KR100954613B1 - Extension type ground anchor - Google Patents
Extension type ground anchor Download PDFInfo
- Publication number
- KR100954613B1 KR100954613B1 KR1020080081439A KR20080081439A KR100954613B1 KR 100954613 B1 KR100954613 B1 KR 100954613B1 KR 1020080081439 A KR1020080081439 A KR 1020080081439A KR 20080081439 A KR20080081439 A KR 20080081439A KR 100954613 B1 KR100954613 B1 KR 100954613B1
- Authority
- KR
- South Korea
- Prior art keywords
- protrusion
- fastening
- hole
- finger
- hinge
- Prior art date
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/74—Means for anchoring structural elements or bulkheads
- E02D5/80—Ground anchors
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
- E02D5/34—Concrete or concrete-like piles cast in position ; Apparatus for making same
- E02D5/38—Concrete or concrete-like piles cast in position ; Apparatus for making same making by use of mould-pipes or other moulds
- E02D5/44—Concrete or concrete-like piles cast in position ; Apparatus for making same making by use of mould-pipes or other moulds with enlarged footing or enlargements at the bottom of the pile
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
- E02D5/54—Piles with prefabricated supports or anchoring parts; Anchoring piles
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2200/00—Geometrical or physical properties
- E02D2200/15—Geometrical or physical properties including at least a hinge
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2600/00—Miscellaneous
- E02D2600/30—Miscellaneous comprising anchoring details
Landscapes
- Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Piles And Underground Anchors (AREA)
Abstract
본 발명은 타격바가 외부의 충격에 의해 핑거 스톱퍼를 상측으로 이동시키면서 레버의 걸림 돌기의 고정을 해지함과 동시에 확장핑거과 압축스프링의 강한 탄성에 의해 90도 각도로 벌어지도록 하여 천공 지반 내면으로 깊숙이 박혀 앵커의 결속력을 높여주며, PC강재 외부로 압축스프링이 설치되어 있어 종래보다 강한 힘으로 압축하여 확장핑거의 벌어짐이 안정적으로 이루어지도록 하는 확장형 그라운드 앵커에 관한 것이다.In accordance with the present invention, the striking bar removes the locking protrusion of the lever while moving the finger stopper upward due to an external impact, and is deeply inserted into the inner surface of the perforated ground so as to be opened at an angle of 90 degrees due to the strong elasticity of the expansion finger and the compression spring The present invention relates to an expandable type ground anchor for enhancing the binding force of an anchor and having a compression spring provided outside the PC steel member so that the expansion finger can be stably expanded by compressing it with a stronger force than the conventional one.
이는 중앙에 지지봉 삽입구멍(11)과 외면에 복수 개의 PC강재(90)가 삽입되는 체결구멍(12)을 형성하고, 체결구멍(12)의 양측으로 상면에 힌지가 체결되는 힌지구멍(13)을 가지면서 중앙 부분에 삽입홈(14)을 갖는 받침판(15)이 구비된 몸체(10)와; 상기 몸체(10)의 삽입홈(14)에 삽입 설치하며, 전방 면 외면 상측에 날카로운 돌기(21)가 형성되고 상측에 레버가 체결되는 체결공(22)과 하측에 힌지가 체결되는 힌지공(23)을 갖는 확장핑거(20)와; 상기 몸체(10)의 지지봉 삽입구멍(11)에 삽입 설치되며 내부에는 상단에 걸림턱(31)이 형성되고 하단 중앙에 나사홈(32)을 갖는 핑거 스톱퍼(33)가 체결되고 걸림턱(31)과 동일한 위치에 절개홈(34)이 형성된 지지봉(30)과; 상기 지지봉(30)의 상측 외면에 설치되며 상측과 하측에 서로 대응되도록 상,하측 받침대(41)(42)를 설치하고 그 사이에 압축스프링(43)을 결합하며, 상측 받침대(41)의 상면에 고정너트(44)를 설치하고 하측 받침대(42)의 하측 면에 힌지공(45)을 갖는 연결턱(46)이 구비된 확장이송구(40)와; 상 기 하측 받침대(42)의 연결턱(46)과 확장핑거(20)가 서로 연결되도록 설치하며 상단에 삽입공(51)이 형성되고 하단에 전방으로 돌출된 걸림 돌기(52)를 가지며 그 후방에 삽입공(53)을 갖는 레버(50)와; 상기 핑거 스톱퍼(33)의 나사홈(32)에 나사 결합하며 상단에 체결 돌기(61)가 형성되고 하단에 타격판(62)을 갖는 타격바(60);로 구성한다.And a hinge hole 13 in which a hinge is fastened to both sides of the fastening hole 12 is formed on both sides of the fastening hole 12. The fastening hole 12 is formed in the center of the fastening hole 12, A body 10 having a base plate 15 having an insertion groove 14 at a central portion thereof; A fastening hole 22 in which a sharp protrusion 21 is formed on the upper side of the outer surface of the front surface and a lever is fastened to the upper side and a hinge hole 23; A finger stopper 33 having a thread groove 32 at the center of the lower end thereof is fastened and a stopping stopper 31 (30) having a cutout groove (34) formed at the same position as the cutout groove (34); The upper and lower pedestals 41 and 42 are provided on the upper side of the support bar 30 so as to correspond to the upper side and the lower side of the pedestal 30 and the compression spring 43 is interposed therebetween. (40) provided with a fixing nut (44) on a lower side of the lower pedestal (42) and a coupling step (46) having a hinge hole (45) on a lower side of the lower pedestal (42); And a locking protrusion 52 protruding forward from the lower end of the insertion protrusion 52. The insertion protrusion 51 is formed at the upper end of the connection protrusion 46 and the extension finger 20 of the lower protrusion 42, A lever (50) having an insertion hole (53) in the body (50); And a striking bar 60 screwed to the thread groove 32 of the finger stopper 33 and having a fastening protrusion 61 formed at an upper end thereof and a striking plate 62 at a lower end thereof.
몸체, 확장핑거, 지지봉, 확장이송구, 레버, 타격바 Body, extension finger, support bar, extension bar, lever, bar
Description
본 발명은 확장형 그라운드 앵커에 관한 것으로, 더욱 상세하게는 PC강재(PC강연선, PC강선, 강봉, 이형강봉 등)를 인장재로 사용하여 토목구조물이나 건축구조물의 보강, 흙막이, 사면안정, 터널보강, 옹벽보강, 교각 안정, 철탑 전도방지, 건축물의 부상방지 등에 적용되는 가설 및 영구 그라운드 앵커공사에서, 별도의 추가 공정 없이 제품 자체 특성만으로 천공 홀에 삽입되는 앵커의 확장핑거가 압축스프링의 탄성에 의하여 레버의 벌어짐에 따라 강하게 확장을 하면서 앵커와 지반과의 결속력을 높여 인장력 확보가 용이하게 이루어지도록 하는 것이다. The present invention relates to an expandable ground anchor, and more particularly, to an expandable ground anchor which is used as a tensile material for PC steel (PC strand, PC steel wire, steel bar, In the construction of the permanent ground anchors, which are applied to reinforcement of retaining walls, the stability of piers, the prevention of falling of steel towers, and the prevention of injury of buildings, the extension fingers of anchors inserted into perforation holes only by the self- So that it is possible to secure the tensile force by increasing the binding force between the anchor and the ground while expanding strongly according to the expansion of the lever.
그라운드 앵커는 사용 기간 및 목적에 의해 영구 구조물에 적용되는 영구 앵커와 일반적으로 2년 미만의 기간으로 사용되는 가설 앵커로 분류하며, 지반에 대한 지지방식에 따라 마찰식, 지압식, 복합식 등으로 분류하고, 인장재의 그라우트에 의한 지지방식에 따라 인장형, 압축 분산형, 압축 집중형 등으로 분류한다.Ground anchors are classified into permanent anchors applied to permanent structures by duration and purpose of use, and hypothetical anchors generally used for less than 2 years. They are classified into friction type, compression type, and compound type depending on the supporting method for the ground And classified into tension type, compression type dispersion type, compression type concentration type, and the like depending on the supporting method by the grout of the tensile material.
그리고 인장재의 종류 및 사용 용도에 따라 PC강연선 앵커, 강봉 앵커, 매립 식 앵커, 제거식 앵커 등으로 분류한다.Depending on the kind of tensile material and application, it is classified as PC strand anchor, steel rod anchor, buried anchor, and removal anchor.
위와 같이 그라운드 앵커공법이 여러 가지로 분류되는 가장 중요한 이유인 인장력 확보를 위해서는 지반 조건에 맞는 시공 방법 및 자재 선정이 이루어져야 한다.In order to secure the tensile strength, which is the most important reason why the ground anchor construction method is classified as above, construction method and material selection should be performed according to the ground conditions.
현재 통상적으로 적용하는 시공순서는, 천공장비에 의해 천공(약 105mm) 되어진 천공 홀 내부에 앵커(길이 약 10~30m)를 삽입한 후, 그라우트(물+시멘트)하고 양생 기간을 거친 후, 구조물(벽체)과 앵커를 고정하고, 프리스트레스(인장, 약 40~80ton)를 가해 안정시키는 순서로 시공이 이루어지고 있다.A typical application sequence is as follows: anchor (length of about 10 to 30 m) is inserted into a perforation hole pierced by a perforation machine (about 105 mm), grout (water + cement) (Wall) and the anchor are fixed, and the construction is performed in order to stabilize by applying a prestress (tensile strength, about 40 to 80 tons).
이는 순수하게 천공 단면적과 그라우트와의 마찰력만으로 인장력을 확보하게 되므로, 지층이 연약할 경우에는 마찰력이 떨어져 인장력 확보가 어려운 관계로, 과다한 설계(수량 증가)와 보완(변형) 공법 병행 등으로 공사기간 지연과 공사비가 증대하는 것은 물론, 무리한 시공으로 상부 지반 변위(갈라짐 등)와 붕괴 등의 위험요인이 있었다.This is because the tensile force is secured only by the cross-sectional area of the perforation and the grout, and when the stratum is weak, the frictional force is weak and it is difficult to secure the tensile force. Therefore, due to the excessive design (increase in quantity) The delay and construction cost increased, and there were risk factors such as upper ground displacement (cracking) and collapse due to unreasonable construction.
또한, 지압식 앵커로 명칭하여 암반층에 적용하는 영구앵커 종류가 있는데, 이는 타앵커보다 길이를 짧게 해도 인장력을 확보할 수 있다는 장점은 있으나, 연약층에서는 적용이 불가하고, 제품 단가가 너무 높으며, 시공 중에 추가 공정을 인위적으로 가해야 효과가 발휘되는 원리로 인해, 추가 공정에 대한 작업자의 기피 현상과 추가 공정을 배제하여 발생하는 문제점 등이 있어, 미비하게 명맥을 유지하며 적용되는 실정이다. In addition, there is a permanent anchor type which is applied to the rock layer named as a pressure anchor, which has the advantage of securing the tensile force even if the length is shorter than that of the other anchor, but it is not applicable to the soft layer, There is a problem caused by elimination of the additional process and the avoidance of the operator for the additional process due to the principle that the additional process is artificially applied during the process.
이처럼 기존에는 기술성과 경제성이 결여되어, 어떠한 지층에서도 원활한 시 공성을 확보하기가 어려운 문제점이 있었다.As a result, there has been a problem in that it is difficult to ensure smooth operability in any stratum due to lack of technical and economical efficiency.
본 발명은 상기와 같은 여러 가지 문제점을 고려하여 이루어진 것으로, 그 목적은 종래보다 강한 힘으로 확장핑거가 벌어지면서 천공 지반 내면 깊숙이 박혀 앵커의 결속력을 높여 주도록 하는 확장형 그라운드 앵커를 제공함에 있다.SUMMARY OF THE INVENTION The present invention has been made in view of the above-mentioned problems, and it is an object of the present invention to provide an expandable type ground anchor for increasing the binding force of the anchors which are embedded deep inside the perforated ground while expanding fingers.
상기와 같은 목적을 달성하기 위하여 본 발명은 중앙에 지지봉 삽입구멍과 외면에 복수 개의 PC강재가 삽입되는 체결구멍을 형성하고, 체결구멍의 양측으로 상면에 힌지가 체결되는 힌지구멍을 가지면서 중앙 부분에 삽입홈을 갖는 받침판이 구비된 몸체와; 상기 몸체의 삽입홈에 삽입 설치하며, 전방 면 외면 상측에 날카로운 돌기가 형성되고 상측에 레버가 체결되는 체결공과 하측에 힌지가 체결되는 힌지공을 갖는 확장핑거와; 상기 몸체의 지지봉 삽입구멍에 삽입 설치되며 내부에는 상단에 걸림턱이 형성되고 하단 중앙에 나사홈을 갖는 핑거 스톱퍼가 체결되고 걸림턱과 동일한 위치에 절개홈이 형성된 지지봉과; 상기 지지봉의 상측 외면에 설치되며 상측과 하측에 서로 대응되도록 상,하측 받침대를 설치하고 그 사이에 압축스프링을 결합하며, 상측 받침대의 상면에 고정너트를 설치하고 하측 받침대의 하측 면에 힌지공을 갖는 연결턱이 구비된 확장이송구와; 상기 하측 받침대의 연결턱과 확장핑거가 서로 연결되도록 설치하며 상단에 삽입공이 형성되고 하단에 전방으로 돌출된 걸림 돌기를 가지며 그 후방에 삽입공을 갖는 레버와; 상기 핑거 스톱퍼의 나사홈에 나사 결합하며 상단에 체결 돌기가 형성되고 하단에 타격판을 갖는 타격바로 구성한다.According to an aspect of the present invention, there is provided a stapler comprising: a support bar insertion hole formed at the center thereof and a fastening hole through which a plurality of PC steels are inserted into an outer surface thereof; a hinge hole, A body provided with a receiving plate having an insertion groove; A extension finger inserted into the insertion groove of the body and having a sharp protrusion formed on the outer surface of the front surface and having a fastening hole for fastening the lever on the upper side and a hinge hole for fastening the hinge on the lower side; A support rod inserted into the support rod insertion hole of the body, a support rod having a fastening protrusion formed at an upper end thereof and a cutter stopper fastened to the lower end of the fastener, the cutter having a cutout at the same position as the fastening protrusion; The upper and lower pedestals are provided on the upper outer surface of the support rod so as to correspond to the upper and lower pedestals. A compression spring is interposed therebetween. A fixing nut is provided on the upper surface of the upper pedestal. An extending mouth provided with a connecting jaw; A lever having an insertion hole formed at an upper end thereof and having an insertion protrusion protruded forward at a lower end thereof and having an insertion hole at the rear thereof, the connection protrusion of the lower pedestal and the extension finger being connected to each other; A fastening protrusion is formed at an upper end thereof and a striking plate having a striking plate at a lower end thereof is screwed into a thread groove of the finger stopper.
본 발명은 타격바가 외부의 충격에 의해 핑거 스톱퍼를 상측으로 이동시키면서 레버의 걸림 돌기의 고정을 해지함과 동시에 확장핑거과 압축스프링의 강한 탄성에 의해 90도 각도로 벌어지도록 하여 천공 지반 내면으로 깊숙이 박혀 앵커의 결속력을 높여주는 효과가 있다.In accordance with the present invention, the striking bar removes the locking protrusion of the lever while moving the finger stopper upward due to an external impact, and is deeply inserted into the inner surface of the perforated ground so as to be opened at an angle of 90 degrees due to the strong elasticity of the expansion finger and the compression spring It has an effect of increasing the anchor's binding force.
본 발명은 PC강재 외부로 압축스프링이 설치되어 있어 종래보다 강한 힘으로 압축하여 확장핑거의 벌어짐이 안정적으로 이루어지도록 하는 장점이 있다.The present invention is advantageous in that a compression spring is provided outside the PC steel material, so that the expansion finger can be stably expanded by compressing it with a stronger force than the conventional one.
이하, 본 발명을 실현하기 위한 지압식 확장형 그라운드 앵커에 대하여 상세히 설명한다.Hereinafter, a geared expansion type ground anchor for realizing the present invention will be described in detail.
첨부된 도면 도 1 내지 도 3은 본 발명의 전체 구성을 나타낸 도면이며, 이의 도면 중 부호 100은 본 발명의 지압식 확장형 그라운드 앵커의 본체를 나타내고 있다.BRIEF DESCRIPTION OF DRAWINGS FIG. 1 is a perspective view of a ground anchor according to an embodiment of the present invention; FIG.
상기 본체(100)는 몸체(10)와 확장핑거(20)와 지지봉(30)과 확장핑거(20)를 이송시키는 확장이송구(40)와 확장핑거(20)와 확장이송구(40)를 서로 연결하는 레버(50)와 타격바(60)로 구성한다.The
상기 몸체(10)는 첨부된 도면 도 4에서 보는 바와 같이 중앙에 원형의 지지봉 삽입구멍(11)을 형성하고 외면에 복수 개의 PC강재가 삽입되는 체결구멍(12)을 형성한다.As shown in FIG. 4, the
그리고 체결구멍(12)의 양측으로 상면에 힌지(19)가 체결되는 힌지구멍(13)을 가지면서 중앙 부분에 삽입홈(14)을 갖는 받침판(15)을 형성한다.A
상기 확장핑거(20)는 전방 면 외면 상측에 날카로운 돌기(21)가 형성되고 상측에 레버(50)가 체결되는 체결공(22)과 하측에 힌지가 체결되는 힌지공(23)을 형성한다.The
상기 확장핑거(20)는 몸체(10)의 받침판(15) 사이 공간인 삽입홈(14)으로 삽입한 후에 힌지(19)로 체결하며 4개가 설치되는 것이 기본이다.The
상기 지지봉(30)은 관 형태로 내부에 중공(35)을 가지면서 상측 외면에 나사산(36)이 형성되어 있으며, 내부 하측으로 상단에 걸림턱(31)이 형성되고 하단 중앙에 나사홈(32)을 가지며 외주 면으로 걸림편(33a)이 형성된 핑거 스톱퍼(33)를 체결한다.The
그리고 상기 핑거 스톱퍼(33)의 걸림턱(31)의 동일한 위치로 지지봉(30)의 외면에 장공 형태의 절개홈(34)을 형성한다.An
상기 지지봉(30)은 몸체(10)의 중앙에 형성된 지지봉 삽입구멍(11)으로 삽입 설치하게 되고 하단의 걸림편(33a)이 삽입구멍(11)의 하단에 걸려 고정된다.The
상기 확장이송구(40)는 상측과 하측에 서로 대응되도록 형성되고 중앙에 삽입공이 형성된 상,하측 받침대(41)(42)를 형성한다. 그리고 상,하측 받침 대(41)(42) 사이로 압축스프링(43)을 체결한다.The
상기 하측 받침대(42)의 하측 면에는 힌지공(45)을 갖는 연결턱(46)을 하향 돌출되게 형성한다.A connecting
그리고 연결턱(46)의 힌지공(45)으로 레버(50)의 상단에 형성된 삽입공(51)을 일치시킨 후에 힌지를 결합하여 연결하고, 레버(50)의 하단에 형성된 삽입공(53)은 확장핑거(20)의 체결공(22)과 일치시킨 후 힌지로 결합한다.The
이때, 레버(50)의 하측 전방에 형성된 걸림 돌기(52)는 지지봉(30)의 절개홈(34)으로 삽입되고 그 선단이 핑거 스톱퍼(33)의 걸림턱(31) 하측 면에 맞닿아 있는 상태로 고정된다.At this time, the
그런 다음 상측 받침대(41)의 상면으로는 고정너트(44)를 체결하여 고정한다. 이와 같이 확장이송구(40)는 지지봉(30)의 상측 면에 고정 설치된다.Then, a
상기 타격바(60)는 상단에 외면에 나사산을 갖는 체결 돌기(61)를 형성하고 하단에는 원형의 타격판(62)을 형성한다. 그리고 타격판(62)의 저면에는 다수 개의 타격 돌기(62a)를 형성하여 사용하게 된다.The
상기 체결 돌기(61)는 핑거 스톱퍼(33)의 나사홈(32)으로 나사 결합하여 고정한다.The
그리고 상기 타격바(60)의 하측으로 내부에 다수 개의 관통공이 형성되고 상단과 하단에 날카로운 돌기(72)가 다수 개가 형성된 천공 여유장 확보형 간격제(70)를 설치하여 사용하게 된다.A plurality of through holes are formed in the lower side of the
상기와 같은 본 발명은 첨부된 도면 도 7에서 보는 바와 같이 먼저, 천공(1) 된 구멍 내부로 천공 여유장 확보용 간격제(70)을 삽입한 후에 종래의 고착제(80)를 삽입하고, 그 다음에 확장형 앵커(100)를 삽입한다.As shown in FIG. 7, the
상기 천공 여유장 확보형 간격제(70)는 천공(1) 내부로 삽입시 발생할 수 있는 부력 등에 대응함은 물론 타격판(62)의 타격 돌기(62a)와 천공 여유장 확보형 간격제(70)의 상단에 형성된 날카로운 돌기(72)가 고착제(80)와 부딪치면서 빠르게 터지도록 하는 역할을 한다.The puncturing allowance securing
상기 확장형 앵커(100)는 앵커의 무게와 천공의 각도에 따라 미끄러지듯이 삽입되면서 타격판(62)의 타격 돌기(62a)가 천공 여유장 확보형 간격제(70)의 날카로운 돌기(72)와 맞닿게 되면서 충돌하게 된다.The expanding
이때, 첨부된 도면 도 5에서 보는 바와 같이 지지봉(30)의 내부에 설치된 핑거 스톱퍼(33)가 지지봉(30)의 내부 공간을 따라 상측으로 이동함과 동시에 레버(50)의 걸림 돌기(52)를 타격하면서 상승하게 된다.5, the
그리고 상기 걸림 돌기(52)의 힌지(52a)가 하측 받침대(42)의 연결턱(46)에 설치된 힌지(46a)와 확장핑거(20)의 힌지(19)를 서로 수직선을 그렸을 때, 그 수직선을 상을 벗어나는 순간 압축스프링(43)의 압축이 풀리면서 레버(50)가 하측으로 내려오게 되고 동시에 첨부된 도면 도 6 및 도 8에서 보는 바와 같이 확장핑거(20)가 90도 각도로 벌어지면서 천공(1) 내면 지반에 견고하게 박히게 된다. When the
이와 아울러, 고착제(80)가 터지면서 물을 흡수하여 단시간 내에 강도를 발현하여 굳어지게 된다. In addition, when the
도 1은 본 발명의 구성을 나타낸 사시도1 is a perspective view showing a configuration of the present invention;
도 2는 본 발명의 구성을 나타낸 측단면도Fig. 2 is a side sectional view showing the constitution of the present invention
도 3은 본 발명의 구성을 나타낸 정면도3 is a front view showing a configuration of the present invention
도 4는 본 발명의 몸체의 구성을 나타낸 평면도4 is a plan view showing a configuration of a body of the present invention
도 5~6은 본 발명의 작동 상태를 나타낸 측면도5 to 6 are side views showing the operating state of the present invention
도 7~8은 본 발명의 사용 상태를 나타낸 참고도7 to 8 are views showing a use state of the present invention
♣도면의 주요 부분에 대한 부호의 설명♣DESCRIPTION OF REFERENCE NUMERALS
100: 본체 10: 몸체100: Body 10: Body
11: 삽입구멍 12: 체결구멍11: insertion hole 12: fastening hole
13: 힌지구멍 14: 삽입홈13: hinge hole 14: insertion groove
15: 받침판 20: 확장핑거15: base plate 20: extended finger
21,72: 돌기 22: 체결공21, 72: projections 22: fastening holes
23,45: 힌지공 30: 지지봉23,45: Hinge ball 30:
31: 걸림턱 32: 나사홈31: locking jaw 32: screw groove
33: 핑거 스톱퍼 34: 절개홈33: finger stopper 34: incision groove
40: 확장이송구 41: 상측 받침대40: Expansion inhaler 41: Upper pedestal
42: 하측 받침대 43: 압축스프링42: lower pedestal 43: compression spring
44: 고정너트 46: 연결턱44: fixing nut 46: connecting jaw
50: 레버 51,53: 삽입공50:
52: 걸림 돌기 60: 타격바 52: latching protrusion 60: batting bar
61: 체결 돌기 62: 타격판61: fastening protrusion 62: striking plate
70: 천공 여유장 확보용 간격제 70: Spacer for securing piercing clearance
Claims (3)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020080081439A KR100954613B1 (en) | 2008-08-20 | 2008-08-20 | Extension type ground anchor |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020080081439A KR100954613B1 (en) | 2008-08-20 | 2008-08-20 | Extension type ground anchor |
Publications (2)
Publication Number | Publication Date |
---|---|
KR20100022765A KR20100022765A (en) | 2010-03-03 |
KR100954613B1 true KR100954613B1 (en) | 2010-04-28 |
Family
ID=42175197
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1020080081439A KR100954613B1 (en) | 2008-08-20 | 2008-08-20 | Extension type ground anchor |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR100954613B1 (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101181543B1 (en) * | 2011-12-21 | 2012-09-10 | 황규철 | Micropile comprising function of compression and inflation for ends |
CN109898866A (en) * | 2019-03-20 | 2019-06-18 | 中亿丰建设集团股份有限公司 | A kind of section construction has bonded post tensioning to draw prestressed girder both ends tension structure |
Families Citing this family (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101250883B1 (en) * | 2012-07-10 | 2013-04-05 | 정택동 | The end head of anchor construction method in soft ground of gavingused the foundation fixing anchor |
CN106436705B (en) * | 2016-09-27 | 2018-09-14 | 河北建科唐秦建筑科技有限公司 | A kind of recoverable side slope anchor pole stops sizing device |
CN106480883B (en) * | 2016-12-09 | 2018-10-09 | 重庆工商职业学院 | Earth anchor |
CN106522221B (en) * | 2016-12-09 | 2018-12-11 | 重庆工商职业学院 | Construction ground anchorage |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3935912A (en) * | 1973-04-13 | 1976-02-03 | Mituo Shibata | Anchoring device and method for settling the device in the ground |
JPS62107108A (en) | 1985-11-01 | 1987-05-18 | Mitsuo Shibata | Earth anchor |
KR100598024B1 (en) | 2005-07-08 | 2006-07-07 | 주식회사 홍익기술단 | Anchor |
KR100855381B1 (en) | 2008-04-04 | 2008-09-04 | 주식회사 한국종합기술 | Extension type ground anchor structure |
-
2008
- 2008-08-20 KR KR1020080081439A patent/KR100954613B1/en active IP Right Grant
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3935912A (en) * | 1973-04-13 | 1976-02-03 | Mituo Shibata | Anchoring device and method for settling the device in the ground |
JPS62107108A (en) | 1985-11-01 | 1987-05-18 | Mitsuo Shibata | Earth anchor |
KR100598024B1 (en) | 2005-07-08 | 2006-07-07 | 주식회사 홍익기술단 | Anchor |
KR100855381B1 (en) | 2008-04-04 | 2008-09-04 | 주식회사 한국종합기술 | Extension type ground anchor structure |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101181543B1 (en) * | 2011-12-21 | 2012-09-10 | 황규철 | Micropile comprising function of compression and inflation for ends |
CN109898866A (en) * | 2019-03-20 | 2019-06-18 | 中亿丰建设集团股份有限公司 | A kind of section construction has bonded post tensioning to draw prestressed girder both ends tension structure |
CN109898866B (en) * | 2019-03-20 | 2020-11-06 | 中亿丰建设集团股份有限公司 | Two-end tensioning structure with bonded post-tensioning prestressed beam for sectional construction |
Also Published As
Publication number | Publication date |
---|---|
KR20100022765A (en) | 2010-03-03 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR100954613B1 (en) | Extension type ground anchor | |
KR100780088B1 (en) | Internal fixer for anchor having releasable tensioning steel wire | |
KR101360731B1 (en) | Construction method for soft removable ground anchor using Extension wing attached inner lower body | |
KR200414856Y1 (en) | Ground anchor structure that steel wire union and taking to pieces are possible | |
JP5140747B2 (en) | Expanded bearing type anchor structure | |
MXPA02008979A (en) | Threaded anchor for poured concrete metal deck floors and wood frame floors. | |
KR100855381B1 (en) | Extension type ground anchor structure | |
KR101040038B1 (en) | A rock bed extension type anchor | |
KR100963682B1 (en) | Anchor assembly, method for reinforcing slope using anchor assembly | |
KR20150078738A (en) | Rotation pressure type expansion anchor | |
KR101253496B1 (en) | Expansion anchor body structure and execution a method | |
KR101410397B1 (en) | Multi extending permanent anchor structure with hitting wedge | |
KR101178043B1 (en) | Construction method using cable bolt and cable bolt | |
KR101633289B1 (en) | Head anchor device of micro pile and reinforced method of foundation concrete using the same | |
KR200430934Y1 (en) | Ground anchor that steel wire union and taking to pieces are possible | |
KR101335957B1 (en) | Non-boring blow type anchor and soil nailing method using the same | |
KR101087891B1 (en) | High Strength Light Soil Nail Having Multi Folder Wedges Fixed Borehole Which Expanded Packer | |
KR101241351B1 (en) | The nail with high anchorage and the nailing construction method thereof | |
WO2001044584A1 (en) | Interlock anchor rod for concrete and a bit of drill for enlarging the earthen hole | |
KR101808172B1 (en) | Anchor Structure with Dual Spreading Structure, and Construction Method of the Anchor Structure | |
KR100997671B1 (en) | Packer type extension anchor | |
KR101358994B1 (en) | Construction method of multi extending permanent anchor | |
KR20090080917A (en) | Nail device for obtaining pre-tention | |
KR200403638Y1 (en) | Ground anchor of removal wire | |
KR101474530B1 (en) | Extension pressure type anchor |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A201 | Request for examination | ||
N231 | Notification of change of applicant | ||
N231 | Notification of change of applicant | ||
A302 | Request for accelerated examination | ||
E902 | Notification of reason for refusal | ||
E701 | Decision to grant or registration of patent right | ||
GRNT | Written decision to grant | ||
FPAY | Annual fee payment |
Payment date: 20130422 Year of fee payment: 4 |
|
FPAY | Annual fee payment |
Payment date: 20140421 Year of fee payment: 5 |
|
FPAY | Annual fee payment |
Payment date: 20150422 Year of fee payment: 6 |
|
FPAY | Annual fee payment |
Payment date: 20160422 Year of fee payment: 7 |
|
FPAY | Annual fee payment |
Payment date: 20170417 Year of fee payment: 8 |
|
FPAY | Annual fee payment |
Payment date: 20180423 Year of fee payment: 9 |
|
FPAY | Annual fee payment |
Payment date: 20190422 Year of fee payment: 10 |