KR100742942B1 - Automatic Operation Test Control Method and System of Boiler - Google Patents

Automatic Operation Test Control Method and System of Boiler Download PDF

Info

Publication number
KR100742942B1
KR100742942B1 KR1020050086388A KR20050086388A KR100742942B1 KR 100742942 B1 KR100742942 B1 KR 100742942B1 KR 1020050086388 A KR1020050086388 A KR 1020050086388A KR 20050086388 A KR20050086388 A KR 20050086388A KR 100742942 B1 KR100742942 B1 KR 100742942B1
Authority
KR
South Korea
Prior art keywords
boiler
input
water level
control
level sensor
Prior art date
Application number
KR1020050086388A
Other languages
Korean (ko)
Other versions
KR20070031681A (en
Inventor
이정민
권기출
이황의
Original Assignee
린나이코리아 주식회사
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 린나이코리아 주식회사 filed Critical 린나이코리아 주식회사
Priority to KR1020050086388A priority Critical patent/KR100742942B1/en
Publication of KR20070031681A publication Critical patent/KR20070031681A/en
Application granted granted Critical
Publication of KR100742942B1 publication Critical patent/KR100742942B1/en

Links

Images

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24HFLUID HEATERS, e.g. WATER OR AIR HEATERS, HAVING HEAT-GENERATING MEANS, e.g. HEAT PUMPS, IN GENERAL
    • F24H9/00Details
    • F24H9/20Arrangement or mounting of control or safety devices
    • F24H9/2007Arrangement or mounting of control or safety devices for water heaters
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24DDOMESTIC- OR SPACE-HEATING SYSTEMS, e.g. CENTRAL HEATING SYSTEMS; DOMESTIC HOT-WATER SUPPLY SYSTEMS; ELEMENTS OR COMPONENTS THEREFOR
    • F24D19/00Details
    • F24D19/10Arrangement or mounting of control or safety devices
    • F24D19/1006Arrangement or mounting of control or safety devices for water heating systems
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24DDOMESTIC- OR SPACE-HEATING SYSTEMS, e.g. CENTRAL HEATING SYSTEMS; DOMESTIC HOT-WATER SUPPLY SYSTEMS; ELEMENTS OR COMPONENTS THEREFOR
    • F24D2220/00Components of central heating installations excluding heat sources
    • F24D2220/04Sensors
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24DDOMESTIC- OR SPACE-HEATING SYSTEMS, e.g. CENTRAL HEATING SYSTEMS; DOMESTIC HOT-WATER SUPPLY SYSTEMS; ELEMENTS OR COMPONENTS THEREFOR
    • F24D2220/00Components of central heating installations excluding heat sources
    • F24D2220/04Sensors
    • F24D2220/048Level sensors, e.g. water level sensors

Abstract

본 발명은 전원이 공급되면, 수위감지센서로부터 감지신호가 입력되는지를 확인하는 단계와, 상기 수위감지센서로부터 감지신호가 입력되면 일반모드로 전환하는 단계 및 상기 수위감지센서로부터 감지신호가 입력되지 않으면, 시운전모드를 실행하는 단계로 이루어진 보일러의 자동 시운전 제어 방법 및 그에 따른 제어 장치에 관한 것이다.According to the present invention, when the power is supplied, checking whether a detection signal is input from the water level sensor, switching to a normal mode when a detection signal is input from the water level sensor, and not detecting the signal from the water level sensor. If not, the present invention relates to a method for controlling automatic commissioning of a boiler consisting of executing a commissioning mode and a control apparatus according thereto.

또한, 보일러의 구성 및 배관의 동결여부를 확인한 후, 동결상태일 경우, 동결에러메시지를 출력하고, 동결상태가 아닐 경우, 상기 수위감지센서로부터 감지신호가 입력되는지를 확인하도록 함은 물론, 리모콘의 연결여부를 확인한 후, 리모콘이 연결된 상태에서 작동될 경우 일반모드로 전환하고, 리모콘이 연결되지 않거나 연결된 상태에서 작동되지 않을 경우, 상기 수위감지센서로부터 감지신호가 입력되는지를 확인하도록 하는 것을 더 포함한 시운전모드를 실행하는 단계로 이루어진 보일러의 자동 시운전 제어 방법 및 그에 따른 제어 장치에 관한 것이다.In addition, after confirming the configuration of the boiler and whether the pipes are frozen, in the case of a freezing state, a freezing error message is output. After checking whether the remote control is connected to the normal mode when the operation is connected, and if the remote control is not connected or not in operation when connected, it is further to check whether the detection signal is input from the water level sensor It relates to a control method and an automatic commissioning control method of the boiler consisting of the step of executing the commissioning mode including.

따라서 보일러의 최초 설치시 상기 보일러에 전원이 인가되면, 상기 보일러가 자동으로 시운전 동작을 수행하도록 함으로서, 상기 보일러의 이상여부를 신속하게 확인할 수 있음은 물론, 상기 보일러의 이상 발생시 상기 보일러의 교체 및 수리가 용이하도록 한 것이다.Therefore, when power is applied to the boiler when the boiler is first installed, the boiler automatically performs a commissioning operation so that it is possible to quickly check whether the boiler is abnormal, as well as to replace the boiler when the boiler is abnormal. It is intended to be easy to repair.

따라서 사용상의 편리성이 개선되어 보다 상품성이 향상되는 등의 매우 유용한 발명인 것이다.Therefore, it is a very useful invention such that the convenience in use is improved and the merchandise is more improved.

보일러, 시운전, 전원공급장치, 수위감지센서, 제어모듈, 부저, 스피커 Boiler, Commissioning, Power Supply, Water Level Sensor, Control Module, Buzzer, Speaker

Description

보일러의 자동 시운전 제어 방법 및 장치{Automatic Operation Test Control Method and System of Boiler}Automatic Operation Test Control Method and System of Boiler

도 1은 본 발명에 의한 보일러의 자동 시운전 제어 방법에 대한 순서도.1 is a flow chart for the automatic commissioning control method of the boiler according to the present invention.

도 2는 본 발명에 의한 보일러의 자동 시운전 제어 장치에 대한 블록도.Figure 2 is a block diagram of the automatic commissioning control device for a boiler according to the present invention.

* 도면의 주요부분에 대한 부호의 설명 *Explanation of symbols on the main parts of the drawings

10 : 전원공급부 20 : 감지부10: power supply unit 20: detection unit

21 : 수위감지센서 30 : 조작입력부21: water level sensor 30: operation input unit

40 : 저장부 50 : 제어모듈40: storage unit 50: control module

60 : 구동수단 70 : 출력수단60: drive means 70: output means

본 발명은 보일러의 자동 시운전 제어 방법 및 장치에 관한 것으로, 더욱 상세하게는 보일러의 최초 설치시 상기 보일러에 전원이 인가되면 상기 보일러가 자동으로 시운전 동작을 수행하도록 함으로써 상기 보일러의 이상 여부를 신속하게 확인할 수 있음은 물론 상기 보일러의 이상 발생시 상기 보일러의 교체 및 수리가 용이하도록 한 것에 관한 것이다.The present invention relates to a method and apparatus for controlling automatic commissioning of a boiler. More particularly, when power is supplied to the boiler during initial installation of the boiler, the boiler automatically performs a commissioning operation to quickly determine whether the boiler is abnormal. Of course, it can be confirmed that the replacement of the boiler in the event of a failure of the boiler to facilitate repair.

일반적으로 보일러(Boiler)라 함은 난방시설 등에 더운물을 공급하기 위하여 물을 끓이는 시설을 말하며, 주택용 보일러의 경우 실내의 바닥 등에 설치된 배관에 더운물을 공급하여 난방을 하거나 급수관을 통해 온수를 공급하는 데에 주로 사용되고 있다.In general, a boiler refers to a facility that boils water to supply hot water to a heating facility. In the case of a residential boiler, hot water is supplied to a pipe installed on the floor of a room to heat or supply hot water through a water pipe. It is mainly used for.

상기와 같은 보일러는 주택시공시 최초 설치되거나 사용중이던 보일러의 노후화로 인해 새로운 보일러를 설치하게 될 경우가 발생하게 되면 설치된 보일러의 동작상태를 확인하기 위하여 시운전을 하게 된다.When the boiler as described above occurs when a new boiler is installed due to the deterioration of the boiler which is being installed or used for the first time during the housing construction, the boiler is subjected to a trial operation to check the operating state of the installed boiler.

그러나 종래에 있어서 보일러의 시운전 동작은 설치자가 보일러의 설치를 완료한 후 시운전 모드를 작동시키기 위한 스위치를 눌러야만 상기 보일러가 시운전되는 불편함이 있었다.However, in the related art, the boiler commissioning operation is inconvenient in that the boiler is commissioned only when the installer presses a switch for operating the commissioning mode after completing the installation of the boiler.

또한 설치자의 실수로 인하여 상기 시운전 모드를 실행시키기 못하게 될 경우 사용자는 보일러의 이상 여부를 확인하지 못하게 되어 보일러의 설치 후 이상이 발생되면 보일러의 수리를 위해 사후서비스를 신청해야 하는 불편함이 있으며, 보일러의 수리가 완료되기 전까지는 보일러를 사용하지 못하게 되는 문제점이 있었다.In addition, if the installation fails to run the commissioning mode due to the mistake of the user is not able to check whether the abnormality of the boiler, if the abnormality occurs after the installation of the boiler there is an inconvenience to apply for the after-service to repair the boiler, There was a problem that the boiler can not be used until the repair of the boiler is completed.

따라서 본 발명의 목적은 상기와 같은 종래의 문제점들을 해결하기 위한 것으로, 보일러의 최초 설치시 상기 보일러에 전원이 인가되면 보일러가 자동으로 시운전 동작을 수행하도록 함으로써 상기 보일러의 이상 여부를 신속하게 확인할 수 있음은 물론 보일러의 이상 발생시 보일러의 교체 및 수리가 용이하도록 한 보일러의 자동 시운전 제어 방법 및 장치를 제공함에 있다.Accordingly, an object of the present invention is to solve the above-mentioned problems, and when the boiler is initially installed, power is applied to the boiler so that the boiler automatically performs a trial operation so that the boiler can be quickly checked for abnormality. In addition, the present invention provides a method and apparatus for automatically commissioning and controlling a boiler to facilitate the replacement and repair of a boiler in the event of a boiler failure.

본 발명의 다른 목적은 사용상의 편리성이 개선되어 보다 상품성이 향상되도록 한 보일러의 자동 시운전 제어 방법 및 장치를 제공함에 있다.Another object of the present invention is to provide a method and apparatus for automatic commissioning control of a boiler to improve the convenience of use and to improve the marketability.

상기 목적을 달성하기 위한 본 발명에 따른 보일러의 자동 시운전 제어 방법은 보일러의 동작을 위해 전기에너지를 공급하는 전원공급부와, 물탱크의 저수위를 감지하기 위한 수위감지센서를 포함하여 구성되며, 난방수의 온도감지 및 난방수의 가열 여부 등을 감지하는 감지부와, 사용자에 의해 상기 보일러의 동작을 입력받는 조작입력부와, 상기 보일러의 시운전모드, 일반동작모드 등의 제어 알고리즘 및 사용자에 의해 설정된 난방수온도 등의 설정정보를 저장하는 저장부와, 상기 전원공급부, 감지부, 조작입력부로 입력된 신호를 분석하여 상기 조작입력부로 입력된 설정정보를 상기 저장부에 저장하도록 하며, 상기 분석결과에 따라 상기 보일러의 동작을 제어하기 위한 제어신호를 출력하는 제어모듈과, 상기 제어모듈에서 출력되는 제어신호에 의해 동작되는 구동수단 및 상기 제어모듈에서 출력되는 제어신호에 의한 제어결과를 출력하는 출력수단을 구비하는 보일러에 있어서, 보일러에 전원이 공급되면 물탱크에 설치된 수위감지센서로부터 감지신호가 입력되는지를 확인하는 단계와, 상기 수위감지센서로부터 감지신호가 입력되면 일반모드로 전환하는 단계 및 상기 수위감지센서로부터 감지신호가 입력되지 않으면 시운전모드를 실행하는 단계로 이루어진 것을 특징으로 한다.Automatic commissioning control method of the boiler according to the present invention for achieving the above object is configured to include a power supply for supplying electrical energy for the operation of the boiler, and a water level sensor for detecting the low water level of the water tank, heating water A sensing unit for detecting a temperature of the heater and whether the heating water is heated, an operation input unit for receiving the operation of the boiler by the user, a control algorithm such as a test operation mode of the boiler, a general operation mode, and a heating set by the user A storage unit for storing setting information such as a water temperature, a signal input to the power supply unit, a sensing unit, and an operation input unit, and storing the setting information input to the operation input unit in the storage unit; A control module for outputting a control signal for controlling the operation of the boiler according to, and the control signal output from the control module A boiler comprising a driving means operated by an output means and an output means for outputting a control result by a control signal output from the control module, wherein when a power is supplied to the boiler, whether a detection signal is input from a level sensor installed in a water tank; Checking and, if the detection signal is input from the water level sensor, switching to the normal mode, and if the detection signal is not input from the water level sensor, characterized in that it comprises the step of executing a trial run mode.

또한 상기 목적을 달성하기 위한 본 발명에 따른 보일러의 자동 시운전 제어 장치는 보일러의 동작을 위해 전기에너지를 공급하는 전원공급부와, 물탱크의 저수위를 감지하기 위한 수위감지센서를 포함하여 구성되며, 난방수의 온도감지 및 난방수의 가열 여부 등을 감지하는 감지부와, 사용자에 의해 상기 보일러의 동작을 입력받는 조작입력부와, 상기 보일러의 시운전모드, 일반동작모드 등의 제어 알고리즘 및 사용자에 의해 설정된 난방수온도 등의 설정정보를 저장하는 저장부와, 상기 전원공급부, 감지부, 조작입력부로 입력된 신호를 분석하여 상기 조작입력부로 입력된 설정정보를 상기 저장부에 저장하도록 하며, 상기 분석결과에 따라 상기 보일러의 동작을 제어하기 위한 제어신호를 출력하는 제어모듈과, 상기 제어모듈에서 출력되는 제어신호에 의해 동작되는 구동수단 및 상기 제어모듈에서 출력되는 제어신호에 의한 제어결과를 출력하는 출력수단을 구비하는 보일러에 있어서, 상기 제어모듈은 상기 전원공급부로부터 전기에너지가 공급되면 상기 물탱크의 저수위감지하기 위한 상기 수위감지센서로부터 출력되는 감지신호의 입력여부를 확인하여 상기 수위감지센서로부터 감지신호가 입력되지 않으면 상기 저장부에 저장된 시운전모드에 따라 상기 구동수단을 제어하도록 구성된 것을 특징으로 한다.In addition, the automatic commissioning control apparatus of the boiler according to the present invention for achieving the above object is configured to include a power supply for supplying electrical energy for the operation of the boiler, and a water level sensor for detecting the low water level of the water tank, heating A sensing unit for sensing the temperature of the water and whether the heating water is heated, an operation input unit for receiving the operation of the boiler by the user, a control algorithm such as a test operation mode of the boiler, a general operation mode, and the like set by the user A storage unit for storing setting information such as a heating water temperature, a signal input to the power supply unit, a sensing unit, and an operation input unit, and storing the setting information input to the operation input unit in the storage unit; Control module for outputting a control signal for controlling the operation of the boiler according to, and the control output from the control module A boiler having a driving means operated by a signal and an output means for outputting a control result by a control signal output from the control module, wherein the control module is a low level of the water tank when electrical energy is supplied from the power supply unit It is characterized in that it is configured to check the input of the detection signal output from the water level sensor for sensing and to control the driving means according to the trial run mode stored in the storage unit if a detection signal is not input from the water level sensor.

따라서 보일러의 최초 설치시 상기 보일러에 전원이 인가되면 상기 보일러가 자동으로 시운전 동작을 수행하도록 함으로써 상기 보일러의 이상 여부를 신속하게 확인할 수 있는 것이다.Therefore, when power is applied to the boiler during the initial installation of the boiler, the boiler can be quickly checked whether the boiler is abnormal by performing a trial operation.

또, 사용상의 편리성이 개선되어 보다 상품성이 향상되는 것이다.In addition, the ease of use is improved, and the merchandise is more improved.

이하에서 상기한 본 발명의 바람직한 실시 예를 첨부된 도면을 참고하여 상세히 설명하도록 한다.Hereinafter, exemplary embodiments of the present invention will be described in detail with reference to the accompanying drawings.

도 1은 본 발명에 의한 보일러의 자동 시운전 제어 방법에 대한 순서도로서, 보일러를 설치한 후 상기 보일러에 전원이 인가(S101)되면 상기 보일러에 설치된 제어장치(보일러 자체에 설치된 제어모듈)는 상기 보일러의 내부 및 외부에 설치된 각종 배관의 동결상태를 확인(S102)하게 된다.1 is a flow chart for a method for controlling the automatic commissioning of the boiler according to the present invention, when power is applied to the boiler after installing the boiler (S101), the control device (control module installed in the boiler itself) installed in the boiler is the boiler. It is to check the freezing state of the various pipes installed inside and outside the (S102).

여기서 상기 동결상태를 확인하기 위한 방법은 당업자의 요구에 따라 다양하게 적용될 수 있으므로 특정한 것에 한정하지 않음은 당연하다.Here, the method for confirming the frozen state may be variously applied according to the needs of those skilled in the art, so it is not limited to the specific one.

상기 동결상태의 확인 결과 상기 보일러의 내부 및 외부에 설치된 각종 배관이 동결로 인해 막혀있는 상태, 즉 완전동결(S103)일 경우 동결에러 메시지를 출력하게 된다.As a result of the checking of the freezing state, when the various pipes installed inside and outside the boiler are blocked due to freezing, that is, in case of complete freezing (S103), a freezing error message is output.

여기서 상기 동결에러 메시지는 LCD(Liquid Crystal Display), LED(Light Emitting Diode), 부저, 스피커 등을 통해 사용자에게 시각 또는 청각 정보로 알려주게 된다.In this case, the freezing error message is notified to the user through visual or auditory information through a liquid crystal display (LCD), a light emitting diode (LED), a buzzer, a speaker, and the like.

만약, 상기 보일러의 내부 및 외부에 설치된 각종 배관이 완전동결상태가 아닐 경우(S103) 상기 제어장치는 상기 보일러의 동작을 제어하기 위한 유무선 리모콘의 전기적 연결상태를 확인(S104)하게 된다.If the various pipes installed inside and outside the boiler are not completely frozen (S103), the controller checks the electrical connection state of the wired / wireless remote controller for controlling the operation of the boiler (S104).

상기 유무선 리모콘의 연결상태를 확인하는 것은 보일러의 사용 도중 외부요인(정전 등)으로 인해 전기에너지의 공급이 잠시 중단되었다가 재개될 경우에는 시운전을 할 필요가 없기 때문에 이를 확인하기 위한 것이다.Checking the connection state of the wired / wireless remote controller is to check this because it is not necessary to perform a trial run when the supply of electrical energy is temporarily stopped due to external factors (such as power failure) during the use of the boiler.

즉, 상기 리모콘이 연결된 상태에서 작동되고 있다면(S105) 보일러의 사용 도중에 전기에너지의 공급이 잠시 중단된 후 재개된 것으로 판단하여 상기 보일러가 일반모드로 동작된다.That is, if the remote control is operating in the connected state (S105), the boiler is operated in the normal mode by determining that the supply of electric energy is temporarily stopped after the use of the boiler.

만약 상기 리모콘이 연결되어 있지 않거나(S104) 연결된 상태에서 작동되지 않을 경우(S105) 보일러의 최초설치로 판단하고, 물탱크에 설치된 수위감지센서로부터 감지신호가 입력되는지를 확인(S106)하게 된다.If the remote control is not connected (S104) or does not operate in a connected state (S105) is determined as the initial installation of the boiler, it is checked whether the detection signal is input from the water level sensor installed in the water tank (S106).

이때 상기 수위감지센서로부터의 신호를 설정된 판단시간동안 입력받도록 함(S107)으로써, 시운전모드의 동작여부를 판단함에 있어 수위감지센서의 오감지에 의한 시운전모드의 오작동을 미연에 방지하도록 한다.At this time, by receiving the signal from the water level sensor for a predetermined determination time (S107), it is possible to prevent the malfunction of the commissioning mode due to the mis-detection of the water level sensor in determining whether the operation of the commissioning mode.

여기서 상기 수위감지센서 및 판단시간의 설정은 당업자의 요구에 따라 다양하게 적용할 수 있으므로 특정한 장치 및 시간에 한정하지 않음은 당연하다.Here, the level sensor and the setting of the determination time can be variously applied according to the needs of those skilled in the art, so it is not limited to a specific device and time.

상기 판단시간이 경과되도록 상기 수위감지센서로부터 감지신호가 입력되지 않을 경우 즉 상기 물탱크에 저장된 물이 없는 것으로 판단이 되는 경우(S108)에는 보일러의 최초 설치로 판단하고 시운전모드를 실행(S109)하게 된다.When the detection signal is not input from the water level sensor so that the determination time elapses, that is, when it is determined that there is no water stored in the water tank (S108), it is determined that the boiler is first installed and the trial operation mode is executed (S109). Done.

여기서 상기 시운전모드에는 물탱크에 물을 자동으로 공급하는 기능을 포함하며, 당업자의 요구에 따라 수동으로 물을 공급하도록 할 수도 있다.Here, the trial run mode includes a function of automatically supplying water to the water tank, and may be configured to manually supply water according to the needs of those skilled in the art.

만약, 상기 판단시간 내에 상기 수위감지센서로부터 감지신호가 입력(S108)되면 상기 물탱크에 물이 저장된 것으로 판단하여 보일러의 일반모드를 실행하게 된다.If the detection signal is input from the water level sensor within the determination time (S108), it is determined that water is stored in the water tank to execute the general mode of the boiler.

도 2는 본 발명에 의한 보일러의 자동 시운전 제어 장치에 대한 블록도로서, 전원공급부(10), 감지부(20), 조작입력부(30), 저장부(40), 제어모듈(50), 구동수단(60), 출력수단(70)으로 구성된다.2 is a block diagram of the automatic commissioning control device of the boiler according to the present invention, the power supply unit 10, the sensing unit 20, the operation input unit 30, the storage unit 40, the control module 50, driving Means 60 and output means 70.

상기 전원공급부(10)는 보일러의 동작을 위해 전기에너지를 공급하는 것으로, 상기 전원공급부(10)를 통해 상기 보일러의 각 전기전자부품으로의 전원공급여부를 상기 제어모듈(50)에 알려주게 된다.The power supply unit 10 supplies electrical energy for the operation of the boiler, and informs the control module 50 of the power supply to each electric and electronic component of the boiler through the power supply unit 10. .

여기서 상기 전원공급부(10)를 통해 공급되는 전원은 상기 제어모듈(50)에도 공급되는 바, 상기 제어모듈(50)이 전기에너지를 공급받아 동작하게 되면 상기 보일러에 전원이 공급된 것으로 판단하도록 할 수 있다.Here, the power supplied through the power supply unit 10 is also supplied to the control module 50, so that when the control module 50 is operated by receiving electric energy, it is determined that power is supplied to the boiler. Can be.

상기 감지부(20)는 물탱크의 저수위를 감지하기 위한 수위감지센서(21), 난방수 및 직수의 온도를 감지하기 위한 온도감지센서(22), 보일러에 설치된 가열수단의 동작여부를 확인하기 위한 화염감지센서(23) 등을 포함하여 구성되며, 상기 각 센서들의 감지신호는 상기 제어모듈(50)로 전송된다.The detection unit 20 is a water level sensor 21 for detecting the low water level of the water tank, a temperature sensor 22 for detecting the temperature of the heating water and direct water, to determine whether the heating means installed in the boiler It is configured to include a flame sensor 23 for the detection, the detection signal of each of the sensors are transmitted to the control module 50.

또한, 상기 각 센서의 종류 및 성능은 당업자의 요구에 따라 다양하게 적용되는 것이므로 특정한 것에 한정하지 않음은 물론이다.In addition, the type and performance of each of the sensors are variously applied according to the needs of those skilled in the art, of course, not limited to a specific one.

상기 조작입력부(30)는 사용자에 의해 상기 보일러의 동작을 입력받기 위한 것으로, 상기 보일러에 직접설치되는 제어패널과 유무선 리모콘 등을 말한다.The operation input unit 30 is for receiving the operation of the boiler by the user, and refers to a control panel and a wired / wireless remote controller installed directly in the boiler.

상기 저장부(40)는 상기 보일러의 시운전모드, 일반동작모드 등의 제어 알고리즘을 저장하는 ROM(Read Only Memory)과, 사용자에 의해 설정된 난방수온도 등의 설정정보를 저장하는 EPPROM(Electrical Erasable Programmable ROM), 연산처리를 위한 임시저장소인 RAM(Random Access Memory) 등으로 구성된다.The storage unit 40 is a ROM (Read Only Memory) for storing control algorithms such as a test operation mode, a general operation mode of the boiler, and EPPROM (Electrical Erasable Programmable) for storing setting information such as a heating water temperature set by a user. ROM) and random access memory (RAM), which is a temporary storage for arithmetic processing.

상기 제어모듈(50)은 상기 전원공급부(10), 감지부(20), 조작입력부(30)로 입력된 신호를 분석하여 상기 조작입력부(30)로 입력된 설정정보를 상기 저장부(40)에 저장하도록 하며, 상기 분석결과에 따라 상기 보일러의 동작을 제어하기 위한 제어신호를 출력하는 것으로, 상기 제어모듈(50)은 도 1에 나타난 순서도에 따라 제어신호를 출력하게 된다.The control module 50 analyzes signals input to the power supply unit 10, the sensing unit 20, and the operation input unit 30, and stores the setting information input to the operation input unit 30 in the storage unit 40. The control module 50 outputs a control signal for controlling the operation of the boiler according to the analysis result, and the control module 50 outputs the control signal according to the flowchart shown in FIG. 1.

상기 구동수단(60)은 상기 제어모듈(50)에서 출력되는 제어신호에 의해 상기 보일러의 난방 및 온수의 공급을 위해 동작되는 것으로, 난방 또는 온수의 공급에 따른 배관계통을 전환하는 삼방변구동부(61), 난방수를 순환시키기 위한 펌프구동부(62), 온수의 공급을 제어하는 온수밸브구동부(63), 난방수를 가열하기 위한 가열수단을 점화하는 점화기구동부(64), 연료연소를 위한 공기를 공급하는 팬구동부(65), 가스의 공급을 제어하는 가스밸브구동부(66) 등을 포함하여 구성된다.The drive means 60 is operated to supply the heating and hot water of the boiler by the control signal output from the control module 50, the three-way drive unit for switching the piping system according to the supply of heating or hot water ( 61), the pump driving unit 62 for circulating the heating water, the hot water valve driving unit 63 for controlling the supply of hot water, the ignition mechanism driving unit 64 for igniting the heating means for heating the heating water, air for fuel combustion And a fan driving unit 65 for supplying the gas, a gas valve driving unit 66 for controlling the supply of gas, and the like.

상기 출력수단(70)은 상기 제어모듈(50)에서 출력되는 제어신호에 의한 제어결과를 출력하는 것으로, LCD(Liquid Crystal Dispaly), LED(Light Emitting Diode), 부저, 스피커 등의 음성 또는 시각정보 출력수단 중 어느 하나 이상을 포함하여 구성된다.The output means 70 outputs a control result by a control signal output from the control module 50, and voice or visual information such as an LCD (Liquid Crystal Dispaly), an LED (Light Emitting Diode), a buzzer, a speaker, and the like. It comprises at least one of the output means.

이하에서 상기와 같이 구성된 본 발명에 의한 보일러의 자동 시운전 제어 장치의 작동상태를 살펴보기로 한다.Hereinafter will be described the operating state of the automatic commissioning control device of the boiler according to the present invention configured as described above.

먼저 보일러를 설치한 후 상기 전원공급부(10)를 통해 상기 보일러에 전원이 인가되면 상기 제어모듈(50)은 상기 보일러의 내부 및 외부에 설치된 각종 배관의 동결상태를 확인하게 된다.First, after the boiler is installed, when power is applied to the boiler through the power supply unit 10, the control module 50 checks the freezing state of various pipes installed inside and outside the boiler.

여기서 상기 동결상태를 확인하기 위한 방법은 당업자의 요구에 따라 다양하게 적용될 수 있으므로 특정한 것에 한정하지 않음은 당연하다.Here, the method for confirming the frozen state may be variously applied according to the needs of those skilled in the art, so it is not limited to the specific one.

상기 동결상태의 확인 결과 상기 보일러의 내부 및 외부에 설치된 각종 배관이 동결로 인해 막혀있는 상태, 즉 완전동결일 경우 상기 제어모듈(50)은 상기 출력수단(70)으로 제어신호를 전송하며, 상기 출력수단(70)은 상기 제어신호에 따라 LED, 부저 도는 스피커 등을 통해 동결에러 메시지를 출력하게 된다.The control module 50 transmits a control signal to the output means 70 when the various pipes installed inside and outside the boiler are blocked due to freezing, that is, when the freezing state is confirmed. The output means 70 outputs a freeze error message through an LED, a buzzer or a speaker according to the control signal.

만약, 상기 보일러의 내부 및 외부에 설치된 각종 배관이 완전동결상태가 아닐 경우 상기 제어모듈(50)은 상기 보일러의 동작을 제어하기 위한 유무선 리모콘, 즉 상기 조작입력부(30)와의 전기적 연결상태를 확인하게 된다.If the various pipes installed inside and outside the boiler are not completely frozen, the control module 50 checks the electrical connection state with the wired / wireless remote controller for controlling the operation of the boiler, that is, the manipulation input unit 30. Done.

만약 상기 조작입력부(30)가 연결되어 있지 않거나, 연결된 상태에서 작동되지 않을 경우 상기 제어모듈(50)은 보일러의 최초설치상태로 판단하고, 상기 물탱크에 설치된 수위감지센서(21)로부터 감지신호가 입력되는지를 확인하게 된다.If the operation input unit 30 is not connected or does not operate in a connected state, the control module 50 determines the initial installation state of the boiler and detects a detection signal from the water level sensor 21 installed in the water tank. Is checked.

상기 수위감지센서(21)로부터 감지신호가 상기 제어모듈(50)로 입력되면 상기 제어모듈(50)은 상기 물탱크에 물이 저장된 것으로 판단하여 보일러의 시운전모드를 실행하게 된다.When the detection signal from the water level sensor 21 is input to the control module 50, the control module 50 determines that water is stored in the water tank and executes the test run mode of the boiler.

즉, 상기 전원공급부(10)로부터 전기에너지가 공급되면 상기 물탱크의 저수위감지하기 위한 상기 수위감지센서(21)로부터 출력되는 감지신호의 입력여부를 확인하여 상기 수위감지센서(21)로부터 감지신호가 입력되지 않으면 상기 저장부(40)에 저장된 시운전모드에 따라 상기 구동수단(60)을 제어하게 되는 것이다.That is, when electrical energy is supplied from the power supply unit 10, the input signal of the detection signal output from the water level sensor 21 for detecting the low water level of the water tank is checked and the detection signal from the water level sensor 21 is detected. If is not input is to control the drive means 60 in accordance with the trial run mode stored in the storage unit 40.

상기 본 발명은 당업자의 요구에 따라 기본 개념을 벗어나지 않는 범위 내에서 다양한 변형이 가능하다.The present invention may be modified in various ways without departing from the basic concept according to the needs of those skilled in the art.

상술한 바와 같이 본 발명에 따르면 보일러의 최초 설치시 상기 보일러에 전원이 인가되면 상기 보일러가 자동으로 시운전 동작을 수행하도록 함으로써 상기 보일러의 이상여부를 신속하게 확인할 수 있음은 물론 상기 보일러의 이상 발생시 상기 보일러의 교체 및 수리가 용이하도록 하는 효과가 있다.As described above, according to the present invention, when power is applied to the boiler during the initial installation of the boiler, the boiler automatically performs a trial operation so that it is possible to quickly check whether the boiler is abnormal. There is an effect to facilitate the replacement and repair of the boiler.

따라서 사용상의 편리성이 개선되어 보다 상품성이 향상되는 등의 매우 유용한 발명인 것이다.Therefore, it is a very useful invention such that the convenience in use is improved and the merchandise is more improved.

Claims (5)

보일러의 동작을 위해 전기에너지를 공급하는 전원공급부(10)와;A power supply unit 10 supplying electric energy for the operation of the boiler; 물탱크의 저수위를 감지하기 위한 수위감지센서(21)를 포함하여 구성되며, 난방수의 온도감지 및 난방수의 가열 여부 등을 감지하는 감지부(20)와;A detection unit 20 configured to include a water level sensor 21 for detecting a low water level of the water tank, and detecting a temperature of the heating water and whether the heating water is heated; 사용자에 의해 상기 보일러의 동작을 입력받는 조작입력부(30)와;An operation input unit 30 which receives an operation of the boiler by a user; 상기 보일러의 시운전모드, 일반동작모드 등의 제어 알고리즘 및 사용자에 의해 설정된 난방수온도 등의 설정정보를 저장하는 저장부(40)와;A storage unit 40 for storing control information such as a test operation mode of the boiler, a general operation mode, and setting information such as a heating water temperature set by a user; 상기 전원공급부(10), 감지부(20), 조작입력부(30)로 입력된 신호를 분석하여, 상기 조작입력부(30)로 입력된 설정정보를 상기 저장부(40)에 저장하도록 하며, 상기 분석결과에 따라 상기 보일러의 동작을 제어하기 위한 제어신호를 출력하는 제어모듈(50)과;Analyzing the signals input to the power supply unit 10, the sensing unit 20, the operation input unit 30, and stores the setting information input to the operation input unit 30 in the storage unit 40, A control module 50 for outputting a control signal for controlling the operation of the boiler according to an analysis result; 상기 제어모듈(50)에서 출력되는 제어신호에 의해 동작되는 구동수단(60); 및Driving means (60) operated by a control signal output from the control module (50); And 상기 제어모듈(50)에서 출력되는 제어신호에 의한 제어결과를 출력하는 출력수단(70);을 구비하는 보일러에 있어서,In the boiler comprising: an output means (70) for outputting a control result by the control signal output from the control module (50), 보일러에 전원이 공급되면 상기 제어모듈(50)이 물탱크에 설치된 수위감지센서(21)로부터 감지신호가 입력되는지를 확인하는 단계와;Checking whether a detection signal is input from the water level sensor 21 installed in the water tank by the control module 50 when power is supplied to the boiler; 상기 제어모듈(50)에 상기 수위감지센서(21)로부터 감지신호가 입력되면 일반모드로 전환하는 단계; 및Switching to a normal mode when a detection signal is input from the water level sensor 21 to the control module 50; And 제어모듈(50)에 상기 수위감지센서(21)로부터 감지신호가 입력되지 않으면 상기 저장부(40)에 저장된 시운전모드를 실행하는 단계;로 이루어진 것을 특징으로 하는 보일러의 자동 시운전 제어 방법.If the detection signal is not input to the control module 50 from the water level sensor 21 to execute the commissioning mode stored in the storage unit; Auto commissioning control method of the boiler, characterized in that consisting of. 제1항에 있어서,The method of claim 1, 제어모듈(50)에서 보일러의 구성 및 배관의 동결여부를 확인하여 동결상태일 경우 동결에러메시지를 출력하고,The control module 50 checks the configuration of the boiler and whether the pipes are frozen, and outputs a frozen error message in the frozen state. 동결상태가 아닐 경우 상기 수위감지센서(21)로부터 감지신호가 입력되는지를 확인하도록 하는 것을 포함하여 이루어진 것을 특징으로 하는 보일러의 자동 시운전 제어 방법.When not in the frozen state, the automatic start-up control method of the boiler, characterized in that made to include checking whether the detection signal is input from the water level sensor (21). 제1항 또는 제2항에 있어서,The method according to claim 1 or 2, 리모콘의 연결여부를 확인하여 리모콘이 연결된 상태에서 작동될 경우 일반모드로 전환하고,Check if the remote controller is connected and if the remote controller is connected, switch to normal mode. 리모콘이 연결되지 않거나 연결된 상태에서 작동되지 않을 경우 상기 수위감지센서(21)로부터 감지신호가 입력되는지를 확인하도록 하는 것을 더 포함하여 이루어진 것을 특징으로 하는 보일러의 자동 시운전 제어 방법.When the remote control is not connected or does not operate in a connected state, the automatic start-up control method of the boiler, characterized in that further comprising the step of confirming whether the detection signal is input from the water level sensor (21). 제3항에 있어서,The method of claim 3, 상기 수위감지센서(21)로부터 감지신호가 입력되는지를 확인하는 단계는,The step of checking whether the detection signal is input from the water level sensor 21, 판단시간동안 상기 감지신호의 입력여부를 확인하는 단계로 이루어진 것을 특징으로 하는 보일러의 자동 시운전 제어 방법.The automatic commissioning control method of the boiler, characterized in that the step consisting of checking the input of the detection signal during the determination time. 보일러의 동작을 위해 전기에너지를 공급하는 전원공급부(10)와;A power supply unit 10 supplying electric energy for the operation of the boiler; 물탱크의 저수위를 감지하기 위한 수위감지센서(21)를 포함하여 구성되며, 난방수의 온도감지 및 난방수의 가열 여부 등을 감지하는 감지부(20)와;A detection unit 20 configured to include a water level sensor 21 for detecting a low water level of the water tank, and detecting a temperature of the heating water and whether the heating water is heated; 사용자에 의해 상기 보일러의 동작을 입력받는 조작입력부(30)와;An operation input unit 30 which receives an operation of the boiler by a user; 상기 보일러의 시운전모드, 일반동작모드 등의 제어 알고리즘 및 사용자에 의해 설정된 난방수온도 등의 설정정보를 저장하는 저장부(40)와;A storage unit 40 for storing control information such as a test operation mode of the boiler, a general operation mode, and setting information such as a heating water temperature set by a user; 상기 전원공급부(10), 감지부(20), 조작입력부(30)로 입력된 신호를 분석하여, 상기 조작입력부(30)로 입력된 설정정보를 상기 저장부(40)에 저장하도록 하며, 상기 분석결과에 따라 상기 보일러의 동작을 제어하기 위한 제어신호를 출력하는 제어모듈(50)과;Analyzing the signals input to the power supply unit 10, the sensing unit 20, the operation input unit 30, and stores the setting information input to the operation input unit 30 in the storage unit 40, A control module 50 for outputting a control signal for controlling the operation of the boiler according to an analysis result; 상기 제어모듈(50)에서 출력되는 제어신호에 의해 동작되는 구동수단(60); 및Driving means (60) operated by a control signal output from the control module (50); And 상기 제어모듈(50)에서 출력되는 제어신호에 의한 제어결과를 출력하는 출력수단(70);을 구비하는 보일러에 있어서,In the boiler comprising: an output means (70) for outputting a control result by the control signal output from the control module (50), 상기 제어모듈(50)은,The control module 50, 상기 전원공급부(10)로부터 전기에너지가 공급되면, 상기 물탱크의 저수위감지하기 위한 상기 수위감지센서(21)로부터 출력되는 감지신호의 입력여부를 확인하여, 상기 수위감지센서(21)로부터 감지신호가 입력되지 않으면, 상기 저장부(40)에 저장된 시운전모드에 따라 상기 구동수단(60)을 제어하도록 구성된 것을 특징으로 하는 보일러의 자동 시운전 제어 장치.When the electrical energy is supplied from the power supply unit 10, by checking whether the detection signal output from the water level sensor 21 for detecting the low water level of the water tank is input, the detection signal from the water level sensor 21 Is not input, the automatic commissioning control device of the boiler, characterized in that configured to control the drive means (60) according to the trial run mode stored in the storage (40).
KR1020050086388A 2005-09-15 2005-09-15 Automatic Operation Test Control Method and System of Boiler KR100742942B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020050086388A KR100742942B1 (en) 2005-09-15 2005-09-15 Automatic Operation Test Control Method and System of Boiler

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020050086388A KR100742942B1 (en) 2005-09-15 2005-09-15 Automatic Operation Test Control Method and System of Boiler

Publications (2)

Publication Number Publication Date
KR20070031681A KR20070031681A (en) 2007-03-20
KR100742942B1 true KR100742942B1 (en) 2007-07-25

Family

ID=41630689

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020050086388A KR100742942B1 (en) 2005-09-15 2005-09-15 Automatic Operation Test Control Method and System of Boiler

Country Status (1)

Country Link
KR (1) KR100742942B1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100968349B1 (en) 2008-12-26 2010-07-09 린나이코리아 주식회사 Controlling method for automatic test driving of boiler
KR20170013458A (en) 2015-07-27 2017-02-07 린나이코리아 주식회사 How boiler control my judgment complete frozen and freeze protection operation accordingly

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100907616B1 (en) * 2007-12-27 2009-07-14 린나이코리아 주식회사 Communication control device and method of boiler remote control for reducing standby power
KR102172762B1 (en) * 2019-01-22 2020-11-02 김상구 Portable hot water boiler

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100291489B1 (en) 1998-12-31 2001-06-01 김우련 Method and device for commissioning gas boiler

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100291489B1 (en) 1998-12-31 2001-06-01 김우련 Method and device for commissioning gas boiler

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100968349B1 (en) 2008-12-26 2010-07-09 린나이코리아 주식회사 Controlling method for automatic test driving of boiler
KR20170013458A (en) 2015-07-27 2017-02-07 린나이코리아 주식회사 How boiler control my judgment complete frozen and freeze protection operation accordingly

Also Published As

Publication number Publication date
KR20070031681A (en) 2007-03-20

Similar Documents

Publication Publication Date Title
US7103272B2 (en) Water heater and method of operating the same
US7747358B2 (en) Building equipment component control with automatic feature detection
KR101976646B1 (en) Three-way fixing and fault detection method of heating-only boiler with hot water storage tank
KR100742942B1 (en) Automatic Operation Test Control Method and System of Boiler
JP4910490B2 (en) Automatic diagnosis method for hot water supply system
JP2007010242A (en) Heat pump type hot water supply device
KR101459278B1 (en) Method for detecting fixed three way valve and misoperation of boiler
KR101506871B1 (en) Control system for inside water leak of water-heating equipment having heat exchanger and the method thereof
KR100601575B1 (en) Operation test waiting time control method and system of close type boiler
KR100830734B1 (en) Controlling apparatus for a boiler sysstem
KR100679818B1 (en) Device of preventing overheat of boiler and method of preventing thereof
JP4668246B2 (en) Hot water use system
KR20170069098A (en) Gas boiler and emergency driving control method thereof
US11408643B2 (en) Water heating apparatus with immediate hot water supply function and water heating system
KR20140037565A (en) Gas boiler and trial run method thereof
KR20150090440A (en) Combustion conversion method for preventiong incomplete combustion of boiler
JP2011106735A (en) Erroneous piping detection system in bathroom heating device
KR100551194B1 (en) Controlling system for rewarding a interruption of electric power of boiler
KR100679897B1 (en) Method for driving a boiler on the freezing mode
KR101039932B1 (en) Emergent driving method for boiler using operation detection of hot water
KR101938565B1 (en) Piping misassembly detection method in cascade boiler system
KR100968349B1 (en) Controlling method for automatic test driving of boiler
JP6523146B2 (en) Bathroom heater
JP6657579B2 (en) Water heater
KR101010921B1 (en) Emergent driving method for boiler using hot water and outdoor temperature detection

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
AMND Amendment
E601 Decision to refuse application
J201 Request for trial against refusal decision
AMND Amendment
B701 Decision to grant
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20130628

Year of fee payment: 7

FPAY Annual fee payment

Payment date: 20140626

Year of fee payment: 8

FPAY Annual fee payment

Payment date: 20160630

Year of fee payment: 10

FPAY Annual fee payment

Payment date: 20180702

Year of fee payment: 12

FPAY Annual fee payment

Payment date: 20190701

Year of fee payment: 13