KR100858139B1 - Corrosion prevention ring insertion apparatus of iron pipe - Google Patents

Corrosion prevention ring insertion apparatus of iron pipe Download PDF

Info

Publication number
KR100858139B1
KR100858139B1 KR1020070038188A KR20070038188A KR100858139B1 KR 100858139 B1 KR100858139 B1 KR 100858139B1 KR 1020070038188 A KR1020070038188 A KR 1020070038188A KR 20070038188 A KR20070038188 A KR 20070038188A KR 100858139 B1 KR100858139 B1 KR 100858139B1
Authority
KR
South Korea
Prior art keywords
iron pipe
corrosion
ring
cast iron
perforated
Prior art date
Application number
KR1020070038188A
Other languages
Korean (ko)
Inventor
이기완
Original Assignee
진원개발 주식회사
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 진원개발 주식회사 filed Critical 진원개발 주식회사
Priority to KR1020070038188A priority Critical patent/KR100858139B1/en
Application granted granted Critical
Publication of KR100858139B1 publication Critical patent/KR100858139B1/en

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23PMETAL-WORKING NOT OTHERWISE PROVIDED FOR; COMBINED OPERATIONS; UNIVERSAL MACHINE TOOLS
    • B23P19/00Machines for simply fitting together or separating metal parts or objects, or metal and non-metal parts, whether or not involving some deformation; Tools or devices therefor so far as not provided for in other classes
    • B23P19/02Machines for simply fitting together or separating metal parts or objects, or metal and non-metal parts, whether or not involving some deformation; Tools or devices therefor so far as not provided for in other classes for connecting objects by press fit or for detaching same
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L58/00Protection of pipes or pipe fittings against corrosion or incrustation
    • F16L58/02Protection of pipes or pipe fittings against corrosion or incrustation by means of internal or external coatings
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L58/00Protection of pipes or pipe fittings against corrosion or incrustation
    • F16L58/02Protection of pipes or pipe fittings against corrosion or incrustation by means of internal or external coatings
    • F16L58/04Coatings characterised by the materials used
    • F16L58/08Coatings characterised by the materials used by metal

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Protection Of Pipes Against Damage, Friction, And Corrosion (AREA)

Abstract

An apparatus for inserting an anti-corrosion ring into an iron pipe is provided to simultaneously perform hole boring work and ring insertion work by using one equipment. An apparatus for inserting an anti-corrosion ring(200) into an iron pipe comprises a body(100), a fixing member(110), a boring member(120), an elastic member and an auxiliary boring member(130). The anti-corrosion ring is fitted around an outer peripheral surface of the body. The fixing member prevents the anti-corrosion ring from being separated from the body. The boring member moves up and down along the fixing member and a tip(121) is provided at a lower portion of the boring member. The elastic member is interposed between the fixing member and the boring member.

Description

주철관의 부식방지링 삽입장치{Corrosion prevention ring insertion apparatus of iron pipe} Corrosion prevention ring insertion apparatus of cast iron pipes

도 1a 내지 도 1d는 종래의 부식방지링 삽입 방법을 순차적으로 나타낸 작동도이다.1A to 1D are operation diagrams sequentially showing a conventional corrosion preventing ring insertion method.

도 2는 본 발명에 따른 주철관의 부식방지링 삽입장치의 구성을 나타낸 분리단면도이다.Figure 2 is an exploded cross-sectional view showing the configuration of the anti-corrosion ring inserting device of the cast iron pipe according to the present invention.

도 3a 내지 도 3f는 본 발명에 따른 주철관의 부식방지링 삽입장치의 작동 상태를 순차적으로 나타낸 도면이다. 3a to 3f are views showing the operating state of the anti-corrosion ring inserting apparatus of the cast iron pipe according to the present invention in sequence.

도 4a와 도 4b는 본 발명에 따른 부식방지링을 나타낸 사시도와 저면도이다.4a and 4b are a perspective view and a bottom view showing a corrosion protection ring according to the present invention.

◎ 도면의 주요부분에 대한 부호의 설명 ◎◎ Explanation of symbols for main part of drawing

1: 주철관 3: 천공1: cast iron pipe 3: perforated

100: 몸체 110: 고정부재100: body 110: fixing member

112: 공간 114: 가이드홈112: space 114: guide groove

120: 천공부재 121: 팁120: punched member 121: tip

122: 가이드돌기 130: 보조천공부재122: guide protrusion 130: auxiliary punching member

131: 팁 140: 탄성부재131: tip 140: elastic member

200: 부식방지링 202: 걸림단200: anti-corrosion ring 202: locking end

204: 절곡부 206: 걸림편204: bending portion 206: locking piece

H: 힌지H: hinge

본 발명은 주철관의 부식방지링 삽입장치에 관한 것으로, 보다 상세하게는 주철관의 천공부에 부식방지링을 삽입할 때 한 번의 작업으로 부식방지링을 용이하게 삽입 및 결합시킬 수 있도록 한 주철관의 부식방지링 삽입장치에 관한 것이다.The present invention relates to an anti-corrosion ring inserting device of a cast iron pipe, and more particularly, to the corrosion of a cast-iron pipe to easily insert and combine the anti-corrosion ring in one operation when inserting the anti-corrosion ring in the perforated portion of the cast iron pipe. An anti-ring insert device.

일반적으로 수돗물이 가정이나 건물로 공급되는 구조를 보면, 수돗물이 흐르는 주철관이 지하에 매설되고 지하에 매설된 주철관에 분기관이 연결되어 각 가정이나 건물로 수돗물을 공급하게 된다. 즉, 주철관에 분기관을 연결 설치하기 위해 먼저 해당 부위에 천공기를 이용하여 천공을 뚫은 다음, 이 천공에 분기관을 연결하여 각 가정이나 건물로 수돗물을 공급하게 된다. In general, when tap water is supplied to a home or a building, a cast iron pipe through which tap water flows is buried underground, and branch pipes are connected to a cast iron pipe buried underground to supply tap water to each home or building. That is, in order to install the branch pipe connected to the cast iron pipe, a perforation is first made using a perforator, and then the branch pipe is connected to the perforated water supply to each home or building.

이때, 주철관의 천공의 가공면은 일정 기간이 경과하게 되면 수돗물에 의해 부식되어 천공의 내경이 작아지는 문제점이 발생되며, 이로 인해 각 가정이나 건물로 흘러들어가는 식수의 양이 줄어들거나 녹이 함께 흘러들어가게 된다. 따라서 이를 이를 개선하기 위해 주철관의 천공에는 도 5에 도시된 바와 같이 부식되지 않는 재질의 부식방지링이 삽입되어 설치된다.At this time, the processing surface of the perforated cast iron pipe is corroded by the tap water after a certain period of time, which causes a problem that the inner diameter of the perforation is reduced, thereby reducing the amount of drinking water flowing into each home or building, or rust flows together do. Therefore, in order to improve this, the perforated cast iron pipe is installed with a corrosion preventing ring of a material that is not corroded as shown in FIG.

종래에 부식방지링을 삽입 설치하는 방법을 설명하면, 먼저 주철관에 천공기를 이용하여 천공을 뚫은 다음, 삽입장치를 이용하여 부식방지링을 삽입하게 된다. 도 1a 내지 도 1d를 참조하여 부식방지링을 삽입 설치하는 방법을 좀더 설명하면, 먼저 도 1a에 도시된 바와 같이 부식방지링(20)을 삽입장치(10)에 결합하여 설치한다. 여기서, 부식방지링(20)은 상단부에 외측방향으로 연장되는 걸림단(22)이 일체로 형성되고, 하단부에는 내측으로 절곡되는 절곡부(24)가 형성되며, 절곡부(24)의 단부는 다시 외측으로 절곡되어 형성된 걸림편(26)이 일체로 형성된 구조를 갖는다. 그리고 삽입장치(10)는 몸체(12)와, 몸체(12)의 하면에 나사방식에 의해 선택적으로 체결되는 고정부재(14)로 구성되며, 몸체(12)의 하면과 고정부재(14)의 사이에는 경사면이 형성되어 부식방지링(20)의 절곡부(22)와 걸림편(26)이 삽입되어 결합될 수 있게 구성된다. 다음으로, 이와 같이 부식방지링(20)을 삽입장치에 결합 설치하게 되면, 도 1b에 도시된 바와 같이 삽입장치(10)를 주철관(1)의 천공(3)에 삽입하여 부식방지링(20)의 걸림단(22)이 천공(3)의 상단 테두리에 걸리도록 한다. 이 상태에서 삽입장치(10)를 더 삽입하게 되면 도 1c에 도시된 바와 같이 삽입장치(10)의 몸체(12) 하단부가 부식방지링(20)의 절곡부(24)를 밀어 절곡부(24)가 펴 지도록 한다. 그러면 절곡부(24)가 펴지면서 걸림편(26)이 천공(3)의 하단 테두리에 걸려 도 1d에 도시된 바와 같이 부식방지링(20)이 천공(3)에서 빠지지 않도록 결합된다.In the prior art, a method of inserting and inserting a corrosion preventing ring is first drilled in a cast iron pipe using a punching machine, and then inserts a corrosion preventing ring using an inserting device. 1A to 1D, a method of inserting and inserting a corrosion preventing ring will be described in detail. First, as shown in FIG. 1A, the corrosion preventing ring 20 is coupled to the insertion device 10 and installed. Here, the anti-corrosion ring 20 is integrally formed with a locking end 22 extending in the outward direction, the lower end is formed with a bent portion 24 is bent inward, the end of the bent portion 24 The locking piece 26 is bent to the outside again has a structure formed integrally. And the inserting device 10 is composed of a body 12 and a fixing member 14 is selectively fastened to the lower surface of the body 12 by a screw method, the lower surface and the fixing member 14 of the body 12 Between the inclined surface is formed between the bent portion 22 and the engaging piece 26 of the corrosion prevention ring 20 is configured to be coupled. Next, when the anti-corrosion ring 20 is installed in the insertion device in this way, as shown in FIG. 1B, the anti-corrosion ring 20 is inserted by inserting the insertion device 10 into the perforation 3 of the cast iron pipe 1. ) So that the locking end 22 is caught by the upper edge of the perforation 3. When the insertion device 10 is further inserted in this state, as shown in FIG. 1C, the lower end of the body 12 of the insertion device 10 pushes the bent part 24 of the corrosion preventing ring 20 and the bent part 24. ) Spread out. Then, as the bent portion 24 is extended, the engaging piece 26 is caught by the lower edge of the perforation 3, and the anti-corrosion ring 20 is coupled with the perforation 3 as shown in FIG. 1D.

그러나, 이와 같이 주철관의 천공에 부식방지링을 삽입하는 종래의 방법은 천공 작업과 부식방지링 삽입 작업이 각각 이루어지기 때문에 작업시간이 많이 소요되고 작업성이 저하되는 단점이 있었다. 즉, 천공 작업과 부식방지링 삽입 작업이 한 번에 이루어지게 되면 시간을 절약하고 작업성을 향상시키게 되는 데, 종래의 삽입장치를 이용해서는 이와 같이 천공 작업과 부식방지링 삽입 작업을 한 번에 실행할 수 없는 단점이 있었다.However, the conventional method of inserting the anti-corrosion ring in the drilling of the cast iron pipe as described above has a disadvantage in that the work takes a lot of time and the workability is deteriorated because the perforation work and the anti-corrosion ring insertion work are performed. In other words, when the drilling work and the anti-corrosion ring insertion work are performed at once, it saves time and improves the workability. Using the conventional inserting device, the perforation work and the anti-corrosion ring insert work at once. There was a drawback that could not be implemented.

본 발명은 상술한 바와 같이 제반되는 문제를 해결하기 위하여 안출한 것으로, 그 목적은 주철관에 부식방지링을 설치할 때 천공 작업과 부식방지링 삽입 작업을 한 번에 실행할 수 있도록 개선된 주철관의 부식방지링 삽입장치를 제공하는데 있다.The present invention has been made in order to solve the problems as described above, the object is to prevent the corrosion of the cast iron pipe improved to be able to perform the drilling operation and the insertion of the anti-corrosion ring at a time when installing the anti-corrosion ring in the cast iron pipe To provide a ring insertion device.

삭제delete

상기 목적을 달성하기 위한 본 발명에 따른 주철관의 부식방지링 삽입장치는 회전 가능하게 설치되고 하단 부분 외주면에 부식방지링이 끼워져 결합되는 몸체; 몸체의 하면에 선택적으로 결합되어 부식방지링이 몸체에서 빠지지 않도록 잡아주는 고정부재; 고정부재의 하면에 상하방향으로 이동가능하게 설치되고, 하면에는 회전시 주철관을 뚫을 수 있도록 팁이 구비된 천공부재; 고정부재와 천공부재의 사이에 개재되어 천공부재를 탄성 가압하는 탄성부재; 및 천공부재의 측면에 슬라이딩 가능하게 조립되어 천공부재가 상승하게 되면 슬라이딩되면서 외측으로 벌어지며, 하면에는 회전시 주철관을 뚫을 수 있도록 팁이 구비된 보조천공부재를 포함하여 구성된 것을 특징으로 한다. 그리고 상기 보조천공부재가 외측으로 벌어지는 폭은 적어도 부식방지링의 두께와 같도록 설계된 것을 특징으로 한다.Corrosion prevention ring inserting device of the cast iron pipe according to the present invention for achieving the above object is rotatably installed and the body is coupled to the corrosion prevention ring fitted to the outer peripheral surface of the lower portion; A fixing member selectively coupled to the lower surface of the body to hold the anti-corrosion ring from the body; It is installed on the lower surface of the fixing member so as to be movable in the vertical direction, the lower surface of the perforated member having a tip so as to drill the cast iron pipe during rotation; An elastic member interposed between the fixing member and the punching member to elastically press the punching member; And is slidably assembled to the side of the perforated member is opened when the perforated member is raised to the outside while sliding, the lower surface is characterized in that it comprises a secondary perforated member having a tip so as to perforate the cast iron pipe during rotation. And it is characterized in that the width of the auxiliary perforating member is designed to be at least equal to the thickness of the anti-corrosion ring.

삭제delete

상술한 본 발명의 목적은 첨부된 도면을 참조하여 후술되는 본 발명의 바람직한 실시예로부터 더욱 명확해질 것이다.The object of the present invention described above will become more apparent from the preferred embodiment of the present invention described below with reference to the accompanying drawings.

이하, 첨부된 도면들을 참조하여 본 발명에 대해 상세히 설명하면 다음과 같다. 첨부된 도 2는 본 발명에 따른 주철관의 부식방지링 삽입장치의 구성을 나타낸 분리단면도이고, 도 3a 내지 도 3f는 본 발명에 따른 주철관의 부식방지링 삽입장치의 작동 상태를 순차적으로 나타낸 도면이며, 도 4a와 도 4b는 본 발명에 따른 부식방지링을 나타낸 사시도와 저면도이다.Hereinafter, the present invention will be described in detail with reference to the accompanying drawings. 2 is an exploded cross-sectional view showing the configuration of the anti-corrosion ring inserting device of the cast iron pipe according to the present invention, Figures 3a to 3f are views showing the operating state of the anti-corrosion ring inserting device of the cast iron pipe according to the present invention in sequence. 4A and 4B are a perspective view and a bottom view showing a corrosion protection ring according to the present invention.

도 2를 참조하면, 본 발명에 따른 주철관의 부식방지링 삽입장치는 부식방지링(200)이 외면에 결합되어 설치될 수 있게 구성된 몸체(100)와 고정부재(110)를 포함한다. 몸체(100)는 미도시된 회전수단에 의해 회전 가능하게 설치되고 하단에는 후술하는 부식방지링(200)의 절곡부(204)가 수용될 수 있도록 내측으로 경사지게 경사면이 형성된다. 그리고 고정부재(110)는 몸체(100)의 하면에 나사방식으로 선택적으로 결합되게 조립되며, 그 상단에는 후술하는 부식방지링(200)의 걸림편(206)이 수용될 수 있도록 내측으로 경사지게 경사면이 형성된다. 즉, 몸체(100)의 경사면과 고정부재(110)의 경사면 사이의 협동에 의해 부식방지링(200)이 몸체(100)에 걸려 빠지지 않도록 설치되는 것이다.Referring to Figure 2, the anti-corrosion ring inserting device of the cast iron pipe according to the present invention includes a body 100 and the fixing member 110 is configured to be installed coupled to the anti-corrosion ring 200 on the outer surface. Body 100 is rotatably installed by a rotating means not shown and the inclined surface is formed to be inclined inward so that the bent portion 204 of the anti-corrosion ring 200 to be described later is received at the bottom. And the fixing member 110 is assembled to be selectively coupled to the lower surface of the body 100 by a screw method, the inclined surface inclined inward so that the upper end of the locking piece 206 of the corrosion preventing ring 200 to be described later is accommodated Is formed. That is, by the cooperation between the inclined surface of the body 100 and the inclined surface of the fixing member 110 is installed so that the anti-corrosion ring 200 is not caught in the body 100.

고정부재(110)의 하면에는 천공부재(120)가 결합되는 데, 이 천공부재(120)는 주철관(1)을 뚫을 수 있도록 하부가 날카롭게 형성되며 그 면에는 팁(121)이 일 체로 형성된다. 그리고 천공부재(120)는 주철관(1)을 뚫을 때에는 주철관(1)에 닿으면서 눌려져 소폭 상승하였다가, 뚫는 작업을 마친 후에는 하강할 수 있도록 상하방향으로 이동가능하게 설치된다. 즉, 고정부재(110)의 하면에는 천공부재(120)의 상단부가 수용되는 공간(112)이 형성되어 이 공간(112) 내로 천공부재(120)의 상단부가 삽입된 상태로 상하 이동되며, 공간(112) 측면에는 가이드홈(114)이 형성되고, 천공부재(120)의 상단 측면에는 가이드홈(114)과 대응되는 가이드돌기(122)가 형성되어 가이드돌기(122)가 가이드홈(114)을 따라 상승 또는 하강하면서 천공부재(120)가 상하 이동되도록 구성된다. 그리고 공간(112) 내에서 고정부재(110)와 천공부재(120)의 사이에는 탄성부재(140)인 스프링이 개재되어 천공부재(120)를 하방향으로 탄성 가압하도록 구성된다. 따라서 주철관(1)을 뚫기 위해 천공부재(120)가 주철관(1)에 닿게 되면 탄성부재(140)가 압축되면서 천공부재(120)가 소폭 상승하게 되고, 뚫는 작업을 마친 후에는 탄성부재(140)의 복원력에 의해 천공부재(120)가 원상태로 하강하게 되는 것이다. 물론, 천공부재(120)는 삽입장치의 몸체(100)가 회전하게 되면 함께 회전하도록 구성되어, 회전하면서 주철관(1)을 뚫어 천공(3)이 형성되도록 한다.The lower surface of the fixing member 110 is coupled to the punching member 120, the punching member 120 is formed in the lower portion so as to penetrate the cast iron pipe (1) and the tip 121 is formed on the surface in one piece. . And the punching member 120 is pressed while touching the cast iron pipe (1) when drilled through the cast iron pipe (1), and is installed to be movable in the vertical direction so as to descend after finishing the drilling work. That is, the bottom 112 of the fixing member 110 is formed with a space 112 for accommodating the upper end of the punching member 120 is moved up and down with the upper end of the punching member 120 inserted into the space 112, the space The guide groove 114 is formed on the side surface 112, and the guide protrusion 122 corresponding to the guide groove 114 is formed on the upper side of the punching member 120 so that the guide protrusion 122 is the guide groove 114. The perforated member 120 is configured to move up and down while being raised or lowered along. In addition, a spring, which is an elastic member 140, is interposed between the fixing member 110 and the punching member 120 in the space 112 so as to elastically press the punching member 120 downward. Therefore, when the perforated member 120 touches the cast iron pipe 1 to drill the cast iron pipe 1, the elastic member 140 is compressed and the perforated member 120 is slightly raised, and after the drilling operation is completed, the elastic member 140 is completed. By the restoring force of the perforated member 120 is to be lowered to its original state. Of course, the drilling member 120 is configured to rotate together when the body 100 of the insertion device is rotated, so that the perforation (3) is formed by drilling the cast iron pipe (1) while rotating.

천공부재(120)의 측면은 상방향으로 갈수록 좁아지는 경사면을 갖도록 형성되고, 이 천공부재(120)의 측면에는 보조천공부재(130)가 슬라이딩 가능하게 설치되며, 보조천공부재(130)의 상단부는 고정부재(110)에 힌지(H) 결합되어 힌지점을 중심으로 회전되면서 천공부재(120)의 측면을 따라 슬라이딩되게 구성된다. 즉, 보 조천공부재(130)는 천공부재(120)가 상승하게 되면 천공부재(120)의 측면을 따라 슬라이딩되면서 도 2b에 도시된 바와 같이 외측으로 소폭 벌어지게 되며, 천공부재(120)가 하강하게 되면 다시 도 2a에 도시된 바와 같이 벌어졌던 보조천공부재(130)가 원상태로 복구된다. 그리고 보조천공부재(130)의 하면에도 주철관(1)을 뚫을 수 있도록 팁(131)이 일체로 형성되며, 따라서 보조천공부재(130)가 벌어지게 되면 천공부재(120)가 1차적으로 주철관(1)을 뚫게 된 후 천공부분을 보조천공부재(130)가 2차적으로 더 넓게 뚫어 충분한 사이즈의 천공(3)이 형성되도록 한다. 여기서, 보조천공부재(130)가 벌어지는 폭은 부식방지링(200)의 두께와 같거나 약간 넓게 이루어지도록 설계되는 것이 바람직하다. 그 이유는 보조천공부재(130)가 주철관(1)을 뚫은 후 주철관(1)의 천공(3)에 부식방지링(200)이 삽입 설치된 다음 삽입장치를 뺄 때 보조천공부재(130)가 원상태로 좁여져 빠질 때 부식방지링(200)에 걸리지 않도록 하기 위한 것이다. The side of the punching member 120 is formed to have an inclined surface narrowing toward the upper direction, the side of the punching member 120 is installed to be slidable, the upper end of the auxiliary punching member 130 The hinge (H) is coupled to the fixing member 110 is configured to slide along the side of the punching member 120 while rotating around the hinge point. That is, the auxiliary boring member 130 is slightly expanded to the outside as shown in Figure 2b while sliding along the side of the punching member 120 when the punching member 120 is raised, the punching member 120 is When descending, the auxiliary punching member 130, which was opened as shown in FIG. 2A, is restored to its original state. In addition, the tip 131 is integrally formed on the lower surface of the auxiliary punching member 130 so that the cast iron pipe 1 can be drilled. Therefore, when the auxiliary punching member 130 is opened, the punching member 120 is primarily cast iron pipe ( 1) After the drilled portion of the secondary drilling member 130 is to be drilled wider secondary secondary wide enough to form a perforation (3) of sufficient size. Here, it is preferable that the width of the auxiliary puncture member 130 is designed to be equal to or slightly wider than the thickness of the corrosion preventing ring 200. The reason is that after the auxiliary drilling member 130 drills the cast iron pipe (1), the anti-corrosion ring (200) is inserted into the drilling (3) of the cast iron pipe (1), and then the auxiliary drilling member (130) is in the original state when the insertion device is removed. The narrowing is to prevent it from being caught by the anti-corrosion ring 200.

한편, 도 4a와 도 4b를 참조하면, 본 발명에 따른 부식방지링(200)은 원통형상으로 형성되고, 그 상단에는 외측으로 벌어지는 걸림단(202)이 일체로 형성되며, 몸체의 하단에는 내측으로 절곡되는 절곡부(204)와 절곡부(204)의 하단에서 외측으로 절곡되는 걸림편(206)이 일체로 형성된다. 그리고 절곡부(204)와 걸림편(206)은 잘 벌어질 수 있도록 꽃 모양으로 형성된다. 여기서 꽃 모양은 8각 또는 12각을 갖도록 형성하는 것이 바람직하나, 6각이나 10각 등 다른 각을 갖도록 구성할 수도 있을 것이다.On the other hand, referring to Figure 4a and Figure 4b, the corrosion preventing ring 200 according to the present invention is formed in a cylindrical shape, the upper end of the engaging end 202 is formed integrally, the lower end of the body inside The bent portion 204 to be bent and the engaging piece 206 bent outward from the lower end of the bent portion 204 is formed integrally. The bent portion 204 and the engaging piece 206 are formed in a flower shape so as to be well opened. Here, the flower shape is preferably formed to have 8 or 12 angles, but may be configured to have other angles such as 6 or 10 angles.

이와 같이 구성된 본 발명에 따른 주철관의 부식방지링 삽입장치의 작동 관계를 설명하면, 먼저 도 3a에 도시된 바와 같이 몸체(100)의 하단에 부식방지링(200)을 결합한 상태에서 몸체(100)의 하면에 고정부재(110)를 결합하여 부식방지링(200)이 분리되지 않도록 고정시킨다. 그런 다음, 주철관(1)의 천공(3) 위치에 천공부재(120)가 위치하도록 한 후, 천공부재(120)를 누른다. 그러면 도 3b에 도시된 바와 같이 탄성부재(140)가 압축되면서 천공부재(120)가 상승하게 되고, 천공부재(120)가 상승하면서 보조천공부재(130)를 밀어서 보조천공부재(130)가 외측 방향으로 벌어지게 된다. 이 상태에서 삽입장치를 누르면서 회전시키게 되면 도 3c에 도시된 바와 같이 천공부재(120)가 1차적으로 주철관(1)을 뚫게 되며, 계속 하강하게 되면 보조천공부재(130)가 2차적으로 주철관(1)의 1차 천공된 부분을 더 넓게 뚫어서 원하는 천공(3)이 형성되도록 한다. 그런 다음, 천공 작업이 완료되면 도 3d에 도시된 바와 같이 삽입장치를 계속 하강시켜 부식방지링(200)의 걸림단(202)이 주철관(1)의 천공(3) 상단 테두리에 걸리도록 한다. 이 상태에서 삽입장치를 강제적으로 더 누르게 되면 도 3e에 도시된 바와 같이 삽입장치의 몸체(100)가 부식방지링(200)의 절곡부(204)를 밀어 절곡부(204)가 펴지게 한다. 그러면 절곡부(204)가 펴지면서 걸림편(206)이 천공(3)의 하단 테두리에 걸려 부식방지링(200)이 천공(3)에 장착된다. 이 작업까지 완료된 후에는 마지막으로 도 3f에 도시된 바와 같이 삽입장치를 빼내면 된다. 이때, 탄성부재(140)의 복원력에 의해 천공부재(120)가 원상태로 하강하기 때문에 보조천공부재(130)도 원상태로 좁여진 상태를 유지하게 되며, 따라서 보조천공부재(130)가 부식방지링(200)에 걸리지 않고 잘 빠지게 된다.Referring to the operation relationship of the anti-corrosion ring inserting device of the cast iron pipe according to the present invention configured as described above, the body 100 in a state in which the anti-corrosion ring 200 is coupled to the lower end of the body 100 as shown in Figure 3a The fixing member 110 is coupled to the lower surface of the corrosion preventing ring 200 so as not to be separated. Then, after the perforated member 120 is positioned at the perforated 3 position of the cast iron pipe 1, the perforated member 120 is pressed. Then, as shown in FIG. 3B, the punching member 120 is raised while the elastic member 140 is compressed, and the auxiliary punching member 130 is pushed out by pushing the auxiliary punching member 130 while the punching member 120 is raised. Direction. When rotating while pressing the insertion device in this state, as shown in Figure 3c, the punching member 120 is primarily drilled through the cast iron pipe (1), and if it continues to descend the secondary punching member 130 is a secondary cast iron pipe ( Drill the wider primary perforated part of 1) to form the desired perforations (3). Then, when the drilling operation is completed, the insertion device is continuously lowered as shown in FIG. 3d so that the locking end 202 of the corrosion prevention ring 200 is caught by the upper edge of the drilling 3 of the cast iron pipe 1. When the insertion device is forcibly pressed further in this state, as shown in FIG. 3E, the body 100 of the insertion device pushes the bent portion 204 of the corrosion preventing ring 200 so that the bent portion 204 is unfolded. Then, as the bent portion 204 is extended, the locking piece 206 is caught by the lower edge of the perforation 3, and the corrosion prevention ring 200 is mounted to the perforation 3. After this operation is completed, the insertion apparatus may be finally removed as shown in FIG. 3F. At this time, since the punching member 120 is lowered to its original state by the restoring force of the elastic member 140, the auxiliary punching member 130 also maintains the narrowed state to its original state, and thus the auxiliary punching member 130 has a corrosion preventing ring. It does not get to 200 and falls well.

이상에서와 같이, 본 발명은 주철관의 천공에 부식방지링을 설치할 때 천공 작업과 부식방지링 삽입 작업을 종래와 같이 각각의 장비로 실행하는 것이 아니라 하나의 장비로 한 번에 실행할 수 있기 때문에 작업성이 향상되고 작업능률이 향상되는 효과가 있다. 또한, 본 발명에 따른 부식방지링은 절곡부와 걸림편이 꽃 모양으로 형성되어 잘 펼쳐지기 때문에 삽입장치의 몸체를 밀어서 절곡부를 펴 걸림편이 천공의 하단에 걸리도록 할 때 그 작업이 수월하게 이루어지는 효과가 있다.As described above, the present invention, when installing the anti-corrosion ring in the perforation of the cast iron pipe, the drilling operation and the anti-corrosion ring inserting operation can be performed at a time as a single equipment, rather than by each equipment as conventional work It has the effect of improving the performance and work efficiency. In addition, the anti-corrosion ring according to the present invention because the bent portion and the engaging piece is formed in a flower shape, and spreads well, the effect of the operation is made easier when the extension of the body of the insertion device to extend the bent part to be caught on the lower end of the perforation There is.

이상에서와 같이 본 발명은 특정의 실시예와 관련하여 도시 및 설명하였지만, 청구범위에 의해 나타난 발명의 사상 및 영역으로부터 벗어나지 않는 한도 내에서 다양한 개조 및 변화가 가능하다는 것을 당 업계에서 통상의 지식을 가진 자라면 누구나 쉽게 알 수 있을 것이다.While the invention has been shown and described in connection with specific embodiments as described above, it is well known in the art that various modifications and changes can be made without departing from the spirit and scope of the invention as indicated by the claims. Anyone who owns it can easily find out.

Claims (4)

회전 가능하게 설치되고 하단 부분 외주면에 부식방지링이 끼워져 결합되는 몸체;Body rotatably installed and the corrosion prevention ring is fitted to the outer peripheral surface of the lower portion; 상기 몸체의 하면에 선택적으로 결합되어 부식방지링이 몸체에서 빠지지 않도록 잡아주는 고정부재;A fixing member selectively coupled to the bottom surface of the body to hold the anti-corrosion ring so as not to fall out of the body; 상기 고정부재의 하면에 상하방향으로 이동가능하게 설치되고, 하면에는 회전시 주철관을 뚫을 수 있도록 팁이 구비된 천공부재;A drilling member installed on the lower surface of the fixing member so as to be movable upward and downward, and having a tip provided on the lower surface so as to penetrate the cast iron pipe during rotation; 상기 고정부재와 천공부재의 사이에 개재되어 천공부재를 탄성 가압하는 탄성부재; 및An elastic member interposed between the fixing member and the punching member to elastically press the punching member; And 상기 천공부재의 측면에 슬라이딩 가능하게 조립되어 천공부재가 상승하게 되면 슬라이딩되면서 외측으로 벌어지며, 하면에는 회전시 주철관을 뚫을 수 있도록 팁이 구비된 보조천공부재를 포함하여 구성된 것을 특징으로 하는 주철관의 부식방지링 삽입장치.The cast iron pipe is slidably assembled on the side of the perforated member so that when the perforated member rises, it opens outwards, and the lower side includes an auxiliary perforated member having a tip so as to perforate the cast iron pipe during rotation. Corrosion resistant ring insert. 제1항에 있어서,The method of claim 1, 상기 보조천공부재가 외측으로 벌어지는 폭은 적어도 부식방지링의 두께와 같도록 설계된 것을 특징으로 하는 주철관의 부식방지링 삽입장치.The anti-corrosion ring inserting device of the cast iron pipe, characterized in that the width of the auxiliary perforating member is designed to be at least equal to the thickness of the anti-corrosion ring. 제1항 또는 제2항에 있어서,The method according to claim 1 or 2, 상기 고정부재의 하면에는 천공부재의 상단부가 수용되는 공간이 형성되어 이 공간 내로 천공부재가 상하 이동되되, 공간 측면에는 가이드홈이 형성되고, 천공부재의 측면에는 가이드홈과 대응되는 가이드돌기가 형성되어 가이드돌기가 가이드홈을 따라 이동하면서 천공부재가 상하 이동되게 구성된 것을 특징으로 하는 주철관의 부식방지링 삽입장치.The lower surface of the fixing member is formed with a space for accommodating the upper end of the perforated member, the perforated member is moved up and down into the space, the guide groove is formed on the side of the space, the guide projection corresponding to the guide groove is formed on the side of the perforated member Corrosion prevention ring inserting device of the cast iron pipe, characterized in that the guide projection is configured to move up and down while the guide projection is moved along the guide groove. 삭제delete
KR1020070038188A 2007-04-19 2007-04-19 Corrosion prevention ring insertion apparatus of iron pipe KR100858139B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020070038188A KR100858139B1 (en) 2007-04-19 2007-04-19 Corrosion prevention ring insertion apparatus of iron pipe

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020070038188A KR100858139B1 (en) 2007-04-19 2007-04-19 Corrosion prevention ring insertion apparatus of iron pipe

Publications (1)

Publication Number Publication Date
KR100858139B1 true KR100858139B1 (en) 2008-09-10

Family

ID=40022977

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020070038188A KR100858139B1 (en) 2007-04-19 2007-04-19 Corrosion prevention ring insertion apparatus of iron pipe

Country Status (1)

Country Link
KR (1) KR100858139B1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101943633B1 (en) * 2017-09-05 2019-01-29 이기완 Fixed seizure for cast iron pipe

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH05106781A (en) * 1991-10-17 1993-04-27 Kubota Corp Anticorrosive sleeve installation tool
JP2000065286A (en) * 1998-08-21 2000-03-03 Suido Gijutsu Kaihatsu Kiko:Kk Bush for preventing corrosion
KR200318956Y1 (en) * 2003-04-02 2003-07-04 부덕실업 주식회사 Corrosion prevention ring of water pipe hole
JP2005282587A (en) 2004-03-26 2005-10-13 Tabuchi Corp Removing device for anticorrosion sleeve

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH05106781A (en) * 1991-10-17 1993-04-27 Kubota Corp Anticorrosive sleeve installation tool
JP2000065286A (en) * 1998-08-21 2000-03-03 Suido Gijutsu Kaihatsu Kiko:Kk Bush for preventing corrosion
KR200318956Y1 (en) * 2003-04-02 2003-07-04 부덕실업 주식회사 Corrosion prevention ring of water pipe hole
JP2005282587A (en) 2004-03-26 2005-10-13 Tabuchi Corp Removing device for anticorrosion sleeve

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101943633B1 (en) * 2017-09-05 2019-01-29 이기완 Fixed seizure for cast iron pipe

Similar Documents

Publication Publication Date Title
KR101839729B1 (en) Punching device for construction of non-closing valve and construction method of valve using the same
MXPA02005718A (en) Acid based micro emulsions.
TNSN06141A1 (en) Method of installing horizontal drains for collecting seawater
KR100858139B1 (en) Corrosion prevention ring insertion apparatus of iron pipe
US20090218092A1 (en) Downhole cleaning tool
US20140166308A1 (en) Anti-Rotation Wedge
KR20090059552A (en) Excavator
JP2006194346A (en) Exchanging method of saddle ferrule, and assembly of saddle ferrule and saddle ferrule exchanger
KR102021376B1 (en) Apparatus for punching pipe
JP4537743B2 (en) Anti-corrosion sleeve removal device
CN219095537U (en) Reaming device for building engineering
GB2445702A (en) A device for a borehole arrangement
US1121573A (en) Well-drilling bit.
KR200318956Y1 (en) Corrosion prevention ring of water pipe hole
JP4513078B2 (en) Cutting bit device in drilling equipment
JP4662907B2 (en) Steel pipe drawing spear and steel pipe drawing method
KR100395839B1 (en) Sheet Pile and Construction Method thereof
KR20230153826A (en) Low height of insertion valve
KR950004877Y1 (en) Filing appliance combined with punch
JP2003254489A (en) Snap tap replacing method and conversion snap tap
KR20100035373A (en) Diverging apparatus
KR200405963Y1 (en) Race way
KR200149160Y1 (en) Hyum drilling machine
KR200345862Y1 (en) Punching apparatus for multi-ply of non-metal bellows
KR19990038051U (en) Pipe perforator

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
LAPS Lapse due to unpaid annual fee