KR100775849B1 - Ground plate for electric pole - Google Patents

Ground plate for electric pole Download PDF

Info

Publication number
KR100775849B1
KR100775849B1 KR1020070083257A KR20070083257A KR100775849B1 KR 100775849 B1 KR100775849 B1 KR 100775849B1 KR 1020070083257 A KR1020070083257 A KR 1020070083257A KR 20070083257 A KR20070083257 A KR 20070083257A KR 100775849 B1 KR100775849 B1 KR 100775849B1
Authority
KR
South Korea
Prior art keywords
ground
electric pole
connection
pair
laying
Prior art date
Application number
KR1020070083257A
Other languages
Korean (ko)
Inventor
김정황
Original Assignee
(주)엑서런트
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by (주)엑서런트 filed Critical (주)엑서런트
Priority to KR1020070083257A priority Critical patent/KR100775849B1/en
Application granted granted Critical
Publication of KR100775849B1 publication Critical patent/KR100775849B1/en

Links

Images

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G13/00Installations of lightning conductors; Fastening thereof to supporting structure
    • H02G13/40Connection to earth
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H12/00Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
    • E04H12/22Sockets or holders for poles or posts
    • E04H12/2253Mounting poles or posts to the holder

Abstract

A ground plate for an electric pole is provided to support an upright state of the electric pole from the ground strongly when the electric pole is constructed and expand a contact size of the ground with a leading-out line led out of the electric pole through a laying tube and a ground part. A semicircular groove(111) is formed at an internal side of a pair of laying pieces(110) of two groups to be laid and constructed in the ground to be adjacent to an outer circumference surface of an electric pole(10). A containing groove(113) is formed in an outer circumference surface of the laying pieces(110). A connection implement(117) on which a coupling bolt(115) is bidirectionally protruded is formed at one side of the containing groove(113). Slit grooves(119) are formed at adjacent both sides of the semicircular groove(111) as one body. A pair of connection pieces(130) of two groups are inserted and connected into the containing groove(113) to be orthogonal to the laying pieces(110) to be capable of mutually connecting the laying pieces(110). Combining implements(135) having coupling holes(133) into which the coupling bolt(115) is inserted are protruded and formed on both end parts of the connection pieces(130). A pair of through holes(137) to which bearings(141) are connected are formed at an internal side of the connection pieces(130). A plurality of laying tubes(140) rotatably connect to an inner diameter of the bearings(141) to be capable of supporting the electric pole(10). A plurality of connection holes(143) are formed at an external side of the laying tubes(140). Connection bars are inserted and connected into the respective connection holes(143). The first ground ball protruded on the ground and the second ground ball internally located are welded and fixed to both ends of the connection bars. An elastic spring connects to an outer circumference surface of the connection bars located at the second ground ball side. A combining bolt(151) of a connection cover(153) of a ground part(150) is coupled to an upper part of the laying tubes(140) to be capable of grounding a leading-out line(20) led out of the electric pole(10) in the ground. A connecting hole opened up and down is formed at an internal side of the connection cover(153). The leading-out line(20) is inserted into an upper part of an inner circumference surface of the ground part(150), and an end part of a connecting rod(157) is fitted into a lower part of the inner circumference surface to connect the ground part(150) to the leading-out line(20). A pair of rubber plates(160) of two groups are safely received in an upper part of the laying pieces(110) to be capable of preventing an electric shock of a person who passes around the electric pole(10). A pair of projections(161) inserted into the slot grooves(119) are formed on a lower part of the rubber plates(160). A pair of combining holes(163) into and on which the laying tubes(140) are inserted and protruded are formed at an internal side of the rubber plate(160). A plurality of cutting grooves(165) are formed in an upper part of the rubber plate(160). A plurality of cases(170) are inserted and connected into the cutting grooves(165) to prevent the laying tubes(140) from being exposed to the outside. A space part(171) in which the laying tubes(140) are contained is formed at an internal side of the cases(170). An opening groove(173) in which the leading-out line(20) is led is formed in an upper part of the cases(170). An airtight ring(175) is connected between the opening groove(173) and the leading-out line(20).

Description

전주용 접지판{GROUND PLATE FOR ELECTRIC POLE}Electric pole ground plate {GROUND PLATE FOR ELECTRIC POLE}

본 발명은 전주용 접지판에 관한 것으로, 더욱 상세하게는 전주시공시 지면으로부터 전주의 직립상태를 견고히 지지할 수 있도록 함과 아울러 전주 내에서 인출되는 인출선과 지면의 접촉면적을 매설관과 접지수단을 통해 확장시킴으로써, 접지저항치를 효율적으로 낮출 수 있도록 한 전주용 접지판에 관한 것이다.The present invention relates to a grounding plate for electric poles, and more particularly, it is possible to firmly support the upright state of electric poles from the ground when constructing electric poles, and to provide the buried pipes and the grounding means for the contact areas of the lead wires and the grounds drawn out in the electric poles. The present invention relates to an electric pole grounding plate that can be lowered to effectively lower grounding resistance.

일반적으로 산업화, 정보화 및 도시화되는 현대사회는 밀집된 지역에서 많은 에너지를 소비하는 특징이 있으며, 이러한 에너지 중 전기에너지는 사용이 편리하고, 수송이 간단하며, 공해가 없이 깨끗하여 보편적으로 널리 사용되고 있으며, 이에 따라 전력의 안정적인 공급은 산업 전반에 걸쳐 중요한 요인이 되는 실정이다.In general, modernized society, which is industrialized, informatized and urbanized, consumes a lot of energy in dense areas. Among these, electric energy is widely used because it is convenient to use, easy to transport, clean and free of pollution, Accordingly, stable supply of power is an important factor throughout the industry.

이러한 전기에너지의 안정적인 공급을 위해서는 낙뢰와 같은 자연적인 재해를 미연에 방지하여 안정적으로 공급되어야 함은 물론 전기의 고품질도 보장되어야 하는데, 발전소에서 발전된 고품질의 전력을 일반 수용가에까지 안정적으로 전달하려면 송전선과 배전선의 품질확보가 필요한 동시에 양호한 접지가 필수적이다.The stable supply of electric energy requires stable supply of natural disasters such as lightning strikes, as well as high quality of electricity. In order to reliably deliver high-quality power generated from power plants to general customers, A good grounding is essential while ensuring the quality of the distribution lines.

상기 접지는 전력이나 낙뢰로부터 인간을 보호하는 기능을 담당할 뿐만 아니라, 전력사업의 측면에서 기준 전위를 제공하며, 낙뢰로부터 전력설비를 보호하고 계통의 고장시 귀로 전류의 통로가 되는 아주 중요한 역할을 담당하고 있을 뿐 아니라 정보화 사회로의 가속화가 진행되면서 일반 가정에서도 팩스밀리 또는 컴퓨터를 이용한 화상정보 및 인터넷등의 설비가 이용되고 있어 사고의 피해와 피해액이 상대적으로 커지고 있으며, 특히 이러한 기기는 써지성의 급준파에 약한 측면이 있어 더욱더 전력의 고품질화를 요구하고 있다.The ground not only serves to protect humans from electric power or lightning, but also provides a reference potential in terms of electric power business, protects the electric power equipment from lightning and serves as a path for return current in the event of a system failure. Not only are they in charge, but as the information society is accelerating, facilities such as facsimile or computer-based image information and the Internet are being used, and the damage and damage of accidents are relatively increasing. Due to the weak side of steep waves, the demand for higher power quality is increasing.

상기 전력은 발전소로부터 변전소로 전송되어 흔히 콘크리트 전주를 지지물로 하는 배전선을 따라 전주 위의 주상 변압기를 통해 가정에 전달되는데, 배전선은 지중선과 가공선으로 분류되며, 지중선은 상대적으로 안정적인 전력을 공급하는데 우수한 반면, 건설비가 가공선에 비해 10배 이상 소요되고 사고의 파급이 크다는 문제가 있고, 특히 도심의 미관 등을 고려할 때 지중선이 바람직하나 이미 형성된 기존 도시에 지중선을 시공하기는 쉽지 않으므로 현재 가공선에 의한 전력의 전송이 함께 이루어지고 있는 것이다.The power is transferred from the power plant to the substation and is often delivered to the home via a pole transformer on the pole along the distribution line supporting the concrete pole. On the other hand, there is a problem that the construction cost is more than 10 times that of overhead lines and the impact of accidents is large. Especially, considering the aesthetics of urban centers, underground lines are preferable, but it is not easy to construct underground lines in existing cities. Is being transmitted together.

또한, 변전소에서 여러 단계의 변압과정을 거친 전력을 각 가정 또는 건물 등의 일반 수용가로 공급하기 위해서는 각 지역에 일정 간격으로 설치되는 전주 등의 배전선로를 이용하게 되는데, 이와 같이 설치되는 배전선로에는 고전압의 흔촉 및 지락(地絡) 사고시 보호계전기의 동작을 확실히 하여 이상전압을 억제하고, 뇌(雷) , 써지(surge) 등 이상전압에 의한 기기보호와 누전으로 인한 각종 전기재해 방지를 위하여 접지를 하게 되는 젓이다.In addition, in order to supply electric power that has undergone various stages of transformation in the substation to general consumers in each home or building, distribution lines such as electric poles installed at regular intervals in each region are used. To prevent abnormal voltages by ensuring the operation of the protective relay in the event of high voltage or ground fault, and to protect the equipment by abnormal voltages such as brain and surge, and to prevent various electrical disasters due to short circuit. It's done.

한편, 접지란 전력 설비의 사고나 절연불량, 전원회로나 전자장치에 뇌서지(Lightning Surge) 또는 개폐서지(Switching Surge) 와 같은 과도한 이상전압이 침입 한때 취급자를 감전사고로부터 보호하고 설비기기의 절연파괴를 방지할 뿐만 아니라 정보, 통신 설비에서 잡음을 제거하여 정보전송의 양질화를 이룩하는 기능성을 향상시키는 것으로 대지에 전기적 단자를 접속하는 것이다.On the other hand, grounding protects the operator from electric shock accidents and insulates the equipment when an excessive abnormal voltage such as lightning surge or switching surge occurs in the power equipment accident or poor insulation, power circuit or electronic device. In addition to preventing destruction, it also removes noise from information and communication facilities to improve the functionality of achieving high quality information transmission.

즉 금속 또는 도전성 물체를 대지와 전기적으로 접속하여 그의 전위를 대지와 같은 전위 또는 전위차를 최소화시키는 수단을 말한다.That is, a means for electrically connecting a metal or a conductive object to the earth and minimizing the potential or the difference in potential thereof as the earth.

이를 위한 지금까지 배전선로의 접지공사는 전주를 매설할 수 있는 일정깊이의 구덩이를 굴착한 후, 상기 구덩이 일측으로 일정깊이와 폭을 갖는 구덩이를 하나 더 굴착하고, 상기 구덩이에 접지에 사용되는 다수의 접지봉을 햄머 등의 도구를 이용하여 타격시켜 매설한 다음 상기 전주 내에서 인출되는 인출선과 상기 접지봉을 직렬 또는 병렬로 연결시키게 되며, 상기 작업이 완료되면 상기 구덩이에 흙과 같은 내용물을 채워 시공 및 설치작업이 이루어지게 되는 것이다.To this end, the grounding work of the distribution line has excavated a pit having a predetermined depth to bury electric poles, and then excavates one more pit having a predetermined depth and width to one side of the pit, and uses a plurality of grounds used for grounding the pit. The ground rod of the hammer is struck by using a tool such as a hammer to be embedded, and then the lead wire drawn out in the pole and the ground rod are connected in series or in parallel. When the work is completed, the construction is performed by filling the pit with contents such as soil. Installation work will be done.

하지만, 이와 같은 종래의 전주의 접지공사는 전주를 시공하기 위한 구덩이 외에 접지봉을 매설하기 위한 구덩이를 도로나 보도블럭에 천공해야 하기 때문에 이에 따른 굴착 및 복구비가 과다하게 소요되는 문제점이 있었다.However, such a conventional grounding construction of Jeonju has a problem in that the excavation and recovery costs are excessively required because a pit for laying a ground rod in addition to a pit for constructing Jeonju must be drilled on a road or sidewalk block.

또한, 종래 전주는 그 하단부의 매설을 통해서만 전주의 직립상태를 유지하기 때문에 돌풍 또는 집중호우와 같은 자연현상에 의해 전주가 쓰러지는 문제점이 있었다.In addition, the conventional pole has a problem that the pole falls by natural phenomena such as gusts or heavy rain because it maintains the upright state of the pole only through the burial of the lower end.

본 발명은 상기와 같은 문제점을 감안하여 안출한 것으로, 그 목적은 전주시 공시 지면으로부터 전주의 직립상태를 견고히 지지할 수 있도록 함과 아울러 전주 내에서 인출되는 인출선과 지면의 접촉면적을 매설관과 접지수단을 통해 확장시킴으로써, 접지저항치를 효율적으로 낮출 수 있도록 한 전주용 접지판을 제공한다.The present invention has been made in view of the above problems, the purpose of which is to support the upright state of Jeonju from the ground of Jeonju, as well as the buried pipe and ground contact area drawn out in Jeonju and buried pipe and ground By extending through the means, there is provided a pole grounding plate which allows the grounding resistance to be lowered efficiently.

본 발명의 다른 목적은 전주 시공시 접지공사를 위한 별도의 굴착작업 없이 전주 시공과 동시에 접지공사를 시행할 수 있도록 함으로써, 전주 시공시 공사기간을 단축할 수 있으며, 이에 따른 공사비용을 절감할 수 있도록 한 전주용 접지판을 제공한다.Another object of the present invention is to be able to carry out the grounding work at the same time with the construction of Jeonju without additional excavation work for the grounding construction in Jeonju construction, can shorten the construction period during construction of Jeonju, thereby reducing the construction cost Provide a pole grounding plate to ensure

본 발명의 또 다른 목적은 전주가 시공된 부위의 지면에 2조 1쌍의 고무판을 돌출되게 설치함으로써, 통행하는 사람으로 하여금 통행지역이 전기위험지역임을 인지할 수 있도록 함과 아울러 상기 고무판을 통해 지면과 통행하는 사람 사이를 차단하여 전기감전사고를 미연에 예방할 수 있도록 한 전주용 접지판을 제공한다. Another object of the present invention is to install a pair of rubber plates protruding on the ground of the site where the pole is constructed, so that the person who passes can recognize that the passage area is an electrical hazard area and through the rubber plate It provides a pole grounding board that blocks the ground and people who pass through it to prevent electric shock accidents.

상기 목적을 달성시키기 위한 본 발명은 The present invention for achieving the above object

전주의 외주면과 접하게 지면에 매설시공할 수 있도록 내측에 반원홈이 형성되고, 외주면에 수용홈이 형성되며, 상기 수용홈의 일측면에 체결볼트가 양방향으로 돌출된 연결구가 형성되고, 상기 반원홈의 인접한 양측에 슬릿홈이 일체로 형성된 2조 1쌍의 매설편과,A semicircular groove is formed on the inner side so as to be buried in the ground in contact with the outer circumference of the pole, and an accommodating groove is formed on the outer circumferential surface. Two pairs of buried pieces formed integrally with slit grooves on both adjacent sides of the

상기 2조 1쌍의 매설편을 서로 연결할 수 있도록 매설편과 직교되게 수용홈에 삽입연결되며, 양단부에 체결볼트가 삽입되는 체결공을 갖는 결합구가 돌출형성되며, 내측에 베어링이 연결된 한 쌍의 통공이 형성된 2조 1쌍의 연결편과,The pair of insertion pieces connected to the receiving groove perpendicular to the buried piece to connect the two pairs of buried pieces, a coupling hole having a fastening hole for inserting the fastening bolts at both ends is formed protruding, the bearing is connected to the inside Two pairs of connecting pieces formed with a through hole,

상기 전주을 지지할 수 있도록 상기 베어링의 내경에 회동가능하도록 연결되며, 외측에 다수개의 연결공이 형성되고, 상기 각 연결공에 연결바가 삽입연결되어 연결바의 양단에 지면으로 돌출되는 제1 접지볼과 내부에 위치되는 제2 접지볼이 용접고정되고, 제2 접지볼 측의 연결바 외주면에 탄성스프링이 연결된 복수개의 매설관과,A first ground ball which is rotatably connected to the inner diameter of the bearing so as to support the electric pole, and a plurality of connection holes are formed on the outside, and connection bars are inserted into and connected to each connection hole to protrude to the ground at both ends of the connection bars; A plurality of buried pipes in which a second ground ball located inside is welded and fixed, and an elastic spring is connected to an outer circumferential surface of the connecting bar on the second ground ball side;

상기 전주에서 인출된 인출선을 지면에 접지시킬 수 있도록 상기 매설관의 상부에 연결덮개의 결합볼트가 볼트체결되고, 상기 연결덮개의 내측에 상하로 개구된 연결홀이 형성되어, 내주면 상부에 인출선이 삽입되며, 내주면 하부에 연결봉의 단부가 억지끼움방식으로 연결되어 상기 인출선과 접속된 접지수단과,A coupling bolt of a connection cover is bolted to an upper portion of the buried pipe so as to ground the lead wire drawn out from the electric pole, and a connection hole which is opened up and down in the inner side of the connection cover is formed, and is drawn out on the inner peripheral surface. A wire is inserted into the grounding means connected to the lead wire by connecting the end of the connecting rod to the lower end of the inner circumferential surface by a force fitting method;

상기 전주 주위를 통행하는 사람이 감전되는 것을 방지할 수 있도록 상기 매설편 상부에 각각 안착되며, 하부에 상기 각 슬릿홈에 삽입되는 한 쌍의 돌기가 형성되고, 내측에 상기 매설관이 삽입돌출되는 한 쌍의 결합공이 형성되며, 상부에 복수개의 절개홈이 형성된 2조 1쌍의 고무판 및 A pair of protrusions are respectively seated on an upper portion of the embedding piece to prevent an electric shock from passing through the electric pole, and a pair of protrusions are inserted into the respective slit grooves at a lower portion thereof, and the embedding pipe is inserted into and protruded from the inside thereof. A pair of coupling holes are formed, two pairs one pair of rubber plate formed with a plurality of incision grooves on the top and

상기 매설관이 외부로 노출되는 것을 방지할 수 있도록 상기 절개홈에 삽입연결되며, 내측에 상기 매설관이 수용되는 공간부가 형성되고, 상부에 인출선이 유입되는 개구홈이 형성되며, 상기 개구홈과 인출선 사이에 밀폐링이 연결된 복수개의 케이스를 포함하여 구성된다.Inserted into the cutting groove so as to prevent the buried pipe is exposed to the outside, a space portion for receiving the buried pipe is formed on the inside, an opening groove in which the leader line is introduced is formed, the opening groove It comprises a plurality of cases connected to the sealing ring between the lead and the lead.

본 발명에 따르면, 전주시공시 지면으로부터 전주의 직립상태를 견고히 지지할 수 있도록 함과 아울러 전주 내에서 인출되는 인출선과 지면의 접촉면적을 매설 관과 접지수단을 통해 확장시킴으로써, 접지저항치를 효율적으로 낮출 수 있는 효과가 있다.According to the present invention, it is possible to firmly support the upright state of the pole from the ground during construction of Jeonju, and to extend the contact area between the lead wire and the ground drawn out from the pole through the buried pipe and the grounding means, thereby effectively lowering the ground resistance value. It can be effective.

또한, 전주 시공시 접지공사를 위한 별도의 굴착작업 없이 전주 시공과 동시에 접지공사를 시행할 수 있도록 함으로써, 전주 시공시 공사기간을 단축할 수 있으며, 이에 따른 공사비용을 절감할 수 있는 효과가 있다.In addition, it is possible to shorten the construction period during construction of Jeonju by allowing the grounding work to be performed simultaneously with the construction of Jeonju without additional excavation work for the construction of the construction site of Jeonju. .

또한, 전주가 시공된 부위의 지면에 2조 1쌍의 고무판을 돌출되게 설치함으로써, 통행하는 사람으로 하여금 통행지역이 전기위험지역임을 인지할 수 있도록 함과 아울러 상기 고무판을 통해 지면과 통행하는 사람 사이를 차단하여 전기 감전사고를 미연에 예방할 수 있는 효과가 있다.In addition, by installing two pairs of rubber plates protruding on the ground of the site where the pole is constructed, it allows people who pass through to recognize that the traffic area is an electrical hazard area, and people who pass through the rubber plate through the rubber plate. It is effective to prevent an electric shock accident by blocking the gap.

이하, 첨부된 도면을 참조하여 본 발명의 바람직한 실시예에 따른 전주용 접지판을 상세히 설명하기로 한다.Hereinafter, an electric pole ground plate according to a preferred embodiment of the present invention with reference to the accompanying drawings will be described in detail.

도 1은 본 발명의 바람직한 실시예에 따른 전주용 접지판을 나타낸 분해사시도이고, 도 2는 본 발명의 바람직한 실시예에 따른 전주용 접지판을 나타낸 사시도이다.1 is an exploded perspective view showing a pole grounding plate according to a preferred embodiment of the present invention, Figure 2 is a perspective view showing a pole grounding plate according to a preferred embodiment of the present invention.

도 1 및 도 2를 참조하면, 본 발명의 바람직한 실시예에 따른 전주용 접지판(100)은 2조 1쌍의 매설편(110), 2조 1쌍의 연결링(120), 2조 1쌍의 연결편(130), 복수개의 매설관(140), 접지수단(150), 2조 1쌍의 고무판(160) 및 복수개의 케이스(170)를 포함하여 구성된다. 1 and 2, the pole grounding plate 100 according to a preferred embodiment of the present invention is a pair of buried pieces 110, two pairs of pairing ring 120, two pairs 1 It is configured to include a pair of connecting pieces 130, a plurality of buried pipe 140, a grounding means 150, a pair of rubber plate 160 and a plurality of cases 170.

상기 2조 1쌍의 매설편(110)은 전주(10)의 외주면과 접하게 지면에 매설시공 된다.The pair of buried pieces 110 is buried in the ground in contact with the outer peripheral surface of the electric pole (10).

이때, 상기 각 매설편(110)은 그 내측에 상기 전주(10)의 직경과 동일한 지름을 갖는 반원홈(111)이 형성되고, 외주면에 수용홈(113)이 형성되며, 상기 수용홈(113)의 일측면에 체결볼트(115)가 양방향으로 돌출된 연결구(117)가 형성되고, 상기 반원홈(111)의 인접한 양측에 슬릿홈(119)이 일체로 형성된다.At this time, each of the buried piece 110 has a semi-circular groove 111 having the same diameter as the diameter of the electric pole 10, the receiving groove 113 is formed on the outer peripheral surface, the receiving groove 113 The coupling bolt 117 is formed on one side of the coupling bolt 115 protrudes in both directions, the slit groove 119 is integrally formed on both adjacent sides of the semi-circular groove (111).

또한, 상기 2조 1쌍의 연결링(120)은 상기 반원홈(111)과 전주(10)의 연결부위를 긴밀히 할 수 있도록 상기 반원홈(111)과 전주(10) 사이에 개재된다.In addition, the pair of pair of ring 120 is interposed between the semi-circular groove 111 and the pole 10 so that the connection portion of the semi-circular groove 111 and the pole 10 can be closely.

이때, 상기 연결링(120)은 절연체인 고무 재질로 이루어지는 것이 바람직하다.At this time, the connection ring 120 is preferably made of a rubber material that is an insulator.

한편, 상기 2조 1쌍의 연결편(130)은 상기 2조 1쌍의 매설편(110)을 서로 연결할 수 있도록 매설편(110)과 직교되게 수용홈(113)에 삽입연결된다.On the other hand, the two pairs of connecting pieces 130 is inserted into the receiving groove 113 orthogonal to the buried piece 110 so as to connect the two pairs of buried pieces 110 to each other.

이때, 상기 각 연결편(130)은 그 양단부에 상기 체결볼트(115)가 삽입되어 너트(131)를 체결할 수 있도록 체결공(133)을 갖는 결합구(135)가 돌출형성되며, 내측에 한 쌍의 통공(137)이 형성된다.At this time, each of the connecting pieces 130, the coupling bolt (115) having a fastening hole 133 so as to fasten the nut 131 is inserted into both ends of the fastening bolt 115 is formed, the inner one A pair of through holes 137 are formed.

또한, 상기 복수개의 매설관(140)은 상기 각 통공(137)에 억지끼움된 베어링(141)의 내경에 회동가능하도록 연결된다.In addition, the plurality of buried pipe 140 is rotatably connected to the inner diameter of the bearing 141 forcibly fitted into the through holes 137.

이때, 상기 각 매설관(140)은 그 상부 내주면에 나선(142)이 형성되고, 외측에 다수개의 연결공(143)이 형성되며, 상기 각 연결공(143)에 연결바(144)가 삽입연결된다.At this time, each of the buried pipe 140 has a spiral 142 is formed on the upper inner circumferential surface, a plurality of connecting holes 143 is formed on the outside, the connecting bar 144 is inserted into each of the connecting holes 143 Connected.

또한, 상기 각 연결바(144)는 그 양단에 지면으로 돌출되는 제1 접지볼(145) 과 내부에 위치되는 제2 접지볼(146)이 용접고정되고, 제2 접지볼(146) 측의 연결바(144) 외주면에 탄성스프링(147)이 연결된다.In addition, each of the connecting bars 144 is welded and fixed to both ends of the first ground ball 145 protruding to the ground and the second ground ball 146 located therein, the second ground ball 146 The elastic spring 147 is connected to the outer circumferential surface of the connecting bar 144.

이에 따라, 상기 제1 접지볼(145)은 평상시에는 상기 탄성스프링(147)의 탄성력에 의해 매설관(140)의 외주면에 밀착되어있다.Accordingly, the first ground ball 145 is usually in close contact with the outer circumferential surface of the buried pipe 140 by the elastic force of the elastic spring 147.

이때, 상기 제1 접지볼(145), 제2 접지볼(146) 및 연결바(144)는 도체인 급속재질로 이루어지며, 매설관(140)은 절연체로 합성수지재질로 이루어지는 것이 바람직하다.At this time, the first ground ball 145, the second ground ball 146 and the connecting bar 144 is made of a rapid material as a conductor, the buried pipe 140 is preferably made of a synthetic resin material as an insulator.

또한, 상기 매설관(140)은 매설시 전주(10)를 지지할 수 있을 정도의 각도로 굴절형성된 것이 바람직하다. In addition, the buried pipe 140 is preferably refracted at an angle enough to support the electric pole 10 when buried.

한편, 상기 접지수단(150)은 상기 전주(10)에서 인출된 인출선(20)을 지면에 접지시킬 수 있도록 상기 인출선(20)과 매설관(140) 사이에 연결된다.On the other hand, the grounding means 150 is connected between the lead wire 20 and the buried pipe 140 to ground the lead wire 20 drawn from the pole 10 to the ground.

이때, 상기 접지수단(150)은 상기 매설관(140)의 나선(142)에 볼트결합할 수 있도록 하부에 결합볼트(151)가 돌출된 연결덮개(153)의 내측에 상하로 개구된 연결홀(155)이 형성되고, 상기 연결홀(155)의 내주면 상부에 인출선(20)이 삽입되며, 상기 연결홀(155)의 내주면 하부에 연결봉(157)의 단부가 억지끼움방식으로 연결되어 상기 인출선(20)과 접속된다.At this time, the grounding means 150 is a connection hole which is vertically opened in the inner side of the connecting cover 153 protruding the coupling bolt 151 at the bottom to be bolted to the spiral 142 of the buried pipe 140 155 is formed, the leader line 20 is inserted into the upper inner circumferential surface of the connecting hole 155, the end of the connecting rod 157 is connected to the lower inner circumferential surface of the connecting hole 155 in the interference fit method It is connected to the leader line 20.

이때, 상기 인출선(20)과 연결봉(157)은 용접에 의해 연결되며, 상기 연결봉(157)은 도체로 이루어지는 것이 바람직하다.At this time, the leader line 20 and the connecting rod 157 is connected by welding, the connecting rod 157 is preferably made of a conductor.

또한, 상기 연결덮개(153)와 결합볼트(151)는 절연체로 이루어지는 것이 바람직하다.In addition, the connection cover 153 and the coupling bolt 151 is preferably made of an insulator.

한편, 상기 2조 1쌍의 고무판(160)은 상기 전주(10) 주위를 통행하는 사람이 감전되는 것을 방지할 수 있도록 상기 2조 1쌍의 매설편(110) 상부에 각각 안착되어 상부가 지면과 동일한 위치가 된다.Meanwhile, the two pairs of rubber plates 160 are respectively seated on the two pairs of the buried pieces 110 to prevent the electric shock of the person passing around the electric pole 10, and the upper surface is grounded. Is the same position as.

이때, 상기 고무판(160)은 그 하부에 상기 각 슬릿홈(119)에 삽입되는 한 쌍의 돌기(161)가 형성되고, 내측에 상기 매설관(140)이 삽입돌출되는 한 쌍의 결합공(163)이 형성되며, 상부에 복수개의 절개홈(165)이 형성된다.At this time, the rubber plate 160 has a pair of protrusions 161 which are inserted into the respective slit grooves 119 in the lower portion thereof, and a pair of coupling holes into which the buried pipe 140 is inserted and protruded inward. 163 is formed, a plurality of incision groove 165 is formed on the top.

또한, 상기 복수개의 케이스(170)는 상기 매설관(140)이 외부로 노출되는 것을 방지할 수 있도록 하부가 상기 절개홈(165)에 삽입연결된다.In addition, the plurality of cases 170 is connected to the lower portion is inserted into the cutting groove 165 to prevent the buried pipe 140 is exposed to the outside.

이때, 상기 케이스(170)는 그 내측에 상기 매설관(140)의 상부가 수용되는 공간부(171)가 형성되고, 상부에 인출선(20)이 유입되는 개구홈(173)이 형성되며, 상기 개구홈(173)과 인출선(20) 사이에 이물질이 유입되는 것을 방지할 수 있도록 밀폐링(175)이 연결된다.At this time, the case 170 has a space portion 171 is formed therein is accommodated in the upper portion of the buried pipe 140, the opening groove 173 is formed in the leader line 20 is introduced therein, A sealing ring 175 is connected to prevent foreign matter from flowing between the opening groove 173 and the leader line 20.

이에, 상기와 같은 결합구성으로 이루어진 본 발명은 본 발명은 전주 시공시 별도의 접지공사를 위한 굴착작업 없이 전주 시공과 동시에 접지공사를 시공할 수 있도록 함으로써, 전주 시공에 따른 공사비용을 절감할 수 있으며, 또한 공사기간을 단축할 수 있도록 한 것으로, 이에 따른 시공관계 및 동작관계를 설명하기로 한다.Thus, the present invention made of a combination configuration as described above, the present invention can be ground construction at the same time with the construction of Jeonju without excavation work for a separate ground construction during construction of Jeonju, can reduce the construction cost according to construction of Jeonju In addition, the construction period is to be shortened, and construction and operation relations will be described.

도 3a 및 도 3b 는 도 2의 A부 확대도 및 작동상태도이고, 도 4는 본 발명의 바람직한 실시예에 따른 전주용 접지판의 시공상태를 나타낸 단면도이다.3A and 3B are an enlarged view of the A portion and an operating state of FIG. 2, and FIG. 4 is a cross-sectional view illustrating a construction state of a pole grounding plate according to a preferred embodiment of the present invention.

도 3a, 도 3b 및도 4를 참조하면, 본 발명의 바람직한 실시예에 따른 전주용 접지판(100)을 전주(10)에 설치하기 위해서는 먼저, 전주(10)를 시공하기 위한 부위에 굴착작업을 하여 구덩이를 형성한다.3A, 3B and 4, in order to install the pole grounding plate 100 according to a preferred embodiment of the present invention on the pole 10, first, excavation work to the site for the pole 10 construction Form a pit.

이와 같이 형성된 구덩이에 전주(10)를 직립되게 위치시킨 후, 본 발명의 전주용 접지판(100)을 설치하여 굴착한 구덩이를 매립설치한다.After placing the pole 10 upright in the pit formed as described above, the installed ground pole plate 100 of the present invention is installed to bury the excavated pit.

즉, 상기 2조 1쌍의 매설편(110)의 내주면에 형성된 반원홈(111)에 전주(10)의 외주면을 위치시킨다. 이때, 상기 전주(10)와 반원홈(111) 사이에는 연결링(120)을 개재한다.That is, the outer circumferential surface of the electric pole 10 is positioned in the semicircular groove 111 formed on the inner circumferential surface of the pair of buried pieces 110. At this time, the connection ring 120 is interposed between the electric pole 10 and the semicircular groove 111.

이에 따라, 상기 연결링(120)은 매설편(110)과 전주(10) 사이에서 탄성력을 제공하여 매설편(110) 시공으로 인한 전주(10)의 파손을 방지한다.Accordingly, the connection ring 120 provides an elastic force between the buried piece 110 and the pole 10 to prevent breakage of the pole 10 due to the construction of the buried piece 110.

이후, 상기 매설편(110)의 수용홈(113)에 매설편(110)과 직교되게 2조 1쌍의 연결편(130)을 삽입연결한다. 이때, 상기 연결편(130)의 체결공(133)에는 체결볼트(115)가 삽입되며, 상기 체결볼트(115)의 단부에는 너트(131)를 체결한다.Subsequently, a pair of connecting pieces 130 are inserted into the receiving groove 113 of the buried piece 110 so as to be orthogonal to the buried piece 110. At this time, the fastening bolt 115 is inserted into the fastening hole 133 of the connecting piece 130, and the nut 131 is fastened to the end of the fastening bolt 115.

이에 따라, 상기 2조 1쌍의 매설편(110)은 상기 연결편(130)에 의해 전주(10)와 견고한 체결관계를 이루게 된다.Accordingly, the pair of buried pieces 110 of the pair has a strong fastening relationship with the electric pole 10 by the connecting piece 130.

이후, 상기 연결편(130)의 통공(137)에는 베어링(141)이 억지끼움되며, 상기 베어링(141)의 내경에는 매설관(140)이 힌지회동 가능하도록 연결된다. 이때, 상기 베어링(141)과 매설관(140)은 억지끼움방식으로 연결된다.Thereafter, the bearing 141 is forcibly fitted into the through hole 137 of the connection piece 130, and the buried pipe 140 is connected to the inner diameter of the bearing 141 so as to be hingeable. At this time, the bearing 141 and the buried pipe 140 is connected in an interference fit method.

이에 따라, 상기 매설관(140)은 힌지회동을 통해 그 굴절부위를 전주의 외측으로 향하도록 자유롭게 조절할 수 있게 된다.Accordingly, the buried pipe 140 can be freely adjusted so that the refractive portion toward the outside of the pole through the hinge rotation.

이때, 상기 매설관(140)의 외주면에 형성된 연결공(143)에는 각각 연결 바(144)가 삽입연결되며, 상기 각 연결바(144)의 단부에는 제1 접지볼(145)과 제2 접지볼(146)이 용접에 의해 고정된다. 이때, 상기 제1 접지볼(145)은 지면으로 돌출되며, 제2 접지볼(146)은 매설관(140) 내에 위치된다. 또한, 상기 제2 접지볼(146) 측의 연결바(144) 외주면에는 탄성스프링(147)이 연결된다.At this time, the connection bar 144 is inserted into the connection hole 143 formed on the outer circumferential surface of the buried pipe 140, respectively, and the first ground ball 145 and the second ground at the end of each connection bar 144 The ball 146 is fixed by welding. In this case, the first ground ball 145 protrudes to the ground, and the second ground ball 146 is located in the buried pipe 140. In addition, an elastic spring 147 is connected to an outer circumferential surface of the connecting bar 144 on the side of the second ground ball 146.

이에 따라, 상기 탄성스프링(147)은 그 일단이 상기 제2 접지볼(146)과 접하며, 그 타단이 상기 매설관(140)의 내면과 접한다.Accordingly, one end of the elastic spring 147 is in contact with the second ground ball 146, the other end is in contact with the inner surface of the buried pipe 140.

따라서, 상기 제1 접지볼(145)은 평상시에는 탄성스프링(147)의 탄성력에 의해 매설관(140)과 접촉되어 있으나, 상기 연결봉(157)이 매설관(140) 내부로 삽입되면, 상기 연결봉(157)이 제2 접지볼(146)을 지면측으로 밀어내며, 이에 따라, 상기 제1 접지볼(145)은 지면측으로 돌출되어 지면과의 접촉면적을 확장시킨다. 이에, 접지저항치를 낮추게 된다.Therefore, the first ground ball 145 is normally in contact with the buried pipe 140 by the elastic force of the elastic spring 147, when the connecting rod 157 is inserted into the buried pipe 140, the connecting rod 157 pushes the second ground ball 146 to the ground side, whereby the first ground ball 145 protrudes to the ground side to expand the contact area with the ground. As a result, the ground resistance value is lowered.

이후, 상기 접지수단(150)의 연결덮개(153)를 매설관(140)의 상부에 볼트결합한다.Thereafter, the connection cover 153 of the grounding means 150 is bolted to the upper portion of the buried pipe 140.

즉, 상기 연결덮개(153)의 하부에 돌출형성된 결합볼트(151)를 매설관(140)의 상부 내주면에 형성된 나선(142)에 볼트결합한다.That is, the coupling bolt 151 protruding from the lower portion of the connecting cover 153 is bolted to the spiral 142 formed on the upper inner peripheral surface of the buried pipe 140.

이에 따라, 상기 접지수단(150)과 매설관(140)은 긴밀한 결합관계를 이루게 된다.Accordingly, the grounding means 150 and the buried pipe 140 has a close coupling relationship.

또한, 상기 접지수단(150)을 매설관(140)에 결합하면, 상기 접지수단(150)의 연결봉(157)이 매설관(140) 내부로 삽입되어 제2 접지볼(146)을 가압한다.In addition, when the grounding means 150 is coupled to the buried pipe 140, the connecting rod 157 of the grounding means 150 is inserted into the buried pipe 140 to press the second ground ball 146.

이와 같이 제2 접지볼(146)을 가압하면, 제1 접지볼(145)이 지면으로 돌출된 다.When the second ground ball 146 is pressed in this way, the first ground ball 145 protrudes to the ground.

이에 따라, 상기 인출선(20)을 통한 접지저항은 상기 제1 접지볼(145)을 통해 지면과이 접촉면적을 확장시킴으로써, 접지저항치를 효율적으로 낮출 수 있게 된다.Accordingly, the ground resistance through the lead wire 20 can be effectively lowered by extending the contact area between the ground and the ground through the first ground ball 145.

이후, 상기 매설편(110)의 상부에는 2조 1쌍의 고무판(160)을 안착시킨다. 이때, 상기 고무판(160)의 돌기(161)는 상기 매설편(110)의 슬릿홈(119)에 삽입연결된다.Thereafter, two sets of pairs of rubber plates 160 are seated on the buried piece 110. At this time, the protrusion 161 of the rubber plate 160 is inserted into the slit groove 119 of the buried piece 110.

여기서 상기 매설편(110)의 상부에 안착되는 고무판(160)은 전주(10)와 보행자 간의 일정 안전거리를 유지할 수 있도록 함과 동시에 전류의 도로 유출을 차단하여 감전사고를 미연에 방지하기 위한 것이다.Here, the rubber plate 160 seated on the upper portion of the buried piece 110 is to maintain a certain safety distance between the electric pole 10 and the pedestrian, and at the same time to block the leakage of the road to prevent electric shock. .

또한, 상기 케이스(170)는 상기 매설관(140)이 외부로 노출되는 것을 방지할 수 있도록 그 하부가 상기 절개홈(165)에 각각 삽입연결되어 직립상태를 유지하게된다. 이때, 상기 케이스(170)의 개구홈(173)에는 인출선이 유입되며, 상기 개구홈(173)과 인출선(20) 사이에는 밀폐링(175)이 연결된다.In addition, the case 170 has a lower portion inserted into the incision groove 165 so as to prevent the buried pipe 140 is exposed to the outside to maintain an upright state. At this time, a leader line flows into the opening groove 173 of the case 170, and a sealing ring 175 is connected between the opening groove 173 and the leader line 20.

이에 따라, 케이스(170) 내부로 이물질이 유입되는 것을 차단할 수 있게 된다.Accordingly, it is possible to block foreign matter from flowing into the case 170.

따라서, 본 발명의 전주용 접지판은 별도의 굴착작업 없이 전주 시공시 전주에서 인출된 인출선을 지면에 접지시킬 수 있으며, 지면과의 접촉면적을 확장시켜 효율적으로 접지저항치를 낮출 수 있게 된다. Therefore, the electric pole ground plate of the present invention can ground the lead wire drawn out from the pole pole on the ground during the construction of the pole without additional excavation work, it is possible to effectively lower the ground resistance value by expanding the contact area with the ground.

도 1은 본 발명의 바람직한 실시예에 따른 전주용 접지판을 나타낸 분해사시도,1 is an exploded perspective view showing a pole grounding plate according to a preferred embodiment of the present invention;

도 2는 본 발명의 바람직한 실시예에 따른 전주용 접지판을 나타낸 사시도,2 is a perspective view showing a pole grounding plate according to a preferred embodiment of the present invention;

도 3a 및 도 3b 는 도 2의 A부 확대도 및 작동상태도,3A and 3B are an enlarged view of an A portion and an operating state of FIG. 2;

도 4는 본 발명의 바람직한 실시예에 따른 전주용 접지판의 시공상태를 나타낸 단면도.Figure 4 is a cross-sectional view showing a construction state of the pole grounding plate according to an embodiment of the present invention.

<도면의 주요 부분에 대한 부호의 설명><Explanation of symbols for the main parts of the drawings>

10 : 전주 20 : 인출선10: pole 20: leader line

110 : 매설편 120 : 연결링110: buried 120: connection ring

130 : 연결편 140 : 매설관130: connection section 140: buried pipe

150 : 접지수단 160 : 고무판150: grounding means 160: rubber plate

170 : 케이스170: case

Claims (1)

전주(10)의 외주면과 접하게 지면에 매설시공할 수 있도록 내측에 반원홈(111)이 형성되고, 외주면에 수용홈(113)이 형성되며, 상기 수용홈(113)의 일측면에 체결볼트(115)가 양방향으로 돌출된 연결구(117)가 형성되고, 상기 반원홈(111)의 인접한 양측에 슬릿홈(119)이 일체로 형성된 2조 1쌍의 매설편(110)과,Semicircular groove 111 is formed on the inner side to be buried in the ground in contact with the outer circumferential surface of the electric pole 10, the receiving groove 113 is formed on the outer circumferential surface, the fastening bolt (one side of the receiving groove 113) The connector 117 protruding in both directions 115 is formed, two pairs of buried pieces 110 formed integrally with the slit groove 119 on both adjacent sides of the semi-circular groove 111, 상기 2조 1쌍의 매설편(110)을 서로 연결할 수 있도록 매설편(110)과 직교되게 수용홈(113)에 삽입연결되며, 양단부에 체결볼트(115)가 삽입되는 체결공(133)을 갖는 결합구(135)가 돌출형성되며, 내측에 베어링(141)이 연결된 한 쌍의 통공(137)이 형성된 2조 1쌍의 연결편(130)과,The fastening hole 133 is inserted into the receiving groove 113 to be orthogonal to the buried piece 110 so as to connect the two pairs of buried pieces 110 to each other, the fastening bolts 115 are inserted at both ends. A coupler 135 having a protrusion formed therein, and a pair of connecting pieces 130 having a pair of through holes 137 connected to the bearing 141 inside, 상기 전주(10)를 지지할 수 있도록 상기 베어링(141)의 내경에 회동가능하도록 연결되며, 외측에 다수개의 연결공(143)이 형성되고, 상기 각 연결공(143)에 연결바(144)가 삽입연결되어 연결바(144)의 양단에 지면으로 돌출되는 제1 접지볼(145)과 내부에 위치되는 제2 접지볼(146)이 용접고정되고, 제2 접지볼(146) 측의 연결바(144) 외주면에 탄성스프링(147)이 연결된 복수개의 매설관(140)과,Is rotatably connected to the inner diameter of the bearing 141 to support the electric pole 10, a plurality of connection holes 143 are formed on the outside, connecting bars 144 in each of the connection holes 143 Is inserted and connected to the first ground ball 145 protruding to the ground at both ends of the connection bar 144 and the second ground ball 146 located therein are welded and connected to the second ground ball 146 side And a plurality of buried pipe 140, the elastic spring 147 is connected to the outer peripheral surface of the bar 144, 상기 전주(10)에서 인출된 인출선(20)을 지면에 접지시킬 수 있도록 상기 매설관(140)의 상부에 연결덮개(153)의 결합볼트(151)가 볼트체결되고, 상기 연결덮개(153)의 내측에 상하로 개구된 연결홀(155)이 형성되어, 내주면 상부에 인출선(20)이 삽입되며, 내주면 하부에 연결봉(157)의 단부가 억지끼움방식으로 연결되어 상기 인출선(20)과 접속된 접지수단(150)과,The coupling bolt 151 of the connection cover 153 is bolted to the upper portion of the buried pipe 140 to ground the lead wire 20 drawn from the electric pole 10 to the ground, the connection cover 153 Connection hole 155 is opened up and down inside the inner), the leader line 20 is inserted into the upper inner circumferential surface, the end of the connecting rod 157 is connected to the lower inner circumferential surface in the interference fit method is the leader line (20) And grounding means 150 connected to 상기 전주(10) 주위를 통행하는 사람이 감전되는 것을 방지할 수 있도록 상기 매설편(110) 상부에 각각 안착되며, 하부에 상기 각 슬릿홈(119)에 삽입되는 한 쌍의 돌기(161)가 형성되고, 내측에 상기 매설관(140)이 삽입돌출되는 한 쌍의 결합공(163)이 형성되며, 상부에 복수개의 절개홈(165)이 형성된 2조 1쌍의 고무판(160) 및 A pair of protrusions 161 are respectively mounted on the buried piece 110 to be prevented from electric shock to the person passing around the electric pole 10, and inserted into each of the slit grooves 119 in the lower portion. And a pair of coupling holes 163 into which the buried pipe 140 is inserted and protruded from the inside thereof, and a pair of rubber plates 160 having a plurality of cutout grooves 165 formed thereon; 상기 매설관(140)이 외부로 노출되는 것을 방지할 수 있도록 상기 절개홈(165)에 삽입연결되며, 내측에 상기 매설관(140)이 수용되는 공간부(171)가 형성되고, 상부에 인출선(20)이 유입되는 개구홈(173)이 형성되며, 상기 개구홈(173)과 인출선(20) 사이에 밀폐링(175)이 연결된 복수개의 케이스(170)를 포함하여 구성됨을 특징으로 하는 전주용 접지판.Inserted and connected to the incision groove 165 to prevent the buried pipe 140 is exposed to the outside, a space portion 171 is formed therein is accommodated in the buried pipe 140 is formed, withdrawal at the top An opening groove 173 through which the line 20 flows is formed, and a plurality of cases 170 are connected between the opening groove 173 and the leader line 20 to include a sealing ring 175. Electric pole ground plate.
KR1020070083257A 2007-08-20 2007-08-20 Ground plate for electric pole KR100775849B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020070083257A KR100775849B1 (en) 2007-08-20 2007-08-20 Ground plate for electric pole

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020070083257A KR100775849B1 (en) 2007-08-20 2007-08-20 Ground plate for electric pole

Publications (1)

Publication Number Publication Date
KR100775849B1 true KR100775849B1 (en) 2007-11-12

Family

ID=39061862

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020070083257A KR100775849B1 (en) 2007-08-20 2007-08-20 Ground plate for electric pole

Country Status (1)

Country Link
KR (1) KR100775849B1 (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100846132B1 (en) 2008-02-21 2008-07-14 최원영 Ground apparatus of electric wiring
KR100857151B1 (en) 2008-05-26 2008-09-10 (주)경전기술감리단 Ground installations for transmission electric pole
KR100882568B1 (en) 2008-10-21 2009-02-12 주식회사 동북아기술 Earth plate of electric supply poles
KR200448141Y1 (en) * 2009-08-28 2010-03-18 유재현 Ground for electric pole using the meterialdecreasing the shaped ground resistance

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100399875B1 (en) 2001-07-19 2003-10-10 창명중전기 주식회사 Equipment method of ground plate for electric pole and ground plate thereof
JP2005135721A (en) 2003-10-30 2005-05-26 Sankosha Corp Grounding device and its execution method
KR200433150Y1 (en) 2006-09-29 2006-12-11 최경식 upholder for street lamppost
KR100673388B1 (en) 2006-10-23 2007-01-24 이이순 The electric pole high-pressure point undergroundwhole line for subterranean laying under the ground
KR100733390B1 (en) 2007-03-28 2007-06-29 주식회사 세종감리 Electric pole support for subterranean laying under the ground

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100399875B1 (en) 2001-07-19 2003-10-10 창명중전기 주식회사 Equipment method of ground plate for electric pole and ground plate thereof
JP2005135721A (en) 2003-10-30 2005-05-26 Sankosha Corp Grounding device and its execution method
KR200433150Y1 (en) 2006-09-29 2006-12-11 최경식 upholder for street lamppost
KR100673388B1 (en) 2006-10-23 2007-01-24 이이순 The electric pole high-pressure point undergroundwhole line for subterranean laying under the ground
KR100733390B1 (en) 2007-03-28 2007-06-29 주식회사 세종감리 Electric pole support for subterranean laying under the ground

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100846132B1 (en) 2008-02-21 2008-07-14 최원영 Ground apparatus of electric wiring
KR100857151B1 (en) 2008-05-26 2008-09-10 (주)경전기술감리단 Ground installations for transmission electric pole
KR100882568B1 (en) 2008-10-21 2009-02-12 주식회사 동북아기술 Earth plate of electric supply poles
KR200448141Y1 (en) * 2009-08-28 2010-03-18 유재현 Ground for electric pole using the meterialdecreasing the shaped ground resistance

Similar Documents

Publication Publication Date Title
KR100818938B1 (en) Ground plate for electric pole
KR100713698B1 (en) Ground plate for electric pole
KR100820061B1 (en) Ground structure for electric pole
KR100983015B1 (en) Damaged perceiving equipment underground
KR100815166B1 (en) Ground plate for electric pole
KR100857151B1 (en) Ground installations for transmission electric pole
KR100775849B1 (en) Ground plate for electric pole
KR102362838B1 (en) Moving type precasted pad for transformer
KR20110097556A (en) Apparatus for grounding circular concrete ground electrode and construction method therefor
KR100846132B1 (en) Ground apparatus of electric wiring
KR100708295B1 (en) Ground plate for electric pole
KR101124965B1 (en) Integral ground manhole structure
KR100879304B1 (en) Ground apparatus for electric wire
US20220399708A1 (en) Apparatus and method for diagonal grounding
KR20030047909A (en) Ground plate for electric pole
KR101171059B1 (en) Ground apparatus of electric wiring
KR100854336B1 (en) Ground plate for electric pole
KR200444665Y1 (en) Support of earth for electric pole
KR200267212Y1 (en) Ground plate for electric pole
KR100754488B1 (en) Earth unit and earth method using the same
CN208874243U (en) A kind of pipe gallery lightning arrester
KR100818149B1 (en) Ground plate for electric pole
KR100399875B1 (en) Equipment method of ground plate for electric pole and ground plate thereof
KR200249957Y1 (en) Ground plate for electric pole
KR200297072Y1 (en) Earth Copper Rod Structure for Electric Power Distribution Line

Legal Events

Date Code Title Description
A201 Request for examination
A302 Request for accelerated examination
N231 Notification of change of applicant
N231 Notification of change of applicant
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20120904

Year of fee payment: 6

FPAY Annual fee payment

Payment date: 20131022

Year of fee payment: 7

FPAY Annual fee payment

Payment date: 20141019

Year of fee payment: 8

FPAY Annual fee payment

Payment date: 20150925

Year of fee payment: 9

FPAY Annual fee payment

Payment date: 20171025

Year of fee payment: 11

FPAY Annual fee payment

Payment date: 20181024

Year of fee payment: 12

FPAY Annual fee payment

Payment date: 20191022

Year of fee payment: 13