KR100997534B1 - Clamp connecting pipe for water supply - Google Patents

Clamp connecting pipe for water supply Download PDF

Info

Publication number
KR100997534B1
KR100997534B1 KR1020100088544A KR20100088544A KR100997534B1 KR 100997534 B1 KR100997534 B1 KR 100997534B1 KR 1020100088544 A KR1020100088544 A KR 1020100088544A KR 20100088544 A KR20100088544 A KR 20100088544A KR 100997534 B1 KR100997534 B1 KR 100997534B1
Authority
KR
South Korea
Prior art keywords
clamp
pipe
main body
sides
groove
Prior art date
Application number
KR1020100088544A
Other languages
Korean (ko)
Inventor
김창규
Original Assignee
김창규
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 김창규 filed Critical 김창규
Priority to KR1020100088544A priority Critical patent/KR100997534B1/en
Application granted granted Critical
Publication of KR100997534B1 publication Critical patent/KR100997534B1/en

Links

Images

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L21/00Joints with sleeve or socket
    • F16L21/08Joints with sleeve or socket with additional locking means

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Joints With Sleeves (AREA)

Abstract

PURPOSE: A clamp joint pipe for waterworks is provided to minimize damage in spite of changes in surrounding environment because the pipe can be extended in the axial direction and turned in the circumferential direction. CONSTITUTION: A clamp joint pipe for waterworks comprises a main body(2) and separate clamps(3). The main body has packing grooves(2a) on both inner sides, in which a packing(5) pressed to a pipe is inserted, and holding protrusions(2b) on both sides which are inserted in holding grooves(3a) of the clamps. The clamps are coupled via coupling pieces(3b) together with bolts and nuts(6).

Description

Clamp connecting pipe for water supply

The present invention relates to a clamp joint pipe for water supply, and more particularly, to provide a clamp clamp pipe for water supply, which can provide a rigid fixed state while being easy to install, improve elasticity, and reduce cost.

In order to supply water to the home, a water pipe is buried underground, and the water pipe is piped in a configuration in which pipes are connected to a joint pipe.

The joint pipe connecting the conventional pipe is coupled to the packing surrounding the pipe to both sides of the main body, the pressure port is arranged on both sides of the main body by pressing the nut is fastened to the pipe by a nut fastened to the screw formed on the main body.

However, the conventional joint pipe for water pipes is a structure in which the pipe and the joint pipe are integrated without fluidity, so that it is difficult to cope with the deflection (position change) or expansion and contraction of the pipe due to the change of the ground, causing the pipe to break or leak. Most of the pipe leaks that occur in the high and actual phenomena are caused by the above-mentioned causes, and the industry requires a new conduit for water pipes that can solve these problems.

Accordingly, the present inventors have researched and developed the present invention to solve the above-described problems, and in the present invention, by combining the clamp is divided into a joint pipe so as to have fluidity in the axial direction and the circumferential direction and the axial perpendicular direction to the ease of construction and The present invention has been completed in view of the technical problem of the present invention by providing a clamp joint pipe for water supply capable of providing a fixed state while improving elasticity and reducing costs.

In the present invention as a means for solving the problem was configured to separate the clamp nutrient in the joint pipe body.

The coupling structure of the main body and the clamp forms a locking protrusion at the end of the main body, and the clamp is divided into a locking groove into which the locking protrusion is inserted, so that the locking protrusion is coupled to have a clearance in the axial direction and the circumferential direction in the locking groove. It was.

And another example is to form a clamp guide portion formed with a locking projection at the end portion in the axial direction in the 90 degree direction to both sides of the main body, it is possible to slide the bisected clamp formed in the clamp guide portion to form a clamping protrusion for clamping the pipe. The clamping protrusion is narrower than the space formed between the neighboring clamp guides so that play may occur in the circumferential direction and be rotated.

When using the clamp joint pipe for water supply provided by the present invention has the following effects.

-Parts can be simplified and manufacturing costs can be reduced, especially by reducing processing costs.

-Even if the surrounding environment such as ground subsidence changes during installation, the pipe can be minimized by the expansion and contraction in the axial direction and rotation in the circumferential direction.

-If the clamp slides into the clamp guide, it can reduce the risk of losing the clamp during the work.

1 is an exploded perspective view showing a preferred embodiment of the water supply clamp fitting pipe provided in the present invention
Figure 2 is a front sectional view of the assembled state of Figure 1
3 is an enlarged plan view of an important part of a water supply clamp fitting pipe provided in the present invention;
Figure 4 is an exploded perspective view showing another embodiment of the water supply clamp joint pipe provided in the present invention
5 is an assembled front sectional view of FIG.
6 is an assembled side cross-sectional view of FIG.

Hereinafter, the configuration of the clamp joint pipe for water supply provided by the present invention will be described in detail with reference to the accompanying drawings.

1 is an exploded perspective view showing a preferred embodiment of the water supply clamp fitting pipe provided in the present invention, Figure 2 is an assembled cross-sectional front view of Figure 1, Figure 3 is a water supply clamp joint provided in the present invention An enlarged plan view of an important part of the tube is shown.

A feature of the constant clamp joint pipe 1 provided by the present invention is that in the construction of the joint pipe 1, the clamp 3 can be clamped in a state in which the pipe 4 is separated from the main body 2. will be.

That is, in the present invention, as shown in the drawing, the main body 2, the packing 5 coupled to the packing grooves 2a formed on both inner sides of the main body 2, and closely contacted with the pipe 4, and the main body 2 The locking grooves 3a are formed to be coupled to the locking projections 2b formed to correspond to both sides of the coupling grooves, and coupling pieces 3b are formed at both ends thereof. It consists of a configuration including, the inner surface of the clamp 3 is formed with a ground projection (3c) in contact with the pipe (4).

At this time, the locking groove (3a) is to accommodate the locking projection (2b), as shown in Figure 3, the locking projection (2b) is formed large enough to move enough in the axial direction and the circumferential direction in the embedded state.

In the case where the pipe 4 is connected and buried with the constant clamp joint pipe 1 having such a configuration as shown in FIG. 2, the catching groove of the clamp 3 clamping and fixing the pipe 4 under adverse conditions such as ground subsidence ( In the state in which the engaging projection 2b is inserted in 3a), the pipe 4 is secured by being stretched in the axial direction or rotated in the circumferential direction by a free space.

Figure 4 is an exploded perspective view showing another embodiment of the water supply clamp fitting pipe provided in the present invention, Figure 5 is an assembled front sectional view of Figure 4, Figure 6 shows an assembled side sectional view of Figure 4 will be.

A feature of the constant clamp joint pipe 1 provided in another embodiment of the present invention is that in constructing the joint pipe 1, both sides of the main body 2 with the clamp 7 separated from the main body 2. It is to be able to clamp the pipe (4) in the coupled state to be slidably moved along the clamp guide portion (8) formed in the engaging projection (8a) formed in the.

That is, another embodiment of the present invention is the main body 2, the packing 5 is in close contact with the pipe (4) coupled to the coupling groove (2a) formed on both inner sides of the main body 2, and the main body (2) Clamp guide portion 8 is formed at both ends of the clamp guide portion (8a) formed at both ends in the 90-degree direction, and the engaging projection (8a) to form a groove (7b) in which the clamp guide portion 8 is inwardly formed The tension connecting portion 7a is formed, and the clamping protrusions 7c inserted into the space 8b between the clamp guide portions 8 are formed at both sides of the tension connecting portion 7a, and the engaging pieces 7d are formed at both ends. It is configured to be bisected by the bolt and the nut (9), the inner surface of the clamp 7 is formed with a ground projection (7e) in contact with the pipe (4).

At this time, the clamp guide portion 8 is embedded in the groove 7b of the tension connection portion 7a and the locking projection 8a is embedded in the space 8b between the clamp guide portions 8, and these tension connection portions 7a. As shown in FIG. 6, the groove 7b and the space 8b are largely formed to have sufficient margin in the circumferential direction in the state where the clamp guide 8 is inserted.

In the case where the pipe 4 is connected and embedded as a constant clamp joint pipe 1 having such a configuration, the clamp 7 clamping the pipe 4 is clamped under adverse conditions such as ground subsidence. Sliding movement along the (8) to expand and contract in the axial direction, in the space (8b) between the groove (8b) of the tension connecting portion (8a) and the clamp guide (8), the clamping guide (8) and the locking projection The clamp 7 is rotated in the circumferential direction even in the state in which 7c is inserted, thereby protecting the pipe 4 safely.

In addition, according to another embodiment of the present invention, when the clamp 7 fixes the pipe 4, the pipe 4 is evenly pressed on the basis of the tension connection part 7a, so that the pipe 4 may be more firmly pressurized. It can be.

In the detailed description of the present invention, specific embodiments have been described, but various modifications may be made without departing from the scope of the present invention. Therefore, the protection scope of the present invention should not be limited to the described embodiments, but should be defined by equivalents as well as the following claims.

1: (water clamp) fitting 2: body
2a: packing groove 2b: locking protrusion
3: clamp 3a: locking groove
3b: Joining piece 3c: Grounding protrusion
4: pipe 5: packing
6: Bolt and nut 7: Clamp
7a: tension connection 7b: groove
7c: Clamping protrusion 7d: Joining piece
7e: Grounding 8: Clamp Guide
8a: Jamming 8b: Space
9: bolt and nut

Claims (2)

delete Water clamping pipe for clamping pipe 4 by clamp 7 separated from main body 2 which combines packing 5 which is in close contact with pipe 4 to packing groove 2a formed on both sides. In constructing (1);
A clamp guide portion (8) is formed on both sides of the main body (2) so that a locking projection (8a) is formed at an end portion in a 90 degree direction;
The clamp 7 forms a tension connecting portion 7a that is engaged with the engaging protrusion 8a so that the groove 7b into which the clamp guide 8 is inserted therein is formed, and the clamp guides both sides of the tension connecting portion 7a. Forming a clamping protrusion 7c embedded in the space 8b between the portions 8, and forming a coupling piece 8d at both ends thereof so as to be mutually coupled with the bolt and the nut 9;
The space 8b between the groove 8b of the tension connecting portion 8a and the clamp guide 8 has a sufficient free space in the circumferential direction in the state where the clamp guide 8 and the clamping protrusion 7c are inserted. Clamp fittings for water, characterized in that formed large to be.
KR1020100088544A 2010-09-09 2010-09-09 Clamp connecting pipe for water supply KR100997534B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020100088544A KR100997534B1 (en) 2010-09-09 2010-09-09 Clamp connecting pipe for water supply

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020100088544A KR100997534B1 (en) 2010-09-09 2010-09-09 Clamp connecting pipe for water supply

Publications (1)

Publication Number Publication Date
KR100997534B1 true KR100997534B1 (en) 2010-12-01

Family

ID=43512227

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020100088544A KR100997534B1 (en) 2010-09-09 2010-09-09 Clamp connecting pipe for water supply

Country Status (1)

Country Link
KR (1) KR100997534B1 (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101335828B1 (en) * 2012-11-26 2013-12-03 주식회사 하이스텐 Flange for coupling plumbing
WO2014081111A1 (en) * 2012-11-26 2014-05-30 주식회사 하이스텐 Clamp for connecting pipes and pipe coupler comprising same
KR101422935B1 (en) * 2012-11-30 2014-07-24 주식회사 하이스텐 Clamp for coupling plumbing
CN110468949A (en) * 2019-07-22 2019-11-19 扬州润祥塑业有限公司 A kind of effluent sewerage pipe facilitating maintenance
KR102212530B1 (en) 2020-02-12 2021-02-08 주식회사 청우엔지니어링 Pipe's connecting structure preventing a water leakage
KR102351804B1 (en) 2020-12-17 2022-01-17 주식회사 후손 Clamp for pipe connection
KR20220155004A (en) 2021-05-14 2022-11-22 주식회사 후손 Main body injection mold of clamp for pipe connection

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20060186668A1 (en) 2005-02-23 2006-08-24 Kazushige Sakazaki Holding structure of hose clamp
US7458619B2 (en) * 2003-11-07 2008-12-02 Breeze-Torca Products, Llc Pipe clamp with integral latch

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7458619B2 (en) * 2003-11-07 2008-12-02 Breeze-Torca Products, Llc Pipe clamp with integral latch
US20060186668A1 (en) 2005-02-23 2006-08-24 Kazushige Sakazaki Holding structure of hose clamp

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101335828B1 (en) * 2012-11-26 2013-12-03 주식회사 하이스텐 Flange for coupling plumbing
WO2014081111A1 (en) * 2012-11-26 2014-05-30 주식회사 하이스텐 Clamp for connecting pipes and pipe coupler comprising same
EP2924329A4 (en) * 2012-11-26 2016-11-02 Hi Sten Co Ltd Clamp for connecting pipes and pipe coupler comprising same
US10107428B2 (en) 2012-11-26 2018-10-23 Hi-Sten. Co., Ltd. Clamp for connecting pipe and device for connecting pipe including the same
KR101422935B1 (en) * 2012-11-30 2014-07-24 주식회사 하이스텐 Clamp for coupling plumbing
CN110468949A (en) * 2019-07-22 2019-11-19 扬州润祥塑业有限公司 A kind of effluent sewerage pipe facilitating maintenance
CN110468949B (en) * 2019-07-22 2021-04-02 扬州润祥塑业有限公司 Sewer sewage pipe of convenient maintenance
KR102212530B1 (en) 2020-02-12 2021-02-08 주식회사 청우엔지니어링 Pipe's connecting structure preventing a water leakage
KR102351804B1 (en) 2020-12-17 2022-01-17 주식회사 후손 Clamp for pipe connection
KR20220155004A (en) 2021-05-14 2022-11-22 주식회사 후손 Main body injection mold of clamp for pipe connection

Similar Documents

Publication Publication Date Title
KR100997534B1 (en) Clamp connecting pipe for water supply
RU2247889C2 (en) Adapter used for corrugation tube
SK284669B6 (en) A device for the assembly of a strait spigot and a flange of two pipeline elements and a sealed and locked assembly of pipeline elements
KR101290291B1 (en) Drain pipe joint structure having slip joint for cope with work in place
CN103363236A (en) Pipe connector with compensator
JP4960207B2 (en) Mounting method of meter unit with built-in meter box and structure of the meter unit
KR101318774B1 (en) Ball type expansion joint
KR200475463Y1 (en) A joint for plumbing connection that angle adjustment is easy
KR101034653B1 (en) Pipe way with protection area
KR20130025696A (en) Pipe connecting apparatus of one-touch type
KR20160004207U (en) Waterproof connector of sewer concrete pipe joint with socket
KR20090117285A (en) Pipe connector
KR101888168B1 (en) Apparatus for connection of branch pipe
KR101844820B1 (en) flexible pipe joint apparatus improved pressure resistance
KR100675065B1 (en) A joint apparatus with ring for prevention of seperation
KR101267263B1 (en) Pipe's connecting structure preventing a water leakage
KR102053283B1 (en) Pipe coupler
KR101218352B1 (en) Conneting device for pipe
KR20140087869A (en) Expansion joint
KR101023940B1 (en) Apparatus for connecting plastic pipes
KR101040230B1 (en) Conneting device for pipe
KR101422269B1 (en) Connection socket of the pipe
KR101016885B1 (en) Connector of hose for agricultural watering line
CN211875341U (en) Locking type pipeline connector
KR101147515B1 (en) Water supply pipe connecting unit

Legal Events

Date Code Title Description
A201 Request for examination
A302 Request for accelerated examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20131101

Year of fee payment: 4

FPAY Annual fee payment

Payment date: 20151204

Year of fee payment: 6

FPAY Annual fee payment

Payment date: 20161124

Year of fee payment: 7

FPAY Annual fee payment

Payment date: 20171124

Year of fee payment: 8

FPAY Annual fee payment

Payment date: 20181126

Year of fee payment: 9

FPAY Annual fee payment

Payment date: 20191125

Year of fee payment: 10