KR100771465B1 - Large tetrapot construction method - Google Patents
Large tetrapot construction method Download PDFInfo
- Publication number
- KR100771465B1 KR100771465B1 KR1020040005205A KR20040005205A KR100771465B1 KR 100771465 B1 KR100771465 B1 KR 100771465B1 KR 1020040005205 A KR1020040005205 A KR 1020040005205A KR 20040005205 A KR20040005205 A KR 20040005205A KR 100771465 B1 KR100771465 B1 KR 100771465B1
- Authority
- KR
- South Korea
- Prior art keywords
- open
- rope
- door
- construction method
- molding
- Prior art date
Links
- 238000010276 construction Methods 0.000 title claims description 12
- 238000000465 moulding Methods 0.000 claims abstract description 8
- 230000002265 prevention Effects 0.000 claims description 5
- 238000009434 installation Methods 0.000 claims description 2
- 238000000034 method Methods 0.000 abstract description 11
- 239000002759 woven fabric Substances 0.000 abstract description 2
- 230000005540 biological transmission Effects 0.000 description 5
- 238000004519 manufacturing process Methods 0.000 description 4
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 4
- 239000004575 stone Substances 0.000 description 3
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 description 2
- 238000010168 coupling process Methods 0.000 description 2
- 238000005859 coupling reaction Methods 0.000 description 2
- 230000008569 process Effects 0.000 description 2
- 238000005086 pumping Methods 0.000 description 2
- 229920003002 synthetic resin Polymers 0.000 description 2
- 239000000057 synthetic resin Substances 0.000 description 2
- 241000272525 Anas platyrhynchos Species 0.000 description 1
- 241000272194 Ciconiiformes Species 0.000 description 1
- 230000009471 action Effects 0.000 description 1
- 230000008901 benefit Effects 0.000 description 1
- 230000002860 competitive effect Effects 0.000 description 1
- 230000008878 coupling Effects 0.000 description 1
- 238000005553 drilling Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 239000000835 fiber Substances 0.000 description 1
- 238000009415 formwork Methods 0.000 description 1
- 229910052742 iron Inorganic materials 0.000 description 1
- 230000007246 mechanism Effects 0.000 description 1
- 238000003825 pressing Methods 0.000 description 1
- 238000003860 storage Methods 0.000 description 1
- 239000000126 substance Substances 0.000 description 1
- 239000003643 water by type Substances 0.000 description 1
Images
Classifications
-
- H—ELECTRICITY
- H05—ELECTRIC TECHNIQUES NOT OTHERWISE PROVIDED FOR
- H05B—ELECTRIC HEATING; ELECTRIC LIGHT SOURCES NOT OTHERWISE PROVIDED FOR; CIRCUIT ARRANGEMENTS FOR ELECTRIC LIGHT SOURCES, IN GENERAL
- H05B6/00—Heating by electric, magnetic or electromagnetic fields
- H05B6/64—Heating using microwaves
- H05B6/647—Aspects related to microwave heating combined with other heating techniques
- H05B6/6482—Aspects related to microwave heating combined with other heating techniques combined with radiant heating, e.g. infrared heating
Landscapes
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Revetment (AREA)
Abstract
해양 구조물이나 각종 형태의 소파 불럭들이 대형 파도에 밀리고 유실, 붕괴 등의 사고가 빈발 하는데도 확고한 대책이 없는데 이는 이들 해양 구조물들을 대형으로 성형,이동,투하 하는 분야에서 기술적으로 미흡한 탓이며 이들 해양 구조물이나 소파 블록 등을 대형화 하면 해소 될수 있는 애로임을 확인한 본 발명은 각종 소파 블록 등을 직포제 ( 織布製 )틀에 콘크리트를 충진 성형 하는 장소를 특수 작업 선상에 설치 성형되는 즉시 투입문을 열어서 하강시키는 성형 투하 방법과 그 장치를 구성한 것으로 본 발명 방법과 그 장치로서 애로를 타개하게 한 것이다There is no firm countermeasure even when offshore structures and various types of sofa blocks are pushed by large waves and frequent accidents such as loss and collapse are due to the technical insufficiency in forming, moving, and dropping these offshore structures. The present invention confirmed that the problem that can be solved by increasing the size of the sofa block, such as to place a variety of sofa blocks, such as filling the concrete in a woven fabric frame on a special work line to open and lower the input door immediately after molding The molding drop method and the device are constituted so as to break the bottle as the method and the device of the present invention.
해양구조물, 테트라포트,Offshore Structure,
Description
도 1은 본 발명 방법 테트라 포트를 제조 하여 구축하는 작업선 설명도1 is an explanatory view of a working line for manufacturing and constructing a method tetrapot according to the present invention;
도 2는 동 장치의 요부를 확대한 사시도2 is an enlarged perspective view of the main portion of the apparatus;
도 3은 동 장치의 신축각을 확대한 측면도3 is an enlarged side view of the expansion angle of the device;
도 4는 도 3의 종단면도4 is a longitudinal cross-sectional view of FIG.
도 5는 본 발명이 개발한 테트라포트의 사시도5 is a perspective view of a tetrapot developed by the present invention
도 6은 본 발명이 개발한 호안 블록의 사시도Figure 6 is a perspective view of the revetment block developed by the present invention
도면중 주요 부분의 부호 설명Explanation of Signs of Main Parts in Drawings
1 - 외피 2,2",3,3",4- 접편 2',2''',3',3''',4' - 과팽창방지로우프1-Sheath 2,2 ", 3,3", 4- Fold 2 ', 2' '', 3 ', 3' '', 4 '-Overexpansion prevention rope
5 - 중심선 6 - 주입구 7 - 설편 8 - 역류방지조5-Centerline 6-Inlet 7-tongue 8-Backflow prevention tank
9,10 거치조 11,11' - 들고리 12 - 밴드 13,14 - 경첩9,10
15,15' -개폐문비 16,17,18,19 - 윈찌 20 - 와이어 로우프15,15 '-Door opening and closing 16,17,18,19-Winch 20-Wire rope
21 - 천정틀 22 - 윈찌 23 - 권양 로우프 24,25,26 - 로우프21-Ceiling 22-Winch 23-Winged Rope 24,25,26-Rope
27,28,29 - 카프링 30 - 스프링 31 - 소레노이드 32 - 압송 호우스27,28,29-Coupling 30-Spring 31-Solenoid 32-Pressure House
33,33',33" - 들고리 34 - 제 1 횡축 35 - 제 1 관절 36 - 웜기어33,33 ', 33 "-Rib 34-1st horizontal axis 35-1st joint 36-Worm gear
37 - 제 2 관절 38 - 제 1 단축 39 - 제 2 단축 40 - 제 3 관절37-2nd joint 38-1st short axis 39-2nd short axis 40-3rd joint
41 - 체인기어 42 - 체인 43 - 웜기어 44 - 체인기어 45 - 웜기어41-Chain Gear 42-Chain 43-Worm Gear 44-Chain Gear 45-Worm Gear
46 - 체인기어 47 - 체인기어 48 - 체인 49 - 체인기어46-CHAIN GEAR 47-CHAIN GEAR 48-CHAIN 49-CHAIN GEAR
50 - 균형 프레임 51 - 무한궤도 52,53 - 전후횡축50-Balanced Frame 51-
54,55 - 동력전달축 56 - 베벨기어 57 - 체인기어 58 - 판축54,55-Power transmission shaft 56-Bevel gear 57-Chain gear 58-Plate shaft
59 - 체인 60,61 - 체인기어 62 - 체인 63 - 체인기어59-Chain 60,61-Chain Gear 62-Chain 63-Chain Gear
64 - 체인 65 - 체인기어 66 -웜기어64-Chain 65-Chain Gear 66-Worm Gear
종래 거푸집에 콘크리트를 주입하여 성형하는 테트라포트는 운반과 축조 과정에 난점이 있어서 대형화 하지 못하였고 이들 소형의 소파 ( 消波 ) 불럭은 가벼워서 파도에 밀려서 동요 하므로 파손 붕괴등의 사고로 수명이 단축 되며 주변에 커다란 피해를 주는 폐단이 있었으나 종래의 기술은 그 난점을 극복 하지 못하고 그의 대책에 고심하고 있었다Conventional tetra-port that is formed by injecting concrete into the formwork has difficulty in transportation and construction, and cannot be enlarged. These small sofa blocks are light and shaken by waves, which shortens the life due to accidents such as breakage collapse. There was a great deal of damage to the surrounding area, but the conventional technology did not overcome the difficulties and struggled with his countermeasures.
본 발명은 파도에 밀리지 않는 각종해양 구조물이나 대형 테트라 포트등을 해상 현장에서 수중에서나 선상에서 성형하여 그 즉석에서 수하( 垂下 ) 축조 할 수 있는 안전하고 효율적인 방법과 그 장치를 얻을 수 있는 기술을 구성하는 것을 기술적 과제로 한다The present invention constitutes a safe and efficient method for forming various marine structures or large tetra pots, which are not pushed by the waves, in the sea or in the water at sea, and immediately constructing them on the fly. It is technical problem to do
A. 구성A. Configuration
본 발명을 구성함에 있어서 소파 블록 중에서 대표적인 테트라포트를 택하였고 성형 장소는 축조 예정지로 선정된 현장에 보행 기능을 겸비한 작업선을 구성 배치하고 그 선상에서 직포제 ( 織布製 ) 외피 내에 콘크리트를 주입하여 완성 되면서 즉시 하향 문비를 열고 그대로 수하하여 소파제 ( 消波提 )를 축조 하는 방법을 구성 하였으므로 그 방법을 실시 할수 있는 장치를 구성 하는 것이다In constructing the present invention, a representative tetrapot was selected among the sofa blocks, and the molding place was formed by arranging a work line having a walking function on the site selected as the construction site, and injecting concrete into the woven fabric on the line. As soon as it was completed, it opened a downward door door and drove it as it was, so it constructed a method of constructing a sofa (으므로 波提).
먼저 본 발명 방법으로 설치 할 테트라포트를 구성하되 튼튼한 화섬직포로 공지형의 테트라포트의 외피 ( 1 )을 5도와 같이 만들어서 수평형 삼방향 돌각 ( 突角 )과 수직형 돌각 들의 결합 기점에 잘록하게 요입되는 부분에 접편 ( 2 ) ( 3 ) ( 4 )를 부착하고 이에 형상 유지를 위하여 과팽창방지로우프 ( 2' ) ( 2''') ( 3 ') ( 3''') ( 4')들을 봉착하여 그 끝을 중심점 ( 5 )에 결속 하여 콘크리트를 주입 하였을때 형태를 정형 ( 整型 )으로 잡아 주게하고 수직형 돌각의 상단에 콘크리트 주입구를 뚤코 이를 덮을 만한 설편 ( 舌片 ) ( 7 )을 형성 하여 역류 방지조 ( 逆流 防止爪 ) ( 8 ) 수개를 거치상 으로 돌설한 합성수지제 거치조 ( 鋸置條 ) ( 9 ) ( 10 ) 두가닦의 후단을 설편 ( 7 ) 봉착 하고 그 선단을 주입구 ( 6 ) 속으로 넣어서 하측 외부로 뽑아내어 이들을 ㄷ 자로 연결 하였으며 수평형돌각에는 합성수지제 끈으로 들고리 ( 11 ) ( 11')를 연결한 밴드 ( 12 )로 하부를 감싸서 들고리 ( 11 ) ( 11')만이 돌각의 좌우에 냄비 손잡이 형태로 부착하여First, the tetrapot to be installed by the method of the present invention is constructed, but the outer shell of the known tetrapot (1) is made of 5 degrees with a strong chemical fiber, so as to cut at the starting point of the horizontal three-way turning and the vertical turning. (2) (3) (4) attached to the recessed part and over-expansion prevention rope (2 ') (2' '') (3 ') (3' '') (4 ') to maintain shape Seals and bind the ends to the center point (5) to hold the shape as a shape when injecting concrete and to cover the concrete inlet at the top of the vertical stone carb (7) (8) Synthetic resin holding tank (9) (10) which seals the rear end of duplex brush (7) and seals its tip. Insert into the inlet (6) and pull it out to the bottom and connect them with c In the horizontal stone angle, the bottom was wrapped with a band (12) connected with a hook made of synthetic resin (11) (11 '), and only the edge (11) (11') was attached to the left and right sides of the stone in the form of a pot handle.
완성 후에 들어 옮기기 편리하게 준비하고 작업선에 성형 수하 장치를 설치한다 즉 선체의 갑판에 사각형 수하구를 뚫고 그양변에 경첩 ( 13 ) ( 14 ) 로 개폐문비 ( 15) ( 15')를 닫으면 그 접경이 서로 맏 물리게 하여 윈치 ( 16 ) ( 17 )는 개폐문비 ( 15 )를, 윈찌 ( 18 ) ( 19 )는 개폐문비 ( 15')를 와이어 로우프 ( 20 )들로써 개폐작용을 하게 하고 닫혀진 개폐문비 ( 15 ) ( 15')의 상면 중앙에 아직 콘크리트를 주입하지 아니한 테트라포트의 외피 ( 1 )를 도 2와 같이 안치하고 수하구 주위의 네개의 지주위에 옥개와 함께 설치한 천정틀 ( 21 )에서 윈찌 ( 22 )로 권양한 권양 로우프 ( 23 )에 매어달은 정 ( 井 )형 승강 틀에 삼각형 위상으로 결착한 로프 ( 24 ) ( 25 ) ( 26 ) 들의 하단에 카프링 ( 27 ) ( 28 ) ( 29 )을 결착 하였는데 이들은 상단을 관착한 좌우 꺽쇠의 하부를 스프링 ( 30 )으로 항상 다물게 탄설 하고 모두를 해제 할때는 솔레노이드 ( 31 )로 벌려 주게 구성하였고 이로써 테트라포트들을 도 2 와 같이 수평형틀 돌각의 들고리 ( 11 ) ( 11')들에 각각걸어서 스프링 ( 30 )의 탄력으로 굳게 잠그고 있게하고 주입구 ( 6 )에 콘크리트 압송 호오스 ( 32 )의 선단을 깊숙히 삽입하여 콘크리트를 팽창되게 압입한다 이렇게 하여 테트라포트의 외피가 팽팽히 팽창하였으면 콘크리트 압송 호오스를 빼내고 거치조 ( 9 ) ( 10 )의 전단의 ㄷ자형의 결속부를 당기어 역류방지조 ( 逆流防止爪 ) ( 8 )가 외면에 빠져나오게 하면 주입구 ( 6 )는 설편 ( 7 )이 폐쇄 되며 윈찌 ( 16 ) ( 17 ) ( 18 ) ( 19 )로 와이어로우프 ( 20 )들을 누추면 개폐문비 ( 15 ) ( 15')가 도 1의 가상선 표시와 같이 하향 개방되므로 이때 천정의 윈찌 ( 22 ) 권양 로프 ( 23 )을 느추어주면 테트라포트가 가상선 표시와 같이 수하된다 소망하는 위치에 안정 자세로 놓였는지를 확인하면 솔레노이드 ( 31 )로 카프링의 좌우꺽쇠를 벌리고 권양 로우프 ( 23 )을 권양 하면 카프링들은 들고리와 분리되고 테트라포트는 축조 예정지점에 축조 완료된 것이다 여타 형태의 호안 블록등 해양 구조물을 축조 할 경우에도 각각의 형태 외피 내측에는 과팽창방지로우프 ( 2') ( 2''') ( 3' ) ( 3''') (4' )를 설치 당초의 형태를 유지케하며 외피에 설치된 들고리 ( 33 ) ( 33' ) ( 33")를 카프링으로 걸어서 반복 제작 작업을한다After completion, it is easy to move and prepare a forming baggage device on the work line, that is, by drilling a rectangular sewer on the deck of the hull (13) (14) and closing the opening door (15) (15 ') with hinges on both sides. The winch (16) (17) opens and closes the door (15) and the winch (18) (19) opens and closes with wire ropes (20). (15) In the ceiling frame (21), the outer shell of tetrapot (1), which has not yet been infused with concrete, is placed in the center of the upper surface of (15 ') as shown in FIG. On the bottom of the ropes (24) (25) (26) bound in a triangular phase to the hoisting lifting frame (23) suspended by a winch (22) (27) (28) ( 29), and they spring on the lower part of the left and right clamps 30) Always hold it tightly and open it with solenoid (31) when releasing all of them. Thus, the tetraports are hanged on the hooks (11) (11 ') of horizontal frame angles as shown in FIG. And firmly insert the tip of the concrete pumping hose (32) into the inlet (6) so that the concrete is inflated.In this way, if the shell of the tetrapot has been expanded, remove the concrete pumping hose and place it (9). Pull the c-shaped binding section at the front end of (10) and let the non-return tank (8) come out of the outer surface.The inlet (6) closes the tongue piece (7) and the winch (16) (17) ( 18) Pressing the wire ropes (20) with (19) will open and close the door opening (15) (15 ′) as shown in the phantom line of FIG. 1. Give me te The traport is dropped as shown by the phantom line. After checking that the position is in a stable position in the desired position, open the left and right brackets of the coupling with the solenoid (31) and the lifting rope (23). (2 ') (2') (3 ') (3') inside the outer shell of each type of shell, even when constructing other structures such as shore revetment blocks. (4 ') to maintain the original shape (33') (33 ') (33') (33 ") installed on the outer shell to repeat the work of manufacturing
블록의 축조 지점을 옴기려면 작업선을 이동시키는데 수심이 깊은 해역에서는 다수의 앵커를 이용하여 예인 이동하며 수심이 얕은 연안지대에서는 체인 구동식 다관절 ( 多關節 ) 신축각 ( 伸縮脚 ) 을 사용한다To move the construction point of the block, the working line is moved. In deep waters, towing is carried out using multiple anchors. In shallow coastal areas, chain-driven multi-joint telescopic angles are used.
신축각은 선체의 전후좌우의 제 1 횡축 ( 34 )에 철제 찬넬 제1관절( 35 )의 상단을 관축에 고정하여서 유삽 ( 遊揷 )하고 그 관축에 웜기어 ( 36 )을 고정하여 웜으로 제1 관절 ( 35 )을 횡축 ( 34 ) 중심으로 호동 ( 弧動 ) 시키게 하고 제1 관절의 하단에 제 2 관절 ( 37 )의 상단을 제 1단축 (38) 으로 관착하여 제 1 단 축 (38)은 제 2 관절 ( 37 )에 고정하고 그하단에 관착한 제 2단축 ( 39 )에 제 3 관절 ( 40 )의 상단을 관착하며 제 1 단 축 ( 38 )의 외단에 고정한 체인기어 ( 41 )에 체인 ( 42 ) 을 걸어서 제 1 횡축 ( 34 ) 에 관축으로 유삽한 체인기어에 걸고 그 관축에 고정하여 제 1 횡축 ( 34 )에 유삽한 웜기어 ( 43 )을 웜으로 회전하여 제 2 관절 ( 37 )의 호동 작용을 시키게 하였으며 그 내측에 체인기어 ( 44 )와 웜기어 ( 45 )를 동일 관축에 고정하여 제 1 횡축( 34 )에 유삽하여 웜으로 회전 시키며 그 체인 하단은 체인기어 ( 46 )에 걸고 이와 동일 관축 에 고정한 체인기어 ( 47 )에 체인기어 ( 48 )을 걸어서 그 하단을 제 2 단축 ( 39 )에 고정한 체인기어 ( 49 )에 걸어서 제 3 관절 ( 40 )의 하단을 호동시키게 하여서 도 3 의 가상선 표시와 같이 절첩 또는 개장하게 하고 제 3 관절 ( 40 )의 하단에 무한 궤도 4륜차 를 설치한다 즉 제 3 관절 ( 40 )의 하단에 좌우 균형프레임 ( 50 )의 중간 지점을 축설하고 그전후 체인기어에 체인 무한 궤도 ( 51 )을 전락하고 그들의 전후 횡축 ( 52 )( 53 )의 중간의 데후에 동력 전달 피니언을 보통차량의 차동장치의 구성으로 하고 전후 동력 전달축 ( 54 ) (55 )는 제 3 관절의 하부의 베벨기어 ( 56 )와 체인기어 ( 57 )을 동일 관축 ( 58 ) 에 고정하여 제 3 관절 ( 40 )축설 하였으며 전후 동력 전달축 ( 54 ) (55 )는 스프라인 신축 기구로 되어있고 상측의 동력 전달은 베벨기어 ( 56 )과 동일 관축에 고정하여 제3 관축 ( 58 )에 유설한 체인기어 ( 57 )에 체인 ( 59 )를 걸어서 그 상단을 체인기어 ( 60 )에 걸고 이와 동일 관축에 고정한 체인기어 ( 61 )에 체인 ( 62 )을 걸고 이와 동일 관축에 고정한 체인기어 ( 63 )에 체인 ( 64 )을 걸고 그상단을 제1 횡축( 34 )에 관축으로 유삽한 체인기어 ( 65 )에 걸고 이와 동일 관축에 고정한 웜기어 ( 66 )을 웜으로 회전하여 그 동력을 하단의 무한 궤도 차량에 전달하게 구성한 것이다The telescopic angle is fixed by inserting the upper end of the iron channel first joint (35) on the first axis (34) in front, back, left, and right of the hull on the tube axis and inserting the worm gear (36) on the tube axis. The
B 작용B action
상기와 같이 구성한 본 발명 방법을 대형 테트라포트를 축조하는 현장의 작업선상에서 직포제 외피속에 콘크리트를 주입 성형하여 하향 개폐문을 열고 윈찌 ( 22 )로 로우프 ( 23 )을 느춰주며 테트라포트가 소정의 축조 위치에 놓여지는 방법이므로 초대형 테트라포트도 즉석에서 성형 축조 하는데 이들 장치가 극히 합리적으로 작용을 하여 종래 난점으로 여기는 초대형 블록을 손쉽게 제조 구축까지 해내며 신축각들을 활용해서 네발가진 짐승의 걸음 모양으로 1좌적각-우후각 2우전각-좌후각 식으로 보행 하거나 네개각을 직립 상태에서 족부의 무한궤도만 작용시켜서 썰매를 타듯이 보행하거나 경사면에서 한쪽 신축 각은 절반쯤 절첩하여 선체의 수평을 유지 시킬 수 있어서 수심의 깊거나 지반의 불균일 지대에서 소파 블록 등 해양 구조물을 성형 동시에 축조하는 작업을 신속히 수행 할수있다The method of the present invention configured as described above is formed by injecting and molding concrete into a woven shell on a work line on a site for constructing a large tetrapot, opening and closing a downward opening and closing door (23) by a winch (22), and a tetrapot for a predetermined construction. Because it is placed in position, the super-large tetrapots are also built and constructed on the fly, and these devices work extremely reasonably, making it easy to manufacture and construct a super-large block that is considered a conventional difficulty. You can walk with left angle-
본 발명 방법과 그 장치를 동원하면 수심이 얕은 지대에서는 신축각을 이용 적절하게 부력을 유지하며 황새와 같이 서서 작업을 하고 수심이 깊은 지역에서는 오리 같이 물에 떠서 작업을 성형즉시 현장에서 축조하는 식이어서 별도로 제품 양생 기간이나 설치 장소와 대형 운반 장비가 없이 콘크리트를 계속 공급하면 테트라포트등 해양 구조물의 성형 축조 완료시 까지 계속 작업을 해서 종래 제조 보관 운반 축조등 다단계 과정을 단일 과정으로 축소 시켜서 시간적,경제적, 타기업과의 경쟁면에서 우위를 점할 수 있는 효과를 가겨오는 유익한 방법과 장치이다When the method and the apparatus of the present invention are mobilized, a buoyant angle is used to maintain buoyancy properly in a shallow water zone, and work like a stork, and float in water like a duck in a deep water area to form a work on the spot immediately. If the concrete is continuously supplied without product curing period or installation place and large transportation equipment, it continues to work until the completion of molding construction of offshore structures such as tetra-port, and reduces the multi-step process such as conventional manufacturing storage transportation construction to a single process. It is a profitable method and device that can bring economic and competitive advantage to other companies.
Claims (3)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020040005205A KR100771465B1 (en) | 2004-01-27 | 2004-01-27 | Large tetrapot construction method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020040005205A KR100771465B1 (en) | 2004-01-27 | 2004-01-27 | Large tetrapot construction method |
Publications (2)
Publication Number | Publication Date |
---|---|
KR20050077233A KR20050077233A (en) | 2005-08-01 |
KR100771465B1 true KR100771465B1 (en) | 2007-10-30 |
Family
ID=37264793
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1020040005205A KR100771465B1 (en) | 2004-01-27 | 2004-01-27 | Large tetrapot construction method |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR100771465B1 (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101137524B1 (en) | 2011-11-25 | 2012-04-20 | 주식회사 삼안 | The collecting device of dissipating block |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP0399090A2 (en) | 1989-05-24 | 1990-11-28 | JOSEF MÖBIUS BAUGESELLSCHAFT (GmbH & Co.) | Float for hydraulic engineering works |
JPH09143956A (en) * | 1995-11-17 | 1997-06-03 | Penta Ocean Constr Co Ltd | Method for forming water-impervious layer on revetment and bag therefor |
-
2004
- 2004-01-27 KR KR1020040005205A patent/KR100771465B1/en not_active IP Right Cessation
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP0399090A2 (en) | 1989-05-24 | 1990-11-28 | JOSEF MÖBIUS BAUGESELLSCHAFT (GmbH & Co.) | Float for hydraulic engineering works |
JPH09143956A (en) * | 1995-11-17 | 1997-06-03 | Penta Ocean Constr Co Ltd | Method for forming water-impervious layer on revetment and bag therefor |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101137524B1 (en) | 2011-11-25 | 2012-04-20 | 주식회사 삼안 | The collecting device of dissipating block |
Also Published As
Publication number | Publication date |
---|---|
KR20050077233A (en) | 2005-08-01 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR100982970B1 (en) | Breakwater construction method using waved shape caisson | |
US8496406B2 (en) | Positioning a sinking tunnel section | |
JPH05503124A (en) | Method and apparatus for constructing artificial islands and islands thus obtained | |
CN107926802A (en) | A kind of floatable deep-sea air bag aquaculture net cage | |
KR100771465B1 (en) | Large tetrapot construction method | |
US3922868A (en) | Deep water platform construction | |
US3706206A (en) | Lightweight readily portable underwater habitation and method of assembly and emplacement | |
US4038830A (en) | Modular geometric offshore structures system | |
US4147036A (en) | Scissor well template | |
US559116A (en) | baldwin | |
US3442239A (en) | Submergible stabilizer for barges | |
CN109083168B (en) | Simple earth-rock cage bag cofferdam | |
US9879394B2 (en) | Herodotus machine | |
CN208647111U (en) | Wind wave prevention marine devices | |
US3948056A (en) | Modular offshore structure system | |
US3253417A (en) | Marine structure and method of erecting same | |
US2562431A (en) | Mobile amphibious collapsible pontoon bridge | |
WO2019011177A1 (en) | Flexible dam having cables, and enhancement method therefor | |
RU197531U1 (en) | INSTALLATION FOR STORAGE AND TRANSPORTATION OF BOATS | |
KR101588608B1 (en) | Rigid packaging of heavy tonbaek possible using the same method | |
US547024A (en) | Shore or bank protector and apparatus for constructing and placing same | |
RU2623626C1 (en) | Device for prevention of underwater leaks from oil wells and localization on the water surface | |
KR102252153B1 (en) | Underwater Geotextile Tube Construction Apparatus and Method | |
CN207791081U (en) | A kind of self-floating garden landscape lookout terrace | |
US7520231B2 (en) | Watercraft lock |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A201 | Request for examination | ||
E902 | Notification of reason for refusal | ||
E601 | Decision to refuse application | ||
AMND | Amendment | ||
J201 | Request for trial against refusal decision | ||
AMND | Amendment | ||
E801 | Decision on dismissal of amendment | ||
E801 | Decision on dismissal of amendment | ||
B601 | Maintenance of original decision after re-examination before a trial | ||
J301 | Trial decision |
Free format text: TRIAL DECISION FOR APPEAL AGAINST DECISION TO DECLINE REFUSAL REQUESTED 20060712 Effective date: 20070530 |
|
S901 | Examination by remand of revocation | ||
GRNO | Decision to grant (after opposition) | ||
GRNT | Written decision to grant | ||
FPAY | Annual fee payment |
Payment date: 20111028 Year of fee payment: 5 |
|
LAPS | Lapse due to unpaid annual fee |