KR100707129B1 - A lining board for temporary bridge and method for manufacturing thereof - Google Patents
A lining board for temporary bridge and method for manufacturing thereof Download PDFInfo
- Publication number
- KR100707129B1 KR100707129B1 KR1020060114753A KR20060114753A KR100707129B1 KR 100707129 B1 KR100707129 B1 KR 100707129B1 KR 1020060114753 A KR1020060114753 A KR 1020060114753A KR 20060114753 A KR20060114753 A KR 20060114753A KR 100707129 B1 KR100707129 B1 KR 100707129B1
- Authority
- KR
- South Korea
- Prior art keywords
- main body
- temporary
- riveting
- frame
- plate
- Prior art date
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01C—CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
- E01C9/00—Special pavings; Pavings for special parts of roads or airfields
- E01C9/08—Temporary pavings
- E01C9/083—Temporary pavings made of metal, e.g. plates, network
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D19/00—Structural or constructional details of bridges
- E01D19/12—Grating or flooring for bridges; Fastening railway sleepers or tracks to bridges
- E01D19/125—Grating or flooring for bridges
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Bridges Or Land Bridges (AREA)
Abstract
본 발명은 제조가 간단하고 경량이며 견고하고 두께를 감소시킬 수 있으며 안전성이 향상되는 가설교량용 복공판 및 그 가설교량용 복공판을 제조하는 방법을 제공한다. The present invention provides a method for manufacturing a temporary bridge for a temporary plate and a method for manufacturing a temporary bridge for a temporary bridge that is simple, lightweight, robust, can reduce the thickness and safety is improved.
본 발명에 따른 가설교량용 복공판은 전방 프레임(12), 후방프레임(14), 제1측방프레임(16)및 제2측방프레임(18)이 일체로 이루어지고, 상기 각각의 프레임에 플랜지(122;142;162;182)가 형성된 본체(10); 상기 본체(10)의 플랜지(122;142;162;182)에 리벳팅되어 상기 본체(10)에 일체적으로 형성되는 차폐부재(20); 플레이트형 몸체(32)와, 상기 몸체(32)의 일단에 형성되며 상기 본체(10)의 전방프레임(12)에 고정되는 제1고정편(34)과, 상기 몸체(32)의 타단에 형성되며 상기 본체(10)의 후방프레임(14)에 리벳팅되는 제2고정편(36)을 구비하는 지지부재(30); 상기 지지부재(30)의 일단에 리벳팅되는 제1고정부(42) 및 상기 지지부재(30)의 타단에 고정되는 제2고정부(44)를 구비하고, 상기 지지부재(30)중 일측의 지지부재(30)의 몸체(32)에 리벳팅되는 제1곡부(46)와 타측의 지지부재(30)의 몸체(32)에 리벳팅되는 제2곡부(48)가 굴곡되어 형성되는 보강부재(40)로 구성된다. The perforated plate for temporary bridges according to the present invention includes a front frame 12, a rear frame 14, a first side frame 16 and a second side frame 18 integrally, and flanges 122 to the respective frames. 142; 162; 182 formed body (10); A shielding member 20 riveted to the flanges 122; 142; 162; 182 of the main body 10 and integrally formed on the main body 10; Plate-shaped body 32, the first fixing piece 34 is formed on one end of the body 32 and fixed to the front frame 12 of the body 10, and formed on the other end of the body 32 A support member 30 having a second fixing piece 36 riveted to the rear frame 14 of the main body 10; A first fixing portion 42 riveted to one end of the supporting member 30 and a second fixing portion 44 fixed to the other end of the supporting member 30, one side of the supporting member 30 Reinforcement formed by bending the first curved portion 46 to be riveted to the body 32 of the support member 30 and the second curved portion 48 to be riveted to the body 32 of the support member 30 on the other side The member 40 is comprised.
가설교량용 복공판, 리벳, 보강부재, 고정부재, 차폐부재 Perforated bridge for temporary bridge, rivet, reinforcing member, fixing member, shielding member
Description
도 1은 특허등록 제10-478603호에 따른 복공판을 보여주는 사시도.1 is a perspective view showing a perforated plate according to Patent Registration No. 10-478603.
도 2는 본 발명의 하나의 실시예에 따른 가설교량용 복공판을 보여주는 분해 사시도.Figure 2 is an exploded perspective view showing a double plate for temporary bridge according to an embodiment of the present invention.
도 3은 도 2의 가설교량용 복공판이 조립된 상태에서의 사시도.FIG. 3 is a perspective view of the temporary bridge plate of FIG. 2 assembled; FIG.
도 4는 도 3의 선Ⅳ-Ⅳ에 따른 단면도.4 is a cross-sectional view taken along the line IV-IV of FIG. 3.
도 5a 내지 5c는 본 발명에 따른 가설교량용 복공판의 제조방법을 보여주는 공정도. 5a to 5c is a process chart showing a manufacturing method of a temporary plate for temporary bridges according to the present invention.
♣ 도면의 주요 부분에 대한 부호의 설명 ♣♣ Explanation of symbols for the main parts of the drawing ♣
10: 본체 20: 차폐부재10: main body 20: shielding member
30: 지지부재 40: 보강부재 30: support member 40: reinforcement member
본 발명은 일시적으로 설치되는 가설교량용 복공판에 관한 것으로서, 보다 상세하게는 제조가 간단하고 견고하며 안전성이 향상되며 이물질의 관통을 방지할 수 있는 가설교량용 복공판에 관한 것이며, 또한 그 가설교량용 복공판을 제조하기 위한 방법에 관한 것이다. The present invention relates to temporarily installed double-hole plates for temporary bridges, and more particularly, to a temporary bridges for double-hole bridges that can be easily manufactured, more robust, improved safety, and can prevent foreign substances from penetrating the bridge. A method for producing a perforated plate.
일반적으로 하나의 지점과 다른 하나의 지점간의 교통 또는 다른 다양한 목적을 위해 임시적으로 설치되는 가설교량에는, 교통 및 통행을 원활하게 하거나 안전을 위해 최종적으로 복공판이 설치되고 있다. 이와 같은 복공판들은 대부분 일정 두께를 갖는 평평한 직육면체 형상을 가지며, 그 설치길이 또는 면적에 따라 수십 내지 수 백 개가 평평하게 배설되어 이용되고 있다. 이와 같은 복공판 들 중 최근에 개발된 것으로서, 특허등록 제10-478603호에 개시된 일명 ‘아톰 복공판’이라 칭하는 복공판이 있다. In general, temporary bridges that are temporarily installed for transportation between one point and another point or for various other purposes are finally provided with double plates for smooth traffic and passage or for safety. Most of these perforated plates have a flat rectangular parallelepiped shape having a predetermined thickness, and dozens or hundreds are flatly disposed depending on the installation length or area thereof. Recently developed among such a perforated plate, there is a perforated plate called "Atom perforated plate" disclosed in Patent Registration No. 10-478603.
특허 등록 제10-478603은 도 1에 도시된 바와 같이, 폭방향으로 나라하게 길이방향으로 접합된 복수의 H형강(1)과, 양측의 H형강(1)의 양측부에 접합되는 C형강 또는 C형으로 절곡한 무늬강판(2)으로 구성된다. 또한, 각각의 무늬강판(2)에는 미끄럼 방지를 위해 엠보싱 타공(3)이 형성되거나, 요홈 타공(4)이 형성된다. Patent registration No. 10-478603 is a plurality of H-shaped steel (1) joined in the longitudinal direction in the width direction, as shown in Figure 1 and C-shaped steel joined to both sides of the H-shaped steel (1) on both sides or It consists of the patterned
이 같은 구성에 따라 계속적인 반복 하중시 피로 파괴에 취약한 점을 보완하면서 노면의 미끄러짐 및 마모를 방지할 수 있는 것이다. According to such a configuration, it is possible to prevent slippage and wear of the road surface while compensating for vulnerabilities to fatigue failure during repeated loads.
그러나 이와 같은 종래의 복공판은 각각의 구성요소들을 상호 용접에 의해 접합시켜야 하므로 제조공정이 복잡하고, 두께가 두꺼워 설치 높이가 높아지며, 견고성이 약하고 중량이 과도해지는 문제점이 있다. However, such a conventional perforated plate has to be bonded to each other by mutual welding, the manufacturing process is complicated, the thickness is thick, the installation height is high, there is a problem of weakness and excessive weight.
본 발명은 상술한 문제점들을 감안해서 이루어진 것으로서, 본 발명의 하나 의 목적은 제조가 간단하고, 경량이고 얇으며, 설치 높이를 낮출 수 있고, 견고한 가설교량용 복공판을 제공하는데 있다. SUMMARY OF THE INVENTION The present invention has been made in view of the above-described problems, and one object of the present invention is to provide a hollow plate for a temporary bridge, which is simple to manufacture, lightweight and thin, and can have a low installation height.
본 발명의 다른 하나의 목적은, 복잡한 용접공정 없이 간단하고 용이하게 대량으로 생산이 가능한 가설교량용 복공판 제조방법을 제공하는데 있다.Another object of the present invention is to provide a method for manufacturing a temporary plate for temporary bridges that can be produced in a simple and easy mass production without complicated welding processes.
이 같은 목적을 달성하기 위해, 본 발명에 따른 가설교량용 복공판은In order to achieve this object, the temporary plate for temporary bridge according to the present invention
가설교량에서 교통 및 통행을 원활하게 하기 위한 가설교량용 복공판에 있어서,In the double deck for temporary bridges for smooth transportation and traffic on temporary bridges,
전방 프레임, 상기 전방프레임에 대향하는 후방프레임, 상기 전방프레임 및 후방프레임의 일단에 일체로 형성되는 제1측방프레임, 및 상기 전방프레임 및 후방프레임의 일단에 일체로 형성되며 상기 제1측방프레임에 대향하는 제2측방프레임으로 이루어지며, 상기 각각의 프레임의 하부변에는 내부 중앙을 향해 일정폭으로 연장되는 플랜지가 일체로 형성되는 본체;A front frame, a rear frame facing the front frame, a first side frame integrally formed at one end of the front frame and the rear frame, and integrally formed at one end of the front frame and the rear frame, A main body formed of an opposing second side frame, the lower side of each frame integrally formed with a flange extending in a predetermined width toward an inner center;
상기 본체의 하부를 차폐하기 위해, 주변이 상기 본체의 각각의 플랜지에 리벳팅되어 상기 본체에 일체적으로 형성되는 차폐부재;A shielding member having a periphery riveted to each flange of the main body to integrally form the main body to shield the lower part of the main body;
일정 높이를 갖는 길다란 플레이트형 몸체와, 상기 몸체의 일단에 일체로 구비되며 상기 본체의 전방프레임에 리벳팅 의해 고정되는 제1고정편과, 상기 몸체의 타단에 일체로 구비되며 상기 본체의 후방프레임에 리벳팅에 의해 고정되는 제2고정편을 일체로 구비하는 지지부재;An elongated plate-shaped body having a predetermined height, a first fixing piece integrally provided at one end of the body and fixed to the front frame of the main body, and integrally provided at the other end of the body and rear frame of the main body A support member integrally provided with a second fixing piece fixed by riveting thereto;
일단에 상기 지지부재의 일단에 리벳팅에 의해 고정되는 제1고정부가 형성되 고 타단에 상기 지지부재의 타단에 리벳팅에 의해 고정되는 제2고정부가 형성되고, 상기 제1고정부와 제2고정부 사이에는 각각 이웃하는 상기 지지부재사이에 삽입되어 상기 지지부재중 일측의 지지부재의 몸체에 리벳팅에 의해 고정되는 제1곡부와 타측의 지지부재의 몸체에 리벳팅에 의해 고정되는 제2곡부가 반복적으로 굴곡되어 형성되는 보강부재를 포함하는 것을 특징으로 한다. A first fixing part fixed to one end of the support member by riveting is formed at one end, and a second fixing part fixed to the other end of the supporting member by riveting is formed at the other end, and the first fixing part and the second fixing part are fixed. The first curved part inserted between the supporting members adjacent to each other and fixed to the body of one of the supporting members by the riveting, and the second curved part fixed by the riveting to the body of the other supporting member It characterized in that it comprises a reinforcing member is formed repeatedly bent.
또한, 본 발명에 따른 가설교량용 복공판 제조방법은, In addition, the method for manufacturing a temporary plate for temporary bridge according to the present invention,
단일 플레이트로 형성된 프레임부재를 절곡 및 굴곡 형성하여 전방 프레임, 후방프레임, 제1측방프레임 및 제2측방프레임과 각각의 플랜지를 형성한 후 플레이트의 양 단부를 리벳팅하여 장방형의 본체를 형성하는 단계;Bending and bending the frame member formed of a single plate to form respective flanges with the front frame, the rear frame, the first side frame and the second side frame, and then riveting both ends of the plate to form a rectangular main body. ;
상기 본체의 내부에 차폐부재를 배치한 후 그 주변과 상기 본체의 각각의 플랜지가 접촉된 부분에 리벳을 이용하여 리벳팅 공정으로 차폐부재를 설치하는 단계;Arranging the shielding member in the interior of the main body, and installing the shielding member by a riveting process using a rivet in a portion in which the periphery thereof and each flange of the main body contact each other;
상기 본체의 내부에 복수의 지지부재를 일정 간격으로 정렬한 후 상기 각각의 지지부재의 제1고정편을 상기 본체의 전방프레임의 내측벽에 접촉시키고 제2고정편을 후방프레임의 내측벽에 접촉시킨 상태에서 리벳을 이용한 리벳팅 공정으로 고정시키는 단계;After arranging a plurality of support members at a predetermined interval inside the main body, the first fixing piece of each supporting member is contacted with the inner wall of the front frame of the main body, and the second fixing piece is contacted with the inner wall of the rear frame. Fixing in a riveting process using rivets in a made state;
상기 각각의 지지부재사이에 보강부재를 삽입하여 상기 각각의 보강부재의 제1고정부를 상기 지지부재의 일단에 접촉시키고 제2고정부를 타단에 접촉시키며, 상기 각각의 고정부 사이에 형성된 제1곡부를 일측의 상기 지지부재의 몸체에 접촉시키고 상기 각각의 고정부 사이에 형성된 제2곡부를 상기 타측의 지지부재의 몸체 에 접촉시켜 배치하는 단계; 및A reinforcing member is inserted between the respective supporting members to contact the first fixing part of each reinforcing member to one end of the supporting member and the second fixing part to the other end, and Placing one curved portion in contact with a body of the support member on one side and a second curved portion formed between the respective fixed portions in contact with the body of the support member on the other side; And
상기 지지부재의 일단부와 상기 보강부재의 제1고정부를 리벳팅하고, 상기 지지부재의 타단부와 상기 보강부재의 제2고정부를 리벳팅 하며, 상기 지지부재의 몸체와 상기 보강부재의 각각의 제1곡부 및 제2곡부가 접촉된 부분을 리벳팅하여 복공판을 완성하는 단계를 포함하는 것을 특징으로 한다.Riveting one end of the support member and the first fixing part of the reinforcing member, riveting the other end of the supporting member and the second fixing part of the reinforcing member, the body of the support member and the reinforcing member And riveting the portions in which each of the first curved portions and the second curved portions are in contact with each other to complete the perforated plate.
이하, 본 발명에 따른 바람직한 실시예를 첨부도면을 참조로 하여 상세히 설명한다.Hereinafter, preferred embodiments of the present invention will be described in detail with reference to the accompanying drawings.
도 2는 본 발명의 하나의 실시예에 따른 가설교량용 복공판을 보여주는 분해 사시도이고, 도 3은 도 2의 가설교량용 복공판이 조립된 상태에서의 사시도이며, 도 4는 도 3의 선Ⅳ-Ⅳ에 따른 단면도이고, 도 5a 내지 5c는 본 발명에 따른 가설교량용 복공판의 제조방법을 보여주는 공정도이다. Figure 2 is an exploded perspective view showing a temporary bridge for a temporary bridge according to an embodiment of the present invention, Figure 3 is a perspective view of the temporary bridge for a temporary bridge of Figure 2 assembled, Figure 4 is a line IV- of FIG. Sectional view according to IV, Figure 5a to 5c is a process chart showing a method for manufacturing a temporary plate for temporary bridges according to the present invention.
도 2 내지 도 5에 있어서, 부호 10은 전체 가설교량용 복공판의 측방 및 전방의 외관을 형성하는 본체이다. 상기 본체(10)는 장방형으로 형성되는 것이 일반적이고 바람직하지만, 제조업자 또는 시공업자가 교량의 형상 또는 공사현장의 특성에 적합하게 선정할 수 있다. In FIGS. 2-5, the code |
상기 본체(10)는 단일 플레이트가 절곡 및 굴곡 형성되어, 전방의 외곽을 형성하는 전방 프레임(12), 상기 전방프레임(12)에 대향하는 후방프레임(14), 상기 전방프레임(12) 및 후방프레임(14)의 일단에 일체로 형성되는 제1측방프레임(16), 및 상기 전방프레임(12) 및 후방프레임(14)의 일단에 일체로 형성되며 상기 제1측방프레임(16)에 대향하는 제2측방프레임(18)으로 이루어진다. 특히, 각각의 프레 임(12;14;16;18)의 하부변에는, 후술되는 차폐부재를 지지 및 고정할 수 있도록 상기 본체(10)의 내부 중앙을 향해 일정폭으로 연장되는 플랜지(122;142;162;182)가 일체로 형성된다. 상기 본체(10)는 양 단부(12a;18a)를 갖는 단일 플레이트로 형성되며, 이와 같이 형성된 플레이트의 상기 단부(12a;18a)를 리벳팅함으로써, 장방형의 본체(10)가 형성되는 것이다. The
도면부호 20은 상기 본체(10)의 일측, 즉 하부를 차폐하기 위한 차폐부재이다. 상기 차폐부재(20)는 장방형 또는 상기 본체(10)의 형상에 상응한 플레이트로 형성된다.
상기 차폐부재(20)는 그 주변과 상기 본체(10)의 각각의 플랜지(122;142;162;182)가 접촉된 상태에서 리벳(R)에 의한 리벳팅 공정에 의해 상기 본체(10)에 일체적으로 형성된다. The
도면부호 30은 상기 본체(10)의 내측에 일체적으로 고정되는 지지부재이다. 상기 지지부재(30)는 상기 본체(10)의 내부에 횡방향으로 일정 간격으로 배치될 수 있도록 복수개가 구비된다.
상기 각각의 지지부재(30)는 일정 높이를 갖는 길다란 플레이트 형의 몸체(32)와, 상기 몸체(32)의 일단에 일체로 구비되며 상기 본체(10)의 전방프레임(12)에 리벳팅에 의해 고정되는 제1고정편(34)과, 상기 몸체(32)의 타단에 일체로 구비되며 상기 본체(10)의 후방프레임(14)에 리벳팅에 의해 고정되는 제2고정편(36)을 일체로 구비한다. Each
도면부호 40은 상기 각각의 지지부재(30)사이에 설치되어 가설교량용 복공판 전체의 강도를 증대시키기 위한 보강부재이다. 상기 보강부재(40)는 상기 각각의 지지부재(30)사이에 삽입 고정되어 보강할 수 있도록 다양한 형태로 형성될 수 있으며 또한 복수개가 구비된다.
상기 각각의 보강부재(40)의 일단부에는 상기 지지부재(30)의 일단에 리벳팅에 의해 고정되는 제1고정부(42)와 상기 지지부재(30)의 타단에 리벳팅에 의해 고정되는 제2고정부(44)를 구비한다. 특히, 상기 제1고정부(42)와 제2고정부(44) 사이에는 각각 이웃하는 상기 지지부재(30)사이에 삽입되어 상기 지지부재(30)중 일측의 지지부재(30)의 몸체(32)에 리벳팅에 의해 고정되는 제1곡부(46)와 타측의 지지부재(30)의 몸체(32)에 리벳팅에 의해 고정되는 제2곡부(48)가 반복적으로 굴곡되어 형성된다. One end of each of the reinforcing
한편, 가설교량용 복공판을 구성하는 상기 본체(10), 상기 폐쇄부재(20), 상기 지지부재(30) 및 상기 보강부재(40)는 모두 최종 생산될 가설교량용 복공판의 사이즈에 따라 규격화되어 대량 생산될 수 있어, 후술되는 바와 같이 가설교량용 복공판을 신속하고 용이하게 대량으로 생산할 수 있는 것이다. On the other hand, the
이하, 전술된 바와 같이 구성된 가설교량용 복공판의 제조방법에 대해 도 5를 참조로 하여 상세히 설명한다. Hereinafter, a method for manufacturing a temporary plate for temporary bridges configured as described above will be described in detail with reference to FIG. 5.
먼저 작업자는 단일 플레이트로 형성될 수 있는 프레임부재를 절곡 및 굴곡 형성하여 전방 프레임(12), 후방프레임(14), 제1측방프레임(16) 및 제2측방프레임(18)과 각각의 플랜지(122;142;162;182)를 형성한 후 플레이트의 양 단부(12a;18a)를 리벳팅하여 장방형의 본체(10)를 형성한다(S100).First, the worker bends and bends the frame member, which may be formed as a single plate, so that the
상기와 같이 형성된 본체(10)의 내부에 차폐부재(20)를 배치한 후 그 주변과 상기 본체(10)의 각각의 플랜지(122;142;162;182)가 접촉된 부분에 리벳(R)을 이용하여 리벳팅 공정으로 상기 차폐부재(20)를 설치한다(S102).After arranging the
상기와 같이 본체(10)의 내부에 복수의 지지부재(30)를 일정 간격으로 정렬한 후 상기 각각의 지지부재(30)의 제1고정편(34)을 상기 본체(10)의 전방프레임(12)의 내측벽에 접촉시키고 제2고정편(36)을 후방프레임(14)의 내측벽에 접촉시킨 상태에서 리벳(R)을 이용한 리벳팅 공정으로 고정시킨다(S104). After aligning the plurality of
이후, 상기 각각의 지지부재(20)사이에 보강부재(40)를 삽입하여 배치한다(S106). 여기서, 상기 각각의 보강부재(40)의 제1고정부(42)는 상기 지지부재(30)의 일단에 접촉되고 제2고정부(44)는 타단에 접촉된다. 또한 상기 각각의 고정부(42;44) 사이에 형성된 제1곡부(46)는 각각 일측의 상기 지지부재(30)의 몸체(32)에 접촉되며, 상기 각각의 고정부(42;44) 사이에 형성된 제2곡부(48)는 각각 타측의 지지부재(30)의 몸체(32)에 접촉된다. Thereafter, the reinforcing
이와 같이 상기 각각의 지지부재(30)사이에 상기 보강부재(40)가 삽입되어 배치된 상태에서, 상기 지지부재(30)의 일단부와 상기 보강부재(40)의 제1고정부(42)를 리벳팅하고, 상기 지지부재(30)의 타단부와 상기 보강부재(40)의 제2고정부(44)를 리벳팅하며, 또한 상기 지지부재(30)의 몸체(32)와 상기 보강부재(40)의 각각의 제1곡부(46) 및 제2곡부(48)가 접촉된 부분을 리벳팅하여 가설교량용 복공판을 완성한다(S108).As described above, in the state where the reinforcing
따라서 복잡한 용접 공정 없이 간단하고 신속하게 가설교량용 복공판을 제조 할 수 있는 것이다. Therefore, it is possible to manufacture the temporary plate for temporary bridges simply and quickly without complicated welding process.
앞에서 설명한 바와 같이, 본 발명의 의한 가설교량용 복공판 및 그 제조방법에 의하면, 지지부재 및 보강부재에 의해 견고성이 우수한 견고성이 확보되고, 두께가 얇아 설치높이를 낮출 수 있음과 동시에 충분한 유효공간을 확보할 수 있으며, 하부가 차폐되어 이물질 등이 교량 하부로 유입되지 않으며, 중량이 감소되어 설치작업이 용이하고 안정성이 보장되는 현저한 효과가 있는 것이다. As described above, according to the ventilated plate for the temporary bridge according to the present invention and the manufacturing method thereof, the support member and the reinforcing member ensure the excellent rigidity, the thickness is thin, the installation height can be lowered, and sufficient effective space is provided. It can be secured, the lower part is shielded, foreign matters, etc. do not flow into the lower part of the bridge, the weight is reduced, there is a remarkable effect of easy installation work and ensure stability.
또한, 가설교량용 복공판을 구성하는 본체, 지지부재, 보강부재, 고정부재 등 모든 구성요소를 규격화하여 공급할 수 있어 대량생산이 용이하며, 용접공정이 생략되어 비숙련자들도 용이하게 제조할 수 있어 생산성이 향상되는 효과가 있는 것이다.In addition, all components such as the main body, support member, reinforcing member, and fixing member constituting the temporary plate for temporary bridge can be standardized and supplied, and mass production is easy, and the welding process is omitted, so that even unskilled people can easily manufacture. Productivity is improved.
Claims (3)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020060114753A KR100707129B1 (en) | 2006-11-20 | 2006-11-20 | A lining board for temporary bridge and method for manufacturing thereof |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020060114753A KR100707129B1 (en) | 2006-11-20 | 2006-11-20 | A lining board for temporary bridge and method for manufacturing thereof |
Publications (1)
Publication Number | Publication Date |
---|---|
KR100707129B1 true KR100707129B1 (en) | 2007-04-13 |
Family
ID=38161775
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1020060114753A KR100707129B1 (en) | 2006-11-20 | 2006-11-20 | A lining board for temporary bridge and method for manufacturing thereof |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR100707129B1 (en) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101065204B1 (en) * | 2008-12-23 | 2011-09-19 | 재단법인 포항산업과학연구원 | A deck plate and a method for producing the same |
KR20190129453A (en) | 2018-05-11 | 2019-11-20 | 강병관 | Road deck panel and its manufacturing method |
KR20190129452A (en) | 2018-05-11 | 2019-11-20 | 강병관 | Road deck panel and its manufacturing method |
KR20210066648A (en) | 2019-11-28 | 2021-06-07 | 주식회사 비바엔에스 | Automatic Rack Space Management System using varialbe length Magnetic Asset Tag and Reed Sensor |
KR20220147775A (en) | 2021-04-27 | 2022-11-04 | 주식회사 디엠씨 | Side mounting radiator bracket with screw-mounted bush |
KR20220147773A (en) | 2021-04-27 | 2022-11-04 | 주식회사 디엠씨 | Side mounting radiator bracket with screw-mounted bush |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS5353838U (en) | 1976-10-12 | 1978-05-09 | ||
KR100478603B1 (en) | 2003-06-16 | 2005-04-07 | 고준현 | Atom deck plate |
KR200383505Y1 (en) | 2005-02-23 | 2005-05-03 | 오수철 | Lining board |
KR200395506Y1 (en) | 2005-06-16 | 2005-09-13 | 신대철 | Wave web beam |
-
2006
- 2006-11-20 KR KR1020060114753A patent/KR100707129B1/en active IP Right Grant
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS5353838U (en) | 1976-10-12 | 1978-05-09 | ||
KR100478603B1 (en) | 2003-06-16 | 2005-04-07 | 고준현 | Atom deck plate |
KR200383505Y1 (en) | 2005-02-23 | 2005-05-03 | 오수철 | Lining board |
KR200395506Y1 (en) | 2005-06-16 | 2005-09-13 | 신대철 | Wave web beam |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101065204B1 (en) * | 2008-12-23 | 2011-09-19 | 재단법인 포항산업과학연구원 | A deck plate and a method for producing the same |
KR20190129453A (en) | 2018-05-11 | 2019-11-20 | 강병관 | Road deck panel and its manufacturing method |
KR20190129452A (en) | 2018-05-11 | 2019-11-20 | 강병관 | Road deck panel and its manufacturing method |
KR20210066648A (en) | 2019-11-28 | 2021-06-07 | 주식회사 비바엔에스 | Automatic Rack Space Management System using varialbe length Magnetic Asset Tag and Reed Sensor |
KR20220147775A (en) | 2021-04-27 | 2022-11-04 | 주식회사 디엠씨 | Side mounting radiator bracket with screw-mounted bush |
KR20220147773A (en) | 2021-04-27 | 2022-11-04 | 주식회사 디엠씨 | Side mounting radiator bracket with screw-mounted bush |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR100707129B1 (en) | A lining board for temporary bridge and method for manufacturing thereof | |
KR20160042175A (en) | Hybrid component and method for producing a hybrid component | |
KR102401463B1 (en) | Assembly type beam mold with a upper plate | |
KR102029302B1 (en) | Combination structure of permanent concrete form and prefabricated steel assembly for steel composite concrete member | |
KR102175516B1 (en) | Permanent Beam Form | |
KR102054364B1 (en) | Prefabricated lightweight concrete form | |
JP2008230453A (en) | Center pillar structure | |
KR102104382B1 (en) | Steel beam, composite column, and joint structure of the same | |
CN117460660A (en) | Vehicle frame rail and method of assembling a vehicle frame rail | |
US8020926B2 (en) | Vehicular structural frame assembly | |
KR200487597Y1 (en) | Frame assembly | |
KR100719081B1 (en) | A lining board and method for manufacturing thereof | |
KR102236827B1 (en) | Prefabricated steel assembly for steel composite concrete column with permanent concrete form | |
JP5374178B2 (en) | Cloth frame with floor | |
KR102351435B1 (en) | Permanent Beam Form And Manufacturing Method Thereof | |
KR100682309B1 (en) | Concert Fabrication of aluminum materials | |
KR20090035241A (en) | Reinforced deck panel type of decreased noise and vibration and construction method therewith | |
KR102654294B1 (en) | Non-welded steel form with symmetrical reinforcing ribs | |
KR102429962B1 (en) | Steel Form Beam And Construction Method Using Thereof | |
TW202110682A (en) | Door leaf frame, door leaf, and method of manufacturing the door leaf frame | |
JP6242176B2 (en) | Elevator car floor and manufacturing method thereof | |
KR102331524B1 (en) | Permanent Beam Form And Manufacturing Method Thereof | |
JP5114258B2 (en) | Steel framework structure of steel concrete composite slab and method for producing steel framework structure | |
US10975587B2 (en) | System for forming swimming pool radius supports | |
JP6916139B2 (en) | Rear side structure of the vehicle body |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A201 | Request for examination | ||
A302 | Request for accelerated examination | ||
E701 | Decision to grant or registration of patent right | ||
N231 | Notification of change of applicant | ||
GRNT | Written decision to grant | ||
FPAY | Annual fee payment |
Payment date: 20130325 Year of fee payment: 7 |
|
FPAY | Annual fee payment |
Payment date: 20140403 Year of fee payment: 8 |
|
FPAY | Annual fee payment |
Payment date: 20170404 Year of fee payment: 11 |
|
FPAY | Annual fee payment |
Payment date: 20180403 Year of fee payment: 12 |
|
FPAY | Annual fee payment |
Payment date: 20190613 Year of fee payment: 13 |