KR101073258B1 - System and Method an Comparing Actual Output When Vessel is Constructed - Google Patents
System and Method an Comparing Actual Output When Vessel is Constructed Download PDFInfo
- Publication number
- KR101073258B1 KR101073258B1 KR1020070131238A KR20070131238A KR101073258B1 KR 101073258 B1 KR101073258 B1 KR 101073258B1 KR 1020070131238 A KR1020070131238 A KR 1020070131238A KR 20070131238 A KR20070131238 A KR 20070131238A KR 101073258 B1 KR101073258 B1 KR 101073258B1
- Authority
- KR
- South Korea
- Prior art keywords
- performance
- unit
- quotation
- information
- mapping table
- Prior art date
Links
Images
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P90/00—Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
- Y02P90/30—Computing systems specially adapted for manufacturing
Landscapes
- Business, Economics & Management (AREA)
- Human Resources & Organizations (AREA)
- Engineering & Computer Science (AREA)
- Economics (AREA)
- Strategic Management (AREA)
- Marketing (AREA)
- Physics & Mathematics (AREA)
- Entrepreneurship & Innovation (AREA)
- Theoretical Computer Science (AREA)
- General Physics & Mathematics (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
- General Business, Economics & Management (AREA)
- Tourism & Hospitality (AREA)
- Quality & Reliability (AREA)
- Educational Administration (AREA)
- Operations Research (AREA)
- Development Economics (AREA)
- Game Theory and Decision Science (AREA)
- Manufacturing & Machinery (AREA)
- Health & Medical Sciences (AREA)
- General Health & Medical Sciences (AREA)
- Primary Health Care (AREA)
Abstract
According to the present invention, in the ship construction process linked to the estimating, designing, and production work steps, the feedback is made of the production quantities produced through the production work steps to convert the units of the feedback performance quantities into the unit of the quotations, and then estimate The present invention relates to a production performance comparison system and method for estimating when building ships, which enables the comparison between quantity and performance quantity. Registering and registering as a part; The material master unit generates and registers an estimate quantity-performance quantity mapping table by mapping information about the quantity of performance to the information on the registered quotation quantity in response to a request for registration of the quantity of information from the performance management unit. Transferring a quantity-performance quantity mapping table to a unit conversion unit; Based on the unit conversion criteria table, the unit for the quotation and the performance quantity are received from the unit for the conversion of the quotation volume-performance quantity mapping table from the material master unit. And then, the process of transferring the quotation volume-performance volume mapping table of the unit conversion is completed to the quotation management unit; The quotation management unit receives the quotation quantity-performance quantity mapping table from which the unit conversion is completed and displays the corresponding quotation quantity-performance quantity mapping table, thereby facilitating the accuracy of the quotation calculated at the time of ordering. On the other hand, it is effective in maximizing the competitiveness of ship orders by ship manufacturers and maximizing profits for material purchase.
Description
The present invention relates to a production performance comparison system and method for estimating the ship construction, in particular, in the ship construction process linked to the estimating, design and production work step, through the estimate quantity and production work step The present invention relates to a production performance comparison system and a method for estimating when building ships, which allows production quantities to be compared with each other.
In general, when a ship manufacturer receives a ship, the ship manufacturer first performs the basic design work of the ship, calculates an estimate for the ship's construction using the standard data for each ship type according to the basic design, and refers to the calculated quotation. After carrying out the construction work design, the material is produced through the work based on the construction work design, and the ship building process is performed to build the ship by processing, manufacturing, assembling and installing the produced material.
Meanwhile, the ship manufacturer purchases raw materials such as reinforcing bars by referring to the estimates calculated during the above-mentioned ship building process, and then produces materials such as blocks through work based on the work design. The accuracy of the estimates calculated according to the initial basic design is checked by comparing the quoted quantities with the quoted quantities.
However, conventionally, in order to compare the quotation volume and the production volume, the manager directly obtains the information about the quotation volume and the performance quantity offline and compares the quotation volume and the performance quantity based on the obtained information. There is a very inconvenient problem to check the accuracy of the.
Moreover, since the calculation criteria of the quotation volume and the performance quantity are different from each other and the units of the quotation volume and the performance quantity are not identical to each other, it is very difficult to directly compare the quotation volume and the performance quantity.
For example, in the case of rebar, which is a raw material included in the quotation, the unit has a unit of weight (Ton), while the quantity produced by processing / assembling the rebar is produced in various forms. ), Quantity (EA / Set), weight (Ton).
The present invention has been made in order to solve the problems described above, in the ship construction process linked to the estimate, design and production work phase, feedback the production volume produced through the production operation step of the feedback It is an object of the present invention to provide a production performance comparison system and method for estimating production in shipbuilding, which enables the unit to be converted into a unit basis of the estimated quantity and then compares the estimated quantity and the actual quantity.
In order to achieve the above object, the production performance comparison system for estimating when the ship is constructed according to an embodiment of the present invention, in the production performance comparison system for estimating when the ship is built, the information on the amount of performance A material master unit for generating and registering an estimate quantity-performance quantity mapping table by mapping the information about the estimate quantity; A unit converting unit converting the unit of the quotation amount and the unit of the performance quantity from the data of the estimate quantity-performance quantity mapping table generated by the material master unit based on a preset unit conversion reference table; A quotation management unit for registering and registering information on the quotation quantity including the identification code of the quotation quantity to the material master unit and displaying a quotation quantity-performance quantity mapping table in which unit conversion is completed through the unit conversion unit; It is preferable to include a performance management unit that registers and registers information on the performance quantity including the identification code of the performance quantity to the material master unit.
Here, it is more preferable that the material master unit stores identification code mapping information of the actual quantity corresponding to the identification code of the estimated quantity.
And, the material master unit, the identification code of the quotation amount included in the information on the quotation quantity requested to be registered to the quotation management unit and the identification code of the performance quantity included in the information on the performance quantity requested from the performance management unit, respectively After confirming, based on the identification code mapping information of the performance quantity corresponding to the identification code of the stored quotation quantity, the information about the quantity of performance corresponding to the information about the quotation quantity is mapped to generate an estimate quantity-performance quantity mapping table and generate It is preferable to register the estimated quantity quantity-performance quantity mapping table, and to transmit it to the unit conversion unit.
On the other hand, according to another embodiment of the present invention, the production performance comparison method for estimating when the ship is built, in the production performance comparison method for estimating when the ship is built, the quotation management unit requests information on the quotation quantity to the material master unit Registering; According to the request for registration of the information on the performance quantity from the performance management unit, the material master maps the information on the performance quantity to the information on the registered quotation quantity to generate the quotation quantity-performance quantity mapping table, and the generated quotation quantity- Registering the performance quantity mapping table and transferring the performance quantity mapping table to a unit conversion unit; Based on the unit conversion criteria table, the unit for the quotation and the performance quantity are received from the unit for the conversion of the quotation volume-performance quantity mapping table from the material master unit. And then, the process of transferring the quotation volume-performance volume mapping table of the unit conversion is completed to the quotation management unit; Preferably, the quotation management unit receives a quotation volume-performance quantity mapping table in which unit conversion is completed from the unit conversion unit and displays the corresponding quotation volume-performance volume mapping table.
The production performance comparison system and method for estimating production during ship construction according to the present invention feeds back the actual production quantity produced through the production operation stage in the ship construction process linked to the estimation, design and production operation stage, and the corresponding feedback performance quantity By converting the unit of the quoted unit on the basis of the quoted quantity, and comparing the quoted quantity and the performance quantity mutually, it is possible to easily check the accuracy of the quoted estimate when ordering the vessel, and on the other hand, to improve the competitiveness of ship orders and material The effect is to maximize the profits purchased.
Hereinafter, with reference to the accompanying drawings will be described in detail with respect to the production performance comparison system and method for estimating when the ship is constructed in accordance with an embodiment of the present invention.
Comparison of the production performance comparison system for estimating the ship construction according to an embodiment of the present invention, as shown in Figure 1, the
The
The
In addition, the
The
The
In addition, the
For example, the
The
For example, as shown in Table 1 below, the
Assume the unit weight is correct.
1. The information of the actual quantity (material, unit weight, size, etc.) is converted into the quotation unit and used (eg iron fittings of the master / cabin board).
2. We do not compare our performance with our estimates.
3. Convert the unit of performance quantity based on the unit of quotation quantity.
In the above-described configuration, a method of comparing the production performance when the ship is constructed according to an embodiment of the present invention will be described with reference to the drawings shown in FIG. 2.
First, the
Thereafter, when the
That is, the
The
The
The production performance comparison system and method for estimating production during ship construction according to the present invention feeds back the actual production quantity produced through the production operation stage in the ship construction process linked to the estimation, design and production operation stage, and the corresponding feedback performance quantity By converting the unit of the quoted unit on the basis of the quoted quantity, and comparing the quoted quantity and the performance quantity, it is possible to easily check the accuracy of the quoted estimate when ordering the ship, on the other hand, to improve the competitiveness of ship orders and purchase materials Profit can be maximized.
1 is a view schematically showing the configuration of the production performance comparison system compared to the estimate when the ship is built according to an embodiment of the present invention.
2 is a view showing a procedure of the production performance comparison method compared to the estimate when the ship is built according to an embodiment of the present invention.
*** Explanation of symbols for the main parts of the drawing ***
10: quotation management unit 20: performance management unit
30: material master unit 40: unit conversion unit
Claims (4)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020070131238A KR101073258B1 (en) | 2007-12-14 | 2007-12-14 | System and Method an Comparing Actual Output When Vessel is Constructed |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020070131238A KR101073258B1 (en) | 2007-12-14 | 2007-12-14 | System and Method an Comparing Actual Output When Vessel is Constructed |
Publications (2)
Publication Number | Publication Date |
---|---|
KR20090063756A KR20090063756A (en) | 2009-06-18 |
KR101073258B1 true KR101073258B1 (en) | 2011-10-12 |
Family
ID=40992658
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1020070131238A KR101073258B1 (en) | 2007-12-14 | 2007-12-14 | System and Method an Comparing Actual Output When Vessel is Constructed |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR101073258B1 (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20240064096A (en) | 2022-11-04 | 2024-05-13 | 디케이소프트 주식회사 | Supporting system for shipbuilding estimate and producing method for similar shipbuilding estimate data using measurement of ship similarity |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR102066627B1 (en) | 2013-08-14 | 2020-02-11 | 대우조선해양 주식회사 | System and method for managibg the amount of materials |
KR20230103370A (en) | 2021-12-31 | 2023-07-07 | (주)성진 | The estimate calculation system for acceptance an order of a ship |
-
2007
- 2007-12-14 KR KR1020070131238A patent/KR101073258B1/en not_active IP Right Cessation
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20240064096A (en) | 2022-11-04 | 2024-05-13 | 디케이소프트 주식회사 | Supporting system for shipbuilding estimate and producing method for similar shipbuilding estimate data using measurement of ship similarity |
Also Published As
Publication number | Publication date |
---|---|
KR20090063756A (en) | 2009-06-18 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP2019036308A (en) | Intelligent warehousing management method, apparatus, system and unmanned intelligent warehousing device | |
CN110955715B (en) | Data conversion method and device for ERP system and target platform and electronic device | |
US8301522B2 (en) | Method, device and system for configuration and quotation processing | |
KR101073258B1 (en) | System and Method an Comparing Actual Output When Vessel is Constructed | |
CN111105134A (en) | Material demand plan calculation method and platform, electronic device and storage medium | |
JP2003167615A (en) | Production plan making device and method | |
CN109086476B (en) | Data processing method for drawing design, PLM plug-in and computing equipment | |
Gutgutia et al. | A closed-form solution for the distribution free continuous review integrated inventory model | |
KR101584575B1 (en) | System for managing manufacturing process of vessel and method thereof | |
JP6900420B2 (en) | Systems and methods for automatic digital RFID printing and integration | |
US20030144986A1 (en) | Environment load amount calculating system, environment load amount calculating method, environment load amount display unit, environment load amount display method, progrom, and medium | |
Stransky et al. | Process of matching work items between bim model and cost estimating software | |
Kim et al. | The use of response surface designs in the selection of optimum tolerance allocation | |
Eklin et al. | Model for cost estimation in a finite-capacity stochastic environment based on shop floor optimization combined with simulation | |
JP6903239B2 (en) | Production scheduling device and production scheduling method | |
JP6772514B2 (en) | Information processing device | |
AU2005310560B2 (en) | System for synchronizing part design with die design, and server, part design terminal and die design terminal for use therein | |
KR20130072599A (en) | Method for transforming of 3d drawing system | |
US20100268748A1 (en) | System and method of updating supplier information | |
WO2010061440A1 (en) | Software modification estimate method and software modification estimate system | |
WO2024178752A1 (en) | Curved surface assembly quality prediction and repair compensation method and apparatus | |
JP7122429B1 (en) | Processed tube ordering and factory production control system, processed tube ordering and factory production control method, and processed tube ordering and factory production control program | |
JP2005293268A (en) | Estimation support system, estimation support method, and program | |
CN117391359B (en) | Method, device, electronic equipment and storage medium for resource scheduling | |
KR20130039966A (en) | Ship product lifecycle management system and valve information transmission method thereof |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A201 | Request for examination | ||
E902 | Notification of reason for refusal | ||
E701 | Decision to grant or registration of patent right | ||
GRNT | Written decision to grant | ||
FPAY | Annual fee payment |
Payment date: 20141002 Year of fee payment: 5 |
|
LAPS | Lapse due to unpaid annual fee |