KR100763033B1 - A prestressing soil nailing structure - Google Patents

A prestressing soil nailing structure Download PDF

Info

Publication number
KR100763033B1
KR100763033B1 KR1020070025224A KR20070025224A KR100763033B1 KR 100763033 B1 KR100763033 B1 KR 100763033B1 KR 1020070025224 A KR1020070025224 A KR 1020070025224A KR 20070025224 A KR20070025224 A KR 20070025224A KR 100763033 B1 KR100763033 B1 KR 100763033B1
Authority
KR
South Korea
Prior art keywords
pipe reinforcement
reinforcement
pipe
ground
prestressing
Prior art date
Application number
KR1020070025224A
Other languages
Korean (ko)
Other versions
KR20070061487A (en
Inventor
양영훈
임해식
Original Assignee
양영훈
김동석
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 양영훈, 김동석 filed Critical 양영훈
Priority to KR1020070025224A priority Critical patent/KR100763033B1/en
Publication of KR20070061487A publication Critical patent/KR20070061487A/en
Application granted granted Critical
Publication of KR100763033B1 publication Critical patent/KR100763033B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/74Means for anchoring structural elements or bulkheads
    • E02D5/80Ground anchors
    • E02D5/801Ground anchors driven by screwing
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D3/00Improving or preserving soil or rock, e.g. preserving permafrost soil
    • E02D3/12Consolidating by placing solidifying or pore-filling substances in the soil
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2250/00Production methods
    • E02D2250/0046Production methods using prestressing techniques

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Agronomy & Crop Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Soil Sciences (AREA)
  • Piles And Underground Anchors (AREA)
  • Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)

Abstract

본 발명은 지반의 침하나 토사의 유실로 안정성이 떨어지는 것을 보완하기 위해 이용되는 보강재에 관한 것으로, 특히 토사의 무너짐이나 암벽으로부터의 낙석을 방지하기 위해, 파이프 보강재의 내주 중앙에 리바 또는 강봉을 설치하고, 조임캡으로 조임으로써 파이프 보강재의 인장력을 향상시키는 쏘일 네일링 구조 및 파이프 보강재의 내주 중앙에 PC강연선을 설치하고, 이 PC강연선을 인장함으로써 파이프 보강재의 인장력을 향상시키는 쏘일 네일링 구조에 관한 것이다.The present invention relates to a reinforcing material used to compensate for the lack of stability due to sedimentation of soil or loss of soil. In particular, a rebar or steel bar is provided at the inner circumference of a pipe reinforcing material to prevent soil collapse and rockfall. And a nail nailing structure for improving the tensile strength of the pipe reinforcement by tightening with a tightening cap, and installing a PC strand in the center of the inner circumference of the pipe reinforcement, and a saw nailing structure for improving the tensile strength of the pipe reinforcement by tensioning the PC strand. will be.

본 발명의 보강재에 있어서, 지반의 배면 압력을 견디도록 파이프 보강재가 지반에 천공된 홀에 삽입되고, 이 삽입된 파이프 보강재의 외주면에 압축 또는 인장 프리스트레싱을 작용시켜 파이프 보강재에 발생하는 인장응력을 상쇄시키고, 굴착면의 변위가 이동되는 것을 억제한다. 이로써, 토사의 무너짐이나 암벽으로부터의 낙석을 방지할 수 있는 보다 안정적인 보강 구조체를 지반에 설치할 수 있다.In the reinforcement of the present invention, a pipe reinforcement is inserted into a hole drilled in the ground to withstand the back pressure of the ground, and the compression or tensile prestressing is applied to the outer circumferential surface of the inserted pipe reinforcement to offset the tensile stress generated in the pipe reinforcement The displacement of the excavation surface is suppressed. As a result, a more stable reinforcing structure capable of preventing the soil from falling down and falling rocks from the rock walls can be provided on the ground.

Description

프리스트레싱 쏘일 네일링 구조{A prestressing soil nailing structure}A prestressing soil nailing structure

도 1a는 종래의 쏘일 네일링에 이용되는 보강재의 상세도이고, 도 1b는 종래의 보강재가 쏘일 네일링에 의해 암벽에 설치된 측면도이다.Figure 1a is a detailed view of the reinforcing material used in conventional saw nailing, Figure 1b is a side view of a conventional reinforcement installed on the rock wall by the saw nailing.

도 2는 본 발명의 제 1실시예에서 설명된 프리스트레싱 쏘일 네일링 구조에 이용되는 파이프 보강재의 상세도이다.2 is a detailed view of a pipe reinforcement used in the prestressing saw nailing structure described in the first embodiment of the present invention.

도 3은 본 발명의 제 1실시예에서 설명된 프리스트레싱 쏘일 네일링 구조에 이용되는 파이프 보강재의 측면도이다.3 is a side view of a pipe reinforcement used in the prestressing saw nailing structure described in the first embodiment of the present invention.

도 4는 본 발명의 제 1실시예의 파이프 보강재를 지반에 삽입한 경우의 쏘일 네일링 구조를 나타내는 도면이다.4 is a view showing a saw nailing structure when the pipe reinforcement of the first embodiment of the present invention is inserted into the ground.

도 5는 본 발명의 제 1실시예의 파이프 보강재를 이용한 프리스트레싱 쏘일 네일링 구조를 나타내는 도면이다.5 is a view showing a prestressing saw nailing structure using the pipe reinforcement of the first embodiment of the present invention.

도 6a는 본 발명의 제 2실시예에서 설명된 프리스트레싱 쏘일 네일링 구조에 이용되는 파이프 보강재의 상세도이고, 도 6b는 파이프 보강재의 측면도이다.FIG. 6A is a detailed view of a pipe reinforcement used in the prestressing saw nailing structure described in the second embodiment of the present invention, and FIG. 6B is a side view of the pipe reinforcement.

도 7은 본 발명의 제 2실시예에서 설명된 프리스트레싱 쏘일 네일링 구조에 이용되는 파이프 보강재의 측면도이다.7 is a side view of a pipe reinforcement used in the prestressing saw nailing structure described in the second embodiment of the present invention.

도 8는 본 발명의 제 2실시예에서 설명된 파이프 보강재를 지반에 삽입한 경우의 프리스트레싱 쏘일 네일링 구조를 나타내는 도면이다.8 is a view showing a prestressing saw nailing structure when the pipe reinforcement described in the second embodiment of the present invention is inserted into the ground.

도 9는 본 발명의 제 2실시예의 파이프 보강재를 지반에 삽입한 경우의 프리스트레싱 쏘일 네일링 구조를 나타내는 도면이다.9 is a view showing a prestressing saw nailing structure when the pipe reinforcement of the second embodiment of the present invention is inserted into the ground.

*부호에 대한 설명* Description of the sign

1, 11. 파이프 보강재 2. 강봉1, 11. pipe reinforcement 2. steel rod

3. 조임캡 4. 고정돌기3. Tightening cap 4. Fixing protrusion

5. 스페이셔 12. 강연선5. Spacer 12. Strand

8, 13. 플레이트 14. 고정구8, 13. Plate 14. Fixture

본 발명은 지반의 침하나 토사의 유실로 안정성이 떨어지는 것을 보완하기 위해 이용되는 보강재에 관한 것으로, 특히 토사의 무너짐이나 암벽으로부터의 낙석을 방지하기 위해, 파이프 보강재의 내주 중앙에 리바 또는 강봉을 설치하고, 조임캡으로 조임으로써 파이프 보강재에 미리 인장력을 도입하여 인장 저항력을 향상시키는 쏘일 네일링 구조 및 파이프 보강재의 내주 중앙에 PC강연선을 설치하고, 이 PC강연선을 그라우팅 양생후 인장하여 파이프 보강재에 인장저항력을 향상시키는 쏘일 네일링 구조에 관한 것이다.The present invention relates to a reinforcing material used to compensate for the lack of stability due to sedimentation of soil or loss of soil. In particular, a rebar or steel bar is provided at the inner circumference of a pipe reinforcing material to prevent soil collapse and rockfall. Soil nailing structure that introduces tensile force to pipe reinforcement to improve tensile resistance by tightening with tightening cap and PC strand is installed in the center of inner circumference of pipe reinforcement, and this PC strand is stretched after grouting curing and tensioned to pipe reinforcement It relates to a saw nailing structure that improves the resistance.

일반적으로 쏘일 네일링은 공기단축, 경비 절감면에서 유리한 공법으로 인식되어 사면의 안정 및 굴착면에 대한 유연한 지보 등에 적용되고 있으며, 그 적용이 널리 확산되고 있는 추세이다.Soil nailing is generally recognized as an advantageous method in terms of air shortening and cost reduction, and is being applied to the stability of slopes and flexible support for excavated surfaces, and its application is widely spreading.

현재, 사용되고 있는 쏘일 네일링에 대해 설명하면 다음과 같다.Currently, the used nail nailing is described as follows.

도 1a는 종래의 쏘일 네일링에 이용되는 보강재의 상세도이다. 도 1a에 도시된 바와 같이, 쏘일 네일링은 보강재(100)과, 간격재(101)와, 그라우팅(102)을 가지고 시공될 수 있다.1A is a detail view of a reinforcement used in conventional saw nailing. As shown in FIG. 1A, the saw nailing may be constructed with the reinforcement 100, the spacer 101, and the grouting 102.

여기서, 쏘일 네일링을 간단히 설명하면, 토사에 천공을 하여 보강재(100)(이형철근, 스틸바 등)를 넣고 공간 내부를 시멘트 밀크로 충진하고, 전면을 쇼크리트로 처리하여 보강된 토체를 일체화시켜서 보강되지 않은 뒤쪽의 지반과 구분시켜 배면의 토압에 저항하므로, 외적으로는 재래식 중력 옹벽과 같은 형태를 이루는 방법이다.Here, the description of the saw nailing briefly, perforated in the soil, put the reinforcing material 100 (reinforcing bar, steel bar, etc.) and filling the interior of the space with cement milk, the front surface is treated with shockcrete to integrate the reinforced soil body It distinguishes from the back ground that is not reinforced and resists earth pressure on the back, so it is externally shaped like a conventional gravity retaining wall.

이와 같이, 쏘일 네일링은 도 1b에 도시된 바와 같이, 천공된 구멍내에 긴밀하게 삽입된 보강재(100)와 상기 천공된 구멍 주변의 빈공간에 견고하게 충입되는 충진물질(예를 들면, 시멘트 밀크)이 간격재(101)와 함께 충실하게 위치하여 주변 지반의 변형 유발하는 힘이 보강재(100)에 의해 저항받도록 하는데 있다.As such, the saw nailing is a filling material (eg, cement milk) that is firmly filled in the reinforcement 100 tightly inserted in the perforated hole and the void space around the perforated hole, as shown in FIG. 1B. ) Is faithfully positioned with the spacer 101 so that the deformation-inducing force of the surrounding ground is resisted by the reinforcement 100.

즉, 쏘일 네일링은 기본적으로 인장력, 전단응력 및 휨 모멘트에 저항할 수 있는 보강재를 비교적 촘촘한 간격으로 삽입하여 원지반의 전체적인 전단강도 증대 및 발생 변위를 가능한 억제하고 또한 굴착공사 도중이나 완료후에 예상되는 이완을 제한하는 것이다.That is, the saw nailing basically inserts reinforcement materials that can resist tensile force, shear stress and bending moment at relatively tight intervals to suppress the increase of the overall shear strength and the displacement caused by the ground, and also to be expected during or after excavation work. It is to limit relaxation.

그러나, 이러한 쏘일 네일링을 하기 위해 도 1에 기재된 종래의 보강재는 지반의 하중을 견디는 인장응력에 한계가 있고, 또한, 이 보강재를 지반에 매설하는 경우, 힘의 변위가 굴착면을 중심으로 외부에 존재하므로, 안정적인 보강 구조체를 형성하기 어려운 문제가 있었다..However, the conventional reinforcement described in FIG. 1 has a limitation in tensile stress to withstand the load of the ground for such a nail nailing, and when the reinforcement is embedded in the ground, the displacement of the force is external to the excavation surface. Since present in, there was a problem difficult to form a stable reinforcing structure.

이 때문에, 종래의 보강재를 사용한 쏘일 네일링은 지반에서 생성된 토압의 하중을 견디는데 보다 안정적인 구조체를 형성하지 못하는 한계가 있었다.For this reason, the conventional nail nailing has a limitation that can not form a more stable structure to withstand the load of earth pressure generated in the ground.

상기한 문제점을 해결하기 위한 본 고안의 목적은 파이프 보강재 내부 중앙에 스페이셔와 함께 강봉이 삽입되고, 조임캡을 사용하여 강봉을 조여 파이프 보강재의 외주면을 인장하고, 이 인장된 파이프 보강재를 지반에 삽입한 후, 그라우팅 양생 완료후 파이프 보강재에 연결된 조임캡과 파이프 보강재 내부의 강봉을 제거함으로써, 파이프 보강재의 외주면을 압축시켜 파이프 보강재에 발생하는 인장응력을 상쇄시키고, 굴착면의 변위 이동을 억제하는 프리스트레싱 쏘일 네일링 구조를 제공한다.An object of the present invention for solving the above problems is to insert a steel bar with a spacer in the center of the pipe reinforcement, to tighten the steel bar using a tightening cap to tension the outer circumferential surface of the pipe reinforcement, the tensioned pipe reinforcement to the ground After inserting, after the grout curing is completed, the tightening cap connected to the pipe reinforcement and the steel bar inside the pipe reinforcement are removed, thereby compressing the outer circumferential surface of the pipe reinforcement to offset the tensile stress generated in the pipe reinforcement and suppressing displacement movement of the excavation surface. Provides prestressing saw nailing structure.

또한, 본 고안의 다른 목적은 파이프 보강재의 내부 중앙에 PC강연선이 삽입되고, 상기 파이프 보강재와 상기 PC강연선을 함께 이를 고정시키는 플레이트의 경사진 삽입구을 거쳐 상기 PC강연선이 외부로 연장하고, 이 연장된 PC강연선을 그라우팅 양생후 인장함으로써, 파이프 보강재의 외주면을 압축시켜 파이프 보강재의 인장응력을 상쇄시키고, 굴착면의 변위 이동을 억제하는 프리스트레싱 쏘일 네일링 구조를 제공한다.In addition, another object of the present invention is that the PC strand is inserted into the inner center of the pipe reinforcement, the PC strand is extended to the outside through the inclined insertion hole of the plate for fixing the pipe reinforcement and the PC strand together, this extended By tensioning the PC strands after grouting curing, the outer circumferential surface of the pipe reinforcement is compressed to offset the tensile stress of the pipe reinforcement and provide a prestressed saw nailing structure that suppresses displacement movement of the excavation surface.

상기와 같은 목적을 달성하기 위해, 지반이 적정 위치에 천공수단을 통해 소정 직경의 천공홀을 형성하고, 상기 천공홀상에 보강재를 삽입하고, 상기 천공홀의 내부와 상기 보강재내 공간을 시멘트 밀크로 충전하여 그라우팅하고, 상기 그라우팅 이후 상기 지반의 굴착면을 쇼크리트로 타설하는 쏘일 네일링 구조에 있어서, In order to achieve the above object, the ground to form a hole of a predetermined diameter through the drilling means at a suitable position, insert a reinforcement on the hole, and fill the interior of the hole and the space in the reinforcement with cement milk In the nail nailing structure for grouting, and after the grouting to cast the excavation surface of the ground with shockcrete,

양측 끝단에 암나사가 형성되고, 상기 지반의 상부 압력을 견디도록 상기 천공홀에 삽입되는 파이프 보강재와,A female reinforcement formed at both ends and a pipe reinforcement inserted into the drilling hole to withstand the upper pressure of the ground;

상기 파이프 보강재의 내주 중앙에 위치하고, 외주에 형성된 스페이셔로 고정된 강봉과,A steel bar positioned at an inner circumference center of the pipe reinforcement and fixed with a spacer formed at an outer circumference;

상기 파이프 보강재의 양측 끝단의 외주를 덮고, 상기 파이프 보강재의 상기 암나사와 결합하여 상기 강봉을 가압할 수 있도록 내주안에 수나사가 형성되고, 일단 내측에 상기 강봉을 고정하는 고정 돌기를 가지는 조임부를 구성한다.Covering the outer circumference of the both ends of the pipe reinforcement, the inner thread is formed in the inner circumference to press the steel bar in combination with the female screw of the pipe reinforcement, and constitutes a tightening portion having a fixing projection for fixing the steel bar once inside do.

선호하게는 상기 파이프 보강재를 천공홀에 삽입하기 전에 상기 파이프 보강재와 연결된 상기 조임부를 조여 상기 강봉을 가압하고, 상기 그라우팅 후에 상기 조임부를 풀고, 상기 파이프 보강재 내부의 상기 강봉을 제거함으로써 상기 파이프 보강재를 압축하도록 구성된다.Preferably, before inserting the pipe reinforcement into the drill hole, tighten the tightening portion connected to the pipe reinforcement to pressurize the steel rod, loosen the tightening portion after the grouting, and remove the steel rod inside the pipe reinforcement. Configured to compress the reinforcement.

또한, 지반이 적정 위치에 천공수단을 통해 소정 직경의 천공홀을 형성하고, 상기 천공홀상에 상기 보강재를 삽입하고, 상기 천공홀의 내부와 보강재내 공간을 시멘트 밀크로 충전하여 그라우팅하고, 상기 그라우팅 이후 상기 지반의 굴착면을 쇼크리트로 타설하는 쏘일 네일링 구조에 있어서, In addition, the ground is formed through the drilling means at a suitable position, the drill hole of a predetermined diameter, the reinforcing material is inserted into the drilling hole, the inside of the hole and the inner space of the reinforcing material with grout to grout, and after the grouting In the nail nailing structure for pouring the excavated surface of the ground with shockcrete,

상기 지반의 상부 압력을 견디도록 천공된 홀에 삽입되는 파이프 보강재와,A pipe reinforcement inserted into a hole drilled to withstand the upper pressure of the ground;

상기 파이프 보강재의 내주 중앙에 위치한 강연선과,A stranded wire located in the center of the inner circumference of the pipe reinforcement,

상기 강연선이 외부로 연장될 수 있도록 경사진 삽입구를 가지는 동시에, 상 기 지반에 상기 파이프 보강재를 고정하는 양측의 플레이트와,Plates on both sides having an inclined insertion hole so that the strand can extend to the outside, and fixing the pipe reinforcement to the ground;

상기 받침부재의 상기 경사진 삽입구를 거쳐서 외부로 연장된 상기 강연선을 고정하는 고정구를 포함하여 구성된다.It comprises a fixture for fixing the strand extending outwards through the inclined insertion port of the support member.

선호하게는 상기 그라우팅 후, 상기 파이프 보강재 내주에 위치한 상기 강연선을 인장함으로써 상기 플레이트의 가압에 의해 상기 파이프 보강재를 압축하도록 구성된다.Preferably, after the grouting, the pipe reinforcement is compressed by pressurization of the plate by tensioning the strand located in the inner circumference of the pipe reinforcement.

선호하게는 상기 파이프 보강재는 스틸 파이프 또는 대나무로 구성된다.Preferably the pipe reinforcement consists of steel pipes or bamboo.

이하, 본 고안에 따른 구성 및 작용효과를 첨부된 도면을 참조하여 실시예에서 상세히 설명하면 다음과 같다.Hereinafter, with reference to the accompanying drawings, the configuration and operation effects according to the present invention will be described in detail as follows.

실시예Example 1 One

도 2는 본 발명의 제 1실시예에서 설명된 프리스트레싱 쏘일 네일링 구조에 이용되는 파이프 보강재(1)의 상세도이다.2 is a detailed view of the pipe reinforcement 1 used in the prestressing saw nailing structure described in the first embodiment of the present invention.

도 3은 본 발명의 제 1실시예에서 설명된 프리스트레싱 쏘일 네일링 구조에 이용되는 파이프 보강재(1)의 측면도이다.3 is a side view of a pipe reinforcement 1 used in the prestressing saw nailing structure described in the first embodiment of the present invention.

도 2 및 3에 도시된 바와 같이, 본 발명의 프리스트레싱 쏘일 네일링 구조에 이용되는 구성은 파이프 보강재(1), 강봉(2), 조임캡(3), 스페이셔(5)로 구성되어 있다. 여기서, 파이프 보강재(1)는 스틸 파이프로 이루어져 있고, 파이프 보강재(1)의 양측 끝단의 외주는 조임캡(3)에 결합할 수 있도록 암나사를 형성하고 있다. 게다가, 파이프 보강재(1)의 내주 중앙에 위치한 강봉(2)은 일정한 간격으로 스페이셔(5)를 장착한 후에 파이프 보강재(1) 내부로 삽입되어 중앙에 위치된 다. 여기서, 강봉(2)은 리바(re-bar)로 대신하여 사용해도 좋다. 또한, 조임캡(3)은 파이프 보강재(1)의 암나사와 결합할 수 있도록 내주에 수나사를 형성하고 있고, 내측 일단에는 강봉(2)을 밀착 고정할 수 있는 고정 돌기(4)를 형성한다.As shown in Figures 2 and 3, the configuration used in the prestressing saw nailing structure of the present invention is composed of a pipe reinforcement (1), a steel bar (2), a tightening cap (3), a spacer (5). Here, the pipe reinforcement (1) is made of a steel pipe, the outer periphery of both ends of the pipe reinforcement (1) is formed with a female screw to be coupled to the tightening cap (3). In addition, the steel bar 2 located in the inner circumferential center of the pipe reinforcement 1 is inserted into the pipe reinforcement 1 after being mounted in the center of the pipe reinforcement 1 after mounting the spacer 5 at regular intervals. Here, the steel bar 2 may be used in place of a re-bar. In addition, the tightening cap 3 forms a male screw on the inner circumference thereof so as to be coupled to the female screw of the pipe reinforcement 1, and forms a fixing protrusion 4 capable of tightly fixing the steel bar 2 to the inner end thereof.

이러한 구성으로 이루어진 파이프 보강재(1)의 양측 끝단 외주를 덮을 수 있도록 양단에 장착된 조임캡(3)을 돌림으로써 강봉(2)을 밀착 고정시킬 수 있다. 여기서, 강봉(2)의 끝단은 조임갭(3)의 내부에 돌출된 고정 돌기(4)에 의해 정확하게 파이프 보강재(1)의 중앙에 위치된다.The steel bar 2 can be tightly fixed by turning the capping caps 3 mounted at both ends so as to cover the outer periphery of both ends of the pipe reinforcement 1 having such a configuration. Here, the end of the steel bar (2) is precisely located in the center of the pipe reinforcement (1) by a fixing projection (4) protruding inside the tightening gap (3).

일단, 강봉(2)이 조임캡(3)에 밀착 고정되면, 양쪽의 조입캡을 돌려 강봉(2)을 조이고, 이렇게 강봉(2)을 강한 힘(도시하지 않음)으로 양쪽에서 조이는 경우, 도 4의 화살표와 같이 강봉(2)이 중앙으로 압축되기 때문에, 파이프 보강재(1)의 외주면은 강봉과 반대되는 중앙 방향으로 인장되게 된다.Once the steel rods 2 are tightly fixed to the tightening caps 3, the two tightening caps are rotated to tighten the steel rods 2, and thus the steel bars 2 are tightened on both sides with a strong force (not shown). Since the steel bar 2 is compressed to the center like the arrow of 4, the outer circumferential surface of the pipe reinforcement 1 is tensioned in the central direction opposite to the steel bar.

도 4는 본 발명의 제 1실시예의 파이프 보강재를 지반에 삽입한 경우의 쏘일 네일링 구조를 나타내는 도면이다.4 is a view showing a saw nailing structure when the pipe reinforcement of the first embodiment of the present invention is inserted into the ground.

도 4에 도시된 바와 같이, 파이프 보강재(1)와 연결된 조임캡(3)을 조여서 압축되는 방향과 반대 방향으로 외주면이 인장된 파이프 보강재(1)를 쏘일 네일링 구조에 따라 천공홀(6)에 삽입하고, 상기 천공홀(6)의 내부와 상기 파이프 보강재(1)내 공간을 시멘트 밀크로 충전하여 그라우팅하고, 이 삽입된 파이프 보강재(1)가 지반(7)에 잘 밀착되도록 플레이트(8)로 고정시키고, 볼트 및 너트(9)를 사용하여 파이프 보강재(1)를 움직이지 않도록 한다. 도 4의 B는 조임캡(3)이 파이프 보강재(1)에 연결된 구조를 나타내는 확대도이다.As shown in FIG. 4, the drilling holes 6 are formed in accordance with a nailing structure in which the pipe reinforcement 1 with its outer peripheral surface tensioned in a direction opposite to the compression direction by tightening the tightening cap 3 connected to the pipe reinforcement 1. To the inside of the hole (6) and the space in the pipe reinforcement (1) filled with cement milk and grouted, the plate 8 so that the inserted pipe reinforcement (1) is in close contact with the ground (7) ) And prevent the pipe reinforcement (1) from moving using bolts and nuts (9). 4B is an enlarged view showing the structure in which the tightening cap 3 is connected to the pipe reinforcement 1.

도 5는 본 발명의 제 1실시예의 파이프 보강재를 이용한 프리스트레싱 쏘일 네일링 구조를 나타내는 도면이다.5 is a view showing a prestressing saw nailing structure using the pipe reinforcement of the first embodiment of the present invention.

도 5에 도시된 바와 같이, 그라우팅하여 양생한 이후에 파이프 보강재(1)의 인장력을 강화하도록 상기 설치된 파이프 보강재(1)의 한쪽 끝단에 연결된 조임캡(3)을 풀고, 파이프 보강재(1)의 내부 중앙에 위치된 강봉(2)을 제거함으로써, 파이프 보강재(1)의 외주면이 중앙으로 압축함으로 인해, 이 압축된 파이프 보강재(1)의 힘의 변위가 지반 내부로 작용하여 파이프 보강재(1)에 발생하는 지반(7)으로부터의 인장응력을 상쇄할 수 있고, 또한, 점선으로 표시된 부분이 화살표 방향과 같이, 내부로 변위가 생기므로, 굴착면 부근의 변위가 외부로 이동하는 것을 억제할 수 있다.As shown in FIG. 5, after grouting and curing, loosen the cap 3 connected to one end of the installed pipe reinforcement 1 to reinforce the tensile force of the pipe reinforcement 1, and By removing the steel bar 2 located in the inner center, the outer circumferential surface of the pipe reinforcement 1 is compressed to the center, so that the displacement of the force of the compressed pipe reinforcement 1 acts into the ground and thus the pipe reinforcement 1 It is possible to offset the tensile stress from the ground 7 generated in the ground, and the portion indicated by the dotted line causes the displacement inward as in the direction of the arrow, so that the displacement near the excavation surface can be suppressed from moving to the outside. have.

또한, 도시하진 않았지만, 이러한 파이프 보강재가 여러개 지반에 삽입되어, 파이프 보강재의 끝단에 연결된 한쪽의 조임캡을 제거하는 경우, 상기 설명한 바와 같은 파이프 보강재의 외주면이 중앙으로 압축하기 때문에, 지반(7)으로부터 생기는 파이프 보강재(1)의 인장응력을 상쇄시킬 뿐만 아니라, 굴착면 부근의 변위 이동을 억제할 수 있다.In addition, although not shown, when such a pipe reinforcement is inserted into a plurality of grounds to remove one of the tightening caps connected to the ends of the pipe reinforcement, since the outer peripheral surface of the pipe reinforcement as described above is compressed to the center, the ground 7 In addition to canceling the tensile stress of the pipe reinforcing material (1) generated from the above, displacement movement in the vicinity of the excavation surface can be suppressed.

이처럼, 파이프 보강재(1)가 줄어듬으로 인해 지반(7) 내부의 토사를 서로 잡아당기고 있기 때문에, 프리스트레싱 쏘일 네일링 구조를 사용하여 지반(7)의 무너짐이나 암벽으로부터의 낙석을 방지할 수 있는 보다 안정적인 보강구조체를 형성할 수 있다.As the pipe reinforcement 1 is thus reduced, the soil inside the ground 7 is pulled together, so that the prestressing saw nailing structure can be used to prevent the ground 7 from falling down or falling rocks from the rock wall. It can form a stable reinforcement structure.

실시예Example 2 2

상기 실시예 1과 동일한 원리를 가진 실시예 2를 아래에 설명할 것이다.Embodiment 2 having the same principle as Embodiment 1 above will be described below.

도 6는 본 발명의 제 2실시예에서 설명된 프리스트레싱 쏘일 네일링 구조에 이용되는 파이프 보강재(11)의 상세도이고, 도 6b는 파이프 보강재의 측면도이다. 도 6a, 6b에 도시된 바와 같이, 본 발명의 프리스트레싱에 이용되는 구성은 파이프 보강재(11), PC강연선(12), 플레이트(13), 고정구(14), 삽입구(15)로 구성되어 있다. 여기서, 보강재(11)는 스틸 파이프로 이루어져 있고, 고정구(14)는 PC강연선(12)을 중앙에 위치할 수 있도록 톱니형의 이를 가지고, 플레이트(13)의 삽입구(15)는 비스듬한 경사를 이루고 있다.6 is a detailed view of the pipe reinforcement 11 used in the prestressing saw nailing structure described in the second embodiment of the present invention, and FIG. 6B is a side view of the pipe reinforcement. As shown in FIGS. 6A and 6B, the configuration used for the prestressing of the present invention is composed of a pipe reinforcement 11, a PC strand 12, a plate 13, a fixture 14, and an insertion hole 15. Here, the reinforcing material 11 is made of a steel pipe, the fastener 14 has a toothed tooth so that the center of the PC strand 12 can be located, the insertion hole 15 of the plate 13 forms an oblique inclination have.

도 7은 본 발명의 제 2실시예에서 설명된 프리스트레싱 쏘일 네일링 구조에 이용되는 파이프 보강재(11)의 측면도를 통하여 자세하게 설명하면, 도 7에 도시된 바와 같이, PC강연선(12)의 외측으로 보강재(11)가 플레이트(13)에 기밀하게 밀착되어 있고, 이 보강재(11)의 내측 중앙에 길게 설치된 PC강연선(12)이 플레이트(13)에 형성된 경사진 삽입구(15)를 거쳐서 외부로 연장되어 있다. 이 연장된 PC강연선(12)이 플레이트(13)에 고정되기 위해 톱니를 가진 고정구(14)가 삽입된다.7 is described in detail through a side view of the pipe reinforcement 11 used in the prestressing saw nailing structure described in the second embodiment of the present invention, as shown in FIG. 7, outward of the PC strand 12. The reinforcing material 11 is hermetically adhered to the plate 13, and the PC strand wire 12, which is provided in the center of the inner side of the reinforcing material 11, extends through the inclined insertion hole 15 formed in the plate 13 to the outside. It is. A toothed fixture 14 is inserted to secure this extended PC strand 12 to the plate 13.

도 8은 상기 설명한 구성으로 이루어진 파이프 보강재(11)를 지반(18)에 삽입한 프리스트레싱 쏘일 네일링 구조를 나타낸 도면이다.8 is a view showing a prestressing saw nailing structure in which the pipe reinforcement 11 having the above-described configuration is inserted into the ground 18.

먼저, 파이프 보강재(11)가 지반(18)의 배면 압력을 견딜 수 있도록 지반(18)에 천공된 홀(17)에 삽입되고, 이 파이프 보강재(11)의 내부 중앙에는 파이프 보강재(11)의 길이보다 긴 PC강연선(12)이 설치되어 있다. 또한, 이 설치된 PC강연선(12)과 보강재(11)가 조립될 수 있도록 서로 다른 방향으로 대향하는 양측의 플레이트(13)를 가지고, 이 플레이트(13)는 지반(18)과 밀착하여 설치하는 동시에 이 양측의 플레이트(13)에 천공된 삽입구(15)를 거쳐서 PC강연선(12)이 외부로 연장되어 있다. 여기서, 플레이트(13)는 파이프 보강재(11)뿐만 아니라 천공된 홀(17) 전체를 밀착하여 덮을 수 있는 크기이다. 또한, 이 삽입구(15)를 거쳐서 연장된 PC강연선(12)이 플레이트(13)에 고정되기 위한 고정구(14)를 가지고 있다.First, the pipe reinforcement 11 is inserted into a hole 17 drilled in the ground 18 so as to withstand the back pressure of the ground 18, and in the inner center of the pipe reinforcement 11 of the pipe reinforcement 11 The PC stranded wire 12 longer than the length is provided. In addition, the PC strands 12 and the reinforcement 11 is installed so that the plate 13 on both sides facing in different directions so as to be assembled, the plate 13 is in close contact with the ground 18, The PC strand 12 extends to the outside via the insertion hole 15 drilled into the plates 13 on both sides. Here, the plate 13 is sized to cover the pipe reinforcement 11 as well as the entire perforated hole 17 in close contact. In addition, the PC stranded wire 12 extending through the insertion opening 15 has a fixing tool 14 for fixing to the plate 13.

이와 같이, PC강연선의 한쪽을 고정하고, 프리스트레싱 쏘일 네일링 구조에 따라 설치된 파이프 보강재(11)의 내부 중앙에 위치한 PC강연선(12)의 연장된 부분을 그라우팅 양생후에 단독콘과 같은 인장기(도시하지 않음)를 통하여 인장하면, 파이프 보강재(11)가 플레이트의 가압에 의해 압축하는 힘을 받으므로, 파이프 보강재(11)의 외주면이 압축하여 이 압축된 파이프 보강재(11)의 힘의 변위가 지반 내부로 작용하기 때문에 파이프 보강재(11)에 발생하는 지반(18)으로부터의 인장응력을 상쇄시킬 수 있고, 점선으로 표시된 부분이 화살표 방향과 같이, 내부로 변위가 생기므로 굴착면의 변위가 외부로 이동하는 것을 억제할 수 있다.In this way, a tensioner such as a sole cone is fixed after fixing one side of the PC strand, and grouting the extended portion of the PC strand 12 located in the inner center of the pipe reinforcement 11 installed according to the prestressing saw nailing structure. Tension of the pipe reinforcement 11, the pipe reinforcement 11 receives a compressive force by pressurization of the plate, so that the outer circumferential surface of the pipe reinforcement 11 is compressed so that the displacement of the force of the compressed pipe reinforcement 11 is grounded. Since it acts internally, the tensile stress from the ground 18 generated in the pipe reinforcement 11 can be canceled, and the portion indicated by the dotted line is displaced inward, as shown by the arrow direction, so that the displacement of the excavation surface is moved to the outside. The movement can be suppressed.

또한, 도시하진 않았지만, 이러한 파이프 보강재가 여러개 지반에 삽입되어, 인장기(도시하지 않음)에 의해 PC강연선(12)을 인장함으로 인해 지반(18)에 삽입된 파이프 보강재(11)의 외주면이 플레이트의 압착에 의해 압축되는 경우, 상기 설명한 바와 같은 파이프 보강재의 외주면이 중앙으로 압축하기 때문에, 지반(7)으로부터 생기는 파이프 보강재(1)의 인장응력을 상쇄시킬 뿐만 아니라, 굴착면 부근의 변위 이동을 억제할 수 있다.In addition, although not shown, such a pipe reinforcement is inserted into a plurality of ground, the outer peripheral surface of the pipe reinforcement 11 inserted into the ground 18 by tensioning the PC strand 12 by a tensioner (not shown) is plate In the case of compression by pressing, the outer circumferential surface of the pipe reinforcement as described above is compressed to the center, thereby not only canceling the tensile stress of the pipe reinforcement 1 generated from the ground 7, but also displacing the displacement movement near the excavation surface. It can be suppressed.

이처럼, 파이프 보강재(1)가 줄어듬으로 인해 지반(7) 내부의 토사를 서로 잡아당기고 있기 때문에, 프리스트레싱 쏘일 네일링 구조를 사용하여 지반(7)의 무너짐이나 암벽으로부터의 낙석을 방지할 수 있는 보다 안정적인 보강구조체를 형성할 수 있다.As the pipe reinforcement 1 is thus reduced, the soil inside the ground 7 is pulled together, so that the prestressing saw nailing structure can be used to prevent the ground 7 from falling down or falling rocks from the rock wall. It can form a stable reinforcement structure.

도 9는 본 발명의 제 2실시예의 파이프 보강재(11)를 지반(18)에 삽입한 경우의 프리스트레싱 쏘일 네일링 구조를 나타내는 도면이다. 도 9의 도시된 바는 도 8과 동일한 구조를 가지고 있어 설명을 생략하고, 단, 여기에서는 파이프 보강재(11)가 대나무로 이루어져 있다. 이러한 대나무를 사용함으로써, 쏘일 네일링에 이용되는 스틸 파이프와 동일한 작용을 할 수 있고, 환경 친화적이면서 비용절감을 가져올 수 있다.FIG. 9 is a view showing a prestressing saw nailing structure when the pipe reinforcement 11 of the second embodiment of the present invention is inserted into the ground 18. As shown in FIG. The bar shown in FIG. 9 has the same structure as that of FIG. 8, and thus description thereof is omitted. However, the pipe reinforcement 11 is made of bamboo. By using such bamboo, it can perform the same function as the steel pipe used for the saw nailing, and can be environmentally friendly and cost-saving.

또한, 실시예 1에 있어서도 파이프 보강재(11)로서 스틸 파이프에 한정하지 않고 대나무로도 이용할 수 있다.Moreover, also in Example 1, it is not only limited to a steel pipe but can also use it as bamboo as a pipe reinforcing material 11.

그러므로, 상기와 같은 실시예 1과 2의 동일한 원리를 가진 프리스트레싱 쏘일 네일링 구조에 의하여 지반에 천공홀에 삽입된 파이프 보강재의 외주면이 압축하는 작용을 이용함으로써, 파이프 보강제에 발생하는 인장응력을 상쇄시킬 수 있고, 굴착면의 변위 이동이 감소되어 토사의 무너짐 등을 막을 수 있다.Therefore, by using the action of compressing the outer circumferential surface of the pipe reinforcement inserted into the drilling hole in the ground by the pre-stressing saw nailing structure having the same principle as in Example 1 and 2, the tensile stress generated in the pipe reinforcement to cancel It is possible to reduce the displacement movement of the excavation surface to prevent the earth and sand collapse.

여기에서는 실시예 2에서 설명된 스틸 파이프 대신에 대나무를 파이프 보강재(11)로서 사용하여도 스틸 파이프와 같은 인장력을 가질 수 있다는 것이 아래에 비교되는 표에서 설명된다.It is described here in the table compared below that even if bamboo is used as the pipe reinforcement 11 instead of the steel pipe described in Example 2, it can have the same tensile force as the steel pipe.

다음의 표 1은 다양한 금속 재료의 인장도를 나타낸 것이다.Table 1 below shows the tensile strength of various metal materials.

Figure 112007020675034-pat00001
Figure 112007020675034-pat00001

다음의 표 1은 다양한 비금속 재료의 인장도를 나타낸 것이다.Table 1 below shows the tensile strengths of various nonmetallic materials.

Figure 112007020675034-pat00002
Figure 112007020675034-pat00002

이로써, 대나무를 사용하여도 표에서 비교된 바와 같이, 스틸 파이프와 같은 안정적인 보강구조체를 형성할 수 있다.As a result, even when bamboo is used, a stable reinforcing structure such as a steel pipe can be formed as compared in the table.

본 발명의 쏘일 네일링 구조에 이용되는 파이프 보강재(11)는 스틸 파이프나 대나무에 한정되지 않고 발명의 범위를 벗어나지 않는 동일한 작용를 할 수 있다면 다양한 재료를 사용해도 좋다.The pipe reinforcing material 11 used in the saw nailing structure of the present invention may be used as long as it is not limited to steel pipes or bamboo, and can use various materials as long as it can perform the same function without departing from the scope of the invention.

상기 본 발명에 기재된 바와 같이, 본 발명에 따른 파이프 보강재 양측 끝단 외주에 조여진 조임캡을 풀어 강봉을 제거함으로써, 파이프 보강재의 외주면을 수착하여 지반에 삽입된 파이프 보강재에 생기는 인장응력을 상쇄시킬 수 있고, 지반에 작용하는 굴착면의 변위가 내부로 작용하게 함으로써, 굴착면의 이동 변위를 억제하거나 감소시킬 수 있다.As described in the present invention, by removing the steel bar by loosening the capping cap tightened on the outer periphery of the pipe reinforcement both ends according to the present invention, it is possible to offset the tensile stress generated in the pipe reinforcement inserted into the ground by soaking the outer peripheral surface of the pipe reinforcement By making the displacement of the excavation surface acting on the ground act inside, it is possible to suppress or reduce the displacement of the excavation surface.

또한, 본 발명의 쏘일 네일링 구조에 의해 그라우팅한 후에 파이프 보강재 내부 중앙에 설치된 PC강연선을 인장하여 파이프 보강재를 압축함으로써, 파이프 보강재에 생기는 인장응력을 상쇄시킬 수 있고, 지반에 작용하는 굴착면의 변위가 내부로 작용하게 함으로써, 굴착면의 이동 변위를 억제하거나 감소시킬 수 있다.In addition, by compressing the pipe reinforcement by tensioning the PC strands installed in the center of the pipe reinforcement after grouting by the saw nailing structure of the present invention, it is possible to offset the tensile stress generated in the pipe reinforcement, the excavation surface acting on the ground By causing the displacement to act internally, it is possible to suppress or reduce the displacement of the excavation surface.

이처럼, 토사의 무너짐이나 암벽으로부터의 낙석을 방지할 수 있는 프리스트레싱 쏘일 네일링 구조를 사용하여 보다 안정적인 보강구조체를 형성할 수 있다.As such, a more stable reinforcement structure can be formed by using a prestressing saw nailing structure capable of preventing the soil from falling down or falling rocks from the rock wall.

Claims (2)

지반의 적정 위치에 천공수단을 통해 소정 직경의 천공홀을 형성하고, 상기 천공홀의 내부 공간을 시멘트 밀크로 충전하여 그라우팅하는 쏘일 네일링 구조에 있어서,In the saw nailing structure for forming a hole having a predetermined diameter through a drilling means at a suitable position of the ground, and filling and grouting the inner space of the drilling hole with cement milk, 양측 끝단에 암나사가 형성되고, 상기 지반의 상부 압력을 견디도록 상기 천공홀에 삽입되는 파이프 보강재와,A female reinforcement formed at both ends and a pipe reinforcement inserted into the drilling hole to withstand the upper pressure of the ground; 상기 파이프 보강재의 내주 중앙에 위치하고, 외주에 형성된 스페이셔로 고정된 강봉과,A steel bar positioned at an inner circumference center of the pipe reinforcement and fixed with a spacer formed at an outer circumference; 상기 파이프 보강재의 양측 끝단의 외주를 덮고, 상기 파이프 보강재의 상기 암나사와 결합하여 상기 강봉을 가압할 수 있도록 내주안에 수나사가 형성되고, 일단 내측에 상기 강봉을 고정하는 고정 돌기를 가지는 조임부를 포함하여 구성된 것을 특징으로 하는 프리스트레싱 쏘일 네일링 구조.Covering the outer circumference of the both ends of the pipe reinforcement, the inner thread is formed in the inner circumference to press the steel bar in combination with the female screw of the pipe reinforcement, and includes a fastening portion having a fixing projection for fixing the steel bar once inside Prestressing saw nailing structure, characterized in that configured. 제 1항에 있어서,The method of claim 1, 상기 파이프 보강재를 천공홀에 삽입하기 전에 상기 파이프 보강재와 연결된 상기 조임부를 조여 상기 강봉을 가압하고, 상기 그라우팅 후에 상기 조임부를 풀고, 상기 파이프 보강재 내부의 상기 강봉을 제거함으로써 상기 파이프 보강재를 압축하도록 구성된 것을 특징으로 하는 프리스트레싱 쏘일 네일링 구조.Compress the pipe reinforcement by tightening the tightening part connected to the pipe reinforcement to press the steel bar before inserting the pipe reinforcement into the drilling hole, loosening the tightening part after the grouting, and removing the steel bar inside the pipe reinforcement. A prestressing saw nailing structure, characterized in that it is configured to.
KR1020070025224A 2007-03-14 2007-03-14 A prestressing soil nailing structure KR100763033B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020070025224A KR100763033B1 (en) 2007-03-14 2007-03-14 A prestressing soil nailing structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020070025224A KR100763033B1 (en) 2007-03-14 2007-03-14 A prestressing soil nailing structure

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
KR1020050120694A Division KR100763032B1 (en) 2005-12-09 2005-12-09 A prestressing soil nailing structure

Publications (2)

Publication Number Publication Date
KR20070061487A KR20070061487A (en) 2007-06-13
KR100763033B1 true KR100763033B1 (en) 2007-10-02

Family

ID=38357307

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020070025224A KR100763033B1 (en) 2007-03-14 2007-03-14 A prestressing soil nailing structure

Country Status (1)

Country Link
KR (1) KR100763033B1 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US9273442B2 (en) 2003-12-18 2016-03-01 R&B Leasing, Llc Composite self-drilling soil nail and method
US8851801B2 (en) 2003-12-18 2014-10-07 R&B Leasing, Llc Self-centralizing soil nail and method of creating subsurface support

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003019558A (en) * 2001-07-05 2003-01-21 Babcock Hitachi Kk Contact type sensor head, and welding robot having the sensor head
JP2004009269A (en) * 2002-06-11 2004-01-15 Hitachi Tool Engineering Ltd Hard film coated high speed steel roughing end mill
KR100715237B1 (en) * 2003-10-10 2007-05-10 정성필 Nailing device

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003019558A (en) * 2001-07-05 2003-01-21 Babcock Hitachi Kk Contact type sensor head, and welding robot having the sensor head
JP2004009269A (en) * 2002-06-11 2004-01-15 Hitachi Tool Engineering Ltd Hard film coated high speed steel roughing end mill
KR100715237B1 (en) * 2003-10-10 2007-05-10 정성필 Nailing device

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
국내등록실용신안공보 제20-0319558호
국내등록실용신안공보 제20-0409269호
국내등록특허공보 제10-0715237호

Also Published As

Publication number Publication date
KR20070061487A (en) 2007-06-13

Similar Documents

Publication Publication Date Title
KR101353882B1 (en) Method of reinforcement and construction of pillar of neighboring tunnel
KR101510297B1 (en) A removable prestressing steel pipe soil nailing structure
JP5065227B2 (en) Slope reinforcement method
JP2008088638A (en) Ground anchor and ground anchor method
KR100763033B1 (en) A prestressing soil nailing structure
KR100763032B1 (en) A prestressing soil nailing structure
KR100896963B1 (en) Rock bolt
KR200420358Y1 (en) A prestressing soil nailing structure
KR200415159Y1 (en) A prestressing soil nailing structure
KR100933220B1 (en) Repairing method for bulging of reinforced soil retaing wall and soil-nail structure used for it
KR100505329B1 (en) Tension nail method of construction
KR101027788B1 (en) Reinforced structure for phc pile
KR100908901B1 (en) Removable prestressed saw nailing construction
KR100505330B1 (en) Tension nail of construction
JP2010159619A (en) Slope frame fixing method for fixing slope retaining member in ground slope by ground anchor
JP3810759B2 (en) Edge widening structure of existing substructure by precast block and its construction method
KR20110021293A (en) Soil-nailing method for elimination of tension member using manual tension device and fixing unit
KR100682556B1 (en) Ground reinforcement method and device thereof
JP4931766B2 (en) Lock bolt nut
KR100741506B1 (en) Reinforcement for civil engineering works
KR100755164B1 (en) A steel pipe file head augmentation device which uses integral socket
JP4097643B2 (en) Strengthening method of landslide prevention pile
KR100943524B1 (en) Anchor assembly and method for constructing retaining wall using anchor assembly
KR200410781Y1 (en) Ground reinforcement device
KR102060423B1 (en) Elastic pressing device, multi-reinforced nail structure and soil nailing method using the same

Legal Events

Date Code Title Description
A107 Divisional application of patent
A201 Request for examination
N231 Notification of change of applicant
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20120924

Year of fee payment: 6

FPAY Annual fee payment

Payment date: 20130923

Year of fee payment: 7

LAPS Lapse due to unpaid annual fee
FPAY Annual fee payment

Payment date: 20150529

Year of fee payment: 8

R401 Registration of restoration
LAPS Lapse due to unpaid annual fee