KR100862062B1 - A knockdown culvert - Google Patents

A knockdown culvert Download PDF

Info

Publication number
KR100862062B1
KR100862062B1 KR1020080022903A KR20080022903A KR100862062B1 KR 100862062 B1 KR100862062 B1 KR 100862062B1 KR 1020080022903 A KR1020080022903 A KR 1020080022903A KR 20080022903 A KR20080022903 A KR 20080022903A KR 100862062 B1 KR100862062 B1 KR 100862062B1
Authority
KR
South Korea
Prior art keywords
coupling
culvert
prefabricated
coupled
bottom plate
Prior art date
Application number
KR1020080022903A
Other languages
Korean (ko)
Inventor
조지현
Original Assignee
(주)한국주조
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by (주)한국주조 filed Critical (주)한국주조
Priority to KR1020080022903A priority Critical patent/KR100862062B1/en
Application granted granted Critical
Publication of KR100862062B1 publication Critical patent/KR100862062B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/045Underground structures, e.g. tunnels or galleries, built in the open air or by methods involving disturbance of the ground surface all along the location line; Methods of making them
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B5/00Artificial water canals, e.g. irrigation canals
    • E02B5/02Making or lining canals
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16BDEVICES FOR FASTENING OR SECURING CONSTRUCTIONAL ELEMENTS OR MACHINE PARTS TOGETHER, e.g. NAILS, BOLTS, CIRCLIPS, CLAMPS, CLIPS OR WEDGES; JOINTS OR JOINTING
    • F16B35/00Screw-bolts; Stay-bolts; Screw-threaded studs; Screws; Set screws

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Environmental & Geological Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Sewage (AREA)

Abstract

A prefabricated culvert is provided to facilitate coupling construction of culvert units and save the construction time, manpower and cost. A prefabricated culvert(1) comprises a plurality of culvert units(5). Each culvert unit includes a bottom plate(20), both side plates(30), a top plate(40) integrally formed with each other so that a common duct(10) is formed therein. Each culvert unit includes an upper coupling section(50) at one end thereof and a lower coupling section(60) at the other end thereof. The upper coupling section integrally protrudes from the bottom plate and both side plates and has a coupling slit(51) at the inner side thereof. The lower coupling section integrally protrudes from the top plate, both side plates and the bottom plate. The lower coupling section has coupling ribs(61) corresponding to the coupling slit at the both sides and lower side thereof, and a locking protrusion(63) locked with the upper end of the upper coupling section at the upper side thereof.

Description

조립식 암거{A Knockdown culvert} Prefabricated Culvert {A Knockdown culvert}

본 발명은 조립식 암거에 관한 것으로서, 보다 상세하게는 길이방향으로 결합되는 암거유니트들의 결합 구조를 개선하여 시공의 편의성을 도모한 조립식 암거에 관한 것이다. The present invention relates to a prefabricated culvert, and more particularly, to a prefabricated culvert designed for convenience of construction by improving the coupling structure of the culvert units are coupled in the longitudinal direction.

일반적으로 암거는 우수, 오수 및 농공업용수 등의 수로를 형성하거나, 인도 및 차도 등의 통행로를 만드는데 사용되는 한편, 전기통신선 등의 매설을 위한 지하공동구의 건설 등에 다양하게 사용되고 있다. In general, culverts are used to form waterways such as stormwater, sewage and agricultural industrial water, or to create passageways such as sidewalks and driveways, and are widely used in the construction of underground joints for laying telecommunication lines.

이러한 암거는 내부에 공동구가 형성된 암거유니트를 공장에서 다량으로 미리 제작하고, 시공 현장에서 미리 설계된 구조에 따라서 암거유니트의 공동구가 상호 연통되도록 암거유니트들을 상호 길이방향으로 결합하여 소정의 통로를 형성하는 조립식 암거가 널리 이용되고 있다. These culverts are pre-fabricated in the factory with a large number of culvert units with hollow holes formed therein, and the culvert units are longitudinally coupled to each other so that the cavities of the culvert units communicate with each other according to a predesigned structure at the construction site to form a predetermined passage. Prefabricated culverts are widely used.

종래 조립식 암거(101)의 일 예가 도 1 및 도 2에 사시도와 단면도로 도시되어 있다. 이들 도면에 도시된 바와 같이, 종래 조립식 암거(101)는 내부에 공동구(110)가 형성되도록 상호 연속적으로 결합되는 복수의 암거유니트(105)를 가진 다. An example of a conventional prefabricated culvert 101 is shown in perspective and sectional views in FIGS. 1 and 2. As shown in these figures, the conventional prefabricated culvert 101 has a plurality of culvert units 105 that are continuously coupled to each other so that the cavity sphere 110 is formed therein.

각 암거유니트(105)는 저판부(120)와 양 측벽부(130) 및 상판부(140)가 상호 일체로 형성되어 있는 구조를 가지고 있다. 그리고, 각 암거유니트(105)의 일측 단부에는 저판부(120)의 하부면으로부터 상향 함몰된 결합턱(121)이 형성되어 있으며, 이에 대향하는 타측 단부에는 결합턱(121)과 상호 형상 맞춤되도록 결합연장부(123)가 형성되어 있다. 또한, 각 암거유니트(105)의 일측 단부에는 공동구(110)의 둘레방향을 따라 돌출된 결합리브(141)가 형성되어 있으며, 이에 대향하는 타측 단부에는 공동구(110)의 둘레방향을 따라 결합리브(141)와 형상 맞춤되는 리브수용부(143)이 형성되어 있다. Each culvert unit 105 has a structure in which the bottom plate portion 120, both side wall portions 130, and the top plate portion 140 are integrally formed with each other. In addition, the coupling jaw 121 recessed upward from the bottom surface of the bottom plate part 120 is formed at one end of each culvert unit 105, and the other end opposite to the coupling jaw 121 is formed to be mutually shaped. Coupling extension part 123 is formed. In addition, a coupling rib 141 protruding along the circumferential direction of the cavity sphere 110 is formed at one end of each culvert unit 105, and a coupling rib along the circumferential direction of the cavity sphere 110 is formed at the other end opposite thereto. A rib receiving portion 143 is formed in shape fitting with 141.

한편, 각 암거유니트(105)의 내부 각 모서리 영역에는 암거유니트(105)의 길이방향을 따라 (111)가 형성되어 있고, 각 (111)에는 암거유니트(105)의 일측 단부의 각 모서리 영역으로부터 타측 단부의 각 모서리 영역까지 연결케이블(150)이 통과할 수 있도록 길이방향을 따라 케이블통과공(113)이 형성되어 있다. 그리고, 각 암거유니트(105)의 내측 (111) 중앙 영역에는 상호 인접 배치된 양 암거유니트(105)의 케이블통과공(113)을 통과한 케이블의 일단을 고정할 수 있도록 함몰된 케이블고정부(115)가 형성되어 있다. On the other hand, (111) is formed in each corner region of the culvert unit 105 along the longitudinal direction of the culvert unit 105, and each (111) from each corner region of one end of the culvert unit 105 A cable passing hole 113 is formed along the longitudinal direction so that the connection cable 150 can pass to each corner region of the other end portion. In addition, a cable fixing part recessed to fix one end of the cable passing through the cable through hole 113 of both culvert units 105 disposed adjacent to each other in the inner 111 central region of each culvert unit 105 ( 115 is formed.

이러한 구조를 갖는 종래 조립식 암거(101)는 시공시 어느 하나의 암거유니트(105)를 시공 위치에 배치하고, 이 암거유니트(105)의 전방 또는 후방에 다른 암거유니트(105)를 위치시킨 상태에서 양 암거유니트(105)의 결합리브(141)와 결함슬 릿 및 결합턱(121)과 결합연장부(123)가 형상 맞춤되도록 양 암거유니트(105)를 상호 인접시킨 후, 연결케이블(150)을 케이블통과공(113)으로 통과시키고, 양 암거유니트(105)의 내부에 형성된 케이블고정부(115)에서 연결케이블(150)을 암거유니트(105)의 케이블고정부(115)에 고정시키는 방법으로 시공한다. In the conventional assembled culvert 101 having such a structure, any one culvert unit 105 is disposed at a construction position during construction, and the other culvert unit 105 is positioned in front of or behind the culvert unit 105. After the coupling ribs 141 of the two culvert units 105, the defect slit, the coupling jaw 121, and the coupling extension portion 123 are adjacent to each other so as to conform the shape, the connection cable 150 To pass through the cable through hole 113, the cable fixing portion 115 formed in the interior of the both culvert unit 105, the fixing cable 150 to the cable fixing portion 115 of the culvert unit 105 Construct with

그런데, 이러한 종래 조립식 암거는 암거유니트들이 길이방향으로 결합되기 때문에, 인접하는 암거유니트의 결합시 결합리브와 결함슬릿 및 결합턱과 결합연장부, 그리고, 케이블통과공을 정확하게 일치시켜야 한다. However, in the conventional prefabricated culvert, the culvert units are coupled in the longitudinal direction, so that when the culvert units are adjacent to each other, the joining ribs, the defect slits, the joining jaws, the joining extensions, and the cable passing holes must be exactly aligned.

이에 의해, 시공 현장에서 크래인 등을 이용하여 암거유니트의 결합위치를 정확하게 배치하는데 매우 많은 시간과 인력 및 장비가 필요하므로, 시공이 매우 불편하고 시공시간 및 시공비가 증가되는 문제점이 발생하였다. As a result, a very large amount of time, manpower, and equipment are required to accurately position the coupling position of the culvert unit using a crane or the like at the construction site, and thus construction is very inconvenient and construction time and construction cost increase.

또한, 인접하는 양 암거유니트의 케이블통과공으로 연결케이블을 관통시킨 후 작업자가 일일이 연결케이블을 고정시켜야 하므로 시공 작업의 불편함과 시공 작업 인원이 증가되고, 시공시간과 자재비용 상승에 의해 시공비 증가가 더욱 가중되는 문제점이 있었다. In addition, after passing the connecting cable through the cable passing holes of the two culvert units, the worker must fix the connecting cable one by one, thus increasing the inconvenience of construction work and the number of construction workers, and increasing the construction cost by increasing the construction time and material cost. There was a problem that was further aggravated.

따라서, 본 발명의 목적은 암거유니트들의 결합 시공이 매우 간편하고, 시공시간과 시공 작업 인력 및 시공비용을 현격하게 절감할 수 있는 조립식 암거를 제공하는 것이다. Accordingly, an object of the present invention is to provide a prefabricated culvert that is very easy to combine construction of culvert units, significantly reducing the construction time and construction work personnel and construction costs.

상기 목적은 본 발명에 따라, 내측에 공동구가 형성되도록 저판부와 양 측벽부 및 상판부가 상호 일체로 형성되어 있으며 상호 길이방향으로 접하게 결합되는 복수의 암거유니트를 갖는 조립식 암거에 있어서, 상기 각 암거유니트의 일측 단부에는 상기 공동구 둘레 영역의 저판부와 양 측벽부로부터 일체로 돌출 형성되며 내측면에 결합슬릿이 형성되어 있는 상향결합부가 형성되어 있고; 타측 단부에는 상기 공동구 둘레 영역의 상기 상판부와 양 측벽부 및 저판부로부터 일체로 돌출 형성되며, 양측과 하부에 상기 결합슬릿에 상하 방향으로 형상 맞춤되는 결합리브가 형성되어 있고, 상부에 상기 상향결합부의 상단에 접하도록 걸리는 걸림단을 갖는 하향결합부가 형성되어 있는 것을 특징으로 하는 조립식 암거에 의해서 달성된다. According to the present invention, in the prefabricated culvert having a plurality of culvert units are formed integrally with each other and formed in contact with each other in the longitudinal direction and the bottom plate portion and both side wall portion and the top plate so that the cavity is formed on the inside, each culvert At one end of the unit is formed an integrally protruding portion from the bottom plate portion and both side wall portions of the cavity peripheral region and an upward coupling portion having a coupling slit formed on an inner side thereof; The other end portion is formed integrally projecting from the upper plate portion, both side wall portion and the bottom plate portion of the cavity around the cavity, the coupling ribs are formed on both sides and the lower portion of the coupling slit in the vertical direction, the upper coupling portion at the top It is achieved by a prefabricated culvert, characterized in that the down coupling portion having a locking end to be in contact with the top is formed.

여기서, 상기 결합슬릿과 상기 결합리브의 폭은 상부로부터 하부를 향할수록 점진적으로 축소되는 것이 바람직하다. Here, the width of the coupling slit and the coupling rib is preferably reduced gradually from the top to the bottom.

그리고, 상기 결합슬릿의 내면과 상기 결합리브의 외면에는 보강재가 결합되어 있는 것이 효과적이다. In addition, it is effective that the reinforcing material is coupled to the inner surface of the coupling slit and the outer surface of the coupling rib.

이때, 상기 상향결합부의 양측 상단과 이에 대응하는 상기 하향결합부의 양측 상부는 결합부재로 상호 결합되는 것이 보다 바람직하다. At this time, it is more preferable that both upper ends of the upper coupling portion and both upper portions of the down coupling portion corresponding thereto are coupled to each other by a coupling member.

삭제delete

또한, 상기 상향결합부와 하향결합부의 접촉 결합면에 지수링이 개재되는 것이 바람직하다. In addition, it is preferable that the index ring is interposed on the contact coupling surface of the uplink and downlink.

이에 의해, 암거유니트들의 결합 시공이 매우 간편하고, 시공시간과 시공 작업 인력 및 시공비용을 현격하게 절감할 수 있는 조립식 암거가 제공된다. As a result, the combined construction of the culvert units is very easy, and a prefabricated culvert can be provided that can significantly reduce the construction time, construction work personnel and construction costs.

도 3은 본 발명의 일 실시예에 따른 조립식 암거의 사시도이고, 도 4는 도 3의 A-A선에 따른 조립식 암거 결합상태의 평단면도이다. 이들 도면에 도시된 바와 같이, 본 실시예에 따른 조립식 암거(1)는 상호 상하 맞물림 결합되는 복수의 암거유니트(5)를 가진다. Figure 3 is a perspective view of a prefabricated culvert according to an embodiment of the present invention, Figure 4 is a cross-sectional plan view of the prefabricated culvert coupled state according to line A-A of FIG. As shown in these figures, the prefabricated culvert 1 according to the present embodiment has a plurality of culvert units 5 engaged up and down with each other.

각 암거유니트(5)는 내측에 공동구(10)가 형성되도록 저판부(20)와 양 측벽부(30) 및 상판부(40)가 상호 일체로 형성되어 있는 구조를 가지고 있다. Each culvert unit 5 has a structure in which the bottom plate portion 20, both side wall portions 30, and the top plate portion 40 are integrally formed with each other so that the cavity 10 is formed therein.

이들 각 암거유니트(5)의 일측 단부에는 인접하는 암거유니트(5)와의 결합을 위해 공동구(10) 둘레 영역의 저판부(20)와 양 측벽부(30)로부터 ∪자 형상으로 돌출된 상향결합부(50)가 형성되어 있고, 타측 단부에는 상향결합부(50)에 상하 방향으로 형상 맞춤되도록 결합되는 하향결합부(60)가 공동구(10) 둘레 영역의 상판부(40)와 양 측벽부(30) 및 저판부(20)로부터 돌출 형성되어 있다. At one end of each of the culvert units 5, an upward coupling protruding in a U-shape from the bottom plate portion 20 and both side wall portions 30 of the circumferential region of the cavity 10 for engagement with the adjacent culvert units 5; A portion 50 is formed, and the other end portion has a down coupling portion 60 coupled to the up coupling portion 50 to be shape-fitted in the up and down direction, and the upper plate portion 40 and both side wall portions of the circumferential region 10. 30 and protruding from the bottom plate 20.

그리고, 상향결합부(50)의 내측면에는 단면 투영시 상향결합부(50)의 최상단으로부터 홈형상을 갖는 결합슬릿(51)이 상향결합부(50)의 내측면 길이방향을 따라 형성되어 있다. 즉, 상향결합부(50)의 양측 대향면과 하측 상부면에 결합슬릿(51) 이 형성되어 있다. 이 결합슬릿(51)은 상향결합부(50)의 상부로부터 하부를 향할수록 그 폭이 점진적으로 축소되는 구조를 갖는 것이 바람직하다. In addition, a coupling slit 51 having a groove shape is formed along the inner side length of the up coupling portion 50 on the inner side of the up coupling portion 50 from the uppermost end of the up coupling portion 50 during cross-sectional projection. . That is, the coupling slit 51 is formed on both opposing surfaces and the lower upper surface of the up coupling portion 50. The coupling slit 51 preferably has a structure in which the width thereof gradually decreases from the upper side to the lower side of the upward coupling part 50.

상대적으로 하향결합부(60)의 외측면, 즉 하향결합부(60)의 양측과 하부 외측면에는 상향결합부(50)의 결합슬릿(51)에 대응하는 결합리브(61)가 하형결합부의 외측면 길이방향을 따라 돌출 형성되어 있다. 그리고, 하향결합부(60)의 상부에는 상향결합부(50)의 양 상단에 접하는 걸림단(63)이 형성되어 있다. 이때, 결합리브(61)는 결합슬릿(51)에 대응하여 형상 맞춤되도록 하향결합부(60)의 상부로부터 하부를 향할수록 그 폭이 점진적으로 축소되는 구조를 가지고 있다. On the outer side of the down coupling part 60, that is, on both sides and the lower outer side of the down coupling part 60, the coupling rib 61 corresponding to the coupling slit 51 of the up coupling part 50 has a lower coupling part. It protrudes along the outer side longitudinal direction. And, the upper end of the down coupling portion 60 is formed with the engaging end 63 in contact with both upper ends of the up coupling portion (50). In this case, the coupling rib 61 has a structure in which the width thereof gradually decreases from the upper portion to the lower portion of the down coupling portion 60 so as to conform to the coupling slit 51.

여기서, 결합슬릿(51)의 내면과 결합리브(61)의 외면에는 암거유니트(5) 간의 상호 결합시 결합슬릿(51)과 결합리브(61)의 파손을 방지하기 위하여 도 4에 확대도로 도시된 바와 같이, 보강재(55)가 결합되어 있는 것이 바람직하다. Here, the inner surface of the coupling slit 51 and the outer surface of the coupling rib 61 are shown in enlarged view in FIG. 4 to prevent breakage of the coupling slit 51 and the coupling rib 61 during mutual coupling between the culvert units 5. As shown, the reinforcement 55 is preferably coupled.

한편, 상향결합부(50)의 양측 상단과 이에 대응하는 하향결합부(60)의 양측 상부에는 상향결합부(50)와 하향결합부(60)의 결합상태를 유지시키기 위한 결합부재(70)가 마련되어 있는 것이 바람직하다. 이 결합부재(70)는 상향결합부(50) 양측 상단에 매입되는 암나사부재(71)와, 이에 대응하는 하향결합부(60)의 양측 상부에 형성되는 결합공(73)을 통해 암나사부재(71)에 체결되는 볼트부재(75)로 마련될 수 있다. 물론, 결합부재(70)는 암나사부재(71) 및 볼트부재(75) 외에 여타 다양한 결합부품을 이용할 수 있다. On the other hand, the coupling member 70 for maintaining the coupling state of the up coupling portion 50 and the down coupling portion 60 on the upper side of both sides of the up coupling portion 50 and the upper side of the down coupling portion 60 corresponding thereto. It is preferable that is provided. The coupling member 70 is a female screw member 71 through the female screw member 71 which is embedded in the upper side of the upper coupling portion 50 and the coupling hole 73 formed on both upper sides of the corresponding downward coupling portion 60 ( It may be provided with a bolt member 75 fastened to the 71. Of course, the coupling member 70 may use a variety of other coupling components in addition to the female screw member 71 and the bolt member 75.

또한, 조립식 암거(1)의 용도가 수로로 이용될 경우에는 상향결합부(50)와 하향결합부(60)의 결합면에 지수링을 마련하여 누수를 방지할 수 있다. In addition, when the use of the prefabricated culvert 1 is used as a water channel can be provided by the water ring on the coupling surface of the up coupling portion 50 and the down coupling portion 60 to prevent leakage.

이러한 구조를 갖는 본 실시예에 따른 조립식 암거(1)는 시공시 어느 하나의 암거유니트(5)를 시공 위치에 배치하고, 이 암거유니트(5)의 상향결합부(50) 상부에 다른 암거유니트(5)의 하향결합부(60)가 위치하도록 결합될 암거유니트(5)를 크래인 등의 장비로 배치시킨다. The prefabricated culvert 1 according to the present embodiment having such a structure arranges any one culvert unit 5 at a construction position during construction, and the other culvert units on the upper coupling portion 50 of the culvert unit 5. The culvert unit (5) to be coupled so that the down coupling part (60) of (5) is positioned by means of equipment such as crane.

이 상태에서 양 암거유니트(5)의 상향결합부(50)와 하향결합부(60)가 상호 상하방향으로 겹쳐지면서 맞물림 결합될 수 있도록 결합될 암거유니트(5)를 하향 이동시킨다. In this state, the culling unit 5 to be coupled is moved downward so that the up coupling portion 50 and the down coupling portion 60 of both culvert units 5 can be engaged with each other while overlapping in the vertical direction.

그러면, 시공 위치에 미리 배치된 암거유니트(5)의 상향결합부(50) 결합슬릿(51)에 결합될 암거유니트(5)의 하향결합부(60) 결합리브(61)가 삽입되면서 양 암거유니트(5)가 간단하게 결합된다. 이때, 상호 결합되는 양 암거유니트(5)의 상형결합부와 하향결합부(60)는 상부로부터 하부로 갈수록 그 폭이 점진적으로 축소되는 구조에 의해 보다 간단하고 원활하게 상호 결합된다. Then, both of the culverts are inserted while the coupling ribs 61 of the down coupling part 60 of the culvert unit 5 to be coupled to the coupling part slit 51 of the up coupling part 50 of the culvert unit 5 previously disposed at the construction position are inserted. The unit 5 is simply combined. At this time, the upper coupling portion and the down coupling portion 60 of the two culvert units 5 are coupled to each other more simply and smoothly coupled by a structure that gradually decreases in width from the top to the bottom.

양 암거유니트(5)가 상호 결합된 상태에서 하향결합부(60)의 양측 상부에 형성된 결합공(73)으로 볼트부재(75)를 삽입하여 상향결합부(50) 양측 상단에 마련된 너트부재와 체결하면 양 암거유니트(5)의 상호 결합이 완료된다. The nut member provided at the upper side of the upper coupling portion 50 by inserting the bolt member 75 into the coupling hole 73 formed on the upper side of both sides of the down coupling portion 60 in a state where the two culvert units 5 are mutually coupled with each other; When fastened, the coupling between the two culvert units 5 is completed.

한편, 도 5는 본 발명의 다른 실시예에 따른 조립식 암거(1)의 사시도이다. 이 도면에 도시된 바와 같이, 본 실시예에 따른 조립식 암거(1)는 전술한 도 3 및 도 4의 실시예에 따른 조립식 암거(1)와 상향결합부(50)와 하향결합부(60)의 상하길이를 제외한 나머지 구조가 거의 동일하므로 그 구조에 대한 상세한 설명은 생략한다. On the other hand, Figure 5 is a perspective view of the prefabricated culvert 1 according to another embodiment of the present invention. As shown in this figure, the prefabricated culvert 1 according to the present embodiment is a prefabricated culvert 1 according to the embodiment of Figures 3 and 4 described above and the up-coupled portion 50 and the down-coupled portion 60. Since the rest of the structure is almost the same except for the vertical length of, the detailed description of the structure is omitted.

본 실시예에 따른 조립식 암거(1)는 상향결합부(50)와 하향결합부(60)의 상하 길이를 축소함으로서, 상호 인접하게 결합되는 양 암거유니트(5)를 결함할 때, 암거유니트(5)의 상하 결함을 위해 이동거리를 줄임으로써, 보다 빠르고 간편하게 암거유니트(5)들을 상호 결합할 수 있다. The prefabricated culvert 1 according to the present embodiment reduces the vertical lengths of the up-coupled part 50 and the down-coupled part 60, so that when the two culvert units 5 which are adjacently coupled to each other are defective, the culvert unit ( By reducing the travel distance for the up and down defects of 5), the culvert units 5 can be combined with each other more quickly and simply.

이와 같이, 본 발명에 따른 조립식 암거는 암거유니트들의 길이 방향 양측 단부에 상호 상하 방향으로 맞물리는 상향결합부와 하향결합부를 형성함으로써, 시공 위치에 미리 배치된 암거유니트에 다른 암거유니트를 결합할 때, 상향결합부와 하향결합부간의 상하 위치를 일치시킨 후 결합될 암거유니트를 하향 이동시키는 것만으로 암거유니트들이 간편하고 빠르게 결합된다.As such, the prefabricated culvert according to the present invention forms an up-coupled portion and a down-coupled portion that are engaged with each other in the vertical direction at both ends in the longitudinal direction of the culvert units, so that when the other culvert units are coupled to the culvert units pre-positioned at the construction position After aligning the up and down positions between the uplink and downlink sections, the culvert units are simply and quickly combined by simply moving the culvert units to be combined downward.

이에 의해, 조립식 암거의 시공이 매우 간편하고, 시공시간 및 작업인원이 현격하게 축소되어 시공비를 절감할 수 있다.As a result, the construction of the prefabricated culvert is very easy, and the construction time and the number of workers are significantly reduced, thereby reducing the construction cost.

또한, 양 암거유니트가 상하 이동에 의해 결합된 상태에서 인전하게 결합된 양 암거유니트의 상부 양측에만 결합부재로 견고하게 체결하면 되므로, 결합된 암거유니트의 견고한 고정을 위한 자재비 및 작업시간과 작업자를 절감할 수 있다.In addition, since both culvert units are firmly fastened with the coupling member only on both upper sides of the culvert units, which are combined in a state in which the culvert units are combined by up and down movement, material costs, working hours and workers for the firm fixing of the culvert units are combined. Can be saved.

도 1은 종래 조립식 암거의 사시고, 1 is a conventional prefabricated culvert,

도 2는 도 1의 조립식 암거의 측단면도,Figure 2 is a side cross-sectional view of the prefabricated culvert of Figure 1,

도 3은 본 발명의 일 실시예에 따른 조립식 암거의 사시도, 3 is a perspective view of a prefabricated culvert according to an embodiment of the present invention,

도 4는 도 3의 A-A선에 따른 조립식 암거 결합상태의 평단면도,Figure 4 is a cross-sectional plan view of the prefabricated culvert coupled state along line A-A of Figure 3,

도 5는 본 발명의 다른 실시예에 따른 조립식 암거의 사시도. 5 is a perspective view of a prefabricated culvert according to another embodiment of the present invention.

* 도면의 주요 부분에 대한 부호의 설명* Explanation of symbols for the main parts of the drawings

5 : 암거유니트 10 : 공동구 5: culvert unit 10: joint ball

20 : 저판부 20: bottom plate

30 : 측벽부 40 : 상판부30 side wall part 40 upper plate part

50 : 상향결합부 51 : 결합슬릿50: up coupling unit 51: coupling slit

55 : 보강재 60 : 하향결합부55: reinforcement 60: downlink portion

61 : 결합리브 70 : 결합부재61: coupling rib 70: coupling member

Claims (6)

내측에 공동구가 형성되도록 저판부와 양 측벽부 및 상판부가 상호 일체로 형성되어 있으며 상호 길이방향으로 접하게 결합되는 복수의 암거유니트를 갖는 조립식 암거에 있어서, In the prefabricated culvert having a plurality of culvert units are formed integrally with each other and the bottom plate portion, both side wall portion and the upper plate portion is formed integrally with each other so that the cavity is formed inside, 상기 각 암거유니트의 Of each culvert unit 일측 단부에는 상기 공동구 둘레 영역의 저판부와 양 측벽부로부터 일체로 돌출 형성되며 내측면에 결합슬릿이 형성되어 있는 상향결합부가 형성되어 있고; At one end portion is formed an integrally protruding from the bottom plate portion and both side wall portions of the cavity sphere peripheral area and the coupling portion is formed on the inner side of the coupling; 타측 단부에는 상기 공동구 둘레 영역의 상기 상판부와 양 측벽부 및 저판부로부터 일체로 돌출 형성되며, 양측과 하부에 상기 결합슬릿에 상하 방향으로 형상 맞춤되는 결합리브가 형성되어 있고, 상부에 상기 상향결합부의 상단에 접하도록 걸리는 걸림단을 갖는 하향결합부가 형성되어 있는 것을 특징으로 하는 조립식 암거. The other end portion is formed integrally projecting from the upper plate portion, both side wall portion and the bottom plate portion of the cavity around the cavity, the coupling ribs are formed on both sides and the lower portion of the coupling slit in the vertical direction, the upper coupling portion at the top Prefabricated culvert, characterized in that the down coupling portion having a locking end is formed to contact the upper end. 제1항에 있어서, The method of claim 1, 상기 결합슬릿과 상기 결합리브의 폭은 상부로부터 하부를 향할수록 점진적으로 축소되는 것을 특징으로 하는 조립식 암거. Prefabricated culvert, characterized in that the width of the coupling slit and the coupling rib is gradually reduced from the top to the bottom. 제2항에 있어서, The method of claim 2, 상기 결합슬릿의 내면과 상기 결합리브의 외면에는 보강재가 결합되어 있는 것을 특징으로 하는 조립식 암거. Prefabricated culvert, characterized in that the reinforcing material is coupled to the inner surface of the coupling slit and the outer surface of the coupling rib. 제1항에 있어서, The method of claim 1, 상기 상향결합부의 양측 상단과 이에 대응하는 상기 하향결합부의 양측 상부는 결합부재로 상호 결합되는 것을 특징으로 하는 조립식 암거. Prefabricated culverts, characterized in that the upper side of the both sides of the up-coupled portion and the upper side of both sides of the down-coupled portion corresponding to each other by a coupling member. 삭제delete 제1항에 있어서, The method of claim 1, 상기 상향결합부와 하향결합부의 접촉 결합면에 지수링이 개재되는 것을 특징으로 하는 조립식 암거. Prefabricated culvert, characterized in that the index ring is interposed on the contact coupling surface of the uplink and downlink.
KR1020080022903A 2008-03-12 2008-03-12 A knockdown culvert KR100862062B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020080022903A KR100862062B1 (en) 2008-03-12 2008-03-12 A knockdown culvert

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020080022903A KR100862062B1 (en) 2008-03-12 2008-03-12 A knockdown culvert

Publications (1)

Publication Number Publication Date
KR100862062B1 true KR100862062B1 (en) 2008-10-09

Family

ID=40152867

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020080022903A KR100862062B1 (en) 2008-03-12 2008-03-12 A knockdown culvert

Country Status (1)

Country Link
KR (1) KR100862062B1 (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101133158B1 (en) 2010-03-19 2012-04-19 주식회사 한양피씨 Chnage section connection structure for concrete pc box
KR101190129B1 (en) 2012-05-04 2012-10-16 장영미 Apparatus for connecting the precast concrete box culverts constructed in the slope
KR101371693B1 (en) 2013-10-31 2014-03-10 창전이앤시 주식회사 Unit connecter for easy maintenance control of common duct
KR101751981B1 (en) * 2016-10-04 2017-07-03 주식회사 보람 Gabion structure of ecological river embankment
KR102329866B1 (en) * 2021-04-28 2021-11-23 추홍수 Pc block connection socket and construction method using it
CN114561882A (en) * 2022-03-29 2022-05-31 北京市市政二建设工程有限责任公司 Frame box culvert jacking structure of underpass railway and construction method thereof

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR19990042021U (en) * 1998-05-29 1999-12-27 박병무 Culvert
KR200221917Y1 (en) * 2000-11-14 2001-04-16 정희창 Assembling concrete closed conduit
KR200403156Y1 (en) * 2005-09-07 2005-12-09 합명회사 남부산업 Articulated block for passage in mountain edge

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR19990042021U (en) * 1998-05-29 1999-12-27 박병무 Culvert
KR200221917Y1 (en) * 2000-11-14 2001-04-16 정희창 Assembling concrete closed conduit
KR200403156Y1 (en) * 2005-09-07 2005-12-09 합명회사 남부산업 Articulated block for passage in mountain edge

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101133158B1 (en) 2010-03-19 2012-04-19 주식회사 한양피씨 Chnage section connection structure for concrete pc box
KR101190129B1 (en) 2012-05-04 2012-10-16 장영미 Apparatus for connecting the precast concrete box culverts constructed in the slope
KR101371693B1 (en) 2013-10-31 2014-03-10 창전이앤시 주식회사 Unit connecter for easy maintenance control of common duct
KR101751981B1 (en) * 2016-10-04 2017-07-03 주식회사 보람 Gabion structure of ecological river embankment
KR102329866B1 (en) * 2021-04-28 2021-11-23 추홍수 Pc block connection socket and construction method using it
CN114561882A (en) * 2022-03-29 2022-05-31 北京市市政二建设工程有限责任公司 Frame box culvert jacking structure of underpass railway and construction method thereof
CN114561882B (en) * 2022-03-29 2023-09-15 北京市市政二建设工程有限责任公司 Frame box culvert jacking structure of underpass railway and construction method thereof

Similar Documents

Publication Publication Date Title
KR100862062B1 (en) A knockdown culvert
KR100892593B1 (en) Assembly manhole
EP3088617B1 (en) Wall with a passageway and a method for the production thereof
KR101556674B1 (en) Steel pipe assembly and construction method of steel pipe structure using the same
KR101477214B1 (en) Prefabricating wall shaped mold unit using horizontal adjustable underpinning and constructing method thereof
KR100349400B1 (en) Precasted culvert
WO2013178644A1 (en) Ducting chamber ring and module, a ducted chamber and a method of assembling a modular chamber system
TWM543900U (en) Rebar coupler
KR200216305Y1 (en) Precasted culvert
KR20090114536A (en) Waterway pipe using clay
KR20160140122A (en) Conduit trench for draining water of the underground building structure
KR102227144B1 (en) Pipe tube forming device
KR200273404Y1 (en) Precasted culvert
KR20000027675A (en) Assembly type culvert and inatalling method thereof
KR200439332Y1 (en) Drainage Trench Unit
KR101494647B1 (en) Apparatus for connecting of plastic pipe
JP6483575B2 (en) Segment frame, segment manufacturing method, and segment
KR102506180B1 (en) Precast culverts with shear key holes
KR19990042102U (en) Culvert
KR200439333Y1 (en) Drainage Trench Unit
KR20030001654A (en) watercourse pipe
KR200381471Y1 (en) A waterway duct unit
KR101059542B1 (en) manhole
KR102222475B1 (en) Height adjustabl manhole cover structure
KR200398131Y1 (en) A Block of Drain and Irrigation Water Road

Legal Events

Date Code Title Description
A201 Request for examination
A302 Request for accelerated examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20120831

Year of fee payment: 5

FPAY Annual fee payment

Payment date: 20131031

Year of fee payment: 6

LAPS Lapse due to unpaid annual fee