KR100740722B1 - Rock splinter removal device of excavation ground - Google Patents

Rock splinter removal device of excavation ground Download PDF

Info

Publication number
KR100740722B1
KR100740722B1 KR1020050128000A KR20050128000A KR100740722B1 KR 100740722 B1 KR100740722 B1 KR 100740722B1 KR 1020050128000 A KR1020050128000 A KR 1020050128000A KR 20050128000 A KR20050128000 A KR 20050128000A KR 100740722 B1 KR100740722 B1 KR 100740722B1
Authority
KR
South Korea
Prior art keywords
turbid water
excavation hole
pressure adjusting
adjusting chamber
hole
Prior art date
Application number
KR1020050128000A
Other languages
Korean (ko)
Other versions
KR20070066615A (en
Inventor
송승원
Original Assignee
동부엔지니어링 주식회사
송승원
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 동부엔지니어링 주식회사, 송승원 filed Critical 동부엔지니어링 주식회사
Priority to KR1020050128000A priority Critical patent/KR100740722B1/en
Publication of KR20070066615A publication Critical patent/KR20070066615A/en
Application granted granted Critical
Publication of KR100740722B1 publication Critical patent/KR100740722B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B37/00Methods or apparatus for cleaning boreholes or wells
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B08CLEANING
    • B08BCLEANING IN GENERAL; PREVENTION OF FOULING IN GENERAL
    • B08B5/00Cleaning by methods involving the use of air flow or gas flow
    • B08B5/04Cleaning by suction, with or without auxiliary action
    • B08B5/043Cleaning travelling work

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Earth Drilling (AREA)

Abstract

본 발명은 굴착공 바닥의 암편 제거장치에 관한 것으로서, 종래의 제거장치는 슬러리만 제거하거나 흡입구 크기가 한정되어서 직경 10cm 이상 크기의 암편은 제거하기가 곤란하였으며, 메카니칼펌프와 행그랩을 이용하는 것은 부압으로 굴착공의 공벽이 붕괴되는 사례가 많다고 할 수 있다.The present invention relates to a device for removing an arm piece at the bottom of an excavation hole, and a conventional removal device is difficult to remove only a slurry or a size of an inlet size of more than 10 cm in diameter, using a mechanical pump and a hang grab. As a result, there are many cases where the excavating wall of the excavation hole collapses.

이에 본 발명은 유입된 탁수를 토출구(111)로 토출하는 압력조정실(110); 상기 압력조정실(110) 하부에 조립되고, 내부에는 흡입한 탁수를 상기 흡입구(121)를 통해 압력조정실(110)로 공급하는 탁수펌프세트(130)가 설치되며, 상기 탁수흡입관(131)으로 유입되는 탁수의 이물질을 걸러주는 1차필터망(132)과 탁수 흡입 때 딸려오는 암편을 튕겨서 옆으로 확산시켜주는 깔대기 형태의 분배기(133)가 함께 설치된 제1본체(120); 상기 제1본체(120) 하부에 조립되고, 하측 개구부(141)를 통해 탁수가 유입되고, 내벽에 복층의 채집망(143)이 다수 형성된 제2본체(140); 상기 압력조정실(110)에서 토출되는 탁수를 굴착공(200)의 바닥으로 분사하는 분사구(150); 로 암편제거장치 본체(100)를 구성하고, 상기 압력조정실(110)과 제1본체(120) 및 제2본체(140)는 통상의 결착수단에 의해 서로 분해 조립되는 구조로 구성한 것으로서, 압력조정실로 흡입된 물을 굴착공 바닥으로 순환 분사시키는 과정을 반복하면서 그 탁수의 흡입력과 분사력을 이용하여 직경 10cm 이상되는 크기의 암편들을 효과적으로 교란시켜 띄워준 후 제2본체 내부의 채집망에 포획시켜 제거하는 것이므로 작업중 공벽의 붕괴 우려가 없어 보다 안전하며, 작업과정이 매우 신속 간편하여 인력과 비용절감 및 공기단축의 효과가 큰 것이다.Accordingly, the present invention provides a pressure control chamber 110 for discharging the introduced turbid water to the discharge port 111; Being assembled under the pressure adjusting chamber 110, there is a turbid water pump set 130 for supplying the suctioned turbid water to the pressure adjusting chamber 110 through the suction port 121, the inflow into the turbid water suction pipe 131 A first main body 120 having a primary filter network 132 for filtering foreign matters of the turbid water and a funnel-type distributor 133 which bounces and spreads the female pieces coming from the inhalation of the turbid water; A second main body 140 assembled under the first main body 120, turbid water is introduced through the lower opening 141, and a plurality of collecting nets 143 are formed on the inner wall; A spray hole 150 for spraying the turbid water discharged from the pressure adjusting chamber 110 to the bottom of the excavation hole 200; The arm piece removal apparatus main body 100, and the pressure adjusting chamber 110, the first body 120 and the second body 140 is configured to be assembled by disassembling each other by the usual binding means, pressure adjusting chamber Repeatedly spraying the water sucked into the bottom of the excavation hole while using the turbidity suction force and spraying force to effectively disturb and float rock pieces larger than 10cm in diameter, and then capture and remove them in the collecting network inside the second body. It is safer because there is no fear of collapse of the wall during work, and the work process is very quick and simple, so the effect of manpower, cost reduction and air shortening is great.

굴착공, 현장타설말뚝, 슬러리월, 암편, 암편제거장치, Excavators, cast-in-place piles, slurry walls, rock fragments, rock removal units,

Description

굴착공 바닥의 암편 제거장치{Rock splinter removal device of excavation ground}Rock splinter removal device of excavation ground

도1 은 본 발명의 암편 제거장치가 인양체인에 매달려 굴착공 바닥에 투입된 상태를 보인 도면1 is a view showing a state in which the arm piece removal device of the present invention is put into the bottom of the drilling hole hanging on the lifting chain

도2 는 본 발명이 실시된 암편 제거장치의 내부 구조를 보인 횡단면도Figure 2 is a cross-sectional view showing the internal structure of the arm piece removal device is implemented the present invention

도3 은 도2 의 A - A선 단면도3 is a cross-sectional view taken along the line A-A of FIG.

도4 는 도2 의 B - B선 단면도4 is a cross-sectional view taken along the line B-B of FIG.

도면의 주요부분에 대한 부호의 설명Explanation of symbols for main parts of the drawings

100 : 암편제거장치 본체 110 : 압력조정실100: arm piece removal device 110: pressure control room

121 : 흡입구 112 : 필터121: inlet 112: filter

120 : 제1본체 130 : 탁수펌프세트120: first body 130: turbid water pump set

131 : 탁수흡입관 132 : 1차필터망131: turbid water suction pipe 132: primary filter network

133 : 분배기 140 : 제2본체133: distributor 140: second body

141 : 개구부 143 : 채집망141: opening 143: collecting network

150 : 분사구 160 : 결착구150: injection hole 160: binding hole

170 : 인양체인 200 : 굴착공170: lifting chain 200: excavator

본 발명은 굴착공 바닥의 암편 제거장치에 관한 것으로서, 더욱 상세히는 굴착시 청수를 사용하는 현장타설말뚝 또는 슬러리월 굴착 완료 후의 굴착공 바닥에 침적되는 물질 중에서 직경 10cm 이상되는 암편(Cobble size)들을 신속 간편하게 대량으로 제거할 수 있는 굴착공 바닥의 암편 제거장치에 관한 것이다.The present invention relates to a device for removing a piece of rock at the bottom of an excavation hole, and more specifically, to a rock pile (Cobble sizes) having a diameter of 10 cm or more among the materials deposited on the bottom of a drilling hole after completion of excavation of a site-pouring pile or slurry wall when using excavation The present invention relates to a device for removing a piece of rock at the bottom of an excavation hole that can be quickly and easily removed in large quantities.

일반적으로 현장타설말뚝의 시공을 위해 또는 차수벽과 지하 외벽의 역활을 하는 벽체구조물인 슬러리월 시공을 위해 지반을 굴착할 경우 그 굴착 완료된 지하의 굴착공 바닥에는 지하수 또는 굴착수와 함께 흘러내린 토사 및 암편 등의 각종 물질이 침적된다.In general, when excavating the ground for the construction of cast-in-place piles or for the construction of slurry walls, which are wall structures that play the role of the order walls and the outer walls of the foundation, the ground and ground water and the excavated water flows along with the groundwater or the excavated water. Various substances, such as rock fragments, are deposited.

그 굴착공 바닥에 침적된 물질 중에서 커다란 암편이 많으면 다음과 같은 문제점을 초래한다. 즉, 현장타설말뚝의 경우 초기 주면 마찰력으로 지지되는 하중은 시간 경과에 따라 점차 선단부로 하중을 전이하여 지지력 저하를 초래하고, 슬러리월 등의 벽체 구조물에 대해서는 차수효과를 현저히 저하시킨다.Many of the large pieces of material deposited on the bottom of the excavation hole causes the following problems. That is, in the case of a cast-in-place pile, the load supported by the initial main surface frictional force gradually transfers the load to the tip portion over time, leading to a decrease in the bearing capacity, and remarkably lowers the ordering effect on wall structures such as slurry walls.

따라서 이를 위해 종래에도 각종 제거장치를 이용하여 지하 굴착이 완료되면 현장타설말뚝이나 슬러리월을 시공하기 전에 굴착공 바닥에 침적된 슬러리나 암편을 제거하고는 있으나 이들은 다음과 같은 문제점들이 있다.Therefore, to this end, conventionally, when underground excavation is completed by using various removal devices, the slurry or rock fragments deposited on the bottom of the excavation hole is removed before the construction of the site-placement pile or slurry wall, but these have the following problems.

에어리프트(Air Lift)를 이용한 것은 슬러리만 제거할 뿐이고, 리버스 서큐레이션(RCD) 공법은 그 흡입구 크기가 한정되어 있어서 직경 10cm 정도 크기의 암 편은 제거가 곤란하며, 메카니칼 펌프(Mechanical Pump)를 이용하는 것은 굴착공 저면에 부압이 형성되어 공벽이 붕괴되는 사례가 많고, 충격식 굴착장비인 행그랩(Hang Grab)을 이용한 것은 효율이 떨어지고 이 역시 공벽의 붕괴사례가 많다. Using Air Lift only removes the slurry, and the Reverse Circulation (RCD) method has a limited inlet size, making it difficult to remove a 10 cm diameter arm piece. In many cases, the negative pressure is formed on the bottom of the excavation hole and the ball wall collapses. The use of Hang Grab is less efficient and there are many cases of collapse of the hollow walls.

특히, 상기한 종래의 제거장치들은 모두 직경 10cm 이상되는 큰 암편(Cobble size)들의 제거는 효과적으로 수행할 수가 없었으며, 이러한 직경 10cm 이상되는 암편(Cobble size)을 신속히 대량으로 제거할 수 있는 장치가 현재까지 개발되지 못함에 따라 종래에는 암편 제거에 따른 인력과 시간 소모가 많고 이로 인해 공사비 상승과 공사기일이 상당히 길어지는 문제점이 있어 그 개발이 시급한 실정이다. In particular, all of the above-mentioned conventional removal apparatuses cannot effectively remove large cobble sizes larger than 10 cm in diameter, and a device capable of rapidly removing a large amount of such cobble sizes larger than 10 cm in diameter can be removed. As it has not been developed to date, conventionally, manpower and time are consumed due to the removal of rock fragments, and thus, there is a problem that the construction cost is increased and the construction date is considerably longer.

본 발명은 상기와 같은 종래의 문제점을 감안하여 개발된 것으로서, 본 발명의 목적은 이물질이 포함되어 탁하게 변한 지하수나 굴착수(이하 "탁수"라 칭함)로 충진되어 있는 현장타설말뚝 또는 슬러리월 굴착공의 바닥에서 상기 탁수를 이용하여 침적되어 있는 직경 10cm 크기 이상되는 암편을 집중적으로 신속 간편하게 제거할 수 있는 굴착공 바닥의 암편 제거장치를 제공하는데 있다.The present invention was developed in view of the above-mentioned conventional problems, and an object of the present invention is to excavate a site-pouring pile or slurry wall filled with turbid ground water or excavated water (hereinafter referred to as "muddy water") containing foreign matter. In the bottom of the ball to provide a rock removal device of the bottom of the excavation hole that can quickly and easily remove the concentrated concentrated rock pieces 10cm in diameter using the turbid water.

이하에서, 본 발명의 상기 목적을 효과적으로 달성할 수 있는 바람직한 기술구성 및 작용을 실시예로 첨부한 별첨 도면에 의해 상세히 설명하면 다음과 같다.Hereinafter, described in detail by the accompanying drawings, preferred embodiments of the present invention, which can effectively achieve the above object of the present invention by way of example.

도1 은 본 발명의 암편 제거장치가 인양체인에 매달려 굴착공 바닥에 투입된 상태를 보인 도면이고, 도2 는 본 발명이 실시된 암편 제거장치의 내부 구조를 보인 횡단면도이며, 도3 은 도2 의 A - A선 단면도, 도4 는 도2 의 B - B선 단면도이다.1 is a view showing a state in which the arm piece removing device of the present invention is put into the bottom of the excavation hole hanging on the lifting chain, Figure 2 is a cross-sectional view showing the internal structure of the arm piece removing device according to the present invention, Figure 3 A-A line sectional drawing, FIG. 4 is B-B line sectional drawing of FIG.

이에 도시된 바와 같이 본 발명은, 현장타설말뚝이나 슬러리월 시공용 굴착공(200) 바닥의 암편 제거장치를 구성함에 있어서, 흡입구(121)를 통해 유입된 탁수는 사방의 토출구(111)를 통해 토출되는 압력조정실(110); As shown in the present invention, in the construction of a rock piece removal device at the bottom of the site-casting pile or slurry wall construction excavation hole 200, turbid water introduced through the inlet 121 through the discharge port 111 in all directions A pressure adjusting chamber 110 discharged;

상기 압력조정실(110) 하부에 조립되고, 내부에는 하단의 탁수흡입관(131)을 통해 흡입한 탁수를 상기 흡입구(121)를 통해 압력조정실(110) 내부로 공급하는 탁수펌프세트(130)가 설치되며, 상기 탁수흡입관(131) 외표면에는 흡입되는 탁수의 이물질을 걸러주는 1차필터망(132)과 탁수 흡입 때 딸려오는 암편을 튕겨서 옆으로 확산시켜주는 깔대기 형태의 분배기(133)가 함께 설치된 제1본체(120); The turbidity water pump set 130 is installed at the lower portion of the pressure regulation room 110, and supplies the turbid water sucked through the turbidity water suction pipe 131 at the bottom thereof into the pressure regulation room 110 through the inlet 121. On the outer surface of the turbid water suction pipe 131, a primary filter network 132 for filtering foreign matters of the turbid water sucked and a funnel-type distributor 133 that bounces the female pieces that come with the turbid water suction and spreads it to the side are installed together. First body 120;

상기 제1본체(120) 하부에 조립되고, 하측 개구부(141)가 지지다리(142)에 의해 지면에서 소정간격 이격된 상태를 이루며, 내벽에 복층으로 다수의 채집망(143)이 형성된 제2본체(140); The second body is assembled to the lower portion of the first body 120, the lower opening 141 is spaced apart from the ground by a support leg 142 a predetermined distance, the second wall having a plurality of collecting nets 143 in a double layer on the inner wall Main body 140;

상기 압력조정실(110)의 각 토출구(111)에 연결되는 토출관(151)의 선단에 설치되며, 굴착공(200)의 바닥을 향하여 하향으로 제2본체(140)의 둘레에 고정 설치되는 분사구(150); 로 암편제거장치 본체(100)를 구성한 것을 특징으로 한다. The injection hole is installed at the distal end of the discharge pipe 151 connected to each discharge port 111 of the pressure adjusting chamber 110 and fixedly installed around the second body 140 downward toward the bottom of the excavation hole 200. 150; The arm piece removal apparatus main body 100 is characterized in that the configuration.

그리고, 상기 암편제거장치 본체(100)를 구성하는 압력조정실(110)과 제1본체(120) 및 제2본체(140)는 통상의 결착수단에 의해 서로 탈착 가능하게 분해 조립식으로 구성함을 특징으로 한다.In addition, the pressure adjusting chamber 110 and the first body 120 and the second body 140 constituting the arm piece removing device 100 are detachably assembled to each other by conventional binding means. It is done.

여기서 상기 압력조정실(110)의 토출구(111) 선단에 2차필터(112)를 설치하여 탁수의 이물질이 2차에 걸쳐 걸러지게 하는 것이 바람직하며, 이는 분사구(150)로 분사되는 물에 이물질이 있을 경우 그 분사력이 저하됨을 방지하기 위한 것이다. In this case, it is preferable to install a secondary filter 112 at the tip of the discharge port 111 of the pressure adjusting chamber 110 so that foreign matter in the turbid water is filtered through the secondary, which is foreign matter in the water injected into the injection hole 150. If present, it is to prevent the injection force is lowered.

그리고, 상기 제2본체(140)의 내벽에 설치되는 다단의 채집망(143)은 위에서 아래로 갈수록 점차 폭이 넓어지는 계단형으로 설치하여 암편들이 단계적으로 걸리도록 하고, 상기 계단형 채집망(143)들은 모두 상향하여 비스듬히 경사지게 설치하여 암편이 잘 떨어지지 않도록 하는 것이 바람직하다.In addition, the multi-stage collecting network 143 installed on the inner wall of the second body 140 is installed in a step shape gradually wider from the top to the bottom so that the female pieces are stepped, and the stepped collecting network ( 143) is preferably installed to be inclined obliquely upward to prevent the arm piece from falling off well.

또한 상기 압력조정실(110)과 제1본체(120) 및 제2본체(140)의 분해 조립을 위한 결착수단은 널리 알려진 통상의 볼트/너트(도면에 미도시)를 이용한 결착수단을 사용하여도 되고, 또는 도면에 도시된 바와같이 걸림턱(162)에 고리(161)가 걸리면 괘정상태를 유지하고 고리(161)가 풀리면 해정되는 통상의 결착구(160)를 사용하여도 무방한 것이며, 그 외에 다른 결착수단을 사용하여도 무방하다. In addition, the binding means for disassembly and assembly of the pressure adjusting chamber 110, the first body 120 and the second body 140 may use a binding means using a well-known conventional bolt / nut (not shown). Or, as shown in the drawing, if the hook 161 is caught on the latching jaw 162, it may be used to maintain the ruled state, and use the normal binder 160 that is released when the hook 161 is released. In addition, other binding means may be used.

그리고, 분사공이 제2본체(140)의 테두리와 굴착공(200) 바닥 사이의 공간부에서 안쪽 바닥을 향하여 비스듬히 분사되게 설치하는 것이 바람직하며, 그렇게 하면 제2본체(140)의 하단에 위치하는 직경 10cm 크기 이상의 암편들을 분사되는 물로 쉽게 교란시켜서 띄워주고 그 띄워진 암편들이 제2본체(140) 내부로 원활히 흡입될 수 있기 때문이다.And, the injection hole is preferably installed so as to be inclined toward the inner bottom in the space between the edge of the second body 140 and the bottom of the excavation hole 200, it is located at the bottom of the second body 140 This is because the armpieces having a diameter of 10 cm or more can be easily disturbed and floated with the sprayed water, and the floated arms can be smoothly sucked into the second body 140.

도면중 미설명 부호 (135)는 탁수펌프세트(130)의 고정구이고, (170)은 본 발명의 암편 제거장치를 굴착공(200)에 인양하기 위해 압력조정실(110) 상단에 결 착한 인양체인 이다.In the drawings, reference numeral 135 is a fixture of the turbid water pump set 130, and 170 is a lifting chain that is attached to the upper end of the pressure adjusting chamber 110 to lift the arm piece removing device of the present invention to the excavation hole 200. to be.

이와 같이 형성된 본 발명의 암편 제거장치에 의해 지하수가 충진된 굴착공 바닥에서 침적되어 있는 암편을 제거하는 과정을 설명하면 다음과 같다. Referring to the process of removing the rock fragments deposited in the bottom of the excavation hole filled with groundwater by the rock piece removal apparatus of the present invention formed as described above are as follows.

본 발명의 암편 제거장치를 인양체인(170)에 매달아 지하수나 굴착수가 채워진 굴착공(200) 속으로 가라앉혀서 하부의 지지다리(142)가 굴착공(200) 바닥에 놓이게 하면 지지다리(142)에 의해 굴착공(200) 바닥과 제2본체(140)의 하측 개구부(141) 사이에는 소정의 간격이 유지되며, 그러한 하측 개구부(141)를 통해 제2본체(140) 속으로 이물질이 포함되어 탁하게 변한 탁수가 유입될 수 있는 상태가 된다.Hanging the rock piece removal device of the present invention to the lifting chain 170 to sink into the excavation hole 200 filled with groundwater or excavation water to support the lower support leg 142 to the bottom of the excavation hole 200, the support leg 142 By a predetermined distance is maintained between the bottom of the excavation hole 200 and the lower opening 141 of the second body 140, foreign matter is contained in the second body 140 through the lower opening 141. The turbid turbid water can be introduced.

이러한 상태에서 탁수펌프세트(130)를 가동시키면 제2본체(140)의 하측 개구부(141)를 통해 제2본체(140) 내부로 유입되는 탁수가 탁수흡입관(131)의 무수한 흡입공을 통해 흡입된 후 흡입구(121)를 통해 압력조정실(110)로 유입되어 채워지며, 압력조정실(110)에 채워진 탁수는 토출구(111)와 연결된 토출관(151)의 분사구(150)를 통해 분사되는 과정을 연속 반복하여 순환하게 된다. When the turbid water pump set 130 is operated in this state, turbid water introduced into the second body 140 through the lower opening 141 of the second body 140 is sucked through the myriad suction holes of the turbid water suction pipe 131. After the inlet 121 is filled into the pressure adjusting chamber 110 through the inlet 121, the turbid water filled in the pressure adjusting chamber 110 is sprayed through the injection port 150 of the discharge pipe 151 connected to the discharge port 111 The cycle is repeated continuously.

이때, 상기 제1본체(120) 속으로 유입된 탁수의 큰 이물질은 탁수흡입관(131)으로 흡입되기 전에 1차필터망(132)에 의해 어느정도 걸러지므로 펌프의 고장을 방지할 수 있고, 그 후 다시 압력조정실(110) 내부의 2차필터(112)에 의해 이물질이 걸러지는 것이므로 토출구(111)와 연결된 토출관(151)을 통해 분사구(150)로 분사되는 물은 보다 맑은 상태로 분사가 된다.At this time, the large foreign matter of the turbid water introduced into the first body 120 is filtered to some extent by the primary filter network 132 before being sucked into the turbid water suction pipe 131, it is possible to prevent the failure of the pump thereafter Since the foreign matter is filtered by the secondary filter 112 inside the pressure adjusting chamber 110, the water injected into the injection hole 150 through the discharge pipe 151 connected to the discharge hole 111 is sprayed in a more clear state. .

그리고, 상기 분사구(150)는 제2본체(140)의 둘레 아래쪽의 굴착공(200) 바닥을 향하도록 하향으로 고정 설치된 것이므로 그 분사되는 물은 항시 굴착공(200) 바닥을 향하여 분사되며, 이로 인해 굴착공(200) 바닥에 침적된 암편들은 직경 10cm 크기 이상의 것이라 하더라도 분사되는 물로 쉽게 교란되어 위로 띄워지게 된다. In addition, since the injection hole 150 is fixedly installed downward to face the bottom of the excavation hole 200 in the circumferential bottom of the second body 140, the sprayed water is always sprayed toward the bottom of the excavation hole 200. Due to this, the rock pieces deposited on the bottom of the excavation hole 200 are easily disturbed by water sprayed even if they are 10 cm or more in diameter and floated up.

이러한 상태에서 탁수흡입관(131)의 흡입력이 작용하면 암편들은 탁수흡입관(131) 외부를 감싸고 있는 1차필터망(132)을 향하여 상승하게 되며, 그러다가 암편들은 탁수흡입관(131) 외부의 1차필터망(132) 표면에 복층으로 설치된 다수의 분배기(133)에 부딪게 된다. 이때 분배기(133)는 아래는 좁고 위쪽이 넓은 깔대기 형태를 이루고 있으므로 분배기(133)에 부딪힌 암편들은 옆으로 퍼지면서 튕겨져 나가게 된다. In this state, when the suction force of the turbid water suction pipe 131 acts, the female pieces rise toward the primary filter network 132 surrounding the turbid water suction pipe 131, and the female pieces are the primary filters outside the turbid water suction pipe 131. A plurality of distributors 133 installed in multiple layers on the surface of the network 132 is hit. At this time, since the distributor 133 has a narrow and top-shaped funnel shape, the arm pieces colliding with the distributor 133 are thrown out to the side.

그리고, 상기와 같이 분배기(133)에 부딪혀 옆으로 튕긴 암편들은 제2본체(140)의 내벽에 빙 둘러서 아래로 갈수록 점차 넓은 폭의 계단형으로 설치된 다단의 채집망(143) 중 어느 하나에 쉽게 걸려 포획되고, 상기 채집망(143)은 제2본체(140)의 내벽에서 비스듬히 위를 향해 경사져 있으므로 채집망(143)에 포획된 암편들은 굴착공(200) 바닥으로 떨어질 우려가 없이 채집망(143)에 포획된 상태를 매우 안정적으로 유지하게 된다.And, the arm pieces hit the distributor 133 and bounced sideways as described above is easy to any one of the multi-stage gathering network 143 installed in a step-wise step of gradually widening round the inner wall of the second body 140 as go down It is caught and caught, the collection net 143 is inclined upwardly obliquely upward from the inner wall of the second body 140, so the female pieces captured in the collection net 143 do not fall to the bottom of the excavation hole (200) collection net ( The state captured in 143) is very stable.

이와 같이 탁수펌프세트(130)를 가동하여 탁수를 흡입 펌핑하여 분사하면서 그 분사되는 물의 분사력으로 직경 10cm 이상 크기의 암편들을 교란시켜서 띄운 후 채집망(143)에 포획하는 과정을 3~10여분 동안 반복하여 행하면 채집망(143)에는 직경 10cm 이상 크기되는 암편들 상당량이 포획된 상태가 된다. As such, the turbid water pump set 130 is operated by suction pumping and spraying turbid water to disturb and disperse the rock pieces having a diameter of 10 cm or more with the spraying force of the sprayed water, and then capture them in the collecting network 143 for about 3 to 10 minutes. Repeatedly, the collecting network 143 is a state in which a considerable amount of the pieces of the size of more than 10cm in diameter is captured.

그러면 탁수펌프세트(130)의 가동을 중지시키고 인양체인(170)을 당겨서 암편 제거장치를 굴착공(200)에서 지상으로 끌어 올린 후 제1본체(120)와 제2본체(140)를 분리하고 그 분리된 제2본체(140)의 채집망(143)에 포획된 암편들을 쏟아내어 제거하면 된다. Then stop the operation of the turbid water pump set 130 and pull the lifting chain 170 to pull the arm piece removal device to the ground from the excavation hole 200 and then separate the first body 120 and the second body 140 and What is necessary is to pour out and remove the trapped rock pieces to the collection network 143 of the separated second body 140.

그 후 다시 제1본체(120)에 제2본체(140)를 조립하고, 그런 다음 다시 암편 제거장치를 체인(170)으로 견인하여 굴착공(200) 바닥으로 집어넣고 상기 과정을 반복하면 암편 제거작업을 연속 수행할 수 있는 것이다. Then, assembling the second main body 140 to the first main body 120 again, and then again to pull the arm piece removal device to the chain 170 to the bottom of the excavation hole 200 and repeat the above process to remove the arm piece You can do the job continuously.

이상에서와 같이 본 발명은 굴착공 내에 채워진 지하수나 굴착수를 암편 제거장치 내부로 흡입한 후 그 흡입된 물을 굴착공 바닥으로 순환 분사시키는 과정을 반복하면서 그 탁수의 흡입력과 분사력을 이용하여 직경 10cm 이상되는 크기의 암편들을 효과적으로 교란시켜 띄워준 후 제2본체 내부의 채집망에 포획시켜 제거하는 것이므로 작업중 공벽의 붕괴 우려가 없어 보다 안전하게 작업할 수 있으며, 작업과정이 매우 신속 간편하므로 인력과 비용 절감 및 공기단축의 효과가 큰 것이다.As described above, the present invention uses a suction force and a spray force of the turbid water while repeating the process of suctioning the groundwater or the excavated water filled in the excavation hole into the rock fragment removing device and then repeatedly circulating the sucked water to the bottom of the excavation hole. It effectively removes 10cm of sized pieces and traps them in the collection net inside the second body to remove them.Therefore, there is no fear of collapse of the wall during work, so you can work more safely. The effect of savings and shortening of air is great.

그리고, 대구경 현장타설말뚝은 시공 초기 또는 작은 하중상태에서도 주면 마찰력만으로도 주된 응력을 지지할 수 있으나, 시간이 점차 경과함에 따라 또는 추가 하중이 큰 경우 선단(굴착공 바닥)으로 하중이 점차 전이되므로 결국 선단의 지지력이 중요한 안정성 결정 요인이 된다고 할 수 있다.In addition, the large diameter cast-in-place pile can support the main stress by the main surface friction force even in the initial construction or the small load state, but the load is gradually transferred to the tip (driller bottom) as time passes or when the additional load is large. The bearing capacity of the tip is an important stability determinant.

이에 따라 선단(굴착공 바닥)의 침적물질 중 그동안 특별히 고려되지 않았던 직경 10cm 이상되는 크기의 암편을 효과적으로 제거할 수 있는 본 발명의 장치는 점차 활용도가 높아져 가고 있는 대구경 현장타설 말뚝의 안정성 확보에 대한 신뢰도를 보다 높일 수 있는 중요한 장치가 될 것이라고 할 것이다.Accordingly, the device of the present invention which can effectively remove the rock fragments having a diameter of 10 cm or more, which has not been specially considered in the sediment material of the tip (drilling hole bottom), is used for securing the stability of the large diameter cast-in-place pile, which is gradually increasing in utilization. It will be an important device to increase the reliability.

Claims (5)

현장타설말뚝이나 슬러리월 시공용 굴착공(200) 바닥의 암편 제거장치를 구성함에 있어서, In constructing a device for removing rock fragments at the bottom of a site-drained pile or slurry wall construction excavation hole 200, 흡입구(121)를 통해 유입된 탁수를 사방의 2차필터(112)가 설치된 토출구(111)로 토출하는 압력조정실(110); A pressure adjusting chamber 110 for discharging the turbid water introduced through the suction port 121 to the discharge port 111 provided with the secondary filters 112 on all sides; 상기 압력조정실(110) 하부에 조립되고, 내부에는 하단의 탁수흡입관(131)을 통해 흡입한 탁수를 상기 흡입구(121)를 통해 압력조정실(110) 내부로 공급하는 탁수펌프세트(130)가 설치되며, 상기 탁수흡입관(131) 외표면에는 흡입되는 탁수의 이물질을 걸러주는 1차필터망(132)과 탁수 흡입 때 딸려오는 암편을 튕겨서 옆으로 확산시켜주는 깔대기 형태의 분배기(133)가 함께 설치된 제1본체(120); The turbidity water pump set 130 is installed at the lower portion of the pressure regulation room 110, and supplies the turbid water sucked through the turbidity water suction pipe 131 at the bottom thereof into the pressure regulation room 110 through the inlet 121. On the outer surface of the turbid water suction pipe 131, a primary filter network 132 for filtering foreign matters of the turbid water sucked and a funnel-type distributor 133 that bounces the female pieces that come with the turbid water suction and spreads it to the side are installed together. First body 120; 상기 제1본체(120) 하부에 조립되고, 하측 개구부(141)가 지지다리(142)에 의해 지면에서 소정간격 이격된 상태를 이루며, 내벽에 복층으로 다수의 채집망(143)이 형성된 제2본체(140); The second body is assembled to the lower portion of the first body 120, the lower opening 141 is spaced apart from the ground by a support leg 142 a predetermined distance, the second wall having a plurality of collecting nets 143 in a double layer on the inner wall Main body 140; 상기 압력조정실(110)의 각 토출구(111)에 연결되는 토출관(151)의 선단에 설치되며, 굴착공(200)의 바닥을 향하여 하향으로 제2본체(140)의 둘레에 고정 설치되는 분사구(150); The injection hole is installed at the distal end of the discharge pipe 151 connected to each discharge port 111 of the pressure adjusting chamber 110 and fixedly installed around the second body 140 downward toward the bottom of the excavation hole 200. 150; 로 구성된 것을 특징으로 하는 굴착공 바닥의 암편 제거장치.Arm piece removal device of the bottom of the excavation hole, characterized in that consisting of. 제1항에 있어서, The method of claim 1, 상기 압력조정실(110)과 제1본체(120) 및 제2본체(140)를 통상의 결착수단에 의해 서로 탈착 가능하게 조립한 것을 특징으로 하는 굴착공 바닥의 암편 제거장치. The pressure adjusting chamber (110), the first body 120 and the second body 140, the arm piece removal device of the bottom of the excavation hole, characterized in that the detachable assembling each other by a normal binding means. 제2항에 있어서, The method of claim 2, 상기 압력조정실(110)과 제1본체(120) 및 제2본체(140)의 분해 조립을 위한 통상의 결착수단은, Conventional binding means for disassembly and assembly of the pressure adjusting chamber 110, the first body 120 and the second body 140, 공지의 볼트/너트를 이용한 결착수단과; Binding means using a known bolt / nut; 걸림턱(162)에 고리(161)가 걸리면 괘정상태를 유지하고, 고리(161)가 풀리면 해정되는 통상의 결착구(160); If the hook 161 is caught on the locking jaw 162, the hooking state 161 is maintained, and when the hook 161 is released, the conventional binding hole 160 is released; 중 어느 하나인 것을 특징으로 하는 굴착공 바닥의 암편 제거장치. Arm piece removal device of the bottom of the excavation hole, characterized in that any one of. 제1항 또는 제2항 또는 제3항 중 어느 한 항에 있어서, The method according to claim 1 or 2 or 3, 상기 제2본체(140)의 내벽에 설치되는 다단의 채집망(143)은, The collecting network 143 of the multi-stage installed on the inner wall of the second body 140, 상향으로 비스듬히 경사져 설치됨과 아울러 윗단에서 아랫단으로 갈수록 점차 넓은 폭으로 설치된 것임을 특징으로 하는 굴착공 바닥의 암편 제거장치.It is installed at an oblique angle upwards, and at the bottom end of the excavation hole bottom piece removal device, characterized in that gradually installed in a wider width. 제4항에 있어서, The method of claim 4, wherein 상기 제2본체(140)의 둘레에 고정 설치되는 분사구(150)는, The injection hole 150 is fixedly installed around the second body 140, 분사공이 제2본체(140)의 테두리와 굴착공(200) 바닥 사이의 공간부에서 안쪽을 비스듬히 향하도록 설치한 것을 특징으로 하는 굴착공 바닥의 암편 제거장치.The apparatus for removing a female piece of the bottom of the excavation hole, characterized in that the injection hole is installed to face inwardly in the space between the edge of the second body 140 and the bottom of the excavation hole (200).
KR1020050128000A 2005-12-22 2005-12-22 Rock splinter removal device of excavation ground KR100740722B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020050128000A KR100740722B1 (en) 2005-12-22 2005-12-22 Rock splinter removal device of excavation ground

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020050128000A KR100740722B1 (en) 2005-12-22 2005-12-22 Rock splinter removal device of excavation ground

Related Child Applications (1)

Application Number Title Priority Date Filing Date
KR2020050036212U Division KR200410262Y1 (en) 2005-12-23 2005-12-23 Rock splinter removal device of excavation ground

Publications (2)

Publication Number Publication Date
KR20070066615A KR20070066615A (en) 2007-06-27
KR100740722B1 true KR100740722B1 (en) 2007-07-20

Family

ID=38365659

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020050128000A KR100740722B1 (en) 2005-12-22 2005-12-22 Rock splinter removal device of excavation ground

Country Status (1)

Country Link
KR (1) KR100740722B1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200449686Y1 (en) 2009-04-29 2010-07-30 김홍권 The device to control the opening and shutting of the mechanical pump

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101651339B1 (en) 2014-11-20 2016-08-26 대우조선해양 주식회사 System for treating cutting
CN108325303B (en) * 2018-02-24 2020-03-03 江苏振华环保科技有限公司 Air inlet flow guide device of washing tower

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH05214741A (en) * 1992-01-31 1993-08-24 Taisei Corp Underwater excavator
KR20010036243A (en) * 1999-10-07 2001-05-07 이계철 Tunneling machines having a means for removing of a crushed material at lower
KR20020036996A (en) * 2002-04-11 2002-05-17 전열돈 removal apparatus for residue of excavation ground

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH05214741A (en) * 1992-01-31 1993-08-24 Taisei Corp Underwater excavator
KR20010036243A (en) * 1999-10-07 2001-05-07 이계철 Tunneling machines having a means for removing of a crushed material at lower
KR20020036996A (en) * 2002-04-11 2002-05-17 전열돈 removal apparatus for residue of excavation ground

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200449686Y1 (en) 2009-04-29 2010-07-30 김홍권 The device to control the opening and shutting of the mechanical pump

Also Published As

Publication number Publication date
KR20070066615A (en) 2007-06-27

Similar Documents

Publication Publication Date Title
CN110093931A (en) A kind of civil construction drainage of foundation pit structure and its construction method
CN103114577A (en) Rotary excavating hole-forming construction method for building pile foundation
KR100740722B1 (en) Rock splinter removal device of excavation ground
JP6661101B2 (en) Apparatus and method for removing deposits on inner surface of hollow pile
KR101557473B1 (en) Apparatus and method for discharging soil slurry of excavation hole in underground water geothermy
CN106014301A (en) Filling pile bottom dreg cleaning equipment and dreg cleaning method adopting same
CN114351678A (en) Self-drainage dynamic compaction treatment method and self-drainage dynamic compaction equipment for wet soft soil foundation
KR200410262Y1 (en) Rock splinter removal device of excavation ground
JP5245503B2 (en) Debris removal device for hollow pile inner surface and method for removing deposits on hollow pile inner surface using the device
RU65123U1 (en) WELL FILTER FOR THE INSERTED BARBED DEPTH PUMP
KR100732646B1 (en) A mechanical pump for remove slime
CN115125976B (en) Civil engineering foundation pit drainage structure and construction method thereof
KR101039417B1 (en) under ground ater drainage apparatus
CN113047789A (en) Sand removing tool
CN202010458U (en) Fiber ball filtering tank
CN108286259A (en) A kind of soft soil foundation base pit dewatering device
KR101199792B1 (en) Apparatus for exhaust water in blasting hole
CN210057555U (en) Filtering device for small reservoir outlet
CN207437010U (en) A kind of oil-water well downhole hydraulic rotational flow flushing device
CN207436120U (en) A kind of hydraulic engineering row's silt device
JP2020045761A (en) Accretion removal device of hollow pile inner surface, and accretion removal method
CN219219312U (en) Water conservancy construction drainage device
CN109339141A (en) A kind of environmental protection channel cleanout slurry treating machine
CN219527924U (en) Urban drainage pipeline dredging device
CN109868824A (en) A kind of pile foundation hole cleaning device

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20130712

Year of fee payment: 7

FPAY Annual fee payment

Payment date: 20140710

Year of fee payment: 8

FPAY Annual fee payment

Payment date: 20150713

Year of fee payment: 9

FPAY Annual fee payment

Payment date: 20160712

Year of fee payment: 10

FPAY Annual fee payment

Payment date: 20170712

Year of fee payment: 11

FPAY Annual fee payment

Payment date: 20180710

Year of fee payment: 12

FPAY Annual fee payment

Payment date: 20190613

Year of fee payment: 13