KR100907297B1 - The manufacturing process civil official system which leads the individual past record data civil official of the automobile aluminum wheel - Google Patents

The manufacturing process civil official system which leads the individual past record data civil official of the automobile aluminum wheel Download PDF

Info

Publication number
KR100907297B1
KR100907297B1 KR1020080032321A KR20080032321A KR100907297B1 KR 100907297 B1 KR100907297 B1 KR 100907297B1 KR 1020080032321 A KR1020080032321 A KR 1020080032321A KR 20080032321 A KR20080032321 A KR 20080032321A KR 100907297 B1 KR100907297 B1 KR 100907297B1
Authority
KR
South Korea
Prior art keywords
management
production
wheel
aluminum
information
Prior art date
Application number
KR1020080032321A
Other languages
Korean (ko)
Other versions
KR20080088537A (en
Inventor
이현수
Original Assignee
주식회사 엘제이텍
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 주식회사 엘제이텍 filed Critical 주식회사 엘제이텍
Priority to KR1020080032321A priority Critical patent/KR100907297B1/en
Publication of KR20080088537A publication Critical patent/KR20080088537A/en
Application granted granted Critical
Publication of KR100907297B1 publication Critical patent/KR100907297B1/en

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/30Computing systems specially adapted for manufacturing

Landscapes

  • Engineering & Computer Science (AREA)
  • Business, Economics & Management (AREA)
  • Physics & Mathematics (AREA)
  • Strategic Management (AREA)
  • Theoretical Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Economics (AREA)
  • Human Resources & Organizations (AREA)
  • General Health & Medical Sciences (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Marketing (AREA)
  • Tourism & Hospitality (AREA)
  • General Factory Administration (AREA)
  • General Business, Economics & Management (AREA)
  • Health & Medical Sciences (AREA)
  • Educational Administration (AREA)
  • Development Economics (AREA)
  • Primary Health Care (AREA)
  • Manufacturing & Machinery (AREA)
  • Game Theory and Decision Science (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Electromagnetism (AREA)
  • Toxicology (AREA)
  • Artificial Intelligence (AREA)
  • Computer Vision & Pattern Recognition (AREA)

Abstract

본 발명은 알루미늄 휠의 주조 공정, 휠의 탕구에 대한 프레스 공정, 휠 주조물에 대한 비파괴 검사공정, 열처리공정, 쇼트 블래스트(SHOT BLAST) 공정, 가공, 리크 테스트(LEAK TEST), 표면처리, 분체도장, 유체도장, 전면가공, 클리어(CLEAR) 도장, 밸런스(BLANCE) 검사, 최종검사, 포장 및 출하의 공정이 순차적으로 이루어지는 자동차 알루미늄 휠의 생산 공정에 관한 것으로 특히, 상기 알루미늄 휠의 주조 공정을 통해 원자재인 알루미늄 강괴를 용해 후 주조하여 자동차 알루미늄 휠의 기본 골격이 형성되는 과정에서 원자재인 알루미늄 강괴에 대한 기준정보와 주조된 시점의 알루미늄 휠 가공정보를 취득하는 제 1과정과; 상기 제1 과정에서 취득되어진 정보를 상기 알루미늄 휠의 주조 공정을 통해 형성된 기본 골격을 갖는 자동차 알루미늄 휠의 특정 위치에 2차원바코드로 마킹을 하는 제 2과정과; 상기 제 2과정에서 마킹되어진 2차원바코드를 기준으로 작업사항을 확인하도록 하며, 그에 따라 휠의 탕구에 대한 프레스 공정, 휠 주조물에 대한 비파괴 검사공정, 열처리공정, 쇼트 블래스트(SHOT BLAST) 공정, 가공, 리크 테스트(LEAK TEST), 표면처리, 분체도장, 유체도장, 전면가공, 클리어(CLEAR) 도장, 밸런스(BLANCE) 검사, 최종검사, 포장 및 출하의 공정중 해당 작업이 필요한 각 생산 공정 별 가공작업을 수행하도록 하는 제 3과정과; 상기 제 3과정을 수행함과 동시에 상기 제 3과정을 수행하는 과정 중에 발생되는 가공 사양정보의 작업내역과 상기 제 2과정을 통해 마킹되어진 2차원 바코드를 읽어 해당 정보들을 함께 임시 저장하며 확인하는 제 4과정; 및 상기 제 4과정을 통해 임시 저장되어진 정보들을 2차원 바코드상에 존재하는 휠 시리얼넘버(S/N;Serial Number)와 가공설비 정보 및 공정내용을 매칭(MATCHING)시켜서 데이터베이스를 구축하는 제 5과정을 포함하는 것을 특징으로 하는 자동차 알루미늄 휠의 개별 이력 데이터 관리를 통한 생산 공정 관리 방법 및 그에 따른 시스템을 제공하여 알루미늄 휠의 개별이력 관리를 실시간으로 할 수 있도록 제품의 개별적인 생산정보 분석 자료를 제공하고 합리적인 공정관리 정보를 활용하여 지속적인 품질관리를 통한 제품의 질적 향상과 추후 제품 추적을 용이하게 하여 제조자 물품 책임 법(PL법)에 대응하게 된다.The present invention is the casting process of aluminum wheel, the press process for the hot water spout of the wheel, the non-destructive inspection process for the wheel casting, the heat treatment process, the shot blast process, the processing, the leak test (LEAK TEST), surface treatment, powder coating , Fluid coating, front surface processing, clear coating, balance inspection, final inspection, packaging and shipping processes are sequentially performed. In particular, through the casting process of the aluminum wheel A first process of acquiring and infor- mating aluminum ingot, which is a raw material, to obtain reference information about the aluminum ingot, which is a raw material, and aluminum wheel processing information at the time of casting in the process of forming a basic skeleton of an automobile aluminum wheel; A second step of marking the information acquired in the first step with a two-dimensional bar code at a specific position of the automobile aluminum wheel having a basic skeleton formed through the casting process of the aluminum wheel; The work items are checked on the basis of the two-dimensional bar code marked in the second process, and accordingly, the press process for the spout of the wheel, the non-destructive inspection process for the wheel casting, the heat treatment process, the shot blast process, and the machining are performed. Process for each production process that requires relevant work during the process of LEAK TEST, surface treatment, powder coating, fluid coating, front processing, clear coating, balance inspection, final inspection, packaging and shipping A third process of performing work; A fourth step of performing the third process and reading the work specification of the processing specification information generated during the process of performing the third process and reading the two-dimensional bar code marked through the second process to temporarily store and check the corresponding information together. process; And a fifth process of constructing a database by matching wheel serial number (S / N; serial number) existing on the two-dimensional bar code, processing equipment information, and process contents with the temporarily stored information through the fourth process. Providing the production process management method and system according to the individual historical data management of the automotive aluminum wheels, including the individual product information analysis data for the real-time management of the aluminum wheels to provide real-time management By using rational process control information, it is possible to respond to the Manufacturers' Product Liability Act (PL Act) by facilitating the quality improvement of the product through continuous quality control and tracking of the product later.

자동차, 알루미늄 휠, 이력, 바코드, 생산 공정, PL법 Automotive, aluminum wheel, history, barcode, production process, PL method

Description

자동차 알루미늄 휠의 개별 이력 데이터 관리를 통한 생산 공정 관리 방법 및 그에 따른 시스템{THE MANUFACTURING PROCESS CIVIL OFFICIAL SYSTEM WHICH LEADS THE INDIVIDUAL PAST RECORD DATA CIVIL OFFICIAL OF THE AUTOMOBILE ALUMINUM WHEEL}TECHNICAL MANUFACTURING PROCESS CIVIL OFFICIAL SYSTEM WHICH LEADS THE INDIVIDUAL PAST RECORD DATA CIVIL OFFICIAL OF THE AUTOMOBILE ALUMINUM WHEEL}

본 발명은 자동차 알루미늄 휠 생산 공정에 관련된 정보화 시스템에 관한 것으로 특히, 알루미늄 휠의 개별이력 관리를 실시간으로 할 수 있도록 제품의 개별적인 생산정보 분석 자료를 제공하고 합리적인 공정관리 정보를 활용하여 지속적인 품질관리를 통한 제품의 질적 향상과 추후 제품 추적을 용이하게 하여 제조자 물품 책임 법(PL법)에 대응하도록 하기 위한 자동차 알루미늄 휠의 개별 이력 데이터 관리를 통한 생산 공정 관리 시스템에 관한 것이다.The present invention relates to an informatization system related to an automobile aluminum wheel production process, and in particular, to provide individual production information analysis data of a product so that individual history management of aluminum wheels can be performed in real time, and continuous quality control by utilizing rational process management information. The present invention relates to a production process management system through individual historical data management of automotive aluminum wheels to facilitate product quality improvement and to facilitate product tracking later, in order to comply with the Manufacturers' Liability Act (PL Act).

일반적으로, 급변하는 환경의 변화, 세계경제의 국제화, 정보화의 물결에 의해 “하나의 시장”으로 통합되는 현상으로 인해 기업의 생존이 그 국정에 관계없이 소비자의 욕구를 충족시키는 능력에 따라 좌우되는 글로벌 시대가 도래 하였다. 이러한 상황 속에서 국민소득의 향상은 소비자의 제품안전, 건강 등에 대한 관심이 높아지게 하였고 또한 소비상품의 복잡화 다양화됨에 따라 제품의 사용과 소비과정에서 소비자 피해가 전반적으로 확산되는 실정이다.In general, the phenomenon of corporate survival depends on the ability to meet the needs of consumers regardless of the state of affairs due to the phenomenon of integration into “one market” by the rapidly changing environment, the globalization of the global economy, and the wave of information. The global age has arrived. Under these circumstances, the improvement of national income has raised the interests on consumer's product safety, health, etc., and as the complexity of consumer products is diversified, consumer damage spreads in the process of product use and consumption.

그러나 소비자가 제품의 결함으로 신체, 재산상의 피해를 입더라도 결함의 존재와, 결함과 피해간의 인과관계, 제조사의 고의나 과실 등을 전문가가 아닌 상태에서 입증하기가 어렵기 때문에 적절한 보상을 받기가 쉽지 않다.However, even if a consumer suffers physical or property damage due to a defect in the product, it is difficult to prove the existence of the defect, the causal relationship between the defect and damage, and the intention or negligence of the manufacturer in a non-professional state. Uneasy.

그러므로 제조자의 안전성문제를 강화한다는 입장에서 엄격책임원칙(무과실 책임)에 입각한 현대적인 책임법의 도입 필요성이 대두됨에 따라 제조자 물품 책임 법(PL법)이 도입되어 확산되고 있는 추세이다.Therefore, as the necessity of introducing a modern liability law based on strict liability principle (no fault liability) in the position of strengthening the safety problem of the manufacturer, the PL law of the manufacturer's goods has been introduced and spread.

“제조물 책임”이라 함은 제조물 즉, 자동차, 가전제품, 식품, 의약품 등의 공업적인 제조, 가공을 거친 제조물의 결함에 의해 소비자, 이용자 또는 제3자의 생명, 신체 또는 재산상에 발생한 손해에 대해서 제조자와 판매자 그리고 제조, 판매에 관여한 자가 민사상 손해배상 책임을 지게 되는 것을 말한다."Product Liability" means damages to the life, body or property of a consumer, user or third party due to a defect in a product, ie an industrially manufactured, processed product such as a car, household appliance, food, or pharmaceutical product. This means that the manufacturer, the seller, and anyone involved in the manufacture or sale is liable for civil damages.

따라서 많은 기업들이 자체 생산 품목에 대한 이력관리를 위한 정보화 시스템을 구축하고 있으나, 실제적으로 생산 공정의 특성상 제품 개개별로는 관리 시스템을 구축하기 어려움에 따라 생산 공정은 배제하고 정보화 시스템을 구축해 왔다.Therefore, many companies are building an informatization system for the history management of their own production items, but due to the nature of the production process, it is difficult to establish a management system for each product.

더욱이 자동차 알루미늄 휠의 경우는 생산 공정뿐만 아니라 제조 공정 또한 제품의 재질 및 생산 공정 특성상 개별관리가 어려운 부분인 것이 현실이었기에, 제조자 물품 책임 법(PL법)에 대한 대응이 어려웠다는 문제점이 있었다.Moreover, in the case of automobile aluminum wheels, it was a reality that individual management was difficult due to not only the production process but also the manufacturing process as well as the material and the characteristics of the production process. Therefore, there was a problem that it was difficult to cope with the PL law.

상술한 문제점을 해소하기 위한 본 발명의 목적은 자동차 알루미늄 휠 생산 공정에 관련된 정보화 시스템에 관한 것으로 특히, 알루미늄 휠의 개별이력 관리를 실시간으로 할 수 있도록 제품의 개별적인 생산정보 분석 자료를 제공하고 합리적인 공정관리 정보를 활용하여 지속적인 품질관리를 통한 제품의 질적 향상과 추후 제품 추적을 용이하게 하여 제조자 물품 책임 법(PL법)에 대응하도록 하기 위한 자동차 알루미늄 휠의 개별 이력 데이터 관리를 통한 생산 공정 관리 시스템을 제공하는 데 있다.An object of the present invention for solving the above problems relates to an informatization system related to an automobile aluminum wheel production process, in particular, to provide individual production information analysis data of the product so that individual history management of the aluminum wheel in real time and a reasonable process Production process management system through individual historical data management of automobile aluminum wheels to improve quality of product through continuous quality control and facilitate product tracking by using management information, and to comply with PL law. To provide.

상기와 같은 목적을 달성하기 위한 본 발명에 따른 자동차 알루미늄 휠의 개별 이력 데이터 관리를 통한 생산 공정 관리 방법의 특징은, 알루미늄 휠의 주조 공정, 휠의 탕구에 대한 프레스 공정, 휠 주조물에 대한 비파괴 검사공정, 열처리공정, 쇼트 블래스트(SHOT BLAST) 공정, 가공, 리크 테스트(LEAK TEST), 표면처리, 분체도장, 유체도장, 전면가공, 클리어(CLEAR) 도장, 밸런스(BLANCE) 검사, 최종검사, 포장 및 출하의 공정이 순차적으로 이루어지는 자동차 알루미늄 휠의 생산 공정에 있어서:
상기 알루미늄 휠의 주조 공정을 통해 원자재인 알루미늄 강괴를 용해 후 주조하여 자동차 알루미늄 휠의 기본 골격이 형성되는 과정에서 원자재인 알루미늄 강괴에 대한 기준정보와 주조된 시점의 알루미늄 휠 가공정보를 포인트 오브 프로덕션(Point Of Production) 관리 퍼스널 컴퓨터(POP 관리 PC)에 의해 취득하는 제 1과정과;
상기 제1 과정에서 취득되어진 정보를 상기 알루미늄 휠의 주조 공정을 통해 형성된 기본 골격을 갖는 자동차 알루미늄 휠의 특정 위치에 2차원바코드로 마킹기에 의해 마킹을 하는 제 2과정과;
상기 제 2과정에서 마킹되어진 2차원바코드를 기준으로 작업사항을 확인하도록 하며, 그에 따라 휠의 탕구에 대한 프레스 공정, 휠 주조물에 대한 비파괴 검사공정, 열처리공정, 쇼트 블래스트(SHOT BLAST) 공정, 가공, 리크 테스트(LEAK TEST), 표면처리, 분체도장, 유체도장, 전면가공, 클리어(CLEAR) 도장, 밸런스(BALANCE) 검사, 최종검사, 포장 및 출하의 공정중 해당 작업이 필요한 각 생산 공정 별 가공작업을 포인트 오브 프로덕션(Point Of Production) 관리 퍼스널 컴퓨터(POP 관리 PC)로부터 제공받아 해당장비에서 수행하도록 하는 제 3과정과;
상기 제 3과정을 수행함과 동시에 상기 제 3과정을 수행하는 과정 중에 발생되는 가공 사양정보의 작업내역과 상기 제 2과정을 통해 마킹되어진 2차원 바코드를 2차원 스캐너에서 읽어 해당 정보들을 함께 상기 포인트 오브 프로덕션(Point Of Production) 관리 퍼스널 컴퓨터(POP 관리 PC)로 임시 저장하며 확인하는 제 4과정; 및
상기 제 4과정을 통해 포인트 오브 프로덕션(Point Of Production) 관리 퍼스널 컴퓨터(POP 관리 PC)에 임시 저장되어진 정보들을 2차원 바코드상에 존재하는 휠 시리얼 넘버(S/N;Serial Number)과 가공설비 정보 및 공정내용을 매칭(MATCHING)시켜서 데이터베이스를 구축하는 제 5과정을 포함하는 것을 특징으로 하는 데 있다..
또한 본 발명은, 상기 제 5과정 이후 외부에서 유입되는 알루미늄 휠에 자체 제작되는 제품과 차별화된 시리얼넘버(S/N;Serial Number)체제의 2차원 바코드를 레이저 마킹기에 의해 부여하는 제 1단계와;
외부에서 유입되는 알루미늄 휠의 생산을 위한 주요가공 및 공법에 대한 데이터를 상기 포인트 오브 프로덕션(Point Of Production) 관리 퍼스널 컴퓨터(POP 관리 PC)에서 관리하며 유입된 알루미늄 휠의 품질을 비파괴검사기, 밸런스검사기를 통해 검사하는 제 2단계와;
납품 및 출하정보를 관리하고 있는 데이터 및 상기 제 1단계에서 부여된 시리얼넘버(S/N)를 상기 포인트 오브 프로덕션(Point Of Production) 관리 퍼스널 컴퓨터(POP 관리 PC)에서 매칭시키는 제 3단계; 및
The characteristics of the production process management method through the management of individual historical data of the automotive aluminum wheel according to the present invention for achieving the above object, the casting process of the aluminum wheel, the pressing process for the hot water of the wheel, the non-destructive inspection of the wheel casting Process, heat treatment process, shot blast process, processing, leak test, surface treatment, powder coating, fluid coating, front processing, clear coating, balance inspection, final inspection, packaging And in the production process of the automotive aluminum wheel in which the shipment process is sequentially:
In the process of melting and casting the aluminum ingot, which is the raw material, through the casting process of the aluminum wheel, the reference information about the aluminum ingot, which is the raw material, and the aluminum wheel processing information at the time of casting are formed. Point Of Production) A first process acquired by a management personal computer (POP management PC);
A second step of marking the information obtained in the first step by a marking machine with a two-dimensional bar code at a specific position of the automobile aluminum wheel having a basic skeleton formed through the casting process of the aluminum wheel;
The work items are checked on the basis of the two-dimensional bar code marked in the second process, and accordingly, the press process for the spout of the wheel, the non-destructive inspection process for the wheel casting, the heat treatment process, the shot blast process, and the machining are performed. Process for each production process that requires relevant work during the process of LEAK TEST, surface treatment, powder coating, fluid coating, front processing, clear coating, balance inspection, final inspection, packing and shipping A third step of receiving work from a Point Of Production management personal computer (POP management PC) and performing the work on the corresponding equipment;
At the same time as performing the third process, the work history of the processing specification information generated during the process of performing the third process and the 2D barcode marked through the second process are read from the 2D scanner, and the corresponding information is read together. A fourth step of temporarily storing and verifying with a Point Of Production managed personal computer (POP managed PC); And
The wheel serial number (S / N) and the processing equipment information, which are temporarily stored in the point of production management personal computer (POP management PC), are present on the two-dimensional barcode through the fourth process. And a fifth step of building a database by matching the process contents.
In addition, the present invention, the first step of giving a two-dimensional bar code of the serial number (S / N; Serial Number) system differentiated from the self-made product on the aluminum wheel introduced from the outside after the fifth process by a laser marker; ;
Data on the main processing and construction methods for the production of aluminum wheels from outside are managed by the Point of Production management personal computer (POP management PC), and the quality of the imported aluminum wheels is determined by non-destructive tester and balance checker. A second step of inspecting through;
A third step of matching the data managing the delivery and shipment information and the serial number (S / N) given in the first step by the point of production management personal computer (POP management PC); And

상기 제 1단계 내지 제 3단계를 통해 획득되어진 데이터를 제품 출하바코드 발행 부착시에 데이터베이스를 구축하는 협력업체 외주 가공정보를 상기 포인트 오브 프로덕션(Point Of Production) 관리 퍼스널 컴퓨터(POP 관리 PC)에서 관리하는 관리 과정을 더 포함하는 데 있다.The point-of-production management personal computer (POP management PC) manages subcontracting processing information that establishes a database at the time of attaching the product shipment bar code to the data obtained through the first to third steps. It involves more management processes.

상기와 같은 목적을 달성하기 위한 본 발명에 따른 자동차 알루미늄 휠의 개별 이력 데이터 관리를 통한 생산 공정 관리 방법의 부가적인 다른 특징으로, 2차원바코드로 마킹하기 위한 자동차 알루미늄 휠의 특정 위치는 자동차 알루미늄 휠의 안쪽 탕구 부분과 볼트체결 구멍 부분 사이의 빈 영역을 사용하는 데 있다.As another additional feature of the production process management method through the individual history data management of the automotive aluminum wheel according to the present invention for achieving the above object, the specific position of the automotive aluminum wheel for marking with two-dimensional bar code This is to use a blank area between the inner spout and the bolt hole.


상기와 같은 목적을 달성하기 위한 본 발명에 따른 자동차 알루미늄 휠의 개별 이력 데이터 관리를 통한 생산 공정 관리 방법의 부가적인 또 다른 특징은, 상기 제 5과정 혹은 협력업체 외주 가공정보 관리 과정이후 구축되어진 데이터베이스는 엔터프라이즈 리소스 플래닝(ERP; Enterprise Resource Planning)와 웨어하우스 메니지먼트 시스템(WMS; Warehouse Management System)에 제공하는 정보공유 과정을 더 포함하는 데 있다.

An additional feature of the production process management method through the individual history data management of the automotive aluminum wheel according to the present invention for achieving the above object is a database built after the fifth process or the process of managing outsourced processing information of suppliers The method further includes an information sharing process provided to an Enterprise Resource Planning (ERP) and a Warehouse Management System (WMS).

상기와 같은 목적을 달성하기 위한 본 발명에 따른 자동차 알루미늄 휠의 개별 이력 데이터 관리를 통한 생산 공정 관리 시스템인 특징은, 알루미늄 휠의 주조 공정, 휠의 탕구에 대한 프레스 공정, 휠 주조물에 대한 비파괴 검사공정, 열처리공정, 쇼트 블래스트(SHOT BLAST) 공정, 가공, 리크 테스트(LEAK TEST), 표면처리, 분체도장, 유체도장, 전면가공, 클리어(CLEAR) 도장, 밸런스(BLANCE) 검사, 최종검사, 포장 및 출하의 공정이 순차적으로 이루어지는 자동차 알루미늄 휠의 생산 공정 관리 시스템에 있어서: 상기 알루미늄 휠의 주조 공정을 통해 원자재인 알루미늄 강괴를 용해 후 주조하여 자동차 알루미늄 휠의 기본 골격이 형성되는 과정에서 원자재인 알루미늄 강괴에 대한 기준정보와 주조된 시점의 알루미늄 휠 가공정보를 취득하고 각종의 생산 공정상의 데이터를 병합하여 데이터베이스를 구축하는 포인트 오브 프로덕션(Point Of Production) 관리 퍼스널 컴퓨터(POP 관리 PC)와; 상기 알루미늄 휠의 주조 공정을 통해 형성된 기본 골격을 갖는 자동차 알루미늄 휠의 특정 위치에 2차원 바코드로 레이저 마킹을 하는 마킹기와; 자동차 알루미늄 휠의 생산 공정을 수행하는 각종의 공정장비들과; 생산현황에 대한 정보를 포인트 오브 프로덕션(Point Of Production) 관리 퍼스널 컴퓨터(POP 관리 PC)에서 받아 보여주는 제 1표시부와; 상기 각각의 공정장비들에 각각 부여되어 있으며 작업 대상의 2차원 바코드를 읽어 판독하고 이를 포인트 오브 프로덕션(Point Of Production) 관리 퍼스널 컴퓨터(POP 관리 PC)에 제공하는 2차원스캐너들; 상기 각각의 공정장비들에 각각 부여되어 있으며 각 공정마다 작업 및 생산지시를 상기 포인트 오브 프로덕션(Point Of Production) 관리 퍼스널 컴퓨터(POP 관리 PC)로부터 제공받아 페이퍼 대신 보여주는 제 2표시부들과; 작업자가 작업한 실적을 수집하는데 사용하는 바코드 리더기인 핸드 스케너; 및 상기 포인트 오브 프로덕션(Point Of Production) 관리 퍼스널 컴퓨터(POP 관리 PC)에서 구축된 데이터베이스를 엔터프라이즈 리소스 플래닝(ERP; Enterprise Resource Planning) 시스템과 웨어하우스 메니지먼트 시스템(WMS; Warehouse Management System) 간에 연동시키기 위한 포인트 오브 프로덕션(POP; Point Of Production) 서버로 구성되어; 알루미늄 휠의 안쪽 탕구부분과 볼트 체결구멍 사이의 특정위치에 2차원바코드로 마킹을 하고 생산공정별로 기 마킹된 2차원바코드를 작업 전에 읽어서는 작업지시 사항을 확인하고, 작업 후에 읽어서는 작업결과를 개별로 DATA BASE화 하면서 실시간(Real Time)으로 진행내용을 화면으로 보여주고 POP서버에 저장한 후 생산성 향상 및 품질개선을 위한 분석을 하는 데 있다.Features of the production process management system through the individual history data management of the automotive aluminum wheel according to the present invention for achieving the above object, the casting process of the aluminum wheel, the pressing process for the hot water of the wheel, the non-destructive inspection of the wheel casting Process, heat treatment process, shot blast process, processing, leak test, surface treatment, powder coating, fluid coating, front processing, clear coating, balance inspection, final inspection, packaging And a production process management system for an automobile aluminum wheel in which a shipment process is performed sequentially: aluminum, which is a raw material, in a process in which a basic skeleton of an automobile aluminum wheel is formed by melting and casting aluminum ingot, which is a raw material, through the casting process of the aluminum wheel. Acquired standard information on steel ingots and machining information of aluminum wheels at the time of casting, A Point Of Production management personal computer (POP management PC) for merging data to build a database; A marking device for laser marking a two-dimensional barcode at a specific position of the automobile aluminum wheel having a basic skeleton formed through the casting process of the aluminum wheel; Various process equipments for producing automobile aluminum wheels; A first display unit for receiving information on the production status from a Point Of Production management personal computer (POP management PC); Two-dimensional scanners which are assigned to the respective process equipments and read and read the two-dimensional bar code of the work object and provide the same to a point-of-production management personal computer (POP management PC); Second display units which are assigned to the respective process equipments and receive work and production instructions from each of the point-of-production management personal computers (POP management PCs) and display papers instead of papers for each process; A hand scanner, which is a bar code reader used to collect the work performed by the operator; And for interworking a database built on the Point Of Production management personal computer (POP management PC) between an Enterprise Resource Planning (ERP) system and a Warehouse Management System (WMS). A Point of Production (POP) server; Mark the two-dimensional bar code at a specific position between the inlet and bolt holes of the aluminum wheel, and read the work instructions by reading the two-dimensional bar code marked for each production process before the operation. It is to analyze the progress for productivity and quality improvement after showing the progress as a real time (Real Time) and saving it in a POP server while making individual data base.

상술한 본 발명에 따른 특징으로 인해 기대되는 효과로는, As expected effects due to the features according to the invention described above,

자동차 알루미늄 휠의 개별적인 품질정보에 대한 이력관리 생산정보시스템을 구축함으로써 실시간으로 Paperless에 의한 생산기지, 생산 집계 및 문제점 파악이 가능하고, 업무 프로세스 및 정보의 통합화로 생산성 향상 및 경영혁신을 꾀할 수 있다.By establishing a history management production information system for individual quality information of automotive aluminum wheels, it is possible to identify production bases, production aggregates and problems by paperless in real time, and improve productivity and management innovation by integrating work processes and information. .

본 발명의 상술한 목적과 여러 가지 장점은 이 기술 분야에 숙련된 사람들에 의해, 첨부된 도면을 참조하여 후술되는 본 발명의 바람직한 실시 예로부터 더욱 명확하게 될 것이다.The above object and various advantages of the present invention will become more apparent from the preferred embodiments of the present invention described below with reference to the accompanying drawings by those skilled in the art.

이하, 본 발명의 바람직한 실시 예를 첨부한 도면을 참조하여 상세히 설명한다.Hereinafter, exemplary embodiments of the present invention will be described in detail with reference to the accompanying drawings.

첨부한 도 1은 본 발명에 따른 자동차 알루미늄 휠의 개별 이력 데이터 관리를 위해 자동차 알루미늄 휠에 특정의 제품 정보를 인식시키기 위한 마크를 세기기 위한 위치에 대해 설명하는 예시도이다.1 is an exemplary view for explaining a position for placing a mark for recognizing specific product information on a car aluminum wheel for managing individual historical data of the car aluminum wheel according to the present invention.

본 발명을 적용하기 위해서는 먼저 첨부한 도 1에 예시되어 있는 것과 같이, 자동차 알루미늄 휠(A1)의 안쪽 탕구(A2) 부분과 볼트체결 구멍(A3) 부분 사이의 빈 영역(A4)에 2차원바코드(A5)를 마킹하는 것이다. 이 부분은 자동차 알루미늄 휠의 생산 공정상에서 개별관리가 가능한 2차원바코드를 마킹 할 수 있는 곳으로 이 부분 이외의 영역에는 마킹하는 방법으론 개별관리 차원의 생산 공정 관리시스템을 구축하기 어렵다.In order to apply the present invention, a two-dimensional barcode is applied to an empty area A4 between an inner side spout A2 portion and a bolting hole A3 portion of an automobile aluminum wheel A1, as illustrated in FIG. Is to mark (A5). This part can mark two-dimensional bar code that can be managed separately in the production process of automobile aluminum wheels, and it is difficult to establish an individual management level production process management system by marking other areas.

이부분이 중요한 이유는 전체 생산 공정에서 알루미늄 휠이 외적인 영향을 받지 않고 실시간 공정관리를 위한 기준이 되는 부분이기 때문이다.This is important because the aluminum wheel is the standard for real time process control without any external influences in the whole production process.

첨부한 도 2는 본 발명에 따른 자동차 알루미늄 휠의 개별 이력 데이터 관리를 통한 생산 공정 관리순서에 입각한 알루미늄 휠의 생산 공정 흐름도이다.2 is a flowchart illustrating a production process of an aluminum wheel based on a production process management procedure through individual historical data management of an automotive aluminum wheel according to the present invention.

스텝 B1에서는 원자재인 알루미늄 강괴(鋼塊)를 용해 후 주조하여 알루미늄 휠(이하 “휠”이라고 한다)을 만들어 낸다.In step B1, aluminum ingots, which are raw materials, are melted and cast to produce aluminum wheels (hereinafter referred to as "wheels").

이후 상기 스텝 B1에서 만들어진 휠이 컨베이어 등에 의해 이송되어지면 스텝 B2에서는 감지센서를 통해 정 위치에 휠이 도착되었는지를 판단하고, 정 위치에 휠이 안착되었다고 판단되는 경우에 스텝 B3으로 진행한다.Thereafter, when the wheel made in step B1 is transferred by a conveyor or the like, in step B2, it is determined whether the wheel arrives at the correct position through the sensor, and when it is determined that the wheel is seated at the correct position, the process proceeds to step B3.

스텝 B3에서는 원자재인 알루미늄 강괴에 대한 기초정보와 주조된 알루미늄 휠 정보를 조합하여 2차원 바코드 초기내용을 생성하고 이를 첨부한 도 1에서 설명한 위치에 레이저 가공방식으로 마킹하게 된다.In step B3, the initial information of the aluminum ingot, which is a raw material, and the cast aluminum wheel information are combined to generate an initial two-dimensional bar code, and the laser marking method is marked at the position described in FIG.

즉, 상술한 스텝 B1의 과정을 진행하는 동안 원자재인 알루미늄 괴에 대한 기초정보와 주조된 휠 정보를 조합하여 2차원 바코드 초기내용을 생성하고 해당 정보가 스텝 B3에서 생성된 데이터를 각각의 휠(A1)의 안쪽 탕구(A2) 부분과 볼트체결 구멍(A3) 부분 사이의 빈 영역(A4)에 2차원바코드(A5)를 레이저 마킹을 하는 것이다. That is, during the process of step B1 described above, the initial information of the aluminum ingot, which is a raw material, and the casted wheel information are combined to generate a two-dimensional bar code initial content, and the information generated in step B3 is converted to each wheel ( The two-dimensional bar code A5 is laser-marked in the empty area A4 between the inner side spout A2 of A1) and the part of the bolt fastening hole A3.

아울러 상기 마킹을 위한 수단으로 제시되는 것으로 레이저 가공방식에 의해 마킹하고 있으나, 본 발명에서는 이에 국한되어질 필요가 없는바 예컨대 기계적 방식인 타각기 등을 이용하여 마킹 작업이 가능할 수 있어 타각기 등을 이용한 마킹 작업시 본 발명에서 제시하는 기술적 사상을 벗어나지 않는 범위내에서는 본 발명의 기술적 권리범위에 속함은 자명하다 할 것이다.In addition, the marking by the laser processing method to be presented as a means for the marking, but the present invention does not need to be limited to this bar, for example, a marking method can be possible using a mechanical marking machine, etc. It will be apparent that the marking work belongs to the technical scope of the present invention without departing from the technical spirit of the present invention.

상기 스텝 B3의 과정을 통해 마킹이 이루어진 휠은 스텝 B4의 과정을 통해 생산 공정별로 마킹된 2차원 바코드를 읽어 작업사항을 확인하도록 하며, 그에 따라 해당 작업이 필요한 각 생산 공정 별 가공작업이 진행되는 스텝 B5의 과정으로 진행되어진다.The wheel marked through the process of step B3 is to read the two-dimensional bar code marked for each production process through the process of step B4 to check the work, and accordingly processing for each production process that requires the corresponding operation The process proceeds to step B5.

스텝 B5의 과정을 간략히 살펴보면, ‘휠의 탕구에 대한 프레스 공정’ → ‘휠 주조물에 대한 비파괴 검사’ → ‘열처리’ → ‘쇼트 블래스트(SHOT BLAST)’ → ‘자동창고’ → ‘가공’ → ‘리크 테스트(LEAK TEST)’ → ‘표면처리’ → ‘분체도장’ → ‘유체도장’ → ‘전면가공’ → ‘클리어(CLEAR) 도장’ → ‘밸런스(BLANCE) 검사’ → ‘최종검사’ → ‘포장’ → ‘출하’등의 과정을 경유하게 된다.The process of step B5 is briefly described as follows: 'Press process for the spout of the wheel' → 'Non-destructive inspection for the wheel casting' → 'Heat treatment' → 'SHOT BLAST' → 'Automatic warehouse' → 'Processing' → ' LEAK TEST '→' Surface Treatment '→' Powder Coating '→' Fluid Coating '→' Front Finishing '→' Clear Coating '→' Balancing '→' Final Inspection '→' 'Packing' → 'shipping'.

상술한 스텝 B5의 과정에 따른 가공작업이 수행되는 것과 동시에 각 가공 공정에서는 상기 스텝 B3의 과정을 통해 마킹되어진 2차원 바코드를 읽어 해당 바코드와 가공 사양정보의 작업내역을 임시 저장함과 동시에 확인하고, 스텝 B7에서는 상기 스텝 B5와 B6의 과정이 완료되는 시점에 휠 시리얼넘버(S/N;Serial Number)와 가공설비정보 및 공정내용을 매칭(MATCHING)시켜서 데이터베이스에 저장(B7)한다.At the same time as the processing operation according to the process of step B5 described above is performed in each processing process, by reading the two-dimensional bar code marked through the process of step B3 and temporarily storing the work history of the barcode and processing specification information, In step B7, the wheel serial number (S / N; serial number), processing equipment information, and process contents are matched and stored in the database (B7) when the processes of steps B5 and B6 are completed.

또한, 협력업체를 통한 외주가공 처리시에도 정보를 공유할 수 있게 같은 휠 시리얼넘버(S/N;Serial Number) 체제를 구축하여 포인트 오브 프로덕션(POP; Point Of Production) 서버 데이터 베이스(D/B)에 저장(B8)하며, 상위 프로세서(WMS, ERP)측에 제공(B9)한다.In addition, the same Wheel Serial Number (S / N) system was established to share information during outsourcing process through partner companies, thereby creating a Point of Production (POP) server database (D / B). (B8), and provide it to the upper processor (WMS, ERP) (B9).

이때, 상기 스텝 B8의 과정은 협력업체 외주 가공정보 관리 시스템으로, 외부 알루미늄 휠에 2차원 바코드를 통해 시리얼넘버(S/N;Serial Number) 체제를 구축하며, 주요가공 및 공법에 대한 데이터 관리기능과, 납품 및 출하정보를 관리하고 있는 데이터 및 시리얼넘버(S/N;Serial Number)와 매칭시킨 후, 이를 제품 출하바코드 발행 부착시에 데이터베이스의 구축을 수행하게 된다.At this time, the process of step B8 is a subcontracting processing information management system of a partner company, to establish a serial number (S / N) system through a two-dimensional bar code on the external aluminum wheel, and data management function for the main processing and construction methods After matching with the serial number (S / N) and the data managing the delivery and shipment information, the database is constructed when the product shipment bar code is issued.

상술한 바와 같이, 첨부한 도 2에 도시되어진 본 발명에 따른 알루미늄 휠의 생산 공정 흐름이 실제적으로 구현되기 위해서는 첨부한 도 3에 도시되어 있는 바와 같은, 하드웨어의 구현이 필요하다.As described above, in order for the production process flow of the aluminum wheel according to the present invention shown in FIG. 2 to be practically implemented, implementation of hardware, as shown in FIG. 3, is required.

첨부한 도 3은 본 발명에 따른 자동차 알루미늄 휠의 개별 이력 데이터 관리를 통한 생산 공정 관리 시스템의 하드웨어 구성 예시도로서, 크게 작업자에 의해 실제적인 작업이 수행되며 그 작업 결과를 판독할 수 있도록 하는 하위 시스템과, 상기 하위 시스템을 운영하기 위한 관리 시스템, 및 상기 관리 시스템을 통해 관리되고 있는 각종의 데이터들을 운영해 생산 공정 전반에 걸친 운영을 수행하는 상위 시스템으로 구분되어진다.FIG. 3 is a diagram illustrating a hardware configuration of a production process management system through individual historical data management of automotive aluminum wheels according to the present invention. It is divided into a system, a management system for operating the sub-system, and a high-level system which operates various data managed through the management system to perform operations throughout the production process.

상위 시스템은 엔터프라이즈 리소스 플래닝(ERP; Enterprise Resource Planning) 서버(C3)와, 웨어하우스 메니지먼트 시스템(WMS; Warehouse Management System) 서버(C1), 및 생상공정관리를 담당하는 포인트 오브 프로덕션(POP; Point Of Production) 서버(C2)이다.The parent system includes an Enterprise Resource Planning (ERP) server (C3), a Warehouse Management System (WMS) server (C1), and Point of Production (POP) responsible for process management. Production) server (C2).

통상적으로 웨어하우스 메니지먼트 시스템(WMS; Warehouse Management System)는 물류센터에서 화물을 관리하기 위한 모든 정보시스템의 총칭을 말하는 것으로, 상기 웨어하우스 메니지먼트 시스템(WMS; Warehouse Management System) 서버(C1)는 휠의 입출고관리, 재고관리, 보관위치관리시스템, 출고지시시스템과 픽킹시스템( DPS- Digital picking system, Digital picker system, Auto picking system etc), 합포장시스템(DAS, Digital assort system), 배송시스템 등으로 구성되어 있다.In general, a warehouse management system (WMS) refers to a general term for all information systems for managing cargo in a distribution center, and the warehouse management system (CMS) server is a wheel of a wheel. It consists of incoming and outgoing management, inventory management, storage location management system, shipping instruction system and picking system (DPS-Digital picking system, digital picker system, auto picking system etc), combined packaging system (DAS, digital assort system), and delivery system. have.

또한, 통상적으로 엔터프라이즈 리소스 플래닝(ERP; Enterprise Resource Planning)는 정보의 통합을 통한 "전사적 자원계획"을 의미하며 기업에서 기간을 이루는 업무들 즉 생산, 자재, 영업, 인사, 회계 등의 제반경영기능이 효율적으로 관될 수 있도록 정보를 제공하고 의사결정을 지원하는 통합정보시스템의 총칭을 말하는 것이다.In addition, Enterprise Resource Planning (ERP) generally means "company-wide resource planning" through the integration of information, and management functions such as production, materials, sales, human resources, accounting, etc. It is the collective name of an integrated information system that provides information and supports decision making so that it can be managed efficiently.

따라서 본 발명에 따른 실질적인 자동차 알루미늄 휠의 개별 이력 데이터 관리를 통한 생산 공정 관리 시스템의 구성은 생상공정관리를 담당하는 포인트 오브 프로덕션(POP) 서버(C2)와, 하위 시스템, 및 상기 하위 시스템과 포인트 오브 프로덕션(POP) 서버(C2)간의 연계를 위한 관리 시스템이라 할 수 있으며, 상기 웨어하우스 메니지먼트 시스템(WMS; Warehouse Management System) 서버(C1)와 엔터프라이즈 리소스 플래닝(ERP; Enterprise Resource Planning) 서버(C3)는 경영상의 관리를 위한 보완적 관계를 유지하는 것이다.Therefore, the configuration of the production process management system through the individual historical data management of the actual automotive aluminum wheel according to the present invention is the point of production (POP) server (C2), the subsystem, and the subsystem and the point in charge of the production process management It may be referred to as a management system for linkage between the production of production (POP) server (C2), the warehouse management system (WMS) server (C1) and the enterprise resource planning (ERP) server (C3) ) Is to maintain complementary relationships for management.

그러므로 관리 시스템과 하위시스템을 살펴보면, 관리 시스템은 하위시스템들과 연계되어 상기 포인트 오브 프로덕션(POP) 서버(C2)와 데이터를 통신하는 포인트 오브 프로덕션(Point Of Production) 관리 퍼스널 컴퓨터(POP 관리 PC)(C4)이며, 하위 시스템은 생산현황에 대한 정보를 포인트 오브 프로덕션(Point Of Production) 관리 퍼스널 컴퓨터(POP 관리 PC)(C4)에서 받아 보여주는 PDP(Plasma Display Panel)(C5)와, 2차원바코드를 표시하는 마킹기(C6)와, 2차원바코드를 읽어 데이터를 판독하는 2차원스캐너(C7)와, 각 공정마다 작업 및 생산지시를 페이퍼 대신 보여주는 포인트 오브 프로덕션(POP)모니터(C8)와, 작업진행이 된 휠의 균열 등의 이상유무 검사에 필요한 비파괴 검사기(C9)와, 정밀부분의 계측에 필요한 각종 측정 장비(C10)와, 휠의 균형정도를 검사하는 밸런스검사기(C11)와, 작업자가 작업한 실적을 수집하는데 사용하는 바코드 리더기인 핸드 스케너(C12)로 구성된다.Therefore, looking at the management system and subsystems, the management system is associated with the subsystems to communicate data with the point of production (POP) server (C2) Point of Production management personal computer (POP management PC) (C4), and the subsystems include Plasma Display Panel (C5) and two-dimensional bar code that receive information on production status from Point of Production management personal computer (C4). Marking machine (C6) to display the, 2D scanner (C7) to read the data by reading the two-dimensional bar code, Point of Production (POP) monitor (C8) showing the work and production instructions for each process instead of paper, Non-destructive inspection machine (C9) necessary for inspection of abnormality such as wheel crack that has been advanced, various measuring equipment (C10) necessary for measurement of precision part, and balance inspection machine (C11) for checking the balance of wheel And it consists of a barcode reader, a hand scanner (C12) used to collect the earnings the worker is working.

이때 상기 2차원스캐너(C7)와 포인트 오브 프로덕션(POP)모니터(C8)는 각종의 장비에 구박되어 있는데, 예를 들어 비파괴 검사기(C9), 밸런스검사기(C11), 휠의 탕구에 대한 프레스 공정을 위한 프레스 기기, 각종 측정 장비(C10)등에 모두 적용되어져 있다.At this time, the two-dimensional scanner (C7) and point of production (POP) monitor (C8) is bound to a variety of equipment, for example, non-destructive tester (C9), balance checker (C11), the press process for the hot ball of the wheel It is applied to all press equipment, various measuring equipment (C10).

즉, 마킹기(C6)를 이용해 도 2의 과정에서 스텝 B3의 과정을 수행하여 휠에 2차원 바코드를 표시한 이후, 도 2의 과정에서 스텝 B5의 과정을 수행하는 각종의 장비에 모두 균일하게 구비되어지는 것이다.That is, after displaying the two-dimensional bar code on the wheel by performing the process of step B3 in the process of Figure 2 using the marking machine (C6), all the equipment to perform the process of step B5 in the process of Figure 2 is uniformly provided It is done.

따라서 상기 각각의 공정장비들은 컨베이어 등에 의해 이송되어진 알루미늄 휠에 부여되어진 2차원 바코드를 상기 2차원스캐너(C7)를 통해 읽어 판독하고 이를 포인트 오브 프로덕션(Point Of Production) 관리 퍼스널 컴퓨터(POP 관리 PC)(C4)에 제공하면, 포인트 오브 프로덕션(Point Of Production) 관리 퍼스널 컴퓨터(POP 관리 PC)(C4)에서는 해당 2차원 바코드 정보를 기준으로 지금 필요한 공정과 해당 공정의 작업에 따른 명령을 포인트 오브 프로덕션(POP)모니터(C8)를 통해 작업자에게 지시하게 된다.Accordingly, each of the process equipments reads and reads a two-dimensional bar code assigned to an aluminum wheel transferred by a conveyor or the like through the two-dimensional scanner C7, and points it to a point of production management personal computer (POP management PC). If provided to (C4), the Point Of Production Management Personal Computer (POP Management PC) (C4) provides the Point of Production command based on the two-dimensional bar code information and the operation according to the operation of the process. The operator is instructed via the (POP) monitor (C8).

작업자는 상기 포인트 오브 프로덕션(POP)모니터(C8)를 통해 지시되어진 해당 작업을 수행함에 있어 바코드 리더기인 핸드 스케너를 사용하여 작업의 이행여부를 통지하도록 한다.In performing the task indicated by the point of production (POP) monitor (C8), the operator uses the barcode scanner hand scanner to notify whether or not the task is performed.

다음은 소프트웨어 중심의 공정도인 도4 부분이다. The following is a part of FIG. 4 which is a software oriented process diagram.

기준정보관리(D1)항목의 내용으로는 불량코드, 품질항목코드, 라인정지코드, 사용자정의코드, 공장코드, 부서/작업장코드, 모델/품목코드, 공정/공정경로, 단말기정보, 생산계획, 품질항목 SETUP, 2차원바코드가 있고,The contents of the standard information management (D1) items include defect code, quality item code, line stop code, user defined code, factory code, department / workshop code, model / item code, process / process path, terminal information, production plan, Quality item SETUP, two-dimensional bar code,

공정관리(D2)의 내용으로는 계획대비실적, 공정진도조회, 작업일보등록, 작업일보조회, 시간별생산실적, 주요공정실적, 일단위생산현황, 목표실적분석, CYCLE TIME 분석, 달성률분석이 있으며,The contents of the process management (D2) include performance against plan, process progress inquiry, work day report registration, work day inquiry, hourly production performance, major process performance, daily production status, target performance analysis, cycle time analysis, achievement rate analysis. ,

추적관리(D3)의 내용으로는 WHEEL이력추적, 정전개와 역전개자원관리(D4)의 내용으로는 일일정지현황, 설비 비가동현황, 라인효율분석, 라인가동률분석, 투입공수분석, 시간당생산수, 인당생산성분석, 설비생산성분석이 있다. The contents of tracking management (D3) include WHEEL history tracking, power outage and reverse expansion resource management (D4). Daily stop status, equipment non-operation status, line efficiency analysis, line utilization analysis, input labor analysis, production hourly Per capita productivity analysis and facility productivity analysis.

품질관리(D5)의 내용으로는 불량이력, 일별불량분석, 불량추이, 불량종합분석, 수리이려조회, 직행률분석, CP/CPK분석이 있으며, 엔터프라이즈 리소스 플래닝(ERP; Enterprise Resource Planning) 인터페이스(INTERFACE)(D6)의 내용으로는 엔터프라이즈 리소스 플래닝(ERP; Enterprise Resource Planning) 다운로드(DOWNLOAD), 기준정보 다운로드(DOWNLOAD), 생산계획 다운로드(DOWNLOAD), 엔터프라이즈 리소스 플래닝(ERP; Enterprise Resource Planning) 업로드(UPLOAD), 계획변경 업로드(UPLOAD), 생산실적 업로드(UPLOAD), 불량정보 업로드(UPLOAD), 입고정보 업로드(UPLOAD)로 구성된다.The contents of quality control (D5) include bad history, daily bad analysis, bad trend, bad comprehensive analysis, repair consideration inquiry, direct rate analysis, CP / CPK analysis, and Enterprise Resource Planning (ERP) interface ( The contents of INTERFACE (D6) include Enterprise Resource Planning (ERP) Download (DOWNLOAD), Baseline Download (DOWNLOAD), Production Plan Download (DOWNLOAD), Enterprise Resource Planning (ERP) Upload ( UPLOAD), plan change upload (UPLOAD), production record upload (UPLOAD), defect information upload (UPLOAD), goods receipt information upload (UPLOAD).

다음은 업무 중심의 공정도인 제 5도 부분이다.The following is part 5 of the work-oriented process chart.

생산계획(E1)과 기준정보(E2)를 가지고 공정흐름관리(E4)에 맞추어 생산을 진행하며, 생산된 휠의 공정품질관리(E5)를 통해 제품으로서의 이상 유무를 확인하고 검증된 휠은 출하이력관리(E6)를 통해 출하 및 창고에 입고시키며, 추후필요시 추적관리(E7)를 통해 원하는 휠을 추적하여 관리한다.Production is carried out in accordance with process flow management (E4) with production plan (E1) and standard information (E2) .The quality of the produced wheel is checked through the process quality control (E5), and the verified wheel is shipped. It is shipped to the warehouse through the history management (E6), and tracks and manages the desired wheel through the tracking management (E7) if necessary.

각각의 업무별 내용을 상세히 하면, 생산계획(E1)의 구성은 생산 마스터플랜 (Master Plan)(ERP Data)기준, 제품별 라인별 디테일 스케쥴(Detail Schedule), 생산지시관리(차종&사양결정)이다.In detail for each task, the composition of production plan (E1) is based on production master plan (ERP Data), detail schedule by line for each product, production order management (vehicle & specification) to be.

또한, 기준정보(E2)의 구성은 원자재정보, 생산계획정보, 출하정보이다.In addition, the structure of the reference information E2 is raw material information, production planning information, and shipping information.

또한, 공정흐르관리(E4)의 구성은 2차원바코드 시리얼넘버(S/N;Serial Number) 번호관리, 시리얼넘버(S/N;Serial Number) 번호 단계별 이력 추가 관리이고; 생산진행(E3)의 구성은 차종&사양결정/2차원바코드마킹, 조립진행(2차원바코드 SCAN시스템), 이종/서열 품질관리, 측정기 품질정보 수집, 계측기 품질정보 수집이다.In addition, the configuration of the process flow management (E4) is a two-dimensional bar code serial number (S / N; Serial Number) number management, serial number (S / N; Serial Number) step by step additional management; The production process (E3) consists of vehicle model & specification determination / 2D barcode marking, assembly process (2D barcode SCAN system), heterogeneous / sequence quality control, instrument quality information collection, instrument quality information collection.

또한, 출하이력관리(E6)의 구성은 완전품입고 및 자동창고관리이고; 추적관 리(E7)는 투입자재추저, 제조이력/품질이력 추적으로 구성된다. In addition, the configuration of the shipping history management (E6) is complete goods receipt and automatic warehouse management; Tracking management (E7) consists of material input tracking and manufacturing history / quality history tracking.

제 6도는 전체 생산관리시스템 공정의 구성도로 상위 내용을 종합적으로 표현한 것이다.6 is a schematic diagram of the overall production management system process.

이상의 설명에서 본 발명은 특정의 실시 예와 관련하여 도시 및 설명하였지만, 특허청구범위에 의해 나타난 발명의 사상 및 영역으로부터 벗어나지 않는 한도 내에서 다양한 개조 및 변화가 가능하다는 것을 당 업계에서 통상의 지식을 가진 자라면 누구나 쉽게 알 수 있을 것이다.While the invention has been shown and described in connection with specific embodiments thereof, it is well known in the art that various modifications and changes can be made without departing from the spirit and scope of the invention as indicated by the claims. Anyone who owns it can easily find out.

도 1은 본 발명에 따라 자동차 알루미늄 휠에 2차원 바코드를 부여하는 위치를 설명하기 위한 예시도1 is an exemplary view for explaining a position to give a two-dimensional bar code to a car aluminum wheel in accordance with the present invention.

도 2는 본 발명에 따른 자동차 알루미늄 휠의 개별 이력 데이터 관리를 통한 생산 공정 관리순서에 입각한 알루미늄 휠의 생산 공정 흐름도Figure 2 is a flow chart of the production process of the aluminum wheel based on the production process management sequence through the individual history data management of the automotive aluminum wheel according to the present invention

도 3은 본 발명에 따른 자동차 알루미늄 휠의 개별 이력 데이터 관리를 통한 생산 공정 관리 시스템을 설명하기 위한 예시도3 is an exemplary view for explaining a production process management system through the individual history data management of the automotive aluminum wheel according to the present invention.

도 4는 도 3에 도시되어 있는 본 발명에 따른 자동차 알루미늄 휠의 개별 이력 데이터 관리를 통한 생산 공정 관리 시스템을 소프트웨어적으로 표현한 예시도FIG. 4 is an exemplary view of software production process management system through individual historical data management of the automotive aluminum wheel according to the present invention shown in FIG.

도 5는 본 발명에 따른 자동차 알루미늄 휠의 개별 이력 데이터 관리를 통한 생산 과정을 공정별 업무중심으로 설명하기 위한 예시도5 is an exemplary view for explaining the production process through the process of individual history data management of automotive aluminum wheels according to the present invention by the process-oriented work center

도 6은 도 4는 도 3에 도시되어 있는 본 발명에 따른 자동차 알루미늄 휠의 개별 이력 데이터 관리를 통한 생산 공정 관리 시스템을 세부적으로 살펴보면 예시도FIG. 6 is an exemplary view illustrating in detail a production process management system through individual historical data management of an automotive aluminum wheel according to the present invention shown in FIG. 3.

Claims (5)

알루미늄 휠의 주조 공정, 휠의 탕구에 대한 프레스 공정, 휠 주조물에 대한 비파괴 검사공정, 열처리공정, 쇼트 블래스트(SHOT BLAST) 공정, 가공, 리크 테스트(LEAK TEST), 표면처리, 분체도장, 유체도장, 전면가공, 클리어(CLEAR) 도장, 밸런스(BLANCE) 검사, 최종검사, 포장 및 출하의 공정이 순차적으로 이루어지는 자동차 알루미늄 휠의 생산 공정에 있어서:Casting process of aluminum wheel, press process for hot water spout of wheel, non-destructive inspection process for wheel casting, heat treatment process, shot blast process, processing, leak test, surface treatment, powder coating, fluid coating In the production process of automotive aluminum wheels, the process of front surface processing, clear coating, balance inspection, final inspection, packing and shipping is performed sequentially: 상기 알루미늄 휠의 주조 공정을 통해 원자재인 알루미늄 강괴를 용해 후 주조하여 자동차 알루미늄 휠의 기본 골격이 형성되는 과정에서 원자재인 알루미늄 강괴에 대한 기준정보와 주조된 시점의 알루미늄 휠 가공정보를 포인트 오브 프로덕션(Point Of Production) 관리 퍼스널 컴퓨터(POP 관리 PC)에 의해 취득하는 제 1과정과;In the process of melting and casting the aluminum ingot, which is the raw material, through the casting process of the aluminum wheel, the reference information about the aluminum ingot, which is the raw material, and the aluminum wheel processing information at the time of casting are formed. Point Of Production) A first process acquired by a management personal computer (POP management PC); 상기 제1 과정에서 취득되어진 정보를 상기 알루미늄 휠의 주조 공정을 통해 형성된 기본 골격을 갖는 자동차 알루미늄 휠의 특정 위치에 2차원바코드로 마킹기에 의해 마킹을 하는 제 2과정과;A second step of marking the information obtained in the first step by a marking machine with a two-dimensional bar code at a specific position of the automobile aluminum wheel having a basic skeleton formed through the casting process of the aluminum wheel; 상기 제 2과정에서 마킹되어진 2차원바코드를 기준으로 작업사항을 확인하도록 하며, 그에 따라 휠의 탕구에 대한 프레스 공정, 휠 주조물에 대한 비파괴 검사공정, 열처리공정, 쇼트 블래스트(SHOT BLAST) 공정, 가공, 리크 테스트(LEAK TEST), 표면처리, 분체도장, 유체도장, 전면가공, 클리어(CLEAR) 도장, 밸런스(BALANCE) 검사, 최종검사, 포장 및 출하의 공정중 해당 작업이 필요한 각 생산 공정 별 가공작업을 포인트 오브 프로덕션(Point Of Production) 관리 퍼스널 컴퓨터(POP 관리 PC)로부터 제공받아 해당장비에서 수행하도록 하는 제 3과정과;The work items are checked on the basis of the two-dimensional bar code marked in the second process, and accordingly, the press process for the spout of the wheel, the non-destructive inspection process for the wheel casting, the heat treatment process, the shot blast process, and the machining are performed. Process for each production process that requires relevant work during the process of LEAK TEST, surface treatment, powder coating, fluid coating, front processing, clear coating, balance inspection, final inspection, packing and shipping A third step of receiving work from a Point Of Production management personal computer (POP management PC) and performing the work on the corresponding equipment; 상기 제 3과정을 수행함과 동시에 상기 제 3과정을 수행하는 과정 중에 발생되는 가공 사양정보의 작업내역과 상기 제 2과정을 통해 마킹되어진 2차원 바코드를 2차원 스캐너에서 읽어 해당 정보들을 함께 상기 포인트 오브 프로덕션(Point Of Production) 관리 퍼스널 컴퓨터(POP 관리 PC)로 임시 저장하며 확인하는 제 4과정; 및At the same time as performing the third process, the work history of the processing specification information generated during the process of performing the third process and the 2D barcode marked through the second process are read from the 2D scanner, and the corresponding information is read together. A fourth step of temporarily storing and verifying with a Point Of Production managed personal computer (POP managed PC); And 상기 제 4과정을 통해 포인트 오브 프로덕션(Point Of Production) 관리 퍼스널 컴퓨터(POP 관리 PC)에 임시 저장되어진 정보들을 2차원 바코드상에 존재하는 휠 시리얼 넘버(S/N;Serial Number)과 가공설비 정보 및 공정내용을 매칭(MATCHING)시켜서 데이터베이스를 구축하는 제 5과정을 포함하는 것을 특징으로 하는 자동차 알루미늄 휠의 개별 이력 데이터 관리를 통한 생산 공정 관리 방법.The wheel serial number (S / N) and the processing equipment information, which are temporarily stored in the point of production management personal computer (POP management PC), are present on the two-dimensional barcode through the fourth process. And a fifth step of building a database by matching process details. 제 1항에 있어서,The method of claim 1, 상기 제 5과정 이후 외부에서 유입되는 알루미늄 휠에 자체 제작되는 제품과 차별화된 시리얼넘버(S/N;Serial Number)체제의 2차원 바코드를 레이저 마킹기에 의해 부여하는 제 1단계와;A first step of giving a two-dimensional bar code of a serial number (S / N; serial number) system differentiated from a self-made product to an aluminum wheel introduced from the outside after the fifth process; 외부에서 유입되는 알루미늄 휠의 생산을 위한 주요가공 및 공법에 대한 데이터를 상기 포인트 오브 프로덕션(Point Of Production) 관리 퍼스널 컴퓨터(POP 관리 PC)에서 관리하며 유입된 알루미늄 휠의 품질을 비파괴검사기, 밸런스검사기를 통해 검사하는 제 2단계와;Data on the main processing and construction methods for the production of aluminum wheels from outside are managed by the Point of Production management personal computer (POP management PC), and the quality of the imported aluminum wheels is determined by non-destructive tester and balance checker. A second step of inspecting through; 납품 및 출하정보를 관리하고 있는 데이터 및 상기 제 1단계에서 부여된 시리얼넘버(S/N)를 상기 포인트 오브 프로덕션(Point Of Production) 관리 퍼스널 컴퓨터(POP 관리 PC)에서 매칭시키는 제 3단계; 및A third step of matching the data managing the delivery and shipment information and the serial number (S / N) given in the first step by the point of production management personal computer (POP management PC); And 상기 제 1단계 내지 제 3단계를 통해 획득되어진 데이터를 제품 출하바코드 발행 부착시에 데이터베이스를 구축하는 협력업체 외주 가공정보를 상기 포인트 오브 프로덕션(Point Of Production) 관리 퍼스널 컴퓨터(POP 관리 PC)에서 관리하는 관리 과정을 더 포함하는 것을 특징으로 하는 자동차 알루미늄 휠의 개별 이력 데이터 관리를 통한 생산 공정 관리 방법.The point-of-production management personal computer (POP management PC) manages subcontracting processing information that establishes a database at the time of attaching the product shipment bar code to the data obtained through the first to third steps. Production process management method through the management of individual historical data of the automotive aluminum wheel, characterized in that it further comprises a management process. 제 1항 또는 제 2항에 있어서,The method according to claim 1 or 2, 2차원바코드로 마킹하기 위한 자동차 알루미늄 휠의 특정 위치는 자동차 알루미늄 휠의 안쪽 탕구 부분과 볼트체결 구멍 부분 사이의 빈 영역을 사용하는 것을 특징으로 하는 자동차 알루미늄 휠의 개별 이력 데이터 관리를 통한 생산 공정 관리 방법.Production process management through individual historical data management of automotive aluminum wheels, characterized in that the specific position of the automotive aluminum wheel for marking with two-dimensional bar code uses a blank area between the inner groove part of the automotive aluminum wheel and the bolting hole part Way. 제2항에 있어서,The method of claim 2, 상기 협력업체 외주 가공정보 관리 과정 이후 구축되어진 데이터베이스는 엔터프라이즈 리소스 플래닝(ERP; Enterprise Resource Planning) 시스템과 웨어하우스 메니지먼트 시스템(WMS; Warehouse Management System)에 제공하는 정보공유 과정을 더 포함하는 것을 특징으로 하는 자동차 알루미늄 휠의 개별 이력 데이터 관리를 통한 생산 공정 관리 방법.The database built after the subcontracting processing information management process of the supplier further comprises an information sharing process provided to an Enterprise Resource Planning (ERP) system and a Warehouse Management System (WMS). How to manage production processes by managing individual historical data on automotive aluminum wheels. 알루미늄 휠의 주조 공정, 휠의 탕구에 대한 프레스 공정, 휠 주조물에 대한 비파괴 검사공정, 열처리공정, 쇼트 블래스트(SHOT BLAST) 공정, 가공, 리크 테스트(LEAK TEST), 표면처리, 분체도장, 유체도장, 전면가공, 클리어(CLEAR) 도장, 밸런스(BLANCE) 검사, 최종검사, 포장 및 출하의 공정이 순차적으로 이루어지는 자동차 알루미늄 휠의 생산 공정 관리 시스템에 있어서:Casting process of aluminum wheel, press process for hot water spout of wheel, non-destructive inspection process for wheel casting, heat treatment process, shot blast process, processing, leak test, surface treatment, powder coating, fluid coating In the production process management system of automobile aluminum wheel, which is a process of front processing, clear painting, balance inspection, final inspection, packing and shipping: 상기 알루미늄 휠의 주조 공정을 통해 원자재인 알루미늄 강괴를 용해 후 주조하여 자동차 알루미늄 휠의 기본 골격이 형성되는 과정에서 원자재인 알루미늄 강괴에 대한 기준정보와 주조된 시점의 알루미늄 휠 가공정보를 취득하고 각종의 생산 공정상의 데이터를 병합하여 데이터베이스를 구축하는 포인트 오브 프로덕션(Point Of Production) 관리 퍼스널 컴퓨터(POP 관리 PC)와;In the process of melting and casting the aluminum ingot, which is the raw material, through the casting process of the aluminum wheel, the reference information about the aluminum ingot, which is the raw material, and the aluminum wheel processing information at the time of casting are acquired in the process of forming the basic skeleton of the automobile aluminum wheel. A Point Of Production management personal computer (POP management PC) for merging data on the production process to build a database; 상기 알루미늄 휠의 주조 공정을 통해 형성된 기본 골격을 갖는 자동차 알루미늄 휠의 특정 위치에 2차원 바코드로 레이저 마킹을 하는 마킹기와;A marking device for laser marking a two-dimensional barcode at a specific position of the automobile aluminum wheel having a basic skeleton formed through the casting process of the aluminum wheel; 자동차 알루미늄 휠의 생산 공정을 수행하는 각종의 공정장비들과;Various process equipments for producing automobile aluminum wheels; 생산현황에 대한 정보를 포인트 오브 프로덕션(Point Of Production) 관리 퍼스널 컴퓨터(POP 관리 PC)에서 받아 보여주는 제 1표시부와;A first display unit for receiving information on the production status from a Point Of Production management personal computer (POP management PC); 상기 자동차 알루미늄 휠의 생산 공정을 수행하는 각종의 공정장비들에 각각 부여되어 있으며 작업 대상의 2차원 바코드를 읽어 판독하고 이를 포인트 오브 프로덕션(Point Of Production) 관리 퍼스널 컴퓨터(POP 관리 PC)에 제공하는 2차원스캐너들;It is assigned to various process equipments for performing the production process of the automotive aluminum wheel, and reads and reads a two-dimensional bar code of a work object and provides it to a point of production management personal computer (POP management PC). Two-dimensional scanners; 상기 자동차 알루미늄 휠의 생산 공정을 수행하는 각종의 공정장비들에 각각 부여되어 있으며 각 공정마다 작업 및 생산지시를 상기 포인트 오브 프로덕션(Point Of Production) 관리 퍼스널 컴퓨터(POP 관리 PC)로부터 제공받아 페이퍼 대신 보여주는 제 2표시부들과;It is assigned to various process equipments for carrying out the production process of the automotive aluminum wheel, and the work and production instructions are provided from the point of production management personal computer (POP management PC) for each process. Showing second displays; 작업자가 작업한 실적을 수집하는데 사용하는 바코드 리더기인 핸드 스케너; 및 A hand scanner, which is a bar code reader used to collect the work performed by the operator; And 상기 포인트 오브 프로덕션(Point Of Production) 관리 퍼스널 컴퓨터(POP 관리 PC)에서 구축된 데이터베이스를 엔터프라이즈 리소스 플래닝(ERP; Enterprise Resource Planning) 시스템과 웨어하우스 메니지먼트 시스템(WMS; Warehouse Management System) 간에 연동시키기 위한 포인트 오브 프로덕션(POP; Point Of Production) 서버로 구성되어; Points for interworking the database built on the Point Of Production management personal computer (POP management PC) between an Enterprise Resource Planning (ERP) system and a Warehouse Management System (WMS). Consists of a Point of Production (POP) server; 알루미늄 휠의 안쪽 탕구부분과 볼트 체결구멍 사이의 특정위치에 2차원바코드로 마킹을 하고 생산공정별로 기 마킹된 2차원바코드를 작업 전에 읽어서는 작업지시 사항을 확인하고, 작업 후에 읽어서는 작업결과를 개별로 데이타 베이스(DATA BASE)화 하면서 실시간(Real Time)으로 진행내용을 화면으로 보여주고 포인트 오브 프로덕션(POP)서버에 저장한 후 생산성 향상 및 품질개선을 위한 분석을 하는 것을 특징으로 하는 자동차 알루미늄 휠의 개별 이력 데이터 관리를 통한 생산 공정 관리 시스템.Mark the two-dimensional bar code at a specific position between the inlet and bolt holes of the aluminum wheel, and read the work instructions by reading the two-dimensional bar code marked for each production process before the operation. Automotive aluminum, which shows the progress in real time while storing data in database, saves it in a Point of Production (POP) server, and analyzes for productivity and quality improvement. Production process management system with individual historical data management on wheels.
KR1020080032321A 2008-04-07 2008-04-07 The manufacturing process civil official system which leads the individual past record data civil official of the automobile aluminum wheel KR100907297B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020080032321A KR100907297B1 (en) 2008-04-07 2008-04-07 The manufacturing process civil official system which leads the individual past record data civil official of the automobile aluminum wheel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020080032321A KR100907297B1 (en) 2008-04-07 2008-04-07 The manufacturing process civil official system which leads the individual past record data civil official of the automobile aluminum wheel

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
KR2020070005126 Division 2007-03-28

Publications (2)

Publication Number Publication Date
KR20080088537A KR20080088537A (en) 2008-10-02
KR100907297B1 true KR100907297B1 (en) 2009-07-13

Family

ID=40150646

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020080032321A KR100907297B1 (en) 2008-04-07 2008-04-07 The manufacturing process civil official system which leads the individual past record data civil official of the automobile aluminum wheel

Country Status (1)

Country Link
KR (1) KR100907297B1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20200038693A (en) 2018-10-04 2020-04-14 정상길 System for automatically producing automobile aluminium wheel

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101425471B1 (en) * 2012-12-10 2014-08-01 신우코스텍 (주) Manufacture system for wheel and Method using the same
CN106127099B (en) * 2016-07-05 2022-04-26 纷美(北京)贸易有限公司 Method and system for associating code spraying data and two-dimensional code information on same product
CN108399447A (en) * 2018-05-16 2018-08-14 苏州德佑昊自动化设备有限公司 Automotive hub one-dimension code setting method
CN109272329A (en) * 2018-07-05 2019-01-25 安徽胜利精密制造科技有限公司 Information source tracing is realized by laser carving bar code, reading code
KR102268732B1 (en) * 2019-09-05 2021-06-25 김영남 Method for tracking record employing QR code marking
CN112269360A (en) * 2020-10-28 2021-01-26 贵阳铝镁设计研究院有限公司 Intelligent data analysis system based on alumina production
CN112700119A (en) * 2020-12-29 2021-04-23 浙江精工钢结构集团有限公司 Material tracing management method

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20050030316A (en) * 2003-09-25 2005-03-30 현대자동차주식회사 System for inputting control function in the electronic control unit at the production line of vehicle
KR20060071206A (en) * 2004-12-21 2006-06-26 (주)에프알텍 Synchronizing of the tdd wireless repeater

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20050030316A (en) * 2003-09-25 2005-03-30 현대자동차주식회사 System for inputting control function in the electronic control unit at the production line of vehicle
KR20060071206A (en) * 2004-12-21 2006-06-26 (주)에프알텍 Synchronizing of the tdd wireless repeater

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20200038693A (en) 2018-10-04 2020-04-14 정상길 System for automatically producing automobile aluminium wheel

Also Published As

Publication number Publication date
KR20080088537A (en) 2008-10-02

Similar Documents

Publication Publication Date Title
KR100907297B1 (en) The manufacturing process civil official system which leads the individual past record data civil official of the automobile aluminum wheel
Beamon Supply chain design and analysis:: Models and methods
Schulze et al. Applying activity-based costing in a supply chain environment
Mackelprang et al. Relationship between just-in-time manufacturing practices and performance: A meta-analytic investigation
Singh et al. Managing industrial operations by lean thinking using value stream mapping and six sigma in manufacturing unit: Case studies
Castorena et al. The influence of information technology and communication supply chain management performance for greater SME manufacturing in aguascalientes
US20070156498A1 (en) Generating information for use in performing physical operations
KR102345145B1 (en) Production and logistics ERP automation system by linking and using customer information
Ping Yi et al. Reducing electronic component losses in lean electronics assembly with Six Sigma approach
Elmoselhy Hybrid lean-agile manufacturing system strategic facet in automotive sector
Lee et al. Simulation-based work plan verification in shipyards
Sillanpää et al. The literature review of supply chain performance measurement in the manufacturing industry
Kabadurmus et al. Design of pull production control systems using axiomatic design principles
Wu et al. Manufacturing strategy analysis and manufacturing information system design: Process and application
Kasemsap The role of lean production on organizational performance
Molina et al. Application of enterprise models and simulation tools for the evaluation of the impact of best manufacturing practices implementation
Ani et al. Factory-in-factory concept as a new business model for automotive production system
Landa et al. Reduction of delivery times in a Peruvian metal-mechanical company
Rambabu et al. Gap analysis and optimization of process involved in product design and development by integrating enterprise resource planning & product lifecycle management
Chellaboina et al. Benchmarking Manufacturing Execution System (MES) Deployed Across Automotive Manufacturing Industries Towards IOT 4.0
Liebetrau Global Traceability as a Competitive Advantage: The Model-Based Approach of a Tier-1 Automotive Supplier
Wadhwa Traceability and Data Support in SME Manufacturing
Trappey et al. SETZ logistics models and system framework for manufacturing and exporting large engineering assets
Mariappan et al. Intelligent VSM Model: a way to adopt Industry 4.0 technologies in manufacturing industry
Nowak et al. The synergy of lean thinking and process analysis as the way to reduce waste in intralogistics

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20130516

Year of fee payment: 5

FPAY Annual fee payment

Payment date: 20140630

Year of fee payment: 6

FPAY Annual fee payment

Payment date: 20160627

Year of fee payment: 8

FPAY Annual fee payment

Payment date: 20180703

Year of fee payment: 10

FPAY Annual fee payment

Payment date: 20190731

Year of fee payment: 11