KR101095413B1 - Flood prediction information system of high-resolution rapid-updated-coupling and flood prediction information method of high- resolution rapid-updated-coupling - Google Patents
Flood prediction information system of high-resolution rapid-updated-coupling and flood prediction information method of high- resolution rapid-updated-coupling Download PDFInfo
- Publication number
- KR101095413B1 KR101095413B1 KR1020090084125A KR20090084125A KR101095413B1 KR 101095413 B1 KR101095413 B1 KR 101095413B1 KR 1020090084125 A KR1020090084125 A KR 1020090084125A KR 20090084125 A KR20090084125 A KR 20090084125A KR 101095413 B1 KR101095413 B1 KR 101095413B1
- Authority
- KR
- South Korea
- Prior art keywords
- flood
- prediction
- information
- weather
- module
- Prior art date
Links
Images
Classifications
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01W—METEOROLOGY
- G01W1/00—Meteorology
- G01W1/10—Devices for predicting weather conditions
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01W—METEOROLOGY
- G01W1/00—Meteorology
- G01W1/02—Instruments for indicating weather conditions by measuring two or more variables, e.g. humidity, pressure, temperature, cloud cover or wind speed
- G01W1/06—Instruments for indicating weather conditions by measuring two or more variables, e.g. humidity, pressure, temperature, cloud cover or wind speed giving a combined indication of weather conditions
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06T—IMAGE DATA PROCESSING OR GENERATION, IN GENERAL
- G06T19/00—Manipulating 3D models or images for computer graphics
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02A—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
- Y02A10/00—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE at coastal zones; at river basins
- Y02A10/40—Controlling or monitoring, e.g. of flood or hurricane; Forecasting, e.g. risk assessment or mapping
Landscapes
- Environmental & Geological Engineering (AREA)
- Engineering & Computer Science (AREA)
- Environmental Sciences (AREA)
- Ecology (AREA)
- Biodiversity & Conservation Biology (AREA)
- Atmospheric Sciences (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Engineering & Computer Science (AREA)
- Theoretical Computer Science (AREA)
- General Physics & Mathematics (AREA)
- Physics & Mathematics (AREA)
- Software Systems (AREA)
- Computer Hardware Design (AREA)
- Computer Graphics (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
본 발명은 고해상도-고빈도 사이클 홍수 정보 예측 시스템 및 방법에 관한 것으로서, 특히 기상모델(meteorological model)과 수문모델(hydrological model)을 연통하여 관심 대상 영역에 대해 0.5 km 간격으로 격자화하여 매 5분 간격으로 홍수 예측 자료를 생산함으로써 보다 정확하고 상세한 홍수 예측 정보를 제공하는 고해상도-고빈도 사이클 홍수 정보 예측 시스템 및 방법에 관한 것이다. 본 발명은 상술한 바와 같이 본 발명은 관심 대상 영역에 대해 0.5㎞ 간격으로 격자화하여 미세한 지역적 특성이 충분히 반영된 고해상도 상세 강우량 정보를 매 5분마다 제공하여 돌발 호우 및 집중 호우의 모니터링이 가능한 고해상도-고빈도 사이클 홍수 정보 예측 시스템 및 방법을 제공할 수 있다. 또한, 본 발명은 미세한 지형적 특성이 반영된 5분 간격의 강우 예측정보를 입력받아 상세 홍수 예측 정보를 생산함으로써 정확하고 신속한 홍수 위험예보 자료를 생산할 수 있는 고해상도-고빈도 사이클 홍수 정보 예측 시스템 및 방법을 제공할 수 있다. 또한, 본 발명은 매 5분 간격의 상세 호우 및 홍수 예측 결과를 웹표출 시스템을 통해 표출함으로써 집중 호우 및 도시 홍수 빈발 지역에 대한 일선 기관 및 지자체의 방재 활동에 필요한 정보를 제공할 수 있는 고해상도-고빈도 사이클 홍수 정보 예측 시스템 및 방법을 제공할 수 있다.The present invention relates to a high resolution and high frequency cycle flood information prediction system and method, in particular through a meteorological model and a hydrological model in a grid of 0.5 km intervals of the region of interest every 5 minutes The present invention relates to a high resolution and high frequency cycle flood information prediction system and method that provides more accurate and detailed flood prediction information by producing flood prediction data at intervals. As described above, the present invention provides a high resolution detailed rainfall information every 5 minutes, which is gridded at intervals of 0.5 km with respect to a region of interest, to sufficiently reflect minute local characteristics, so that sudden and heavy rainfall can be monitored. High frequency cycle flood information prediction systems and methods can be provided. In addition, the present invention provides a high-resolution high-frequency cycle flood information prediction system and method capable of producing accurate and rapid flood risk forecasting data by receiving detailed rainfall forecasting information received at 5 minute intervals reflecting microscopic features. Can provide. In addition, the present invention displays detailed rainfall and flood prediction results every 5 minutes through the web presentation system to provide information necessary for disaster prevention activities of front-line organizations and local governments for intensive rainfall and urban flooding frequent areas. High frequency cycle flood information prediction systems and methods can be provided.
고해상도, 고빈도, 사이클, 홍수 예측 High resolution, high frequency, cycle, flood prediction
Description
본 발명은 고해상도-고빈도 사이클 홍수 정보 예측 시스템 및 방법에 관한 것으로서, 특히 기상모델(meteorological model)과 수문모델(hydrological model)을 연통하여 관심 대상 영역에 대해 0.5㎞ 간격으로 격자화하여 매 5분 간격으로 홍수 예측 자료를 생산함으로써 보다 정확하고 상세한 홍수 예측 정보를 제공하는 고해상도-고빈도 사이클 홍수 정보 예측 시스템 및 방법에 관한 것이다.The present invention relates to a high resolution and high frequency cycle flood information prediction system and method, in particular through a meteorological model and a hydrological model in communication with the grid of 0.5km interval of interest area every 5 minutes The present invention relates to a high resolution and high frequency cycle flood information prediction system and method that provides more accurate and detailed flood prediction information by producing flood prediction data at intervals.
하천의 홍수예측은 크게 기상법, 수위법 ,강우-유출법, 기상-강우-유출법 등의 접근법이 있는데, 기상법은 미국의 PROFS(Prototype Regional Observing and Forecasting Service), 영국의 FRONTIER(Forecasting Rain Optimized Using New Techniques of Interactive Enhanced Radar and satellite), 스웨덴의 PROMIS-90(Program for an Operation Meteorological Information System) 등과 같이 지상 강우관측소, 레이더 및 기상위성 등을 이용하여 정확한 정량적 강수예측에 의해 홍수가 발생 가능한 강우량에 대하여 위험을 평가하는 방법이다.River flood forecasting can be classified into weather, water level, rainfall-runoff, weather-rainfall-run, etc. Weather forecasting methods include Prototype Regional Observing and Forecasting Service (PROFS) in the United States, and Forecasting Rain Optimized (FRONTIER) in the UK. New rainfalls such as New Enhanced Techniques of Interactive Enhanced Radar and Satellite, and Sweden's Program for an Operation Meteorological Information System (PROMIS-90) can be used to determine the amount of rainfall that can be triggered by accurate quantitative precipitation prediction using ground rainfall stations, radars, and meteorological satellites. This is how you assess risk.
수위법은 하천 상류의 수위 관측값 변화에 따라 하류의 유량 변화를 계산하는 일종의 경험공식으로 한장 인도교 수위예보에 사용된 바 있다. 강우-유출법은 기존 5대강 홍수통제소의 홍수예경보 시스템에서 사용하는 방법으로 현재 가장 보편적인 방법이다.The water level method is a type of empirical formula that calculates the change in the downstream flow according to the change of the water level observation upstream. Rainfall-runoff is the most common method currently used in flood forecasting systems of the five major flood control stations.
그러나, 긴박한 실시간 홍수 위험 예보를 위해서는 단순한 강우-유출법보다는 강우예측모형과 직접 연동함으로써 예보의 정확성과 신속성을 기할 수 있다. 또한, 정확한 홍수 예측 정보를 제공하기 위해서는 실시간으로 제공되는 상세한 강우 예측 정보가 필수적인데, 종래에는 30km 격자간격의 중규모(mesoscale)기상 모형을 사용하여 약 3시 간 마다 강우량 예측 정보를 생산하는 것이 일반적이었다. 그러나, 삼면이 바다로 이루어져 있고 지의 2/3가 산지로 이루어진 우리나라의 지형적 조건을 고려하였을 때, 상기 30km 격자 간격의 3시간 강우량 정보는 수문모델의 입력 자료로 적용하기 어렵다. 특히 강우의 경우 돌발적으로 발생하는 경우가 많고 시 공간적 편차가 매우 크기 때문에 상기 해상도의 정보로는 국지적인 강우 발생에 따른 홍수정보를 예측하기 어렵다는 단점이 있다.However, for impending real-time flood risk forecasts, the accuracy and speed of forecasting can be ensured by directly linking with the rainfall forecasting model rather than the simple rainfall-runoff method. In addition, in order to provide accurate flood prediction information, detailed rainfall prediction information provided in real time is essential. In the past, it is common to produce rainfall prediction information about every three hours using a mesoscale weather model with a 30 km grid spacing. It was. However, considering the topographical conditions of Korea, where three sides consist of the sea and two thirds of the land consists of mountains, the three-hour rainfall information with 30 km grid spacing is difficult to apply as an input to the hydrological model. Particularly, in case of rainfall, it is often generated suddenly and the temporal and spatial variation is very large. Therefore, it is difficult to predict flood information according to local rainfall with the resolution information.
또한, 더욱 상세한 강우 예측 정보를 위하여 상기 중규모 기상 모형의 시ㅇ공간 해상도를 높일 경우, 해상도를 2배 높일 때마다 4 배의 계산 시간이 더 소요되므로 이를 실제 수문모형과 연계 운영한다는 것은 거의 불가능한 일이었다. 따라서, 정확한 홍수 정보를 위해서는 지역적으로 매우 세분화된 상세한 강수 정보를 빠른 시간 안에 생산할 수 있는 미세 격자 규모의 정량적 강수 산출 체계와 수문 예측 모형간의 연계가 필요하다는 문제가 있다.In addition, if the time-space resolution of the medium-scale weather model is increased for more detailed rainfall prediction information, it is almost impossible to operate it in conjunction with the actual hydrologic model because it takes 4 times more computation time every time the resolution is increased twice. It was. Therefore, there is a problem in that accurate flood information requires a linkage between a fine grid-scale quantitative precipitation calculation system and a hydrologic prediction model that can produce detailed local precipitation information in a short time.
또한, 미세 격자 규모의 정량적 강수 산출 체계와 수문 예측 모형 간의 실시간 연통을 통하여 이들을 종합적으로 표출할 수 있는 시스템이 부족한 실정이다.In addition, there is a lack of a system capable of expressing them comprehensively through real-time communication between the quantitative precipitation calculation system of the fine grid scale and the hydrologic prediction model.
본 발명의 목적은 중규모 기상 수치모형에서는 표현되지 않는 소규모의 지형적 안출한 것으로서, 기존효과까지도 고려하여 고해상도(0.5km), 고빈도(5분)의 상세 강우량 정보를 빠른 시간 내에 생산할 수 있는 고해상도-고빈도 사이클 홍수 정보 예측 시스템 및 방법을 제공하는 것이다.The object of the present invention is to develop a small geographic feature that is not represented in the medium-scale meteorological numerical model. To provide a high frequency cycle flood information prediction system and method.
또한, 본 발명의 다른 목적은 정량적 강수 산출 체계로부터 상세 강수 정보를 입력받고, 이를 수문 모형의 입력장으로 활용함으로써 매 5분마다 상세 홍수 예측 정보를 생산할 수 있는 고해상도-고빈도 사이클 홍수 정보 예측 시스템 및 방법을 제공하는 것이다.In addition, another object of the present invention is a high-resolution high-frequency cycle flood information prediction system capable of generating detailed flood prediction information every 5 minutes by receiving detailed precipitation information from the quantitative precipitation calculation system and using it as an input field of the hydrologic model And a method.
또한 ,본 발명의 다른 목적은 미세 격자 규모의 정량적 강수 산출 체계와 수문 예측 모형간의 연동 결과를 웹상에 표출할 수 있는 시스템을 구축함으로써, 유저로 하여금 선택한 기간 및 지역 등에 대하여 실시간으로 홍수 예측 정보를 파악할 수 있는 고해상도-고빈도 사이클 홍수 정보 예측 시스템 및 방법을 제공하는 것이다.In addition, another object of the present invention is to establish a system that can display the results of the interlocking results between the quantitative precipitation calculation system of the fine grid scale and the hydrologic prediction model on the web, so that the user can receive the flood prediction information in real time for the selected period and region, etc. To provide a high resolution, high frequency cycle flood information prediction system and method that can be identified.
상술한 목적을 달성하기 위해 본 발명은 일정한 크기의 격자로 나누어진 지역의 기상을 예측하는 격자 기상 예측 모듈과, 일정한 크기의 격자로 나누어진 지역의 강수를 정량적으로 예측하는 강수 예측 모듈과, 상기 격자 기상 예측 모듈과 상기 강수 예측 모듈에서 생성된 자료를 기초로 도시유역의 범람유출량을 예측하는 도시유역 범람유출량 예측 모듈과, 상기 도시유역 범람유출량 예측 모듈에서 생성된 도시유역 범람유출량을 기초로 범람위험도를 평가하는 범람위험도 평가 모듈을 포함하는 것을 특징으로 하는 고해상도-고빈도 사이클 홍수 정보 예측 시스템을 제공한다. 상기 격자 기상 예측 모듈은 지구 전체를 20㎞의 크기를 갖는 격자로 나누어 기상 변화를 모의하는 전지구 20㎞ 격자 기상예측 모듈과, 지구 전체를 8㎞의 크기를 갖는 격자로 나누어 기상 변화를 모의하는 중규모 8㎞ 격자 기상예측 모듈과, 지구 전체를 2㎞의 크기를 갖는 격자로 나누어 기상 변화를 모의하는 중규모 2㎞ 격자 기상예측 모듈을 포함한다. 상기 격자 기상 예측 모듈과, 상기 강수 예측 모듈에서 생성된 기상 예측 자료와 강수 예측 자료를 상기 도시유역 범람유출량 예측 모듈의 입력자료인 유역강우로 변환하는 도시유역 유출모형 입력자료 변환 모듈을 포함한다. 상기 범람위험도 평가모형 입력자료 변환 모듈에서 생성된 범람유출량을 상기 범람위험도 평가모듈의 입력자료로 변환하는 범람위험도 평가모형 입력자료 변환 모듈을 포함한다. 상기 범람위험도 평가 모듈에서 도출된 범람위험도를 지도와, 상기 지도에 범람위험도를 표시한 범람지도를 디스플레이하는 3D 이미지 디스플레이 모듈을 포함한다.In order to achieve the above object, the present invention provides a grid weather prediction module for predicting the weather of an area divided into a grid of a constant size, a precipitation prediction module for quantitatively predicting precipitation of an area divided into a grid of a constant size, and Flooding based on urban watershed overflow forecasting module that predicts flooding in urban watershed based on the data generated by grid meteorological prediction module and precipitation forecasting module, and flooding based on urban watershed flooding generated by urban watershed overflow forecasting module It provides a high-resolution high-frequency cycle flood information prediction system comprising a flood risk assessment module for assessing the risk. The grid meteorological prediction module is a global 20km grid meteorological prediction module that simulates weather changes by dividing the entire globe into a grid having a size of 20 km, and a medium scale that simulates weather changes by dividing the entire globe into a grid having a size of 8 km. 8km grid meteorological prediction module, and a medium-sized 2km grid meteorological prediction module that simulates weather changes by dividing the entire globe into a grid having a size of 2km. It includes a grid weather prediction module, urban watershed runoff model input data conversion module for converting the weather forecast data and precipitation prediction data generated by the precipitation prediction module into a watershed rainfall which is input data of the urban watershed overflow forecasting module. And a flood risk assessment model input data converting module for converting the overflow amount generated by the flood risk assessment model input data converting module into input data of the flood risk assessment module. And a 3D image display module displaying a flood risk map derived from the flood risk assessment module and a flood map displaying the flood risk on the map.
또한, 본 발명은 원시 기상 정보를 수집하는 단계와, 상기 수집된 원시 기상 정보를 기초로 기상장 예측자료를 생성하는 단계와, 상기 수집된 원시 기상 정보를 기초로 강우량 예측자료를 생성하는 단계와, 상기 기상장 예측자료와 상기 강우량 에측자료를 기초로 범람 유출량 예측자료를 생성하는 단계와, 상기 범람 유출량 예측자료를 기초로 홍수위험 및 범람지도를 작성하는 단계를 포함하는 것을 특징으로 하는 고해상도-고빈도 사이클 홍수 정보 예측 방법을 제공한다. 상기 원시 기상 정보를 수집하는 단계는, 기온, 강수량, 증발량, 풍속, 습도, 증기압, 일조합, 전운량, 해면기압을 포함하는 원시 기상 정보를 수집하는 단계를 포함한다. 상기 수집된 원시 기상 정보를 기초로 기상장 예측자료를 생성하는 단계는, 전구 규모의 기상모형을 이용하여 20㎞ 격자/3시간 간격의 바람과 온도와 지위고도 및 습도를 포함하는 3D 기상장 예측자료를 생성하는 단계와, 중규모 기상모형을 이용하여 8㎞ 격자/3시간 간격의 바람과 온도와 지위고도 및 습도를 포함하는 3D 기상장 예측자료를 생성하는 단계와, 중규모 기상모형을 이용하여 2㎞ 격자/5분 간격의 바람과 온도와 지위고도 및 습도를 포함하는 3D 기상장 예측자료를 생성하는 단계를 포함한다. 상기 수집된 원시 기상 정보를 기초로 강우량 예측자료를 생성하는 단계는, 상기 수집된 원시 기상 정보를 기초로 정량적 강우예측모형을 이용하여 0.5㎞ 격자/5분 간격 강우량의 예측자료를 생성하는 단계를 포함한다. 상기 수집된 원시 기상 정보를 기초로 강우량 예측자료를 생성하는 단계는, 상기 수집된 원시 기상 정보를 기초로 우수분출량을 도출하는 단계와, 상기 수집된 원시 기상 정보를 기초로 홍수유출량을 도출하는 단계를 포함한다. 상기 수집된 원시 기상 정보를 기초로 우수분출량을 도출하는 단계는, 지표면 유출이 발생하는 소유역을 지면저류가 없는 제 1 불투수영역과 지면저류가 있는 제 2 불투수영역 및 지면저류가 있는 투수영역으로 구분하는 단계와, 상기 제 2 불투수영역과 상기 투수영역을 비선형저수지로 가정한 후 연속방정식과 Manning 식을 사용하여 지표면을 통한 유출량을 도출하는 단계와, 상기 소유역의 수심과 유량을 SWMM(Storm Water Management Model)을 이용하여 도 출하는 단계를 포함한다. 상기 수집된 원시 기상 정보를 기초로 홍수유출량을 도출하는 단계는, 상기 소유역의 홍수유출량을 SWMM(Storm Water Management Model)을 이용하여 도출하는 단계를 포함한다.In addition, the present invention comprises the steps of collecting the raw weather information, generating weather field prediction data based on the collected raw weather information, and generating rainfall prediction data based on the collected raw weather information; Generating a flood flow forecast data based on the meteorological field prediction data and the rainfall prediction data; and generating a flood risk and flood map based on the flood flow forecast data. Provides a method for predicting high frequency cycle flood information. The collecting the raw weather information includes collecting raw weather information including temperature, precipitation, evaporation amount, wind speed, humidity, vapor pressure, combination, clouding amount, and barometric pressure. Generating weather field prediction data based on the collected raw weather information, 3D weather field prediction including wind, temperature, position altitude, and humidity at 20 km grid / 3 hour intervals using a global scale weather model. Generating data, generating 3D weather field prediction data including wind, temperature, position altitude, and humidity at 8 km grid / 3 hour intervals using the medium-scale weather model, and using the medium-scale weather model. Generating 3D meteorological field prediction data including wind, temperature, position altitude, and humidity at km grid intervals of 5 minutes. The step of generating rainfall prediction data based on the collected raw weather information includes generating prediction data of 0.5 km grid / 5 minute intervals using a quantitative rainfall prediction model based on the collected raw weather information. Include. Generating rainfall prediction data based on the collected raw weather information, the step of deriving rainwater ejection amount based on the collected raw weather information, and deriving a flood flow rate based on the collected raw weather information Steps. The step of deriving the storm water discharge based on the collected raw weather information, the first impermeable region without ground retention, the second impermeable region with ground retention and the pitcher with ground retention Dividing the area into regions, and assuming that the second impermeable region and the permeable region are nonlinear reservoirs, deriving a flow rate through the surface using a continuous equation and a manning equation, and calculating the water depth and flow rate of the subwatershed (Storm Water Management Model) includes the step of deriving. Deriving a flood outflow based on the collected raw weather information, the step of deriving a flood outflow of the subwatershed using a Storm Water Management Model (SWMM).
본 발명은 미세한 지역적 특성이 충분히 반영된 0.5km 간격의 고해상도 상세 강우량 정보를 매 5분마다 제공하여 돌발 호우 및 집중 호우의 모니터링이 가능한 고해상도-고빈도 사이클 홍수 정보 예측 시스템 및 방법을 제공할 수 있다.The present invention can provide a high resolution-high frequency cycle flood information prediction system and method capable of monitoring sudden and heavy rainfall by providing high-resolution detailed rainfall information every 0.5 minutes with 0.5 km intervals sufficiently reflecting minute regional characteristics.
또한,본 발명은 미세한 지형적 특성이 반영된 5분 간격의 강우 예측정보를 입력받아 상세 홍수 예측 정보를 생산함으로써 정확하고 신속한 홍수 위험예보 자료를 생산할 수 있는 고해상도-고빈도 사이클 홍수 정보 예측 시스템 및 방법을 제공할 수 있다.In addition, the present invention provides a high-resolution high-frequency cycle flood information prediction system and method capable of producing accurate and rapid flood risk forecasting data by receiving detailed rainfall forecasting information received at five-minute intervals reflecting microscopic features. Can provide.
또한,본 발명은 매 5분 간격의 상세 호우 및 홍수 예측 결과를 웹표출 시스템을 통해 표출함으로써 집중 호우 및 도시 홍수 빈발 지역에 대한 일선 기관 및 지자체의 방재 활동에 필요한 정보를 제공할 수 있는 고해상도-고빈도 사이클 홍수 정보 예측 시스템 및 방법을 제공할 수 있다.In addition, the present invention displays detailed rainfall and flood forecasting results every 5 minutes through the web presentation system to provide information necessary for disaster prevention activities of front-line organizations and local governments for intensive rainfall and urban flooding frequent areas. High frequency cycle flood information prediction systems and methods can be provided.
이하, 도면을 참조하여 본 발명의 실시예를 상세히 설명하기로 한다.Hereinafter, exemplary embodiments of the present invention will be described in detail with reference to the accompanying drawings.
그러나 본 발명은 이하에서 개시되는 실시예에 한정되는 것이 아니라 서로 다른 다양한 형태로 구현될 것이며, 단지 본 실시예들은 본 발명의 개시가 완전하도록 하며, 통상의 지식을 가진 자에게 발명의 범주를 완전하게 알려주기 위해 제 공되는 것이다. 도면상의 동일 부호는 동일한 요소를 지칭한다.However, the present invention is not limited to the embodiments disclosed below, but will be implemented in various forms, and only the embodiments are intended to complete the disclosure of the present invention, and to those skilled in the art to fully understand the scope of the invention. It is provided to inform you. Like reference numerals in the drawings refer to like elements.
도 l은 본 발명에 따른 고해상도-고빈도 사이클 홍수 정보 예측 시스템의 개념도이고, 도 2는 본 발명에 따른 고해상도-고빈도 사이클 홍수 정보 예측 방법에 사용된 SWMM 모형이다.1 is a conceptual diagram of a high resolution-high frequency cycle flood information prediction system according to the present invention, and FIG. 2 is a SWMM model used in the high resolution-high frequency cycle flood information prediction method according to the present invention.
본 발명에 따른 고해상도-고빈도 사이클 홍수 정보 예측 시스템은 도 1에 도시된 바와 같이, 격자 기상예측 모듈(100)과, 강수예측 모듈(200)과, 도시유역 유출모형 입력자료 변환 모듈(300)과, 도시유역 범람유출량 예측 모듈(400)과, 범람위험도 평가모형 입력자료 변환 모듈(500)과, 범람위험도 평가 모듈(600)과, 3D 이미지 디스플레이 모듈(700)을 포함한다.As shown in FIG. 1, the high resolution-high frequency cycle flood information prediction system according to the present invention includes a grid
격자 기상예측 모듈(100)은 일정한 격자 간격으로 기상 변화를 모의하기 위한 것으로서, 전지구 20㎞ 격자 기상예측 모듈(120)과, 중규모 8㎞ 격자 기상예측 모듈(140)과, 중규모 2㎞ 격자 기상예측 모듈(160)을 포함한다. 이러한 여러 크기의 격자 모듈은 각각이 지구 전체를 20㎞와 8㎞와 2㎞의 크기를 갖는 격자로 나누고 이에 대한 기상 변화를 모의한다. 물론, 격자 기상예측 모듈(100)은 기상청 등의 유관기관으로부터 수집된 원시기상정보를 기초하여 기상모형을 이용하여 바람과 온도와 지위고도 및 습도를 포함하는 3D 기상장 예측자료를 생성한다. 또한, 미세규모 0.5㎞ 격자 정량적 강수예측 모듈(200)은 0.5㎞ 크기의 격자로 나누어진 지역의 강수를 예측한다.The grid
도시유역 유출모형 입력자료 변환 모듈(300)은 도시유역 범람유출량 예측 모 듈(400)에 입력하기 위한 입력자료를 변환한다. 이때, 도시유역 범람유출량 예측 모듈(400)에 입력되는 입력자료는 격자 기상예측 모듈(100)과 강수예측 모듈(200)에서 생성된 예측 자료이며, 도시유역 유출모형 입력자료 변환 모듈(300)은 상기 예측 자료를 도시유역 범람유출량 예측 모듈(400)에 입력하기 위해 유역강우로 변환한다.Urban watershed outflow model input
도시유역 범람유출량 예측 모듈(400)은 도시유역 유출모형 입력자료 변환 모듈(300)에 의해 예측 자료에서 변환된 유역강우를 입력으로 하여 도시유역의 범람유출량을 예측한다.The urban watershed
범람위험도 평가모형 입력자료 변환모듈(500)은 도시유역 범람유출량 예측 모듈(400)에서 예측된 범람유출량을 범람위험도 평가 모듈의 입력자료로 변환한다.The flood risk assessment model input
범람위험도 평가 모듈(600)은 범람위험도 평가모형 입력자료에서 변환된 입력자료를 기초로 강우 시 해당 지역에 대한 범람위험도를 평가한다. 본 발명은 이를 위해 SWMM(Storm Water Management Model)을 사용한다. SWMM은 도시유역 내에서 강우사상으로 인해 발생하는 지표면 및 지표하 흐름, 배수관망에 대한 유출량추적, 저류지 모의, 오염물질에 대한 처리와 비용계산 등을 모의할 수 있는 종합적인 모형으로서, 도시유역 하수시스템내의 유량과 수질을 모의할 수 있도록 구성된다. 또한, SWMM은 호우에 의한 유출 유량과 수질을 예측하기 위해 강우주상도, 기상학적 입력자료, 소유역이나 하수 관로와 같은 시스템의 특성을 고려하여 실제 호우사상을 모의한다. 이러한 SWMM모형은 도 2에 도시된 바와 같이, 유거수(RUNOFF) 블록, 트랜스포트(TRANSPORT) 블록, 익스트란(EXTRAN) 블록, 저장/처 리(STORAGE/TREATMENT) 블록의 4개의 실행블록과 강우(RAIN) 블록, 기온(TEMPERATURE) 블록, 결합(COMBIN) 블록, 통계(STATISTICS) 블록 등의 5개의 보조블록들로 구성되며, 126개의 부 프로그램들을 포함한다. 이때, 본 발명은 SWMM의 유거수(RUNOFF) 블록과, 트랜스포트(TRANSPORT) 블록을 사용한다.The flood
3D 이미지 디스플레이 모듈(700)은 범람위험도 평가 모듈(600)에 의해 평가된 범람위험도를 3D 이미지로 디스플레이한다. 이때, 3D 이미지는 범람위험도가 평가된 지역의 지도를 기초로 해당 지도에 강우 시 하천, 강 등의 수심을 단계별로 구분된 색상으로 표시하여 구현할 수 있다.The 3D
상술한 바와 같이 본 발명은 기상 모델(meteorological model)과 수문 모델(hydrological model)을 연통하여 관심 대상 영역에 대해 0.5㎞ 간격으로 격자화하여 미세한 지역적 특성이 충분히 반영된 고해상도 상세 강우량 정보를 매 5분마다 제공하여 돌발 호우 및 집중 호우의 모니터링이 가능한 고해상도-고빈도 사이클 홍수 정보 예측 시스템을 제공할 수 있다. 또한, 본 발명은 미세한 지형적 특성이 반영된 5분 간격의 강우 예측정보를 입력받아 상세 홍수 예측 정보를 생산함으로써 정확하고 신속한 홍수 위험예보 자료를 생산할 수 있는 고해상도-고빈도 사이클 홍수 정보 예측 시스템을 제공할 수 있다. 또한, 본 발명은 매 5분 간격의 상세 호우 및 홍수 예측 결과를 웹표출 시스템을 통해 표출함으로써 집중 호우 및 도시 홍수 빈발 지역에 대한 일선 기관 및 지자체의 방재 활동에 필요한 정보를 제공할 수 있는 고해상도-고빈도 사이클 홍수 정보 예측 시스템을 제공할 수 있다.As described above, the present invention communicates the meteorological model and the hydrological model to grid the grid at 0.5 km intervals of the region of interest so that high-resolution detailed rainfall information is sufficiently reflected every 5 minutes. To provide high-resolution, high-frequency cycle flood information forecasting systems that can monitor sudden and intensive rainfall. In addition, the present invention is to provide a high-resolution high-frequency cycle flood information prediction system capable of producing accurate and rapid flood risk forecasting data by receiving detailed rainfall forecasting information received at five-minute intervals reflecting fine geographic characteristics Can be. In addition, the present invention displays detailed rainfall and flood prediction results every 5 minutes through the web presentation system to provide information necessary for disaster prevention activities of front-line organizations and local governments for intensive rainfall and urban flooding frequent areas. High frequency cycle flood information prediction system can be provided.
다음은 본 발명에 따른 고해상도-고빈도 사이클 홍수 정보 예측 시스템을 이용한 고해상도-고빈도 사이클 홍수 정보 예측 방법에 대해 도면을 참조하여 설명하고자 한다. 후술할 내용 중 전술된 본 발명에 따른 고해상도-고빈도 사이클 홍수 정보 예측 시스템의 설명과 중복되는 내용은 생략하거나 간략히 설명하기로 한다.Next, a high resolution-high frequency cycle flood information prediction method using the high resolution-high frequency cycle flood information prediction system according to the present invention will be described with reference to the accompanying drawings. In the following description, the overlapping description of the high resolution-high frequency cycle flood information prediction system according to the present invention described above will be omitted or briefly described.
도 3은 본 발명에 따른 고해상도-고빈도 사이클 홍수 정보 예측 방법의 순서도이고, 도 4는 본 발명에 따른 고해상도-고빈도 사이클 홍수 정보 예측 방법에 따라 도출된 우수분출 수문 곡선 그래프이다. 또한, 도 5는 본 발명에 따른 고해상도-고빈도 사이클 홍수 정보 예측 방법에 따라 범람 모의를 수행한 범람지도이다.3 is a flowchart of a high resolution-high frequency cycle flood information prediction method according to the present invention, and FIG. 4 is a storm water curve graph derived according to the high resolution-high frequency cycle flood information prediction method according to the present invention. FIG. 5 is a flood map in which a flood simulation is performed according to the high resolution-high frequency cycle flood information prediction method according to the present invention.
본 발명에 따른 고해상도-고빈도 사이클 홍수 정보 예측 방법은 도 2에 도시된 바와 같이, 원시 기상 정보를 수집하는 단계(S1)와, 3D 기상장 예측자료를 생성하는 단계(S2)와, 강우량 예측자료를 생성하는 단계(S3)와, 범람 유출량 예측자료를 생성하는 단계(S4)와, 홍수위험 및 범람지도를 작성하는 단계(S5)를 포함한다.High resolution-high frequency cycle flood information prediction method according to the present invention, as shown in Figure 2, collecting the raw weather information (S 1 ), generating a 3D weather field prediction data (S 2 ), Generating a rainfall forecast data (S 3 ), generating a flood runoff prediction data (S 4 ), and creating a flood risk and flood map (S 5 ).
원시 기상 정보를 수집하는 단계(S1)에서는 기상청 등의 유관기관으로부터 원시 기상 정보를 수집한다. 이때, 원시 기상 정보는 기온, 강수량, 증발량, 풍속, 습도, 증기압, 일조합, 전운량, 해면기압 등을 포함할 수 있다.In collecting raw weather information (S 1 ), raw weather information is collected from a related agency such as a meteorological office. At this time, the raw weather information may include air temperature, precipitation, evaporation amount, wind speed, humidity, steam pressure, day combination, cloud cloud amount, sea level air pressure.
3D 기상장 예측자료를 생성하는 단계(S2)에서는 전구 규모와, 중규모, 및 소규모의 기상모형을 이용하여 3D 기상장 예측자료를 생성한다. 이러한 3D 기상장 예측자료를 생성하는 단계는 전구 규모 기상모형을 이용하여 3D 기상장 예측자료를 생성하는 단계(S2-1)와, 중규모 기상모형을 이용하여 3D 기상장 예측자료를 생성하는 단계(S2-2), 및 소규모 기상모형을 이용하여 3D 기상장 예측자료를 생성하는 단계(S2-3)를 포함한다.In generating the 3D weather field prediction data (S 2 ), the 3D weather field prediction data is generated by using the global scale, the medium scale, and the small scale weather model. Generating 3D weather field prediction data includes generating 3D weather field prediction data using a global scale weather model (S 2-1 ), and generating 3D weather field prediction data using a medium-scale weather model. (S 2-2 ), and generating 3D weather field prediction data using the small scale weather model (S 2-3 ).
전구 규모 기상모형을 이용하여 3D 기상장 예측자료를 생성하는 단계(S2-1)에서는 전구 규모의 기상모형을 이용하여 20㎞ 격자/3시간 간격의 바람과 온도와 지위고도 및 습도를 포함하는 3D 기상장 예측자료를 생성한다. 이때, 기상장은 In the step of generating 3D weather field prediction data using the global scale weather model (S 2-1 ), the global scale includes wind, temperature, position altitude, and humidity at 20 km grid / 3 hours. Generate 3D weather field forecast data. At this time, the weather station
중규모 기상모형을 이용하여 3D 기상장 예측자료를 생성하는 단계(S2-2)에서는 중규모 기상모형을 이용하여 8㎞ 격자/3시간 간격의 바람과 온도와 지위고도 및 습도를 포함하는 3D 기상장 예측자료를 생성한다.In the step of generating 3D weather field prediction data using the medium-scale weather model (S 2-2 ), the 3D weather field including the wind, temperature, position altitude, and humidity of 8 km grid / 3 hours using the medium-scale weather model is used. Generate forecast data.
소규모 기상모형을 이용하여 3D 기상장 예측자료를 생성하는 단계(S2-3)에서는 중규모 기상모형을 이용하여 2㎞ 격자/5분 간격의 바람과 온도와 지위고도 및 습도를 포함하는 3D 기상장 예측자료를 생성한다.In generating the 3D weather field prediction data using the small-scale weather model (S 2-3 ), the 3D weather field including the wind, temperature, position altitude, and humidity at 2 km grid / 5 minutes interval using the medium-scale weather model is used. Generate forecast data.
정량적 강우예측모형을 이용하여 강우량의 예측자료를 생성하는 단계(S3)는 정량적 강우예측모형을 이용하여 0.5㎞ 격자/5분 간격 강우량의 예측자료를 생성한다. 이때, 대상 유역의 총면적에서 각 격자들이 차지하는 비율을 가중치로 하여 각 격자의 가중치와 강우량을 곱한 값들의 합으로 면적우량을 계산한다. 이를 수식으로 나타내면 수식 1과 같다.Generating prediction data of rainfall using the quantitative rainfall prediction model (S 3 ) generates prediction data of 0.5 km grid / 5 minute intervals using the quantitative rainfall prediction model. At this time, the area rainfall is calculated from the sum of the weights of the gratings and the rainfall of the gratings. This is expressed as Equation 1 below.
[수식 1][Equation 1]
여기서, 는 면적 강우량이고, 는 번째 격자에 포함되는 대상유역의 면적이다. 또한, 는 대상유역의 총 면적을 의미한다.here, Is the area rainfall, Is The area of the target basin included in the first grid. Also, Is the total area of the watershed.
강우량 예측자료를 생성하는 단계(S3)에서는 강우-유출현상의 모의를 위하여 지표면 유출이 발생하는 소유역을 지면저류가 없는 불투수영역()과 지면저류가 있는 불투수영역(), 그리고 지면저류가 있는 투수영역()의 세 부분으로 구분한다. 그리고 이들 지표면을 통한 유출량은 유역을 비선형저수지(nonlinear reservoir)로 가정한 후 연속방정식과 Manning 식을 사용하여 계산할 수 있다. 이때, 지표면 유출이 발생하는 유역에서 초기()조건으로 지표면 저류량을 0으로 둔다. 또한, 경계조건은 유역의 상류 끝에서 외부유입이 없는 것으로 가정한다. 즉, 상류 유역에서 강우로 인해 발생하는 지표면유출은 수리학적으로 연결된 하류 유역에 유입되며, 다른 유역으로 유출되지 않는다. 지표면 유출에 대한 기본방정식은 마찰경사를 유역경사와 같다고 가정하는 운동파 근사법의 비선형 저류방정식이 사용된다.In the step of generating rainfall prediction data (S 3 ), in order to simulate the rainfall-flow phenomenon, an impermeable area without ground storage is used for the subwatershed where the surface runoff occurs. ) And impervious areas with ground retention ( ) And permeable area with ground retention ( ) Into three parts. The runoff through these land surfaces can be calculated using a continuous equation and a manning equation, assuming that the watershed is a nonlinear reservoir. At this time, the initial stage in the watershed Leave the surface reservoir at zero. In addition, boundary conditions assume no external inflow at the upstream end of the watershed. That is, surface runoff due to rainfall in upstream basins flows into hydraulically linked downstream basins and does not flow into other basins. The basic equations for surface runoff are kinematic wave nonlinear storage equations that assume frictional slopes are equivalent to watershed slopes.
SWMM(Storm Water Management Model)에서 런오프(RUNOFF) 블록을 이용하여 각 소유역의 수심과 유량을 결정한다. 이때, 이를 위해서는 연속 방정식과 Manning 식을 사용한다. 소유역의 표면적 에 대한 유효우량 (= 강우강도-증발 및 침투율, mm/sec)와 유출률 , 흐름체적 , 소유역의 폭 , 수심 을 가지고 연속방정식을 구성하면 수식 2와 같다.Runoff blocks are used in the Storm Water Management Model (SWMM) to determine the depth and flow rate of each subwatershed. In this case, a continuous equation and a manning equation are used for this. Surface area of subwatershed Effectiveness for (= Rainfall intensity-evaporation and penetration rate, mm / sec) and runoff rate , Flow volume Width of subwatershed , Depth If we construct a continuous equation with,
[수식 2][Equation 2]
여기서, 라고 가정하여 Manning 식을 적용하면 수식 3과 같이 유출률을 구할 수 있다.here, If we apply Manning's equation, we can get outflow rate like
[수식 3][Equation 3]
여기서,은 Manning의 조도계수, 는 지면저류 손실수심, 는 소유역 경사이다.here, Is Manning's roughness coefficient, Is the depth of ground loss loss, Is a subwatershed slope.
수식 3에서 동수반경은 와 같이 근사되었다. 수식 2와 수식 3을 결합하면 수식 4와 같은 하나의 비선형 미분방정식을 얻을 수 있다.In
[수식 4][Equation 4]
또한, 수식 4의 차분식은 다음의 수식 5와 같이 나타낼 수 있다.In addition, the differential equation of
[수식 5][Equation 5]
수식 5에서 은 시각의 수심, 은 시각의 수심, 는 시간간격(), 는 시간간격당 평균 초과강수량이다. 상기와 같은 비선형 방정식에서 는 Newton-Raphson 반복법을 이용하여 구하고 이 값으로부터 수식 3을 이용하여 각 구간의 순간 유출량을 구한다. 여기서 계산된 순간 유출값은 유입구나 측구 및 관로 등에 유입되며, 연속되는 SWMM 모형내 다른 블록에 전달되는 입력자료(유량자료)가 된다. 이 유출량은 각 소유역에서 구해지고 전체 유역의 유출량은 이의 합으로 표현된다. Newton-Raphson 계산과정은 수식 6으로 변환하여 수행한다.In
[수식 6][Equation 6]
여기서, 은 유역폭, 경사, 조도계수 등을 하나로 표현한 변수로서 유역의 특성에 따라 변화하는 유역특성 인자이다. Newton-Raphson 반복법을 사용하기 위해 Newton 함수를 구성한다.here, Is a variable representing the watershed width, slope, and roughness coefficient, and is a watershed characteristic factor that changes according to the characteristics of the watershed. Construct a Newton function to use the Newton-Raphson iteration.
[수식 7][Formula 7]
수식 7을 미분하면 수식 8과 같다.Differentiating
[수식 8][Equation 8]
여기서, 값을 계산하기 위해 다음과 같이 Newton-Raphson 반복법을 사용하며, 이는 수식 9와 같이 구할 수 있다.here, The Newton-Raphson iteration method is used to calculate the value, which can be obtained as shown in
[수식 9][Equation 9]
이때, 반복 계산과정에 의해 가 0에 수렴하는 값으로부터 단계의 수심 이 계산된다.At this time, iterative calculation process Converges to zero From value Depth of steps This is calculated.
SWMM(Storm Water Management Model)에서 트랜스포트(TRANSPORT) 블록의 흐름지배방정식은 수식 10 및 수식 11과 같은 운동파식으로 구성된다.In the SWMM (Storm Water Management Model), the flow governing equation of the transport block is composed of kinematic wave equations such as
[수식 10][Equation 10]
[수식 11][Equation 11]
여기서, 는 수로/관길이, 는 시간, 는 수로/관경사, 는 마찰경사, 는 유량, 는 흐름 단면적이다.here, Channel / pipe length, Time, Channel / viewer, The friction inclination, Is the flow rate, Is the flow cross section.
이때, 수식 11에서 마찰경사는 Manning 식으로부터 수식 12와 같이 구할 수 있다.In this case, the friction slope in
[수식 12][Equation 12]
여기서, 은 Manning의 조도계수, 은 동수반경이다. 위의 두 식, 즉, 수식 11과 수식 12로부터 수식 13과 같이 유량을 구할 수 있다.here, Is Manning's roughness coefficient, Is the same radius. From the above two equations, that is,
[수식 13][Equation 13]
수식 13에서 흐름 단면적 와 동수반경 은 수심 의 함수이다.Flow cross section in Equation 13 Radius of equality Silver depth Is a function of.
이와 같이, 전술된 방법으로 5분 단위로 예측된 강우량을 통해 도시유역에서 발생되는 홍수유출량과 우수분출량을 계산할 수 있다. 이때, 강우량이 일정치 이상이라면 도 4와 같이 우수분출량이 발생될 것이며, 우수분출량이 발생하면 범람 예측 모형의 입력자료로 사용하여 침수 분석을 수행할 수 있다.As described above, the amount of flooding and stormwater discharge generated in the urban basin can be calculated through the rainfall forecasted in units of 5 minutes by the aforementioned method. At this time, if the rainfall is more than a predetermined value will be a good ejection amount as shown in Figure 4, if the rainfall is generated can be used as an input data of the flood prediction model can be performed inundation analysis.
범람 유출량 예측자료를 생성하는 단계(S4)에서는 강우량이 일정치 이상일 때 발생된 우수분출량을 범람 예측 모형의 입력자료로 사용하여 침수 분석을 수행한다. 이때 사용되는 모형은 FLUMEN(FLUvial Modelling ENgine)으로 스위스 Beffa에 의해 개발된 프로그램으로서, 스위스, 독일, 오스트레일리아 등에서 홍수범람해석에 사용된 바 있다.In the generation of overflow forecast data (S 4 ), the flooding analysis is performed using the rainfall output generated when the rainfall is above a certain value as input data for the overflow prediction model. The model used at this time is FLUMEN (FLUvial Modeling ENgine), a program developed by Beffa, Switzerland, and has been used for flood flood analysis in Switzerland, Germany and Australia.
FLUMEN 모형의 지배방정식은 수심 적분된 비선형 천수방정식으로서 보존형으로 나타내면 수식 14와 같다.The governing equation of the FLUMEN model is the depth-integrated nonlinear shallow water equation, which is represented by Eq.
[수식 14][Equation 14]
여기서 x, y는 수평과 수직방향, t는 시간, 의 보존형 벡터로 수심 H와 비유량 q와 r의 항으로 표현된다. x 및 y축의 flux 벡터 E, G와 source 벡터 S는 각각 수식 15와 같다.Where x and y are horizontal and vertical directions, t is time, Conserved vector of, expressed in terms of depth H and specific flow q and r. The flux vectors E, G, and the source vector S of the x and y axes are the same as Equation 15, respectively.
[수식 15][Equation 15]
E= pmatrix { q # {q^2 over h}+{g over 2}h^2# gr over h}; G=pmatrix { q # gr over h#{r^2 over h}+{g over 2}h^2};S=pmatrix { 0 # gh{ PARTIAL_{Z}_{b} over PARTIAL_{x}+{tau_{bx}over rho}}# gh{ PARTIAL_{Z}_{b} over PARTIAL_{y}+{tau_{by}over rho}}E = pmatrix {q # {q ^ 2 over h} + {g over 2} h ^ 2 # gr over h}; G = pmatrix {q # gr over h # {r ^ 2 over h} + {g over 2} h ^ 2}; S = pmatrix {0 # gh {PARTIAL_ {Z} _ {b} over PARTIAL_ {x} + {tau_ {bx} over rho}} # gh {PARTIAL_ {Z} _ {b} over PARTIAL_ {y} + {tau_ {by} over rho}}
여기서, g는 중력가속도, 는 유체의 밀도, 는 하상고도, 는 하상전단력이다. 비선형 천수방정식들은 정수압 분포가 가정된 Navier-Stokes 방정식으로부터 유도되었다.Where g is the acceleration of gravity, Is the density of the fluid, Is the altitude, Is the bed shear force. Nonlinear shallow water equations are derived from the Navier-Stokes equation assuming hydrostatic pressure distribution.
우수분출량은 미리 작성된 대상 유역의 불규칙 삼각망에 Point-Source 형태로 입력되게 되며 정해진 시간간격에 따라 분출된 우수의 흐름을 계산하게 된다.Stormwater discharge is inputted in the form of Point-Source into the irregular triangular network of the target watershed, and the flow of stormwater discharged at predetermined time intervals is calculated.
홍수위험 및 범람지도를 작성하는 단계(S5)에서는 평가위험도 평가모형을 이용하여 홍수위험 및 범람지도를 작성한다. 이는 도 5에 도시된 바와 같이, 범람 모의를 수행한 지역의 지도에 수심을 여러 가지 색상으로 단계적으로 표현하여 구현할 수 있다.In the step of preparing a flood risk and flood map (S 5 ), a flood risk and flood map is prepared using an evaluation risk evaluation model. As shown in FIG. 5, the depth of water may be expressed in steps of various colors on the map of the area where the flood simulation is performed.
상술한 바와 같이 상술한 바와 같이 본 발명은 기상 모델(meteorological model)과 수문 모델(hydrological model)을 연통하여 관심 대상 영역에 대해 0.5㎞ 간격으로 격자화하여 미세한 지역적 특성이 충분히 반영된 고해상도 상세 강우량 정보를 매 5분마다 제공하여 돌발 호우 및 집중 호우의 모니터링이 가능한 고해상도-고빈도 사이클 홍수 정보 예측 방법을 제공할 수 있다. 또한, 본 발명은 미세한 지형적 특성이 반영된 5분 간격의 강우 예측정보를 입력받아 상세 홍수 예측 정보를 생산함으로써 정확하고 신속한 홍수 위험예보 자료를 생산할 수 있는 고해상도-고빈도 사이클 홍수 정보 예측 방법을 제공할 수 있다. 또한, 본 발명은 매 5분 간격의 상세 호우 및 홍수 예측 결과를 웹표출 시스템을 통해 표출함으로써 집중 호우 및 도시 홍수 빈발 지역에 대한 일선 기관 및 지자체의 방재 활동에 필요한 정보를 제공할 수 있는 고해상도-고빈도 사이클 홍수 정보 예측 방법을 제공할 수 있다.As described above, the present invention communicates the meteorological model and the hydrological model to grid the grid at 0.5 km intervals of the region of interest, thereby obtaining high-resolution detailed rainfall information sufficiently reflecting the fine regional characteristics. It can be provided every 5 minutes to provide a high-resolution, high-frequency cycle flood forecasting method that can monitor sudden and torrential downpours. In addition, the present invention provides a high-resolution high-frequency cycle flood information prediction method that can generate accurate and rapid flood risk forecasting data by receiving detailed rainfall forecasting information received at 5 minute intervals reflecting fine geographic characteristics. Can be. In addition, the present invention displays detailed rainfall and flood prediction results every 5 minutes through the web presentation system to provide information necessary for disaster prevention activities of front-line organizations and local governments for intensive rainfall and urban flooding frequent areas. High frequency cycle flood information prediction method can be provided.
도 l은 본 발명에 따른 고해상도-고빈도 사이클 홍수 정보 예측 시스템의 개념도.1 is a conceptual diagram of a high-resolution high-frequency cycle flood information prediction system according to the present invention.
도 2는 본 발명에 따른 고해상도-고빈도 사이클 홍수 정보 예측 방법에 사용된 SWMM 모형.2 is a SWMM model used in the high-resolution high-frequency cycle flood information prediction method according to the present invention.
도 3은 본 발명에 따른 고해상도-고빈도 사이클 홍수 정보 예측 방법의 순서도.3 is a flowchart of a method for predicting high resolution-high frequency cycle flood information according to the present invention;
도 4는 본 발명에 따른 고해상도-고빈도 사이클 홍수 정보 예측 방법에 따라 도출된 우수분출 수문 곡선 그래프.4 is a storm water flow curve graph derived according to the high-resolution high-frequency cycle flood information prediction method according to the present invention.
도 5는 본 발명에 따른 고해상도-고빈도 사이클 홍수 정보 예측 방법에 따라 범람 모의를 수행한 범람지도.5 is a flood map performing a flood simulation according to the high-resolution high-frequency cycle flood information prediction method according to the present invention.
<도면의 주요 부분에 대한 부호의 설명><Explanation of symbols for the main parts of the drawings>
100: 격자 기상예측 모듈 200: 강수예측 모듈100: lattice weather prediction module 200: precipitation prediction module
300: 도시유역 유출모형 입력자료 변환 모듈300: city watershed outflow model input data conversion module
400: 도시유역 범람유출량 예측 모듈400: urban watershed overflow forecasting module
500: 범람위험도 평가모형 입력자료 변환 모듈500: flood risk assessment model input data conversion module
600: 범람위험도 평가 모듈600: flood risk assessment module
700: 3D 이미지 디스플레이 모듈700: 3D image display module
Claims (12)
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020090050687 | 2009-06-08 | ||
KR20090050687 | 2009-06-08 |
Publications (2)
Publication Number | Publication Date |
---|---|
KR20100131902A KR20100131902A (en) | 2010-12-16 |
KR101095413B1 true KR101095413B1 (en) | 2011-12-20 |
Family
ID=43507796
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1020090084125A KR101095413B1 (en) | 2009-06-08 | 2009-09-07 | Flood prediction information system of high-resolution rapid-updated-coupling and flood prediction information method of high- resolution rapid-updated-coupling |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR101095413B1 (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101758234B1 (en) | 2016-08-09 | 2017-07-14 | 한국과학기술정보연구원 | Apparatus for data assimilation and method for data assimilation |
Families Citing this family (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102426398A (en) * | 2011-08-25 | 2012-04-25 | 南通航运职业技术学院 | Course weather forecast method |
CN107609713B (en) * | 2017-10-03 | 2021-03-02 | 中国水利水电科学研究院 | Land-air coupling real-time forecasting method through rainfall and runoff double-factor correction |
CN109241212B (en) * | 2018-07-25 | 2020-08-11 | 中国水利水电科学研究院 | Retrieval method for historical rainfall based on mesoscale numerical atmospheric mode and high resolution |
CN112785053B (en) * | 2021-01-15 | 2023-11-03 | 北京市水科学技术研究院 | Method and system for forecasting urban drainage basin flood |
KR20220121383A (en) | 2021-02-25 | 2022-09-01 | (주)헤르메시스 | Apparatus for providing heavy rain forecasting and warning, and method thereof |
CN114118884B (en) * | 2021-10-28 | 2024-09-17 | 南方科技大学 | Urban storm waterlogging area risk identification method, system and storage medium |
KR20240015368A (en) * | 2022-07-27 | 2024-02-05 | 배재대학교 산학협력단 | Flood level prediction model management system |
KR102654405B1 (en) * | 2023-08-23 | 2024-04-04 | 대한민국 | System and Method for Predicting Flood based on the Small Stream Flood Early Warning Framework(FEWF) |
CN117974389A (en) * | 2023-12-26 | 2024-05-03 | 北京市测绘设计研究院 | Urban waterlogging risk assessment method and device, computer equipment and storage medium |
Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2008050903A (en) | 2006-08-28 | 2008-03-06 | Nippon Telegr & Teleph Corp <Ntt> | Flood prediction method and flood prediction system |
-
2009
- 2009-09-07 KR KR1020090084125A patent/KR101095413B1/en not_active IP Right Cessation
Patent Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2008050903A (en) | 2006-08-28 | 2008-03-06 | Nippon Telegr & Teleph Corp <Ntt> | Flood prediction method and flood prediction system |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101758234B1 (en) | 2016-08-09 | 2017-07-14 | 한국과학기술정보연구원 | Apparatus for data assimilation and method for data assimilation |
Also Published As
Publication number | Publication date |
---|---|
KR20100131902A (en) | 2010-12-16 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR101095413B1 (en) | Flood prediction information system of high-resolution rapid-updated-coupling and flood prediction information method of high- resolution rapid-updated-coupling | |
Ali et al. | Simulation of the impacts of land-use change on surface runoff of Lai Nullah Basin in Islamabad, Pakistan | |
Amaguchi et al. | Development and testing of a distributed urban storm runoff event model with a vector-based catchment delineation | |
Liu et al. | Flood modeling for complex terrain using GIS and remote sensed information | |
Amengual et al. | A hydrometeorological modeling study of a flash-flood event over Catalonia, Spain | |
Ahmad et al. | Hydrological modelling and flood hazard mapping of Nullah Lai | |
CN115391712A (en) | Urban flood risk prediction method | |
Şensoy et al. | Developing a decision support framework for real‐time flood management using integrated models | |
Seenu et al. | Visualisation of urban flood inundation using SWMM and 4D GIS | |
Gioti et al. | A GIS-based flash flood runoff model using high resolution DEM and meteorological data | |
Chen et al. | Watershed environmental hydrology (WEHY) model: Model application | |
San et al. | Developing flood inundation map using RRI and SOBEK models: a case study of the Bago River Basin, Myanmar | |
Morianou et al. | Assessing hydro-morphological changes in Mediterranean stream using curvilinear grid modeling approach-climate change impacts | |
Caro-Camargo et al. | Hydro-dynamic modeling for identification of flooding zones in the city of Tunja | |
Olayinka et al. | Estimation of Hydrological Outputs using HEC-HMS and GIS | |
Madi et al. | Flood Vulnerability Mapping and Risk Assessment Using Hydraulic Modeling and GIS in Tamanrasset Valley Watershed, Algeria | |
Mutua et al. | Predicting daily streamflow in ungauged rural catchments: the case of Masinga catchment, Kenya | |
Herrero et al. | Modeling the sedimentary response of a large Pyrenean basin to global change | |
Olivares et al. | A simulation chain for early prediction of rainfall-induced landslides | |
Rápalo et al. | Developing an open-source flood forecasting system adapted to data-scarce regions: A digital twin coupled with hydrologic-hydrodynamic simulations | |
Amengual et al. | Hydrometeorological ensemble simulations of flood events over a small basin of Majorca Island, Spain | |
Dikici et al. | Flood hazard assessment for Alibeyköy watershed in İstanbul with MIKE NAM and MIKE 21 | |
Kafle et al. | Basin scale rainfall-runoff modelling for flood forecasts | |
Sarchani et al. | Climate change impact on flood inundation along the downstream reach of the Humber River basin | |
Engin et al. | Climate change impact assessment under data scarcity by hydrological and hydrodynamic modeling in Izmit Bay/Turkey |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A201 | Request for examination | ||
E902 | Notification of reason for refusal | ||
E701 | Decision to grant or registration of patent right | ||
GRNT | Written decision to grant | ||
FPAY | Annual fee payment |
Payment date: 20141127 Year of fee payment: 4 |
|
FPAY | Annual fee payment |
Payment date: 20151201 Year of fee payment: 5 |
|
LAPS | Lapse due to unpaid annual fee |