KR100582213B1 - Automatic remote wattmeter inspection system - Google Patents

Automatic remote wattmeter inspection system Download PDF

Info

Publication number
KR100582213B1
KR100582213B1 KR1020040020153A KR20040020153A KR100582213B1 KR 100582213 B1 KR100582213 B1 KR 100582213B1 KR 1020040020153 A KR1020040020153 A KR 1020040020153A KR 20040020153 A KR20040020153 A KR 20040020153A KR 100582213 B1 KR100582213 B1 KR 100582213B1
Authority
KR
South Korea
Prior art keywords
meter
power
voltage
mechanical
power line
Prior art date
Application number
KR1020040020153A
Other languages
Korean (ko)
Other versions
KR20050094711A (en
Inventor
장원영
Original Assignee
주식회사 우림데이시스
주식회사 소디프 이앤티
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 주식회사 우림데이시스, 주식회사 소디프 이앤티 filed Critical 주식회사 우림데이시스
Priority to KR1020040020153A priority Critical patent/KR100582213B1/en
Publication of KR20050094711A publication Critical patent/KR20050094711A/en
Application granted granted Critical
Publication of KR100582213B1 publication Critical patent/KR100582213B1/en

Links

Images

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02KDYNAMO-ELECTRIC MACHINES
    • H02K1/00Details of the magnetic circuit
    • H02K1/06Details of the magnetic circuit characterised by the shape, form or construction
    • H02K1/22Rotating parts of the magnetic circuit
    • H02K1/24Rotor cores with salient poles ; Variable reluctance rotors
    • HELECTRICITY
    • H01ELECTRIC ELEMENTS
    • H01FMAGNETS; INDUCTANCES; TRANSFORMERS; SELECTION OF MATERIALS FOR THEIR MAGNETIC PROPERTIES
    • H01F41/00Apparatus or processes specially adapted for manufacturing or assembling magnets, inductances or transformers; Apparatus or processes specially adapted for manufacturing materials characterised by their magnetic properties
    • H01F41/02Apparatus or processes specially adapted for manufacturing or assembling magnets, inductances or transformers; Apparatus or processes specially adapted for manufacturing materials characterised by their magnetic properties for manufacturing cores, coils, or magnets
    • H01F41/0206Manufacturing of magnetic cores by mechanical means
    • H01F41/0233Manufacturing of magnetic circuits made from sheets
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02KDYNAMO-ELECTRIC MACHINES
    • H02K15/00Methods or apparatus specially adapted for manufacturing, assembling, maintaining or repairing of dynamo-electric machines
    • H02K15/02Methods or apparatus specially adapted for manufacturing, assembling, maintaining or repairing of dynamo-electric machines of stator or rotor bodies
    • H02K15/022Methods or apparatus specially adapted for manufacturing, assembling, maintaining or repairing of dynamo-electric machines of stator or rotor bodies with salient poles or claw-shaped poles
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02KDYNAMO-ELECTRIC MACHINES
    • H02K2201/00Specific aspects not provided for in the other groups of this subclass relating to the magnetic circuits
    • H02K2201/09Magnetic cores comprising laminations characterised by being fastened by caulking

Abstract

본 발명은 저압용 일반 기계식 전력량계를 교체하지 않고, 저압용 일반 기계식 전력량계가 설치된 상태에서 설치하여 실시간 원격 검침시스템을 구현할 수 있도록 하는 전력량 자동원격검침(AMR; Automatic meter Reading)장치에 관한 것이다. The present invention relates to an automatic power meter reading (AMR) device for realizing a real-time remote meter reading system by installing in a state in which a low pressure general mechanical wattmeter is installed, without replacing the low pressure general mechanical wattmeter.

원격검침을 위하여 각 수용가의 전자식 전력량계를 모두 교체해야하므로, 비용상, 설치시공상 어려움이 뒤따르며, 또한 전자식 전력량계는 에러 또는 고장 등의 발생율이 기계식 전력량계와 대비하여 높아, 전력을 담당하는 담당관서에서는 전자식 전력량계의 설치를 꺼려하게 된다.As the electronic meter is required to be replaced for each meter for the remote meter reading, there is a cost and difficulty in installation.In addition, the electronic meter has a high incidence of errors or failures compared to a mechanical meter. Will be reluctant to install an electronic electricity meter.

본 발명은 각 수용가에 설치된 기계식 전력량계가 설치된 상태에서, 기계식 전력량계에 연결된 전력선로에 설치하여 전력량을 산출하고, 산출된 정보를 전력선통신을 이용하여 원격검침정보로 중앙시스템으로 전송할 수 있도록 하므로써, 일반 기계식 전력량계를 교체하지 않고서도 실시간 원격검침 시스템의 구현이 가능하도록 하여 기존 전자식 전력량계의 문제점 및 기존 설치된 기계식 전력량계의 단순기능을 보완할 수 있도록 한다.The present invention is installed in the power line connected to the mechanical electricity meter in the state where the mechanical electricity meter is installed in each customer, calculates the amount of power, and transmits the calculated information to the central system by remote meter reading information using power line communication, general Real-time remote metering system can be implemented without replacing the mechanical electricity meter, so that the problems of the existing electronic electricity meter and the simple function of the existing mechanical electricity meter can be complemented.

전자식전력량계, 원격검침, 전력원격검침Electronic electricity meter, remote meter reading, remote meter reading

Description

전력량 자동 원격 검침장치{Automatic remote wattmeter inspection system}Automatic remote wattmeter inspection system

도 1은 본 발명 전력량 자동 원격검침장치의 설치 구성을 나타낸 도면.1 is a view showing the installation configuration of the present invention automatic power meter reading.

도 2는 본 발명 전력량 자동 원격검침장치의 구성을 나타낸 블록도.Figure 2 is a block diagram showing the configuration of the automatic power meter reading apparatus of the present invention.

본 발명은 저압용 일반 기계식 전력량계를 교체하지 않고, 저압용 일반 기계식 전력량계가 설치된 상태에서 설치하여 실시간 원격 검침시스템을 구현할 수 있도록 하는 전력량 자동원격검침(AMR; Automatic meter recoder)장치에 관한 것이다.The present invention relates to an automatic power meter reading (AMR) device for realizing a real-time remote meter reading system by installing in a state where the low pressure general mechanical meter is installed, without replacing the low pressure general mechanical meter.

근래에 들어서는 전기, 수도, 중수, 온수, 가스, 오폐수 등 다양한 분야에서 사람이 직접 검침하지 않고서도 원격지에서 검침이 가능한 다양한 시스템이 개발되고 있으며, 이중 전기에 대해서도 이른 바, CDMA, PCS 등의 무선 이동통신망을 이용한 원격검침 시스템이 개발되어 고압수용에 대한 원격검침이 일부 시행되고 있다. In recent years, various systems, such as electricity, water, heavy water, hot water, gas, and waste water, have been developed for remote meter reading without a person's direct reading. Among the electricity, wireless, such as CDMA and PCS, has been developed. Remote meter reading system using mobile communication network has been developed, and remote meter reading for high pressure acceptance is partly implemented.

그러나 기타 원격검침은 물론 특히 저압전기분야에서 원격검침 또한 경제성 및 시공상의 문제점이 우선적으로 해결되어야만 시행이 가능하다고 볼 수 있다.However, remote meter reading as well as remote meter reading, especially in the field of low voltage electricity, can only be implemented if economic and construction problems are addressed first.

각 수용가에는 사용하는 전력량을 검침하기 위하여 전력량계가 설치되어 있으며, 수용가로 전력을 공급하기 위한 전력 선로상에 설치되어 내부의 회전자 코일과 고정자 전압코일을 이용하여 전류/전압을 측정하여 전력량을 산출하는 기계식 전력량계가 설치되어 있다.A power meter is installed in each customer to read the amount of power used, and it is installed on a power line for supplying power to the customer, and calculates the amount of power by measuring current / voltage using an internal rotor coil and stator voltage coil. Mechanical electricity meter is installed.

근래에 들어서는 원격검침을 위하여 일부 전자식 전력량계가 설치되어 있긴 하지만, 대부분 기계식 전력량계가 설치되어 있다.In recent years, although some electronic meters are installed for remote meter reading, most are equipped with mechanical meters.

원격검침을 위하여서는 각 수용가의 기계식 전력량계를 전자식 전력량계로 교체해야하므로, 전체적으로 원격검침을 위한 시스템을 구축하기 위해서는 비용상, 설치 시공상 어려움이 뒤따른다.For the remote meter reading, each customer's mechanical meter needs to be replaced with an electronic meter. Therefore, in order to construct a system for remote metering in general, there are cost and installation difficulties.

또한 전자식 전력량계는 에러발생 또는 고장 등의 발생율이 기계식 전력량계에 비해 높아, 전력회사에서는 전자식 전력량계의 설치를 꺼려하게 된다.In addition, the electronic electricity meter has a higher occurrence rate such as an error occurrence or a failure than the mechanical electricity meter, so that the electric company is reluctant to install the electronic electricity meter.

또한 저압수용의 경우 RF 통신, 전화전용선, 유무선 인터넷 등을 이용한 다양한 방법의 원격검침 시스템이 개발되어 제시되고 있으나, 이 또한 통신 인프라의 구축 및 통신료 등의 비용발생으로 인하여 확대 시행되지 않고 있는 실정이다. In addition, in case of low pressure water, various methods of remote meter reading system using RF communication, telephone line, wired / wireless internet, etc. have been developed and presented, but this has not been expanded due to the cost of constructing communication infrastructure and communication fee. .

본 발명에서는 이와 같은 점을 감안하여 각 수용가에 설치된 기계식 전력량계가 설치된 상태에서, 기계식 전력량계가 연결된 전력선로에 간단히 설치하여 전력량을 산출하고, 산출된 정보를 전력선통신을 이용하여 원격검침정보로 중앙시스템으로 전송할 수 있도록 하므로써, 저압용 일반 기계식 전력량계를 교체하지 않고서도 실시간 원격검침 시스템의 구현이 가능하도록 하므로써, 경제적인 구축비용으로 전자식 전력량계의 문제점 및 기존 설치된 기계식 전력량계의 단순기능을 보완할 수 있도록 한 전력량 자동 원격 검침장치를 제공하고자 한 것이다.In view of the above, in the present invention, in the state where the mechanical wattmeter installed in each customer is installed, the electric wattmeter is simply installed on the power line to which the mechanical wattmeter is connected to calculate the electric power, and the calculated information is used as remote meter reading information using the remote meter reading information. It is possible to implement the real-time remote metering system without replacing the general mechanical meter for low pressure by transmitting it to the system, and to solve the problem of the electronic meter and the simple function of the existing mechanical meter with economical construction cost. It is to provide an automatic remote meter reading device.

본 발명 전력량 자동 원격 검침장치는, The present invention automatic power meter reading device,

각 수용가의 저압 전력선로의 전류 및 전압을 검출하기 위한 전력검출수단과, 전력검출수단을 통해 얻어진 아날로그 형태의 전류 및 전압을 디지털 신호로 변환, 연산 처리하여 유효전력량을 산출하고, 중앙시스템에서 전력량계에 대하여 요구하는 전월지침, 현재지침, 유효전력량, 전압 등의 검침정보를 산출, 저장하기 위한 메모리 수단 및 프로그램이 내장된 중앙제어처리수단과, 중앙제어처리수단으로부터 처리된 전기에 관한 데이터를 표시하여 주는 표시수단과, 중앙제어처리수단으로부터 생성된 검침정보을 중앙시스템으로 전송 또는 중앙시스템으로 부터의 소정의 정해진 제어데이터 또는 정보를 전송받기 위하여 중앙시스템과 저압 전력선로를 이용하여 전력선통신하기 위한 PLC(Power Line Communication) 모뎀부와, 기계식 전력량계에 표시된 적산전력량과 동기값을 맞추어 주기 위한 수단을 포함하는 사용자 입력수단과, 전력선으로부터 전압을 공급받아 본체의 동작전원으로 정류하여 공급하는 전원공급수단을 포함하여 구성되며, Power detection means for detecting current and voltage of low voltage power line of each customer, and converting current and voltage of analog type obtained through power detection means into digital signal and calculating and calculating effective power amount, and power meter in central system Displays the central control processing means having a built-in memory means and a program for calculating and storing metering information such as the previous month's instructions, the current instructions, the effective power amount, the voltage, and the data about the electricity processed by the central control processing means. PLC for power line communication using the low voltage power line and the central system to transmit the display means and meter reading information generated from the central control processing means to the central system or to receive predetermined control data or information from the central system. (Power Line Communication) The totalizer displayed on the modem unit and the mechanical power meter. And a user input means including a means for matching a power amount and a synchronization value, and a power supply means for receiving a voltage from a power line and rectifying and supplying it to an operating power source of the main body.

상기 저압전력선로의 전류를 검출하기 위하여 기계식 전력량계의 일측 저압 전력선로에 설치하기 위하여 자동원격 검침장치의 본체외부로 변류기(CT)를 구성하고, 상기 변류기는 자동원격 검침장치의 본체내에 구성되는 전력검출수단의 전류검출부에 연결된 구성을 갖는 것을 특징으로 한다. A current transformer (CT) is formed outside the main body of the automatic remote meter reading device to be installed in the low voltage power line on one side of the mechanical meter to detect the current of the low voltage power line, and the current transformer is a power configured in the main body of the automatic remote meter reading device. It is characterized by having a configuration connected to the current detection unit of the detection means.

또한 상기 자동원격 검침장치의 본체 외부로는 누전을 감지하기 위한 정보를 수집하기 위하여 저압 전력선로의 공통 중성선(neutral)상에 설치되는 영상변류기(Z-CT)를 구성하고, 본체 내부로 영상변류기의 2차측 전압을 검출하기 위한 영상전압검출수단을 더 포함하여 구성한 것을 특징으로 한다.In addition, an image current transformer (Z-CT) is installed on a common neutral line of a low voltage power line to collect information for detecting a short circuit to the outside of the main body of the automatic remote meter reading device. It further comprises a video voltage detection means for detecting the secondary voltage of the.

이와 같은 특징을 갖는 본 발명 전력량 자동원격 검침장치를 첨부된 도면 도 1 내지 도 2에 도시된 실시예를 참조하여 그 구성 및 작용을 상세히 설명하면 다음과 같다.With reference to the embodiment shown in Figures 1 to 2 attached to the present invention automatic power meter reading device having such a feature will be described in detail the configuration and operation as follows.

수용가에 설치된 기계식 전력량계(100)의 일 측 저압 전력선로에 원격검침장치(200)의 본체가 설치되고, 저압 전력선로의 전류를 검출하기 위하여 저압 전력선로에 설치되는 변류기(CT)는 원격검침장치(200)의 본체외부에 구성된다.The main body of the remote metering device 200 is installed on one side of the low-voltage power line of the mechanical power meter 100 installed in the customer, and the current transformer CT installed on the low-voltage power line to detect the current of the low-voltage power line is a remote metering device. It is comprised outside the main body of 200.

상기 원격검침장치(200)의 본체내에는 상기 변류기(CT)와 연결되어 저압 전력선로의 전류를 검출하는 전류검출부(212)와, 저압 전력선로의 전압을 검출하는 전압검출부(211)를 포함하는 전력검출부(210)와, 전력검출부(210)를 통해 얻어진 아날로그 형태의 전류 및 전압을 디지털 신호로 변환, 연산 처리하여 유효전력량을 산출하고, 중앙시스템에서 전력량계에 대하여 요구하는 전월지침, 현재지침, 유효전력량, 전압 등의 검침정보를 산출, 저장하고, 데이터의 전송제어를 위한 메모리 수단 및 프로그램이 내장된 중앙제어처리부(220)와, 중앙제어처리부(220)로부터 처리된 전기에 관한 데이터를 표시하여 주는 LCD표시부(230)와, 중앙제어처리부(220)로부터 생성된 검침정보를 중앙시스템으로 전송 또는 중앙시스템으로 부터의 소정의 정해진 제어데이터 또는 정보를 전송받기 위하여 중앙시스템과 저압 전력선로를 이용하여 전력선 통신하기 위한 PLC(Power Line Communication) 모뎀부(240)와, 기계식 전력량계(100)에 표시된 적산전력량과 동기값을 맞추어 주기 위한 키이수단을 포함하는 사용자 입력부(250)와, 저압 전력선으로부터 전압을 공급받아 상기 각 부에서 요구되는 동작 전원전압을 공급하는 전압공급부(power supply)(260)를 포함하여 구성된다. The main body of the remote meter 200 includes a current detector 212 connected to the current transformer CT to detect a current of a low voltage power line, and a voltage detector 211 to detect a voltage of a low voltage power line. The power detector 210 and the analog current and voltage obtained through the power detector 210 are converted into a digital signal and processed to calculate an effective power amount, and the previous month's instructions, current guidelines, Calculates and stores meter reading information such as effective power amount and voltage, and displays data related to electricity processed by the central control processing unit 220 and the central control processing unit 220 in which memory means and programs for controlling data transmission and control are incorporated. The LCD display 230 and the meter reading information generated from the central control processor 220 are transmitted to the central system or predetermined predetermined control data or information from the central system. PLC (Power Line Communication) modem unit 240 for power line communication using the central system and low-voltage power line to receive the transmission, and key means for matching the integrated power amount and the synchronization value displayed on the mechanical power meter 100 And a power supply unit 260 for receiving a voltage from the low voltage power line and supplying an operating power voltage required by each unit.

상기 중앙제어처리부(220)는 전력검출부(210)로부터 얻어진 아날로그 전류/전압 신호를 디지털 데이터로 변환하는 A/D 변환수단(221)과, 디지털 변환된 데이터를 연산하여 전월지침, 현재지침, 유효전력량, 무효전력량 등의 검침 데이터를 산출하는 프로세스수단(222)과, 산출된 데이터를 저장하는 메모리수단(223)과, 내장된 전력량계 프로그램에 따라서 데이터의 처리 및 저장, 전송, 표시 등의 제어과정을 수행하는 제어수단(224)을 포함하여 구성된다.The central control unit 220 converts the analog current / voltage signal obtained from the power detector 210 into digital data, and the A / D conversion unit 221 calculates the digitally converted data. Control means for calculating meter reading data such as power amount, reactive power amount, etc., memory means 223 for storing the calculated data, and processing, storage, transmission, display, etc. of the data according to the built-in power meter program. It comprises a control means 224 to perform.

그리고, 원격검침장치(200)의 본체 외부로 영상변류기(Z-CT)를 구성하고, 저압전력선로의 공통 중성선(neutral)상에 설치된 영상변류기(Z-CT)를 설치하고, 본체내부로 영상변류기(Z-CT)의 2차측 전압을 검출하기 위한 영상전압검출부(270)를 더 포함하여 구성한다.Then, the image current transformer (Z-CT) is formed outside the main body of the remote meter reading device 200, and the image current transformer (Z-CT) installed on the common neutral line of the low voltage power line is installed, and the image inside the main body is installed. The apparatus further includes an image voltage detector 270 for detecting the secondary voltage of the current transformer Z-CT.

이와 같은 구성을 갖는 본 발명 전력량 자동 원격 검침장치는 기계식 전력량계가 설치된 상태에서 덧붙여 설치하여 원격검침 시스템을 구현하도록 하는데 그 특징이 있는 것으로, The present invention has an automatic remote meter reading device having such a configuration to implement a remote meter reading system by installing in addition to the mechanical meter installed state,

전자식 전력량계의 구성을 포함하는 원격검침장치(200)를 구성하되 그 외부에 변류기(CT)를 구성하여 기계식 전력량계(100)가 설치된 위치에서 저압 전력선로 에 간단히 설치할 수 있도록 한 것이다.Remote metering device 200 including the configuration of an electronic electricity meter is configured, but the current transformer (CT) is configured to the outside so that the mechanical power meter 100 is installed so that it can be easily installed on the low-voltage power line.

또한 영상전압을 검출하여 누전 등의 이상 정보를 수집하기 위하여 영상변류기(Z-CT)를 원격검침장치(200)의 외부에 구성하여 저압 전력선로의 중성선상에 설치하고, 이의 2차 전압을 검출하여 그 극성을 판단하여 누전여부를 판단할 수 있도록 한다.In addition, in order to detect the video voltage and collect abnormality information such as a short circuit, a current transformer (Z-CT) is configured outside the remote meter reading device 200 and installed on the neutral line of the low voltage power line, and the secondary voltage is detected. It is possible to determine whether the short circuit by judging its polarity.

여기서 상기 원격검침장치(200)는 기계식 전력량계(100)의 전단보다는 기계식 전력량계(100)의 후단, 즉 수용가로 연결되는 위치로 연결된 전력선로에 설치하는 것이 바람직하다.Here, the remote meter reading device 200 is preferably installed on the power line connected to the rear end of the mechanical wattmeter 100, that is, connected to the customer rather than the front of the mechanical wattmeter 100.

이의 설치를 살펴보면, 수용가에 설치된 기계식 전력량계(100)의 일측으로 저압 전력선로에 원격검침장치(200)의 본체 외부에 구성된 변류기(C-T)와 영상변류기(Z-CT)를 설치한다.Looking at the installation thereof, the current transformer (C-T) and the image current transformer (Z-CT) is installed on the low-voltage power line to the one side of the mechanical power meter 100 installed in the customer outside the main body of the remote meter reading device 200.

이후, 기계식 전력량계(100)의 적산전력량과 설치된 원격검침장치(200)의 LCD표시부(230)에 표시된 적산전력량의 동기를 맞추기 위하여 설치자는 사용자입력부(250)의 해당 키이를 선택하여 기계식 전력량계(100)에 표시된 적산전력량을 입력시키므로써, 설치를 완료한다.Subsequently, in order to synchronize the integrated power amount of the mechanical power meter 100 with the integrated power amount displayed on the LCD display 230 of the installed remote metering apparatus 200, the installer selects the corresponding key of the user input unit 250 to display the mechanical power meter 100. The installation is completed by inputting the accumulated power amount indicated in).

그 동작과정을 살펴보면, If you look at the operation process,

기계식 전력량계(100)는 기계식 전력량계(100)대로 원격검침장치(200)는 원격검침장치(200)대로 각각 개별적으로 동작한다.Mechanical meter 100 is operated as a mechanical meter 100, the remote meter 200 is operated individually as a remote meter 200.

원격검침장치(200)는 전력검출부(210)에서 변류기(CT)와 연결된 전류검출부(212)로부터 저압전력선로의 전류를 검출하고, 전압검출부(211)로부터 저압 전력선로의 전압을 검출한다.The remote meter 200 detects a current of the low voltage power line from the current detector 212 connected to the current transformer CT in the power detector 210, and detects a voltage of the low voltage power line from the voltage detector 211.

이와 같이 검출된 데이터는 중앙제어처리부(220)로 입력되고, 중앙제어처리부(220)에서는 소정의 정해진 프로그램에 따라 전력량을 산출하고, 메모리수단(223)에 저장하는 한편, 전월지침, 현재지침, 유효전력량, 전압 등의 검침정보를 생성한다.The detected data is input to the central control processing unit 220, the central control processing unit 220 calculates the amount of power according to a predetermined program, and stores the amount of power in the memory means 223, while the previous month's instructions, the present guidelines, Generate meter reading information such as effective power amount and voltage.

이와 같이 생성된 정보는 PLC 모뎀부(240)을 통해 중앙시스템으로 전송된다.The generated information is transmitted to the central system through the PLC modem unit 240.

또한 PLC 모뎀부(240)를 통해 중앙시스템과 전력선 통신하여 중앙시스템의 요구에 응하여 해당하는 정보를 중앙시스템으로 전송한다.In addition, power line communication with the central system through the PLC modem unit 240 transmits the corresponding information to the central system in response to the request of the central system.

이와 같이 기계식 전력량계(100)와 원격검침장치(100)로 전력량 검침 시스템을 구축하게 되면, 수용가 또는 담당관서에서는 원격검침장치(200)의 이상이 발생할 경우 기계식 전력량계(100)의 적산량을 확인하여 처리하면 되므로, 전자식 전력량계를 구현한 원격검침장치의 이상으로 인한 전력 정보의 손실 등의 염려가 없다.As described above, when the electric power metering system is constructed using the mechanical meter 100 and the remote metering device 100, the customer or the responsible office checks the integrated amount of the mechanical meter 100 when an abnormality of the remote meter 200 occurs. Since there is no need to worry about the loss of power information due to the error of the remote meter reading device implemented electronic wattmeter.

이상에서와 같은 본 발명을 적용하면, 저압용 일반 기계식 전력량계를 교체하지 않고서도 실시간 원격검침 시스템을 구축할 수 있다.Applying the present invention as described above, it is possible to build a real-time remote metering system without replacing the low-voltage general mechanical electricity meter.

또한 경제적인 구축비용으로 기존 기계식 전력량계의 단순기능을 보완할 수 있으며, 전자식 전력량계의 문제점을 보완할 수 있다.In addition, it is possible to supplement the simple function of the existing mechanical meter with the economical construction cost, and to solve the problem of the electronic meter.

또한 실시간 규정전압감시, 계량기측의 고장 또는 인입선 부점사고 등을 실시간 색출하여 향상된 품질의 전력을 공급할 수 있으며, 누전을 실시간 감지하므로써, 옥내 전기설비의 고장에 대한 책임 분계점의 구분이 명확하여 고장접수시에 불 필요한 현장 출동을 피할수 있어, 고장 원인파악 및 수리(정전)시간을 단축시킬 수 있는 효과가 있다.In addition, real-time regulated voltage monitoring, faults on the meter side or incoming line accidents can be searched in real time to provide improved quality power. By detecting real-time leakage, the division of responsibility thresholds for failure of indoor electrical equipment is clearly distinguished. Unnecessary on-site dispatch can be avoided at the time, and the cause of failure and repair (outage) time can be shortened.

Claims (2)

(삭제)(delete) (정정) 각 수용가의 저압 전력선로의 전류 및 전압을 검출하기 위한 전력검출수단과, 전력검출수단을 통해 얻어진 아날로그 형태의 전류 및 전압을 디지털 신호로 변환, 연산 처리하여 유효전력량을 산출하고 중앙시스템에서 전력량계에 대하여 요구하는 전월지침, 현재지침, 유효전력량, 전압 등의 검침정보를 산출, 저장하기 위한 메모리 수단 및 프로그램이 내장된 중앙제어처리수단과, 중앙제어처리수단으로부터 처리된 검침정보를 표시하여 주는 표시수단과, 중앙시스템과 저압 전력선로를 이용하여 전력선 통신을 하여 데이터를 송수신하기 위한 PLC(Power Line Communication) 모뎀부가 포함되어 구성되고, 저압 전력선로에 변류기(CT)가 구성되며, 상기 변류기는 전력검출수단의 전류검출부와 연결된 전력량 검침장치에 있어서,(Correction) power detection means for detecting current and voltage of low voltage power line of each customer; and converting current and voltage in analog form obtained through power detection means into digital signal and calculating and calculating effective power amount Displays the central control processing means with built-in memory means and program for calculating and storing metering information such as the previous month's instructions, current guidelines, effective power amount, voltage, etc. Including a display means, and the central system and a PLC (Power Line Communication) modem unit for transmitting and receiving data by power line communication using a low-voltage power line, a current transformer (CT) is configured on the low-voltage power line, In the current transformer is a power meter reading device connected to the current detector of the power detection means, 상기 저압 전력선로의 전류를 검출하기 위하여 기계식 전력량계와 병렬로 설치되고, 상기 기계식 전력량계에 표시된 적산전력량과 동기값을 맞추어 주기 위한 키이수단이 포함된 사용자 입력수단이 구성되며, 상기 저압 전력선로의 공통 중성선(neutral)상에 설치되어 누전을 감지하기 위한 정보를 수집하는 영상변류기(Z-CT)가 구성되고, 상기 영상변류기의 2차측 전압을 검출하기 위한 영상전압검출수단을 포함하여 이루어진 것을 특징으로 하는 전력량 자동 원격 검침장치.In order to detect the current of the low-voltage power line is installed in parallel with a mechanical power meter, a user input means including a key means for matching the integrated power amount and the synchronization value displayed on the mechanical power meter is configured, common to the low voltage power line An image transformer (Z-CT) is installed on a neutral wire and collects information for detecting a short circuit, and includes an image voltage detecting means for detecting a secondary voltage of the image transformer. Power automatic meter reading.
KR1020040020153A 2004-03-24 2004-03-24 Automatic remote wattmeter inspection system KR100582213B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020040020153A KR100582213B1 (en) 2004-03-24 2004-03-24 Automatic remote wattmeter inspection system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020040020153A KR100582213B1 (en) 2004-03-24 2004-03-24 Automatic remote wattmeter inspection system

Publications (2)

Publication Number Publication Date
KR20050094711A KR20050094711A (en) 2005-09-28
KR100582213B1 true KR100582213B1 (en) 2006-05-23

Family

ID=37275410

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020040020153A KR100582213B1 (en) 2004-03-24 2004-03-24 Automatic remote wattmeter inspection system

Country Status (1)

Country Link
KR (1) KR100582213B1 (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100697859B1 (en) * 2005-11-29 2007-03-22 김명호 Remote system for realtime diagnosing underground power distribution line using powerline communication
KR100721251B1 (en) * 2005-12-02 2007-05-22 엘에스산전 주식회사 Monitoring system of underground power line
KR101546027B1 (en) * 2013-10-04 2015-08-20 주식회사 타이드 eletricity reading unit and the using method

Also Published As

Publication number Publication date
KR20050094711A (en) 2005-09-28

Similar Documents

Publication Publication Date Title
Mir et al. Review on smart electric metering system based on GSM/IOT
KR101627793B1 (en) A water meter and a waterworks controll system using the same
KR100701298B1 (en) Ubiquitous automatic meter reading and cutting system using home automation system, and method thereof
US7622912B1 (en) Method for enabling monitoring of power consumption
KR100860551B1 (en) A system for phase identification
US20130116952A1 (en) Power metering system and a method of displaying reading derived from the same
KR101153173B1 (en) Method for remotely reading metering-value in a gas meter along with temperature/pressure-corrected metering-value through two-wire line, and apparatus and system for the same
KR20190026305A (en) Home automation automatic meter reading wall-pad and home automation automatic meter reading and advabced metering infrastructure system including the same
KR20190053433A (en) Waterworks smart metering system and method thereof
KR20100022608A (en) Remote automatic meter reading system
US20030076241A1 (en) Apparatus and method of remote monitoring of utility usage
KR20210126474A (en) Smart metering-based indoor water leakage detection system and indoor water leakage detection method
KR20110066425A (en) Metering system using mobile communication network
KR100582213B1 (en) Automatic remote wattmeter inspection system
EP0834849B1 (en) Metering Apparatus
KR102495230B1 (en) Counter terminal to check the number of communication outputs
KR101048679B1 (en) Remote power supply control
KR102556772B1 (en) Apparatus for detecting phase error of watt hour meter and method thereof
KR20180007159A (en) Remot flower-meter reading system with electric power device and Bar code reader
KR20090085923A (en) System and method for monitoring leakage using remote meter-reading data
KR100443825B1 (en) Electronic watt-hour meter that having perceiving function of surreptitious use of electricity
KR200432760Y1 (en) Monitoring Device of Maximum Electric Power Demand
KR100443824B1 (en) Watt-hour meter that having electronic and mechanical display device
KR20120028210A (en) Intelligent advanced meter infrastructure and transformer management system
KR101000073B1 (en) Realtime monitoring system of greenhouse gas each energy source using pulsemaker

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20100517

Year of fee payment: 5

LAPS Lapse due to unpaid annual fee