KR100816304B1 - A boundary stone of road and carrying method - Google Patents

A boundary stone of road and carrying method Download PDF

Info

Publication number
KR100816304B1
KR100816304B1 KR1020080006248A KR20080006248A KR100816304B1 KR 100816304 B1 KR100816304 B1 KR 100816304B1 KR 1020080006248 A KR1020080006248 A KR 1020080006248A KR 20080006248 A KR20080006248 A KR 20080006248A KR 100816304 B1 KR100816304 B1 KR 100816304B1
Authority
KR
South Korea
Prior art keywords
boundary stone
support
stone
pedestal
boundary
Prior art date
Application number
KR1020080006248A
Other languages
Korean (ko)
Inventor
임형택
Original Assignee
한국기술개발 주식회사
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 한국기술개발 주식회사 filed Critical 한국기술개발 주식회사
Priority to KR1020080006248A priority Critical patent/KR100816304B1/en
Application granted granted Critical
Publication of KR100816304B1 publication Critical patent/KR100816304B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C11/00Details of pavings
    • E01C11/22Gutters; Kerbs ; Surface drainage of streets, roads or like traffic areas
    • E01C11/221Kerbs or like edging members, e.g. flush kerbs, shoulder retaining means ; Joint members, connecting or load-transfer means specially for kerbs
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C19/00Machines, tools or auxiliary devices for preparing or distributing paving materials, for working the placed materials, or for forming, consolidating, or finishing the paving
    • E01C19/50Removable forms or shutterings for road-building purposes; Devices or arrangements for forming individual paving elements, e.g. kerbs, in situ
    • E01C19/502Removable forms or shutterings, e.g. side forms; Removable supporting or anchoring means therefor, e.g. stakes
    • E01C19/506Removable forms or shutterings, e.g. side forms; Removable supporting or anchoring means therefor, e.g. stakes for kerbs, gutters or similar structures, e.g. raised portions, median barriers
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C19/00Machines, tools or auxiliary devices for preparing or distributing paving materials, for working the placed materials, or for forming, consolidating, or finishing the paving
    • E01C19/52Apparatus for laying individual preformed surfacing elements, e.g. kerbstones

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Road Paving Structures (AREA)

Abstract

A boundary stone of a road excelling in arrangement and installation and a constructing method thereof are provided to maintain a stable manufacturing state by striking rear ends of adjusting wedges by a hammer and fitting the wedges between the lower surface of a supporting curb and a center curb, and a V groove of a supporter. Supporters are laid on a plane mixed base(100). Supporting curbs are laid at the center of the supporters(110). The center curbs are laid on the supporters to fit steel rods into rod grooves of the center curbs(120). Adjusting wedges are fitted between the lower surface of the supporting curb and the center curb, and a V groove of the supporter, and rear ends of the wedges are hammered to control fine height(130). Molds are installed to contact the supporting curb and the center curb(140). Concrete is poured between the molds to form an L side device and to remove the molds.

Description

배열과 설치가 간편한 도로 경계석 및 그 시공 방법{A boundary stone of road and carrying method}A boundary stone of road and carrying method that is easy to arrange and install

본 발명은 배열과 설치가 간편한 도로 경계석 및 그 시공 방법에 관한 것으로서, 더욱 상세하게는 도로 경계석을 숙련공이 설치하지 않아도 경계석을 쉽고 정확하게 배열시킬 수 있어 시공성을 증대 시킨 배열과 설치가 간편한 도로 경계석 및 그 시공 방법에 관한 것이다.The present invention relates to a road boundary stone that is easy to arrange and install, and a construction method thereof. More specifically, the boundary stone can be easily and accurately arranged without a skilled worker installing the road boundary stone, thereby increasing the constructability and easy to install the road boundary stone. It is about the construction method.

일반적으로 도로 경계석은 보도와 차도간의 경계 지점에 설치되는 구조물로, 화강암과 같은 자연석을 가공하여 제작하거나 콘크리트를 프레스로 압착시켜 양생하여 보도와 차도를 분리하고 있다.In general, the road boundary stone is a structure installed at the boundary point between the sidewalk and the driveway. The road boundary stone is manufactured by processing natural stone such as granite or pressing and curing concrete by pressing to separate the sidewalk and the roadway.

이러한 도로 경계석의 설치 구조나 설치하는 종래의 방법은 도 10에서 도 14에 도시되어 있듯이, 혼합기층(1) 위에 기초콘크리트(4)를 만들기 위한 한쌍의 기초거푸집(2)(3)을 기초콘크리트(4) 폭만큼 설치하고, 기초거푸집(2)(3) 사이에 기초콘크리트(4)를 타설한 후 양생한다.The installation structure of such a road boundary stone or a conventional method of installing it is based on a pair of foundation forms (2) and (3) for making foundation concrete (4) on the mixer layer (1) as shown in FIGS. (4) It is installed as wide as it is, and the foundation concrete (2) is poured between the foundation concrete (4), and it cures.

기초콘크리트(4)가 형성된 후에 일측의 기초거푸집(3)을 제거하고, 기초콘크 리트(4)위에 경계석(5)을 올려놓는다. 이때 기초콘크리트(4)는 완전히 양생하지 않은 상태에서 올려놓아 경계석(5)의 높이와 열을 타공 방식으로 맞춘다.After the foundation concrete 4 is formed, the foundation formwork 3 on one side is removed, and the boundary stone 5 is placed on the foundation concrete 4. At this time, the foundation concrete 4 is placed in a state that is not completely cured to fit the height and heat of the boundary stone 5 in a perforated manner.

그리고 다시 차도(8) 쪽에 거푸집(6)을 세워 이전에 세워진 기초거푸집(2)과의 사이 공간에서 경계석(5)을 제외한 부분에 콘크리트 타설한 후 양생하여 엘형측구(7)를 형성한다.And again to form the mold (6) on the side of the driveway (8) in the space between the foundation and the formwork (2) previously erected concrete in the portion except for the boundary stone (5) to cure to form the el-shaped side (7).

엘형측구(7)가 만들어진 다음 기초거푸집(2)과 거푸집(6)을 제거한 후 보도(9)와 차도(8)를 형성한다.After the elbow (7) is made, the foundation formwork (2) and the formwork (6) are removed and the sidewalk (9) and the driveway (8) are formed.

이와 같은 방식은 기초콘크리트(4)를 양생하기 위한 작업에 많은 시간이 소요되고, 경계석(5)을 타공방식으로 높이와 열을 맞추는데 많은 시간이 소요되는 문제점이 있다. 이와 같이 도로 경계석을 설치할 때 숙련된 작업자의 경우 열과 높이를 비교적 잘 맞추나 비숙련자의 경우 제대로 열과 높이를 맞추어 시공하기 어려운 문제가 있고, 작업자에 따라 그 정도의 차이가 심해 문제가 발생한다.Such a method takes a lot of time for the work to cure the foundation concrete 4, there is a problem that takes a lot of time to match the height and heat in the perforated method of the boundary stone (5). As described above, when installing the road boundary stone, the skilled worker adjusts the heat and height relatively well, but in the case of the unskilled worker, it is difficult to properly adjust the heat and the height, and the difference occurs depending on the worker, causing problems.

그리고 열을 맞추기 위해 타공 방식으로 경계석을 직접 치게 되는데, 이와 같이 타공 방식으로 도로 경계석을 치게 되면, 콘크리트 경계석의 내부에 균열이 발생하여 차후에 파손이 되는 원인이 된다.In addition, the boundary stones are directly hit by the perforation method to match the heat. Thus, when the road boundary stones are hit by the perforation method, cracks are generated in the interior of the concrete boundary stones, causing damage later.

본 발명은 전술한 바와 같은 문제를 해결하기 위하여 안출한 것으로서, 비숙련자나 숙련자 모두 비슷한 정도의 시공을 할 수 있게 구성되고, 도로 경계석의 길이방향으로 별도의 작업없이 선을 맞추어 시공할 수 있게 하며, 기초콘크리트를 별도로 양생하는 시간을 절약하여 공기를 단축할 수 있게 하는 배열과 설치가 간편한 도로 경계석 및 그 시공 방을 제공하고자 하는 목적이 있다.The present invention has been made in order to solve the problems described above, it is configured to be able to perform a similar degree of construction for both unskilled and skilled, and to be able to install the line in the longitudinal direction of the road boundary stone without any additional work It is an object of the present invention to provide a road boundary stone and an installation room that can easily be arranged and installed to save air by saving time of curing the concrete separately.

그리고 높이 조절을 위하여 조절쐐기를 쳐서 미세하게 차이가 있는 높이를 조절할 수 있게 하고자 한다.And by adjusting the wedge for height adjustment to be able to adjust the height of the fine difference.

또한 경계석의 하부에 지반이 침하되거나 토사가 유출되어도 일차 지지되게 하여 안정적인 시공상태를 유지하게 하고자 하는 목적이 있다.In addition, there is an object to maintain a stable construction state by the primary support even if the ground is subsided or sediment spilled to the bottom of the boundary stone.

본 발명은 전술한 목적을 달성하기 위하여 콘크리트를 장방형으로 형성한 몸체에 길이 방향으로 봉홀이 한 개 또는 두 개가 형성되어 고정되는 지지경계석; 콘크리트를 장방형으로 형성한 몸체 저면에 길이 방향으로 ∩형 봉홈이 봉홀과 같은 수로 형성되고, 지지경계석의 사이에 다수개 설치되는 중간경계석; 봉홀의 숫자만큼 구비되고, 봉체에 중간경계석의 하부에 위치하도록 탄성피복을 형성하고, 봉체의 양단이 지지경계석의 봉홀에 삽입되어 고정되는 강봉; 석재로 사각의 박스체가 형성되고, 박스체의 상면에 V형홈이 형성되며, 지지경계석과 중간경계석 사이와 중 간경계석과 중간경계석 사이의 하부에 설치되는 받침대; 후단과 전단의 폭이 동일하게 몸체가 형성되되 몸체 하단이 전단 방향으로 기울어지는 경사를 가지게 형성되고, 몸체 하단을 중심으로 양측 방향에 받침대의 V형홈과 같은 경사각도를 가진 경사면이 형성되어 받침대의 V형홈과 지지경계석 또는 중간경계석 하부 사이에 일부 삽입되는 조절쐐기;로 구성되는 것을 특징으로 하는 배열과 설치가 간편한 도로 경계석. 및 콘크리트 경계석을 설치하는 방법에 있어서, 받침대를 지지경계석과 중간경계석의 사이와 중간경계석과 중간경계석 사이에 위치하도록 평탄화된 혼합기층 위에 올려놓는 받침대 설치단계; 받침대의 중간 부분에 단부가 위치하도록 지지경계석을 올려놓고, 지지경계석의 봉홀에 강봉의 일단을 삽입한 후 두개 또는 세개의 간격을 띄워 다시 다른 지지경계석을 올려놓고, 강봉의 타단을 다른 지지경계석 쪽으로 밀어 설치하는 것을 반복하는 지지경계석 설치단계; 중간경계석의 봉홈으로 설치된 강봉이 끼워지도록 중간경계석을 받침대 위에 올려놓는 것을 반복하는 중간경계석 설치단계; 놓여진 지지경계석과 중간경계석의 저면과 받침대의 V형홈에 조절쐐기를 끼운 후 망치로 조절쐐기의 후단을 쳐서 맞지 않는 미세한 높이 조절을 하는 높이 조절단계; 보도측으로 지지경계석과 중간경계석에 닿게 거푸집을 설치하고, 차도측으로 엘형측구를 형성할 만큼의 간격을 두고 거푸집을 설치하는 거푸집 설치단계; 거푸집 사이에 콘크리트를 타설하여 엘형측구를 형성하고 거푸집을 제거하는 마감단계;를 포함하는 것을 특징으로 하는 배열과 설치가 간편한 도로 경계석 시공 방법을 제공한다.The present invention is a support boundary stone is formed by fixing one or two rod holes in the longitudinal direction to the body formed in a rectangular shape to achieve the above object; Middle boundary stone is formed in the longitudinal direction in the longitudinal direction of the bottom surface of the body formed in the shape of concrete in the same number as the rod hole, and a plurality of support boundary stones; A steel bar provided with a number of rod holes, forming an elastic coating to be positioned below the middle boundary stone in the rod body, and both ends of the rod being inserted into and fixed in the rod hole of the support boundary stone; A square box body is formed of stone, and a V-shaped groove is formed on an upper surface of the box body, and a pedestal is installed between the support boundary stone and the middle boundary stone and between the middle boundary stone and the middle boundary stone; The body is formed with the same width of the rear end and the front end, but the bottom of the body is formed to have an inclination inclined in the front direction, and the inclined surface having the same inclination angle as the V-shaped groove of the pedestal is formed in both directions around the bottom of the body. Easy to install and install road boundary stone, characterized in that consisting of; V-shaped groove and the support wedge or the adjustment wedge is inserted between the lower part of the middle boundary stone. And a method for installing a concrete boundary stone, comprising: placing a pedestal on a flattened mixer layer to be positioned between the support boundary stone and the intermediate boundary stone and between the intermediate boundary stone and the intermediate boundary stone; Place the support boundary stone in the middle part of the pedestal so that the end is located, insert one end of the steel rod into the support hole of the support boundary stone, and then place another support boundary stone with two or three spaces apart, and put the other end of the steel rod toward the other support boundary stone. Support boundary stone installation step of repeating the push installation; Middle boundary stone installation step of repeating to place the middle boundary stone on the pedestal so that the steel bar installed as the rod groove of the middle boundary stone; Height adjustment step of inserting the adjustment wedge into the V-shaped groove of the base and the bottom of the support boundary stone and the intermediate boundary stone is not fitted by hitting the rear end of the adjustment wedge with a hammer; Forming step of installing the formwork to the support side and the intermediate boundary stone to the side of the sidewalk, and install the formwork at intervals enough to form the el-shaped side opening to the driveway side; Placing concrete between the formwork to form an el-shaped side opening and removing the formwork; provides a road boundary stone construction method easy to install and install, characterized in that it comprises a.

이상과 같이 본 발명은 콘크리트 경계석을 봉홀이 형성된 지지경계석과 봉홈이 형성된 중간경계석으로 구분 생산하여, 설치될 곳의 일정간격마다 받침대를 놓고 지지경계석을 설치하며, 지지경계석에 강봉을 연결 설치하므로 기초 콘크리트를 위한 거푸집과 콘크리트 타설과 양생에 걸리는 시간을 절약할 수 있다.As described above, the present invention divides the concrete boundary stone into a support boundary stone with a rod hole and an intermediate boundary stone with a rod groove, and installs a support boundary stone at a predetermined interval of a place to be installed, and installs a support boundary stone and connects a steel bar to the support boundary stone. Save time on formwork and concrete casting and curing for concrete.

강봉이 중간경계석을 지지하고 있으므로 부분 침하시, 강봉의 지지력으로 침하되는 것을 방지하는 효과가 있다.Since the steel bar supports the middle boundary stone, there is an effect of preventing the partial sinking and sinking by the bearing force of the steel bar.

강봉이 길이 방향 라인을 가이드하고 있으므로 별도의 조정작업이 필요없어 작업시간이 절감되는 효과가 있다.Since the steel bar guides the longitudinal line, there is no need for additional adjustment, which saves time.

두개의 강봉을 설치시 안정적인 지지가 되는 효과가 있다.When installing two steel rods, there is an effect of stable support.

이하 첨부된 도면을 참조하여 본 발명의 구성을 상세히 설명하면 다음과 같다.Hereinafter, the configuration of the present invention will be described in detail with reference to the accompanying drawings.

본 명세서 및 청구범위에 사용된 용어나 단어는 통상적이거나 사전적인 의미로 한정해서 해석하여서는 되지 않고, 발명자는 그 자신의 발명을 가장 최선의 방법으로 설명하기 위해 용어의 개념을 적절하게 정의할 수 있다는 원칙에 입각하여 본 발명의 기술적 사상에 부합하는 의미와 개념으로 해석되어야만 한다.The terms or words used in the present specification and claims should not be interpreted as being limited to the ordinary or dictionary meanings, and the inventors may appropriately define the concept of terms in order to best explain the invention of their own. Based on the principle, it should be interpreted as meaning and concept corresponding to the technical idea of the present invention.

본 발명은 콘크리트 경계석의 설치에 있어서, 강봉에 의해 경계석 열을 쉽게 맞추어 설치할 수 있게 하고, 경계석을 받치고 있는 받침대의 높이 조절을 조절쐐 기에 의하여 용이하게 할 수 있는 것으로서, 지지경계석(10)(10-1)과 중간경계석(20)(20-1)을 조합하여 설치하되, 지지경계석(10)(10-1)들 사이에는 강봉(30)이 설치되고, 강봉(30)이 삽입되도록 봉홈(22)이 형성된 중간경계석(20)(20-1)을 사이에 설치하는 것을 주요 구성으로 한다.In the present invention, in the installation of the concrete boundary stone, it is possible to easily install the boundary stone rows by steel rods, and to easily adjust the height of the pedestal supporting the boundary stone by the adjustment wedge, the support boundary stone (10) (10) -1) and the intermediate boundary stones 20, 20-1 is installed in combination, but between the support boundary stones 10, 10-1, the steel bar 30 is installed, the rod groove (30) is inserted into the rod groove ( It is a main configuration to provide between the intermediate boundary stones 20 and 20-1 having the 22 formed thereon.

이하에서 지지경계석(10)(10-1)과 중간경계석(20)(20-1)을 통칭하여 사용할 경우에는 '경계석'이라 한다.In the following, when used as a support boundary stones 10, 10-1 and intermediate boundary stones 20, 20-1 collectively referred to as 'border stone'.

본 발명의 지지경계석과 중간경계석은 두개의 실시예가 있는데, 첫번째 실시예는 지지경계석(10)에 하나의 봉홀(12)이 형성되고, 중간경계석(20)은 하나의 봉홈(22)이 형성되며, 두개의 지지경계석(10) 사이에 강봉(30) 하나가 끼워져 고정되는 것이다.The support boundary stone and the middle boundary stone of the present invention have two embodiments. The first embodiment has one rod hole 12 formed in the support boundary stone 10, and the middle boundary stone 20 has one rod groove 22 formed therein. , One of the steel bar 30 is sandwiched between two support boundary stones 10 is fixed.

다른 실시예로, 두 개의 강봉(30)을 사용하도록 지지경계석(10-1)에 두 개의 봉홀(12)을 형성하고, 중간경계석(20-1)에 두 개의 봉홈(21)을 형성한다.In another embodiment, two rod holes 12 are formed in the support boundary stone 10-1 so as to use two steel bars 30, and two rod grooves 21 are formed in the intermediate boundary stone 20-1.

이러한 두가지 실시예는 같은 개념이므로 이하에서 동일하게 설명한다.These two embodiments are the same concept and will be described below in the same manner.

지지경계석(10)(10-1)은 콘크리트를 장방형으로 형성한 몸체(11)에 길이 방향으로 봉홀(12)이 한 개 또는 두 개가 형성된다.The support boundary stones 10 and 10-1 are formed with one or two rod holes 12 in the longitudinal direction in the body 11 formed with the rectangular shape of the concrete.

중간경계석(20)(20-1)은 콘크리트를 장방형으로 형성한 몸체(21) 저면에 길이 방향으로 ∩형 봉홈(22)이 봉홀(12)과 같은 갯수인 하나 또는 두개가 형성되고, 지지경계석(10)의 사이에 다수개 설치된다. 일반적으로 중간경계석은 지지경계석 사이에 2개 내지 3개가 고정되는 것이 바람직하다.The middle boundary stones 20 and 20-1 have one or two 봉 -shaped grooves 22 formed in the longitudinal direction on the bottom surface of the body 21 in which the concrete is formed in a rectangular shape, the same number as the rod holes 12, and the support boundary stones. A large number is provided between (10). In general, it is preferable that two or three middle boundary stones are fixed between supporting boundary stones.

강봉(30)은 봉홀(12)의 숫자만큼 구비되고, 봉체(31)에 중간경계석(20)의 하 부에 위치하도록 탄성피복(32)을 형성한다. 탄성피복(32)은 중간경계석(20)(20-1)의 봉홈(22)에 끼워져 압착되어 안정적으로 지지되게 한다.Steel bar 30 is provided by the number of the rod hole 12, and forms an elastic coating 32 to be located in the lower portion of the middle boundary stone 20 in the rod (31). The elastic coating 32 is fitted into the rod grooves 22 of the intermediate boundary stones 20 and 20-1 so that the elastic coating 32 is stably supported.

강봉(30)의 봉체(31) 양단이 지지경계석(10)의 봉홀(12)에 삽입되어 고정된다. Both ends of the rod body 31 of the steel bar 30 are inserted into and fixed to the rod hole 12 of the support boundary stone 10.

받침대(40)는 석재로 사각의 박스체(41)가 형성되고, 박스체(41)의 상면에 V형홈(42)이 형성된다. V형홈(42)은 완만한 경사를 가지도록 형성되고, 경계석의 저면이 V형홈(42) 위에 놓이게 된다.Pedestal 40 is formed of a rectangular box body 41 of stone, the V-shaped groove 42 is formed on the upper surface of the box body 41. The V-shaped groove 42 is formed to have a gentle slope, and the bottom surface of the boundary stone is placed on the V-shaped groove 42.

받침대(40)는 지지경계석과 중간경계석 사이와 중간경계석과 중간경계석 사이의 하부에 설치되어 경계석을 받치게 된다.The pedestal 40 is installed at the lower portion between the support boundary stone and the middle boundary stone and between the middle boundary stone and the middle boundary stone to support the boundary stone.

받침대(40) 상면의 V형홈(42)과 경계석 저면 사이에 V형홈(42)에 의한 틈이 발생되는데, 이 틈에 조절쐐기(50)의 전단(52)을 넣은 후 망치 등으로 톡톡 쳐서 밀어넣으면 높이 조절이 된다.A gap is generated between the V-shaped groove 42 of the upper surface of the pedestal 40 and the bottom of the boundary stone by the V-shaped groove 42. The front end 52 of the adjustment wedge 50 is inserted into the gap and then pushed by a hammer or the like. Insert it to adjust the height.

조절쐐기(50)는 후단(53)과 전단(52)의 폭이 동일하게 몸체(51)가 형성되고, 몸체(51) 하단(54)이 전단(52) 방향으로 기울어지는 경사를 가지게 형성된다. 그리고 몸체(51) 하단(54)을 중심으로 양측 방향에 받침대(40)의 V형홈(42)과 같은 경사각도를 가진 경사면(55)이 형성되어 받침대(40)의 V형홈(42)에 밀착되게 된다.The adjusting wedge 50 is formed such that the body 51 is formed with the same width of the rear end 53 and the front end 52, and the lower end 54 of the body 51 is inclined in the direction of the front end 52. . And inclined surface 55 having the same inclination angle as the V-shaped groove 42 of the pedestal 40 is formed in both sides around the lower body 54 of the body 51 is in close contact with the V-shaped groove 42 of the pedestal 40. Will be.

따라서 경계석과 V형홈(42) 사이에 끼워진 조절쐐기(50)의 후단(53)을 망치로 쳐서 밀어넣으면 경계석이 위로 밀려 올라가 높이가 조절된다.Therefore, by pushing the rear end 53 of the adjustment wedge 50 inserted between the boundary stone and the V-shaped groove 42 with a hammer, the boundary stone is pushed up to adjust the height.

그리고 길이 방향의 위치는 강봉(30)에 의해 자동적으로 맞추어 지므로 높이 조절만 조절쐐기(50)를 망치로 약간씩 두드려 조절한다. And because the position of the longitudinal direction is automatically adjusted by the steel bar 30, only the height adjustment by adjusting the hammer slightly tapping the wedge 50.

본 발명의 배열과 설치가 간편한 도로 경계석을 이용한 시공 방법은 아래에 설명하는 것과 같은 순서로 시공한다.The construction method using the road boundary stone of the arrangement and installation of the present invention is easy to install in the order described below.

우선 첫번째로 받침대 설치단계(100)는 받침대(40)를 지지경계석(10)(10-1)과 중간경계석(20)(20-1)의 사이와 중간경계석(20)(20-1)과 중간경계석(20)(20-1) 사이에 위치하도록 평탄화된 혼합기층(1) 위에 올려놓는다. 이때 경계석의 길이를 미리 측정하여 계산한 위치에 받침대(40)를 놓는다.First, the pedestal installation step 100 is a pedestal 40 between the support boundary stones 10, 10-1 and the middle boundary stones 20, 20-1 and the middle boundary stones 20, 20-1 and It is placed on the flattened mixer layer 1 so as to be located between the middle boundary stones 20 and 20-1. At this time, the base 40 is placed at the position calculated by measuring the length of the boundary stone in advance.

그 다음으로 지지경계석 설치단계(110)를 거치는데, 이 단계에서 받침대(40)의 중간 부분에 단부가 위치하도록 지지경계석(10)(10-1)을 올려놓고, 지지경계석(10)(10-1)의 봉홀(12)에 강봉(30)의 일단을 삽입한 후 두개 또는 세개의 간격을 띄워 다시 다른 지지경계석(10)(10-1)을 올려놓는다. 그리고 강봉(30)의 타단을 다른 지지경계석(10)(10-1)의 봉홀로 밀어 넣어 설치하는 것을 반복한다.Then go through the support boundary stone installation step 110, in this step to place the support boundary stones 10, 10-1 so that the end is located in the middle portion of the pedestal 40, the support boundary stone 10 (10) Insert one end of the steel rod 30 into the rod hole 12 of -1) and then put two or three spaced apart to put another support boundary stone 10 (10-1) again. Then, the other end of the steel bar 30 is pushed into the rod hole of the other support boundary stones 10 (10-1) and repeated installation.

중간경계석 설치단계(120)는 중간경계석(20)(20-1)의 봉홈(22)으로 설치된 강봉(30)이 끼워지도록 중간경계석(20)을 받침대(40) 위에 올려놓는다.The middle boundary stone installation step 120 puts the middle boundary stone 20 on the pedestal 40 so that the steel bar 30 installed as the rod groove 22 of the middle boundary stone 20, 20-1 is fitted.

경계석이 다 놓여지면 경계석 사이에 높이 차이가 있는 것을 조절하는 높이 조절단계(130)를 거친다. 높이조절단계(130)는 놓여진 지지경계석(10)(10-1)과 중간경계석(20)(20-1)의 저면과 받침대(40)의 V형홈(42) 사이에 조절쐐기(50)를 끼운 후 망치로 조절쐐기(50)의 후단(53)을 쳐서 맞지 않는 미세한 높이 조절을 한다.When the boundary stone is laid, the height adjustment step 130 to adjust the height difference between the boundary stones. Height adjustment step 130 is the adjustment wedge 50 between the bottom of the support boundary stone 10, 10-1 and the intermediate boundary stone 20, 20-1 placed and the V-shaped groove 42 of the base 40. After insertion, hit the rear end 53 of the adjustment wedge 50 with a hammer to adjust the fine height does not fit.

경계석의 높이를 다 조절하여 맞추고 나면 엘형측구(62)를 형성하기 위한 거푸집을 설치하는 거푸집 설치단계(140)를 거친다.After adjusting the height of the boundary stone to go through the formwork installation step 140 to install the formwork for forming the el-shaped side opening (62).

이 단계에서 보도측으로 지지경계석(10)과 중간경계석(20)에 닿게 거푸 집(60)을 설치하고, 차도측으로 엘형측구(62)를 형성할 만큼의 간격을 두고 거푸집(61)을 설치한다.In this step, the formwork 60 is installed in contact with the support boundary stone 10 and the middle boundary stone 20 at the sidewalk side, and the formwork 61 is installed at intervals enough to form the elbow side opening 62 at the side of the roadway.

그리고 마감단계(150)에서 거푸집(60)(61) 사이에 콘크리트를 타설하여 엘형측구(62)를 형성하고 거푸집(60)(61)을 제거한다.And in the finishing step 150 to form the concrete between the mold (60) (61) to form an el-shaped side opening (62) and remove the form (60, 61).

도 1은 본 발명의 배열과 설치가 간편한 도로 경계석이 설치된 상태를 도시한 사시도.1 is a perspective view showing a state in which the road boundary stone is easy to install and install the present invention.

도 2는 본 발명의 배열과 설치가 간편한 도로 경계석을 도시한 사시도.Figure 2 is a perspective view showing a road boundary stone easy to arrange and install the present invention.

도 3은 본 발명의 배열과 설치가 간편한 도로 경계석을 도시한 분해 사시도.Figure 3 is an exploded perspective view showing a road boundary stone easy to arrange and install the present invention.

도 4는 본 발명의 배열과 설치가 간편한 도로 경계석에 사용하는 조절쐐기를 도시한 도면.Figure 4 is a view showing the adjustment wedge used in the road boundary stone easy to install and install the present invention.

도 5는 본 발명의 배열과 설치가 간편한 도로 경계석 시공 방법에서 받침대위에 경계석이 놓여진 상태를 도시한 단면도.Figure 5 is a cross-sectional view showing a state in which the boundary stone is placed on the pedestal in the road boundary stone construction method easy to install and install the present invention.

도 6은 본 발명의 배열과 설치가 간편한 도로 경계석 시공 방법에서 거푸집을 세워 엘형측구를 형성한 상태를 도시한 단면도.Figure 6 is a cross-sectional view showing a state in which the form of an el-shaped side by forming the formwork in the road boundary stone construction method easy to install and install of the present invention.

도 7은 본 발명의 배열과 설치가 간편한 도로 경계석 시공 방법에서 차도와 보도가 설치된 상태를 도시한 단면도.Figure 7 is a cross-sectional view showing a state in which the driveway and the sidewalk installed in the road boundary stone construction method easy to install and install the present invention.

도 8은 본 발명의 배열과 설치가 간편한 도로 경계석의 다른 실시예를 도시한 분해 사시도.Figure 8 is an exploded perspective view showing another embodiment of the road boundary stone easy to arrange and install the present invention.

도 9는 본 발명의 배열과 설치가 간편한 도로 경계석 시공 방법을 도시한 순서도.Figure 9 is a flow chart illustrating a road boundary stone construction method easy to arrange and install the present invention.

도 10 내지 도 14는 종래에 경계석이 설치되는 공정을 순차적으로 도시한 도면.10 to 14 is a view sequentially showing a process in which the boundary stone is conventionally installed.

< 도면의 주요 부분에 대한 부호의 간단한 설명 > <Brief description of symbols for the main parts of the drawings>

1 : 혼합기층 2, 3 : 기초 거푸집1: Mixer Layer 2, 3: Foundation Formwork

4 : 기초콘크리트 5 : 경계석4: foundation concrete 5: boundary stone

6 : 거푸집 7 : 엘형측구6 formwork 7

8 : 차도 9 : 보도8: Driveway 9: Sidewalk

10, 10-1 : 지지경계석 11 : 몸체10, 10-1: support boundary stone 11: the body

12 : 봉홀 20, 20-1 : 중간경계석12: rod hole 20, 20-1: middle boundary stone

21 : 몸체 22 : 봉홈21 body 22 bar groove

30 : 강봉 31 : 봉체30: steel bar 31: bar

32 : 탄성피복 40 : 받침대32: elastic coating 40: pedestal

41 : 박스체 42 : V형홈41: box 42: V-shaped groove

50 : 조절쐐기 51 : 몸체50: adjustment wedge 51: body

52 : 전단 53 : 후단52: front end 53: rear end

54 : 하단 55 : 경사면54: lower 55: inclined plane

60, 61 : 거푸집 62 : 엘형측구60, 61: die 62: elbow

100 : 받침대 설치 단계 110 : 지지경계석 설치단계100: pedestal installation step 110: support boundary stone installation step

120 : 중간경계석 설치단계 130 : 높이 조절 단계120: intermediate boundary stone installation step 130: height adjustment step

140 : 거푸집 설치단계 150 : 마감단계140: formwork installation step 150: finishing step

Claims (2)

콘크리트를 장방형으로 형성한 몸체(11)에 길이 방향으로 봉홀(12)이 한 개 또는 두 개가 형성되는 지지경계석(10)(10-1);Support boundary stones 10 and 10-1 in which one or two rod holes 12 are formed in the longitudinal direction of the body 11 having concrete formed in a rectangular shape; 콘크리트를 장방형으로 형성한 몸체(21) 저면에 길이 방향으로 ∩형 봉홈(22)이 봉홀(12)과 같은 수로 형성되고, 지지경계석(10)의 사이에 다수개 설치되는 중간경계석(20)(20-1);In the longitudinal direction of the body 21 formed in the shape of a rectangular rectangular bar groove 22 in the longitudinal direction is formed in the same number as the rod hole 12, a plurality of intermediate boundary stones (20) installed between the support boundary stones ( 20-1); 봉홀(12)의 숫자만큼 구비되고, 봉체(31)에 중간경계석(20)의 하부에 위치하도록 탄성피복(32)을 형성하고, 봉체(31)의 양단이 지지경계석(10)의 봉홀(12)에 삽입되어 고정되는 강봉(30);The number of the bar holes 12 is provided, and the elastic coating 32 is formed on the bar 31 so as to be positioned below the middle boundary stone 20, and both ends of the bar body 31 are the bar holes 12 of the support boundary stone 10. Steel rod 30 is inserted into the fixed; 석재로 사각의 박스체(41)가 형성되고, 박스체(41)의 상면에 V형홈(42)이 형성되며, 지지경계석과 중간경계석 사이와 중간경계석과 중간경계석 사이의 하부에 설치되는 받침대(40);Square box body 41 is formed of stone, the V-shaped groove 42 is formed on the upper surface of the box body 41, the pedestal is installed in the lower portion between the support boundary stone and the middle boundary stone and between the middle boundary stone and the middle boundary stone ( 40); 후단(53)과 전단(52)의 폭이 동일하게 몸체(51)가 형성되되 몸체(51) 하단(54)이 전단(52) 방향으로 기울어지는 경사를 가지게 형성되고, 몸체(51) 하단(54)을 중심으로 양측 방향에 받침대(40)의 V형홈(42)과 같은 경사각도를 가진 경사면(55)이 형성되어 받침대(40)의 V형홈(42)과 지지경계석 또는 중간경계석 하부 사이에 일부 삽입되는 조절쐐기(50);로 구성되는 것을 특징으로 하는 배열과 설치가 간편한 도로 경계석.The body 51 is formed to have the same width of the rear end 53 and the front end 52, but the lower end 54 of the body 51 is formed to have an inclination inclined toward the front end 52, and the lower end of the body 51 54, the inclined surface 55 having the same inclination angle as the V-shaped groove 42 of the pedestal 40 is formed on both sides with a center between the V-shaped groove 42 of the pedestal 40 and the lower portion of the support boundary or middle boundary stone. The road boundary stone is easy to install and install, characterized in that consisting of; 콘크리트 경계석을 설치하는 방법에 있어서,In the method of installing the concrete boundary stone, 받침대(40)를 지지경계석과 중간경계석의 사이와 중간경계석과 중간경계석 사이에 위치하도록 평탄화된 혼합기층(1) 위에 올려놓는 받침대 설치단계(100);A pedestal installation step 100 of placing the pedestal 40 on the flattened mixer layer 1 so as to be positioned between the support boundary stone and the intermediate boundary stone and between the intermediate boundary stone and the intermediate boundary stone; 받침대(40)의 중간 부분에 단부가 위치하도록 지지경계석을 올려놓고, 지지경계석의 봉홀(12)에 강봉(30)의 일단을 삽입한 후 두개 또는 세개의 간격을 띄워 다시 다른 지지경계석을 올려놓고, 강봉(30)의 타단을 다른 지지경계석 쪽으로 밀어 설치하는 것을 반복하는 지지경계석 설치단계(110);Place the support boundary stone in the middle part of the pedestal 40 so that the end is located, and insert one end of the steel bar 30 into the rod hole 12 of the support boundary stone, and then place another support boundary stone with two or three spaces apart. , Support boundary stone installation step 110 of repeating the other end of the installation of the steel bar 30 by pushing toward the support boundary stone; 중간경계석의 봉홈(22)으로 설치된 강봉(30)이 끼워지도록 중간경계석을 받침대(40) 위에 올려놓는 것을 반복하는 중간경계석 설치단계(120);An intermediate boundary stone installation step 120 of repeating placing the intermediate boundary stone on the pedestal 40 so that the steel rod 30 installed as the rod groove 22 of the intermediate boundary stone is fitted; 놓여진 지지경계석과 중간경계석의 저면과 받침대(40)의 V형홈(42) 사이에 조절쐐기(50)를 끼운 후 망치로 조절쐐기(50)의 후단(53)을 쳐서 맞지 않는 미세한 높이 조절을 하는 높이 조절단계(130);After inserting the adjustment wedge 50 between the bottom of the supported boundary stone and the intermediate boundary stone and the V-shaped groove 42 of the pedestal 40, a fine height adjustment is performed by hitting the rear end 53 of the adjustment wedge 50 with a hammer. Height adjustment step 130; 보도측으로 지지경계석과 중간경계석에 닿게 거푸집(60)을 설치하고, 차도측으로 엘형측구(62)를 형성할 만큼의 간격을 두고 거푸집(61)을 설치하는 거푸집 설치단계(140);Formwork installation step 140 to install the formwork 60 to the support side stone and the intermediate boundary stone to the side of the side, spaced enough to form the el-shaped side opening (62) to the driveway side 140; 거푸집(60)(61) 사이에 콘크리트를 타설하여 엘형측구(62)를 형성하고 거푸집(60)(61)을 제거하는 마감단계(150);를 포함하는 것을 특징으로 하는 배열과 설치가 간편한 도로 경계석 시공 방법.Forming concrete between the mold (60) (61) to form an el-shaped side opening (62) and the finishing step (150) for removing the form (60) (61); Easy to arrange and install the road comprising a Boundary stone construction method.
KR1020080006248A 2008-01-21 2008-01-21 A boundary stone of road and carrying method KR100816304B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020080006248A KR100816304B1 (en) 2008-01-21 2008-01-21 A boundary stone of road and carrying method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020080006248A KR100816304B1 (en) 2008-01-21 2008-01-21 A boundary stone of road and carrying method

Publications (1)

Publication Number Publication Date
KR100816304B1 true KR100816304B1 (en) 2008-03-24

Family

ID=39411539

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020080006248A KR100816304B1 (en) 2008-01-21 2008-01-21 A boundary stone of road and carrying method

Country Status (1)

Country Link
KR (1) KR100816304B1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101406295B1 (en) * 2011-11-09 2014-06-12 서종철 Boundary stone

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6460808A (en) * 1987-08-31 1989-03-07 Sony Corp Alignment disk
JPH0335345A (en) * 1989-06-30 1991-02-15 Casio Comput Co Ltd Compact electronic computer
KR20000067469A (en) * 1999-04-28 2000-11-15 권재원 Joint device for road boundary stone
KR200245271Y1 (en) * 2001-05-29 2001-10-17 주식회사 대우엔지니어링 A road border concreted rock preventing a seperation
KR200385473Y1 (en) * 2005-03-04 2005-05-27 서명호 Boundary stone to prevent freezing

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6460808A (en) * 1987-08-31 1989-03-07 Sony Corp Alignment disk
JPH0335345A (en) * 1989-06-30 1991-02-15 Casio Comput Co Ltd Compact electronic computer
KR20000067469A (en) * 1999-04-28 2000-11-15 권재원 Joint device for road boundary stone
KR200245271Y1 (en) * 2001-05-29 2001-10-17 주식회사 대우엔지니어링 A road border concreted rock preventing a seperation
KR200385473Y1 (en) * 2005-03-04 2005-05-27 서명호 Boundary stone to prevent freezing

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
일본 등록실용 제3035345호
일본 특개평 10-60808호

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101406295B1 (en) * 2011-11-09 2014-06-12 서종철 Boundary stone

Similar Documents

Publication Publication Date Title
KR100758356B1 (en) Boundary stone establishing structure and method
KR100654170B1 (en) Apparatus for constructing a curbstone
KR100816304B1 (en) A boundary stone of road and carrying method
KR102186470B1 (en) Dowel Bar steel form
KR20060047929A (en) A supporter of a road boundary stone and the using method thereof
KR100421058B1 (en) Precast concrete block for retaining wall
JP2009161961A (en) Gutter and method of constructing gutter
KR101158445B1 (en) Form for constructing road boundary stones and method using thesame
KR20100092609A (en) Precast form structure for gutter and construction method using the same
KR100953962B1 (en) Floating construction apparatus for boundary stone
KR20030057840A (en) Method for dry constructing road boundary stones and road boundary stone supporting device
KR20110078593A (en) Support for reinforcing bar, manufacturing method thereof and construction method for foundation using that
KR200438779Y1 (en) boundary block height adjustment
KR200456737Y1 (en) A supporter of a road boundary stone
KR101032138B1 (en) Curb supporter and construction method using the same
KR101354890B1 (en) The constructiom method of the boundary stone using the boundary stone mould
KR100445627B1 (en) A road border construction process
JP2007217871A (en) Dry foundation and its construction method
KR101239038B1 (en) Base ground construction method for concrete waterway pipe
KR102359642B1 (en) Road gutter and boundary stone integrated concrete structure and construction method thereof
KR100516275B1 (en) Boundary stone establishing structure
KR200405459Y1 (en) Iron mould
KR200361659Y1 (en) A supporter of a road boundary stone
KR200465392Y1 (en) The boundary stone mould
KR200291868Y1 (en) Boundary stone establishing structure

Legal Events

Date Code Title Description
A201 Request for examination
A302 Request for accelerated examination
N231 Notification of change of applicant
N231 Notification of change of applicant
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20130314

Year of fee payment: 6

FPAY Annual fee payment

Payment date: 20140313

Year of fee payment: 7

FPAY Annual fee payment

Payment date: 20150316

Year of fee payment: 8

FPAY Annual fee payment

Payment date: 20160318

Year of fee payment: 9

FPAY Annual fee payment

Payment date: 20170320

Year of fee payment: 10

FPAY Annual fee payment

Payment date: 20180226

Year of fee payment: 11

FPAY Annual fee payment

Payment date: 20190318

Year of fee payment: 12

FPAY Annual fee payment

Payment date: 20200225

Year of fee payment: 13