KR101008018B1 - Method for making independent polygon of contiguity structure in original drawing map - Google Patents

Method for making independent polygon of contiguity structure in original drawing map Download PDF

Info

Publication number
KR101008018B1
KR101008018B1 KR1020100052281A KR20100052281A KR101008018B1 KR 101008018 B1 KR101008018 B1 KR 101008018B1 KR 1020100052281 A KR1020100052281 A KR 1020100052281A KR 20100052281 A KR20100052281 A KR 20100052281A KR 101008018 B1 KR101008018 B1 KR 101008018B1
Authority
KR
South Korea
Prior art keywords
boundary line
coordinate
building
boundary
map
Prior art date
Application number
KR1020100052281A
Other languages
Korean (ko)
Inventor
이정일
안동철
Original Assignee
(주)신한항업
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by (주)신한항업 filed Critical (주)신한항업
Priority to KR1020100052281A priority Critical patent/KR101008018B1/en
Application granted granted Critical
Publication of KR101008018B1 publication Critical patent/KR101008018B1/en

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06TIMAGE DATA PROCESSING OR GENERATION, IN GENERAL
    • G06T17/00Three dimensional [3D] modelling, e.g. data description of 3D objects
    • G06T17/05Geographic models
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06TIMAGE DATA PROCESSING OR GENERATION, IN GENERAL
    • G06T7/00Image analysis
    • G06T7/10Segmentation; Edge detection
    • G06T7/13Edge detection
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06TIMAGE DATA PROCESSING OR GENERATION, IN GENERAL
    • G06T7/00Image analysis
    • G06T7/50Depth or shape recovery
    • G06T7/543Depth or shape recovery from line drawings
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01CMEASURING DISTANCES, LEVELS OR BEARINGS; SURVEYING; NAVIGATION; GYROSCOPIC INSTRUMENTS; PHOTOGRAMMETRY OR VIDEOGRAMMETRY
    • G01C11/00Photogrammetry or videogrammetry, e.g. stereogrammetry; Photographic surveying

Abstract

PURPOSE: An individual polygon formation method of an adjacent building by easily performing the separation of the building is provided to reduce error rate and time for manufacturing a figure map by automatically generating the guilding in an individual polygon. CONSTITUTION: A border line extraction unit extracts a border between neighbor buildings(301). A coordinate calculator calculates a coordinate value of two border lines through end point coordinate and start point coordinate of teh extracted border line(302). An overlapped surface removing unit generates four coordinate values. An independent polygon generator generates an independence polygon(304).

Description

도화원도 내 인접 건축물의 독립 폴리건 형성 방법{METHOD FOR MAKING INDEPENDENT POLYGON OF CONTIGUITY STRUCTURE IN ORIGINAL DRAWING MAP}METHOD FOR MAKING INDEPENDENT POLYGON OF CONTIGUITY STRUCTURE IN ORIGINAL DRAWING MAP}

본 발명은 도화원도 내 인접 건축물의 독립 폴리건 형성 방법에 관한 것으로, 더욱 상세하게는 수치지도를 제작함에 있어 수치도화 과정을 통해 생성된 도화원도 상에서 서로 인접된 건축물을 독립 폴리건의 형태로 자동으로 생성하기 위한, 도화원도 내 인접 건축물의 독립 폴리건 형성 방법에 관한 것이다.
The present invention relates to a method of forming an independent polygon of adjacent buildings in a drawing garden, and more particularly, to automatically create buildings in the form of independent polygons on a drawing drawing generated through a drawing process in the production of a digital map. The present invention relates to a method of forming an independent polygon of adjacent buildings in a drawing garden.

수치지도는 표현하고자 하는 지리적/지형적인 내용을 수치로 나타내는 지도로서, 수심을 수치로 나타내는 해도(海圖)와, 지형의 기복 상태를 나타내는 지형계측도(地形計測圖) 등이 있다. 즉, 수치지도는 특정 지점에 대한 지리적/지형적인 특징을 수치정보로 표현하면서 도화된 이미지에 적용한 것이다.A digital map is a map that shows the geographical / territorial content to be expressed numerically, such as a sea chart representing the depth of the water and a topographic map showing the ups and downs of the terrain. In other words, the digital map is applied to the image which is represented while expressing the geographical / terrain feature of a specific point as numerical information.

따라서 수치지도는 이용자가 지도를 보면서 지리적/지형적 정보를 쉽게 취득할 수 있도록, 해당 지점에 대한 수치화된 지리정보가 도화된 이미지에 정확히 적용되어야 하고, 아울러 도화된 이미지 또한 상기 지리정보에 맞춰 정확히 도시되어야 한다.Therefore, the digital map should be applied to the image that is digitized geographic information about the point exactly, so that the user can easily acquire geographic and geographical information while viewing the map. Should be.

여기서, 지리정보는 GPS 좌표값일 수도 있고 지적도의 행정구역 단위에 따른 좌표값일 수도 있는데, GPS 좌표값과 지적도의 좌표값은 그 정보가 서로 상응해야 하고 수치지도상에도 해당 위치에 정확히 표기되어야 한다.Here, the geographic information may be a GPS coordinate value or a coordinate value according to the administrative unit of the cadastral map. The GPS coordinate value and the coordinate value of the cadastral map should correspond to each other and should be accurately indicated at the corresponding position on the digital map.

일반적으로 이러한 수치지도는 항공사진 촬영, 밀착사진 및 양화필름 제작, 지상 기준점 측량, 사진 기준점 측량, 수치도화, 지리조사 및 보완측량, 정위치 편집, 구조화 편집 과정을 통해 제작된다.In general, these digital maps are produced through aerial photographing, close-up photographic and quantum film production, ground control point surveying, photo control point surveying, numerical mapping, geographic survey and complementary survey, in situ editing, and structured editing.

이하, 일반적인 수치지도 제작 과정에 대해 상세히 살펴보기로 한다.Hereinafter, a general digital mapping process will be described in detail.

먼저, 항공사진 촬영은 카메라를 장착한 항공기를 이용하여 공중에서 지상의 지형지물에 대한 영상정보를 얻는 과정으로, 이는 항공사진 측량에서 가장 중요한 부분을 차지하는 작업으로서 후속되는 사진판독과 좌표측정 및 수치 데이터의 정확도에 큰 영향을 미치는 요인이 된다. 특히, 촬영시의 기상조건은 사진의 질뿐만 아니라, 작업능률에도 결정적인 영향을 미친다.First, aerial photographing is the process of obtaining image information of ground features in the air by using a camera equipped with a camera, which is the most important part of aerial surveying. This is a factor that greatly affects the accuracy of the data. In particular, weather conditions at the time of shooting have a decisive influence not only on the quality of the photograph but also on the work efficiency.

따라서 촬영 전 항공기의 비행 계획을 수립하고, 촬영카메라, 사진 축척, 촬영 고도 및 촬영 기준면을 설정한 후 기후를 고려하여 촬영한다. 이때 사진의 중복도는 촬영진행방향으로 60%, 인접코스간 30%를 표준으로 한다.Therefore, before taking a picture, a flight plan of the aircraft is to be set up, a photographing camera, a photograph scale, a photographing altitude, a photographing plane, and the photographing are taken into account in consideration of the climate. At this time, the degree of redundancy of photographs shall be based on 60% in the shooting direction and 30% between adjacent courses.

다음으로, 촬영된 필름은 일반적인 사진과 같이 현상(develop), 정착, 수세현상, 항공필름, 플로팅(PLOTTING) 작업, 보안검열, 필름 주기삽입, 밀착 및 양화 필름 제작 등의 세부 공정을 거쳐 지상기준점 측량 및 수치도화 공정에 필요한 양화필름 및 밀착사진으로 제작된다.Next, the photographed film is subjected to detailed process such as development, fixation, flushing, aviation film, plotting, security screening, film insertion, film adhesion, and quantification film production like general photographs. Produced with positive film and close-up photographs required for the surveying and digitization process.

다음으로, 지상 기준점 측량은 사진 기준점 측량 및 해석 도화 작업에 필요한 기준점의 성과를 얻기 위하여 현지에서 실시하는 지상 측량으로서, 대한민국 경위도 원점을 기준으로 경도 및 위도와 평면 직각좌표를 구하기 위한 측량을 의미한다.Next, the ground reference point survey is a ground survey conducted locally to obtain the performance of the reference point required for photographic reference point survey and analytical drawing work, and refers to a survey for obtaining longitude, latitude, and plane Cartesian coordinates based on the Korean longitude latitude origin. .

다음으로, 사진 기준점 측량은 도화기 또는 좌표측정기에 의하여 항공사진상에서 측정된 구점의 모델(기계) 좌표를 지상 기준점 측량 성과와 연결하여 지상좌표로 전환하는 작업을 말한다.Next, photographic reference point surveying refers to the operation of converting the model (machine) coordinates of a sphere measured on aerial photographs by a projector or coordinate measuring machine into ground coordinates by connecting the ground reference point survey results.

다음으로, 수치도화는 측량된 항공사진상의 지형지물을 해석 도화기를 이용하여 디지털 데이터로 측정한 후 이를 컴퓨터로 수록하는 과정으로, 내부표정, 상호표정, 절대표정의 작업을 거쳐 도화기의 좌ㆍ우 2개의 투영기에 한 모델을 이루는 좌ㆍ우 사진의 투명 양화를 장착한 후 빛을 비추면 그 광속의 교점들이 실제 지형과 동일한 입체 모델을 재현하게 되고, 표정점들을 찾아 그 절대 좌표를 도화기 상에 입력한 후 측표(Measuring Mark) 또는 부표(Floating Mark)로 원하는 지형지물을 추적하면 그에 따라 지형도상에 도화되는 원리를 이용한다.Next, numerical mapping is the process of measuring digital features of surveyed aerial photographs by using analytical projection screen and recording them with a computer. When the right two projectors are equipped with transparent positives of left and right photographs that make up a model, and the light shines on them, the intersections of the beams reproduce the three-dimensional model that is identical to the actual terrain. After inputting the image, the desired feature is tracked using a measuring mark or floating mark, and thus the drawing is applied accordingly.

여기서, 도화는 원칙적으로 건물, 도로, 식생, 하천, 등고선의 순으로 계층(Layer)별로 분류한 표준코드와 도형의 형태, 크기, 구조 및 방향을 규정한 표준도식을 따른다.Here, in principle, the drawing follows the standard code that defines the shape, size, structure, and direction of the standard code and the figure classified by the layers in the order of buildings, roads, vegetation, rivers, and contours.

다음으로, 지리조사는 정위치 편집을 위하여 지리/지명 조사와 항공사진을 기초로 도면상에 나타내어야 할 지형 및 지물과 이에 관련되는 사항을 현지에서 조사하는 것을 말한다. 이러한 지리조사 작업은 디지털 데이터를 도면으로 출력한 도화원도와 2배 확대 사진을 이용하여 정확하게 조사 표기한다.Next, geographic survey refers to surveying the terrain and features and related matters to be displayed on the drawing based on geographic and geographical surveys and aerial photographs for in-situ editing. This geographic survey work is precisely marked and marked by using a picture and a 2x magnification of the digital data.

다음으로, 보완측량은 촬영 당시의 지형지물과 도화 완료 후의 지형변경에 대한 수정작업으로 모든 측점(TOTAL-STATION) 및 GPS를 이용하여 지형도 보완수정작업을 수행한다. 이때 현장에서 조사한 내용과 자료 수집한 내용을 "현지조사 표기요령"에 의거 2배 확대 사진 위에 투명지를 덮어 지형, 지물, 지명 등의 순으로 정리 편집한다.Next, the supplementary surveyer performs the topographic map supplementary correction by using all points (TOTAL-STATION) and GPS as a correction for the feature at the time of photographing and the change of the terrain after the drawing is completed. At this time, the contents surveyed and the data collected are arranged and edited in the order of topography, features, place names, etc. by covering the transparent paper on the 2x magnified image according to the "local survey notation method".

다음으로, 정위치 편집(수치지도 Ver 1.0) 과정은 수치도화에서 취득된 도화원도와 현지조사 및 현지보완측량에서 얻어진 성과 또는 지리데이터 입력 성과에 데이터를 추가/삭제/수정/보완하는 파일작업으로 하기의 과정을 포함한다.Next, the in-place editing (numerical map ver 1.0) process is performed by a file operation that adds / deletes / modifies / supplements data to the results obtained from the digital drawing and the results obtained from field surveys and local supplementary surveys or the input of geographic data. Involves the process of.

- 수치도화가 완료된 데이터 인수.-The data argument is completed.

- 편집장비와 출력장비 점검과 입력 및 출력에 대한 소프트웨어 체크.-Inspection of editing equipment and output equipment and software check of input and output.

- 수치도화 파일의 추가/삭제/수정 작업시 현지 조사자료(행정경계, 주기) 활용.-Use of local survey data (administrative boundary, cycle) when adding / deleting / modifying numerical mapping files.

- 수치지도작업규칙 제71호(국립지리원)에 의거하여 데이터 검수.-Inspection of data in accordance with No. 71 (National Geographic Information Institute).

- 도엽 간 인접, 도식규정준수 등의 최종 파일 점검.-Final file checks such as neighboring leaves and compliance with schematic regulations.

마지막으로, 구조화 편집(수치지도 Ver 2.0) 과정은 수치지도 Ver 1.0의 사용상 불편함을 해소하고 사용자의 요구에 대응하기 위하여 Ver 2.0을 재구축하는 과정이다.Finally, the structured editing (numeric map Ver 2.0) process is a process of rebuilding Ver 2.0 to solve the inconvenience of using the digital map Ver 1.0 and to respond to the user's request.

즉, 제1차 NGIS 구축 기본계획(1995~2000)에 의해 제작된 수치지도 Ver 1.0이 생산자 위주의 지도적 관점의 지형지물 표현에만 중점을 두어 제작되어 GIS에 활용하기 위해서는 많은 가공과 추가작업이 필요하게 되어 이용에 불편이 있었고, 국토지리정보원에서 이러한 문제를 검토/보안하여 새로 마련한 수치지도 제작기준이 Ver 2.0으로서, 2004년부터 제작되는 수치지도는 이 기준에 의해 작성되어야 한다.In other words, the digital map Ver 1.0 produced by the 1st NGIS Construction Basic Plan (1995-2000) was produced with a focus on the feature representation of producer-oriented leadership, which requires much processing and additional work. It was inconvenient to use, and the National Geographic Information Institute reviewed and secured these problems, and the newly created digital map production standard was Ver 2.0, and digital maps produced from 2004 should be prepared by this standard.

이러한 수치지도 제작 과정에서, 지도 제작자는 수치도화 과정에서 생성된 도화원도를 화면에 출력한 후 인접 건축물 간의 경계(Polyline)를 수작업으로 일일이 확인하여 독립 폴리건의 형태로 생성하였다. 이는 매우 비효율적인 과정으로 수치지도를 제작하는 제작자 입장에서는 반드시 자동화되어야 할 공정이다.In the process of producing digital maps, the map maker printed out the drawing drawings generated during the digital drawing process on the screen and manually confirmed the boundaries between adjacent buildings by hand to create an independent polygon. This is a very inefficient process and must be automated for the producer of the digital map.

지금까지 살펴본 수치지도 제작 과정을 요약해 보면, 항공사진 촬영을 통하여 획득한 데이터는 수치지도라는 벡터 데이터의 형태로 재생성되는데, 이는 수치도화를 통해 이루어진다. 그러나 수치도화 과정에서 독립 폴리건으로 생성되어야 할 각각의 건축물이 도 1에 도시된 바와 같이 서로 인접하여 표현되는, 즉 서로 붙어 있는 경우가 상당수 발생한다.Summarizing the process of digital map production, the data acquired through aerial photographs are reproduced in the form of vector data called digital map. However, a number of cases in which each building to be generated as an independent polygon in the numerical drawing process are represented adjacent to each other, that is, attached to each other as shown in FIG.

수치지도 생성시, 건축물을 표현함에 있어 개별 건축물은 하나의 독립된 객체로서 존재해야 한다. 이는 지리정보 데이터가 속성정보와 도형정보라는 데이터 구조로 구축되는 것에 기인하며, 위상구조(topology)를 형성하는 기본 조건이기도 하다. 이를 일반적인 표현으로 데이터의 구조화라 하며, 건축물이 하나의 도형정보와 하나의 속성정보를 갖기 위해서는 구조화는 필수 불가결한 조건이다. 아울러 실세계에서도 각각의 건축물이 서로 인접되어 건설되는 경우는 없으므로 이를 분리해 주어야 한다.When creating a digital map, in representing a building, each building must exist as an independent object. This is because geographic information data is constructed with data structures of attribute information and figure information, and is also a basic condition for forming a topology. This is called structure of data in general expression, and structure is indispensable condition for building to have one figure information and one attribute information. In addition, since each building is not constructed adjacent to each other in the real world, it must be separated.

따라서, 도화원도 상에서 각각의 건축물이 서로 붙어 있는 경우 이를 분리해야 하는데, 현재는 사람이 직접 육안으로 인접 건축물 간의 경계(Polyline)를 확인 후 수작업에 의해 붙어 있는 건축물을 분리하는 작업을 수행하고 있어 많은 시간이 소요되는 문제점이 있었다.
Therefore, when each building is attached to each other on the Dohwawon map, it is necessary to separate them. Currently, a person performs a task of separating the buildings attached by manual work after checking the polyline between adjacent buildings. There was a time-consuming problem.

상기와 같은 종래 기술의 문제점을 해결하고자 하는 것이 본 발명의 과제이다.It is a problem of the present invention to solve the problems of the prior art as described above.

따라서, 본 발명은 수치지도를 제작함에 있어 수치도화 과정을 통해 생성된 도화원도 상에서 서로 인접되어 표현된 건축물을 독립 폴리건의 형태로 자동으로 생성함으로써, 수치지도를 제작하는데 소요되는 시간과 오류율을 감소시키기 위한, 도화원도 내 인접 건축물의 독립 폴리건 형성 방법을 제공하는데 그 목적이 있다.Therefore, the present invention reduces the time and error rate required to produce a digital map by automatically generating the buildings in the form of independent polygons, which are represented adjacent to each other on the drawing map created through the digital drawing process. It is an object of the present invention to provide a method for forming an independent polygon of adjacent buildings in a city.

본 발명의 목적들은 이상에서 언급한 목적으로 제한되지 않으며, 언급되지 않은 본 발명의 다른 목적 및 장점들은 하기의 설명에 의해서 이해될 수 있으며, 본 발명의 실시예에 의해 보다 분명하게 알게 될 것이다. 또한, 본 발명의 목적 및 장점들은 특허 청구 범위에 나타낸 수단 및 그 조합에 의해 실현될 수 있음을 쉽게 알 수 있을 것이다.
The objects of the present invention are not limited to the above-mentioned objects, and other objects and advantages of the present invention which are not mentioned can be understood by the following description, and will be more clearly understood by the embodiments of the present invention. Also, it will be readily appreciated that the objects and advantages of the present invention may be realized by the means and combinations thereof indicated in the claims.

상기 목적을 달성하기 위한 본 발명의 방법은, 도화원도 내 인접 건축물의 독립 폴리건 형성 방법에 있어서, 경계선 추출부가 도화원도 내 각 건축물의 폴리라인 구성정보를 이용하여 인접한 건축물 간의 경계선을 추출하는 단계; 좌표값 산출부가 상기 추출된 경계선의 시작점 좌표(a1,a2)와 끝점 좌표(b1,b2)를 이용하여 기 설정된 이격 거리(r)를 가지는 새로운 두 경계선의 좌표값을 산출하는 좌표값 산출단계; 중첩 면 제거부가 상기 산출된 두 경계선의 네 좌표값으로 이루어진 면을 생성한 후 도화원도의 해당 위치에 중첩시켜 중첩되는 면을 제거하는 단계; 및 독립 폴리건 생성부가 상기 산출된 좌표값을 가지는 경계선을 상기 중첩 면이 제거된 해당 건축물의 폴리라인으로 설정하여 독립 폴리건을 생성하는 단계를 포함하되,According to an aspect of the present invention, there is provided a method of forming an independent polygon of an adjacent building in a drawing garden, comprising: extracting a boundary between adjacent buildings using polyline configuration information of each building in the drawing garden; Coordinates for calculating a coordinate value of two new boundary lines having a predetermined distance (r) by using a coordinate calculation unit the start point coordinates (a 1 , a 2 ) and the end point coordinates (b 1 , b 2 ) of the extracted boundary line Value calculating step; An overlapping surface removing unit generating a surface consisting of four coordinate values of the calculated two boundary lines, and then overlapping the corresponding surface of the drawing circle to remove the overlapping surface; And generating, by an independent polygon generating unit, an independent polygon by setting a boundary line having the calculated coordinate value as a polyline of the corresponding building from which the overlapping surface is removed.

상기 좌표값 산출단계는,The coordinate value calculating step,

Figure 112010035639540-pat00001
Figure 112010035639540-pat00001

(여기서, (a1,a2)는 경계선의 시작점 좌표, (b1,b2)는 경계선의 끝점 좌표,

Figure 112010035639540-pat00002
는 경계선의 시작점이 x축과 이루는 각, r은 이격 거리,
Figure 112010035639540-pat00003
을 의미한다.)(Where (a 1 , a 2 ) is the starting point coordinate of the boundary line, (b 1 , b 2 ) is the end point coordinate of the boundary line,
Figure 112010035639540-pat00002
Is the angle between the x-axis of the boundary line, r is the separation distance,
Figure 112010035639540-pat00003
Means.)

를 이용하여 경계선의 좌표값을 산출하는 것을 특징으로 한다.
It is characterized in that to calculate the coordinate value of the boundary line using.

상기와 같은 본 발명은, 수치지도를 제작함에 있어 수치도화 과정을 통해 생성된 도화원도 상에서 서로 인접되어 표현된 건축물을 독립 폴리건의 형태로 자동으로 생성함으로써, 수치지도를 제작하는데 소요되는 시간과 오류율을 감소시킬 수 있는 효과가 있다.
In the present invention as described above, the time and error rate required to produce a digital map by automatically generating a building in the form of an independent polygon represented adjacent to each other on the drawing garden diagram generated through the digital drawing process in the production of the digital map There is an effect that can reduce.

도 1 은 수치도화 과정에서 생성된 도화원도 내 인접 건축물에 대한 일예시도,
도 2 는 본 발명에 따른 도화원도 내 인접 건축물의 독립 폴리건 형성 장치에 대한 일실시예 구성도,
도 3 은 본 발명에 따른 도화원도 내 인접 건축물의 독립 폴리건 형성 방법에 대한 일실시예 흐름도,
도 4 는 본 발명에 이용되는 인접 건축물을 포함하는 도화원도의 일예시도,
도 5 는 본 발명에 따른 도화원도 내 인접 건축물의 독립 폴리건 형성 방법을 이용하여 추출한 경계선에 대한 일예시도,
도 6 은 본 발명에 따른 도화원도 내 인접 건축물의 독립 폴리건 형성 방법을 이용하여 생성한 경계선의 좌표 산출 과정에 대한 일실시예 설명도,
도 7 은 본 발명에 따른 도화원도 내 인접 건축물의 독립 폴리건에 대한 일예시도,
도 8 은 본 발명에 따른 도화원도 내 인접 건축물의 독립 폴리건 형성 방법을 이용하여 수정한 도화원도에 대한 일예시도이다.
1 is an exemplary view of the adjacent building in the Dohwawon diagram generated during the digital drawing process,
Figure 2 is a configuration diagram of an embodiment of the independent polygon forming apparatus of the adjacent building in the Dohwawon diagram according to the present invention,
3 is a flow chart of an embodiment of a method for forming an independent polygon of an adjacent building in a drawing garden according to the present invention;
4 is an exemplary view of a drawing garden including an adjacent building used in the present invention,
5 is an exemplary view of a boundary line extracted using the independent polygon forming method of the adjacent building in the Dohwawon diagram according to the present invention,
FIG. 6 is an explanatory diagram for explaining a coordinate calculation process of a boundary line generated by using an independent polygon forming method of a neighboring building in a drawing garden according to the present invention; FIG.
7 is an exemplary view of the independent polygon of the adjacent building in the Dohwawon diagram according to the present invention,
FIG. 8 is an exemplary view of a drawing diagram modified using a method of forming an independent polygon of an adjacent building in the drawing drawing diagram according to the present invention.

상술한 목적, 특징 및 장점은 첨부된 도면을 참조하여 상세하게 후술되어 있는 상세한 설명을 통하여 보다 명확해 질 것이며, 그에 따라 본 발명이 속하는 기술분야에서 통상의 지식을 가진 자가 본 발명의 기술적 사상을 용이하게 실시할 수 있을 것이다. 또한, 본 발명을 설명함에 있어서 본 발명과 관련된 공지 기술에 대한 구체적인 설명이 본 발명의 요지를 불필요하게 흐릴 수 있다고 판단되는 경우에 그 상세한 설명을 생략하기로 한다. 이하, 첨부된 도면을 참조하여 본 발명에 따른 바람직한 실시예를 상세히 설명하기로 한다.BRIEF DESCRIPTION OF THE DRAWINGS The above and other objects, features and advantages of the present invention will become more apparent from the following detailed description of the present invention when taken in conjunction with the accompanying drawings, It can be easily carried out. In the following description, well-known functions or constructions are not described in detail since they would obscure the invention in unnecessary detail. Hereinafter, exemplary embodiments of the present invention will be described in detail with reference to the accompanying drawings.

이에 앞서, 수치지도작성작업규칙(국토해양부령 제191호, 일부개정 2009.12.14)을 근거로 본 발명과 관련된 용어에 대해 살펴보기로 한다.Prior to this, the terms related to the present invention will be described on the basis of the numerical mapping operation rules (Ministry of Land, Transport and Maritime Affairs No. 191, Partial Revision 2009.12.14).

1. "수치지도(數値地圖)"라 함은 지표면ㆍ지하ㆍ수중 및 공간의 위치와 지형ㆍ지물 및 지명 등의 각종 지형공간정보를 전산시스템을 이용하여 일정한 축척에 의하여 디지털형태로 나타낸 것을 말한다.1. "Summary map" means the digital representation of various geospatial information, such as the location of the earth's surface, the ground, the water and the space, and the topography, the features, and the place names, using a computerized system at a constant scale. Say.

1-2. "수치지도 Ver 1.0"이라 함은 지리조사 및 현지측량에서 얻어진 자료를 이용하여 도화데이터 또는 지도입력데이터를 수정ㆍ보완하는 정위치편집 작업이 완료된 수치지도를 말한다.1-2. "Numerical map Ver 1.0" means a numerical map on which a location edit is completed to correct or supplement drawing data or map input data using data obtained from a geographic survey and a local survey.

- 수치지도 Ver 1.0에 표현되는 지형ㆍ지물은 다른 수치지도와의 연계 및 활용 등을 위하여 철도(1), 하천(2), 도로(3), 건물(4), 지류(5), 시설물(6), 지형(7), 행정 및 지역경계(8), 주기(註記)(9)로 분류한다.-The terrain and features represented in the digital map Ver 1.0 are used for railways (1), rivers (2), roads (3), buildings (4), tributaries (5), facilities ( 6), terrain (7), administrative and regional boundaries (8), period (9).

1-3. "수치지도 Ver 2.0"이라 함은 데이터 간의 지리적 상관관계를 파악하기 위하여 정위치편집된 지형ㆍ지물을 기하학적 형태로 구성하는 구조화편집 작업이 완료된 수치지도를 말한다.1-3. "Numeric map Ver 2.0" refers to a digital map in which structured and edited work consisting of geometries and geometries edited in place is completed to grasp the geographical correlation between data.

- 수치지도 Ver 2.0에 표현되는 지형ㆍ지물은 다른 수치지도와의 연계 및 활용 등을 위하여 교통(A), 건물(B), 시설(C), 식생(D), 수계(E), 지형(F), 경계(G), 주기(H)로 분류한다.-The terrain and features represented in the digital map Ver 2.0 can be used for transportation (A), buildings (B), facilities (C), vegetation (D), water systems (E), and terrain ( F), boundary (G) and period (H).

2. "수치지도작성"이라 함은 각종 지형공간정보를 취득하여 전산시스템에서 처리할 수 있는 형태로 제작 또는 변환하는 일련의 과정을 말한다.2. "Numeric map preparation" refers to a series of processes of acquiring various geospatial information and making or converting it into a form that can be processed by a computer system.

3. "좌표계"라 함은 공간상에서 지형ㆍ지물의 위치와 기하학적 관계를 수학적으로 나타내기 위한 체계를 말한다.3. "Coordinate system" means a system for mathematically representing the position and geometrical relations of features and features in space.

4. "좌표"라 함은 좌표계상에서 지형ㆍ지물의 위치를 수학적으로 나타낸 값을 말한다.4. "Coordinates" means mathematically representing the position of a feature or feature in the coordinate system.

5. "도곽(圖廓)"이라 함은 일정한 크기에 따라 분할된 지도의 가장자리에 그려진 경계선을 말한다.5. "Map" means the boundary drawn on the edge of the map divided according to a certain size.

6. "도엽(圖葉)코드"라 함은 수치지도의 검색ㆍ관리 등을 위하여 각 축척별로 일정한 크기에 따라 분할된 지도에 부여한 일련번호를 말한다.6. "Map leaf code" means a serial number assigned to a map divided according to a certain size for each scale for the search and management of digital maps.

7. "속성정보"라 함은 수치지도에 표현되는 각종 지형ㆍ지물의 고유한 특성에 관한 정보를 말한다.7. "Property information" means information on the inherent characteristics of the various terrains and features represented on the digital map.

8. "유일식별자(UFID)"라 함은 지형ㆍ지물의 체계적인 관리와 효과적인 검색 및 활용을 위하여 다른 데이터베이스와의 연계 또는 지형ㆍ지물간의 상호참조가 가능하도록 수치지도의 지형ㆍ지물에 유일하게 부여되는 코드를 말한다.8. The term "unique identifier" (UFID) is uniquely assigned to a feature or feature of a digital map to enable cross-references between features or features in relation to other databases for systematic management and effective retrieval and use of the feature or feature. Says the code.

9. "메타데이터"라 함은 작성된 수치지도의 체계적인 관리와 편리한 검색ㆍ활용을 위하여 수치지도의 이력 및 특징 등을 기록한 자료를 말한다.9. "Metadata" means data that records the history and characteristics of the digital map for the systematic management of the created digital map and convenient search and utilization.

10. "품질검사"라 함은 수치지도의 결과가 수치지도의 작성기준 및 목적에 부합하는지 여부를 판단하는 것을 말한다.
10. "Quality inspection" means the determination of whether the results of a digital map meet the criteria and objectives of creating a digital map.

도 2 는 본 발명에 따른 도화원도 내 인접 건축물의 독립 폴리건 형성 장치에 대한 일실시예 구성도이다.Figure 2 is a configuration diagram of an embodiment of the independent polygon forming apparatus of the adjacent building in the Dohwawon diagram according to the present invention.

도 2 는 본 발명에 따른 도화원도 내 인접 건축물의 독립 폴리건 형성 장치는, 도화원도 내 각 건축물의 폴리라인 구성정보를 이용하여 인접 건축물 간의 경계선을 추출하는 경계선 추출부(21), 상기 경계선 추출부(21)에서 추출한 경계선의 시작점 좌표와 끝점 좌표를 이용하여 기 설정된 이격 거리를 가지는 새로운 경계선 좌표값을 산출하는 좌표값 산출부(22), 상기 좌표값 산출부(22)에서 산출한 두 경계선의 네 좌표값으로 이루어진 면을 생성한 후 상기 도화원도의 해당 위치에 중첩시켜 중첩된 면을 제거(extract)하는 중첩 면 제거부(23), 상기 좌표값 산출부(22)에서 산출한 좌표값을 가지는 경계선을 상기 중첩 면 제거부(23)에서 중첩 면이 제거된 해당 건축물의 폴리라인으로 설정하여 독립 폴리건을 생성하는 독립 폴리건 생성부(24)를 포함한다.2 is an independent polygon forming apparatus of a neighboring building in the Dohwawon map according to the present invention, a boundary line extracting unit 21 for extracting a boundary between adjacent buildings using polyline configuration information of each building in the Dohwawon map, and the boundary line extracting unit. A coordinate value calculator 22 for calculating a new boundary line coordinate value having a predetermined separation distance using the start point coordinates and the end point coordinates of the boundary line extracted in (21), and the two boundary lines calculated by the coordinate value calculator 22; After generating a plane consisting of four coordinate values, the overlapping surface removal unit 23 for extracting the overlapping surface by overlapping the corresponding position of the drawing circle diagram, and the coordinate value calculated by the coordinate value calculation unit 22 It includes an independent polygon generating unit 24 for setting the boundary line to the polyline of the building in which the overlapping surface is removed from the overlapping surface removing unit 23 to generate an independent polygon.

여기서, 독립 폴리건 생성부(24)는 새롭게 생성된 경계선에 의해 이등분되는 2개의 폴리라인을 삭제하고, 새로운 4개의 폴리라인을 생성한다. 아울러, 새롭게 생성한 4개의 폴리라인에 대한 좌표값을 추출한다.
Here, the independent polygon generating unit 24 deletes two polylines bisected by the newly created boundary line and generates four new polylines. In addition, the coordinate values of the four newly created polylines are extracted.

도 3 은 본 발명에 따른 도화원도 내 인접 건축물의 독립 폴리건 형성 방법에 대한 일실시예 흐름도이다.3 is a flow chart of an embodiment of a method for forming an independent polygon of an adjacent building in a drawing garden according to the present invention.

먼저, 도화원도 내 각 건축물의 폴리라인 구성정보를 이용하여 인접 건축물 간의 경계선을 추출한다(301).First, a boundary line between adjacent buildings is extracted using polyline configuration information of each building in the Dohwawon province (301).

도화원도 상의 건축물은 도 4에 도시된 바와 같이, 다수의 폴리라인(폴리건을 구성하는 라인)으로 이루어져 있으며, 각 건축물은 어느 폴리라인으로 구성되어 있는지를 나타내는 폴리라인 구성정보와 매칭되어 있다. 아울러, 각 폴리라인은 시작점 좌표와 끝점 좌표를 가지며, 각 좌표는 기준점(0.0000, 0.0000)으로부터의 이격 위치를 나타낸다.As illustrated in FIG. 4, the building on the drawing garden is composed of a plurality of polylines (lines constituting a polygon), and each building is matched with polyline configuration information indicating which polyline is configured. In addition, each polyline has a start point coordinate and an end point coordinate, and each coordinate represents a spaced position from a reference point (0.0000, 0.0000).

따라서 '인접 건축물 간 경계를 나타내는 폴리라인'(이하, 경계선)의 추출이 가능하다. 즉, 모든 폴리라인을 대상으로 각 건축물의 폴리라인 구성정보와 비교하여 다수의 건축물에 중복 사용된 폴리라인을 추출한다. 이는 동일한 시작점 좌표와 끝점 좌표를 가지는 폴리라인으로 이루어진 건축물이 다수인 경우에 해당한다.Therefore, it is possible to extract a 'polyline representing a boundary between adjacent buildings' (hereinafter referred to as a boundary line). That is, the polylines used for a plurality of buildings are extracted by comparing the polyline configuration information of each building to all the polylines. This is the case when there are many buildings made of polylines having the same start point coordinates and end point coordinates.

이렇게 추출된 폴리라인에 하기의 [표 1]과 같이 양수 값을 가지는 일련번호(LEFT_FID)를 부여하고, '중복 사용되지 않은 폴리라인'(경계선이 아닌 폴리라인)에는 -1을 부여한다. 이때 추출된 도화원도 상의 해당 폴리라인(경계선)은 도 5에 도시된 바와 같다.
A serial number (LEFT_FID) having a positive value is assigned to the extracted polyline as shown in Table 1 below, and -1 is assigned to a 'unused polyline' (a polyline that is not a boundary line). In this case, the corresponding polyline (boundary line) on the extracted source diagram is as shown in FIG. 5.

Figure 112010035639540-pat00004
Figure 112010035639540-pat00004

이후, 상기 추출한 경계선의 시작점 좌표와 끝점 좌표를 이용하여 기 설정된 이격 거리를 가지는 새로운 경계선의 좌표값을 산출한다(302).Thereafter, a coordinate value of a new boundary line having a predetermined separation distance is calculated using the extracted starting point coordinates and end point coordinates of the boundary line (302).

이하, 도 6을 참조하여 인접한 각 건축물의 새로운 경계선 좌표값을 산출하는 과정에 대해 상세히 살펴보기로 한다.Hereinafter, a process of calculating a new boundary line coordinate value of each adjacent building will be described in detail with reference to FIG. 6.

먼저, 도 6의 (a)에 도시된 바와 같이 시작점 좌표를 A(a1,a2), 끝점 좌표를 B(b1,b2), 평행 이동거리를 r(양수)이라 하고, A'=(0,0), B'=(b1-a1, b2-a2)라 하면

Figure 112010035639540-pat00005
는 A'=(0,0)을 시작점으로 하는
Figure 112010035639540-pat00006
의 위치벡터가 된다.First, as shown in (a) of FIG. 6, the starting point coordinate is A (a 1 , a 2 ), the end point coordinate is B (b 1 , b 2 ), and the parallel moving distance is r (positive), and A ' = (0,0), B '= (b 1 -a 1 , b 2 -a 2 )
Figure 112010035639540-pat00005
Where A '= (0,0) is the starting point
Figure 112010035639540-pat00006
Becomes the position vector of.

또한

Figure 112010035639540-pat00007
Figure 112010035639540-pat00008
라 하고 B'으로부터 x축에 내린 수선과의 교점을 C=(b1-a1,0)라 하면,
Figure 112010035639540-pat00009
가 되고
Figure 112010035639540-pat00010
가 된다.Also
Figure 112010035639540-pat00007
To
Figure 112010035639540-pat00008
Let's assume that the intersection with the waterline from B 'on the x-axis is C = (b 1 -a 1 , 0),
Figure 112010035639540-pat00009
Become
Figure 112010035639540-pat00010
Becomes

도 6의 (b)에서,

Figure 112010035639540-pat00011
이므로, D는
Figure 112010035639540-pat00012
를 음의 방향으로
Figure 112010035639540-pat00013
만큼 회전 이동시켰을 때 B'에 대응하는 점이 되고,
Figure 112010035639540-pat00014
Figure 112010035639540-pat00015
와 길이가 같고 x축 위에 존재하게 된다. 즉, D(x,y)는 하기의 [수학식 1]과 같이 표현할 수 있다.In Figure 6 (b),
Figure 112010035639540-pat00011
Since D is
Figure 112010035639540-pat00012
In the negative direction
Figure 112010035639540-pat00013
When it rotates by as much as the point corresponding to B ',
Figure 112010035639540-pat00014
Is
Figure 112010035639540-pat00015
Are the same length and are on the x-axis. That is, D (x, y) can be expressed as Equation 1 below.

Figure 112010035639540-pat00016
Figure 112010035639540-pat00016

이제

Figure 112010035639540-pat00017
를 +r만큼 평행 이동시킨 선분을
Figure 112010035639540-pat00018
이라 하고,
Figure 112010035639540-pat00019
를 -r만큼 평행 이동시킨 선분을
Figure 112010035639540-pat00020
라 하면, A1, D1, A2, D2의 좌표는 하기의 [수학식 2]와 같다.now
Figure 112010035639540-pat00017
To move the segment by + r
Figure 112010035639540-pat00018
This is called,
Figure 112010035639540-pat00019
To translate the segment by -r
Figure 112010035639540-pat00020
In this case, the coordinates of A1, D1, A2, and D2 are as shown in Equation 2 below.

Figure 112010035639540-pat00021
Figure 112010035639540-pat00021

도 6의 (c)에서,

Figure 112010035639540-pat00022
이므로,
Figure 112010035639540-pat00023
Figure 112010035639540-pat00024
Figure 112010035639540-pat00025
만큼 평행 이동시킨 벡터가 된다.In FIG. 6C,
Figure 112010035639540-pat00022
Because of,
Figure 112010035639540-pat00023
Is
Figure 112010035639540-pat00024
To
Figure 112010035639540-pat00025
It becomes the vector which was moved in parallel.

따라서

Figure 112010035639540-pat00026
를 (a1,a2)만큼 평행 이동시켜 각각에 대응하는 점을
Figure 112010035639540-pat00027
라 하면,
Figure 112010035639540-pat00028
Figure 112010035639540-pat00029
Figure 112010035639540-pat00030
만큼 평행 이동시킨 벡터가 되며, 이때 각 좌표는 하기의 [수학식 3]과 같다.therefore
Figure 112010035639540-pat00026
Move (a 1 , a 2 ) in parallel to find the corresponding points.
Figure 112010035639540-pat00027
Say,
Figure 112010035639540-pat00028
Is
Figure 112010035639540-pat00029
To
Figure 112010035639540-pat00030
It becomes a vector moved in parallel, wherein each coordinate is as shown in Equation 3 below.

Figure 112010035639540-pat00031
Figure 112010035639540-pat00031

여기서,

Figure 112010035639540-pat00032
이다.
here,
Figure 112010035639540-pat00032
to be.

예를 들어, A(194.5288, 236.1174), B(162.5175, 205.2272), r=50이라 하면, A'=(0,0), B'=(-32.0113, -30.8902)이 되고,

Figure 112010035639540-pat00033
=0.7676이 된다.For example, A (194.5288, 236.1174), B (162.5175, 205.2272), r = 50, A '= (0,0), B' = (-32.0113, -30.8902),
Figure 112010035639540-pat00033
= 0.7676.

따라서, D(-44.4851, 0.0000)이 되고, 상기 [수학식 2]를 이용하여 A1=(0.0000, 50.0000, D1=(-44.4851, 50), A2=(0.0000, -50.0000), D2=(-44.4851, -50.0000)를 산출할 수 있다.Therefore, D (-44.4851, 0.0000), and A 1 = (0.0000, 50.0000, D 1 = (-44.4851, 50), A 2 = (0.0000, -50.0000), D using Equation 2 above. 2 = (-44.4851, -50.0000)

이렇게 산출한 결과를 [수학식 3]에 적용하면, 새로운 두 경계선의 시작점 좌표와 끝점 좌표로서, P'1=(159.8091, 272.0972), Q'1=(127.7978, 241.2070), P'2=(229.2485, 200.1376), Q'2=(197.2372, 169.2474)를 산출할 수 있다.Applying this result to Equation 3, P ' 1 = (159.8091, 272.0972), Q'1 = (127.7978, 241.2070), P'2 = ( 229.2485, 200.1376), and Q'2 = (197.2372, 169.2474).

이러한 경계선 좌표값 산출 과정을 통해, 본 발명은 임의의 이격 거리를 가지는 새로운 경계선의 좌표값을 산출할 수 있음을 알 수 있다.
Through this process of calculating the boundary coordinate value, it can be seen that the present invention can calculate the coordinate value of a new boundary line having an arbitrary distance.

이후, 상기 산출한 두 경계선의 네 좌표값으로 이루어진 면을 생성한 후 도화원도의 해당 위치에 중첩시켜 중첩되는 면을 제거(extract)한다(303). 여기서 중첩되는 면의 제거는 도화원도에서 중첩되는 면의 색을 배경색(건축물의 색상과 다른 색상)으로 나타내는 것을 의미한다.Subsequently, after generating the plane consisting of the four coordinate values of the two boundary lines, the overlapping planes are extracted by overlapping the corresponding positions of the drawing circle diagram (303). Here, the removal of the overlapping faces means that the colors of the overlapping faces in the drawing circle are represented as a background color (a color different from that of the building).

이후, 상기 산출한 좌표값을 가지는 경계선을 상기 중첩 면이 제거된 해당 건축물의 폴리라인으로 설정하여 독립 폴리건을 생성한다(304). 이는 도 7에 도시된 바와 같다.Thereafter, an independent polygon is generated by setting the boundary line having the calculated coordinate value as the polyline of the corresponding building from which the overlapping surface is removed (304). This is as shown in FIG.

이러한 방식으로 도화원도 내 모든 경계선에 대해 적용한 결과는 도 8에 도시된 바와 같다.
In this way, the result of applying all the boundary lines in the FDO is as shown in FIG. 8.

한편, 전술한 바와 같은 본 발명의 방법은 컴퓨터 프로그램으로 작성이 가능하다. 그리고 상기 프로그램을 구성하는 코드 및 코드 세그먼트는 당해 분야의 컴퓨터 프로그래머에 의하여 용이하게 추론될 수 있다. 또한, 상기 작성된 프로그램은 컴퓨터가 읽을 수 있는 기록매체(정보저장매체)에 저장되고, 컴퓨터에 의하여 판독되고 실행됨으로써 본 발명의 방법을 구현한다. 그리고 상기 기록매체는 컴퓨터가 판독할 수 있는 모든 형태의 기록매체를 포함한다.On the other hand, the method of the present invention as described above can be written in a computer program. And the code and code segments constituting the program can be easily inferred by a computer programmer in the art. In addition, the written program is stored in a computer-readable recording medium (information storage medium), and read and executed by a computer to implement the method of the present invention. The recording medium may include any type of computer readable recording medium.

이상에서 설명한 본 발명은, 본 발명이 속하는 기술 분야에서 통상의 지식을 가진 자에게 있어 본 발명의 기술적 사상을 벗어나지 않는 범위 내에서 여러 가지 치환, 변형 및 변경이 가능하므로 전술한 실시예 및 첨부된 도면에 의해 한정되는 것이 아니다.
The present invention described above is capable of various substitutions, modifications, and changes without departing from the technical spirit of the present invention for those skilled in the art to which the present invention pertains. It is not limited by the drawings.

21 : 경계선 추출부 22 : 좌표값 산출부
23 : 중첩 면 제거부 24 : 독립 폴리건 생성부
21: boundary line extraction unit 22: coordinate value calculation unit
23: overlapping surface removal unit 24: independent polygon generating unit

Claims (1)

도화원도 내 인접 건축물의 독립 폴리건 형성 방법에 있어서,
경계선 추출부가 도화원도 내 각 건축물의 폴리라인 구성정보를 이용하여 인접한 건축물 간의 경계선을 추출하는 단계;
좌표값 산출부가 상기 추출된 경계선의 시작점 좌표(a1,a2)와 끝점 좌표(b1,b2)를 이용하여 기 설정된 이격 거리(r)를 가지는 새로운 두 경계선의 좌표값을 산출하는 좌표값 산출단계;
중첩 면 제거부가 상기 산출된 두 경계선의 네 좌표값으로 이루어진 면을 생성한 후 도화원도의 해당 위치에 중첩시켜 중첩되는 면을 제거하는 단계; 및
독립 폴리건 생성부가 상기 산출된 좌표값을 가지는 경계선을 상기 중첩 면이 제거된 해당 건축물의 폴리라인으로 설정하여 독립 폴리건을 생성하는 단계를 포함하되,
상기 좌표값 산출단계는,
Figure 112010052576606-pat00034

(여기서, (a1,a2)는 상기 추출한 경계선의 시작점 좌표, (b1,b2)는 상기 추출한 경계선의 끝점 좌표,
Figure 112010052576606-pat00035
는 상기 추출한 경계선의 시작점이 x축과 이루는 각, r은 이격 거리,
Figure 112010052576606-pat00036
을 의미하고, P'1는 상기 새로운 두 경계선 중 제 1 경계선의 시작점 좌표, Q'1은 상기 제 1 경계선의 끝점 좌표, P'2는 상기 새로운 두 경계선 중 제 2 경계선의 시작점 좌표, Q'2는 상기 제 2 경계선의 끝점 좌표를 각각 의미한다.)
를 이용하여 새로운 두 경계선의 좌표값을 산출하는 것을 특징으로 하는 도화원도 내 인접 건축물의 독립 폴리건 형성 방법.
In the independent polygon formation method of the adjacent building in the Tokyo flower garden,
Extracting, by the boundary extracting unit, boundary lines between adjacent buildings using polyline configuration information of each building in the drawing garden diagram;
Coordinates for calculating a coordinate value of two new boundary lines having a predetermined distance (r) by using a coordinate calculation unit the start point coordinates (a 1 , a 2 ) and the end point coordinates (b 1 , b 2 ) of the extracted boundary line Value calculating step;
An overlapping surface removing unit generating a surface consisting of four coordinate values of the calculated two boundary lines, and then overlapping the corresponding surface of the drawing circle to remove the overlapping surface; And
And an independent polygon generating unit generating an independent polygon by setting a boundary line having the calculated coordinate value as a polyline of the corresponding building from which the overlapping surface has been removed.
The coordinate value calculating step,
Figure 112010052576606-pat00034

(Wherein (a 1 , a 2 ) is the starting point coordinate of the extracted boundary line, (b 1 , b 2 ) is the end point coordinate of the extracted boundary line,
Figure 112010052576606-pat00035
Is the angle of the starting point of the extracted boundary line with the x-axis, r is the separation distance,
Figure 112010052576606-pat00036
P ' 1 is the starting point coordinates of the first boundary line of the new two boundary lines, Q' 1 is the end point coordinates of the first boundary line, P ' 2 is the starting point coordinates of the second boundary line of the new two boundary lines, Q' 2 denotes end point coordinates of the second boundary line, respectively.)
Independent polygon forming method of adjacent buildings in the Dohwawon map, characterized in that to calculate the coordinate values of the two new boundary line using.
KR1020100052281A 2010-06-03 2010-06-03 Method for making independent polygon of contiguity structure in original drawing map KR101008018B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020100052281A KR101008018B1 (en) 2010-06-03 2010-06-03 Method for making independent polygon of contiguity structure in original drawing map

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020100052281A KR101008018B1 (en) 2010-06-03 2010-06-03 Method for making independent polygon of contiguity structure in original drawing map

Publications (1)

Publication Number Publication Date
KR101008018B1 true KR101008018B1 (en) 2011-01-14

Family

ID=43616270

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020100052281A KR101008018B1 (en) 2010-06-03 2010-06-03 Method for making independent polygon of contiguity structure in original drawing map

Country Status (1)

Country Link
KR (1) KR101008018B1 (en)

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100609786B1 (en) * 2005-12-28 2006-08-09 공간정보기술 주식회사 Method of modelling 3-dimensional building using original drawing map
KR100895773B1 (en) * 2008-02-20 2009-05-06 한국철도시설공단 A database for link of Serch data in GIS system, a serch method

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100609786B1 (en) * 2005-12-28 2006-08-09 공간정보기술 주식회사 Method of modelling 3-dimensional building using original drawing map
KR100895773B1 (en) * 2008-02-20 2009-05-06 한국철도시설공단 A database for link of Serch data in GIS system, a serch method

Similar Documents

Publication Publication Date Title
CN110689563A (en) Data processing method for extracting illegal building information in remote sensing image
KR101706447B1 (en) A gis-based pervious/impervious map production method for urban areas using multiple spatial data
CN110838153B (en) Method for making modern inland river electronic channel chart based on ArcGIS system and application
KR20160048255A (en) A gis-based thematic mapping method to use in estimating the annual amount of non-point source pollutants using partially updated land-cover map
CN111947625A (en) Measurable BIM (building information modeling) method for measuring rural homestead based on CORS (continuous operational reference system) and integrating unmanned aerial vehicle laser scanning and oblique photography
KR101008019B1 (en) System for fabricating numerical map using method for automatic making independent polygon of contiguity structure
KR100732915B1 (en) Method for three-dimensional determining of basic design road route using digital photommetry and satellite image
KR100924008B1 (en) Digital drawing based Aerial Photograph Enhancement Method
KR101008018B1 (en) Method for making independent polygon of contiguity structure in original drawing map
Apollonio et al. The palladiolibrary geo-models: An open 3D archive to manage and visualize information-communication resources about palladio
CN113418510A (en) High-standard farmland acceptance method based on multi-rotor unmanned aerial vehicle
Chen et al. Fast Updating National Geo-Spatial Databases with High Resolution Imagery: China's Methodology and Experience
Bernstein The costs of land information systems
El Garouani et al. Digital surface model generation for 3D city modeling (Fez, Morocco)
CN114863033B (en) Section extraction method based on point cloud digital-analog
Smith et al. A land use survey of developed areas in England and Wales
Shamil et al. MODERN TECHNOLOGIES IN THE PREPARATION OF INTERACTIVE SOIL MAPS OF THE REPUBLIC OF AZERBAIJAN
Franic et al. 3D model and a scale model of the City of Zagreb
PORUMB et al. Automated Edgematching of Features from Adjoining Vector Map Databases
Crosilla et al. Fifty years of the Friuli Venezia Giulia regional technical map: a best practice in the Italian cartographic context
Grapentine et al. Georeferencing large-scale aerial photographs of a great lakes coastal wetland: a modified photogrammetric method
KALE et al. INTEGRATION 3D MODEL WITH GIS
KR101225207B1 (en) Digital map system and editing method using the same
Grün et al. The geoglyphs of Nasca: 3-D recording and analysis with modern digital technologies
Downar-Zapolska et al. Map of the terminal moraine of the Werenskioldbreen glacier (South-West Spitsbergen) from 2015

Legal Events

Date Code Title Description
A201 Request for examination
A302 Request for accelerated examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20131016

Year of fee payment: 4

FPAY Annual fee payment

Payment date: 20150106

Year of fee payment: 5

FPAY Annual fee payment

Payment date: 20160406

Year of fee payment: 6

FPAY Annual fee payment

Payment date: 20170124

Year of fee payment: 7

FPAY Annual fee payment

Payment date: 20190107

Year of fee payment: 9

FPAY Annual fee payment

Payment date: 20200103

Year of fee payment: 10