KR100855099B1 - A circular mat and the using method for very soft ground - Google Patents

A circular mat and the using method for very soft ground Download PDF

Info

Publication number
KR100855099B1
KR100855099B1 KR1020080016424A KR20080016424A KR100855099B1 KR 100855099 B1 KR100855099 B1 KR 100855099B1 KR 1020080016424 A KR1020080016424 A KR 1020080016424A KR 20080016424 A KR20080016424 A KR 20080016424A KR 100855099 B1 KR100855099 B1 KR 100855099B1
Authority
KR
South Korea
Prior art keywords
mat
soft ground
shaft
circular
ultra soft
Prior art date
Application number
KR1020080016424A
Other languages
Korean (ko)
Inventor
최균영
김재선
Original Assignee
초석건설산업(주)
김재선
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 초석건설산업(주), 김재선 filed Critical 초석건설산업(주)
Priority to KR1020080016424A priority Critical patent/KR100855099B1/en
Application granted granted Critical
Publication of KR100855099B1 publication Critical patent/KR100855099B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D3/00Improving or preserving soil or rock, e.g. preserving permafrost soil
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C19/00Machines, tools or auxiliary devices for preparing or distributing paving materials, for working the placed materials, or for forming, consolidating, or finishing the paving
    • E01C19/12Machines, tools or auxiliary devices for preparing or distributing paving materials, for working the placed materials, or for forming, consolidating, or finishing the paving for distributing granular or liquid materials
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2200/00Geometrical or physical properties
    • E02D2200/14Geometrical or physical properties resilient or elastic
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2200/00Geometrical or physical properties
    • E02D2200/16Shapes
    • E02D2200/1685Shapes cylindrical
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2300/00Materials
    • E02D2300/0004Synthetics

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Civil Engineering (AREA)
  • Environmental & Geological Engineering (AREA)
  • Agronomy & Crop Science (AREA)
  • Architecture (AREA)
  • Soil Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • General Engineering & Computer Science (AREA)
  • Revetment (AREA)

Abstract

A circular mat for the ultra soft ground and a pavement method using the circular mat are provided to pave a mat by manufacturing a mat by winding a mat round the outside of a shaft in a circle and moving on the surface of the ultra soft ground, thereby making the mat rotated and unwound naturally, to pave a mat on the surface of the ultra soft ground smoothly by forming a hollow in a shaft for minimizing the weight and generating buoyancy, and to pave a mat easily by rotating on the surface of the ultra soft ground and minimizing surface resistance. A circular mat(100) for the ultra soft ground is manufactured to be wound round the outside of a shaft(110) provided with a hollow(111) to secure buoyancy. A pavement method using the circular mat comprises the steps of: fixing one end of a mat manufactured to be wound round the outside of a shaft to one side of a revetment; connecting a wire rope to two sides of the shaft and winding or pulling the wire rope with a take-up device for rotating the mat and paving across the surface of the ultra soft ground; stitching up the sides of the mat paved on the surface of the ultra soft ground; and paving the mat on the construction area of the ultra soft ground.

Description

초연약지반용 원형매트 및 이를 이용한 포설 공법{A circular mat and the using method for very soft ground}A circular mat and the using method for very soft ground}

본 발명은 초연약지반용 원형매트 및 이를 이용한 포설 공법에 관한 것으로, 더욱 상세하게는 초연약지반의 표면에 매트를 신속하게 포설하여 시공기간을 획기적으로 단축시킬 수 있음은 물론 초연약지반과 매트의 표면저항을 최소화하여 작업효율을 향상시켜 시공품질을 극대화시킬 수 있도록 하는 초연약지반용 원형매트 및 이를 이용한 포설 공법(Chosuk Circular Mat, 이하 "CCM"라 함)에 관한 것이다.The present invention relates to a circular mat for ultra soft ground and a laying method using the same, and more particularly, to quickly install a mat on the surface of the ultra soft ground, thereby significantly reducing the construction period, as well as the ultra soft ground and the mat. It relates to an ultra soft ground circular mat and a laying method using the same (Chosuk Circular Mat, hereinafter "CCM") to minimize the surface resistance to improve the work efficiency to maximize the construction quality.

일반적으로 초연약지반은 지지력이 거의 없는 매우 연약한 상태이므로 지반을 개량하기 위한 시공장비의 주행성을 확보하기 위해서는 초연약지반의 표면에 매트를 포설한 후 상기 매트의 상부에 일정두께를 갖도록 모래를 복토하여 시공장비의 진입시 안전성 확보와 함께 하중분산의 목적을 달성하게 된다.In general, the ultra soft ground is very fragile with little support, so in order to secure the driving performance of the construction equipment to improve the ground, the mat is laid on the surface of the super soft ground, and the sand is covered to have a certain thickness on the top of the mat. Therefore, the purpose of load distribution is achieved along with securing safety when entering construction equipment.

즉, 상기한 매트는 초연약지반과 모래층 사이에 형성되어 이토의 혼입을 방지하여 지반침하 및 융기현상을 최소화함은 물론 초연약지반의 개량시공에서 시공 장비의 주행성을 확보할 수 있는 지반 보강재 역할을 수행하게 된다.That is, the mat is formed between the super soft ground and the sand layer to prevent the mixing of ITO to minimize ground subsidence and ridge phenomenon, as well as to act as a ground reinforcement material to secure the runability of construction equipment in the improved construction of super soft ground Will be performed.

따라서, 종래에는 도 1 또는 도 2에 도시된 바와 같이 호안(A)의 일측에 매트(1)를 적재하고 상기 매트(1)의 일단에 와이어로프(D)를 연결한 후 호안(A)의 타측에 설치된 굴삭기 또는 윈치와 같은 권취수단(C)의 작동으로 상기 와이어로프(D)를 감거나 당겨서 초연약지반(B)의 표면에 매트(1)를 포설하는 방법과,Therefore, in the related art, as shown in FIG. 1 or FIG. 2, the mat 1 is loaded on one side of the revetment A, and the wire rope D is connected to one end of the mat 1. Method of laying the mat (1) on the surface of the super soft ground (B) by winding or pulling the wire rope (D) by the operation of the winding means (C), such as an excavator or winch installed on the other side,

도 3 또는 도 4에 도시된 바와 같이 초연약지반(B)의 표면을 따라서 이동할 수 있는 이송함체(E)의 상부에 매트(1)를 적재하고 상기 이송함체(E)의 전방에 와이어로프(D)를 연결한 후 호안(A)의 타측에 설치된 굴삭기 또는 윈치와 같은 권취수단(C)의 작동으로 상기 와이어로프(D)를 감거나 당겨서 상기 이송함체(E)가 초연약지반(B)의 표면을 통과하면서 매트(1)를 포설하는 방법이 활용되고 있다.As shown in FIG. 3 or FIG. 4, the mat 1 is loaded on the upper portion of the transfer container E that can move along the surface of the super soft ground B, and a wire rope is placed in front of the transfer container E. After connecting D), the transfer box (E) is super soft ground (B) by winding or pulling the wire rope (D) by the operation of winding means (C) such as an excavator or winch installed on the other side of the shore (A). The method of laying the mat 1 while passing through the surface of is utilized.

그러나 종래의 매트 포설 방법은 초연약지반(B)과 매트(1)가 맞닿은 상태에서 전방으로 이동하게 되는데, 이는 미끄럼저항을 유발하는 방식으로 초연약지반(B)과 매트(1)의 사이에 발생하는 표면저항으로 인해서 이동효율이 저하됨은 자명할 것이므로, 이로 인해 전체적인 시공기간을 지연시켜 경제적인 손실을 유발시키는 폐단을 갖게 되었다.However, the conventional mat laying method is moved forward in the state in which the super soft ground (B) and the mat (1) abuts, which induces sliding resistance between the super soft ground (B) and the mat (1) It will be obvious that the movement efficiency is lowered due to the surface resistance that occurs, which leads to economic losses by delaying the overall construction period.

특히 종래의 매트 포설 방법은 초연약지반(B)과 매트(1)의 사이에 발생하는 표면저항으로 인해서 굴삭기 또는 윈치와 같은 권취수단의 작동효율이 저하되는 사용상의 한계를 갖게 되었다.In particular, the conventional mat laying method has a limitation in use that the operating efficiency of the winding means such as an excavator or a winch is lowered due to the surface resistance generated between the super soft ground (B) and the mat (1).

또한, 종래의 매트 포설 방법은 초연약지반(B)과 매트(1)의 사이에 발생하는 표면저항으로 인해서 와이어로프(D)가 절단되거나 또는 심한 경우에는 매트(1)가 손상(찢어짐)되므로, 이로 인해 초연약지반(B)의 내부로 작업자를 투입해야 하므로 작업효율의 저하는 물론 안전사고의 발생원인을 제공하게 되었다.In addition, the conventional mat laying method is because the wire rope (D) is cut due to the surface resistance generated between the super soft ground (B) and the mat (1) or in severe cases the mat (1) is damaged (torn) Because of this, the worker must be put into the inside of the ultra soft ground (B), thereby reducing the work efficiency and providing a cause of a safety accident.

아울러 종래의 매트 포설 방법은 초연약지반의 상태(융기,침하,장애물)에 따라서 상기 이송함체(E)의 이동에 간섭 및 제약이 발생하기 때문에 매트(1)의 원활한 포설이 어려울 뿐만 아니라 특히 이동되는 다수의 이송함체(E)의 속도가 일정하지 못할 경우에는 매트(1)의 방향이 서로 엇갈려 포설되어 시공품질을 저하시키는 문제점을 갖게 되었다.In addition, in the conventional mat laying method, since the interference and constraints occur in the movement of the transfer container E according to the state of the super soft ground (elevation, settlement, obstacles), it is difficult not only to smoothly install the mat 1, but also to move. When the speed of the plurality of transfer boxes (E) is not constant, the mat 1 has a problem in that the directions of the mats are alternately installed to reduce the construction quality.

따라서 본 발명은 상기와 같은 종래의 문제점을 해결하기 위해 안출된 것으로서,Therefore, the present invention has been made to solve the above conventional problems,

본 발명의 목적은 축의 외경에 매트를 원형으로 감아 제작함으로써 초연약지반의 표면을 이동하면서 매트가 회전과 동시에 자연스럽게 풀리면서 포설될 수 있도록 하는 초연약지반용 원형매트 및 이를 이용한 포설 공법을 제공함에 있다.SUMMARY OF THE INVENTION An object of the present invention is to provide a super soft ground circular mat and an installation method using the same, which allows the mat to be naturally released at the same time as it rotates while moving the surface of the ultra soft ground by winding the mat around the outer diameter of the shaft. .

본 발명의 다른 목적은 축의 내부에 중공부가 형성하여 무게를 최소화함과 동시에 부력을 발생시켜 초연약지반의 표면에 매트를 원활하게 포설할 수 있도록 하는 초연약지반용 원형매트 및 이를 이용한 포설 공법을 제공함에 있다.It is another object of the present invention to provide a super soft ground circular mat and an installation method using the same to form a hollow portion inside the shaft to minimize the weight and at the same time generate buoyancy to smoothly lay the mat on the surface of the super soft ground. Is in.

본 발명의 또 다른 목적은 초연약지반의 표면을 회전하면서 표면저항을 최소화하여 매트가 용이하게 포설할 수 있도록 하는 초연약지반용 원형매트 및 이를 이용한 포설 공법을 제공함에 있다.Still another object of the present invention is to provide a super soft ground circular mat and an installation method using the same, while minimizing surface resistance while rotating the surface of the super soft ground.

본 발명은 초연약지반용 매트에 있어서, 상기 매트(100)는 내부에 중공부(111)를 구비하여 부력을 확보하도록 형성되는 축(110)의 외경에 원형으로 감기도록 제작되어짐을 특징으로 한다.In the ultra-soft ground mat, the mat 100 is characterized in that it is made to be wound around the outer diameter of the shaft 110 is formed to ensure a buoyancy by having a hollow portion 111 therein.

또한, 본 발명은 축(110)의 외경에 원형으로 감기도록 제작되는 매트(100)의 일단을 호안(A)의 일측에 고정하는 공정(a)과, 상기 축(110)의 양측에 와이어로 프(D)를 연결한 후 호안(A)의 타측에 설치된 권취수단(C)의 작동으로 상기 와이어로프(D)를 감거나 당김으로 상기 매트(100)가 회전하면서 초연약지반(B)의 표면을 가로질러 포설하는 공정(b)과, 상기의 a~b공정을 반복 실행하여 초연약지반(B)의 표면에 포설된 매트(100)의 측면을 서로 연결하기 위해서 봉합하는 공정(c)과, 상기의 a~c공정을 반복 실행하여 초연약지반(B)의 시공면적에 매트(100)의 포설을 완료하는 공정(d)으로 이루어짐을 특징으로 한다.In addition, the present invention is a step (a) of fixing one end of the mat 100 to be wound around the outer diameter of the shaft 110 to one side of the arc (A), and wires on both sides of the shaft (110) After connecting the rope (D) by the operation of the winding means (C) installed on the other side of the revetment (A) by winding or pulling the wire rope (D) while the mat 100 is rotated of the super soft ground (B) Process (b) of laying across the surface and suturing in order to connect the side surfaces of the mat (100) laid on the surface of the super soft ground (B) by repeating the above steps a to b (c). And, it is characterized by consisting of a step (d) of repeating the above steps a to c to complete the installation of the mat 100 in the construction area of the super soft ground (B).

본 발명은 초연약지반의 표면에 매트를 신속하게 포설할 수 있으므로 시공기간을 획기적으로 단축시켜 경제적인 이익을 창출할 수 있는 효과를 갖는다.The present invention can quickly install the mat on the surface of the ultra-soft ground has an effect that can significantly reduce the construction period to create economic benefits.

또한, 본 발명은 종래와 같이 미끄럼접촉으로 포설하던 방법을 탈피하여 초연약지반의 표면에 회전과 동시에 구름접촉을 유도함으로써 초연약지반의 표면과 매트의 사이에 발생하는 표면저항을 최소화하여 포설효율을 극대화할 수 있는 효과를 갖는다.In addition, the present invention avoids the method of laying in the sliding contact as in the prior art by inducing rolling contact with the surface of the super soft ground at the same time by minimizing the surface resistance generated between the surface of the super soft ground and the mat laying efficiency Has the effect of maximizing.

특히 본 발명은 초연약지반의 표면과 매트의 사이에 발생하는 표면저항을 최소화하여 장비의 과부하 및 매트의 손상을 사전에 방지할 수 있는 효과를 갖는다.In particular, the present invention has the effect of preventing the overload of the equipment and damage to the mat in advance by minimizing the surface resistance generated between the surface of the ultra soft ground and the mat.

아울러 본 발명은 구조가 간단하고 유지보수가 용이하여 활용범위 및 사용효율을 증대시킬 수 있는 매우 유용한 발명이다.In addition, the present invention is a very useful invention that can increase the scope and efficiency of use of the simple structure and easy maintenance.

상기한 바와 같이 본 발명 초연약지반용 원형매트의 목적을 달성하기 위한 기술적 구성을 첨부한 도면에 의해 상세히 설명하면 다음과 같다. When described in detail by the accompanying drawings the technical configuration for achieving the object of the present invention super soft ground circular mat as described above.

도 5는 본 발명 초연약지반용 원형매트의 구조를 나타내기 위한 사시도이고, 도 6은 본 발명 초연약지반용 원형매트의 구조를 나타내기 위한 단면도이며, 도 7은 본 발명 초연약지반용 원형매트의 다른 구조를 나타내기 위한 단면도를 도시한 것이다.Figure 5 is a perspective view for showing the structure of the ultra-soft ground circular mat of the present invention, Figure 6 is a cross-sectional view showing the structure of the circular mat for the super soft ground of the present invention, Figure 7 is another of the circular mat for the super soft ground of the present invention The cross section for showing a structure is shown.

상기 매트(100)는 공장에서 포설 면적 및 설계 시방에 따라서 일정넓이를 갖도록 제작되며 탄력성은 물론 내구성이 강한 합성섬유 재질로 제작된다.The mat 100 is manufactured to have a certain width according to the installation area and design specifications in the factory, and is made of a synthetic fiber material having high elasticity and durability.

본 발명에서 사용되는 매트의 품질 기준은 표 1과 같다.The quality standards of the mat used in the present invention are shown in Table 1.

Figure 112008013414926-pat00001
Figure 112008013414926-pat00001

이때 상기 매트(100)는 초연약지반(B)의 일측에서 타측까지 1회에 포설될 수 있는 길이를 갖도록 제작됨은 당연할 것이다.At this time, the mat 100 will be manufactured to have a length that can be installed at one time from one side to the other side of the ultra soft ground (B).

도 5를 참조하면, 상기 축(110)은 매트(100)를 원형으로 말아서 회전과 동시에 초연약지반(B)의 표면에 자연스럽게 포설될 수 있도록 유도하게 된다.Referring to FIG. 5, the shaft 110 is rolled around the mat 100 to induce rotation so that it can be naturally laid on the surface of the super soft ground B.

특히 상기 중공부(111)는 내부가 비어있는 형태로 상기 축(110)의 무게를 최소화함은 물론 부력을 발생시켜 상기 매트(100)의 중량에 따라서 초연약지반(B)을 원활하게 이동할 수 있도록 한다.In particular, the hollow portion 111 may minimize the weight of the shaft 110 in an empty form, as well as generate buoyancy to smoothly move the super soft ground B according to the weight of the mat 100. Make sure

한편, 도 7에 도시된 바와 같이 상기 축(110)의 양단에는 중앙에서 외측으로 갈수록 점차 지름이 줄어드는 축경부(112)를 형성할 수 있는데, 이는 초연약지반(B)에 표면에 서로 겹치도록 포설되는 매트(100)의 양측에 맞닿는 면적을 최소화하여 하중이 집중되는 현상을 방지하게 된다.Meanwhile, as shown in FIG. 7, both ends of the shaft 110 may form shaft diameters 112 that gradually decrease in diameter from the center to the outside thereof, so that the super soft ground B may overlap each other on the surface. By minimizing the area in contact with both sides of the mat 100 to be installed to prevent the concentration of load.

이처럼 상기 축(110)은 바닷물과 접촉되는 특성상 내식성은 물론 무게가 가벼운 알루미늄은 물론 별도의 표면처리가 완료된 금속재질로 제작될 뿐만 아니라 매트(100)의 중량에 따라서 지름과 규격이 달라지도록 제작됨이 바람직하다.As described above, the shaft 110 is made of a material having a corrosion resistance, light weight aluminum as well as a separate surface treatment, as well as a diameter and a specification, depending on the weight of the mat 100. This is preferred.

또한, 상기 축(110)의 양측에는 도 6에 도시된 바와 같이 와이어로프(D)가 연결된 상태로 상기 축(110)이 공회전할 수 있도록 롤러(120)가 형성될 수 있는데, 이는 상기 축(110)의 양측에 와이어로프(D)가 연결된 상태에서 이동할 경우에 매트(100)를 원활하게 회전시키기 위함이다.In addition, rollers 120 may be formed at both sides of the shaft 110 to allow the shaft 110 to idle in a state in which the wire rope D is connected as shown in FIG. 6. This is to smoothly rotate the mat 100 when moving in a state where the wire ropes D are connected to both sides of the 110.

즉, 상기 롤러(120)는 와이어로프(D)가 연결된 상태로 전방으로 이동하게 되면 상기 축(110)은 매트(100)와 함께 회전할 수 있게 되므로, 이로 인해 초연약지반(B)의 표면을 따라서 구름운동을 하면서 매트(100)를 포설할 수 있게 된다.That is, when the roller 120 moves forward with the wire rope D connected, the shaft 110 is able to rotate together with the mat 100, and thus the surface of the super soft ground B Along the cloud movement along the mat can be laid (100).

도 6을 참조하면, 상기 롤러(120)의 내부에는 상기 축(110)을 원활하게 회전시킬 수 있도록 공지의 회전부재(121)가 구비되는데, 이때 상기 회전부재(121)는 베어링 또는 부시와 같은 공지의 기술이 사용될 수 있음은 당연할 것이다.Referring to Figure 6, the roller 120 is provided with a known rotating member 121 to smoothly rotate the shaft 110, wherein the rotating member 121 is such as a bearing or bush It will be appreciated that known techniques can be used.

아울러 와이어로프(D)의 일측에는 부유부재(130)가 설치될 수 있는데, 이는 와이어로프(D)의 길이가 길어질수록 장력이 저하되어 초연약지반(B)의 표면과 맞닿아 포설효율이 제한되므로 이를 방지하기 위함이다.In addition, the floating member 130 may be installed on one side of the wire rope (D), and the longer the length of the wire rope (D), the lower the tension and the surface of the super soft ground (B) is limited in laying efficiency. This is to prevent this.

이때 상기 부유부재(130)는 초연약지반(B)의 표면을 자연스럽게 이동할 수 있는 다양한 형태(함체,보트)의 수단이 사용될 수 있다.At this time, the floating member 130 may be used in various forms (box, boat) means that can naturally move the surface of the ultra-soft ground (B).

상기한 바와 같은 본 발명 초연약지반용 원형매트를 이용한 포설 공법을 각 공정별로 나누어 첨부한 도면에 의해 상세하게 설명하면 다음과 같다.When the installation method using the super soft ground circular mat of the present invention as described above is described in detail by the accompanying drawings divided by each process as follows.

도 8은 본 발명 초연약지반용 원형매트를 이용한 포설 공법의 시공상태를 나타내기 위한 평면도이고, 도 9는 본 발명 초연약지반용 원형매트를 이용한 포설 공법의 시공상태를 나타내기 위한 측면도를 도시한 것이다.8 is a plan view for showing the construction state of the installation method using the super soft ground circular mat of the present invention, Figure 9 is a side view for showing the construction state of the installation method using the super soft ground circular mat of the present invention. .

축(110)의 외경에 원형으로 감기도록 제작되는 매트(100)의 일단을 호안(A)의 일측에 고정하는 공정(a)과, A step (a) of fixing one end of the mat 100 to be wound around the outer diameter of the shaft 110 on one side of the arc A;

상기 축(110)의 양측에 와이어로프(D)를 연결한 후 호안(A)의 타측에 설치된 권취수단(C)의 작동으로 상기 와이어로프(D)를 감거나 당김으로 상기 매트(100)가 회전하면서 초연약지반(B)의 표면을 가로질러 포설하는 공정(b)과, After connecting the wire rope (D) to both sides of the shaft 110, the mat (100) by winding or pulling the wire rope (D) by the operation of the winding means (C) installed on the other side of the arc (A) A step (b) of laying the surface of the super soft ground (B) while rotating;

상기의 a~b공정을 반복 실행하여 초연약지반(B)의 표면에 포설된 매트(100)의 측면을 서로 연결하기 위해서 봉합하는 공정(c)과, A step (c) of suturing to repeatedly connect the side surfaces of the mat 100 placed on the surface of the ultra soft ground B by repeatedly performing the steps a to b, and

상기의 a~c공정을 반복 실행하여 초연약지반(B)의 시공면적에 매트(100)의 포설을 완료하는 공정(e)으로 이루어진다.The process (e) of repeating the steps a to c is completed to complete the installation of the mat 100 in the construction area of the ultra soft ground (B).

이때 상기 b공정에서 매트의 측면(일측 또는 양측)은 서로 겹치도록 포설되는데, 이는 봉합공정에서 작업효율을 증대시키기 위함이다.At this time, the side (one side or both sides) of the mat in the step b is installed to overlap each other, in order to increase the work efficiency in the sewing process.

한편, 상기 c공정에서 공지의 봉합기계를 이용하여 봉합되는데, 이는 초연약지반(B)의 시공면적에 따라서 지중의 이토가 결속부분의 사이로 유출됨을 방지함은 물론 견고한 결속력을 확보하기 위함이다.On the other hand, in the step c is sealed using a known sewing machine, which is to prevent the outflow of ITO in the ground between the binding portion according to the construction area of the ultra soft ground (B) as well as to ensure a solid binding force.

이처럼 상기와 같이 본 발명의 실시예에 대하여 상세히 설명하였으나, 본 발명의 권리범위는 이에 한정되지 않으며, 본 발명의 실시예와 실질적으로 균등의 범위에 있는 구성까지 본 발명의 권리범위에 포함됨은 당연할 것이다.As described above, the embodiments of the present invention have been described in detail, but the scope of the present invention is not limited thereto, and it is natural that the present invention is included in the scope of the present invention to a configuration that is substantially equivalent to the embodiments of the present invention. something to do.

도 1 - 종래 초연약지반을 개량하기 위한 매트 포설 공법의 시공상태를 나타내기 위한 평면도.1-a plan view showing the construction state of the mat laying method for improving the conventional super soft ground.

도 2 - 종래 초연약지반을 개량하기 위한 매트 포설 공법의 시공상태를 나타내기 위한 측면도.Figure 2-side view for showing the construction state of the mat laying method for improving the conventional super soft ground.

도 3 - 종래 초연약지반을 개량하기 위한 매트 포설 공법의 다른 시공상태를 나타내기 위한 평면도.3-a plan view showing another construction state of the mat laying method for improving the conventional super soft ground.

도 4 - 종래 초연약지반을 개량하기 위한 매트 포설 공법의 다른 시공상태를 나타내기 위한 측면도.Figure 4-side view for showing another construction state of the mat laying method for improving the conventional super soft ground.

도 5 - 본 발명 초연약지반용 원형매트의 구조를 나타내기 위한 사시도.5 is a perspective view for showing the structure of the present invention ultra-soft circular mat.

도 6 - 본 발명 초연약지반용 원형매트의 구조를 나타내기 위한 단면도.6 is a cross-sectional view showing the structure of the present invention for the ultra soft ground circular mat.

도 7 - 본 발명 초연약지반용 원형매트의 다른 구조를 나타내기 위한 단면도.7 is a cross-sectional view showing another structure of the circular mat for ultra soft ground of the present invention.

도 8 - 본 발명 초연약지반용 원형매트를 이용한 포설 공법의 시공상태를 나타내기 위한 평면도.8-a plan view for showing the construction of the installation method using the present invention super-soft circular mat.

도 9 - 본 발명 초연약지반용 원형매트를 이용한 포설 공법의 시공상태를 나타내기 위한 측면도.Figure 9-side view for showing the construction of the installation method using the present invention super soft ground circular mat.

* 도면의 주요부분에 대한 부호의 설명 *Explanation of symbols on the main parts of the drawings

1: 종래 초연약지반용 매트1: Conventional Super Soft Ground Mat

100: 매트100: matt

110: 축 111: 중공부110: axis 111: hollow part

112: 축경부112: shaft portion

120: 롤러 121: 회전부재120: roller 121: rotating member

130: 부유부재130: floating member

A: 호안(도로) B: 초연약지반A: Hoan (road) B: Super soft ground

C: 권취수단 D: 와이어로프C: winding means D: wire rope

E: 이송함체E: transport enclosure

Claims (6)

삭제delete 삭제delete 삭제delete 삭제delete 내부에 중공부를 구비하여 부력을 확보하도록 형성되는 축의 외경에 원형으로 감기도록 제작되는 초연약지반용 원형매트를 이용한 포설 공법으로서,As a laying method using a circular mat for ultra soft ground, which is formed to have a hollow inside and wound around the outer diameter of a shaft formed to secure buoyancy, 상기 매트의 일단을 호안의 일측에 고정하는 공정(a)과, (A) fixing one end of the mat to one side of the lake; 상기 축의 양측에 와이어로프를 연결한 후 호안 타측에 설치된 권취수단의 작동으로 상기 와이어로프를 감거나 당김으로 상기 매트가 회전하면서 초연약지반의 표면을 가로질러 포설하는 공정(b)과, (B) connecting the wire ropes to both sides of the shaft and then placing the wire ropes across the surface of the super soft ground while the mat is rotated by winding or pulling the wire ropes by the operation of the winding means installed on the other side of the lake; 상기의 a~b공정을 반복 실행하여 초연약지반의 표면에 포설된 매트의 측면을 서로 연결하기 위해서 봉합하는 공정(c)과, (C) suturing to repeatedly connect the side surfaces of the mat laid on the surface of the ultra soft ground by performing the above steps a to b, and 상기의 a~c공정을 반복 실행하여 초연약지반의 시공면적에 매트의 포설을 완료하는 공정(d)으로 이루어짐을 특징으로 하는 초연약지반용 원형매트를 이용한 포설 공법.The method of laying using the super soft ground circular mat, characterized in that it comprises the step (d) of repeating the steps a ~ c to complete the mat laying on the construction area of the super soft ground. 제 5항에 있어서, 상기 b공정에서 매트의 측면은 서로 겹치도록 포설되어짐을 특징으로 하는 초연약지반용 원형매트를 이용한 포설 공법.The method according to claim 5, wherein the side surfaces of the mat in step b are laid to overlap each other.
KR1020080016424A 2008-02-22 2008-02-22 A circular mat and the using method for very soft ground KR100855099B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020080016424A KR100855099B1 (en) 2008-02-22 2008-02-22 A circular mat and the using method for very soft ground

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020080016424A KR100855099B1 (en) 2008-02-22 2008-02-22 A circular mat and the using method for very soft ground

Publications (1)

Publication Number Publication Date
KR100855099B1 true KR100855099B1 (en) 2008-08-29

Family

ID=39878867

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020080016424A KR100855099B1 (en) 2008-02-22 2008-02-22 A circular mat and the using method for very soft ground

Country Status (1)

Country Link
KR (1) KR100855099B1 (en)

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100719069B1 (en) 2006-10-18 2007-05-16 주식회사 세일종합기술공사 A bottom surface mat construction method and a bottom surface mat construction equipment using the same
KR100750677B1 (en) 2006-05-10 2007-08-20 주식회사 한국 종합엔지니어링 Safer for coming and going manhole for water supply

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100750677B1 (en) 2006-05-10 2007-08-20 주식회사 한국 종합엔지니어링 Safer for coming and going manhole for water supply
KR100719069B1 (en) 2006-10-18 2007-05-16 주식회사 세일종합기술공사 A bottom surface mat construction method and a bottom surface mat construction equipment using the same

Similar Documents

Publication Publication Date Title
KR102412430B1 (en) Method for laying geotextile mat
CN106786193B (en) Long range intertidal zone submarine cable logs in cable laying operation operational method and system
CN207782294U (en) Cable dragging device
CN109506044A (en) A kind of pipeline under the ocean construction technology
KR101254018B1 (en) Floating pier
CN101604829A (en) A kind of optical cable overhead binding lays machine and laying method thereof
CN102718165B (en) Winding plant and rotary drilling rig with same
CN111740687A (en) Intertidal zone offshore floating type photovoltaic system and construction method thereof
KR100855099B1 (en) A circular mat and the using method for very soft ground
KR101412733B1 (en) Fiber gabion and method for manufacturing fiber gabion
KR101177440B1 (en) Method installing mat cylinder type long distance
KR100890399B1 (en) Geotextile mat winder and method for laying geotextile using the same
CN111636372B (en) Construction method for laying interlocking block soft mattress in high-beach shallow water area under low water level
KR200473345Y1 (en) Fiber gabion and apparatus for lifting fiber gabion
KR100870060B1 (en) A mat and the using method for very soft ground
CN105089016A (en) Cable traction reversed-V-shaped water retaining dam
CN212503755U (en) Petroleum electric winch control device
CN213508095U (en) Novel swivel support with traction anchoring ear plate
CN213402893U (en) Intertidal zone marine floating type photovoltaic system
CN204549911U (en) A kind of rotary drilling rig and reel, hoisting system
KR100719069B1 (en) A bottom surface mat construction method and a bottom surface mat construction equipment using the same
JP5075888B2 (en) How to strengthen residential ground
CN216999735U (en) Underwater geotechnical pad paving equipment
JP6393032B2 (en) How to build a dam
CN221118529U (en) Cross-sea bridge cofferdam installation device

Legal Events

Date Code Title Description
A201 Request for examination
A302 Request for accelerated examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20120813

Year of fee payment: 5