KR100926947B1 - Water pipeline repairing method of not-digging type - Google Patents

Water pipeline repairing method of not-digging type Download PDF

Info

Publication number
KR100926947B1
KR100926947B1 KR1020090033415A KR20090033415A KR100926947B1 KR 100926947 B1 KR100926947 B1 KR 100926947B1 KR 1020090033415 A KR1020090033415 A KR 1020090033415A KR 20090033415 A KR20090033415 A KR 20090033415A KR 100926947 B1 KR100926947 B1 KR 100926947B1
Authority
KR
South Korea
Prior art keywords
pipe
water pipe
water
working
tube
Prior art date
Application number
KR1020090033415A
Other languages
Korean (ko)
Inventor
김성열
Original Assignee
유한회사 태양건설
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 유한회사 태양건설 filed Critical 유한회사 태양건설
Priority to KR1020090033415A priority Critical patent/KR100926947B1/en
Application granted granted Critical
Publication of KR100926947B1 publication Critical patent/KR100926947B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03BINSTALLATIONS OR METHODS FOR OBTAINING, COLLECTING, OR DISTRIBUTING WATER
    • E03B7/00Water main or service pipe systems
    • E03B7/006Arrangements or methods for cleaning or refurbishing water conduits
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29CSHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
    • B29C63/00Lining or sheathing, i.e. applying preformed layers or sheathings of plastics; Apparatus therefor
    • B29C63/26Lining or sheathing of internal surfaces
    • B29C63/34Lining or sheathing of internal surfaces using tubular layers or sheathings
    • B29C63/36Lining or sheathing of internal surfaces using tubular layers or sheathings being turned inside out

Landscapes

  • Engineering & Computer Science (AREA)
  • Health & Medical Sciences (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Hydrology & Water Resources (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • Manufacturing & Machinery (AREA)
  • Sewage (AREA)

Abstract

PURPOSE: A water pipe renovation inverting method of a pipe partial cutting type and a pipe cleaning method are provided to prevent the water leakage in spite of the ground settlement or the high-level vibration by welding a cut portion of a working pipe. CONSTITUTION: A water pipe renovation inverting method of a pipe partial cutting type is composed of the steps of constructing a cut portion(10) by cutting a part of a water supply pipe(1), and welding a cylindrical hollow work pipe to the cut portion to be inclined upward within 20-80° range about the water supply pipe. The working pipe has a lower rim(21) and an upper opening(22). The shape of the lower rim is corresponded to the rim of the cut portion. The reinforcing tube is advanced to the lower direction and the water supply pipe is repaired by processing the front end of the reinforcing tube after a reinforcing tube is advanced to the inside by the inversion construction method through the opening of the inclined working pipe.

Description

상수도관 일부절개 방식의 상수도관 갱생공사 반전공법 및 세관공법 { Water Pipeline Repairing Method of Not-Digging Type } Water Pipeline Repairing Method of Not-Digging Type

본 발명은 보호튜브를 반전삽입 시켜 상수도관로의 내벽을 보수 보강하는 상수도관 갱생공사 반전공법에 관한 것으로, 상수도관을 전부 절단하지 않고 일부만 절개한 후 경사진 작업관을 설치하여 반전 공법으로 시공함으로써 시공이 간편하고 시공비가 절감되며 보호튜브의 반전삽입 작업이 용이한 상수도관 일부절개 방식의 상수도관 갱생공사 반전공법에 관한 것이다.The present invention relates to a water pipe rehabilitation reversal method for repairing and reinforcing the inner wall of the water supply pipe by reversing the protection tube, by installing a sloped working pipe after the incision without installing all the water pipes, The present invention relates to a water pipe rehabilitation reversal method of a water pipe partial cut-off method that is easy to install, saves construction cost, and easily inserts a protective tube.

대한민국 특허 제10-0615070호(상하수도 관로의 비굴착 관로보수 공법 및 장치, 이하 '종래기술 1'이라 함)는, "공지된 반전장치의 배출구에 연결튜브를 결합시키는 과정, 상기 연결튜브의 선단에 L자형의 연결홀더를 결합시키는 과정, 상기 반전장치에 와이어가 연결된 채로 드럼에 감겨진 보강튜브가 연결튜브와 연결홀더를 관통한 후 연결홀더의 선단에 뒤집어 고정되는 과정, 상기 보강튜브로 반전장치에서 공기압 또는 수압을 가하여 상하수관로의 내부로 반전되며 끼워지게 하는 과정, 상기 상하수관로의 선단에 일정거리를 이격시켜 차단관을 설치하는 과정, 상하수관로와 차단관 사이로 노출된 보강튜브에 배출밸브를 설치하는 과정, 반전장치에 서 보강튜브로 열풍을 송풍시켜 보강튜브를 경화시키는 과정, 상하수관로의 길이에 맞추어 보강튜브를 절단하는 과정을 수행하여 된 것을 특징으로 하는 상하수 관로의 비굴착 관로보수 공법."를 게시한다.Republic of Korea Patent No. 10-0615070 (non-excavation pipeline repair method and apparatus of water supply and sewage pipes, hereinafter referred to as 'prior art 1'), "the process of coupling the connection tube to the outlet of the known inverting device, the end of the connection tube Coupling the L-shaped connection holder to the reinforcement tube, the reinforcing tube wound on the drum while the wire is connected to the reversing device, passing through the connection tube and the connection holder, and then being fixed to the front end of the connection holder. The air pressure or water pressure in the device is reversed into the interior of the water supply and sewage pipe, the process of being fitted, the process of installing a blocking pipe spaced a certain distance at the tip of the water supply and drain pipe, discharge valve on the reinforcement tube exposed between the water and sewer pipe and the blocking pipe The process of installing the process, blowing hot air from the reversing device to the reinforcement tube to cure the reinforcement tube, Non-excavation pipeline repair method for water and sewage pipes, characterized in that the cutting process. "

대한민국 특허 제 10-0764878호(비굴착 전체보수 갱생생관의 단부처리 방법 및 단부처리용슬리브, 이하 '종래기술 2'라 함)는, "갱생관(10)의 일부를 절단하여 제거하는 과정과, 갱생관(10)의 절단된 부위를 이용하여 결합장치(30)를 갱생관(10)의 외측에 양쪽으로 각각 끼우는 과정과, 갱생관(10)의 절단된 부위에 맞추어 갱생관(10)과 연결되게 연결관(20)을 끼우는 과정과, 상기 결합장치(30)를 갱생관(10)과 연결관(20)의 외부에 씌워 연결관(20)을 갱생관(10)에 고정시키는 과정을 수행함에 있어서, Republic of Korea Patent No. 10-0764878 (end treatment method and end treatment sleeve of the non-excavated total repair rehabilitation pipe, hereinafter referred to as "prior art 2"), "the process of cutting a part of the rehabilitation pipe 10 by removing And, the process of fitting the coupling device 30 to the outside of the rehabilitation pipe 10 by using the cut portion of the rehabilitation pipe 10, respectively, and the rehabilitation pipe (10) in accordance with the cut portion of the rehabilitation pipe (10) The process of fitting the connecting pipe 20 to be connected to) and the coupling device 30 to cover the outer pipe 10 and the outside of the connection pipe 20 to fix the connection pipe 20 to the rehabilitation pipe (10) In carrying out the process,

상기 갱생관(10)의 절단부위에서 갱생관(10) 쪽으로 슬리브(50)의 걸림부(52)가 갱생관(10)의 단부에 닿게 슬리브(50)를 끼우는 과정을 수행하고, 상기 갱생관(10)의 수지층(12) 내측으로 슬리브(50)의 끼움부(51)가 끼워지게 하되 끼움부(51)의 외측에 패킹(53)을 끼워 수지층(12)에 밀착시키는 과정을 수행한 후 연결관(20)을 끼워 결합장치(30)로 연결하는 과정을 수행하는 것을 특징으로 하는 비굴착 전체보수 갱생관의 단부처리 방법."을 게시한다.The process of fitting the sleeve 50 to the end of the rehabilitation tube 10 is the engaging portion 52 of the sleeve 50 toward the regeneration tube 10 at the cut portion of the rehabilitation tube 10, the rehabilitation tube ( The fitting portion 51 of the sleeve 50 is inserted into the resin layer 12 of the 10, but the packing 53 is fitted to the outer side of the fitting portion 51 to perform a process of close contact with the resin layer 12 After the connecting pipe 20 is inserted into the coupling device 30, the process of the end treatment method of the non-excavated total repair rehabilitation pipe, characterized in that performing a process. "

도 1은 종래기술의 반전공법에 의해 상수도관로를 보수하는 시공상태도(종래기술 1의 도면 6)이고, 도 2는 종래기술의 반전공법에 의해 상수도관로를 보수하는 시공상태도(종래기술 1의 도면 6)이다.1 is a construction state diagram for repairing the water supply conduits by the conventional inverted method (Fig. 6 of the prior art 1), Figure 2 is a construction state diagram for repairing the water conduit by the conventional inversion method (prior art 1 6).

도 1에 도시된 바와 같이, 종래기술에 따른 특허 제10-0615070호(종래기술 1)는 비굴착식 관로보수 공법은 소정간격(예를들어, 100 ~ 200M)으로 터파기를 한 다음 상수도관을 일정길이 만큼 절단 후 적출하고, 절단된 부분으로 반전공법에 의해 보호튜브를 시공, 마감한다. 도 2에 도시된 바와 같이, 종래기술에 따른 제 10-0764878호(종래기술 2)는 종래기술 1 등에 의해 보호튜브 시공이 완료된 상수도관의 절단 부분을 연결관으로 연결한 후 슬리브를 게재시킨 상태에서 연결관의 양측에 위치한 두개의 결합장치로 결합시킨다.As shown in FIG. 1, Patent No. 10-0615070 according to the prior art (Prior Art 1) is a non-excavation pipe repair method is a trench at a predetermined interval (for example, 100 ~ 200M) and then the water pipe After cutting for a certain length, take out and cut the protective tube by reversing method. As shown in Fig. 2, No. 10-0764878 according to the prior art (Prior Art 2) is a state in which a sleeve is placed after connecting a cut portion of the water pipe, in which the construction of the protection tube is completed by the prior art 1, to the connection pipe. At the two couplings located on both sides of the connector.

종래기술의 경우, 시공시 상수도관을 완전히 절단 후 적출하여야 하고, 절개된 상수도관 부위를 별도의 연결관을 도입하여 별도의 결합장치로 연결하여야 하기 때문에 시공작업이 복잡하고 자재가 많이 소요되는 문제점이 있었다.In the case of the prior art, the construction of the water supply pipe must be completely cut and removed, and the construction of the water supply pipe is complicated and requires a lot of materials because the separate water supply pipe must be connected by a separate coupling device. There was this.

또한, 지반 침하나 진동 등으로 인하여 결합장치의 결합이 느슨해지면 상수도관과 연결관의 틈으로 누수가 발생할 우려가 높은 문제점이 있었다. 또한, 상수도관은 보호튜브가 코팅되나 연결관 부위에 보호튜브가 존재하지 않아 상수도관 단부에 형성된 보호튜브의 마감부가 물의 흐름에 의한 저항에 의해 벗겨져서 보호튜브가 이탈되는 문제점이 있었다.In addition, when the coupling of the coupling device is loose due to ground subsidence or vibration, there is a high risk of water leakage into the gap between the water supply pipe and the connection pipe. In addition, the water pipe has a problem that the protective tube is coated, but the protective tube is not present in the connection pipe portion, so that the finish of the protective tube formed at the end of the water pipe is peeled off by the resistance of the water flow, thereby leaving the protective tube.

본 발명은 상수도관을 전부 절단하지 않고 일부만 절개한 후 경사진 작업관을 설치하여 반전 공법으로 시공함으로써, 종래기술의 의한 시공시 상수도관을 완전히 절단하고 그 절단된 상수도관 부위를 연결관과 결합장치로 결합시켜야 되기 때문에 시공 단계가 복잡하고 시공비가 많이 소요되는 문제점을 해결한 상수도관 일부절개 방식의 상수도관 갱생공사 반전공법을 제공하기 위한 것이다.The present invention is installed by the inverted method by installing the inclined working pipe after cutting only a part of the water pipe without cutting all, the water pipe during the construction according to the prior art completely cut the combined water pipe portion combined with the connection pipe It is to provide a water pipe rehabilitation reversal method of the water pipe partial cut-off method that solves the problem of complicated construction steps and high construction cost because it must be combined with the device.

또한, 작업관을 절개부에 용접 결합시킴으로써 지반 침하나 고레벨의 진동 등에도 불구하고 누수의 우려가 없는 비절단형 반전 보수공법을 제공하기 위한 것이다. 또한, 작업관을 통한 마감처리 작업으로 보호튜브가 단절되지 않고 상수도관 내에서 연속적으로 설치되게 하는 보호튜브 겹침시공이 가능하여 종래의 보호튜브의 마감부가 물의 흐름에 의한 저항에 의해 벗겨져서 보호튜브가 이탈되는 문제점을 해결한 상수도관 일부절개 방식의 상수도관 갱생공사 반전공법을 제공하기 위함이다.In addition, by welding the working pipe to the incision to provide a non-cutting reversal repair method without fear of leakage despite ground subsidence, high-level vibration and the like. In addition, it is possible to overlap the protective tube that allows the protective tube to be continuously installed in the water supply pipe without the disconnection of the protective tube by the finishing work through the working tube, so that the finish of the conventional protective tube is peeled off by the resistance of the water flow. This is to provide a water pipe rehabilitation reversal method of the water pipe partial cutting method that solves the problem of deviation.

이러한 본 발명의 목적을 달성하기 위한 본 발명에 따른 상수도관 일부절개 방식의 상수도관 갱생공사 반전공법은, 상수도관(1)의 일부가 노출되게 지면을 일정간격으로 터파기하는 단계(S1)를 포함하는 상수도관로의 보수공법에 있어서, 상수도관(1)을 절단시키지 않고 그 일부를 절개하여 절개부(10)를 시공하는 단 계(S10)와;In order to achieve the object of the present invention, the water pipe regeneration construction method of the water pipe partial cutting method according to the present invention, the step (S1) to break the ground at a predetermined interval to expose a portion of the water pipe (1) In the repairing method of the water conduit comprising a step (S10) for constructing the incision 10 by cutting a portion thereof without cutting the water conduit (1);

상기 절개부(10)의 테두리(11)에 상응하는 형상의 하부테두리(21)를 갖으며 상부에 개구부(22)가 형성된 중공 통체형의 작업관(20)을 상기 절개부(10)에 용접결합시키되, 상수도관(1) 대비 20~80° 범위 안에서 상류방향(도 1 참조)으로 경사지도록 상기 절개부(10)에 작업관(20)을 설치하는 단계(S20)와;The hollow tubular work tube 20 having a lower edge 21 having a shape corresponding to the edge 11 of the cutout 10 and having an opening 22 formed thereon is welded to the cutout 10. Combined, but the step of installing a working pipe 20 in the incision 10 to be inclined in an upstream direction (see Fig. 1) within the range 20 ~ 80 ° compared to the water pipe (1) (S20);

기울어진 작업관(20)의 개구부(22)를 통해 상수도관(1) 내부로 보강튜브(5)를 반전공법을 이용하여 진입시킨 후 하류방향으로 전진시켜 보강튜브(5)를 시공하고 그 선단을 처리하여 상수도관(1)을 보수하는 단계(S30);를 포함하여 구성된다.The reinforcing tube 5 is introduced into the water supply pipe 1 through the opening 22 of the inclined working tube 20 by using an inversion method, and then advanced in the downstream direction to construct the reinforcing tube 5 and the tip thereof. It is configured to include; processing (S30) to repair the water pipe (1).

본 발명에 따르는 경우 종래 기술의 문제점이 해결되며, 상수도관을 전부 절단하지 않고 일부만 절개한 후 경사진 작업관을 설치하여 반전 공법으로 시공함으로써, 시공이 간편하고 시공비가 절감되는 상수도관 일부절개 방식의 상수도관 갱생공사 반전공법이 제공된다.According to the present invention solves the problems of the prior art, by installing a sloped working pipe after cutting only a part of the water pipe without cutting all the construction by inverted method, the construction of the water pipe is part of a simple construction and the construction cost is reduced A water pipe rehabilitation reversal method is provided.

또한, 작업관을 절개부에 용접 결합시킴으로써 지반 침하나 고레벨의 진동 등에도 불구하고 누수의 우려가 없는 상수도관 일부절개 방식의 상수도관 갱생공사 반전공법이 제공된다. In addition, by welding the work pipe to the incision to provide a water pipe rehabilitation reversal method of the water pipe partial cut-off method without fear of leakage despite ground subsidence, high-level vibration and the like.

또한, 작업관을 통한 마감처리 작업으로 보호튜브가 단절되지 않고 상수도관 내에서 연속적으로 설치되게 하는 보호튜브 겹침시공이 가능하여 종래의 보호튜브 의 단부가 상수도관으로부터 이탈되는 문제점을 해결한 상수도관로 비절단형 반전 보수공법이 제공된다.In addition, the water pipe can solve the problem that the end of the conventional protection tube is separated from the water supply pipe by the overlapping construction of the protection tube that allows the protective tube is continuously installed in the water supply pipe without being disconnected by the finishing work through the working pipe. Non-cut reversal repairs are provided.

또한, 본 발명은 상수도관 대비 수직이 아닌 기울어진 상태의 작업관으로 보호튜브를 진입시킨다. 따라서, 진입하는 보호튜브와 상수도관이 이루는 보호튜브의 진입각도(A)를 줄여주기 때문에 보호튜브의 반전삽입시 상수도관 만나는 지점에서 생기는 보호튜브의 주름을 줄일 수 있어 보호튜브 반전삽입이 용이하게 되는 상수도관 일부절개 방식의 상수도관 갱생공사 반전공법이 제공된다.In addition, the present invention enters the protective tube into the working tube in the inclined state not perpendicular to the water supply pipe. Therefore, since the entrance angle (A) of the protective tube formed by the entering protective tube and the water supply pipe is reduced, the wrinkle of the protective tube generated at the point where the water conduit meets during the reverse insertion of the protective tube can be reduced, so that the protective tube can be easily reversed. The water pipe rehabilitation reversal method is provided.

또한, 본 발명의 공법에 시공된 작업관 또는 세관용 작업간은 세관청소장치의 출입구 기능을 동시에 수행할 수 있는 장점이 있다.In addition, the work pipe or customs work installed in the construction method of the present invention has the advantage that can simultaneously perform the doorway function of the customs cleaning device.

이하 본 발명에 의한 상수도관 일부절개 방식의 상수도관 갱생공사 반전공법을 첨부도면에 도시한 실시예에 따라 상세히 설명한다. It will be described in detail below according to the embodiment shown in the accompanying drawings the water pipe regeneration construction method of the water pipe partial cut-off method according to the present invention.

도 3은 본 발명의 일실시예에 따른 상수도관 일부절개 방식의 상수도관 갱생공사 반전공법의 시공 상태 정면구성도, 도 4은 본 발명의 일실시예에 따른 상수도관 일부절개 방식의 상수도관 갱생공사 반전공법의 시공 상태도, 도 5는 본 발명의 일실시예에 따른 상수도관 일부절개 방식의 상수도관 갱생공사 반전공법의 시공 후 상태도, 도 6은 본 발명의 제2 실시예에 따른 상수도관 일부절개 방식의 상수도관 갱생공사 반전공법의 시공상태도이고, 도 8은 본 발명의 일실시예에 따른 상수도관 일부절개 방식의 상수도관 갱생공사 반전공법의 흐름도이다.Figure 3 is a front configuration diagram of the construction state of the water pipe partial renovation method of inverted water pipe according to an embodiment of the present invention, Figure 4 is a water pipe regeneration of the water pipe partial cut method according to an embodiment of the present invention Construction state diagram of the construction reversal method, Figure 5 is a state diagram after construction of the water pipe rehabilitation reversal method of the water pipe partial cut-off method according to an embodiment of the present invention, Figure 6 is a water supply according to a second embodiment of the present invention 8 is a state diagram of the construction of the water pipe regeneration work reversal method of the partial pipe cutting method, Figure 8 is a flow chart of the water pipe rehabilitation work method of the water pipe partial cutting method according to an embodiment of the present invention.

본 발명에 있어서, 상수도관 갱생공사 반전공법이란 용어는 비굴착식 관로보수공법으로 변경될 수 있다.In the present invention, the term water pipe rehabilitation reversal method may be changed to a non-excavated pipeline repair method.

도 3 내지 도 8에 도시된 바와 같이, 본 발명의 일실시예에 따른 상수도관 일부절개 방식의 상수도관 갱생공사 반전공법은 상수도관(1)의 일부가 노출되게 지면을 일정간격으로 터파기하는 단계(S1)를 포함하는 상수도관로의 보수공법에 관한 것이다. 그 중에 특히 보호튜브를 반전 공법에 의해 상수도관로 내부로 삽입시켜 상수도관을 보수보강하는 공법에 관한 것이다. 공지의 반전공법에 대한 상세한 설명은 본 명세서에서 생략하며 반전공법의 불명함에 의해 본원발명이 불명확해질 수 없음은 당연하다. 보호튜브를 반전공법에 의해 시공하는 구성은 공개특허 제2002-0084669, 특허 제10-0615070호 등에 상세하게 기재되어 있다.As shown in Figure 3 to 8, the water pipe rehabilitation reversal method of the water pipe partial cut-off method according to an embodiment of the present invention is to break the ground at a predetermined interval so that a portion of the water pipe (1) is exposed It relates to a repair method of a water pipe including the step (S1). In particular, the protection tube is inserted into the water supply pipe by the inversion method to a method of repairing and strengthening the water supply pipe. Detailed description of the known inversion method is omitted in the present specification and it is natural that the present invention cannot be made clear by the unknown of the inversion method. The construction for constructing the protective tube by the inversion method is described in detail in Patent Publication No. 2002-0084669, Patent No. 10-0615070, and the like.

본 발명의 보호튜브는 당업계의 관용어로 사용되는 속경화성 튜브 및 다운튜브를 포함하는 개념으로 가열에 의해 연화 또는 일부 용융되어 상수도관 내벽에 가압에 의해 접착될 수 있고 내악에 의해 경화되는 공지의 프라스틱성 수지 등을 포함하는 개념이다.The protective tube of the present invention is a concept including a fast-curing tube and a down tube, which are used in the art, and can be softened or partially melted by heating, adhered to the inner wall of a water supply pipe by pressure, and hardened by inner ear. It is a concept containing a plastic resin.

본 발명의 일실시예에 따른 상수도관 일부절개 방식의 상수도관 갱생공사 반전공법은 절개부(10)를 시공하는 단계(S10)와 작업관(20)을 설치하는 단계(S20)와 수도관(1)을 보수하는 단계(S30)를 포함하여 구성된다.Water pipe rehabilitation reversal method of the water pipe partial cutting method according to an embodiment of the present invention is the step (S10) and the installation of the work pipe 20 (S20) and the water pipe (1) for the construction of the incision 10 It is configured to include a step (S30) to repair.

절개부(10)를 시공하는 단계(S10)에서, 상수도관(1)을 절단시키지 않고 그 일부를 절개한다. 이 부분이 종래 기술과 결정적으로 다른 부분이다. 도 3 내지 도 8에 도시된 바와 같이, 본 발명은 상수도관(1)을 완전히 절단하지 않고 일부만을 절개한다. In the step (S10) of constructing the cutout 10, a portion of the water pipe 1 is cut without cutting. This part is crucially different from the prior art. As shown in Figs. 3 to 8, the present invention cuts only a part of the water pipe 1 without completely cutting it.

바람직하게 절개부(10)를 시공하는 단계(S10)에 있어서, 도 1 내지 도 7에 도시된 바와 같이, 절개부(10)는 상수도관 중심선(C1) 상부에 위치한 관의 상부중 일부를 절개하여 형성되는 것이 바람직하다.Preferably in the step (S10) of constructing the incision 10, as shown in Figures 1 to 7, the incision 10 cuts a portion of the upper portion of the tube located above the water pipe centerline (C1) It is preferable to form.

작업관(20)을 설치하는 단계(S20)에서, 절개부(10)의 테두리(11)에 상응하는 형상의 하부테두리(21)를 갖으며 상부에 개구부(22)가 형성된 중공 통체형의 작업관(20)을 절개부(10)에 용접결합시킨다. 작업관(20)은 상수도관(1) 대비 20~80° 범위 안에서 상류방향(도 1 참조)으로 경사지도록 절개부(10)에 용접결합된다.In the step (S20) of installing the working pipe 20, the hollow tubular work having a lower border 21 of a shape corresponding to the edge 11 of the incision 10 and the opening 22 formed in the upper portion The pipe 20 is welded to the incision 10. The working pipe 20 is welded to the cutout 10 so as to be inclined in an upstream direction (see FIG. 1) within a range of 20 ° to 80 ° relative to the water pipe 1.

작업관(20)이 상수도관(1) 대비 기울어진 각도가 20° 미만인 경우 작업관(20)과 상수도관(1)이 평행에 가까워져 작업자나 보호튜브 마무리용 기계장치가 관 내부로 진입하는 겻이 불편해지는 문제점이 있으며 작업관(20)이 상수도관(1) 대비 기울어진 각도가 80°를 초과하는 경우, 도 5에 도시된 바와 같은 작업상황에서 보호튜브가 90도 가까이 굽혀져야 하기 때문에 주름이 발생하게 되는 문제점이 있다. 또한, 작업관(20)이 상수도관(1) 대비 기울어진 각도가 80°를 초과하는 경우 자동 관로세관장치가 가이드레일을 타고 하강 또는 상승이 불가능 세관 작업시 출입구 기능을 할 수 없게 되는 문제점이 있다.When the work pipe 20 is inclined with respect to the water pipe 1 less than 20 °, the work pipe 20 and the water pipe 1 become parallel to each other so that a worker or a protective tube finishing machine enters the inside of the pipe. There is a problem in this inconvenience and when the work tube 20 is inclined relative to the water supply pipe 1 exceeds 80 °, wrinkles because the protective tube should be bent close to 90 degrees in the working situation as shown in FIG. There is a problem that occurs. In addition, when the angle of inclination of the working pipe 20 with respect to the water supply pipe 1 exceeds 80 °, there is a problem in that the automatic pipeline customs device is unable to descend or rise on the guide rail and thus cannot function as an entrance and exit function during customs work. have.

다음으로, 상수도관(1)을 보수하는 단계(S30)는, 기울어진 작업관(20)의 개구부(22)를 통해 상수도관(1) 내부로 보강튜브(5)를 반전공법을 이용하여 진입시킨 후 하류방향으로 전진시켜 보강튜브(5)를 시공하고 그 선단을 처리하는 단게가 진행된다. 보강튜브(5)의 선단처리는 일측과 양측에서 모두 하게 된다. 일측 선단 처리는 후술한다. 타측 선단처리는 인접하는 작업관(20b)에 못미치게 절개한 후 마감한다. Next, the step (S30) for repairing the water supply pipe 1 enters the reinforcing tube 5 into the water supply pipe 1 through the opening 22 of the inclined working pipe 20 by using an inversion method. After advancing in the downstream direction to construct the reinforcing tube (5) and the step of processing the tip proceeds. The front end treatment of the reinforcing tube 5 is performed on one side and both sides. One side tip processing is mentioned later. The other end treatment is closed after cutting to less than the adjacent working pipe (20b).

본 발명의 일실시예에 따른 상수도관 일부절개 방식의 상수도관 갱생공사 반전공법은, 제2 작업관(20b)을 시공하는 단계(S120)와, 보강튜브(5)의 타단과 겹침부(D)를 형성하도록 마감처리하는 단계(S130)와, 개구부(22)를 덮개판으로 밀폐하는 단계(S140)를 더 포함하여 구성될 수 있다.Water pipe rehabilitation reversal method of the water pipe partial cutting method according to an embodiment of the present invention, the step of constructing the second working pipe (20b) (S120), the other end and the overlapping portion (D) of the reinforcing tube (5) It may be configured to further include a step (S130) for finishing to form a) and sealing the opening 22 with a cover plate (S140).

단계(S120)에서, 상수도관(1)의 상류측에 위치한 타측 상수도관(1b)의 절개부(10b)에 제2 작업관(20b)을 용접결합시키되, 제2 작업관(20b)이 타측 상수도관(1b) 대비 20~80° 범위 안에서 상류방향(도 3 참조)으로 경사지도록 시공한다.In step S120, the second work pipe 20b is welded to the cutout 10b of the other water pipe 1b located upstream of the water pipe 1, and the second work pipe 20b is welded to the other side. Construct so as to incline in an upstream direction (see FIG. 3) within a range of 20 ° to 80 ° relative to the water pipe 1b.

단계(S130)에서, 보강튜브(5)를 반전공법을 이용하여 제2 작업관(20b)을 통해 타측 상수도관(1b) 배부로 진입시킨 후 하류방향으로 전진시켜 보강튜브(5)를 시공하되, 타측 상수도관(1b)을 관통하여 작업관(20)을 지난 보강튜브(5)의 일단은 상기 상수도관(1)에 시공된 보강튜브(5)의 타단과 겹침부(D)를 형성하도록 마감처리된다. 단계(S140)에서, 일정영역의 관로보수가 완성되면 작업관(20)의 상단의 개구부(22)를 덮개판으로 밀폐한다. (부연하면 도 5에 도시된 바와 같이, 겹침부(D)는 당연히 시간적으로 뒤 단계에서 설치된 보강튜브(5)의 일단이 시간적으로 전단계에서 설치된 보강튜브(5)의 타단을 덮어서 겹쳐지는 형상이다.)In step (S130), the reinforcing tube (5) to enter the other water supply pipe (1b) distribution through the second working pipe (20b) using an inverted method and then advance in the downstream direction to construct the reinforcing tube (5) One end of the reinforcement tube 5 passing through the working water pipe 20 through the other water supply pipe 1b forms the other end and the overlapping portion D of the reinforcement tube 5 constructed in the water supply pipe 1. Finished. In step S140, when the pipeline maintenance of the predetermined area is completed, the opening 22 of the upper end of the working pipe 20 is sealed with a cover plate. (In other words, as shown in Fig. 5, the overlapping portion (D) is naturally shaped so that one end of the reinforcing tube (5) installed in a later step in time overlaps the other end of the reinforcing tube (5) installed in a previous step in time. .)

도 6은 본 발명의 제2 실시예에 따른 상수도관 일부절개 방식의 상수도관 갱생공사 반전공법의 시공상태도이다. 도 6에 도시된 바와 같이, 절개부의 테두리(11)는, 상수도관(1)을 정면에서 바라볼 때(도 6기준) 직선 형상인 짧고 중심선 대비 경사각도(각도B)가 50 ~ 80 ° 범위인 급경사선(11a)과, 중심선 대비 경사각도(각도C)가 10 ~ 40° 범위인 완만한 경사선(11b)이 서로 연결되는 있는 형상으로 절개되는 되는 것이 작업상 용이할 수 있다.6 is a state diagram of the construction of the water pipe rehabilitation reversal method of the water pipe partial cut-off method according to a second embodiment of the present invention. As shown in FIG. 6, the edge 11 of the incision has a short, inclined angle with respect to the centerline (angle B) when viewed from the front of the water pipe 1 (see FIG. 6) in a range of 50 to 80 °. It may be easy for the emergency inclination line 11a and the inclination angle (angle C) with respect to the center line to be cut in a shape in which the gentle inclination line 11b having a range of 10 to 40 ° is connected to each other.

각도B가 50 ~ 80 ° 범위를 그리고 각도C)가 10 ~ 40° 범위를 벗어나는 경우 작업관(20)을 상수도관(1) 대비 20~80° 범위 안에 시공하는 것이 어려워진다. 도시된 바와 같이, 작업관(20)의 단부에는 결합홀이 형성된 플랜지면(23)이 형성되고 덮개판은 플랜지면(23) 고정결합되는 것이 작업성 및 밀폐성 측면에서 유리하다.If the angle B is in the range of 50 to 80 ° and the angle C is out of the range of 10 to 40 °, it is difficult to construct the work pipe 20 within the range of 20 to 80 ° compared to the water pipe 1. As shown, it is advantageous in terms of workability and sealing property that the flange surface 23 having a coupling hole is formed at the end of the working pipe 20 and the cover plate is fixedly coupled to the flange surface 23.

본 발명에 따른 상수도관 일부절개 방식의 상수도관 갱생공사 반전공법을 이용하여 상수도관에 작동관을 형성하는 경우, 이렇게 형성된 작동관과 달느 방향으로 기울어진 세관용 작업관(220)을 이용하여 본 발명에 따른 세관공법을 수행할 수 있게 된다. In the case of forming the working pipe in the water pipe using the water pipe partial reinforcement work reversal method of the water pipe according to the present invention, the working pipe 220 inclined in a different direction from the working pipe thus formed is viewed using Customs construction according to the invention can be carried out.

도 7은 본 발명의 제3 실시예에 따른 상수도관 일부절개 방식의 상수도관 갱생공사 반전공법 및 세관공법 시공상태도, 도 9는 본 발명의 일실시예에 따른 세관공법 흐름도이다.FIG. 7 is a view illustrating a construction state of the water pipe regeneration construction and the customs construction method of the water pipe partial cutting method according to the third embodiment of the present invention. FIG. 9 is a flow chart illustrating the customs construction method according to an embodiment of the present invention.

도 7 또는 도 9에 도시된 바와 같이, 본 발명의 일실시예에 따른 상수도관 일부절개 방식의 상수도관 갱생공사 반전공법 및 세관공법은, 세관용 절개부(210)를 시공하는 단계(S210)와 세관용 작업관(220)을 설치하는 단계(S220)와 세관용 작업관(220)에 가이드레일을 설치하는 단계(S230)와 수도관을 세관하는 단계(S240)를 더 포함하여 구성될 수 있다.As shown in Figure 7 or 9, the water pipe rehabilitation reversal method and the customs method of the water pipe partial cut-off method according to an embodiment of the present invention, the step of constructing a custom cut section 210 (S210) And it may be configured to further include the step of installing the customs working pipe 220 (S220) and the step of installing the guide rail in the customs working pipe 220 (S230) and customs to the water pipe (S240). .

세관용 절개부(210)를 시공하는 단계(S210)에서, 상수도관(1)을 절단시키지 않고 그 일부를 절개한다. 세관용 작업관(220)을 설치하는 단계(S220)에서, 세관용 절개부(210)의 테두리(211)에 상응하는 형상의 하부테두리(221)를 갖으며 상부에 개구부(222)가 형성된 중공 통체형의 세관용 작업관(220)을 상기 세관용 절개 부(210)에 용접결합시킨다. 이때, 세관용 작업관(220)이 상수도관(1) 대비 20~80° 범위 안에서 하류방향(도 7 참조)으로 경사지도록, 즉, 상기 작업관(20)과 반대방향으로 경사지게 설치하는 것이 작업관(20) 설치방법과 다르다.In the step S210 of constructing the customs incision 210, a part of the water pipe 1 is not cut off. In the step of installing the customs working pipe 220 (S220), the hollow having a lower border 221 of the shape corresponding to the edge 211 of the incision 210 for customs and the opening 222 is formed in the upper A tubular tubular tubular tube 220 is welded to the tubular cutout 210. At this time, the work pipe for customs 220 is inclined in the downstream direction (see Fig. 7) within the range of 20 ~ 80 ° compared to the water pipe (1), that is to install inclined in the opposite direction to the work pipe 20 It is different from the pipe 20 installation method.

세관용 작업관(220)의 각도가 20~80° 범위를 벗어나는 경우, 관로세척장치의 진입이 어려워지거나 가이드레일의 길이가 과도하게 길어지거나 반대로 가이드레일의 경사가 너무 커서 관로세척장치의 추락 위험이 있다.If the angle of the customs working pipe 220 is out of the range of 20 to 80 °, the entry of the pipe washing device becomes difficult, the length of the guide rail is excessively long, or the inclination of the guide rail is too large. There is this.

단계(S230)에서, 작업관(20) 및 상기 세관용 작업관(220)에 가이드레일을 설치한다. 단계(S240)에서 작업관(20)에 관로세척장치를 진입시켜 관을 세척하게 한 후 세관용 작업관(220)으로 관로세척장치를 탈출시켜서 상수도관을 세관한다.In step S230, the guide rail is installed in the working pipe 20 and the customs working pipe 220. In step (S240) to enter the pipeline washing device to the working pipe 20 to clean the pipe and then to the customs working pipe 220 to escape the pipeline washing device to customs water pipe.

관로세척장치를 이용한 세관 기술은 공지기술로서 이에 대한 상세한 설명은 생략하며, 본원의 출원시에 공지된 관로 세척공법 및 세관장치에 관한 구성은 본원의 명세서에 기재된 것으로 본다. 본 발명의 관로세척장치는 스펀지 형태의 포리픽일 수 있으며 포리픽은 관에 삽입된 후 후면로부터 공급되는 물의 수압에 의해 진행되며 관의 내벽을 세관하는 공지의 물체이다.Customs technology using a pipe washing device is a well-known technology, and a detailed description thereof will be omitted, and a configuration related to a pipe cleaning method and a customs device known at the time of filing the present application is considered to be described in the specification of the present application. The pipeline washing apparatus of the present invention may be a sponge-type polyimide, which is a well-known object that is inserted into the tube and proceeds by hydraulic pressure of water supplied from the rear side, and customs the inner wall of the tube.

작업관 또는 세관용 작업관의 상단면이 작업관 또는 세관용 작업관의 중심선과 이루는 각도는 도 7에 도시된 바와 같이 90도가 바람직하지만 본 발명의 범위가 여기에 한정되는 것은 아니다.The angle at which the top surface of the working tube or the customs working tube forms the centerline of the working tube or the customs working tube is preferably 90 degrees as shown in FIG. 7, but the scope of the present invention is not limited thereto.

본 발명은 상기에서 언급한 바람직한 실시예와 관련하여 설명됐지만, 본 발명의 범위가 이러한 실시예에 한정되는 것은 아니며, 본 발명의 범위는 이하의 특허청구범위에 의하여 정하여지는 것으로 본 발명과 균등 범위에 속하는 다양한 수정 및 변형을 포함할 것이다.Although the present invention has been described in connection with the above-mentioned preferred embodiments, the scope of the present invention is not limited to these embodiments, and the scope of the present invention is defined by the following claims, and equivalent scope of the present invention. It will include various modifications and variations belonging to.

아래의 특허청구범위에 기재된 도면부호는 단순히 발명의 이해를 보조하기 위한 것으로 권리범위의 해석에 영향을 미치지 아니함을 밝히며 기재된 도면부호에 의해 권리범위가 좁게 해석되어서는 안될 것이다.The reference numerals set forth in the claims below are merely to aid the understanding of the present invention, not to affect the interpretation of the scope of the claims, and the scope of the claims should not be construed narrowly.

도 1은 종래기술의 반전공법에 의해 상수도관로를 보수하는 시공상태도(종래기술 1의 도면 6).1 is a construction state diagram for repairing a water supply conduit by the inversion method of the prior art (Fig. 6 of the prior art 1).

도 2는 종래기술의 반전공법에 의해 상수도관로를 보수하는 시공상태도((종래기술 1의 도면 6)).Figure 2 is a construction state diagram for repairing the water supply pipe by the inversion method of the prior art (Fig. 6 of the prior art 1).

도 3은 본 발명의 일실시예에 따른 상수도관 일부절개 방식의 상수도관 갱생공사 반전공법의 시공 상태 정면구성도.Figure 3 is a front configuration diagram of the construction state of the water pipe rehabilitation reversal method of the water pipe partial cut-off method according to an embodiment of the present invention.

도 4은 본 발명의 일실시예에 따른 상수도관 일부절개 방식의 상수도관 갱생공사 반전공법의 시공 상태도.Figure 4 is a state diagram of the construction of the water pipe rehabilitation reversal method of the partial water pipe cutting method according to an embodiment of the present invention.

도 5는 본 발명의 일실시예에 따른 상수도관 일부절개 방식의 상수도관 갱생공사 반전공법의 시공 후 상태도.Figure 5 is a state diagram after the construction of the water pipe rehabilitation reversal method of the water pipe partial cutting method according to an embodiment of the present invention.

도 6은 본 발명의 제2 실시예에 따른 상수도관 일부절개 방식의 상수도관 갱생공사 반전공법의 시공상태도.6 is a state diagram of the construction of the water pipe regeneration work reversal method of the partial water pipe cutting method according to the second embodiment of the present invention.

도 7은 본 발명의 제3 실시예에 따른 상수도관 일부절개 방식의 상수도관 갱생공사 반전공법 및 세관공법 시공상태도.7 is a state of construction of the water pipe regeneration work reversal method and the customs method of the water pipe partial cut-off method according to the third embodiment of the present invention.

도 8은 본 발명의 일실시예에 따른 상수도관 일부절개 방식의 상수도관 갱생공사 반전공법의 흐름도.8 is a flow chart of a water pipe regeneration construction reversal method of the partial water pipe cutting method according to an embodiment of the present invention.

도 9는 본 발명의 일실시예에 따른 세관공법 흐름도.9 is a flow chart customs method according to an embodiment of the present invention.

<도면의 주요부분에 대한 부호의 설명><Description of the symbols for the main parts of the drawings>

1, 1b : 상수도관 5 : 보강튜브1, 1b: water supply pipe 5: reinforcement tube

10, 10b : 절개부 11 : 테두리10, 10b: incision 11: the border

1a : 절개부 테두리 급경사선1a: incision edge steep slope

11b : 절개부 테두리 완만한 경사선11b: sloping edge gentle incline

20, 20b : 작업관 21 : 하부테두리20, 20b: workman 21: lower border

22 : 개구부 23 : 플랜지면22: opening 23: flange face

D : 겹침부 C1 : 상수도관 중심선D: Overlap C1: Center of water pipe

각도 A : 상수도관 대비 작업관이 이루는 각도Angle A: The angle made by the working pipe compared to the water pipe

각도 B : 절개부 테두리 급경사선의 중심선 대비 경사각도Angle B: Angle of inclination of centerline of incision sharp steep line

각도 C : 절개부 테두리 완만한 경사선의 중심선 대비 경사각도Angle C: angle of inclination of centerline of inclined edge

Claims (7)

삭제delete 상수도관(1)의 일부가 노출되게 지면을 일정간격으로 터파기하는 단계(S1)를 포함하는 상수도관로의 보수공법에 있어서,In the repair method of the water supply pipe, including the step (S1) of breaking the ground at a predetermined interval so that a portion of the water supply pipe (1), 상수도관(1)을 절단시키지 않고 그 일부를 절개하여 절개부(10)를 시공하는 단계(S10)와;Constructing the cutout 10 by cutting a portion thereof without cutting the water pipe 1 (S10); 상기 절개부(10)의 테두리(11)에 상응하는 형상의 하부테두리(21)를 갖으며 상부에 개구부(22)가 형성된 중공 통체형의 작업관(20)을 상기 절개부(10)에 용접결합시키되, 상수도관(1) 대비 20~80° 범위 안에서 상류방향(도 1 참조)으로 경사지도록 상기 절개부(10)에 작업관(20)을 설치하는 단계(S20)와;The hollow tubular work tube 20 having a lower edge 21 having a shape corresponding to the edge 11 of the cutout 10 and having an opening 22 formed thereon is welded to the cutout 10. Combined, but the step of installing a working pipe 20 in the incision 10 to be inclined in an upstream direction (see Fig. 1) within the range 20 ~ 80 ° compared to the water pipe (1) (S20); 기울어진 작업관(20)의 개구부(22)를 통해 상수도관(1) 내부로 보강튜브(5)를 반전공법을 이용하여 진입시킨 후 하류방향으로 전진시켜 보강튜브(5)를 시공하고 그 선단을 처리하여 상수도관(1)을 보수하는 단계(S30)와;The reinforcing tube 5 is introduced into the water supply pipe 1 through the opening 22 of the inclined working tube 20 by using an inversion method, and then advanced in the downstream direction to construct the reinforcing tube 5 and the tip thereof. Repairing and repairing the water pipe (1) (S30); 상기 상수도관(1)의 상류측에 위치한 타측 상수도관(1b)의 절개부(10b)에 제2 작업관(20b)을 용접결합시키되, 제2 작업관(20b)이 타측 상수도관(1b) 대비 20~80° 범위 안에서 상류방향(도 3 참조)으로 경사지도록 시공하는 단계(S120)와;The second work pipe 20b is welded to the cutout 10b of the other water pipe 1b located upstream of the water pipe 1, and the second work pipe 20b is connected to the other water pipe 1b. Constructing to incline in an upstream direction (see FIG. 3) within a range of 20 to 80 ° (S120); 보강튜브(5)를 반전공법을 이용하여 제2 작업관(20b)을 통해 타측 상수도관(1b) 배부로 진입시킨 후 하류방향으로 전진시켜 보강튜브(5)를 시공하되,After the reinforcing tube 5 enters the other water supply pipe 1b through the second working pipe 20b by using the inversion method, advances in the downstream direction to construct the reinforcing tube 5, 타측 상수도관(1b)을 관통하여 작업관(20)을 지난 보강튜브(5)의 일단이 상기 상수도관(1)에 시공된 보강튜브(5)의 타단과 겹침부(D)를 형성하도록 마감처리하는 단계(S130)와;One end of the reinforcing tube (5) passing through the other side water pipe (1b) passing the working pipe 20 is finished to form the other end and the overlap (D) of the other end of the reinforcing tube (5) constructed in the water supply pipe (1) Processing (S130); 일정영역의 관로보수가 완성되면 작업관(20)의 상단의 개구부(22)를 덮개판으로 밀폐하는 단계(S140);를 포함하여 구성되는 것을 특징으로 하는 상수도관 일부절개 방식의 상수도관 갱생공사 반전공법.When the maintenance of the pipeline in a certain area is completed, the step of sealing the opening 22 of the upper end of the working pipe (20) with a cover plate (S140); Inversion method. 제2항에 있어서,The method of claim 2, 상기 단계(S10)의 절개부(10)는 상수도관 중심선(C1) 상부에 위치한 관의 상부중 일부를 절개하여 형성되는 것을 특징으로 하는 상수도관 일부절개 방식의 상수도관 갱생공사 반전공법.The cutting portion 10 of the step (S10) is a water pipe reinforcement reinforcement method of the water pipe partial cut-off method, characterized in that formed by cutting a part of the upper portion of the pipe located on the water pipe center line (C1). 제3항에 있어서,The method of claim 3, 상기 절개부의 테두리(11)는, 상기 상수도관(1)을 정면에서 바라볼 때(도 6기준) 직선 형상인 짧고 중심선 대비 경사각도(각도B)가 50 ~ 80 ° 범위인 급경사선(11a)과, 중심선 대비 경사각도(각도B)가 10 ~ 40° 범위인 완만한 경사선(11b)이 서로 연결되는 있는 형상으로 절개되는 것을 특징으로 하는 상수도관 일부절개 방식의 상수도관 갱생공사 반전공법.The edge 11 of the cutout is a short inclined line 11a having a straight line shape and an inclination angle (angle B) in a range of 50 to 80 ° when viewed from the front of the water supply pipe 1 (see FIG. 6). And, inclined angle (angle B) with respect to the center line is inclined in the shape that the gentle inclined line (11b) in the range of 10 to 40 ° are connected to each other, the water pipe partial incision method of reinforcement construction of water pipes. 제4항에 있어서,The method of claim 4, wherein 상기 작업관(20)의 단부에는 결합홀이 형성된 플랜지면(23)이 형성되고 상기 덮개판은 상기 플랜지면(23) 고정결합되는 것을 특징으로 하는 상수도관 일부절개 방식의 상수도관 갱생공사 반전공법.A flange surface 23 having a coupling hole is formed at an end of the working pipe 20, and the cover plate is fixedly coupled to the flange surface 23. . 상수도관(1)의 일부가 노출되게 지면을 일정간격으로 터파기하는 단계(S1)를 포함하는 상수도관로의 보수공법에 있어서,In the repair method of the water supply pipe, including the step (S1) of breaking the ground at a predetermined interval so that a portion of the water supply pipe (1), 상수도관(1)을 절단시키지 않고 그 일부를 절개하여 절개부(10)를 시공하는 단계(S10)와;Constructing the cutout 10 by cutting a portion thereof without cutting the water pipe 1 (S10); 상기 절개부(10)의 테두리(11)에 상응하는 형상의 하부테두리(21)를 갖으며 상부에 개구부(22)가 형성된 중공 통체형의 작업관(20)을 상기 절개부(10)에 용접결합시키되, 상수도관(1) 대비 20~80° 범위 안에서 상류방향(도 1 참조)으로 경사지도록 상기 절개부(10)에 작업관(20)을 설치하는 단계(S20)와;The hollow tubular work tube 20 having a lower edge 21 having a shape corresponding to the edge 11 of the cutout 10 and having an opening 22 formed thereon is welded to the cutout 10. Combined, but the step of installing a working pipe 20 in the incision 10 to be inclined in an upstream direction (see Fig. 1) within the range 20 ~ 80 ° compared to the water pipe (1) (S20); 기울어진 작업관(20)의 개구부(22)를 통해 상수도관(1) 내부로 보강튜브(5)를 반전공법을 이용하여 진입시킨 후 하류방향으로 전진시켜 보강튜브(5)를 시공하고 그 선단을 처리하여 상수도관(1)을 보수하는 단계(S30)와;The reinforcing tube 5 is introduced into the water supply pipe 1 through the opening 22 of the inclined working tube 20 by using an inversion method, and then advanced in the downstream direction to construct the reinforcing tube 5 and the tip thereof. Repairing and repairing the water pipe (1) (S30); 상기 상수도관(1)의 상류측에 위치한 타측 상수도관(1b)의 절개부(10b)에 제2 작업관(20b)을 용접결합시키되, 제2 작업관(20b)이 타측 상수도관(1b) 대비 20~80° 범위 안에서 상류방향(도 3 참조)으로 경사지도록 시공하는 단계(S120)와;The second work pipe 20b is welded to the cutout 10b of the other water pipe 1b located upstream of the water pipe 1, and the second work pipe 20b is connected to the other water pipe 1b. Constructing to incline in an upstream direction (see FIG. 3) within a range of 20 to 80 ° (S120); 보강튜브(5)를 반전공법을 이용하여 제2 작업관(20b)을 통해 타측 상수도관(1b) 배부로 진입시킨 후 하류방향으로 전진시켜 보강튜브(5)를 시공하되,After the reinforcing tube 5 enters the other water supply pipe 1b through the second working pipe 20b by using the inversion method, advances in the downstream direction to construct the reinforcing tube 5, 타측 상수도관(1b)을 관통하여 작업관(20)을 지난 보강튜브(5)의 일단이 상기 상수도관(1)에 시공된 보강튜브(5)의 타단과 겹침부(D)를 형성하도록 마감처리하는 단계(S130)와;One end of the reinforcing tube (5) passing through the other side water pipe (1b) passing the working pipe 20 is finished to form the other end and the overlap (D) of the other end of the reinforcing tube (5) constructed in the water supply pipe (1) Processing (S130); 일정영역의 관로보수가 완성되면 작업관(20)의 상단의 개구부(22)를 덮개판으로 밀폐하는 단계(S140)와;Sealing the opening 22 of the upper end of the working pipe 20 with the cover plate when the maintenance of the predetermined area is completed (S140); 상수도관(1)을 절단시키지 않고 그 일부를 절개하여 세관용 절개부(210)를 시공하는 단계(S210)와;Constructing a customs cut section 210 by cutting a portion thereof without cutting the water pipe 1 (S210); 상기 세관용 절개부(210)의 테두리(211)에 상응하는 형상의 하부테두리(221)를 갖으며 상부에 개구부(222)가 형성된 중공 통체형의 세관용 작업관(220)을 상기 세관용 절개부(210)에 용접결합시키되, The hollow tubular tubular customs work tube 220 having a lower border 221 having a shape corresponding to the edge 211 of the tubular incision 210 and having an opening 222 formed thereon, for the tubular incision. Welded to the portion 210, 상수도관(1) 대비 20~80° 범위 안에서 하류방향(도 7 참조)으로 경사지도록, 즉, 상기 작업관(20)과 반대방향으로 경사지게 세관용 작업관(220)을 설치하는 단계(S220);를 포함하여 구성되는 것을 특징으로 하는 상수도관 일부절개 방식의 상수도관 갱생공사 반전공법 및 세관공법.Installing the customs work pipe 220 so as to be inclined in a downstream direction (see FIG. 7) within a range of 20 ° to 80 ° compared to the water pipe 1, that is, to be inclined in a direction opposite to the work pipe 20 (S220). Water pipe rehabilitation reversal method and customs method of water pipe partial cut-off method comprising a. 제6항에 있어서,The method of claim 6, 상기 작업관(20) 및 상기 세관용 작업관(220)에 가이드레일을 설치하는 단계(S230)와;Installing a guide rail in the working pipe (20) and the customs working pipe (220) (S230); 작업관(20)에 관로세척장치를 진입시켜 관을 세척하게 한 후 상기 세관용 작업관(220)으로 관로세척장치를 탈출시켜서 상수도관을 세관하는 단계(S240);를 더 포함하여 구성되는 것을 특징으로 하는 상수도관 일부절개 방식의 상수도관 갱생공사 반전공법 및 세관공법.After entering the pipeline washing device into the working pipe (20) to clean the pipes and the customs working pipe (220) to escape the pipeline washing device to the customs to the water pipe (S240); Water pipe rehabilitation reversal method and customs method of water pipe partial cutting method.
KR1020090033415A 2009-04-17 2009-04-17 Water pipeline repairing method of not-digging type KR100926947B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020090033415A KR100926947B1 (en) 2009-04-17 2009-04-17 Water pipeline repairing method of not-digging type

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020090033415A KR100926947B1 (en) 2009-04-17 2009-04-17 Water pipeline repairing method of not-digging type

Publications (1)

Publication Number Publication Date
KR100926947B1 true KR100926947B1 (en) 2009-11-17

Family

ID=41605058

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020090033415A KR100926947B1 (en) 2009-04-17 2009-04-17 Water pipeline repairing method of not-digging type

Country Status (1)

Country Link
KR (1) KR100926947B1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101147135B1 (en) 2012-03-02 2012-05-25 (주)크린텍 Mending method for non-digging sewerage uses frange

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH1163366A (en) 1997-08-11 1999-03-05 Tokyo Gas Co Ltd Underground buried pipeline lining method
JP2001269998A (en) * 2000-03-28 2001-10-02 Iseki Poly-Tech Inc Lining method for existing sewer and lateral
KR100761368B1 (en) * 2007-05-11 2007-09-27 수자원기술 주식회사 Device for pressurized pipeline

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH1163366A (en) 1997-08-11 1999-03-05 Tokyo Gas Co Ltd Underground buried pipeline lining method
JP2001269998A (en) * 2000-03-28 2001-10-02 Iseki Poly-Tech Inc Lining method for existing sewer and lateral
KR100761368B1 (en) * 2007-05-11 2007-09-27 수자원기술 주식회사 Device for pressurized pipeline

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101147135B1 (en) 2012-03-02 2012-05-25 (주)크린텍 Mending method for non-digging sewerage uses frange

Similar Documents

Publication Publication Date Title
KR100758724B1 (en) Method of repairing manhole and material for repairing manhole
KR101632286B1 (en) Non-digging Sewerage Mending Apparatus and its manufacturing method
GB2084686A (en) Lining pipework
US8985157B2 (en) Method for pulling in restoration pipe and restored pipeline
KR200414994Y1 (en) Packer for repair of water pipe
KR101928263B1 (en) Non-Excavation Pipe Repair Device and Method using Straight Pipe
KR100926947B1 (en) Water pipeline repairing method of not-digging type
KR101495705B1 (en) Fluid distribution device for reparing conduit in non-excavation manner
KR100730516B1 (en) Non-excavating lining method and non-excavating liner applied to the same
KR101524598B1 (en) Manifold device for reparing conduit in non-excavation manner
KR100909569B1 (en) Mortar repair method of pipe non-excavation part
KR101272128B1 (en) Method of repairing manhole
JP2000303800A (en) Cleaning device and cleaning method for water introducing gutter in underground structure
KR100995348B1 (en) Manhole fixture
JP6382053B2 (en) Intake system
KR200211157Y1 (en) Underground Pipe Repair Device
US8585323B2 (en) Method for repairing a damaged sewage pipeline without digging a trench
KR20120085398A (en) Repairing Method Of Wrinkle Pipe Using Paker and Thereof Paker
JP3691882B2 (en) Branch pipe repair and repair sleeve
KR100943937B1 (en) The waterworks tube leads and the impurities removalsystem
KR100320780B1 (en) Process for rehabilitating sewerage pipe by molding
KR101638062B1 (en) Non-digging Sewerage Mending Apparatus and its manufacturing method
KR101759264B1 (en) Cutoff device for intercepting sewer and construction method thereof
KR102082491B1 (en) Maintenance and reinforcement system and method for decrepit water pipes through the formation of multiple maintenance and reinforcement layers
EP2322836A1 (en) Method to carry out a branching point of a pipe line under repair

Legal Events

Date Code Title Description
A201 Request for examination
A302 Request for accelerated examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20121024

Year of fee payment: 4

FPAY Annual fee payment

Payment date: 20131107

Year of fee payment: 5

FPAY Annual fee payment

Payment date: 20141105

Year of fee payment: 6

FPAY Annual fee payment

Payment date: 20151202

Year of fee payment: 7

FPAY Annual fee payment

Payment date: 20161109

Year of fee payment: 8

FPAY Annual fee payment

Payment date: 20171101

Year of fee payment: 9

FPAY Annual fee payment

Payment date: 20181211

Year of fee payment: 10

FPAY Annual fee payment

Payment date: 20191111

Year of fee payment: 11