KR100591195B1 - Scour guard of bridge well basin foundation - Google Patents

Scour guard of bridge well basin foundation Download PDF

Info

Publication number
KR100591195B1
KR100591195B1 KR1020050011039A KR20050011039A KR100591195B1 KR 100591195 B1 KR100591195 B1 KR 100591195B1 KR 1020050011039 A KR1020050011039 A KR 1020050011039A KR 20050011039 A KR20050011039 A KR 20050011039A KR 100591195 B1 KR100591195 B1 KR 100591195B1
Authority
KR
South Korea
Prior art keywords
scour
scour prevention
well
prevention block
screw
Prior art date
Application number
KR1020050011039A
Other languages
Korean (ko)
Other versions
KR20050023378A (en
Inventor
김길평
성수복
Original Assignee
(주)드림인기술
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by (주)드림인기술 filed Critical (주)드림인기술
Priority to KR1020050011039A priority Critical patent/KR100591195B1/en
Publication of KR20050023378A publication Critical patent/KR20050023378A/en
Application granted granted Critical
Publication of KR100591195B1 publication Critical patent/KR100591195B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B17/00Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor
    • E02B17/0017Means for protecting offshore constructions

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

본 발명은 교량 우물통 기초의 세굴방지대에 관한 것으로서, 더욱 상세하게는 교량의 피어부(100) 하단에 설치되는 우물통 기초(200)의 세굴을 방지하기 위한 우물통 기초의 세굴방지대에 있어서, 하부에 회전바퀴(111)가 설치되며 외측부(112)는 평면이나 내측부(113)는 유선형으로 형성된 세굴방지블록(11)과; 내부는 중공부(121)가 형성되며 외주면으로 나사형상의 세굴방지블럭 설치홈(122)이 상부를 시작으로 하부까지 형성되는 한편, 상기 세굴방지블럭 설치홈(122)에는 세굴방지블록(11)이 구를 수 있는 레일부(123)가 형성되며, 상기 레일부(123)에 연장되게 형성되며 세굴방지블록(11)의 이탈을 방지하는 가이드부(124)가 구비된 나사선식 회전고정틀(12)을 포함하여서 구성되는 것을 특징으로 하며, 본 발명은 피어부의 우물통을 설치한 후 바로 나사선식 회전고정틀을 외부로 설치할 수 있도록 하였으며, 회전고정틀에는 세굴방지블럭을 중력에 의해 자연스럽게 하단으로 설치할 수 있도록 하여 유속에 의한 교각의 세굴현상을 방지할 수 있도록 하였다. The present invention relates to a scrubbing rod of a bridge well basin base, and more particularly, to a scrubbing rod of a well basin base for preventing scour of a well base 200 installed at a lower end of a peer portion 100 of a bridge. In the lower part, the rotating wheel 111 is installed and the outer portion 112 is a flat or inner portion 113 is a scour prevention block 11 formed in a streamline; Inside the hollow portion 121 is formed and the screw-shaped anti-reflection block installation groove 122 is formed from the upper side to the lower side, while the scour prevention block installation groove 122 in the scour prevention block installation 11 The rollable rail part 123 is formed, and is formed to extend on the rail part 123, and the screw-type rotary fixing frame 12 is provided with a guide part 124 to prevent separation of the scour prevention block 11 It is characterized in that it comprises a), the present invention was able to install the screw-type rotary fixing frame immediately after installing the well of the peer portion, the rotation fixing frame can be installed naturally to the lower scour prevention block by gravity The scour phenomena of the piers due to the flow velocity can be prevented.

나사선식 회전고정틀, 세굴방지블럭, 레일부Screw-in rotary frame, scour block, rail

Description

교량 우물통 기초의 세굴방지대{Institution of injury protect for bridge}Infiltration of injury protector bridge

도 1은 기존 교량의 피어기초의 문제점을 도시한 상태도.1 is a state diagram showing the problem of the foundation of the existing bridge.

도 2는 본 발명의 교량 우물통 기초의 세굴방지대의 구조를 개략적으로 도시한 설치구조도.Figure 2 is an installation structure schematically showing the structure of the scour prevention bar of the bridge well basin foundation of the present invention.

도 3a는 본 발명의 세굴방지블럭의 형상을 도시한 사시도.Figure 3a is a perspective view showing the shape of the scour prevention block of the present invention.

도 3b는 본 발명의 세굴방지블럭의 형상을 도시한 평면도.Figure 3b is a plan view showing the shape of the anti-washing block of the present invention.

도 4는 본 발명의 나사선식 회전고정틀의 형상을 도시한 도면.Figure 4 is a view showing the shape of the threaded rotary frame of the present invention.

도 5는 본 발명의 나사선식 회전고정틀에 세굴방지블럭이 설치되는 구조를 도시한 도면.5 is a view showing a structure in which the scour prevention block is installed in the screw-type rotary fixing frame of the present invention.

<도면의 주요 부분에 대한 부호의 설명><Explanation of symbols for the main parts of the drawings>

10 : 세굴방지대 11 : 세굴방지블럭10: scour prevention bar 11: scour prevention block

12 : 나사선식회전고정틀 100 : 피어부12: screw type rotary fixing frame 100: peer portion

111 : 회전바퀴 112 : 외측부111: rotating wheel 112: outer portion

113 : 내측부 121 : 중공부113: inner part 121: hollow part

122 : 세굴방지블럭 설치홈 123 : 레일부122: scour prevention block mounting groove 123: rail

124 : 가이드부 200 : 우물통기초124: guide portion 200: well well foundation

본 발명은 교량 우물통 기초의 세굴방지대에 관한 것으로서, 특히 피어의 우물통을 설치한 후 바로 나사선식 회전고정틀을 외부로 설치할 수 있도록 하였으며, 회전고정틀에는 세굴방지블럭을 중력에 의해 자연스럽게 하단으로 설치할 수 있도록 하여 유속에 의한 교각의 세굴현상을 방지할 수 있도록 한 것에 관한 것이다.The present invention relates to a scour bar on the foundation of a bridge well, and in particular, a screw-type rotary fixing frame can be installed to the outside immediately after installing a well hole of a peer, and the scour prevention block naturally rotates to the bottom by gravity. The present invention relates to an installation to prevent the scour of the piers caused by the flow velocity.

본 고안은 교각 기초부분의 세굴방지구조에 관한 것으로서, 더욱 상세하게는 교량을 지지하는 교각을 설치할 때, 그 교각 우물통 기초 하부의 외측 둘레면에 세굴방지대를 설치함으로써 우물통 기초 하부의 세굴현상을 방지할 수 있도록 하기 위한 교각 기초부분의 세굴방지구조에 관한 것이다.The present invention relates to the scour prevention structure of the foundation part of the bridge, more specifically, when installing the bridge supporting the bridge, the scour at the bottom of the well basin base by installing a scour prevention bar on the outer peripheral surface of the bottom of the bridge well basin base It relates to a scour prevention structure of the foundation part of the piers to prevent the phenomenon.

일반적으로 강을 횡단하는 교량을 설치할 때에는 강의 바닥부분에 우물통 기초(200)를 침설하여 고정시키고 그 중앙부에 피어부(100)를 축조하여 구축된다.In general, when installing the bridge across the river is settled by fixing the well base 200 in the bottom portion of the river and is constructed by constructing the pier part 100 in the center thereof.

이와 같이 구축되어진 상기 우물통 기초(200)의 하부는 도1에 도시된 바와 같이, 시간이 경과됨에 따라 흐르는 강물의 속도 또는 상류에서 하류측으로 이동되는 수중물체에 의해서 부딪혀서 변형(세굴현상)이 발생하게 된다.As shown in FIG. 1, the lower part of the well basin base 200 constructed as described above is hit by a velocity of the flowing river or an underwater object moving upstream from the upstream side as time elapses so that deformation (washing phenomenon) occurs. Done.

그러나 변형이 심할 경우에는 피어부(100)를 손상시키게 되고 상기 피어부(100)가 손상되면 교량이 붕괴되는 등의 문제점을 일으키게 된다.However, if the deformation is severe, the peer portion 100 is damaged, and if the peer portion 100 is damaged, problems such as collapse of the bridge are caused.

이러한 문제점을 해결하기 위하여 종래에는 포대콘크리트를 수중에 투하하는 공법을 이용하고 있으나, 이러한 공법은 크레인을 이용하거나 굴삭기 장비를 이용하여 투하하게 되므로 수중고르기가 일정하지 못하여 부실 시공사례가 발생하였고, 세굴방지용 콘크리트 포대가 터지는 등 재 시공비에 막대한 비용이 소요되는 등의 문제점이 있었다.Conventionally, in order to solve this problem, the method of dropping the bag concrete in the water is used, but such a method is dropped by using a crane or an excavator equipment. There was a problem such as a huge cost for the reconstruction cost, such as the explosion of the concrete sacks to prevent.

본 발명은 상기한 종래 문제점을 개선하기 위해 제안된 것으로서, 저렴한 시공비로 효율적으로 교량의 피어부의 세굴을 방지할 수 있도록 하는 것이 목적이다.The present invention has been proposed to improve the above-mentioned conventional problems, and an object of the present invention is to be able to effectively prevent scouring of a pier part of a bridge at a low construction cost.

상기 기술한 목적을 달성하기 위하여, 교량의 피어부 하단에 설치되는 우물통 기초의 세굴을 방지하기 위한 우물통 기초의 세굴방지대에 있어서, 하부에 회전바퀴가 설치되며 외측부는 평면이나 내측부는 유선형으로 형성된 세굴방지블록과; 내부는 중공부가 형성되며 외주면으로 나사형상의 세굴방지블럭 설치홈이 상부를 시작으로 하부까지 형성되는 한편, 상기 세굴방지블럭 설치홈에는 세굴방지블록이 구를 수 있는 레일부가 형성되며, 상기 레일부에 연장되게 형성되며 세굴방지블록의 이탈을 방지하는 가이드부가 구비된 나사선식 회전고정틀를 포함하여서 구성되는 것을 특징으로 하는 우물통 기초의 세굴방지대를 제공한다.In order to achieve the above object, in the well base of the well to prevent the scour of the well base installed in the lower end of the bridge portion of the bridge, the rotating wheel is installed in the lower portion and the outer portion is flat or the inner portion is streamlined Scour prevention block formed with; A hollow part is formed inside, and a screw-shaped scour prevention block installation groove is formed from the upper side to a lower portion, while the scour prevention block installation groove is formed with a rail portion through which the scour prevention block can be rolled. It is formed to extend to the scour prevention block provides a scrub prevention base of the well bucket, characterized in that it comprises a screw-type rotary fixing frame provided with a guide to prevent the separation.

이하, 본 발명의 구체적인 실시예를 첨부도면을 참조하여 상세히 살펴보기로 한다.Hereinafter, specific embodiments of the present invention will be described in detail with reference to the accompanying drawings.

우선, 첨부된 도면을 설명하면 다음과 같다.First, the accompanying drawings will be described.

도 2는 본 발명의 교량 우물통 기초의 세굴방지대의 구조를 개략적으로 도시한 설치구조도이며, 도 3a는 본 발명의 세굴방지블럭의 형상을 도시한 사시도이고, 도 3b는 본 발명의 세굴방지블럭의 형상을 도시한 평면도이며, 도 4는 본 발명의 나사선식 회전고정틀의 형상을 도시한 도면이고, 도 5는 본 발명의 나사선식 회전고정틀에 세굴방지블럭이 설치되는 구조를 도시한 도면이다.FIG. 2 is an installation structure diagram schematically showing the structure of the scour bar according to the foundation of the bridge well bucket of the present invention, FIG. 3A is a perspective view showing the shape of the scour prevention block of the present invention, and FIG. 3B is a scour prevention block of the present invention. Figure 4 is a plan view showing the shape of, Figure 4 is a view showing the shape of the threaded rotary fixing frame of the present invention, Figure 5 is a view showing a structure in which a scour prevention block is installed in the threaded rotary fixing frame of the present invention.

본 발명은 우선 피어부의 우물통을 설치한 후 바로 나사선식 회전고정틀을 외부로 설치할 수 있도록 하였으며, 회전고정틀에는 세굴방지블럭을 중력에 의해 자연스럽게 하단으로 설치할 수 있도록 하여 유속에 의한 교각의 세굴현상을 방지할 수 있도록 한 것임은 상기에서 기술한 바가 있다.The present invention was to first install the threaded rotary fixing frame immediately after installing the water well of the peer portion, the scour phenomenon of the piers due to the flow rate by allowing the scour prevention block to be installed naturally to the bottom by gravity. It has been described above to be able to prevent.

즉, 본 발명의 특징은 교량의 피어부(100) 하단에 설치되는 우물통 기초(200)의 나사선식 회전고정틀(12)의 구조와 세굴방지블록(11)이 체결된 것을 주로한다.That is, the main feature of the present invention is that the structure of the screw-type rotation fixing frame 12 and the scour prevention block 11 of the well base 200 installed at the bottom of the peer portion 100 of the bridge is mainly fastened.

상기의 구체적인 내용은 나사선식 회전고정틀의 구조를 알 수 있는 도4 및 도5에 도시된 바와 같이, 본 발명의 나사선식 회전고정틀(12)의 내부는 중공부(121)가 형성되며 외주면으로 나사형상의 세굴방지블럭 설치홈(122)이 상부를 시작으로 하부까지 형성되게 된다.Detailed description of the above is shown in Figures 4 and 5 to understand the structure of the screw-type rotary fixing frame, the inside of the screw-type rotary fixing frame 12 of the present invention is formed with a hollow portion 121 and screwed to the outer peripheral surface Scour prevention block installation groove 122 of the shape is formed from the top to the bottom.

또한, 상기 세굴방지블럭 설치홈(122)에는 세굴방지블록(11)이 구를 수 있는 레일부(123)가 형성되며, 상기 레일부(123)에 연장되게 형성되며 세굴방지블록(11)의 이탈을 방지하는 가이드부(124)가 구비되게 되는 구조이다. In addition, the scour prevention block installation groove 122 is formed with a rail portion 123 through which the scour prevention block 11 can be rolled, and is formed to extend on the rail portion 123 and to the scour prevention block 11. The guide portion 124 to prevent the separation is provided with a structure.

그리고 세굴방지블럭의 사시형상과 평면형상을 도시한 도3a와 도3b에서 알 수 있듯이, 본 발명의 세굴방지블록(11)은 하부에 회전바퀴(111)가 설치되며 외측부(112)는 평면이나 내측부(113)는 유선형으로 형성되게 되게 된다.And as can be seen in Figures 3a and 3b showing the perspective shape and planar shape of the scour prevention block, the scour prevention block 11 of the present invention is provided with a rotating wheel 111 at the bottom and the outer portion 112 is flat The inner portion 113 is to be formed in a streamlined.

즉, 상기 세굴방지블록(11)의 내측부(113)의 형상을 유선형으로 함으로써 나사선식 회전고정틀(12)의 외주면으로 형성된 나사형상의 세굴방지블럭 설치홈(122)에 밀착되어 설치되게 되어 이격의 형성으로 인한 세굴방지블록(11)의 유동이나 이탈을 효율적으로 막을 수 있게 된다.That is, by making the shape of the inner side 113 of the scour prevention block 11 into a streamlined shape, it is installed in close contact with the screw-shaped scour prevention block installation groove 122 formed by the outer circumferential surface of the screw-type rotation fixing frame 12. It is possible to effectively prevent the flow or escape of the scour prevention block 11 due to the formation.

상술한 바와 같은 본 발명의 세굴방지대(10)는 크게 세굴방지블록(11)과 나사선식 회전고정틀(12)로 구성되게 되며, 본 발명은 시공상 용이할 뿐만 아니라 효율적으로 세굴현상을 방지할 수 있게 되는 구조이다. The scour bar 10 of the present invention as described above is largely composed of a scrubbing block 11 and a screw-type rotary fixing frame 12, the present invention is not only easy in construction but also effectively prevent scour phenomenon It is the structure that becomes possible.

그리고, 이와 같은 구조의 본 발명의 세굴방지대(10)는 기술적 사상이나 전망으로부터 개별적으로 이해되어져서는 안되며, 변형된 실시예들은 본 발명의 첨부된 특허청구범위 안에 속한다 해야 할 것이다.In addition, the scour bar 10 of the present invention having such a structure should not be understood individually from the technical idea or the prospect, and the modified embodiments should fall within the appended claims of the present invention.

상술한 바와 같이, 본 발명은 피어부의 우물통을 설치한 후 바로 나사선식 회전고정틀을 외부로 설치할 수 있도록 하였으며, 회전고정틀에는 세굴방지블럭을 중력에 의해 자연스럽게 하단으로 설치할 수 있도록 하여 유속에 의한 교각의 세굴현상을 효율적으로 방지할 수 있게 되었다.As described above, the present invention was able to install the screw-type rotary fixing frame immediately after installing the well of the peer portion, the scaffold block to be installed naturally to the lower side by gravity to the rotating fixing frame pier by the flow velocity The scour phenomenon can be effectively prevented.

또한 작업시에 세굴방지블럭을 중력을 이용하여 자연스럽게 설치함으로써 시공이 용이하다는 장점이 있다. In addition, there is an advantage that the construction is easy by installing the scour prevention block naturally using gravity during operation.

Claims (1)

교량의 피어부 하단에 설치되는 우물통 기초의 세굴을 방지하기 위한 우물통 기초의 세굴방지대에 있어서,In the scour prevention bar of the well base to prevent scour of the well base installed in the lower end of the bridge portion, 몸체 하부에 회전바퀴(111)가 설치되고, 평면으로 형성된 외측부(112)와 유선형으로 형성된 내측부(113)로 이루어지는 세굴방지블록(11)과;Rotation wheel 111 is installed in the lower body, the scour prevention block 11 consisting of an outer portion 112 formed in a plane and an inner portion 113 formed in a streamline; 내부에 중공부(121)가 형성되고, 외주면을 따라 나사형상의 세굴방지블럭 설치홈(122)이 상부를 시작으로 하부까지 형성되는 한편, 상기 세굴방지블럭 설치홈(122)에는 세굴방지블록(11)이 구를 수 있는 레일부(123)가 형성되며, 상기 레일부(123)에 일체로 외측으로 연장되어 가이드부(124)가 형성된 나사선식 회전고정틀(12);를 포함하여 구성되는 것을 특징으로 하는 우물통 기초의 세굴방지대.A hollow portion 121 is formed therein, and a screw-type anti-refrigeration block installation groove 122 is formed along the outer circumferential surface from the upper side to the lower side, while the anti-reflection block installation groove 122 is disposed in the anti-reflection block ( 11) is formed a rail portion 123 that can be rolled, and is integrally extended to the outside of the rail portion 123, the threaded rotary fixing frame 12, the guide portion 124 is formed; The scour guard of the well basin base characterized by
KR1020050011039A 2005-02-05 2005-02-05 Scour guard of bridge well basin foundation KR100591195B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020050011039A KR100591195B1 (en) 2005-02-05 2005-02-05 Scour guard of bridge well basin foundation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020050011039A KR100591195B1 (en) 2005-02-05 2005-02-05 Scour guard of bridge well basin foundation

Publications (2)

Publication Number Publication Date
KR20050023378A KR20050023378A (en) 2005-03-09
KR100591195B1 true KR100591195B1 (en) 2006-06-30

Family

ID=37230950

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020050011039A KR100591195B1 (en) 2005-02-05 2005-02-05 Scour guard of bridge well basin foundation

Country Status (1)

Country Link
KR (1) KR100591195B1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20240040523A (en) * 2022-09-21 2024-03-28 한국해양과학기술원 pier for marine bridge having spiral protrusion and manufacturing method thereof

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7823240B2 (en) * 2008-04-24 2010-11-02 Chen Su-Chin Hooked collar for piers and bridge including the same
CN102864756A (en) * 2012-09-10 2013-01-09 重庆交通大学 Measuring and controlling method of maximal scouring depth of bridge abutment
CN110241715B (en) * 2019-07-15 2020-09-18 浙江海洋大学 Bridge pier protector

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20240040523A (en) * 2022-09-21 2024-03-28 한국해양과학기술원 pier for marine bridge having spiral protrusion and manufacturing method thereof
KR102681814B1 (en) * 2022-09-21 2024-07-04 한국해양과학기술원 pier for marine bridge having spiral protrusion and manufacturing method thereof

Also Published As

Publication number Publication date
KR20050023378A (en) 2005-03-09

Similar Documents

Publication Publication Date Title
KR100591195B1 (en) Scour guard of bridge well basin foundation
CN110241715B (en) Bridge pier protector
CN211340639U (en) River channel dam reinforcing mechanical equipment
CN113389174B (en) Protection device for building bridge
JP2020193556A (en) Flood barrier
KR20120065306A (en) A waterproof plate for flooding prevention
JP5361096B1 (en) Water gate
JP4678893B1 (en) Intake mechanism of Sabo Dam
JP4772489B2 (en) Reactor building
KR100583368B1 (en) Institution of injury protect for bridge
KR100734754B1 (en) eddy prevention apparatus for siphon
CN216948084U (en) Device for preventing river bank from scouring
KR101253061B1 (en) Screen device for removing adulterated materials without power
JP4073195B2 (en) Water-driven waterproof device
KR101953344B1 (en) Backflow prevention cover and backflow prevention apparatus comprising the same
CN215715035U (en) A bank protection reinforced structure for soil and water conservation design
JP6285117B2 (en) Portable drainage pump
KR101262093B1 (en) Anti-overflow type fill dam using crest pavement and intermediate channel
JP2010185183A (en) Simplified check gate
KR200415207Y1 (en) Apparatus for preventing an oblong body from being caught on a bridge and/or doing harm to the bridge
US2918077A (en) Automatic storm drain outlet
KR102219973B1 (en) Seawall install method using waves offset block and sand loss prevention device
JP2004003238A (en) Water gate for preventing high tide
CN217536891U (en) Deep-cylinder type energy dissipation well with tail end pressure flow discharged in municipal pipeline engineering
CN213926140U (en) High-stability gate supporting device for hydraulic engineering

Legal Events

Date Code Title Description
A201 Request for examination
A302 Request for accelerated examination
N231 Notification of change of applicant
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
N231 Notification of change of applicant
N231 Notification of change of applicant
N231 Notification of change of applicant
N231 Notification of change of applicant
GRNT Written decision to grant
N231 Notification of change of applicant
FPAY Annual fee payment

Payment date: 20110607

Year of fee payment: 6

LAPS Lapse due to unpaid annual fee