KR100821335B1 - Constructing method of eps and metal moulding - Google Patents

Constructing method of eps and metal moulding Download PDF

Info

Publication number
KR100821335B1
KR100821335B1 KR1020070116984A KR20070116984A KR100821335B1 KR 100821335 B1 KR100821335 B1 KR 100821335B1 KR 1020070116984 A KR1020070116984 A KR 1020070116984A KR 20070116984 A KR20070116984 A KR 20070116984A KR 100821335 B1 KR100821335 B1 KR 100821335B1
Authority
KR
South Korea
Prior art keywords
eps
metal
metal molding
molding
wall
Prior art date
Application number
KR1020070116984A
Other languages
Korean (ko)
Inventor
이관표
Original Assignee
(주)엄앤드이종합건축사사무소
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by (주)엄앤드이종합건축사사무소 filed Critical (주)엄앤드이종합건축사사무소
Priority to KR1020070116984A priority Critical patent/KR100821335B1/en
Application granted granted Critical
Publication of KR100821335B1 publication Critical patent/KR100821335B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F19/00Other details of constructional parts for finishing work on buildings
    • E04F19/02Borders; Finishing strips, e.g. beadings; Light coves

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Finishing Walls (AREA)

Abstract

A construction method of EPS metal mouldings is provided to make construction simple and to increase durability when installing EPS metal mouldings to an external wall of a building. A construction method of EPS metal mouldings comprises the steps of: installing an angle to an external wall of a building where EPS metal mouldings are to be installed(S1); connecting EPS metal mouldings horizontally by interposing sockets according to the installation length of the angle(S2); coupling an end cover to an opened end of the EPS metal moulding(S3); coupling the back of the EPS metal moulding to the angle installed to the external wall and fixing vertically using a screw pin(S4); and caulking the space between the external wall and the EPS metal moulding and the insertion of the screw pin(S5).

Description

이피에스 금속몰딩 시공방법{Constructing method of EPS and metal moulding}Constructing method of EPS and metal molding

본 발명은 건물의 외벽에 몰딩재를 이용한 조형물을 설치하는 시공방법에 관한 것으로서, 더욱 상세하게는 금속판으로 형성된 몰딩 내에 EPS몰딩을 삽입시킨 EPS금속몰딩 성형물과 수평연결을 위한 소켓 등을 이용하여 건물의 외벽에 조형물을 설치함으로써 경량화 및 조립성을 향상시켜 시공이 간편하고 내구성이 뛰어나며 시공단가가 저렴한 EPS금속몰딩 시공방법에 관한 것이다.The present invention relates to a construction method for installing the molding using the molding material on the outer wall of the building, and more particularly, the building using the EPS metal molding molding inserting the EPS molding in the molding formed of a metal plate and the socket for horizontal connection. By installing the sculpture on the outer wall of the lightweight and assembling improves the construction is easy, excellent durability and low construction cost EPS metal molding construction method.

건물의 외벽을 장식하기 위한 조형물로서 종래에는 주로 철재 또는 알룸늄 등의 금속몰딩 또는 EPS(발포폴리스티렌)몰딩이 시공되어 왔으며, 금속몰딩의 경우 오염발생이 적고 표면 내구성도 강하여 반영구적으로 사용할 수 있는 장점이 있지만, 제품성형이 어렵고 제작비용이 비싸다는 문제점뿐만 아니라 몰딩 내부가 비어 있어서 우수나 강풍에 의해 소음이 발생하는 문제점이 있다.As a molding for decorating the exterior wall of a building, metal molding or EPS (foam polystyrene) molding, such as steel or aluminum, has been constructed in the past, and in the case of metal molding, it is possible to use semi-permanently because of less pollution and strong surface durability. There is a problem, however, that product molding is difficult and the manufacturing cost is high, as well as the interior of the molding is empty, causing noise due to rain or strong wind.

이에 반하여, EPS몰딩은 저렴한 가격과 표현 성형이 자유롭다는 장점으로 아파트나 주상복합물에 많이 사용되고 있었으나, 내구성과 표면강도가 약하여 충격에 쉽게 변형되거나 파손되며, 시간이 경과함에 따라 우수 등에 의하여 오염발생이 심 해지는 문제점을 가지고 있다.On the contrary, EPS molding has been widely used in apartments and residential composites because of its low price and freedom of expression molding, but it is easily deformed or damaged due to its durability and surface strength, and it may be polluted due to its excellentness over time. This has got worse.

이러한 문제점을 해결하기 위하여 철, 알루미늄, 갈바륨, 칼라철판, 아연판 등의 재질인 금속판과 EPS(Expanded Polystyrene)를 이용하여 제조되는 EPS금속몰딩이 대한민국특허등록번호 제10-0689235호로 등록되어 있다.In order to solve this problem, a metal plate made of a material such as iron, aluminum, galvalume, color plate, zinc plate and EPS metal molding manufactured using EPS (Expanded Polystyrene) is registered as Korean Patent Registration No. 10-0689235.

상기 EPS금속몰딩은 발포폴리스티렌 또는 스티로폼으로 불려지는 EPS를 이용하여 성형이 용이함과 동시에 외부를 감싸는 금속몰딩에 의하여 내구성과 표면강도가 뛰어나므로 건물의 외벽 등에 설치되어 일정형태를 장기간 유지해야하는 조형물로서 뛰어난 적합성을 가지고 있다.The EPS metal molding is easy to form using EPS called polystyrene foam or styrofoam and is excellent as a molding to be installed on the outer wall of a building for a long time because it is excellent in durability and surface strength by metal molding surrounding the outside. Has suitability.

한편, 상기의 EPS금속몰딩을 이용하여 건물의 외벽 등에 시공할 때 간편하고 용이하게 시공할 수 있는 시공방법의 필요성이 대두되고 있으므로 그에 관한 연구개발이 필요하다.On the other hand, when using the above-mentioned EPS metal molding when the construction of the outer wall of the building, the need for a construction method that can be easily and easily rises, so research and development is required.

따라서, 상기와 같은 문제점을 해결하기 위한 본 발명의 기술적 과제는 금속판으로 형성된 몰딩 내에 EPS몰딩을 삽입시킨 EPS금속몰딩 성형물을 이용하여 수평연결, 돌출부분 및 개방단부에 대한 처리방법을 제시함으로써 건물의 외벽에 조형물을 설치할 때 시공이 간편하고 내구성이 뛰어난 EPS금속몰딩 시공방법을 제공하는 것이다.Therefore, the technical problem of the present invention for solving the above problems is to propose a method for treating the horizontal connection, the protrusion and the open end by using the EPS metal molding molding in which the EPS molding is inserted into the molding formed of a metal plate. When installing the sculptures on the outer wall to provide a simple construction method and excellent durability EPS metal molding construction method.

상기의 기술적 과제를 해결하기 위하여 본 발명은,The present invention to solve the above technical problem,

EPS금속몰딩이 설치될 건물 외벽의 일정위치에 수평으로 앵글을 고정설치하는 제1 단계; A first step of horizontally fixing the angle at a predetermined position of the outer wall of the building where the EPS metal molding is to be installed;

상기 앵글의 설치길이에 일치하도록 EPS금속몰딩들을 소켓을 개재시킨 상태에서 수평으로 연결하고 이음부를 코킹처리하는 제2 단계; A second step of horizontally connecting the EPS metal moldings with the socket interposed therebetween so as to correspond to the installation length of the angle and caulking the joint;

EPS금속몰딩의 개방된 단부에 단부커버를 결합하고 결합부분을 코킹처리하는 제3 단계; Coupling the end cover to the open end of the EPS metal molding and caulking the coupling portion;

EPS금속몰딩의 배면을 외벽에 설치된 앵글에 결합시키고 스크루핀을 이용하여 수직으로 고정시키고 결합부분을 코킹처리하는 제4 단계; 및A fourth step of coupling the rear surface of the EPS metal molding to an angle installed on an outer wall, vertically fixing the same by using a screw pin, and caulking the joint portion; And

외벽과 EPS금속몰딩 사이의 틈과 상기 스크루핀 삽입부분을 코킹처리하는 제5 단계; 를 포함하는 EPS금속몰딩 시공방법을 제공한다.A fifth step of caulking the gap between the outer wall and the EPS metal molding and the screw pin insertion portion; It provides a EPS metal molding construction method comprising a.

상기 소켓은 EPS몰딩과 동일한 재질로 형성된 부재인 것이 바람직하다.The socket is preferably a member formed of the same material as the EPS molding.

상기 소켓의 일측에는 EPS몰딩의 단부에 삽입되는 삽입부가 형성되고, 타측에는 상부에 물매가 경사지게 형성되고 하부에 물끊기홈이 구비된 이음부가 형성되며, 상기 소켓의 삽입부와 이음부는 일체로 형성될 수 있다.One side of the socket is formed with an insertion portion inserted into the end of the EPS molding, the other side is formed with a slanted inclined at the top and the bottom is formed with a water cutting groove is formed, the insertion portion and the joint of the socket is formed integrally Can be.

상기 제2 단계에서, EPS금속몰딩이 설치될 외벽에 돌출관이 설치된 경우, 상기 EPS금속몰딩의 배면에 돌출관을 수용할 수 있는 배면홈을 형성하는 단계와, 상기 배면홈에 배면홈커버를 결합하는 단계가 더 포함될 수 있다.In the second step, when the projection tube is installed on the outer wall on which the EPS metal molding is to be installed, forming a rear groove that can accommodate the projection tube on the rear surface of the EPS metal molding, and the rear groove cover in the rear groove Combining step may be further included.

상기에서 설명한 바와 같은 본 발명의 EPS금속몰딩 시공방법에 의하면, 금속판으로 형성된 몰딩 내에 EPS몰딩을 삽입시킨 EPS금속몰딩 성형물을 이용하고 수평연결용 소켓, 돌출부분 처리수단 및 개방단부 처리수단을 이용하여 건물의 외벽에 조형물을 설치함으로써 경량화 및 조립성을 향상시켜 시공이 간편하고 내구성이 뛰어나며 시공단가가 저렴하게 되는 효과가 있다.According to the EPS metal molding construction method of the present invention as described above, by using the EPS metal molding molding in which the EPS molding is inserted into a molding formed of a metal plate, and using a horizontal connection socket, a protrusion treatment means and an open end treatment means. By installing the sculptures on the outer wall of the building, it is light in weight and easy to assemble, thereby making the construction simple, excellent in durability, and low in construction cost.

본 발명은 금속판으로 형성된 몰딩 내에 EPS몰딩을 삽입시킨 EPS금속몰딩 성형물을 이용하여 건물(1)의 외벽(2)에 설치하는 시공방법에 관한 것으로서, 상기 금속판의 재질은 철, 알루미늄, 갈바륨, 칼라철판, 아연판 등으로 이루어지며, 상기 EPS(Expanded Polystyrene) 몰딩은 발포폴리스티렌 또는 스티로폼으로도 불려지는 재질로서 성형이 용이한 재료이다. 상기 EPS금속몰딩의 제조방법 및 구조는 상기에서 설명한 바와 같이 선출원등록번호 제10-0689235호에 개시되어 있다. 본 발명은 상기와 같은 방법 및 구조로 제조된 EPS금속몰딩을 이용한 조형물을 건물(1)의 외벽에 설치하기 위한 것이다.The present invention relates to a construction method for installing on the outer wall (2) of the building (1) by using an EPS metal molding molding in which the EPS molding is inserted into a molding formed of a metal plate, the material of the metal plate is iron, aluminum, galvalume, color It is made of iron plate, zinc plate, etc., The EPS (Expanded Polystyrene) molding is a material that is also called foamed polystyrene or styrofoam and is a material that is easy to mold. The manufacturing method and structure of the EPS metal molding is disclosed in Korean Patent Application No. 10-0689235 as described above. The present invention is to install the sculpture using the EPS metal molding manufactured by the above method and structure on the outer wall of the building (1).

이하에서 첨부된 예시도면에 의거하여 본 발명의 일 실시예에 의한 EPS금속몰딩 시공방법을 상세히 설명한다.Hereinafter, the EPS metal molding construction method according to an embodiment of the present invention will be described in detail with reference to the accompanying drawings.

도 1은 본 발명의 시공방법에 대한 연속적인 각 과정을 도시한 신호흐름도로서, 도 1을 참조하면, 본 발명의 일 실시예에 의한 EPS금속몰딩 시공방법은, EPS금속몰딩(10)이 설치될 건물(1) 외벽(2)의 일정위치에 수평으로 앵글(20)을 설치하는 제1 단계(S1)와, 상기 앵글의 설치길이에 일치하도록 소켓(30)을 개재하여 EPS금속몰딩(10)들을 수평으로 연결하는 제2 단계(S2)와, EPS금속몰딩(10)의 개방된 단부에 단부커버(50)를 결합하는 제3 단계(S3)와, EPS금속몰딩(10)의 배면을 외벽(2)에 설치된 앵글(20)에 결합시키고 스크루핀(22)을 이용하여 수직으로 고정시키는 제4 단계(S4)와, 외벽(2)과 EPS금속몰딩(10) 사이와 상기 스크루핀(22) 삽입부분에 코킹처리하는 제5 단계(S5)를 포함한다.1 is a signal flow diagram illustrating each successive process for the construction method of the present invention. Referring to FIG. 1, EPS metal molding construction method according to an embodiment of the present invention, EPS metal molding 10 is installed The first step S1 of installing the angle 20 horizontally at a predetermined position of the outer wall 2 of the building 1 to be constructed, and the EPS metal molding 10 through the socket 30 so as to match the installation length of the angle. ) The second step (S2) of horizontally connecting, the third step (S3) of coupling the end cover 50 to the open end of the EPS metal molding 10, and the back surface of the EPS metal molding 10 The fourth step (S4) for coupling to the angle 20 installed on the outer wall (2) and fixed vertically using the screw pin 22, between the outer wall (2) and the EPS metal molding 10 and the screw pin ( 22) a fifth step S5 of caulking the insertion part.

도면을 참조하여 본 발명을 더욱 자세하게 설명하면 다음과 같다.Hereinafter, the present invention will be described in more detail with reference to the accompanying drawings.

상기 제1 단계(S1)는 앵글(20) 설치단계로서, 건물(1)의 외벽(2) 중 EPS금속몰딩(10)이 설치될 위치에 상기 EPS금속몰딩(10)을 지지하기 위한 앵글(20)을 수평으로 설치한다. 상기 앵글(20)은 도 12에서 알 수 있는 바와 같이 ㄱ자형 앵글(20)을 앵커볼트(21)를 이용하여 외벽(2)에 수평으로 고정설치한다.The first step S1 is an angle 20 installation step, and an angle for supporting the EPS metal molding 10 at the position where the EPS metal molding 10 is to be installed in the outer wall 2 of the building 1. 20) Install horizontally. The angle 20 is fixed to the outer wall (2) horizontally using the A-shaped angle 20, the anchor bolt 21, as can be seen in FIG.

도 2는 본 발명의 시공방법에 의하여 EPS금속몰딩을 수평으로 연결하는 과정을 도시한 일부사시도이고, 도 3은 도 2의 과정에서 수평으로 연결되는 EPS금속몰딩들 사이에 삽입되는 소켓을 확대하여 도시한 사시도이고, 도 4는 도 2의 과정에 의하여 EPS금속몰딩이 수평으로 연결된 상태를 도시한 일부사시도이며, 도 5는 도 4와 같이 연결된 상태에서 이음부를 코킹처리한 상태를 도시한 일부사시도이다.2 is a partial perspective view showing a process of horizontally connecting the EPS metal molding by the construction method of the present invention, Figure 3 is to enlarge the socket inserted between the EPS metal molding connected in the process of Figure 2 4 is a partial perspective view illustrating a state in which the EPS metal molding is horizontally connected by the process of FIG. 2, and FIG. 5 is a partial perspective view illustrating a state in which the joint is caulked in the connected state as shown in FIG. 4. to be.

도면을 참조하면, 상기 제2 단계(S2)는 EPS금속몰딩 수평연결단계로서, 상기 외벽(2)의 설치길이에 일치하도록 단품의 EPS금속몰딩(10)을 상호연결하는 과정이다.Referring to the drawings, the second step (S2) is a horizontal connection of the EPS metal molding, a process of interconnecting the single-piece EPS metal molding 10 to match the installation length of the outer wall (2).

도 2에 도시되어 있는 바와 같이, EPS금속몰딩(10) 사이에는 연결용 소켓(30)을 삽입하는데, 상기 소켓(30)은 EPS몰딩(11)과 동일한 재질로 형성된 부재로서, 일측에는 EPS몰딩(11)의 단면과 동일한 단면을 가진 삽입부(31)를 형성하고, 타측에는 상부에 경사진 물매(34)가 형성되고 하부에 물끊기홈(35)을 구비한 이음부(32)가 형성되어 있다. 상기 삽입부(31)와 이음부(32)는 일체로 형성된다.As shown in FIG. 2, a connection socket 30 is inserted between the EPS metal moldings 10, wherein the sockets 30 are members formed of the same material as the EPS moldings 11 and on one side of the EPS moldings. An insertion portion 31 having the same cross section as that of the cross section of the 11 is formed, and on the other side, an inclined seal 34 is formed at the upper portion, and a joint portion 32 having a water cutting groove 35 is formed at the lower portion thereof. It is. The insertion part 31 and the joint part 32 are integrally formed.

그리고, 연결되는 일측의 EPS금속몰딩(10) 단부는 금속몰딩(12)을 내부의 EPS몰딩(11) 보다 일정간격만큼 연장되도록 설치하여 소켓삽입부(15)가 형성되도록 하여 연결시 소켓(30)의 삽입부(31)가 상기 소켓삽입부(15)에 삽입된다. 이때 양쪽의 EPS금속몰딩(10)과 삽입부(31) 및 이음부(32) 사이에는 투명실리콘을 도포하여 접착시킨다. 도 4는 이와 같이 양쪽의 EPS금속몰딩(10)이 소켓(30)을 개재하여 연결된 상태를 도시하고 있다.And, one end of the EPS metal molding 10 is connected to the metal molding 12 is installed so as to extend a predetermined interval than the EPS molding 11 therein so that the socket inserting portion 15 is formed to connect the socket 30 Is inserted into the socket inserting portion (15). At this time, the transparent silicon is coated and adhered between the EPS metal molding 10, the insertion part 31, and the joint part 32 on both sides. 4 illustrates a state in which both EPS metal moldings 10 are connected through the socket 30.

이와 같은 상태에서 소켓(30)의 삽입부(31)는 일측의 EPS금속몰딩(10) 내에 삽입되어 양쪽 EPS금속몰딩(10) 사이에는 이음부(32)가 노출되므로, 상기 노출된 이음부(32)에는 코킹재(60)를 도포하여 빗물 등이 내부로 스며들어 EPS몰딩(11)이 오염되는 것을 방지한다.In this state, the insertion part 31 of the socket 30 is inserted into the EPS metal molding 10 on one side, so that the joint part 32 is exposed between the two EPS metal moldings 10, and thus the exposed joint part ( The caulking material 60 is applied to the 32 to prevent rain water and the like from penetrating into the EPS molding 11.

또한, 상기 금속몰딩(12)의 배면쪽 부분은 내측으로 절곡된 절곡부(13)를 이루고 있어서 EPS몰딩(11)을 견고하게 감싸고 있으므로, EPS금속몰딩(10)이 외부충격에 대하여 일정한 형태를 유지하는데 필요한 충분한 강도를 가진다.In addition, since the rear side portion of the metal molding 12 forms the bent portion 13 bent inwardly so as to firmly surround the EPS molding 11, the EPS metal molding 10 may have a constant shape against external impact. Have sufficient strength to maintain.

도 6은 본 발명의 시공방법에 의하여 돌출관이 설치된 외벽에 EPS금속몰딩을 설치하는 과정을 도시한 일부사시도이고, 도 7은 도 6의 과정에 따라 건물의 외벽에 EPS금속몰딩이 설치된 상태를 도시한 정면측 일부사시도이며, 도 8은 도 6의 과정에 따라 건물의 외벽에 EPS금속몰딩이 설치된 상태를 도시한 배면측 일부사시도이다.FIG. 6 is a partial perspective view illustrating a process of installing EPS metal molding on an outer wall on which a protruding pipe is installed by the construction method of the present invention, and FIG. 7 illustrates a state in which EPS metal molding is installed on an outer wall of a building according to the process of FIG. 6. Figure 8 is a partial perspective view of the front side, Figure 8 is a partial perspective view of the rear side showing a state in which the EPS metal molding is installed on the outer wall of the building according to the process of FIG.

도 6 내지 도 8에 도시된 바와 같이 EPS금속몰딩(10)이 설치될 외벽(2)에 가스관 등의 돌출관(3)이 설치되어 있거나 돌출부분이 있는 경우에는, 상기 EPS금속몰딩(10)의 배면에 돌출관(3)을 수용할 수 있는 배면홈(16)을 형성하고(T1), 상기 배면홈(16)에 침수를 차단하기 위한 배면홈커버(40)를 결합한다(T2).6 to 8, when the protrusion pipe 3 such as a gas pipe or the like is installed on the outer wall 2 on which the EPS metal molding 10 is to be installed, the EPS metal molding 10 is provided. Forming a rear groove 16 that can accommodate the protruding tube (3) on the back of the (T1), and coupled to the rear groove cover 40 for blocking immersion in the rear groove (16) (T2).

상기 배면홈커버(40)는 배면홈(16)의 형태와 동일하게 절곡하고 양측 단부는 EPS금속몰딩(10)의 배면에 밀착되도록 절곡부(41)를 형성하여 접착제 또는 결합수단으로 배면홈(16)에 부착시킨다.The rear groove cover 40 is bent in the same manner as the shape of the rear groove 16, and both ends are formed with a bent portion 41 to be in close contact with the rear surface of the EPS metal molding 10 to form a rear groove with an adhesive or coupling means ( 16).

도 9는 본 발명의 시공방법에 의하여 EPS금속몰딩의 단부를 처리하는 과정을 도시한 일부사시도이고, 도 10은 도 9의 과정에 의하여 EPS금속몰딩에 단부커버가 결합된 상태를 도시한 일부사시도이며, 도 11은 도 10과 같이 연결된 상태에서 삽입부 및 연결부를 코킹처리한 상태를 도시한 일부사시도이다.9 is a partial perspective view showing a process of processing the end of the EPS metal molding by the construction method of the present invention, Figure 10 is a partial perspective view showing a state in which the end cover is coupled to the EPS metal molding by the process of FIG. FIG. 11 is a partial perspective view illustrating a state in which the insertion part and the connection part are caulked in a connected state as shown in FIG. 10.

도면에서 알 수 있는 바와 같이 상기 제3 단계(S3)는 EPS금속몰딩 단부처리 단계로서, 도 9 내지 도 11에 도시된 바와 같이 EPS금속몰딩(10)의 단면형상과 동일한 금속재질의 단부커버(50)로 밀폐되는데, 상기 단부커버(50)의 상하부에는 절곡된 삽입부(51)를 형성시켜 각각 EPS몰딩(11)과 금속몰딩(12) 사이에 삽입되도록 한다. 이와 같이, 상기 단부커버(50)가 EPS금속몰딩(10)의 단부면에 결합된 상태에서 양자의 접촉선을 따라 코킹재(60)를 도포하여 기밀성을 높임으로써 빗물 등이 내부로 스며들어 EPS몰딩(11)이 오염되는 것을 방지한다.As can be seen in the drawing, the third step S3 is an EPS metal molding end treatment step. As shown in FIGS. 9 to 11, the end cover of the same metal material as the cross-sectional shape of the EPS metal molding 10 ( It is sealed by 50, the bent insert 51 is formed in the upper and lower portions of the end cover 50 to be inserted between the EPS molding 11 and the metal molding 12, respectively. In this way, while the end cover 50 is coupled to the end surface of the EPS metal molding 10 by applying the caulking material 60 along the contact line of both to increase the airtightness, the rainwater, etc. penetrates into the EPS The molding 11 is prevented from being contaminated.

도 12는 본 발명의 시공방법에 의하여 EPS금속몰딩을 건물의 외벽에 설치하는 과정을 도시한 단면도이고, 도 13은 도 12의 과정에 의하여 EPS금속몰딩이 건물의 외벽에 설치된 상태를 도시한 단면도이다.12 is a cross-sectional view showing a process of installing the EPS metal molding on the outer wall of the building by the construction method of the present invention, Figure 13 is a cross-sectional view showing a state in which the EPS metal molding is installed on the outer wall of the building by the process of FIG. to be.

상기 제4 단계(S4)는 도 12와 도 13에서 알 수 있는 바와 같이 EPS금속몰딩과 앵글의 결합단계로서, 외벽(2)에 설치된 앵글(20)을 EPS금속몰딩(10)의 배면과 소켓(30)의 배면에 연속적인 일직선으로 형성되어 있는 앵글삽입홈(14,33)에 삽입하여 결합시킨 다음, 상기 EPS금속몰딩(10)이 외벽(2)에 밀착된 상태에서 스크루핀(22)을 이용하여 수직으로 고정시킨다. 상기 스크루핀(22)은 EPS금속몰딩(10)의 상부면(17)과 EPS몰딩(11)을 관통하여 앵글(20)과 직각을 이루도록 고정결합된다.12 and 13, the fourth step S4 is a step of combining the EPS metal molding and the angle, and the angle 20 installed on the outer wall 2 is connected to the back and the socket of the EPS metal molding 10. Inserted into the angle insertion grooves (14, 33) formed in a continuous straight line on the back of the (30), and then combined, the screw pin 22 in the state that the EPS metal molding 10 is in close contact with the outer wall (2) Fix it vertically using. The screw pin 22 penetrates the upper surface 17 and the EPS molding 11 of the EPS metal molding 10 so as to be perpendicular to the angle 20.

마지막으로, 상기 제5 단계(S5)는 코킹처리단계로서, 외벽(2)과 EPS금속몰딩(10) 사이의 틈과 상기 스크루핀(22) 삽입부분의 틈으로 빗물 등이 스며드는 것을 방지하기 위하여 코킹재(60)를 이용하여 코킹처리한다. 따라서, EPS금속몰딩(10)의 내부에는 빗물 등이 외부로부터 스며들 수 없도록 설치되므로, 외벽(2)에 설치된 조형물의 내구성을 크게 향상시킬 수 있다.Finally, the fifth step (S5) is a caulking treatment step, in order to prevent the rain water penetrates into the gap between the outer wall 2 and the EPS metal molding 10 and the gap between the screw pin 22 insertion portion. The caulking process is carried out using the caulking material 60. Therefore, since the rain water and the like are installed inside the EPS metal molding 10 so as not to penetrate from the outside, the durability of the molded product installed on the outer wall 2 can be greatly improved.

도 14는 본 발명의 시공방법에 의하여 건물의 외벽에 EPS금속몰딩이 설치된 상태를 도시한 시공상태도이다.14 is a construction state diagram showing a state in which the EPS metal molding is installed on the outer wall of the building by the construction method of the present invention.

도면에서 알 수 있는 바와 같이 본 발명에 이용되는 EPS금속몰딩(10)은 매우 가볍고 시공이 용이하므로, 아파트 벽면이나 출입구 또는 소형 건물뿐만 아니라 대형건물에도 용이하게 설치할 수 있다.As can be seen in the drawing, the EPS metal molding 10 used in the present invention is very light and easy to install, and can be easily installed in a large building as well as an apartment wall or an entrance or a small building.

도 1은 본 발명의 시공방법에 대한 연속적인 각 과정을 도시한 신호흐름도이다.1 is a signal flow diagram showing each successive process for the construction method of the present invention.

도 2는 본 발명의 시공방법에 의하여 EPS금속몰딩을 수평으로 연결하는 과정을 도시한 일부사시도이다.2 is a partial perspective view illustrating a process of horizontally connecting the EPS metal molding by the construction method of the present invention.

도 3은 도 2의 과정에서 수평으로 연결되는 EPS금속몰딩들 사이에 삽입되는 소켓을 확대하여 도시한 사시도이다.3 is an enlarged perspective view illustrating a socket inserted between EPS metal moldings connected horizontally in the process of FIG. 2.

도 4는 도 2의 과정에 의하여 EPS금속몰딩이 수평으로 연결된 상태를 도시한 일부사시도이다.4 is a partial perspective view illustrating a state in which the EPS metal molding is horizontally connected by the process of FIG. 2.

도 5는 도 4와 같이 연결된 상태에서 이음부를 코킹처리한 상태를 도시한 일부사시도이다.FIG. 5 is a partial perspective view illustrating a state in which the joint is caulked in a connected state as shown in FIG. 4.

도 6은 본 발명의 시공방법에 의하여 돌출관이 설치된 외벽에 EPS금속몰딩을 설치하는 과정을 도시한 일부사시도이다.Figure 6 is a partial perspective view showing a process of installing the EPS metal molding on the outer wall is installed by the construction method of the present invention.

도 7은 도 6의 과정에 따라 건물의 외벽에 EPS금속몰딩이 설치된 상태를 도시한 정면측 일부사시도이다.7 is a partial perspective view of the front side showing a state in which the EPS metal molding is installed on the outer wall of the building according to the process of FIG.

도 8은 도 6의 과정에 따라 건물의 외벽에 EPS금속몰딩이 설치된 상태를 도시한 배면측 일부사시도이다.8 is a partial perspective view of the rear side showing a state in which the EPS metal molding is installed on the outer wall of the building in accordance with the process of FIG.

도 9는 본 발명의 시공방법에 의하여 EPS금속몰딩의 단부를 처리하는 과정을 도시한 일부사시도이다.9 is a partial perspective view showing a process of treating the end of the EPS metal molding by the construction method of the present invention.

도 10은 도 9의 과정에 의하여 EPS금속몰딩에 단부커버가 결합된 상태를 도 시한 일부사시도이다.FIG. 10 is a partial perspective view illustrating a state in which an end cover is coupled to an EPS metal molding by the process of FIG. 9.

도 11은 도 10과 같이 연결된 상태에서 삽입부 및 연결부를 코킹처리한 상태를 도시한 일부사시도이다.FIG. 11 is a partial perspective view illustrating a state in which the insertion part and the connection part are caulked in the connected state as shown in FIG. 10.

도 12는 본 발명의 시공방법에 의하여 EPS금속몰딩을 건물의 외벽에 설치하는 과정을 도시한 단면도이다.12 is a cross-sectional view showing a process of installing the EPS metal molding on the outer wall of the building by the construction method of the present invention.

도 13은 도 12의 과정에 의하여 EPS금속몰딩이 건물의 외벽에 설치된 상태를 도시한 단면도이다.FIG. 13 is a cross-sectional view illustrating a state in which an EPS metal molding is installed on an outer wall of a building by the process of FIG. 12.

도 14는 본 발명의 시공방법에 의하여 건물의 외벽에 EPS금속몰딩이 설치된 상태를 도시한 시공상태도이다.14 is a construction state diagram showing a state in which the EPS metal molding is installed on the outer wall of the building by the construction method of the present invention.

<도면의 주요부분에 대한 부호의 설명><Description of the symbols for the main parts of the drawings>

1:건물 2:외벽1: building 2: outer wall

3:돌출관 10:EPS금속몰딩3: Extruder 10: EPS Metal Molding

11:EPS몰딩 12:금속몰딩11: EPS molding 12: Metal molding

13:절곡부 14:앵글삽입홈13: Bend 14: Angle Insertion Groove

16:배면홈 17:상부면16: Back groove 17: Top view

20:앵글 21:앵커볼트20: angle 21: anchor bolt

22:스크루핀 30:소켓22: screw pin 30: socket

31:삽입부 32:이음부31: Insertion part 32: Joint part

33:앵글삽입홈 34:물매33: angle insertion groove 34: selling

35:물끊기홈 40:배면홈커버35: water cutting groove 40: back groove cover

41:절곡부 50:단부커버41: bend 50: end cover

51:삽입부 60:코킹재51: inserting part 60: caulking material

Claims (3)

삭제delete EPS금속몰딩(10)이 설치될 건물(1) 외벽(2)의 일정위치에 수평으로 앵글(20)을 고정설치하는 제1 단계(S1); 상기 설치길이에 일치하도록 EPS금속몰딩(10)들을 소켓(30)을 개재시킨 상태에서 수평으로 연결하고 이음부(32)를 코킹재(60)로 코킹처리하는 제2 단계(S2); EPS금속몰딩(10)의 개방된 단부에 단부커버(50)를 결합하고 결합부분을 코킹재(60)로 코킹처리하는 제3 단계(S3); EPS금속몰딩(10)의 배면을 외벽(2)에 설치된 앵글(20)에 결합시키고 스크루핀(22)을 이용하여 수직으로 고정시키고 결합부분을 코킹재(60)로 코킹처리하는 제4 단계(S4); 및 외벽(2)과 EPS금속몰딩(10) 사이의 틈과 상기 스크루핀(22) 삽입부분에 코킹재(60)로 코킹처리하는 제5 단계(S5);를 포함하는 EPS금속몰딩 시공방법에 있어서, A first step S1 of horizontally fixing the angle 20 at a predetermined position of the outer wall 2 of the building 1 in which the EPS metal molding 10 is to be installed; A second step (S2) of horizontally connecting the EPS metal moldings 10 in a state where the socket 30 is interposed so as to correspond to the installation length and caulking the joint part 32 with the caulking material 60; A third step S3 of coupling the end cover 50 to the open end of the EPS metal molding 10 and caulking the coupling part with the caulking material 60; A fourth step of coupling the back surface of the EPS metal molding 10 to the angle 20 installed on the outer wall 2, fixing it vertically using the screw pin 22, and caulking the coupling part with the caulking material 60 ( S4); And a fifth step (S5) of caulking with a caulking material 60 in the gap between the outer wall 2 and the EPS metal molding 10 and the insertion portion of the screw pin 22 in the EPS metal molding construction method. In 상기 제2 단계에서의 소켓(30)의 일측에는 EPS몰딩(11)의 단부에 삽입되는 삽입부(31)가 형성되고, 타측에는 상부에 물매(34)가 경사지게 형성되고 하부에 물끊기홈(35)이 구비된 이음부(32)가 형성되며, 상기 삽입부(31)와 이음부(32)는 일체로 형성되고, 제2 단계(S2)에서 EPS금속몰딩(10)이 설치될 외벽(2)에 돌출관(3)이 있는 경우, 상기 EPS금속몰딩(10)의 배면에 돌출관(3)을 수용할 수 있는 배면홈(16)을 형성하는 단계(T1)와, 상기 배면홈(16)에 배면홈커버(40)를 결합하는 단계(T2)가 더 포함되는 것을 특징으로 하는 EPS금속몰딩 시공방법.An insertion part 31 is formed at one side of the socket 30 in the second step and is inserted into an end portion of the EPS molding 11, and at the other side, a water droplet 34 is inclined at an upper portion thereof and a water cutting groove is disposed at the lower portion thereof. A joint part 32 having a 35 is formed, and the insert part 31 and the joint part 32 are integrally formed, and the outer wall in which the EPS metal molding 10 is to be installed in the second step S2 ( 2) if there is a protruding tube (3), forming a back groove (16) for receiving the protruding tube (3) on the back of the EPS metal molding (10) and the back groove ( 16) EPS metal molding construction method characterized in that it further comprises the step (T2) of coupling the rear groove cover (40). 삭제delete
KR1020070116984A 2007-11-16 2007-11-16 Constructing method of eps and metal moulding KR100821335B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020070116984A KR100821335B1 (en) 2007-11-16 2007-11-16 Constructing method of eps and metal moulding

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020070116984A KR100821335B1 (en) 2007-11-16 2007-11-16 Constructing method of eps and metal moulding

Publications (1)

Publication Number Publication Date
KR100821335B1 true KR100821335B1 (en) 2008-04-11

Family

ID=39534553

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020070116984A KR100821335B1 (en) 2007-11-16 2007-11-16 Constructing method of eps and metal moulding

Country Status (1)

Country Link
KR (1) KR100821335B1 (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101142806B1 (en) * 2009-06-05 2012-05-08 김석기 Prefab frame having drip groove
KR101246019B1 (en) * 2011-08-18 2013-03-20 문병대 Plastic Reinforced External Wall Molding Materials And Construction Method Thereof
KR101415824B1 (en) * 2012-10-04 2014-07-08 서경찬 Molding material for building decoration
CN109057248A (en) * 2018-07-26 2018-12-21 中船第九设计研究院工程有限公司 It is a kind of to form building masonry wall decoration for vertical face lines and its construction method with extruded sheet
CN112392258A (en) * 2020-11-23 2021-02-23 成艳秋 Installation and construction method for heat-preservation anti-cracking EPS lines of building decoration material

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200359615Y1 (en) 2004-05-28 2004-08-21 주식회사 단디건설 Structure of Connection external wall decoration molding for building
KR200378622Y1 (en) 2004-12-31 2005-03-18 주식회사 단디건설 Structure of Connection external wall decoration molding for building
KR100554008B1 (en) 2005-09-09 2006-02-22 이재승 Moulding structure for decorating of building and method for constructing thereof
KR20060071709A (en) * 2004-12-22 2006-06-27 주식회사 아이 피 유 Moulding and structure with the same
KR20060133171A (en) * 2005-06-20 2006-12-26 주식회사 예인이엠 Construction structure of expanded polystyrene moulding and construction method of the same
KR100689235B1 (en) 2005-11-21 2007-03-02 오성석 Manufacturing method and structure thereof of expanded polystyrene inner form
KR100738508B1 (en) * 2006-09-06 2007-07-11 대건엔지니어링 주식회사 Reinforcement structure of modeling for building exterior adornment

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200359615Y1 (en) 2004-05-28 2004-08-21 주식회사 단디건설 Structure of Connection external wall decoration molding for building
KR20060071709A (en) * 2004-12-22 2006-06-27 주식회사 아이 피 유 Moulding and structure with the same
KR200378622Y1 (en) 2004-12-31 2005-03-18 주식회사 단디건설 Structure of Connection external wall decoration molding for building
KR20060133171A (en) * 2005-06-20 2006-12-26 주식회사 예인이엠 Construction structure of expanded polystyrene moulding and construction method of the same
KR100554008B1 (en) 2005-09-09 2006-02-22 이재승 Moulding structure for decorating of building and method for constructing thereof
KR100689235B1 (en) 2005-11-21 2007-03-02 오성석 Manufacturing method and structure thereof of expanded polystyrene inner form
KR100738508B1 (en) * 2006-09-06 2007-07-11 대건엔지니어링 주식회사 Reinforcement structure of modeling for building exterior adornment

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101142806B1 (en) * 2009-06-05 2012-05-08 김석기 Prefab frame having drip groove
KR101246019B1 (en) * 2011-08-18 2013-03-20 문병대 Plastic Reinforced External Wall Molding Materials And Construction Method Thereof
KR101415824B1 (en) * 2012-10-04 2014-07-08 서경찬 Molding material for building decoration
CN109057248A (en) * 2018-07-26 2018-12-21 中船第九设计研究院工程有限公司 It is a kind of to form building masonry wall decoration for vertical face lines and its construction method with extruded sheet
CN112392258A (en) * 2020-11-23 2021-02-23 成艳秋 Installation and construction method for heat-preservation anti-cracking EPS lines of building decoration material

Similar Documents

Publication Publication Date Title
KR100821335B1 (en) Constructing method of eps and metal moulding
KR101697740B1 (en) Method for combining composition curtain wall
KR101450628B1 (en) Windows and doors curtain wall insulation system
KR101344734B1 (en) Curtain wall with insulation material inside
KR101682202B1 (en) A exterior panels of a building
KR20130094906A (en) Method for constructing finish insulation panels of building
KR101570509B1 (en) A decorative panel used in building construction
KR101524973B1 (en) A curtain wall for Aluminum-PVC integrated window.
KR200358392Y1 (en) Double windows and doors associativity of an adiabatic panel
KR100753474B1 (en) Composite window sash
KR102173879B1 (en) Exterior panel assembly with improved assembly and waterproof properties
KR101697739B1 (en) Composition curtain wall
JP4969898B2 (en) Ventilation device for building and its mounting method
KR100642990B1 (en) Fixing structure of window frame for building
KR102063967B1 (en) Curtain wall type system window and construction method thereof
KR200489841Y1 (en) Transparent bulkhead structure to prevent from flood
KR200487982Y1 (en) Bracket for window frame fixation
KR200449914Y1 (en) Joining structure of window frame
KR200434194Y1 (en) Glass fixing gasket Aluminum sash
KR101084404B1 (en) A building panel for the watertight interior/exterior, and construction method therefor
KR20060111237A (en) A connecting device of wall corner part
JP2002038706A (en) Exterior-wall outside angle structure
KR200367889Y1 (en) Dew condensation prevention apparatus of door frame
KR102117892B1 (en) Cladding for the atypical exterior
KR20130003855U (en) System windows

Legal Events

Date Code Title Description
A201 Request for examination
A302 Request for accelerated examination
N231 Notification of change of applicant
N231 Notification of change of applicant
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20130116

Year of fee payment: 6

FPAY Annual fee payment

Payment date: 20140113

Year of fee payment: 7

FPAY Annual fee payment

Payment date: 20150302

Year of fee payment: 8

FPAY Annual fee payment

Payment date: 20160401

Year of fee payment: 9

FPAY Annual fee payment

Payment date: 20170403

Year of fee payment: 10

LAPS Lapse due to unpaid annual fee