KR100605273B1 - Floor board support module of access floor and floor board construction method with floor board support module - Google Patents
Floor board support module of access floor and floor board construction method with floor board support module Download PDFInfo
- Publication number
- KR100605273B1 KR100605273B1 KR1020010053143A KR20010053143A KR100605273B1 KR 100605273 B1 KR100605273 B1 KR 100605273B1 KR 1020010053143 A KR1020010053143 A KR 1020010053143A KR 20010053143 A KR20010053143 A KR 20010053143A KR 100605273 B1 KR100605273 B1 KR 100605273B1
- Authority
- KR
- South Korea
- Prior art keywords
- base panel
- flooring
- rail
- floor
- support module
- Prior art date
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F15/00—Flooring
- E04F15/02—Flooring or floor layers composed of a number of similar elements
- E04F15/024—Sectional false floors, e.g. computer floors
- E04F15/02405—Floor panels
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F15/00—Flooring
- E04F15/02—Flooring or floor layers composed of a number of similar elements
- E04F15/02044—Separate elements for fastening to an underlayer
Abstract
본 발명은 상층과 하층을 구분하는 슬래브에 설치되는 바닥재에 있어서, 상기 슬래브와 바닥재의 사이에 공간부가 형성되도록 바닥재를 지지하는 바닥재지지모듈 및 이런 바닥재지지모듈을 이용한 바닥재 설치방법을 제공하는 데 그 목적이 있다.The present invention provides a flooring support module for supporting a flooring material so as to form a space between the slab and the flooring material installed on the slab that separates the upper and lower floors, and a flooring installation method using the flooring support module. There is a purpose.
본 발명에 따르면, 바닥재(20)를 지면으로부터 이격시켜 지지하는 바닥재지지모듈에 있어서, 지면에 배치될 베이스패널(111, 211)과, 베이스패널(111, 211)로부터 수직상방으로 돌출한 지지스템(113, 213)과, 베이스패널(111, 211)로부터 제1 방향으로 연장된 가로레일(130, 230) 및, 베이스패널(111, 211)로부터 제1 방향과 90°의 위상차를 갖는 제2 방향으로 연장된 세로레일(140, 240)을 포함하고, 베이스패널(111, 211)의 하면에는 제1 방향과 180°의 위상차를 갖는 방위에 가로레일(130, 230)의 단부와 결합될 수 있는 가로결합부(150, 250) 및, 제2 방향과 180°의 위상차를 갖는 방위에 세로레일(140, 240)의 단부와 결합될 수 있는 세로결합부(150, 250)가 형성되어 있는 바닥재지지모듈이 제공된다.According to the present invention, in the flooring support module for supporting the flooring 20 spaced apart from the ground, the base panel (111, 211) to be disposed on the ground and the support stem protruding vertically upward from the base panel (111, 211) (113, 213), horizontal rails (130, 230) extending in the first direction from the base panels (111, 211), and a second having a phase difference of 90 ° from the first panel (111, 211) in the first direction. It includes a longitudinal rail (140, 240) extending in the direction, the lower surface of the base panel (111, 211) can be coupled with the ends of the horizontal rail (130, 230) in a direction having a phase difference of 180 ° with the first direction The horizontal coupling parts 150 and 250 and the flooring material having the vertical coupling parts 150 and 250 which may be coupled to the ends of the vertical rails 140 and 240 in a direction having a phase difference of 180 ° with the second direction. A support module is provided.
Description
도 1은 종래 기술에 따른 바닥재지지모듈들이 슬래브의 상면에 고정된 상태를 나타낸 사시도이고,1 is a perspective view showing a state in which the floor support modules according to the prior art is fixed to the upper surface of the slab,
도 2는 도 1에 도시된 바닥재지지모듈의 상면에 바닥재가 안착된 상태를 나타낸 사시도이고,Figure 2 is a perspective view showing a state in which the flooring is seated on the upper surface of the flooring support module shown in Figure 1,
도 3은 본 발명의 제 1 실시예에 따른 바닥재지지모듈들이 슬래브의 상면에 배치된 상태를 나타낸 부분사시도이고,3 is a partial perspective view showing a state in which the floor retaining modules according to the first embodiment of the present invention is disposed on the upper surface of the slab,
도 4는 도 3에 도시된 바닥재지지모듈을 나타낸 사시도이고,Figure 4 is a perspective view of the floor support module shown in Figure 3,
도 5는 도 4에 도시된 바닥재지지모듈의 레일과 베이스패널의 체결을 나타낸 단면도이고,5 is a cross-sectional view showing the fastening of the rail and the base panel of the floor support module shown in FIG.
도 6은 본 발명의 제 2 실시예에 따른 바닥재지지모듈의 사시도이며,Figure 6 is a perspective view of a floor support module according to a second embodiment of the present invention,
도 7은 도 6에 도시된 바닥재지지모듈의 체결관계를 설명하기 위한 사시도이다.7 is a perspective view for explaining the fastening relationship of the floor support module shown in FIG.
♠ 도면의 주요부분에 대한 부호의 설명 ♠ ♠ Explanation of symbols on the main parts of the drawing ♠
1 : 슬래브 10, 100, 200 : 바닥재지지모듈 1:
20 : 바닥재 111 : 베이스패널 20: flooring 111: base panel
113, 213 : 지지스템 130, 230 : 가로레일 113, 213: Supporting
140, 240 : 가로레일 150, 250 : 체결편 140, 240:
본 발명은 아파트(Apartment), 빌라(Villa) 등과 같은 공동주택의 바닥(floor)에 설치되어 상층에서 발생한 충격음이 하층으로 전달되는 것을 차단하고, 또한, 케이블의 설치가 용이한 이중바닥재에 관한 것이며, 특히, 슬래브의 상면에 바닥재가 안착될 수 있도록 조립만으로 바닥재지지부재를 설치할 수 있는 바닥재지지모듈 및 바닥재지지모듈을 이용한 바닥재 설치방법에 관한 것이다.The present invention relates to a double floor material that is installed on the floor of a multi-family house such as an apartment, a villa, and the like, to prevent the impact sound generated from the upper floor from being transmitted to the lower floor, and to easily install a cable. In particular, the present invention relates to a flooring installation method using a flooring support module and a flooring support module that can install a flooring support member only by assembling the flooring material to be seated on an upper surface of the slab.
일반적으로 공동주택은 일정한 면적에 다수의 층으로 건축된 건축물로서, 각층에 여러 세대가 거주할 수 있는 다세대 주택이다. 이런 공동주택에 가장 큰 단점 중에 하나는 상층에서 발생한 소음이 하층으로 바로 전달된다는 것이다. 따라서, 상층에 거주하는 세대는 하층의 주거환경을 위해 소음이 발생하지 않도록 각별히 신경을 쓰며 생활하여야 한다.In general, a multi-family house is a multi-storey building in a certain area, and several households can live on each floor. One of the biggest drawbacks to these apartments is that the noise from the upper floors goes straight to the lower floors. Therefore, the households living in the upper floors should pay special attention so that noise does not occur for the lower-level residential environment.
이러한 단점을 보완하기 위해 종래에는 이중바닥재 설치시스템이 개발되었다.In order to make up for this drawback, a double floor installation system has been developed.
도면에서, 도 1은 종래 기술에 따른 바닥재지지모듈들이 슬래브의 상면에 고 정된 상태를 나타낸 사시도이고, 도 2는 도 1에 도시된 바닥재지지모듈의 상면에 바닥재가 안착된 상태를 나타낸 사시도이다.In the drawings, Figure 1 is a perspective view showing a state in which the flooring support module according to the prior art is fixed to the upper surface of the slab, Figure 2 is a perspective view showing a state in which the flooring material is seated on the upper surface of the flooring support module shown in FIG.
도 1 및 도 2에 도시된 바와 같이, 이중바닥재 설치시스템은 상층과 하층을 구분하는 슬래브의 상면에 바닥재지지모듈(10)이 일정간격으로 슬래브의 상면 전체에 배치된다.As shown in Figures 1 and 2, in the double flooring installation system, the
종래의 바닥재지지모듈(10)은 하면 플레이트(11)와, 하면 플레이트(11)의 중심에 고정된 지지스템(13)과, 지지스템(13)의 중공에 나사체결되어 회전에 의해 상하로 이동하는 스크루(15)와, 스크루(15)의 상단에 고정되며 바닥재(20)를 지지하는 상면 플레이트(17)를 포함한다.The conventional
그리고, 바닥재(20)는 직사각형 또는 정사각형의 플레이트의 형상으로서, 바닥재지지모듈(10)의 상면 플레이트(17)의 상면에 안착된다. 일반적으로 바닥재지지모듈(10)의 상면 플레이트(17)에는 접해 있는 4개의 바닥재(20)의 모서리가 안착된다. 따라서, 일정한 면적을 갖는 바닥재(20)의 크기에 따라 슬래브의 상면에 설치되는 바닥재지지모듈(10)의 설치위치가 결정된다. 따라서, 시공자는 슬래브의 상면에 바닥재(20)의 크기에 따라 바닥재지지모듈(10)을 일정 간격으로 위치시킨 후에 바닥재지지모듈(10)의 하면 플레이트(11)를 관통하는 앵커(19)를 체결하여 바닥재지지모듈(10)을 슬래브의 상면에 고정시킨다.In addition, the
이와 같이 시공된 이중 바닥재는 바닥재(20)와 슬래브 사이에 공간부가 형성되기 때문에 바닥재(20)에 가해지는 충격이 하층으로 전달되는 것을 차단함으로써, 방음효과가 있으며, 또한, 공간부를 통해 실내에 설치되는 전기전자 제품 또는 통신기기 등의 케이블이 배치됨으로써, 실내의 배선 설치에 효과적이라는 장점이 있다. Since the double flooring constructed in this way has a space portion formed between the
그러나, 넓은 실내공간을 갖는 이중바닥재를 시공하기 위해서는 바닥재의 수 만큼의 바닥재지지모듈(10)을 일정한 간격을 배치한 후에 슬래브에 고정시켜야 한다. 따라서, 바닥재지지모듈(10)의 위치를 설정하는데 많은 시간이 소요된다는 단점이 있다.However, in order to construct a double flooring having a large indoor space, as many
본 발명은 앞서 설명한 바와 같은 종래 기술의 문제점을 해결하기 위하여 제공된 것으로서, 슬래브 상면에 조립식으로 체결되어 배치하는 이중바닥재의 바닥재지지모듈 및 바닥재지지모듈을 이용한 바닥재 설치방법을 제공하는 데 그 목적이 있다.The present invention is provided to solve the problems of the prior art as described above, the object of the present invention is to provide a flooring installation method using a flooring support module and a flooring support module of the double floor material is assembled and fastened to the upper surface of the slab. .
앞서 설명한 바와 같은 목적을 달성하기 위한 본 발명에 따르면, 바닥재를 지면으로부터 이격시켜 지지하는 바닥재지지모듈에 있어서, 지면에 배치될 베이스패널과, 상기 베이스패널로부터 수직상방으로 돌출한 지지스템과, 상기 베이스패널로부터 제1 방향으로 연장된 가로레일 및, 상기 베이스패널로부터 상기 제1 방향과 90°의 위상차를 갖는 제2 방향으로 연장된 세로레일을 포함하고, 상기 베이스패널의 하면에는 상기 제1 방향과 180°의 위상차를 갖는 방위에 상기 가로레일의 단부와 결합될 수 있는 가로결합부 및, 상기 제2 방향과 180°의 위상차를 갖는 방위에 상기 세로레일의 단부와 결합될 수 있는 세로결합부가 형성되어 있는 바닥재지지모 듈이 제공된다.According to the present invention for achieving the object as described above, in the floor support module for supporting the flooring spaced from the ground, the base panel to be disposed on the ground, the support stem protruding vertically upward from the base panel, A horizontal rail extending from the base panel in a first direction, and a vertical rail extending from the base panel in a second direction having a phase difference of 90 ° with the first direction; and a lower surface of the base panel in the first direction. And a horizontal coupling portion that can be coupled to the end of the transverse rail in an orientation having a phase difference of 180 °, and a vertical coupling portion that can be coupled to an end of the vertical rail in an orientation having a phase difference of 180 ° with the second direction. There is provided a floor covering module.
또한, 본 발명에 따르면, 바닥재를 지면으로부터 이격시켜 지지하는 바닥재지지모듈에 있어서, 지면에 배치될 4개의 베이스패널과, 각각의 베이스패널로부터 수직상방으로 돌출한 지지스템들과, 제1 베이스패널로부터 제1 방향으로 연장된 제1 가로레일과, 제4 베이스패널로부터 제1 방향으로 연장된 제2 가로레일과, 제1 베이스패널로부터 상기 제1 방향과 90°의 위상차를 갖는 제2 방향으로 연장된 제1 세로레일 및, 제2 베이스패널로부터 상기 제1 방향과 90°의 위상차를 갖는 제2 방향으로 연장된 제2 세로레일을 포함하고, 상기 제4 베이스패널은 상기 제1 세로레일의 중간에 결합되어 있으며, 상기 제2 베이스패널은 상기 제1 가로레일의 중간에 결합되어 있고, 제3 베이스패널은 상기 제2 가로레일 및 상기 제2 세로레일의 중간에 결합되어 있으며, 상기 제1 및 제4 베이스패널의 하면에는 상기 제1 방향과 180°의 위상차를 갖는 방위에 상기 제1 및 제2 가로레일의 단부와 결합될 수 있는 제1 및 제2 가로결합부가 각각 형성되어 있고, 상기 제1 및 제2 베이스패널의 하면에는 상기 제2 방향과 180°의 위상차를 갖는 방위에 상기 제1 및 제2 세로레일의 단부와 결합될 수 있는 제1 및 제2 세로결합부가 형성되어 있는 바닥재지지모듈이 제공된다.In addition, according to the present invention, in the floor support module for supporting the flooring spaced from the ground, the four base panels to be disposed on the ground, the support stems protruding vertically upward from each base panel, the first base panel A first transverse rail extending in a first direction from the second base rail, a second transverse rail extending in the first direction from the fourth base panel, and a second direction having a phase difference of 90 ° from the first base panel in the first direction. An extended first longitudinal rail and a second longitudinal rail extending from a second base panel in a second direction having a phase difference of 90 ° with the first direction, wherein the fourth base panel is formed of the first longitudinal rail; It is coupled in the middle, the second base panel is coupled in the middle of the first horizontal rail, the third base panel is coupled in the middle of the second horizontal rail and the second longitudinal rail, First and second horizontal coupling parts are formed on lower surfaces of the first and fourth base panels, respectively, to be coupled to the ends of the first and second horizontal rails in an orientation having a phase difference of 180 ° with the first direction. Lower surfaces of the first and second base panels are provided with first and second vertical coupling parts that can be engaged with ends of the first and second longitudinal rails in an orientation having a phase difference of 180 ° with the second direction. Floor covering module is provided.
또한, 본 발명에 따르면, 90°의 위상차를 갖는 제1 방향과 제2 방향으로 각각 배치된 가로레일 및 세로레일과 수직상방으로 돌출한 지지스템을 갖는 바닥재지지모듈을 이용하여 바닥재를 지면으로부터 이격시켜 설치하는 바닥재설치방법에 있어서, 다수의 바닥재지지모듈을 상기 가로레일과 상기 세로레일이 협력하여 격자모 양을 이루도록 지면에 전개하는 단계와, 상기 가로레일과 상기 세로레일의 단부를 인접한 베이스패널에 연결하는 단계와, 상기 가로레일과 상기 세로레일이 협력하여 형성된 격자의 교차점에 존재하는 지지스템 상에 바닥재의 사각코너부분을 고정시키는 단계를 포함하는 바닥재설치방법이 제공된다.Further, according to the present invention, the flooring material is spaced apart from the ground by using a floor support module having a horizontal rail and a vertical rail and a support stem protruding vertically upward, respectively disposed in a first direction and a second direction having a phase difference of 90 °. In the floor mounting method to be installed, the step of deploying a plurality of floor support module on the ground to form a grid in cooperation with the horizontal rail and the vertical rail, and the end of the horizontal rail and the vertical rail adjacent base panel And a step of fixing the rectangular corner portion of the flooring material to a support stem present at the intersection of the lattice formed by cooperating with the horizontal rail and the vertical rail.
아래에서, 본 발명에 따른 이중바닥재의 바닥재지지모듈 및 바닥재지지모듈을 이용한 바닥재 설치방법의 양호한 실시예를 첨부한 도면을 참조로 하여 상세히 설명하겠다.In the following, with reference to the accompanying drawings, a preferred embodiment of a flooring support module and a flooring support module of the flooring support module according to the present invention will be described in detail.
[실시예 1]Example 1
도면에서, 도 3은 본 발명의 제 1 실시예에 따른 바닥재지지모듈들이 슬래브의 상면에 배치된 상태를 나타낸 부분사시도이고, 도 4는 도 3에 도시된 바닥재지지모듈을 나타낸 사시도이며, 도 5는 도 4에 도시된 바닥재지지모듈의 레일과 베이스패널의 체결을 나타낸 단면도이다.3 is a partial perspective view showing a state in which the floor support modules according to the first embodiment of the present invention is disposed on the upper surface of the slab, Figure 4 is a perspective view showing the floor support module shown in Figure 3, Figure 5 4 is a cross-sectional view showing the fastening of the rail and the base panel of the floor support module shown in FIG.
도 3 및 도 4에 도시된 바와 같이, 바닥재지지모듈(100)은 상부에 안착되는 바닥재(20)의 크기만큼 이격되어 위치하는 4개의 베이스패널(111; 111a, 111b, 111c, 111d)과, 각각의 베이스패널(111)의 상면에 고정된 지지스템(113)들과, 사각형으로 배치된 4개의 베이스패널(111)을 일방향으로 연결하는 한 쌍의 가로레일(130) 및, 상기 4개의 베이스패널(111)을 일방향에 대한 직각방향으로 연결하는 한 쌍의 세로레일(140)을 포함한다.As shown in Figure 3 and 4, the
한편, 4개의 베이스패널(111)의 상면에 고정된 각 지지스템(113)의 이격거리는 일평면상으로 밀착된 4장의 바닥재(20)의 모서리가 모인 지점에 지지스템(113) 의 중심축이 위치하도록 이격되어 있다.On the other hand, the separation distance of each
그리고, 4개의 베이스패널(111)에는 한 쌍의 가로레일(130)과 한 쌍의 세로레일(140)이 격자구조의 형태로 고정되는데, 이런 레일들의 고정관계에 대하여 상세히 설명하겠다.In addition, a pair of
앞에서 설명한 바와 같이, 바닥재(20)의 크기만큼 이격되어 배치된 제1, 제2, 제3, 제4 베이스패널(111a, 111b, 111c, 111d)을 4개의 레일(130, 140)로 연결하여 4개의 베이스패널(111)들을 일평면상으로 고정한다. 여기에서, 제1, 제2, 제3, 제4 베이스패널(111a, 111b, 111c, 111d)은 한 베이스패널(111a)을 기준으로 시계방향으로 순차적으로 정의한 것이다. 그리고, 사각형상으로 배치된 4개의 베이스패널(111; 111a, 111b, 111c, 111d)은 고정레일(131b, 132b, 141b, 142b)에 의해 연결된다.As described above, the first, second, third, and
한편, 4개의 베이스패널(111)에 4개의 고정레일(131b, 132b, 141b, 142b)이 연결되어 형성된 사각형상에 있어서, 제2 베이스패널(111b)에는 상기 사각형상의 바깥방향으로 제1 가로레일(131a)이 고정되고, 제1 가로레일(131a)과 평행한 제2 가로레일(132a)이 제3 베이스패널(111c)에 고정되며 또한 제3 베이스패널(111c)에는 제2 가로레일(132a)에 대한 수직방향으로 제2 세로레일(142a)이 고정되고, 제2 세로레일(142a)과 평행한 제1 세로레일(141a)이 제4 베이스패널(111d)에 고정된다.Meanwhile, in the quadrangular shape formed by connecting four
여기에서, 일방향으로 평행한 한 쌍의 가로레일(130)은 제1 가로레일(131a)과, 제2 가로레일(132a) 및, 제1, 제2 가로레일(131a, 132a)과 연장선에 위치한 두 고정레일(131b, 132b)을 포함하며, 상기 일방향에 대한 90°방향으로 위치한 한 쌍의 세로레일(140)은 제1 세로레일(141a)과, 제2 세로레일(142a) 및, 제1, 제2 세로레일(141a, 142a)과 연장선에 위치한 두 고정레일(141b, 142b)을 포함한다.Here, the pair of
그리고, 제1, 제2 가로레일(131a, 132a)과, 제1, 제2 세로레일(141a, 142a)의 단부 즉, 베이스패널(111)과 연결된 단부의 반대쪽 단부에는 체결편(150)이 각각 형성되며, 이런 체결편(150)은 사각형의 베이스패널(111)에서 레일(131a, 131b, 132a, 132b, 141a, 141b, 142a, 142b)이 고정되지 않은 변의 상면에 접한 상태에서 볼트체결되어 고정된다.In addition, the
이상과 같이 구성된 이중바닥재의 바닥재지지모듈을 이용한 바닥재 설치방법에 대하여 상세히 설명하겠다.The flooring installation method using the flooring support module of the double flooring material configured as described above will be described in detail.
다수 개의 바닥재지지모듈(100)을 슬래브(1)의 상면에 배치한다. 이때, 도 4 및 도 5에 도시된 바와 같이, 한 바닥재지지모듈(100)에서 제1, 제2 세로레일(141a, 142a)의 체결편(150)이 다른 바닥재지지모듈(100)의 한 쌍의 세로레일(140)의 단부에 위치한 제1 베이스패널(111a)과 제2 베이스패널(111b)에 접한 상태에서 볼트체결된다.A plurality of
또한, 한 바닥재지지모듈(100)에서 제1, 제2 가로레일(131a, 132a)의 체결편(150)이 또 다른 바닥재지지모듈(100)의 한 쌍의 가로레일(130)의 단부에 위치한 제1 베이스패널(111a)과 제4 베이스패널(111d)에 접한 상태에서 볼트체결된다. In addition, the
이와 같은 방식으로 다수 개의 바닥재지지모듈(100)을 연결하면, 각 바닥재 지지모듈(100)의 한 쌍의 가로레일(130)들은 가로방향으로 연장되면서 슬래브(1)의 상면에 위치하고, 한 쌍의 세로레일(140)들은 세로방향으로 연장되면서 슬래브(1)의 상면에 위치한다.When connecting a plurality of
이와 같이, 다수 개의 바닥재지지모듈(100)이 모두 연결되면, 슬래브(1)의 상면에는 격자구조로 가로레일(130)과 세로레일(140)들이 연장되고, 가로레일(130)과 세로레일(140)의 교차부위에는 베이스패널(111)이 위치하며, 베이스패널(111)의 상면에는 지지스템(113)이 위치한다.As such, when a plurality of
이런 지지스템(113)의 상면에 바닥재(20)를 안착시키고 접착제 등을 이용하여 바닥재(20)와 지지스템(113)을 고정한다.The
[실시예 2]Example 2
실시예 2를 실시예 1과 비교하였을 때에, 실시예 1은 4개의 지지스템과, 4개의 베이스패널과, 한 쌍의 가로레일 및, 한 쌍의 세로레일이 격자구조로 고정되어 바닥재지지모듈을 형성하였으나, 실시예 2에서는 1개의 지지스템과 1개의 베이스패널과, 1 개씩의 가로레일 및 세로레일로서 바닥재지지모듈을 형성하는 것을 제외하고는 동일하다.When comparing Example 2 with Example 1, Example 1 has four support stems, four base panels, a pair of transverse rails, and a pair of longitudinal rails fixed in a lattice structure to provide a floor support module. Although formed in Example 2, it is the same except that the floor support module is formed as one support stem and one base panel, and one horizontal rail and one vertical rail.
도면에서, 도 6은 본 발명의 제 2 실시예에 따른 바닥재지지모듈의 사시도이며, 도 7은 도 6에 도시된 바닥재지지모듈의 체결관계를 설명하기 위한 사시도이다.In the drawings, Figure 6 is a perspective view of a floor support module according to a second embodiment of the present invention, Figure 7 is a perspective view for explaining the fastening relationship of the floor support module shown in FIG.
도 6 및 도 7에 도시된 바와 같이, 사각형 베이스패널(211)의 중심에는 지지스템(213)이 고정되고, 상호 직각을 이루는 가로레일(230)과 세로레일(240)이 사각 형 베이스패널(211)에 고정된다. 이런 가로레일(230) 및 세로레일(240)의 단부 즉, 베이스패널(211)에 고정된 단부의 반대쪽 단부에는 체결편(250)이 형성된다.6 and 7, the
이와 같은 다수 개의 바닥재지지모듈(200)을 슬래브(1)의 상면에 위치시키고, 각 바닥재지지모듈(200)의 가로레일(230) 및 세로레일(240)이 일직선 상에 위치하도록 바닥재지지모듈(200)을 위치한 후에 가로레일(230) 및 세로레일(240)의 단부에 형성된 체결편(250)을 베이스패널(211)에 고정한다.Such a plurality of
이때에도, 실시예 1에서와 같이, 가로레일(230)과 세로레일(240)의 단부에 형성된 체결편(250)이 베이스패널(211)의 가장자리와 접하도록 한 후에 볼트체결하여 고정한다. 그러면, 실시예 1에서 설명한 바와 같이, 다수 개의 바닥재지지모듈(200)은 슬래브(1)의 상면에 격자구조로 배치되고, 바닥재지지모듈(200)의 지지스템(213) 상면에 바닥재(20)를 안착하여 고정한다.In this case, as in the first embodiment, the
한편, 앞에서 설명한 실시예 1 및 실시예 2에서의 지지스템(213)의 길이는 40mm정도가 가장 양호하다. 지지스템(213)의 길이가 40mm이상이 되었을 때에는 실내공간의 높이가 작아지게 되기 때문에 지지스템(213)의 길이가 40mm일 때가 가장 양호하다.On the other hand, the length of the
또한, 앞에서 설명한 실시예 1 및 실시예 2에서는 바닥재지지모듈이 건축된 슬래브의 상면에 설치된다 설명하였으나, 이미 슬래브의 상면에 바닥재가 깔린 상태에서, 바닥재의 상면에 바닥재지지모듈을 설치하고 바닥재지지모듈 상면에 새로운 바닥재를 설치하여 하부 바닥재와 새로운 바닥재의 사이에 배선 등을 배치할 수 있다.In addition, in the above-described Embodiments 1 and 2, the floor support module is installed on the upper surface of the built slab. However, in the state where the floor material is already laid on the upper surface of the slab, the floor support module is installed on the upper surface of the floor material and the floor support is supported. New floorings can be installed on the top of the module to route wiring between the bottom flooring and the new flooring.
앞서 상세히 설명한 바와 같이, 본 발명의 이중바닥재의 바닥재지지모듈 및 바닥재지지모듈을 이용한 바닥재 설치방법은 기초 콘크리트 바닥인 슬래브와 바닥재의 사이에 공간부를 형성하여 상부에서 가해지는 상충격음을 차단하여 방음효과가 있으며, 바닥재지지모듈의 위치를 설정할 필요 없이 다수 개의 바닥재지지모듈을 조립하여 체결하면 상부에 안착될 바닥재의 크기만큼 이격되어 지지스템이 위치함으로써, 바로 바닥재를 설치할 수 있다는 장점이 있다.As described above in detail, the flooring installation method using the flooring support module and the flooring support module of the double flooring material of the present invention by forming a space between the slab and the flooring that is the foundation concrete floor to block the impact impact applied from the upper soundproofing effect If there is no need to set the location of the floor support module assembly and fastening by assembling a plurality of floor support module spaced by the size of the floor material to be seated on the upper support stem is located, there is an advantage that can be installed immediately.
또한, 본 발명의 이중바닥재의 바닥재지지모듈 및 바닥재지지모듈을 이용한 바닥재 설치방법은 슬래브와 바닥재의 사이에 공간부가 형성됨으로써, 공간부를 통해 실내에 배치될 각종 가전제품의 케이블을 용이하게 배치할 수 있다는 장점이 있다.In addition, in the flooring installation method using the flooring support module and the flooring support module of the double flooring of the present invention, since a space is formed between the slab and the flooring, it is possible to easily arrange the cables of various home appliances to be placed indoors through the space. There is an advantage.
이상에서 본 발명의 이중바닥재의 바닥재지지모듈 및 바닥재지지모듈을 이용한 바닥재 설치방법에 대한 기술사상을 첨부도면과 함께 서술하였지만, 이는 본 발명의 가장 양호한 실시예를 예시적으로 설명한 것이지 본 발명을 한정하는 것은 아니다. 또한, 이 기술분야의 통상의 지식을 가진 자이면 누구나 본 발명의 기술사상의 범주를 이탈하지 않는 범위 내에서 다양한 변형 및 모방이 가능함은 명백한 사실이다. Although the technical idea of the flooring support module and the flooring installation method using the flooring support module of the double flooring of the present invention has been described with the accompanying drawings, this is illustrative of the best embodiments of the present invention to limit the present invention. It is not. In addition, it is obvious that any person skilled in the art can make various modifications and imitations without departing from the scope of the technical idea of the present invention.
Claims (3)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020010053143A KR100605273B1 (en) | 2001-08-31 | 2001-08-31 | Floor board support module of access floor and floor board construction method with floor board support module |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020010053143A KR100605273B1 (en) | 2001-08-31 | 2001-08-31 | Floor board support module of access floor and floor board construction method with floor board support module |
Publications (2)
Publication Number | Publication Date |
---|---|
KR20030019801A KR20030019801A (en) | 2003-03-07 |
KR100605273B1 true KR100605273B1 (en) | 2006-07-28 |
Family
ID=27721765
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1020010053143A KR100605273B1 (en) | 2001-08-31 | 2001-08-31 | Floor board support module of access floor and floor board construction method with floor board support module |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR100605273B1 (en) |
-
2001
- 2001-08-31 KR KR1020010053143A patent/KR100605273B1/en not_active IP Right Cessation
Also Published As
Publication number | Publication date |
---|---|
KR20030019801A (en) | 2003-03-07 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP2006522885A (en) | Structurally integrated accessible floor system | |
PL178128B1 (en) | Method of securing in place architectural facade finish elements | |
JPH07509290A (en) | Panel systems and methods for building construction | |
CA1279968C (en) | Flooring system | |
US20180155935A1 (en) | Modular raised floor system | |
KR100605273B1 (en) | Floor board support module of access floor and floor board construction method with floor board support module | |
US20080053019A1 (en) | Modular Decking System | |
AU2012100824A4 (en) | Building Element for Modular Building | |
US9637910B2 (en) | Modular interior partition for a structural frame building | |
KR102174955B1 (en) | Assembly type electric room | |
JP2009068307A (en) | Reinforcing device for post erected on base stone | |
JP4644005B2 (en) | Unit building | |
WO2019009779A1 (en) | Wall element, wall element aggregate, building wall construction system, building wall and methods for constructing such a building wall and manufacturing of a wall element | |
US20040194405A1 (en) | Building system | |
JPH0728300Y2 (en) | Double floor support leg installation structure | |
JP2007191926A (en) | Partition panel installation method and partition panel | |
KR102247641B1 (en) | Bottom Construction for Structure | |
JPH0412200Y2 (en) | ||
KR101980664B1 (en) | Modular unit for sandwich panel installation | |
JPH0623619Y2 (en) | Floor panel | |
WO2004055283A1 (en) | Improved building system | |
JPH0248697B2 (en) | ||
JP3400688B2 (en) | Dry double floor structure and method of changing floor plan | |
KR200229303Y1 (en) | The corner type vertical unit for assembly of the light weight wall | |
JPH0428984Y2 (en) |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A201 | Request for examination | ||
E701 | Decision to grant or registration of patent right | ||
GRNT | Written decision to grant | ||
FPAY | Annual fee payment |
Payment date: 20120704 Year of fee payment: 7 |
|
FPAY | Annual fee payment |
Payment date: 20130704 Year of fee payment: 8 |
|
FPAY | Annual fee payment |
Payment date: 20140721 Year of fee payment: 9 |
|
FPAY | Annual fee payment |
Payment date: 20150520 Year of fee payment: 10 |
|
FPAY | Annual fee payment |
Payment date: 20160704 Year of fee payment: 11 |
|
FPAY | Annual fee payment |
Payment date: 20170704 Year of fee payment: 12 |
|
LAPS | Lapse due to unpaid annual fee |