, 상기 패널(100)은 이웃한 패널과의 연결시 맞닿는 단부에 U자형 조인트가 형성되되, 상기 U자형 조인트는 이웃한 패널과 서로 겹쳐진 상태에서 연결근으로 하여금 조립된 후 이음된 부분이 지수재(코킹 또는 백업제)로 마감되도록 형성되며, 상기 복수의 피씨 패널(100) 중 내측 피씨 패널(100-1)은 상단부에 걸림턱(140)이 형성되되, 상기 걸림턱(140) 상부에는 PC슬래브가 안착된 뒤, 상기 PC슬래브의 상면으로 철근 콘트리트(200)가 타설되어 지하층의 천정 또는 지상층의 바닥을 이루되, 패널의 공간부로 상기 현장타설 콘크리트(200)가 유입 타설되어 일체형의 층간 및 외벽을 이루도록 구성된다.An
이러한 본 발명은 2장의 피씨 패널의 사이에 현장타설 콘크리트를 타설한 후 상기 현장타설 콘크리트로부터 분기된 다수의 토사 매립용 와이어에 의해 콘크리트 사용량을 현저히 감소시키되, 토압 지지 구조는 현저히 개선되는 특징이 있다. The present invention is characterized in that the concrete usage is significantly reduced by a plurality of earth-filled wires branched from the cast concrete after pouring the cast concrete between the two PC panels, the earth pressure supporting structure is remarkably improved. .
이때, 상기 토사 매립용 와이어(400)는 앵커 브라켓(300)을 기준으로 피시 패널의 외벽체를 관통하여 토사에 매립되도록 하되, 상기 분기된 와이어(400)는 하나의 앵커 브라켓(300)을 기준으로 다수의 와이어가 방사형으로 분기되어 매립될 수 있도록 하는 것이 바람직하다.At this time, the earth-
이에, 상기 분기된 와이어의 외주면에는 접합면의 확대를 위해 굴곡면 또는 주름골이 형성되어 토사에 매립시 보다 견고한 묻힘이 이루어지도록 형성되는 것이 바람직하다.Thus, the outer peripheral surface of the branched wire is preferably formed to be more rigid buried when the buried surface or wrinkles are formed for embedding in the earth and sand for expansion of the joint surface.
또한, 상기 기초(10)의 상부면에 형성된 벽체 기립용 홈(11)에 끼워져 기립되는 것으로, 상기 기립용 홈(11)은 상면으로부터 식각된 홈의 깊이가 200~300mm 인 것이 바람직하다.In addition, it is to be standing in the
이에, 상기 토사 매립용 와이어(400)는 토사(G)를 향해 분기된 단부가 하향으로 기울어지면서 매립되도록 하여 피씨 패널(100)의 기립 지지력이 더 확보되도록 하는 것이 바람직하다.Thus, it is preferable that the earth-
또한, 상기 피씨 월은 저류조, 아파트, 주차장 시공시 굴삭된 지하층에 설치되되, 상기 토사 매립용 와이어(400)는 굴삭된 지하층의 가시설(H-빔 골조)을 관통하며 토사(G)에 매립되도록 하는 것이 바람직하다.In addition, the PC wall is installed in the basement excavated during the storage tank, apartment, parking lot construction, the
이때, 상기 U자형 조인트(500)는 일측 선단이 피씨 패널(100) 내에 매립되고, 타측 선단이 양 피씨 패널의 사이 공간부에 배치되어 현장타설 콘크리트(200)에 의해 매립되도록 하는 것이 바람직하다.In this case, the U-shaped joint 500 is preferably one end is embedded in the
이때, 상기 타이볼트(120)와 조임너트(130) 사이에는 고무패킹(150)과 와셔(160)가 체결 결합되는 것이 바람직하다.At this time, it is preferable that the rubber packing 150 and the
이에, 상기 피씨 패널(100)은 구조물의 모서리(코너) 접합시 서로 맞닿는 경사면(170)을 형성하되, 상기 경사면 측에 직교되는 피씨 패널의 단부에는 기 양생된 접합판(180)이 형성되고, 상기 접합판의 외측에는 앵글 브라켓(190)의 절곡된 양단부가 서로 대응되어 용접 결합되도록 하는 것이 바람직하다.Accordingly, the
또한, 상기 피씨 패널(100)은 서로 이웃한 피씨 패널과 결합시 맞닿는 단부에 끼움돌기(600) 및 끼움홈(700)이 형성되어 암수 요철 형상으로 조립 및 접합될 수 있도록 한 것이 바람직하다.In addition, the
이때, 상기 피씨 패널(100)은 기초(10)의 상부면에 형성된 벽체 기립용 홈(11)에 끼워져 기립시 현장타설 콘크리트가 타설되는 중앙 공간부와 기립용 홈의 중앙에 지수판(800)이 결합되는 것이 바람직하다.At this time, the
이에, 상기 피씨 월은 도 9에 도시된 바와 같이, 외벽체(W-1)를 기준으로 그 내부에서 종횡방향으로 구획되어 연결되는 내벽체(W-2)가 형성되되, 상기 내벽체는 외벽체와 직교되어 연결되는 T자형 존이 현장타설 콘크리트로부터 연장되어 성형된 RC벽체이거나, 복수의 피씨 패널 및 현장타설 콘크리트의 연결로 형성되는 합성벽체 중 어느 하나로 형성되는 것이 바람직하다.Accordingly, the PC wall is formed with an inner wall (W-2) which is partitioned and connected in the longitudinal direction from the inside, based on the outer wall (W-1), as shown in Figure 9, the inner wall and the outer wall The orthogonal T-shaped zone is preferably formed of any one of the RC wall formed by extending from the cast concrete, or a composite wall formed by the connection of a plurality of PC panels and cast concrete.
이때, 상기 T자형 존이 RC벽체로 형성될 경우에는 외벽체를 이루는 피씨 패널의 내측 피씨 패널의 길이가 외측 피씨 패널 보다 짧게 형성되어 현장타설 콘크리트가 내부로 벽체를 형성할 수 있도록 하는 개구부가 형성되고, 상기 개구부와 대응되는 폭 간격으로 거푸집이 형성되어 현장타설 콘크리트로 하여금 내벽체가 타설 및 양생되도록 형성된다.In this case, when the T-shaped zone is formed of an RC wall, the length of the inner PC panel of the PC panel constituting the outer wall is formed to be shorter than that of the outer PC panel, and an opening for forming the wall inside the cast-in-place concrete is formed. Formwork is formed at a width interval corresponding to the opening to form the cast-in-place concrete so that the inner wall is poured and cured.
또한, 상기 피씨 월은 도 10에 도시된 바와 같이, 외벽체 내에서 종횡으로 구획되는 내벽체의 교차구간에 L자형 피씨 패널(100-3)이 4방향의 내벽체용 피씨 패널과 각각 연결되도록 형성되어 현장타설 콘크리트에 의해 타설 양생시 십자형 일체화 내부 교차구간을 이루도록 형성되는 것이 바람직하다.In addition, the PC wall is formed so that the L-shaped PC panel 100-3 is connected to the PC panel for the inner wall in each of four directions at the intersection of the inner wall partitioned vertically and horizontally in the outer wall, as shown in FIG. It is preferable to form a cross-shaped integrated internal cross section during casting curing by cast-in-place concrete.
즉, 상기 L자형 피씨 패널은 교차구간용 패널로서, 현장타설 콘크리트와 피씨 패널간의 교차점 구간을 보다 용이하고 신속하게 시공할 수 있도록 형성된다.That is, the L-shaped PC panel is a cross section panel, and is formed so that the intersection point between the cast-in-place concrete and the PC panel can be easily and quickly constructed.
이때, 상기 피씨 패널은 도 11에 도시된 바와 같이, 면상에 내외부가 관통된 관통공(150)이 형성되어 지하구조물의 시공시 측면 토사에 의해 벽체 구조가 붕괴되는 것을 미연에 방지하도록 토사측 지지체인 H-형강과 직교되면서 버팀구조를 갖는 Y-자형 스트럿(900: STRUT)이 가설 후 제거되도록 하는 것이 바람직하다.At this time, the PC panel, as shown in Figure 11, the through-
이때, 상기 Y-자형 스트럿은 H-형강으로 된 일종의 버팀 구조물로서, 상기 Y-자형 부가 토사측을 지지하도록 형성되고, I-자형 부가 구조물의 내측에서 지지하도록 형성되어 시공 안전성을 도모하도록 하는 한편, 구조 시공이 일정 단계에 이르면 이를 제거하도록 형성된다.At this time, the Y-shaped strut is a kind of support structure made of H-shaped steel, and is formed to support the Y-shaped additional soil side, and is formed to support the inside of the I-shaped additional structure to promote construction safety, When the construction reaches a certain stage, it is formed to remove it.
또한, 상기 피씨 패널은 도 12에 도시된 바와 같이, 어느 일측에 배수관(50)이 시공되도록 배수관용 통공(160)이 형성되되, 상기 배수관은 링 형태의 탈부착식 거푸집(60)에 의해 피씨 패널의 통공(160)으로 배관된 후 무수축 몰탈 또는 그라우트에 의해 양생 및 고정되면 상기 거푸집(60)을 제거하여 피씨 패널과 일체로 합성되도록 하는 것이 바람직하다.In addition, the PC panel, as shown in Figure 12, the drainage pipe through-
즉, 상기 거푸집은 배수관을 고정하도록 하는 원형 링 형태의 고정구로서, 상기 거푸집은 링 형태의 몸체가 1/2 종방향으로 분할되되, 별도의 체결볼트 및 너트에 의해 배수관을 기준으로 조립될 수 있도록 하여 시공 전후 탈장착될 수 있도록 형성된다.That is, the formwork is a circular ring-shaped fixture for fixing the drain pipe, the formwork is divided into a ring-shaped body in the
아울러, 상기 피씨 패널은 도 13에 도시된 바와 같이, 층간 결합시 각층 피씨 패널의 하단부에 슬리브(170)가 형성되어 각층 결합용 연결근(180)에 의해 끼움 조립된 후 토핑콘크리트로 하여금 각 층 외벽 구조를 이루도록 하되, 상기 슬리브와 연결근은 조립 후 무수축 몰탈에 의해 양생되어 일체화되도록 하며, 상기 연결된 슬리브와 연결근의 이음부에는 PVC지수판(190)에 의해 방수 처리되도록 한 뒤 토핑콘크리트와 함께 벽체와 층간 플로워가 일체로 합성되도록 하는 것이 바람직하다.
In addition, the PC panel, as shown in Figure 13, when the
본 발명은 상술한 특정의 바람직한 실시예에 한정되지 아니하며, 청구범위에서 청구하는 본 발명의 요지를 벗어남이 없이 당해 고안이 속하는 기술분야에서 통상의 지식을 가진 자라면 누구든지 다양한 변형실시가 가능한 것은 물론이고, 그와 같은 변경은 청구범위 기재의 범위 내에 있게 된다.
It will be understood by those skilled in the art that various changes in form and details may be made therein without departing from the spirit and scope of the present invention as defined by the appended claims and their equivalents. Of course, such modifications are within the scope of the claims.
10 ... 기초 11 ... 벽체 기립용 홈
12 ... 주근
100 ... 패널 200 ... 현장타설 콘크리트
300 ... 앵커 브라켓 400 ... 토사 매립용 와이어
500 ... U형 조인트 600 ... 끼움돌기
700 ... 끼움홈 800 ... 지수판10 ...
12 ... freckles
100 ...
300 ...
500 ... U-shaped joint 600 ... Fitting
700 ...
Claims (15)
상기 공간부에는 체결공이 형성되는 앵커 브라켓(300)이 내장되고, 상기 앵커 브라켓의 체결공에는 토사 매립용 와이어(400)의 일단이 결합되며 연장된 타단은 외벽측 피씨 패널을 관통한 후 토사(G)에 매립되도록 하되, 상기 패널(100)은 서로 마주보는 측면에 현장타설 콘크리트(200)에 의해 매립되도록 트러스 보강근(110)이 형성되고, 상기 마주보는 패널은 다수개의 타이볼트(120)가 관통된 후 조임너트(130)에 의해 체결되도록 형성되며, 기초로부터 분기된 다수개의 주근(12)은 상기 현장타설 콘크리트(200) 하부 내로 상향 돌출되어 매립됨으로써, 벽체로서의 구조 보강이 크게 확보되도록 함은 물론 상기 패널(100)은 이웃한 패널과의 연결시 맞닿는 단부에 U자형 조인트(500)가 형성되고, 상기 U자형 조인트는 이웃한 패널과 서로 겹쳐진 상태에서 연결근으로 하여금 조립된 후 이음된 부분이 지수재(코킹 또는 백업제)로 마감되도록 형성되며, 상기 복수의 피씨 패널(100) 중 내측 피씨 패널(100-1)은 상단부에 걸림턱(140)이 형성되되, 상기 걸림턱(140) 상부에는 PC슬래브가 안착된 뒤, 상기 PC슬래브의 상면으로 철근 콘트리트(200)가 타설되어 지하층의 천정 또는 지상층의 바닥을 이루고, 패널의 공간부로 상기 현장타설 콘크리트(200)가 유입 타설되어 일체형의 층간 및 외벽을 이루도록 형성되며,
상기 토사 매립용 와이어(400)는 앵커 브라켓(300)을 기준으로 피시 패널의 외벽체를 관통하여 토사에 매립되도록 하되, 상기 분기된 와이어(400)는 하나의 앵커 브라켓(300)을 기준으로 다수의 와이어가 방사형으로 분기되어 매립될 수 있도록 하는 것을 특징으로 하는 토사 일체화 합벽구조를 갖는 구조물용 피씨 월.In the plurality of PC panel 100 is formed so as to stand while facing each other, the space between the two PC panel 100 facing each other is formed to be synthesized by the cast-in-place concrete 200,
An anchor bracket 300 having a fastening hole is formed in the space part, and one end of the earth-filling wire 400 is coupled to the fastening hole of the anchor bracket, and the other end thereof extends through the outer wall side PC panel, and then the earth and sand ( G) to be embedded, but the panel 100 is truss reinforcement 110 is formed to be embedded by the site-casting concrete 200 on the side facing each other, the facing panel is a plurality of tie bolts 120 After being penetrated, it is formed to be fastened by the tightening nut 130, and the plurality of the main roots 12 branched from the foundation protrudes upward into the bottom of the cast-in-place concrete 200 to be embedded, so that the structural reinforcement as a wall is greatly secured. Of course, the panel 100 is a U-shaped joint 500 is formed at the end abutting when connecting with the neighboring panel, the U-shaped joint is connected to the neighboring panel in the state overlapping with each other After the assembly of the filtrate is formed so that the joint portion is finished with the index material (caulking or backing agent), the inner PC panel (100-1) of the plurality of PC panel 100 is formed with a locking jaw 140 at the upper end After the PC slab is seated on the locking jaw 140, the reinforced concrete 200 is poured onto the upper surface of the PC slab to form the ceiling or the ground floor of the basement floor, and the site-casting concrete 200 as a space part of the panel. ) Is formed to form an integral interlayer and outer wall by pouring inflow.
The earth-filling wire 400 is embedded in the earth and sand through the outer wall of the fish panel based on the anchor bracket 300, the branched wire 400 is a plurality of anchor bracket 300 based on A PC wall for a structure having a soil-integrated plywood structure, characterized in that the wire is radially branched and embedded.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020120057592A KR101193896B1 (en) | 2012-05-30 | 2012-05-30 | Pc wall with ancher wire for structrue |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020120057592A KR101193896B1 (en) | 2012-05-30 | 2012-05-30 | Pc wall with ancher wire for structrue |
Publications (1)
Publication Number | Publication Date |
---|---|
KR101193896B1 true KR101193896B1 (en) | 2012-10-29 |
Family
ID=47288531
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1020120057592A KR101193896B1 (en) | 2012-05-30 | 2012-05-30 | Pc wall with ancher wire for structrue |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR101193896B1 (en) |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106368215A (en) * | 2016-10-09 | 2017-02-01 | 上海市政工程设计研究总院(集团)有限公司 | Embedded grouting pipe module |
KR20180050201A (en) * | 2016-11-04 | 2018-05-14 | (주)연우피씨엔지니어링 | The underground wall structure and construction method thereof |
KR20180055035A (en) * | 2016-11-16 | 2018-05-25 | 피씨에스솔루션 주식회사 | Retaining wall structure using precast double-wall and construction method thereof |
CN108166627A (en) * | 2017-12-19 | 2018-06-15 | 浙江绿筑集成科技有限公司 | A kind of turning building method of faced wall |
CN108560914A (en) * | 2018-05-29 | 2018-09-21 | 中冶建工集团有限公司 | Construct the large form support construction method for dismounting of no holdfast concrete barricade |
CN109629663A (en) * | 2018-12-28 | 2019-04-16 | 北京泽昌盛建筑科技有限公司 | A kind of absolutely dry formula concrete house structural and preparation method thereof that is linked and packed of standardization |
CN110593304A (en) * | 2019-08-30 | 2019-12-20 | 中建一局集团建设发展有限公司 | Assembly type double-skin wall structure and system and construction method thereof |
CN114606954A (en) * | 2022-04-20 | 2022-06-10 | 西安市第二市政工程公司 | Enclose purlin and strut |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5588784A (en) | 1995-06-07 | 1996-12-31 | Schnabel Foundation Company | Soil or rock nail wall with outer face and method of constructing the same |
KR101001208B1 (en) | 2010-08-30 | 2010-12-15 | 대한이.이엔.씨(주) | A constructing method of structure using sandwich pc-wall |
KR101083670B1 (en) | 2011-07-05 | 2011-11-15 | 덕산콘크리트(주) | Construction of wall for the water-storage tank using method of construction with pc and rc |
-
2012
- 2012-05-30 KR KR1020120057592A patent/KR101193896B1/en active IP Right Grant
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5588784A (en) | 1995-06-07 | 1996-12-31 | Schnabel Foundation Company | Soil or rock nail wall with outer face and method of constructing the same |
KR101001208B1 (en) | 2010-08-30 | 2010-12-15 | 대한이.이엔.씨(주) | A constructing method of structure using sandwich pc-wall |
KR101083670B1 (en) | 2011-07-05 | 2011-11-15 | 덕산콘크리트(주) | Construction of wall for the water-storage tank using method of construction with pc and rc |
Cited By (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106368215B (en) * | 2016-10-09 | 2023-11-10 | 上海市政工程设计研究总院(集团)有限公司 | Pre-buried slip casting pipe assembly |
CN106368215A (en) * | 2016-10-09 | 2017-02-01 | 上海市政工程设计研究总院(集团)有限公司 | Embedded grouting pipe module |
KR102100330B1 (en) * | 2016-11-04 | 2020-04-13 | (주)연우피씨엔지니어링 | The underground wall structure and construction method thereof |
KR20180050201A (en) * | 2016-11-04 | 2018-05-14 | (주)연우피씨엔지니어링 | The underground wall structure and construction method thereof |
KR20180055035A (en) * | 2016-11-16 | 2018-05-25 | 피씨에스솔루션 주식회사 | Retaining wall structure using precast double-wall and construction method thereof |
CN108166627B (en) * | 2017-12-19 | 2023-11-10 | 浙江绿筑集成科技有限公司 | Corner construction method of combined wall |
CN108166627A (en) * | 2017-12-19 | 2018-06-15 | 浙江绿筑集成科技有限公司 | A kind of turning building method of faced wall |
CN108560914A (en) * | 2018-05-29 | 2018-09-21 | 中冶建工集团有限公司 | Construct the large form support construction method for dismounting of no holdfast concrete barricade |
CN109629663A (en) * | 2018-12-28 | 2019-04-16 | 北京泽昌盛建筑科技有限公司 | A kind of absolutely dry formula concrete house structural and preparation method thereof that is linked and packed of standardization |
CN110593304A (en) * | 2019-08-30 | 2019-12-20 | 中建一局集团建设发展有限公司 | Assembly type double-skin wall structure and system and construction method thereof |
CN110593304B (en) * | 2019-08-30 | 2024-04-05 | 中建一局集团建设发展有限公司 | Assembled double-skin wall structure and system and construction method thereof |
CN114606954A (en) * | 2022-04-20 | 2022-06-10 | 西安市第二市政工程公司 | Enclose purlin and strut |
CN114606954B (en) * | 2022-04-20 | 2023-12-08 | 西安市市政工程(集团)有限公司 | Enclosing purlin support |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR101193896B1 (en) | Pc wall with ancher wire for structrue | |
KR101630235B1 (en) | Precast truss wall structure and construction method of underground structure using thereof | |
KR100799358B1 (en) | Combined retaining wall and method for constructing thereof | |
JP4698491B2 (en) | Temporary closing method and structure of underwater structure | |
KR102015564B1 (en) | Panel-type retaining wall structure with h-pile and joint device and construction method thereof | |
KR102071225B1 (en) | Construction method of sheathing temporary facility using steel sheet pile | |
KR101118263B1 (en) | Rain retaining facility and constructing method thereof using precast concrete block | |
KR101083670B1 (en) | Construction of wall for the water-storage tank using method of construction with pc and rc | |
KR20140013497A (en) | Method for constructing block type reinforced retaining wall in cut site | |
KR20110132909A (en) | Underpass using precast concrete pile and method for constructing the same | |
US20210017755A1 (en) | Composite wall and methods of constructing a composite wall | |
CN219157761U (en) | Basement bottom plate high-low span connection structure | |
KR20110052360A (en) | Downward construction method of underground structure that enables continuous basement wall using non-wale and diaphragm action of concrete slab | |
CN114263187B (en) | Foundation pit bottom plate force transmission structure and construction method thereof | |
KR101808833B1 (en) | Floor structure of underground floor with reduced floor height using shear reinforcement and the construction method thereof | |
KR101390683B1 (en) | Retaining wall using precast concrete panel and construction method of the same | |
KR101271290B1 (en) | Underground reclamation type water storage tank having a assembling structure | |
CN212452765U (en) | Two-in-one underground pipe gallery structure | |
JP5280150B2 (en) | Yamadome retaining wall and method of forming Yamadome retaining wall | |
KR101056395B1 (en) | The water-storage tank of assembly type and method for constructing thereof | |
KR100823348B1 (en) | Installation method of a retaining wall | |
JP2010168808A (en) | Protective wall and protective wall formation method | |
JP4332651B2 (en) | Foundation reinforcement device and foundation construction method | |
KR100999410B1 (en) | Assembled wale beam and construction method of underground structure using the same | |
KR200428941Y1 (en) | Strut system of temporary retaining wall |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A201 | Request for examination | ||
A302 | Request for accelerated examination | ||
E902 | Notification of reason for refusal | ||
E701 | Decision to grant or registration of patent right | ||
GRNT | Written decision to grant | ||
FPAY | Annual fee payment |
Payment date: 20151013 Year of fee payment: 4 |
|
FPAY | Annual fee payment |
Payment date: 20160922 Year of fee payment: 5 |
|
FPAY | Annual fee payment |
Payment date: 20171017 Year of fee payment: 6 |
|
FPAY | Annual fee payment |
Payment date: 20181017 Year of fee payment: 7 |
|
R401 | Registration of restoration |