KR101041557B1 - Roof shingle and preventing method for repairing and blowing of roof shingle - Google Patents

Roof shingle and preventing method for repairing and blowing of roof shingle Download PDF

Info

Publication number
KR101041557B1
KR101041557B1 KR1020100102619A KR20100102619A KR101041557B1 KR 101041557 B1 KR101041557 B1 KR 101041557B1 KR 1020100102619 A KR1020100102619 A KR 1020100102619A KR 20100102619 A KR20100102619 A KR 20100102619A KR 101041557 B1 KR101041557 B1 KR 101041557B1
Authority
KR
South Korea
Prior art keywords
shingle
layer
shingles
roof
connection layer
Prior art date
Application number
KR1020100102619A
Other languages
Korean (ko)
Inventor
박승규
Original Assignee
박승규
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 박승규 filed Critical 박승규
Priority to KR1020100102619A priority Critical patent/KR101041557B1/en
Application granted granted Critical
Publication of KR101041557B1 publication Critical patent/KR101041557B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04DROOF COVERINGS; SKY-LIGHTS; GUTTERS; ROOF-WORKING TOOLS
    • E04D5/00Roof covering by making use of flexible material, e.g. supplied in roll form
    • E04D5/14Fastening means therefor
    • E04D5/148Fastening means therefor fastening by gluing
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04DROOF COVERINGS; SKY-LIGHTS; GUTTERS; ROOF-WORKING TOOLS
    • E04D5/00Roof covering by making use of flexible material, e.g. supplied in roll form
    • E04D5/10Roof covering by making use of flexible material, e.g. supplied in roll form by making use of compounded or laminated materials, e.g. metal foils or plastic films coated with bitumen
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G23/00Working measures on existing buildings
    • E04G23/02Repairing, e.g. filling cracks; Restoring; Altering; Enlarging
    • E04G23/0281Repairing or restoring roofing or roof covering

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Roof Covering Using Slabs Or Stiff Sheets (AREA)

Abstract

PURPOSE: A repair and separation prevention method of a roof shingle and the roof shingle thereby are provided to prevent the separation of shingle boards by wind, etc. by increasing the connecting strength of shingle boards. CONSTITUTION: A roof shingle contains: a shingle board layer(100) manufactured by plural boards including a first shingle board(110), a second shingle board(120) and an n-th shingle board(190); an adhesive layer formed between the shingle board layer and a roof external wall surface(S); a connection layer(300) formed on the shingle board layer attached to the roof external wall surface by the adhesive layer; and a cutoff layer formed on the shingle board layer installed to the connection layer.

Description

지붕 슁글의 보수 및 날림방지 공법과 그 지붕 슁글{ROOF SHINGLE AND PREVENTING METHOD FOR REPAIRING AND BLOWING OF ROOF SHINGLE }ROOF SHINGLE AND PREVENTING METHOD FOR REPAIRING AND BLOWING OF ROOF SHINGLE}

본 발명은 방수 등을 위해 지붕상에 실시되는 지붕 슁글의 보수 및 바람에 의한 날림방지 공법과 그 지붕슁글의 구조에 관한 기술이다.The present invention relates to a repair of a roof shingle that is carried out on a roof for waterproofing and the like, and a technique of preventing the blown air and the structure of the roof shingle.

일반적으로 건축물의 지붕이나 옥상의 콘크리트층은 대기 온도에 따라 수축과 팽창이 반복되는데, 따라서 이러한 지붕 외벽면이 그대로 노출되었을 경우 그만큼 균열 등의 발생가능성이 클 수밖에 없다.In general, the roof or concrete floor of the roof is repeated contraction and expansion according to the air temperature, so if the roof surface of the roof is exposed as it is, the possibility of cracking and the like is inevitable.

따라서 최근에는 지붕외벽면 표면에 판재형태의 슁글마감층을 부착시켜 외부 환경으로부터 지붕외벽면을 보호하는 시공법이 널리 사용되고 있다.Therefore, in recent years, a construction method of protecting a roof outer wall surface from an external environment by attaching a shingle finish layer in the form of a plate to the roof outer wall surface has been widely used.

이때 사용되는 슁글마감층은 평판형태의 각 슁글판재 단부가 상호 적층된 상태, 즉 기와 형태로 덧대어지는 구조가 반복되어 지붕외벽면 전체를 덮고 있는 상태로 설치된다.At this time, the shingle finish layer used is installed in a state in which the end of each shingles of the flat plate is stacked on each other, that is, a structure that is repeated in the form of a tile to cover the entire roof outer wall surface.

그런데 이러한 각 슁글판재는 접착층에 의해 지붕외벽면에 고정된 상태에서 각 되어 있기는 하지만 각 슁글판재 간에는 별도 결합구조가 형성되어 있지 않으므로 태풍 등에 의해 바람이 세게 불 경우 각 슁글판재가 떨어져 나가 사람이나 기타 기물에 충돌하는 현상이 빈번하게 발생된다.However, each shingles are fixed on the outer wall of the roof by the adhesive layer, but each shingles do not have a separate bonding structure. Therefore, if the wind blows hard due to typhoons, each shingles will fall out. Frequent collisions with other objects occur frequently.

물론 각 슁글판재 표면에 도포되는 방수도료 등에 의해 각 슁글판재가 연결되어 있기는 하지만 풍력 등을 견딜 수 있을 정도의 강도는 전혀 발휘하지 못하고 있다.Of course, each shingle plate is connected by a waterproof coating applied to each shingle plate surface, but the strength to withstand wind, etc. is not exhibited at all.

본 발명의 실시예는, 각 슁글판재 간의 연결강도를 늘려 바람 등에 의한 슁글판재의 분리현상을 방지할 수 있는 지붕 슁글의 보수 및 날림방지공법과 그 지붕 슁글을 제공하고자 한다.An embodiment of the present invention is to provide a repair method and a roof shingles and roof shingles of the roof shingles that can increase the strength of the connection between each shingles to prevent the separation of the shingles.

위의 목적을 달성하기 위해 제안된 본 발명의 실시예는,Embodiment of the present invention proposed to achieve the above object,

건축물의 지붕외벽면 상에 도포되어 있는 접착층, 상기 접착층 상에 부착되어 있는 제1슁글판재, 상기 일단부가 제1슁글판재의 일단부에 적층되어 있는 제2슁글판재를 포함하고, 상기 제1슁글판재와 상기 제2슁글판재의 표면 상에 횡방향으로 동시에 부착되어 있는 적어도 하나 이상의 제1연결층, 그리고 상기 제1슁글판재와 상기 제2슁글판재의 표면 상에 종방향으로 동시에 부착되어 있는 적어도 하나 이상의 제2연결층을 포함한다.An adhesive layer applied on the roof outer wall surface of the building, a first shingle plate member adhered to the adhesive layer, and a second shingle plate member having one end portion laminated on one end of the first shingle plate member, At least one first connecting layer which is simultaneously attached laterally on the surface of the plate and the second shingle plate, and at least simultaneously attached to the surface of the first and the second shingle plate in the longitudinal direction At least one second connection layer.

그리고 상기 제1연결층과 상기 제2연결층은 띠 형태로 이루어져 길이방향을 따라 상기 제1슁글판재와 상기 제2슁글판재에 부착될 수 있다.The first connection layer and the second connection layer may have a band shape and may be attached to the first shingle plate member and the second shingle plate member along a longitudinal direction.

또한 상기 제2연결층은 간격을 두고 수평상태로 복수개 배열될 수 있다.In addition, the second connection layer may be arranged in plural in a horizontal state at intervals.

그리고 상기 제1연결층은 상기 제1슁글판재와 상기 제2슁글판재 중 상호 중첩되어 있는 단부를 동시에 덮고 있는 상태로 설치될 수 있다.The first connection layer may be installed in a state of simultaneously covering end portions overlapping each other among the first shingle plate material and the second shingle plate material.

또한 상기 제1연결층과 상기 제2연결층은 상호 교차된 상태에서 교차된 부분이 상호 중첩된 상태로 설치될 수 있다.In addition, the first connection layer and the second connection layer may be installed in a state where the intersections overlap each other in a state where they cross each other.

그리고 상기 제1연결층과 상기 제2연결층 중 적어도 어느 하나는 메쉬구조로 이루어질 수 있다.At least one of the first connection layer and the second connection layer may have a mesh structure.

또한 상기 제1연결층과 상기 제2연결층 중 적어도 어느 하나는 부직포로 이루어질 수 있다.In addition, at least one of the first connection layer and the second connection layer may be formed of a nonwoven fabric.

그리고 상기 제1슁글판재와 상기 제2슁글판재 상면에 도포되는 차단층을 더 포함하고 상기 제1연결층과 상기 제2연결층은 상기 차단층과 상기 제1, 2슁글판재 사이에 위치될 수 있다.And a blocking layer applied to upper surfaces of the first and second shingle plates, wherein the first connection layer and the second connection layer may be positioned between the blocking layer and the first and second shingle plates. have.

이러한 여러 실시예를 갖는 본 발명은,The present invention having these various embodiments,

제1, 2연결층을 포함하는 다수개의 연결층이 각 슁글판재를 횡방향 및 종방향으로 동시에 연결하므로 연결강도가 사방으로 형성되어, 결국 슁글 전체에 걸쳐 견고한 연결이 이루어지는 장점을 갖는다.Since a plurality of connection layers including the first and second connection layers simultaneously connect each shingle plate member in the transverse direction and the longitudinal direction, the connection strength is formed in all directions, which in turn has a strong connection throughout the shingle.

또한 차단층이 연결층위에 도포되기 때문에 연결층의 보호 및 외관저하 현상도 방지할 수 있는 장점도 갖는다.In addition, since the barrier layer is applied on the connection layer, it also has the advantage of preventing the protection layer and the appearance deterioration phenomenon.

도1은 지붕에 슁글이 설치된 상태를 나타낸 개략도
도2는 연결층의 설치구조를 나타낸 분해사시도
도3은 전체 적층구조를 나타낸 절개사시도
도4는 도3의 확대사시도
도5는 도3의 측단면도
도6은 연결층이 설치된 상태의 평면 개략도
1 is a schematic view showing a state in which the shingle is installed on the roof
Figure 2 is an exploded perspective view showing the installation structure of the connection layer
Figure 3 is a cutaway perspective view showing the overall laminated structure
Figure 4 is an enlarged perspective view of Figure 3
Figure 5 is a side cross-sectional view of Figure 3
Figure 6 is a plan schematic view of the connection layer installed

이하, 본 발명이 속하는 기술 분야에서 통상의 지식을 가진 자가 용이하게 실시할 수 있도록 본 발명의 실시예에 대하여 첨부한 도면을 참고로 하여 상세히 설명한다. 그러나 본 발명은 여러 가지 상이한 형태로 구현될 수 있으며 여기에서 설명하는 실시예에 한정되지 않는다. 명세서 전체를 통하여 유사한 부분에 대해서는 동일한 도면 부호를 붙였다.Hereinafter, exemplary embodiments of the present invention will be described in detail with reference to the accompanying drawings so that those skilled in the art may easily implement the present invention. The present invention may, however, be embodied in many different forms and should not be construed as limited to the embodiments set forth herein. Like parts are designated by like reference numerals throughout the specification.

이상에서 본 발명의 바람직한 실시예에 대하여 상세하게 설명하였지만 본 발명의 권리범위는 이에 한정되는 것은 아니고 다음의 청구범위에서 정의하고 있는 기본 개념을 이용한 당업자의 여러 변형 및 개량 형태도 본 발명의 권리범위에 속하는 것이다.Although the preferred embodiments of the present invention have been described in detail above, the scope of the present invention is not limited thereto, and various modifications and improvements of those skilled in the art using the basic concepts defined in the following claims are also within the scope of the present invention. It belongs to.

본 발명 지붕 슁글은 [도 1] 내지 [도 6]에 도시된 바와 같이 크게 슁글판재층(100)와, 접착층(200), 연결층(300) 및 차단층(400)을 포함한다.The roof shingles of the present invention include a shingles board layer 100, an adhesive layer 200, a connection layer 300, and a blocking layer 400 as shown in FIGS. 1 to 6.

먼저 슁글판재층(100)은 실질적인 지붕의 덮개기능을 하는 것으로 제1슁글판재(110)와 제2슁글판재(120) 내지 제n판재(190)를 포함하는 복수개의 판재로 분할 제작된 구조로 이루어진다.First, the shingles plate layer 100 functions as a cover of a substantially roof, and is divided into a plurality of plates including the first shingles 110 and the second shingles 120 to n-th board 190. Is done.

이러한 각 슁글판재(110)(120)..(190)들은 모두 아스팔트재를 이용해 얇은 사각판재 형태로 이루어지며 상호 적층된 구조로 설치된다.Each shingle plate 110, 120, .. 190 are all made of a thin rectangular plate using asphalt material and are installed in a stacked structure.

구체적으로 설명하면 제1슁글판재(110)는 바닥면이 지붕외벽면 표면에 접촉된 상태로 안착되고 제2슁글판재(120)는 일단부가 제1슁글판재(110)의 일단부 상면에 얹혀져 중첩된 상태에서 나머지 부분이 지붕외벽면(S)에 안착된 상태로 설치된다.Specifically, the first shingle plate member 110 is seated in a state where the bottom surface is in contact with the surface of the roof outer wall surface and the second shingle plate member 120 is placed on one end of the first shingle plate member 110 and overlapped. The remaining part is installed in a state seated on the roof outer wall (S).

그 후 나머지 슁글판재들을 비롯한 n판재(190)들도 이러한 적층구조가 반복되는 형태로 설치된다. 따라서 슁글판재의 설치가 완료되면 슁글판재층(100)은 전체적으로 기와 형태가 된다.Thereafter, the n plate members 190 including the remaining shingle plates are installed in such a repeating structure. Therefore, when the installation of the shingle plate is completed, the shingle plate layer 100 is in a tile shape as a whole.

참고로 각 슁글판재층(110)(120)..(190)은 도면과 같이 지붕 폭과 동일한 하나의 기다란 판재형태일 수 있으며, 이 외에도 각 슁글판재(110)(120)..(190)도 길이방향을 따라 일정간격씩 분할된 형태로도 제작될 수 있다.For reference, each shingle plate layer (110, 120) .. (190) may be in the form of one elongate plate the same as the roof width as shown, in addition to each shingle plate (110, 120) .. (190) It may also be produced in a form divided by a predetermined interval along the longitudinal direction.

이렇게 설치된 슁글판재층(100)과 지붕외벽면(S) 사이에는 접착층(200)이 형성되는데, 접착층(200)은 슁글판재층(100)을 지붕외벽면(S)에 고정시키는 역할을 하는 것으로, 일반적인 도막공사 등에서 사용되는 접착제 중 접착기능과 더불어 방수기능도 함께 갖는 성분이 사용된다.The adhesive layer 200 is formed between the shingle plate layer 100 and the roof outer wall surface S installed as described above, and the adhesive layer 200 serves to fix the shingle plate layer 100 to the roof outer wall surface S. Among the adhesives used in general coating work, etc., a component having an adhesive function as well as a waterproof function is used.

참고로 접착층(200)은 슁글판재층(100)의 설치 이전에 수지 상태에서 지붕외벽면(S) 상에 도포되거나, 각 슁글판재층(100)을 제작하는 과정에서 각 슁글판재(110)(120)..(190) 바닥면에 형성될 수 있다.For reference, the adhesive layer 200 may be applied on the roof outer wall surface S in a resin state before the installation of the shingle plate layer 100, or in the process of manufacturing each shingle plate layer 100, each shingle plate material 110 ( 120) .. 190 may be formed on the bottom surface.

그리고 접착층(200)은 각 슁글판재(110)(120)..(190)간 중첩 부위에도 형성되어 각 슁글판재(110)(120)..(190)간의 연결기능도 할 수 있다.In addition, the adhesive layer 200 may also be formed at an overlapping portion between each shingle plate 110, 120,... 190, and may also function as a connection between each shingle plate 110, 120, ... 190.

이렇게 접착층(200)을 통해 지붕외벽면(S) 상에 부착 고정된 슁글판재층(100)에는 연결층(300)이 더 형성된다.The connection layer 300 is further formed on the shingles plate layer 100 attached to the roof outer wall surface S through the adhesive layer 200.

연결층(300)은 각 슁글판재(110)(120)..(190)를 상호 연결하여 슁글판재층(100) 전체 강도를 보강하는 역할을 하는 것으로, [도 2] 내지 [도 6]과 같이 다시 제1연결층(310)과 제2연결층(320)을 포함한다.The connection layer 300 serves to reinforce the overall strength of the shingles plate layer 100 by interconnecting each shingles 110, 120, .. 190, [Fig. 2] to [Fig. 6] and Likewise, the first connection layer 310 and the second connection layer 320 are included.

그 중 제1연결층(310)은 각 슁글판재(110)(120)..(190)간의 횡방향 연결기능을 하는 것으로, 전체적으로 각 슁글판재(110)(120)..(190)의 횡 폭과 동일한 길이를 갖는 직물 또는 합성수지재의 띠 형태로 이루어진다.Among them, the first connection layer 310 serves as a lateral connection function between each shingle plate 110, 120,... 190, and the width of each shingle plate 110, 120,. It consists of a strip of woven fabric or synthetic resin with the same length as the width.

그리고 제1연결층(310)은 도면과 같이 전체적으로 메쉬(mesh)형태로 제작되어 추후 도포되는 차단층(400)이 제1연결층(310) 내부 전체에 침투될 수 있도록 한다.In addition, the first connection layer 310 is made in a mesh shape as a whole so that the blocking layer 400 applied afterwards can penetrate the entire inside of the first connection layer 310.

참고로 이러한 메쉬 구조 외에도 각 슁글판재(110)(120)..(190)간 연결 시 자체적으로 충분한 인장강도 등을 갖는 구조 및 재질이라면 얼마든지 변형 적용될 수 있다.For reference, in addition to the mesh structure, each shingles plate 110, 120, .. 190 may be applied to any modification if the structure and the material having a sufficient tensile strength itself when connecting between.

이러한 제1연결층(310)은 각 슁글판재(110)(120)..(190)와 동일한 개수로 구비된 상태에서 각 슁글판재(110)(120)..(190)간 경계지점, 즉 중첩된 부분의 각 경계라인(101)을 덮은 상태로 배치된다.The first connection layer 310 is provided with the same number as each of the shingles (110, 120) .. 190, the boundary point between each of the shingles (110, 120, ...) 190, namely It is arranged to cover each boundary line 101 of the overlapped portion.

따라서 각 제1연결층(310)은 거의 일정간격을 두고 수평상태로 배치된 상태가 된다.Therefore, each of the first connection layers 310 is disposed in a horizontal state with a substantially constant interval.

좀더 구체적으로 설명하면 제1슁글판재(110)와 제2슁글판재(120)간 경계지점에 배치된 제1연결층(310)은 전체적으로 경계라인(101)을 덮고 있는 상태에서 바닥면 중 절반이 제1슁글판재(110) 상부면에 안착되고 반대쪽 절반은 제2슁글판재(120)의 상부면에 안착된 상태로 설치된다.More specifically, half of the bottom surface of the first connection layer 310 disposed at the boundary point between the first shingle plate member 110 and the second shingle plate member 120 covers the boundary line 101 as a whole. The first shingle plate 110 is seated on the upper surface and the opposite half is installed in a state seated on the upper surface of the second shingle plate 120.

이러한 방식으로 각 슁글판재(110)(120)..(190) 간 경계지점(101)마다 배치되는 것이다.In this manner, each shingle plate 110, 120,... 190 is arranged for each boundary point 101.

이때 제1연결층(310) 바닥면 상에 별도의 접착제를 형성시켜 제1연결층()을 각 슁글판재(110)(120)..(190)부착 고정 시킬 수도 있다. In this case, a separate adhesive may be formed on the bottom surface of the first connection layer 310 to fix the first connection layer () to each shingles (110, 120) .. (190).

이러한 제1연결층(310)에 의해 각 슁글판재(110)(120)..(190)는 횡방향으로 동시에 연결된 상태가 된다.By each of the first connection layers 310, each of the shingles 110, 120,... 190 is in a state connected simultaneously in the transverse direction.

그리고 제1연결층(310)과 더불어 연결층(300)을 구성하는 제2연결층(320)은 각 슁글판재(110)(120)..(190)의 종방향 연결 기능을 하는 것으로, 제1연결층(310)과 동일한 구조, 즉 직물 또는 합성수지재의 얇은 띠 형태이고 역시 전체가 메쉬 형태로 이루어져 있다.In addition, the second connection layer 320 constituting the connection layer 300 together with the first connection layer 310 serves as a longitudinal connection function of each shingles 110, 120,. The same structure as that of the connection layer 310, that is, a thin strip of woven fabric or synthetic resin material, and the whole is made of a mesh shape.

물론 제2연결층(320)도 제1연결층(310)처럼 메쉬 구조 외에 단순 부직포 등의 구조로도 제작될 수 있다.Of course, the second connection layer 320 may also be manufactured in a structure such as a simple nonwoven fabric in addition to the mesh structure like the first connection layer 310.

이러한 제2연결층(320)도 복수개로 제작된 상태에서 슁글판재층(100)상에 배치되는데, 이때 각 제2연결층(320)은 각 제1연결층(310)과 수직으로 교차된 상태로 위치되고 이 상태에서 상호 간격을 두고 슁글판재층(100) 길이방향을 따라 간격을 두고 수평 배치된다.The second connection layer 320 is also disposed on the shingles plate layer 100 in a state where a plurality of manufacturing, wherein each second connection layer 320 is perpendicular to the first connection layer 310 and the state And positioned in the horizontally spaced apart along the longitudinal direction of the shingles plate layer 100 at intervals from each other.

따라서 각 슁글판재()()..()는 제2연결층()에 의해 길이방향을 따라 종방향으로 동시에 연결된 상태가 된다.Therefore, each shingle plate () () .. () is in a state connected simultaneously in the longitudinal direction along the longitudinal direction by the second connection layer ().

이때 제2연결층(320)도 접착제를 통해 각 슁글판재(110)(120)..(190)에 접착 고정되도록 할 수도 있다.In this case, the second connection layer 320 may also be adhesively fixed to each shingles 110, 120, .. 190 through an adhesive.

이렇게 제2연결층(320)이 배치됨에 따라 [도 3] 및 [도 6]와 같이 각 제2연결층(320)과 각 제1연결층(310) 간 교차지점은 상호 상하 중첩된 상태가 되고, 이로 인해 각 슁글판재(110)(120)..(190)는 횡방향 및 종방향으로 동시에 연결된 상태가 된다.As the second connection layer 320 is disposed as described above, as shown in FIGS. 3 and 6, intersection points between the second connection layers 320 and the first connection layers 310 are overlapped with each other. As a result, each shingle plate 110, 120, .. 190 is in a state connected simultaneously in the transverse direction and the longitudinal direction.

따라서 제1, 2연결층(310)(320)을 각 슁글판재(110)(120)..(190)에 접착 고정시킬 경우, 각 슁글판재(110)(120)..(190)간 연결력이 슁글판재층(100) 전체 면적에 걸쳐 분포되는 것이다.Accordingly, when the first and second connection layers 310 and 320 are adhesively fixed to each of the shingles 110 and 120 .. 190, the shingles are connected between the shingles 110 and 120. The force is distributed over the entire area of the shingle plate layer 100.

이로 인해 바람의 영향을 받더라도 제1, 2연결층(310)(320)에 의한 연결력이 슁글판재층(100) 전체에 걸쳐 형성된 상태이므로, 특정 슁글판재가 떨어져 나가는 현상은 발생되지 않게 된다.Because of this, even if under the influence of the wind, since the connection force by the first and second connection layers 310 and 320 is formed over the entire shingles plate layer 100, the phenomenon of the falling of the particular shingles does not occur.

참고로 각 제1, 2연결층(310)(320)간 교차지점(301)마다 접착제를 도포시켜 제1, 2연결층(310)(320)간에도 접착이 이루어지도록 할 수도 있다.For reference, an adhesive may be applied at each intersection point 301 between each of the first and second connection layers 310 and 320 so that adhesion may be performed between the first and second connection layers 310 and 320.

이러한 제1연결층(310)과 제2연결층(320)은 둘 중 어느 한 연결층 전체를 먼저 배치시킨 후 그 위에 다른 연결층 전체를 배치시키는 형태로 설치될 수 있으며, 각 제1연결층(310)과 각 제2연결층(320)을 번갈아 가며 배치시킴에 따라 교차지점이 직물의 섬유 재직구조처럼 상호 번갈아 가며 엇갈리도록 할 수도 있다.The first connection layer 310 and the second connection layer 320 may be installed in such a way that the entirety of any one of the first connection layer is disposed first and then the entire other connection layer is disposed thereon, each of the first connection layers. By alternately arranging 310 and each of the second connection layers 320, the intersecting points may be alternately alternated with each other like a fiber woven structure of a fabric.

이 외에도 각 교차지점이 일체화된 상태, 즉 하나의 연결층을 재단하여 제1, 2연결층(310)(320)이 동시에 형성된 구조로도 구현될 수 있다.In addition, the intersection points may be integrated, that is, the first and second connection layers 310 and 320 may be simultaneously formed by cutting one connection layer.

참고로 각 슁글판재(110)(120)..(130)간 중첩이 도면과 달리 종방향으로 이루어질 경우 제1연결층과 제2연결층 역할은 상호 반대가 된다.For reference, when overlapping between each shingle plate 110, 120, .. 130 is made in the longitudinal direction, unlike the drawings, the role of the first connection layer and the second connection layer becomes opposite to each other.

이렇게 연결층(300)까지 설치된 슁글판재층(100) 상에는 차단층(400)이 더 형성되는데, 차단층(400)은 연결층(300)의 외부 노출방지기능과 연결층과 슁글판재층간 일체화 및 방수기능을 하는 것으로, 수지상태로 연결층(300)을 비롯해 슁글판재층(100) 표면 전체를 뒤덮은 상태로 도포된다.The blocking layer 400 is further formed on the shingle plate layer 100 installed up to the connection layer 300, and the blocking layer 400 is integrated with the connection layer and the shingle plate layer and prevents external exposure of the connection layer 300. By waterproofing, it is applied in a state covering the entire surface of the shingles plate layer 100, including the connection layer 300 in a resin state.

이 상태에서 차단층(400)을 경화시키면 차단층(400)에 의해 제1, 2연결층(310)(320)이 각 슁글판재(110)(120)..(190) 부착된 상태로 고정이 이루어지고, 이때 제1, 2연결층(310)(320)이 메쉬 형태일 경우 차단층(400)은 제1, 2연결층(310)(320)의 각 통공으로 유입됨에 따라 그만큼 제1, 2연결층(310)(320)과 각 슁글판재(110)(120)..(190)의 일체화 효율이 높아지게 된다.In this state, when the hardening layer 400 is hardened, the first and second connection layers 310 and 320 are fixed to each of the shingles 110 and 120 by the blocking layer 400. In this case, when the first and second connection layers 310 and 320 have a mesh shape, the blocking layer 400 is introduced into each through hole of the first and second connection layers 310 and 320. The integration efficiency of the two connection layers 310 and 320 and each shingle plate 110 and 120 .. 190 is increased.

이러한 차단층(400)은 폴리에틸렌과 자외선 안정제, 엘라스토머, 에틸렌비닐아세테이트수지 등의 혼합체 형태로 제작되어 방수 및 접착기능이 강화되도록 할 수도 있다.The blocking layer 400 may be manufactured in the form of a mixture of polyethylene, an ultraviolet stabilizer, an elastomer, and an ethylene vinyl acetate resin to enhance waterproofing and adhesion.

참고로 슁글판재층(100) 및 접착층(200) 만으로도 충분한 방수효과를 얻을 수 있고 연결층(200)의 훼손우려만 없다면 접착층(400)은 생략될 수도 있다.For reference, only the shingle plate layer 100 and the adhesive layer 200 may obtain a sufficient waterproofing effect, and the adhesive layer 400 may be omitted if only the damage of the connection layer 200 is compromised.

그리고 이러한 구조를 이용한 지붕슁글의 보수 및 날림방지공법은,And the repairing and skid prevention method of the roof shingle using this structure,

먼저 지붕외벽면(s)상에 슁글판재층(100)을 부착시키는 단계와 슁글판재층(100)상에 제1, 2연결층을 형성시켜 각 슁글판재층(110)(120)..(190)을 횡 방향과 종 방향으로 동시에 연결시키는 단계를 포함하고,First, the step of attaching the shingles board layer 100 on the roof outer wall surface (s) and the first and second connection layers on the shingles board layer 100 to form each shingles board layer (110, 120). Simultaneously connecting 190) in the transverse and longitudinal directions,

선택적으로 제1, 2연결층 위에 차단층을 덮어씌우는 단계를 더 실시하는 형태로 진행된다.Optionally, the method further includes the step of covering the barrier layer over the first and second connection layers.

이상에서 본 발명의 바람직한 실시예에 대하여 상세하게 설명하였지만 본 발명의 권리범위는 이에 한정되는 것은 아니고 다음의 청구범위에서 정의하고 있는 기본 개념을 이용한 당업자의 여러 변형 및 개량 형태도 본 발명의 권리범위에 속하는 것이다.Although the preferred embodiments of the present invention have been described in detail above, the scope of the present invention is not limited thereto, and various modifications and improvements of those skilled in the art using the basic concepts defined in the following claims are also within the scope of the present invention. It belongs to.

100 : 슁글판재층 110 : 제1슁글판재
120 : 제2쉴글판재 190 : n슁글판재
201 : 경계라인 200 : 접착층
300 : 연결층 310 : 제1연결층
320 : 제2연결층 301 : 교차지점
400 : 차단층
100: shingle plate layer 110: the first shingle plate
120: second shield plate 190: n blade plate
201: boundary line 200: adhesive layer
300: connection layer 310: first connection layer
320: second connection layer 301: intersection
400: blocking layer

Claims (9)

건축물의 지붕 외벽면 상에 도포되어 있는 접착층,
상기 접착층 상에 부착되어 있는 제1슁글판재 및 일단부가 제1슁글판재에 적층되어 있는 제2슁글판재를 가지는 슁글판재층,
상기 제1슁글판재와 상기 제2슁글판재의 표면 상에 횡방향으로 동시에 부착되어 있는 적어도 하나 이상의 제1연결층 및 상기 제1슁글판재와 상기 제2슁글판재의 표면 상에 종방향으로 동시에 부착되어 있는 적어도 하나 이상의 제2연결층을 가지는 연결부
를 포함하는 지붕 슁글.
An adhesive layer applied on the roof outer wall of the building,
A shingles layer having a first shingles attached to the adhesive layer and a second shingles having one end laminated on the first shingles;
At least one first connection layer which is simultaneously attached in the transverse direction on the surfaces of the first shingle plate and the second shingle plate and at the same time in the longitudinal direction on the surfaces of the first shingle plate and the second shingle plate Connecting part having at least one second connection layer
Roof shingles including.
제1항에서,
상기 제1연결층과 상기 제2연결층은 각각 띠 형태로 이루어져 있고, 바닥 면이 상기 제1슁글판재와 상기 제2슁글판재에 동시 부착되어 있는
지붕 슁글.
In claim 1,
Each of the first connection layer and the second connection layer has a band shape, and a bottom surface thereof is simultaneously attached to the first and second shingle plates.
Roof Shingles.
제2항에서,
상기 제1연결층은 상기 제1슁글판재와 상기 제2슁글판재 간 중첩부위의 경계지점을 덮고 있는 상태로 설치되어 있는 지붕 슁글.
In claim 2,
The first connecting layer is a roof shingle is installed in a state covering the boundary point of the overlapping portion between the first shingle plate material and the second shingle plate material.
제2항에서,
상기 제2연결층은 간격을 두고 상호 수평상태로 복수개 배열되어 있는
지붕 슁글.
In claim 2,
The second connection layer is arranged in a plurality of horizontally spaced apart from each other
Roof Shingles.
제2항 내지 제3항 중 어느 한 항에서,
상기 제1연결층과 상기 제2연결층은 상호 교차된 상태에서 교차된 부분이 상호 중첩된 상태로 배치되어 있는
지붕 슁글.
The method according to any one of claims 2 to 3,
The first connection layer and the second connection layer are disposed in a state where the intersections overlap each other in a state where they cross each other.
Roof Shingles.
제1항에서,
상기 제1연결층과 상기 제2연결층 중 적어도 어느 하나는 메쉬 구조로 이루어져 있는 지붕 슁글,
In claim 1,
At least one of the first connection layer and the second connection layer is a roof shingle made of a mesh structure,
제1항 또는 제6항에서,
상기 제1슁글판재와 상기 제2슁글판재 상면에 도포되는 차단층을 더 포함하고,
상기 제1연결층과 상기 제2연결층은 상기 차단층과 상기 제1, 2슁글판재 사이에 위치되어 있는
지붕 슁글.
In claim 1 or 6,
Further comprising a blocking layer applied to the upper surface of the first shingle plate material and the second shingle plate material,
The first connection layer and the second connection layer are located between the blocking layer and the first and second shingles.
Roof Shingles.
건축물의 지붕외벽면에 제1슁글판재와 제2슁글판재를 포함하는 슁글판재층을 부착시키는 단계,
제1연결층을 상기 제1슁글판재와 제2슁글판재 간 횡방향 경계지점 상에 배치시켜 상기 제1, 2슁글판재를 동시에 횡방향으로 연결하는 단계,
제2연결층을 상기 제1연결층과 수직방향으로 교차 배치하여 상기 제1, 2슁글판재를 동시에 종방향으로 연결하는 단계
를 포함하는 지붕슁글의 보수 및 날림방지 공법.
Attaching a shingles layer including a first shingles and a second shingles to the roof outer wall of the building;
Arranging a first connection layer on a transverse boundary point between the first and second shingle plates and simultaneously connecting the first and second shingle plates in a transverse direction;
Connecting the first and second shingles in the longitudinal direction at the same time by arranging a second connection layer perpendicularly to the first connection layer;
Repairing and skimming construction method of the roof shingle comprising a.
제8항에서,
상기 제1, 2연결층 상에 차단층을 형성시키는 단계를 더 포함하는
지붕 슁글의 보수 및 날림방지 공법.


9. The method of claim 8,
Forming a blocking layer on the first and second connection layers;
Repair and shrunk roof shingles.


KR1020100102619A 2010-10-20 2010-10-20 Roof shingle and preventing method for repairing and blowing of roof shingle KR101041557B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020100102619A KR101041557B1 (en) 2010-10-20 2010-10-20 Roof shingle and preventing method for repairing and blowing of roof shingle

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020100102619A KR101041557B1 (en) 2010-10-20 2010-10-20 Roof shingle and preventing method for repairing and blowing of roof shingle

Publications (1)

Publication Number Publication Date
KR101041557B1 true KR101041557B1 (en) 2011-06-15

Family

ID=44405581

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020100102619A KR101041557B1 (en) 2010-10-20 2010-10-20 Roof shingle and preventing method for repairing and blowing of roof shingle

Country Status (1)

Country Link
KR (1) KR101041557B1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR102184648B1 (en) 2020-04-09 2020-11-30 김소중 Waterproofing method with asphalt shingles prevention function
KR102441785B1 (en) 2021-05-12 2022-09-08 삼우건설 주식회사 Building Roof Waterproofing Method Using Waterproofing Materials for Roof Repair

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20040018871A (en) * 2002-08-27 2004-03-04 리노공업주식회사 Vertical Type Probe Device
KR200418871Y1 (en) 2006-03-24 2006-06-15 이동원 A reinforcement belt of a shingle.
KR20080083106A (en) * 2005-08-05 2008-09-16 오웬스-코닝 인텔렉츄얼 캐피탈 엘엘씨 Shingle with reinforced nail zone and method of manufacturing

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20040018871A (en) * 2002-08-27 2004-03-04 리노공업주식회사 Vertical Type Probe Device
KR20080083106A (en) * 2005-08-05 2008-09-16 오웬스-코닝 인텔렉츄얼 캐피탈 엘엘씨 Shingle with reinforced nail zone and method of manufacturing
KR200418871Y1 (en) 2006-03-24 2006-06-15 이동원 A reinforcement belt of a shingle.

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR102184648B1 (en) 2020-04-09 2020-11-30 김소중 Waterproofing method with asphalt shingles prevention function
KR102441785B1 (en) 2021-05-12 2022-09-08 삼우건설 주식회사 Building Roof Waterproofing Method Using Waterproofing Materials for Roof Repair

Similar Documents

Publication Publication Date Title
US11767673B2 (en) Composite membrane for building applications
KR100363436B1 (en) Plastic panels for waterproofing of a rooftop
US20030126810A1 (en) Drainage mat and mortar blocker
CA2516135C (en) Fiberglass reinforced spray foam roof construction
US11391048B2 (en) Panelized lath and drainage plane system for building exteriors
WO2014165199A1 (en) Protected membrane roof system
KR102051495B1 (en) Waterproof and root isolation sheet and construction method of the sam
CA2896599A1 (en) Sustainable energy efficient roof system
DE202015004314U1 (en) Moisture barrier or wall barrier
KR101041557B1 (en) Roof shingle and preventing method for repairing and blowing of roof shingle
KR100984734B1 (en) A hole and zigzag-type have complex-joint connection waterproof sheet
US20240076874A1 (en) Reduced weight, multi-layer roofing shingles and methods for installing them
KR102165178B1 (en) Waterproof panel for construction using composite material and steel angle
KR101465453B1 (en) Structure for avoiding water of a building
KR200362798Y1 (en) Insulation-type joint structure of waterproofing sheet
JP2011032864A (en) External facing material and external facing structure
KR20050120222A (en) Pvc waterproofing sheet with foaming layer and insulation-type joint structure of waterproofing sheet
EP2826620B1 (en) An under tile multilayer sheet for waterproofing a roof of a building, wherein said roof includes a metal roof covering.
KR101654781B1 (en) Moisture exhaust induction waterproof system and method of the structure
EP2053178A2 (en) Insulator element
KR102600851B1 (en) Method For Constructing Waterproofing Layer Comprising Protecting Layer With Separatable Lattice Structure Improved Accuracy And Economic Feasibility
JP6963985B2 (en) Waterproof structure of the outer wall parting part and its formation method
DE202015004955U1 (en) Moisture barrier or wall barrier
KR101558457B1 (en) Rooftop waterproof method using carbon fiber
JP4278755B2 (en) Horizontal ceramics roofing material

Legal Events

Date Code Title Description
A201 Request for examination
A302 Request for accelerated examination
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20150526

Year of fee payment: 5

FPAY Annual fee payment

Payment date: 20160719

Year of fee payment: 6

FPAY Annual fee payment

Payment date: 20170627

Year of fee payment: 7

FPAY Annual fee payment

Payment date: 20180703

Year of fee payment: 8

FPAY Annual fee payment

Payment date: 20190527

Year of fee payment: 9