KR100835587B1 - Ceiling flush mounting type power distribution panel for apartment house - Google Patents

Ceiling flush mounting type power distribution panel for apartment house Download PDF

Info

Publication number
KR100835587B1
KR100835587B1 KR1020080009861A KR20080009861A KR100835587B1 KR 100835587 B1 KR100835587 B1 KR 100835587B1 KR 1020080009861 A KR1020080009861 A KR 1020080009861A KR 20080009861 A KR20080009861 A KR 20080009861A KR 100835587 B1 KR100835587 B1 KR 100835587B1
Authority
KR
South Korea
Prior art keywords
fixed
guide
hole
ceiling
vertical guide
Prior art date
Application number
KR1020080009861A
Other languages
Korean (ko)
Inventor
김무정
정종규
Original Assignee
주식회사 티아이엔지니어링건축사사무소
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 주식회사 티아이엔지니어링건축사사무소 filed Critical 주식회사 티아이엔지니어링건축사사무소
Priority to KR1020080009861A priority Critical patent/KR100835587B1/en
Application granted granted Critical
Publication of KR100835587B1 publication Critical patent/KR100835587B1/en

Links

Images

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G3/00Installations of electric cables or lines or protective tubing therefor in or on buildings, equivalent structures or vehicles
    • H02G3/36Installations of cables or lines in walls, floors or ceilings
    • H02G3/38Installations of cables or lines in walls, floors or ceilings the cables or lines being installed in preestablished conduits or ducts
    • H02G3/381Installations of cables or lines in walls, floors or ceilings the cables or lines being installed in preestablished conduits or ducts in ceilings
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G3/00Installations of electric cables or lines or protective tubing therefor in or on buildings, equivalent structures or vehicles
    • H02G3/02Details
    • H02G3/08Distribution boxes; Connection or junction boxes
    • H02G3/081Bases, casings or covers
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G3/00Installations of electric cables or lines or protective tubing therefor in or on buildings, equivalent structures or vehicles
    • H02G3/02Details
    • H02G3/08Distribution boxes; Connection or junction boxes
    • H02G3/18Distribution boxes; Connection or junction boxes providing line outlets
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G3/00Installations of electric cables or lines or protective tubing therefor in or on buildings, equivalent structures or vehicles
    • H02G3/22Installations of cables or lines through walls, floors or ceilings, e.g. into buildings

Abstract

A ceiling flush mounting type power distribution panel for an apartment house is provided to facilitate the change of a position of the distribution panel and a distribution direction by burying the distribution panel in a ceiling. A ceiling flush mounting type power distribution panel for an apartment house includes a power distribution panel guide support frame(10), an arrow-like leaf spring(20), and a power distribution panel body(30). The power distribution panel guide support frame is fixed to a ceiling slab inside a ceiling finish. The arrow-like leaf spring guides the power distribution panel to be slid inside the power distribution guide support frame. The power distribution panel body is elevated inside the power distribution guide support frame to distribute electricity.

Description

공동주택용 천장 전기 분전함{CEILING FLUSH MOUNTING TYPE POWER DISTRIBUTION PANEL FOR APARTMENT HOUSE} Ceiling electric distribution box for apartment house {CEILING FLUSH MOUNTING TYPE POWER DISTRIBUTION PANEL FOR APARTMENT HOUSE}

본 발명은 공동주택용 천장 전기 분전함에 관한 것으로서, 보다 상세하게는 분전반을 천정에 매립 고정 설치하여 분전반의 위치변경 및 배선방향을 보다 용이하게 변경하고, 장애물과의 간섭이 없어 실내 공간활용을 극대화시킬 수 있는 공동주택용 천장 전기 분전함에 관한 것이다. The present invention relates to a ceiling electrical distribution box for a multi-family house, and more particularly, to install and install a distribution panel on the ceiling to more easily change the location and wiring direction of the distribution panel, and to maximize indoor space utilization without interference with obstacles. It can be related to the ceiling electric distribution box for apartment houses.

일반적으로 분전반은 배전반으로부터 소정의 전력공급을 받아 전등, 전열, 동력부하 등 각종 부하에 맞게 전력을 배분하여 주는 장치로서, 일반주택에 사용되는 주택용분전반과 빌딩, 공장등에 사용되는 산업용분전반으로 구분된다.In general, the distribution panel is a device that distributes electric power according to various loads such as light, heat, and power load by receiving a predetermined power supply from the distribution panel, and is divided into a housing distribution panel used for general housing and an industrial distribution panel used for a building and a factory. .

종래의 분전반은 내부에 공간부가 형성된 분전함 케이스와, 상기 분전함 케이스의 공간부에 삽입 설치되고 일측면에는 저압 분기 차단기가 배열 설치된 기판과, 상기 기판의 전방에 고정 설치되는 보호커버와, 상기 분전함 케이스에 회동가능하게 힌지 결합된 개폐도어로 구성되어 있다. 상기 기판에 고정 설치되는 보호커버에는 상기 저압 분기 차단기에 설치된 스위치를 조작시킬 수 있게 관통공이 형성되어 있다.Conventional distribution boards include a distribution box case having a space portion formed therein, a substrate inserted into a space portion of the distribution box case and having a low voltage branch circuit breaker arranged on one side thereof, a protective cover fixedly installed in front of the substrate, and the distribution box case. It is composed of an opening and closing door hinged to be rotatable. The protective cover fixed to the substrate is provided with a through hole to operate the switch installed in the low pressure branch breaker.

이와 같이 구성된 종래의 분전반은 건축물의 바닥 구조물 공사후 벽체 공사시 분전반을 매립 설치한 다음 배관, 배선작업을 하면 된다.In the conventional distribution panel configured as described above, after installing the floor structure of the building, the distribution panel may be buried and then piped and wired.

그러나, 이와 같이 구성된 종래 분전반은 구조물 축조 후 벽체 공사시 분전반을 매립 고정시킨 다음 배선공사가 이루어지므로 분전반 설치 후 분전반의 위치변경 및 배관, 배선방향 등을 변경하여 작업할 수 없는 불편함이 있었고, 분전반이 설치된 벽체 전방에는 기타 장애물 등을 설치할 수 없어 공간활용의 폭이 줄어들었을 뿐만 아니라 관계자 외에 일반인이 분전반을 조작할 수 있는 안전사고가 발생되는 문제점이 있었다.However, the conventional distribution panel configured as described above was uncomfortable because it was not possible to work by changing the position of the distribution panel and changing the piping and wiring direction after installing the distribution panel, since the wiring work is performed after the construction of the wall is completed after the construction of the wall. Other obstacles, etc. can not be installed in front of the wall in which the panel board is installed, and the width of the space utilization is reduced, and there is a problem that a safety accident that can be operated by the general public in addition to the person concerned can occur.

본 발명은 상기와 같은 문제점을 해결하기 위한 것으로서, 분전반을 천정에 매립 고정 설치하여 분전반의 위치변경 및 배선방향을 보다 용이하게 변경하고, 장애물과의 간섭이 없어 실내 공간활용을 극대화시킬 수 있는 공동주택용 천장 전기 분전함을 제공함에 그 목적이 있다.The present invention is to solve the problems as described above, by installing the distribution panel fixed to the ceiling fixed installation of the distribution panel and change the wiring direction more easily, there is no interference with obstacles to maximize the indoor space utilization The purpose is to provide a ceiling electrical distribution box for homes.

이와 같은 목적을 달성하기 위하여, 본 발명은 천장슬라브에 고정되는 직육면체인 틀체로 상단에는 일측에는 상단에 연결단자를 갖는 연결선이 삽입된 절연피복관이 관통되는 다수 개의 단자공을 갖는 직사각형상의 상판이 형성되고, 상판 좌우측 상면에 앵커공을 갖고 천장슬라브에 앵커볼트로 고정되는 앵커틀이 고정결합되며, 사각기둥으로 좌우측으로 관통되어 상하로 길게 가이드장공을 갖고 상판의 좌우측전후방 모서리 저면에 각각 직립고정되는 수직안내바가 각각 형성되되 전방좌우측 수직안내바 전방 상하부에는 ㄷ형상의 고정쇠가 외측으로 수평고정되고, 전방좌우측 수직안내바 하단부에는 하부에 개폐손잡이를 갖고 탄성힌지축이 관통되어 스프링 탄성에 의해 닫힌상태를 유지하는 개폐도어의 일측단이 축결합되는 축공이 형성되며, 전방좌우측 수직안내바는 후방좌우측 수직안내바와 하단에서 연결프레임에 의해 고정되어 천장마감재 수평연장선상에 개폐도어가 위치되는 분전함안내지지틀과;In order to achieve the above object, the present invention is formed into a rectangular top plate having a plurality of terminal holes through which an insulating coating pipe is inserted into a frame that is a rectangular parallelepiped fixed to the ceiling slab, the connection line having a connecting terminal at one side at the top. The anchor frame is fixed to the ceiling slab and anchor bolts are fixed to the ceiling slab, and the anchor frame is fixed to the ceiling slab. Vertical guide bars are formed respectively, the front left and right vertical guide bar in front of the top and bottom of the c-shaped fastener horizontally fixed to the outside, the front left and right vertical guide bar has an opening and closing handle at the bottom and the elastic hinge shaft is penetrated and closed by spring elasticity One end of the opening and closing door to maintain the shaft hole is formed, Room left and right vertical guide bar distribution box which is opened and closed door position on board the rear left and right vertical guide bar is fixed by connecting the frame at the bottom of the ceiling finishing material horizontally extending guide and support frame;

판체스프링으로 상하부에는 상기 분전함안내지지틀 수직안내바의 상하부 고정쇠가 삽입되어 고정볼트에 의해 각각 걸림고정되는 장공이 형성되고, 상하단에는 상기 수직안내바의 가이드장공 상에 활형으로 위치되어 내측으로 반원형상으로 절곡되는 상하단반원고리부가 각각 형성되는 활형판스프링과;The upper and lower parts of the vertical guide bar of the distribution box guide frame vertical guide bar is inserted into the plate spring to form a long hole is fixed by the fixing bolt, respectively, and the upper and lower ends are located in a bow shape on the guide hole of the vertical guide bar in a semi-circular shape A bow-shaped spring having upper and lower half-circle rings each bent upward;

측면이 삼각형상의 함체로 전후방측 상부 측면에는 상기 수직안내바의 가이드장공에 삽입되어 걸림고정되는 승강안내볼트가 각각 형성되고, 후방좌우측 승강안내볼트는 너트에 의해 승강가능하게 고정되며, 상면에는 상기 절연피복관이 삽입되는 피복관통공이 형성되고, 피복관통공 연장선상의 내측하단면에는 연결선이 피복관통공 하단에 위치된 접지단자에 통전연결되면서 하단면에 사면으로 고정된 스위치회로기판의 저압분기차단기에 통전연결되며, 스위치회로기판은 절연커버에 의해 저압분기차단기만 개방되게 밀폐되고, 상단면에는 개폐판이 형성되며, 하단면에는 인출손잡이가 형성되어 상기 분전함안내지지틀에서 상하로 이동되는 전기분전함체을 구비하는 특징이 있다.Each side of the front and rear sides of the triangular shape is formed in the lifting guide bolts are inserted into the guide hole of the vertical guide bar is fixed to each other, the rear left and right lifting guide bolts are fixed to the elevable by a nut, the upper surface is A sheath through hole into which the insulation coating tube is inserted is formed, and an inner bottom end of the sheath through hole is connected to the low voltage branch circuit breaker of the switch circuit board which is connected to the ground terminal located at the bottom of the sheath through hole and is fixed to the bottom surface. The switch circuit board is sealed so that only the low voltage circuit breaker is opened by an insulating cover, and an opening and closing plate is formed at an upper surface thereof, and a drawer handle is formed at the lower surface thereof, and the electrical distribution enclosure is moved up and down in the distribution box guide support frame. There is a characteristic.

이와 같이, 본 발명은 분전반을 천정에 매립 고정 설치하여 분전반의 위치변경 및 배선방향을 보다 용이하게 변경하고, 장애물과의 간섭이 없어 실내 공간활용을 극대화시킬 수 있는 효과가 있다.As described above, the present invention has an effect of burying the distribution board fixedly mounted on the ceiling to change the position and wiring direction of the distribution panel more easily, and to maximize the utilization of indoor space without interference with obstacles.

본 발명은 상술한 특정의 바람직한 실시 예에 한정되지 아니하며, 청구범위에서 청구하는 본 발명의 요지를 벗어남이 없이 당해 발명이 속하는 기술분야에서 통상의 지식을 가진 자라면 누구든지 다양한 변형 실시가 가능한 것은 물론이고, 그와 같은 변경은 청구범위 기재의 범위 내에 있게 된다.The present invention is not limited to the above-described specific preferred embodiments, and various modifications can be made by those skilled in the art without departing from the gist of the present invention as claimed in the claims. Of course, such changes will fall within the scope of the claims.

이하, 본 발명을 첨부된 도면에 의해 보다 상세하게 설명하면 다음과 같다.Hereinafter, the present invention will be described in more detail with reference to the accompanying drawings.

도 1은 본 발명 실시 예인 공동주택용 천장 전기 분전함의 시공모습을 보인 사시도이고, 도 2는 본 발명 실시 예인 공동주택용 천장 전기 분전함의 체결모습을 보인 분리 사시도이며, 도 3은 본 발명 실시 예인 공동주택용 천장 전기 분전함의 활형판스프링의 체결모습을 보인 분리 사시도이고, 도 4는 본 발명 실시 예인 공동주택용 천장 전기 분전함의 시공모습을 보인 측단면도이며, 도 5는 본 발명 실시 예인 공동주택용 천장 전기 분전함의 작동모습을 보인 측단면도이다.1 is a perspective view showing a construction of the ceiling electric distribution box for an apartment house according to an embodiment of the present invention, Figure 2 is an exploded perspective view showing a fastening of the ceiling electric distribution box for an apartment house according to an embodiment of the present invention, Figure 3 is a multi-unit housing for an embodiment of the present invention Figure 4 is an exploded perspective view showing the fastening pattern of the spring of the electrical distribution box of the ceiling, Figure 4 is a side cross-sectional view showing the construction of the ceiling electrical distribution box for an apartment house according to an embodiment of the present invention, Figure 5 is A side cross-sectional view showing the operation.

참고로 본 발명을 설명함에 있어 관련된 공지 기능 또는 구성에 대한 구체적인 설명이 본 발명의 요지를 불필요하게 흐릴 수 있다고 판단될 경우에는 그 상세한 설명을 생략하였다.For reference, in describing the present invention, when it is determined that a detailed description of a related known function or configuration may unnecessarily obscure the gist of the present invention, the detailed description thereof is omitted.

또한, 후술되는 용어들은 본 발명에서의 기능을 고려하여 정의된 용어들로서 이는 사용자, 운영자의 의도 또는 관례 등에 따라 달라질 수 있다.In addition, terms to be described below are terms defined in consideration of functions in the present invention, which may vary according to the intention or convention of a user or an operator.

그러므로, 그 정의는 본 명세서 전반에 걸친 내용을 토대로 내려져야 할 것임은 물론이다.Therefore, the definition should be made based on the contents throughout the specification.

본 발명의 공동주택용 천장 전기 분전함은, 천장마감재(40) 내측에서 천장슬라브(50)에 고정설치되는 분전함안내지지틀(10)과, 분전함안내지지틀(10) 내측에서 전기분전함체(30)를 슬라이딩되게 승강안내하는 활형판스프링(20)과, 분전함안내지지틀(10)의 내측에서 승강되어 전기의 분전이 이루어지는 전기분전함체(30)로 구성된다.Ceiling electrical distribution box for a multi-unit house of the present invention, the distribution box guide support frame 10 is fixed to the ceiling slab 50 inside the ceiling finishing material 40 and the electrical distribution box 30 in the distribution box guide support frame 10 inside. It is composed of an elbow leaf spring 20 for guiding the lifting and sliding of the electric distribution box 30, which is lifted in the inner side of the distribution box guide support frame 10, the electrical distribution is made.

상기 분전함안내지지틀(10)은 천장슬라브(50)에 고정되는 직육면체인 틀체로, 상단에는 일측에는 상단에 연결단자(14a)를 갖는 연결선(14)이 삽입된 절연피복관(13)이 관통되는 다수 개의 단자공(12)을 갖는 직사각형상의 상판(11)이 형성되고, 상판(11) 좌우측 상면에 앵커공(15a)을 갖고 천장슬라브(50)에 앵커볼트(15b)로 고정되는 앵커틀(15)이 고정결합되며, 사각기둥으로 좌우측으로 관통되어 상하로 길게 가이드장공(16a)을 갖고 상판(11)의 좌우측전후방 모서리 저면에 각각 직립고정되는 수직안내바(16)가 각각 형성되되 전방좌우측 수직안내바(16) 전방 상하부에는 ㄷ형상의 고정쇠(18,18a)가 외측으로 수평고정되고, 전방좌우측 수직안내바(16) 하단부에는 하부에 개폐손잡이(17c)를 갖고 탄성힌지축(17)이 관통되어 스프링(17a) 탄성에 의해 닫힌 상태를 유지하는 개폐도어(17b)의 일측단이 축결합되는 축공(16b)이 형성되며, 전방좌우측 수직안내바(16)는 후방좌우측 수직안내바(16)와 하단에서 연결프레임(19)에 의해 고정되어 천장마감재(40) 수평연장선상에 개폐도어(17b)가 위치된다. The distribution box guide support frame 10 is a rectangular parallelepiped frame fixed to the ceiling slab 50, the insulating coating pipe 13 through which the connection line 14 having a connection terminal 14a at one side is inserted into the upper side. A rectangular upper plate 11 having a plurality of terminal holes 12 is formed, the anchor frame having anchor holes 15a on the left and right upper surfaces of the upper plate 11 and fixed to the ceiling slab 50 with anchor bolts 15b ( 15) are fixedly coupled, vertical guide bars 16 are respectively formed on the left and right front and rear corner bottoms of the upper plate 11 and vertical guide bars 16a are vertically penetrated to the left and right through the square pillars, respectively. The vertical guide bar 16 has a c-shaped clamp 18 and 18a horizontally fixed to the outside at the front upper and lower sides thereof, and an elastic hinge shaft 17 having an opening and closing handle 17c at the bottom of the front left and right vertical guide bars 16 at the lower end thereof. Is penetrated to maintain the closed state by elasticity of the spring 17a. One end of the closed door (17b) is formed with a shaft hole 16b is axially coupled, the front left and right vertical guide bar 16 is fixed by the rear left and right vertical guide bar 16 and the connecting frame 19 at the lower ceiling The opening and closing door 17b is positioned on the finishing material 40 horizontal extension line.

상기 활형판스프링(20,20a)은 판체스프링으로 상하부에는 상기 분전함안내지지틀(10) 수직안내바(16)의 상하부 고정쇠(18,18a)가 삽입되어 고정볼트(22)에 의해 각각 걸림고정되는 장공(21,21a)이 형성되고, 상하단에는 상기 수직안내바(16)의 가이드장공(16a) 상에 활형으로 위치되어 내측으로 반원형상으로 절곡되는 상하단반원고리부(23,23a)가 각각 형성되어 가이드장공(16a)을 관통한 승강안내볼트(31,31a,32,32a)와 밀착되어 승강안내볼트(31,31a,32,32a)를 탄성에 의해 상하측으로 슬라이딩이동되도록 안내하게 된다. The bow-shaped springs (20, 20a) is a plate spring, the upper and lower clamps (18, 18a) of the vertical distribution bar 16 of the distribution box guide support frame 10 is inserted into the upper and lower fastening by the fixing bolt 22, respectively Long holes 21 and 21a are formed, and upper and lower semicircular rings 23 and 23a are positioned on the guide hole 16a of the vertical guide bar 16 and are bent in a semicircle to the inside. It is formed to be in close contact with the elevating guide bolts (31, 31a, 32, 32a) penetrating the guide hole 16a to guide the elevating guide bolts (31, 31a, 32, 32a) to move up and down by elasticity.

상기 전기분전함체(30)는 측면이 삼각형상의 함체로, 전후방측 상부 측면에는 상기 수직안내바(16)의 가이드장공(16a)에 삽입되어 걸림고정되는 승강안내볼트(31,31a,32,32a)가 각각 형성되고, 후방좌우측 승강안내볼트(32,32a)는 너트(32b)에 의해 승강가능하게 고정되며, 상면에는 상기 절연피복관(13)이 삽입되는 피복관통공(33)이 형성되고, 피복관통공(33) 연장선상의 내측하단면에는 연결선(14)이 피복관통공(33) 하단에 위치된 접지단자(33a)에 통전연결되면서 하단면에 사면으로 고정된 스위치회로기판(34) 저면의 저압분기차단기(34a)에 통전연결되며, 스위치회로기판(34)은 절연커버(35)에 의해 저압분기차단기(34a)만 개방되게 내측에 고정되고, 상단면에는 개폐판(36)이 형성되며, 하단면에는 인출손잡이(37)가 형성되어 상기 분전함안내지지틀(10)에서 상하로 이동된다. The electrical distribution box 30 is a triangular enclosure side, the front and rear side of the lifting guide bolts 31, 31a, 32, 32a inserted into the guide hole 16a of the vertical guide bar 16 is fixed Are respectively formed, and the rear left and right lifting guide bolts 32 and 32a are fixed to be liftable by the nut 32b, and the top surface is formed with a covering through hole 33 into which the insulating coating pipe 13 is inserted. Low pressure branch of the bottom surface of the switch circuit board 34 fixed to the bottom surface while the connecting line 14 is electrically connected to the ground terminal 33a located at the bottom of the covering through hole 33 on the inner lower end surface of the through hole 33 extension line. It is electrically connected to the circuit breaker 34a, and the switch circuit board 34 is fixed inside to open only the low voltage circuit breaker 34a by the insulating cover 35, and an opening and closing plate 36 is formed on the upper surface thereof. A drawer handle 37 is formed on the surface to move up and down in the distribution box guide support frame 10. It is.

이와 같은 본 발명은, 전기분전함체(30) 하단의 인축손잡이(37)을 잡고서 하부로 당기면, 개폐도어(17b)는 탄성힌지축(17)을 축으로 하부로 회동되고, 전기분전함체(30)는 전방좌우측의 승강안내볼트(31,31a)가 고정쇠(18,18a)에 의해 고정된 활형판스프링(20,20a)의 외면과 면접촉되면서 도 6과 같이, 전기분전함체(30)를 활형판스프링(20,20a)의 탄성으로 서서히 하강시키게 된다. 이때, 가이드장공(16a)을 관통한 승강안내볼트(31,31a,32,32a)는 활형판스프링(20,20a)의 돌출된 외측면과 밀착되면서 활형판스프링(20,20a)을 탄성에 의해 내측으로 밀면서 서서히 하측으로 슬라이딩이동되도록 안내되어 하강된다.In the present invention as described above, when the lower portion of the electrical distribution box 30, the grasping handle 37 is pulled down, the opening and closing door 17b is rotated downward with respect to the elastic hinge shaft 17, electrical distribution box 30 6) the electrical distribution enclosure 30 as shown in FIG. 6 while the front and left lifting guide bolts 31 and 31a are in surface contact with the outer surfaces of the slide plate springs 20 and 20a fixed by the clamps 18 and 18a. It is gradually lowered to the elasticity of the slide plate spring (20, 20a). At this time, the elevating guide bolts 31, 31a, 32, and 32a penetrating the guide long hole 16a are in close contact with the protruding outer surfaces of the leaf springs 20 and 20a, and thus, the spring leaf springs 20 and 20a are elastic. It is guided and lowered so as to slide downward while gradually moving inward.

다시 전기분전함체(30)를 분전함안내지지틀(10) 하측에서 상측으로 밀어 올리면, 개폐도어(17b)는 스프링(17a)의 탄성으로 원위치되고, 활형판스프링(20,20a)에 의해서 전기분전함체(30)는 서서히 상승하여 원위치된다.When the electrical distribution box 30 is pushed upward from the lower side of the distribution box guide support frame 10, the opening / closing door 17b is returned to the elasticity of the spring 17a, and the electrical distribution is carried out by the slide plate springs 20 and 20a. The enclosure 30 slowly rises to its original position.

도 1은 본 발명 실시 예인 공동주택용 천장 전기 분전함의 시공모습을 보인 사시도, 1 is a perspective view showing the construction of the ceiling electric distribution box for apartment house according to an embodiment of the present invention,

도 2는 본 발명 실시 예인 공동주택용 천장 전기 분전함의 체결모습을 보인 분리 사시도, Figure 2 is an exploded perspective view showing a fastening of the ceiling electric distribution box for apartment house according to the embodiment of the present invention,

도 3은 본 발명 실시 예인 공동주택용 천장 전기 분전함의 활형판스프링의 체결모습을 보인 분리 사시도, Figure 3 is an exploded perspective view showing the fastening of the bow-shaped spring of the ceiling electrical distribution box for apartment house according to the embodiment of the present invention,

도 4는 본 발명 실시 예인 공동주택용 천장 전기 분전함의 시공모습을 보인 측단면도, Figure 4 is a side cross-sectional view showing the construction of the ceiling electric distribution box for apartment house according to an embodiment of the present invention,

도 5는 본 발명 실시 예인 공동주택용 천장 전기 분전함의 작동모습을 보인 측단면도.Figure 5 is a side cross-sectional view showing the operation of the ceiling electrical distribution box for apartment house according to an embodiment of the present invention.

*도면의 주요 부분에 대한 부호의 설명** Description of the symbols for the main parts of the drawings *

10 : 분전함안내지지틀 11 : 상판10: distribution box guide frame 11: the top plate

12 : 단자공 13 : 절연피복관12: terminal hole 13: insulation coating pipe

14 : 연결선 14a : 연결단자14: connecting line 14a: connecting terminal

15 : 앵커틀 15a : 앵커공15: anchor frame 15a: anchor ball

15b : 앵커볼트 16 : 수직안내바 15b: Anchor Bolt 16: Vertical Guide Bar

16a : 가이드장공 16b : 축공16a: guide hole 16b: shaft hole

17 : 탄성힌지축 17a : 스프링17: elastic hinge shaft 17a: spring

17b : 개폐도어 17c : 개폐손잡이17b: opening and closing door 17c: opening and closing handle

18,18a : 고정쇠 19 : 연결프레임18,18a: Fixture 19: Connecting Frame

20,20a : 활형판스프링 21,21a : 장공 20,20a: Bow type spring 21,21a: Long hole

22 : 고정볼트 23,23a : 상하단반원고리부22: fixing bolt 23,23a: upper and lower semi-circular ring portion

30 : 전기분전함체 31,31a,32,32a : 승강안내볼트30: electric distribution enclosure 31,31a, 32,32a: lift guide bolt

33 : 피복관통공 33a : 접지단자 33: through-hole 33a: ground terminal

34 : 스위치회로기판 34a : 전압분기차단기34: switch circuit board 34a: voltage branch circuit breaker

35 : 절연커버 36 : 개폐판35: insulation cover 36: opening and closing plate

40 : 천장마감재 40: ceiling finish

50 : 찬장슬라브50: Cupboard Slabs

60 : 벽체60: wall

Claims (1)

천장슬라브에 고정되는 직육면체인 틀체로 상단에는 일측에는 상단에 연결단자를 갖는 연결선이 삽입된 절연피복관이 관통되는 다수 개의 단자공을 갖는 직사각형상의 상판이 형성되고, 상판 좌우측 상면에 앵커공을 갖고 천장슬라브에 앵커볼트로 고정되는 앵커틀이 고정결합되며, 사각기둥으로 좌우측으로 관통되어 상하로 길게 가이드장공을 갖고 상판의 좌우측전후방 모서리 저면에 각각 직립고정되는 수직안내바가 각각 형성되되 전방좌우측 수직안내바 전방 상하부에는 ㄷ형상의 고정쇠가 외측으로 수평고정되고, 전방좌우측 수직안내바 하단부에는 하부에 개폐손잡이를 갖고 탄성힌지축이 관통되어 스프링 탄성에 의해 닫힌상태를 유지하는 개폐도어의 일측단이 축결합되는 축공이 형성되며, 전방좌우측 수직안내바는 후방좌우측 수직안내바와 하단에서 연결프레임에 의해 고정되어 천장마감재 수평연장선상에 개폐도어가 위치되는 분전함안내지지틀과;Rectangular top plate fixed to the ceiling slab is formed on the top of the rectangular top plate is formed with a plurality of terminal holes through which the insulation coating tube inserted through the connecting line having a connection terminal at the top is formed on one side, the anchor plate on the upper left and right sides An anchor frame fixed to the slab is fixedly coupled to the slab, and the vertical guide bar is vertically fixed to the bottom of the left and right front and rear corners of the top plate, respectively, having a guide hole extending vertically through the left and right through a square pillar. The c-shaped fastener is horizontally fixed to the outside at the front upper and lower sides, and one side end of the opening / closing door which has an open / close handle at the bottom of the front left and right vertical guide bar and the elastic hinge shaft penetrates to be kept closed by spring elasticity is axially coupled. The shaft hole is formed, the front left and right vertical guide bar is the rear left and right vertical guide A distribution box guide frame fixed to the bar at the bottom and positioned to open and close the door on a horizontal extension line of the ceiling finishing material; 판체스프링으로 상하부에는 상기 분전함안내지지틀 수직안내바의 상하부 고정쇠가 삽입되어 고정볼트에 의해 각각 걸림고정되는 장공이 형성되고, 상하단에는 상기 수직안내바의 가이드장공 상에 환형으로 위치되어 내측으로 반원형상으로 절곡되는 상하단반원고리부가 각각 형성되며, 상기 가이드장공을 관통한 하기 승강안내볼트와 밀착되어 하기 승강안내볼트를 탄성에 의해 상하측으로 슬라이딩이동되도록 안내하는 활형판스프링과;The upper and lower parts of the vertical guide bar of the distribution box guide frame vertical guide bar is inserted into the plate spring to form a long hole is fixed by the fixing bolt, respectively, and the upper and lower ends are located in an annular shape on the guide hole of the vertical guide bar in a semi-circular shape An upper and lower semi-circular ring portions each bent upwardly and in close contact with the elevating guide bolt penetrating the guide hole to guide the elevating guide bolt so as to slide upward and downward by elasticity; 측면이 삼각형상의 함체로 전후방측 상부 측면에는 상기 수직안내바의 가이드장공에 삽입되어 걸림고정되는 승강안내볼트가 각각 형성되고, 후방좌우측 승강안내볼트는 너트에 의해 승강가능하게 고정되며, 상면에는 상기 절연피복관이 삽입되는 피복관통공이 형성되고, 피복관통공 연장선상의 내측하단면에는 연결선이 피복관통공 하단에 위치된 접지단자에 통전연결되면서 하단면에 사면으로 고정된 스위치회로기판의 저압분기차단기에 통전연결되며, 스위치회로기판은 절연커버에 의해 저압분기차단기만 개방되게 내측에 고정되고, 상단면에는 개폐판이 형성되며, 하단면에는 인출손잡이가 형성되어 상기 분전함안내지지틀에서 상하로 이동되는 전기분전함체을 구비하는 공동주택용 천장 전기 분전함.Each side of the front and rear sides of the triangular shape is formed in the lifting guide bolts are inserted into the guide hole of the vertical guide bar is fixed to each other, the rear left and right lifting guide bolts are fixed to the elevable by a nut, the upper surface is A sheath through hole into which the insulation coating tube is inserted is formed, and an inner bottom end of the sheath through hole is connected to the low voltage branch circuit breaker of the switch circuit board which is connected to the ground terminal located at the bottom of the sheath through hole and is fixed to the bottom surface. The switch circuit board is fixed inside to open only the low voltage circuit breaker by an insulating cover, and an opening and closing plate is formed on the upper surface thereof, and a drawer handle is formed on the lower surface thereof to move the electrical distribution enclosure moved up and down in the distribution box guide support frame. Equipped with ceiling electrical distribution boxes for apartments.
KR1020080009861A 2008-01-31 2008-01-31 Ceiling flush mounting type power distribution panel for apartment house KR100835587B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020080009861A KR100835587B1 (en) 2008-01-31 2008-01-31 Ceiling flush mounting type power distribution panel for apartment house

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020080009861A KR100835587B1 (en) 2008-01-31 2008-01-31 Ceiling flush mounting type power distribution panel for apartment house

Publications (1)

Publication Number Publication Date
KR100835587B1 true KR100835587B1 (en) 2008-06-05

Family

ID=39770202

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020080009861A KR100835587B1 (en) 2008-01-31 2008-01-31 Ceiling flush mounting type power distribution panel for apartment house

Country Status (1)

Country Link
KR (1) KR100835587B1 (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100876915B1 (en) 2008-06-13 2009-01-07 금탑엔지니어링 주식회사 Electricity distribution box of ceiling for building
KR100979771B1 (en) 2010-02-11 2010-09-02 주식회사 이린 Distributing board
KR101055858B1 (en) 2011-06-13 2011-08-09 주식회사 동도이엔씨 Electricity distribution box of ceiling for building
KR101715252B1 (en) * 2016-08-31 2017-03-13 주식회사 진일기술단 Electrical distribution equipment
KR101717157B1 (en) * 2016-08-25 2017-03-16 주식회사 자람앤수엔지니어링 Electrical distribution box of ceiling
KR101717153B1 (en) * 2016-08-26 2017-03-16 주식회사 자람앤수엔지니어링 Switching equipment for controlling electrical distribution
KR101914680B1 (en) 2018-08-13 2018-11-05 성영환 Chest

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200236602Y1 (en) 2001-04-13 2001-10-11 주식회사 케이디파워 Ceiling flush mounting type power distribution panel

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200236602Y1 (en) 2001-04-13 2001-10-11 주식회사 케이디파워 Ceiling flush mounting type power distribution panel

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100876915B1 (en) 2008-06-13 2009-01-07 금탑엔지니어링 주식회사 Electricity distribution box of ceiling for building
KR100979771B1 (en) 2010-02-11 2010-09-02 주식회사 이린 Distributing board
KR101055858B1 (en) 2011-06-13 2011-08-09 주식회사 동도이엔씨 Electricity distribution box of ceiling for building
KR101717157B1 (en) * 2016-08-25 2017-03-16 주식회사 자람앤수엔지니어링 Electrical distribution box of ceiling
KR101717153B1 (en) * 2016-08-26 2017-03-16 주식회사 자람앤수엔지니어링 Switching equipment for controlling electrical distribution
KR101715252B1 (en) * 2016-08-31 2017-03-13 주식회사 진일기술단 Electrical distribution equipment
KR101914680B1 (en) 2018-08-13 2018-11-05 성영환 Chest

Similar Documents

Publication Publication Date Title
KR100835587B1 (en) Ceiling flush mounting type power distribution panel for apartment house
US8013242B1 (en) Outdoor electrical box
US10020645B2 (en) Outdoor electrical box
US9077166B2 (en) Weatherproof electrical box
US9819158B2 (en) Integrated electrical assembly for housing modular units and related components thereof
KR100646349B1 (en) Structure for isolating electromagnetic waves of electric supply line in an apartment house
US9653900B2 (en) Outdoor electrical box
WO2019010200A3 (en) Weatherproof electrical enclosure with reinforcement
KR200483834Y1 (en) case assembly for distribution board
US20160261055A1 (en) Integrated electrical assembly for housing modular units and related components thereof
CN203645188U (en) Outdoor comprehensive distribution box
CN104284537A (en) Adjustable base for electrical cabinet
JP2978391B2 (en) Drop-in board for apartment house
KR101597195B1 (en) Wall embedded type compact cabinet panel
KR101534396B1 (en) Variable distribution box having level adjusting for finishing quality
CN110093975A (en) A kind of rural area assembled-type house
KR101047497B1 (en) Electrical distribution box of ceiling for apartment house
CN206250640U (en) A kind of movable outdoor electric power cabinet
RU2672068C1 (en) Lift distribution system with fixed panel
JP3219775U (en) Unit installation unit in cubicle of switchboard / distribution panel
CN208890156U (en) A kind of low pressure electronic box
KR100968075B1 (en) An electric distri-bution box in apartment building
RU2681150C1 (en) Lifting distribution system with lifting panel
KR100876915B1 (en) Electricity distribution box of ceiling for building
WO2019085537A1 (en) Wallboard for movable house and movable house

Legal Events

Date Code Title Description
A201 Request for examination
A302 Request for accelerated examination
N231 Notification of change of applicant
N231 Notification of change of applicant
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20120530

Year of fee payment: 5

FPAY Annual fee payment

Payment date: 20130530

Year of fee payment: 6

LAPS Lapse due to unpaid annual fee