KR100564721B1 - Work party up-and- down rotary apparatus in the prefabricated scaffolding system - Google Patents

Work party up-and- down rotary apparatus in the prefabricated scaffolding system Download PDF

Info

Publication number
KR100564721B1
KR100564721B1 KR1020030018801A KR20030018801A KR100564721B1 KR 100564721 B1 KR100564721 B1 KR 100564721B1 KR 1020030018801 A KR1020030018801 A KR 1020030018801A KR 20030018801 A KR20030018801 A KR 20030018801A KR 100564721 B1 KR100564721 B1 KR 100564721B1
Authority
KR
South Korea
Prior art keywords
rope
rope pulley
pulley
tank
work
Prior art date
Application number
KR1020030018801A
Other languages
Korean (ko)
Other versions
KR20040084023A (en
Inventor
윤재근
Original Assignee
유양기술 주식회사
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 유양기술 주식회사 filed Critical 유양기술 주식회사
Priority to KR1020030018801A priority Critical patent/KR100564721B1/en
Publication of KR20040084023A publication Critical patent/KR20040084023A/en
Application granted granted Critical
Publication of KR100564721B1 publication Critical patent/KR100564721B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/28Mobile scaffolds; Scaffolds with mobile platforms
    • E04G3/30Mobile scaffolds; Scaffolds with mobile platforms suspended by flexible supporting elements, e.g. cables
    • E04G3/305Mobile scaffolds; Scaffolds with mobile platforms suspended by flexible supporting elements, e.g. cables specially adapted for tanks, silos or similar vessels
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G23/00Working measures on existing buildings
    • E04G23/02Repairing, e.g. filling cracks; Restoring; Altering; Enlarging
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/28Mobile scaffolds; Scaffolds with mobile platforms
    • E04G2003/286Mobile scaffolds; Scaffolds with mobile platforms mobile vertically

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Chemical & Material Sciences (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Electrochemistry (AREA)
  • Movable Scaffolding (AREA)

Abstract

본 발명은 구형 탱크의 내부 검사 및 보수용 조립식 비계 시스템에서의 작업대 상하 회전장치에 관한 것으로, 특히 구형 탱크내에 조립 설치되는 조립식 비계 시스템에 회전장치를 부설한 후, 이 회전장치에 의해 작업자가 탑승한 작업대가 상하 회전하면서 구형 탱크 내부를 효율적으로 검사 및 보수할 수 있도록 한 것이다.BACKGROUND OF THE INVENTION 1. Field of the Invention [0001] The present invention relates to an up / down rotating device for a work platform in an internal inspection and repair of a spherical tank, and in particular, after installing a rotating device in an assembled scaffold system that is installed and installed in an old tank, an operator rides on the work. One workbench rotates up and down to efficiently inspect and repair the inside of an older tank.

작업대 상하 회전장치Worktable

Description

구형 탱크의 내부 검사 및 보수용 조립식 비계 시스템에서의 작업대 상하 회전장치{Work party up-and- down rotary apparatus in the prefabricated scaffolding system}Work party up-and-down rotary apparatus in the prefabricated scaffolding system}

도1은 본 발명에 따른 작업대 상하 회전장치가 비계 시스템에 설치된 상태를 나타낸 정면도,1 is a front view showing a state in which the work table up and down rotation apparatus according to the present invention is installed in the scaffolding system,

도2는 본 발명에 따른 작업대 상하 회전장치가 비계 시스템에 설치된 상태를 나타낸 평면도,Figure 2 is a plan view showing a state in which the work platform up and down rotation apparatus according to the present invention is installed in a scaffolding system

도3은 본 발명에 따른 작업대 상하 회전장치의 요부 확대 정면도.Figure 3 is an enlarged front view of the main portion of the work table up and down rotation apparatus according to the present invention.

(도면중 주요 부분에 대한 부호의 설명)(Explanation of symbols for the main parts of the drawing)

100 ; 샤프트 200 ; 베이스 프레임 300 ; 이동프레임100; Shaft 200; Base frame 300; Moving frame

310 ; 작업대 320 ; 힌지 400 ; 제1로프풀리310; Working table 320; Hinge 400; 1st Rope Pulley

400a ; 제2로프풀리 410,410a ; 연결대 420,420a ; 고정부400a; Second rope pulley 410,410a; Connecting rod 420,420a; Fixture

430,430a ; 큰풀리 440,440a ; 중간풀리 450,450a ; 작은풀리430,430a; Large pulleys 440,440a; Intermediate pulley 450,450a; Small pulley

500 ; 로프 600,610 ; 걸림고리 700 ; 구동모터500; Rope 600,610; Hook 700; Drive motor

710 ; 보빈710; Bobbin

본 발명은 구형 탱크의 내부 검사 및 보수용 조립식 비계 시스템에서의 작업대 상하 회전장치에 관한 것으로, 특히 조립식 비계 시스템에 별도의 회전장치를 설치한 후, 이 회전장치에 의해 작업자가 탑승한 작업대가 상하 회전이 가능하게 함으로써 효율적으로 구형 탱크 내부를 검사 및 보수할 수 있도록 한 구형 탱크의 내부 검사 및 보수용 조립식 비계 시스템에서의 작업대 상하 회전장치에 관한 것이다.The present invention relates to a work platform up and down rotating apparatus in the prefabricated scaffolding system for the internal inspection and repair of a spherical tank, and in particular, after the installation of a separate rotating device in the prefabricated scaffolding system, the work platform occupied by the worker is moved up and down. The present invention relates to a workbench up and down rotation apparatus in a prefabricated scaffolding system for inspecting and repairing an old tank, which enables the inside of the old tank to be inspected and repaired efficiently.

일반적으로 고압가스등과 같은 유체를 저장하는 탱크는 단위의 철판을 포밍하여 구형의 형상으로 제작되고 있고 상,하단에는 점검 및 보수시 작업자가 출입할 수 있는 맨홀이 설치되어 있다. 이러한 구형 탱크는 안전이 가장 중요한 요소이기 때문에 고압가스 안전관리법 제17조 및 산업안전 보건법 제36조제2항 및 기타 설비 정기점검이나 보수계획에 의하여 구형 탱크등의 내부에 비계(Scaffold)를 설치하고, 비계를 통하여 작업자가 점검 및 보수를 실시하게 된다.In general, a tank for storing a fluid such as a high pressure gas is formed into a spherical shape by forming a steel plate of the unit, and the upper and lower ends are provided with a manhole for the operator to enter and exit during inspection and repair. Since safety is the most important factor of these old tanks, scaffolds should be installed inside old tanks according to Article 17 of the High Pressure Gas Safety Management Act, Article 36 (2) of the Industrial Safety and Health Act, and other facilities. At the same time, the scaffold will be inspected and repaired by the operator.

이러한 비계를 통하여 구형 탱크내의 점검 및 보수작업을 실시할 수 있다는 잇점은 있으나, 이는 구형 탱크내에 숙련공을 통하여 비계가 수작업으로 설치되기 때문에 그만큼 설치 작업 기간이 많이 소요될 뿐 아니라 3D 업종에 속하여 숙련공의 연령층이 노령화되어 있다.This scaffolding has the advantage of being able to carry out the inspection and repair work in the old tank, but since the scaffold is manually installed through skilled workers in the old tank, it takes not only a lot of installation work but also the age group of skilled workers in the 3D industry. This is aging.

따라서 작업능률이 크게 저할될뿐 아니라 별도의 안전장치가 마련되어 있지 않기 때문에 작업중 추락등과 같은 재해로 인한 안전사고의 위험이 항상 내포되고 있으며, 점검 및 보수작업 완료후 비계 해체시에도 많은 기간이 소요되어 제조 및 검사 원가가 상승되는 제반 문제점이 발생되었다.Therefore, not only the work efficiency is greatly reduced, but also no safety device is provided, so there is always a risk of safety accidents due to disasters such as falling during work, and it takes a long time to dismantle the scaffold after the inspection and repair work is completed. As a result, various problems of manufacturing and inspection costs have been raised.

따라서 본 발명의 목적은 상기와 같은 종래의 문제점을 감안하여 안출한 것으로, 조립식 비계 시스템에 별도의 회전장치를 설치한 후, 이 회전장치에 의해 작업자가 탑승한 작업대가 상하 회전이 가능하게 함으로써 효율적으로 구형 탱크 내부를 검사 및 보수할 수 있도록 한 구형 탱크의 내부 검사 및 보수용 조립식 비계 시스템에서의 작업대 상하 회전장치를 제공하는데 있다.Accordingly, an object of the present invention is to devise in view of the above-described conventional problems, and after installing a separate rotating device in the prefabricated scaffolding system, the work platform occupied by the operator can be rotated up and down efficiently by the rotating device. The present invention provides an up-and-down rotation device for a work platform in an assembled scaffolding system for inspecting and repairing an old tank.

상기와 같은 목적을 달성하기 위한 수단으로 본 발명은, 구형 탱크 내부에 수직으로 설치된 샤프트 중간에 일체로 체결 고정되는 베이스 프레임과,The present invention as a means for achieving the above object, the base frame is integrally fastened and fixed in the middle of the shaft vertically installed in the spherical tank,

상기 베이스 프레임의 좌우측에 일정한 길이를 가지고 형성되고 일단은 베이스 프레임 중간에 힌지 결합되며 타단은 사용자가 탑승하는 작업대가 형성되며 작업위치에 따라 힌지를 중심으로 상하 이동되는 이동프레임과,It is formed with a predetermined length on the left and right sides of the base frame and one end is hinged in the middle of the base frame and the other end is formed with a work platform for the user to move and move up and down around the hinge according to the working position,

상기 이동프레임의 바깥쪽과 샤프트 상단에 각각 형성되는 걸림고리에 각기 독립적으로 체결 고정되며 작업대의 상하 위치에 따라 서로 근접되고 멀어지는 제1로프풀리 및 제2로프풀리와,A first rope pulley and a second rope pulley, each of which is fastened and fixed independently to the hooks formed on the outer side of the moving frame and the shaft top, respectively, and close to and away from each other according to the upper and lower positions of the work table;

일단은 보빈에 연결되고 타단은 상기 제1로프풀리 및 제2로프풀리와 유기적으로 연결되는 로프와,One end is connected to the bobbin and the other end is organically connected to the first and second rope pulleys,

상기 로프를 보빈에 감기게 하거나 풀리게 하면서 작업대가 작업위치로 상하 회전되게 하는 구동모터로 구성되는 것을 그 기술적 구성상의 기본 특징으로 한다.The technical feature of the technical configuration is that the rope consists of a drive motor to be rotated up and down to the working position while winding or unwinding the rope to the bobbin.

이하 본 발명의 바람직한 실시예를 첨부도면을 참조하여 보다 상세하게 설명하면 다음과 같다.Hereinafter, preferred embodiments of the present invention will be described in detail with reference to the accompanying drawings.

도1은 본 발명에 따른 작업대 상하 회전장치가 비계 시스템에 설치된 상태를 나타낸 정면도 이고, 도2는 본 발명에 따른 작업대 상하 회전장치가 비계 시스템에 설치된 상태를 나타낸 평면도 이며, 도3은 본 발명에 따른 작업대 상하 회전장치의 요부 확대 정면도 이다.1 is a front view showing a work platform up and down rotation apparatus according to the present invention installed in the scaffolding system, Figure 2 is a plan view showing a work table up and down rotation apparatus installed in the scaffolding system, Figure 3 is a present invention This is an enlarged front view of the main part of the worktable vertical rotation device according to the above.

본 발명의 조립식 비계 시스템도 구형 탱크(B) 내부에 조립된 상태에서는 구형 탱크의 내부를 검사 및 보수 작업케 하고, 작업 완료 후에는 구형 탱크(B) 내에서 분해되는 구성을 갖는다.The prefabricated scaffolding system of the present invention also has a configuration in which the interior of the spherical tank is inspected and repaired in the state assembled in the spherical tank B, and disassembled in the spherical tank B after the work is completed.

이러한 구성을 갖는 비계 시스템(A)에서는 작업자가 작업대에 탑승한 상태에서 구형 탱크 내부(B)를 검사 및 보수하기 위해서는 상하로 회전되는 것이 요구된다.In the scaffolding system A having such a configuration, it is required to rotate up and down in order to inspect and repair the inside of the old tank B in a state where the worker is on the workbench.

이를 위해 도1 내지 도3에서와 같이 작업대 상하 회전장치가 동원되는데, 이는 구형 탱크(B) 내부에 수직으로 설치된 샤프트(100) 중간에 일체로 체결 고정되는 베이스 프레임(200)과, 상기 베이스 프레임(200)을 중심으로 상하 회전하는 이동프레임(300)과, 상기 이동프레임(300)을 상하 회전시키는 제1,2로프풀리(400)(400a)와, 상기 제1,2로프풀리(400)(400a)를 작동시키는 보빈(710), 로프(500) 및 구동모터(700)가 기본적으로 동원된다.To this end, as shown in FIGS. 1 to 3, a work table vertical rotation device is mobilized. The base frame 200 is integrally fastened and fixed to the middle of the shaft 100 vertically installed inside the spherical tank B, and the base frame. Moving frame 300 to rotate up and down about 200, the first and second rope pulleys 400 and 400a for vertically rotating the moving frame 300, and the first and second rope pulleys 400 The bobbin 710, the rope 500, and the drive motor 700 for operating the 400a are basically mobilized.

이동프레임(300)은 베이스 프레임(200)의 좌우측에 일정한 길이를 가지고 형성되는데, 이 베이스 프레임(200)을 중심으로 상하 회전할 수 있도록 일단은 베이 스 프레임 중간에 각각 힌지(320) 결합되며 타단은 사용자가 탑승하여 구형 탱크 (B)내부를 검사 및 보수할 수 있는 작업대(310)가 형성된다.The moving frame 300 is formed to have a predetermined length on the left and right sides of the base frame 200, one end is coupled to each other in the middle of the base frame so as to rotate up and down about the base frame 200, the other end The work bench 310 is formed to allow the user to inspect and repair the inside of the old tank (B).

제1로프풀리(400) 및 제2로프풀리(400a)는 이동프레임(300)의 바깥쪽과 샤프트(100) 상단에 각각 형성되는 걸림고리(600)(610)에 각기 독립적으로 체결 고정되어 작업대(310)의 작업위치에 따라 서로 근접되고 멀어지는 구성을 가지며, 이러한 제1로프풀리(400)와 제2로프풀리(400a)는 일정한 길이를 갖는 연결대(410)(410a)와, 상기 연결대(410)(410a) 내부에 위치하고 일정한 간격을 가지고 차례로 회전 가능하게 설치되는 큰풀리(430)(430a), 중간풀리(440)(440a) 및 작은풀리(450)(450a)와, 상기 연결대(410)(410a) 한쪽에 형성되어 제1로프풀리(400)는 걸림고리(610)에 제2로프풀리(400a)는 걸림고리(600)에 각각 고정되게 하는 고정부(420)(420a)로 구성된다.The first rope pulley 400 and the second rope pulley 400a are independently fastened and fixed to the hooks 600 and 610 respectively formed on the outer side of the moving frame 300 and the top of the shaft 100. The first rope pulley 400 and the second rope pulley 400a are connected to each other according to the working position of the 310, and the second rope pulley 400a has a predetermined length with the connecting rods 410 and 410a, and the connecting rod 410. Large pulleys 430, 430a, intermediate pulleys 440, 440a, and small pulleys 450, 450a, which are positioned inside the 410a and are rotatably installed at regular intervals, and the connecting table 410. The first rope pulley 400 is formed on one side of the hook 410 and the second rope pulley 400a is composed of fixing parts 420 and 420a respectively fixed to the hook 600. .

상기한 제1로프풀리(400) 및 제2로프풀리(400a)를 서로 근접시키고 멀어지게 함으로써 작업대(310)가 상하 회전되게 하는 로프(500)의 일단은 보빈에 연결되고 타단은 상기 제1로프풀리(400) 및 제2로프풀리(400a)와 유기적으로 연결된다. The first rope pulley 400 and the second rope pulley 400a close to each other and away from each other, one end of the rope 500 is rotated up and down is connected to the bobbin and the other end is the first rope It is organically connected to the pulley 400 and the second rope pulley 400a.

이를 더욱 상세하게 설명하면 로프(500) 일단은 구동모터(700)에 의해 구동되는 보빈(710)측에 연결 고정되고 타단은 제1로프풀리(400)의 큰풀리(430), 제2로프풀리(400a)의 큰풀리(430a), 제1로프풀리의 중간풀리(440), 제2로프풀리의 중간풀리(440a), 제1로프풀리의 작은풀리(450), 제2로프풀리의 작은풀리(450a)를 차례로 거치면서 제1로프풀리(400)의 연결대(410) 단부에 연결 고정된다.To explain this in more detail, one end of the rope 500 is connected and fixed to the bobbin 710 side driven by the driving motor 700, and the other end of the rope 500 has a large pulley 430 and a second rope pulley of the first rope pulley 400. Large pulley 430a of the 400a, the middle pulley 440 of the first rope pulley, the middle pulley 440a of the second rope pulley, the small pulley 450 of the first rope pulley, the small pulley of the second rope pulley While passing through (450a) in turn is fixed to the connection end 410 end of the first rope pulley (400).

여기서, 보빈(710)을 회전시키는 구동수단으로 구동모터(700)를 채택 사용하 였으나 이에 한정되는 것은 아니고 보빈을 회전시킬 수 있다면 보빈측에 별도의 수동 핸들을 형성하고, 이 수동 핸들에 의해 로프가 보빈에 감기거나 풀리게 할 수 있음을 밝혀둔다.Here, the driving motor 700 is used as a driving means for rotating the bobbin 710, but is not limited thereto. If the bobbin can be rotated, a separate manual handle is formed on the bobbin side, and a rope is formed by the manual handle. It is possible to wind or loosen the bobbin.

이와 같이 구성된 본 발명을 사용하기 위해서는 먼저 도1에서와 같이 구형 탱크(B) 하단에 작업대(310)가 위치하고 이동프레임(300)이 내려온 상태에서 작업자는 작업대(310)에 탑승한다. 상기와 같은 상태에서 구형 탱크(B)내의 검사 및 보수가 완료되면 구동모터(700)에 전원을 인가하여 다음 작업 위치로 작업대(310)를 상승시킨다.In order to use the present invention configured as described above, as shown in FIG. 1, the work bench 310 is positioned at the bottom of the spherical tank B, and the worker rides on the work bench 310 while the moving frame 300 is lowered. When the inspection and repair in the spherical tank (B) in the above state is completed, power is applied to the drive motor 700 to raise the work platform 310 to the next working position.

즉, 구동모터(700)에 전원이 인가되면 보빈(710)이 회전하고, 회전하는 보빈(710)측에 로프(500)가 감기면 제1로프풀리(400)와 제2로프풀리(400a)는 서로 가까워진다. 이때 이동프레임(300)은 힌지(320)를 중심으로 상부로 회전하면서 작업대(310)를 작업하고자 하는 위치로 상승시킨다.That is, when power is applied to the driving motor 700, the bobbin 710 rotates, and when the rope 500 is wound around the rotating bobbin 710, the first rope pulley 400 and the second rope pulley 400a are rotated. Get closer to each other. At this time, the moving frame 300 is rotated upward with respect to the hinge 320 to raise the work table 310 to the position to work.

상기와 같은 방법을 통하여 구형 탱크(B) 내의 검사 및 보수작업하면서 작업대(310)가 구형 탱크 내의 상단에 위치하면 제1로프풀리(400)와 제2로프풀리(400a)는 완전 근접한 상태가 되고, 로프(500)는 보빈(710)에 많이 감겨 있는 상태가 된다. 상기와는 반대로 구동모터(700)가 역회전하면 보빈(710)은 로프(500)를 서서히 풀고, 제1로프풀리(400)와 제2로프풀리(410)는 서로 멀어지면서 작업대(310)를 하강시키게 되는 것이다.When the worktable 310 is positioned at the upper end of the old tank while the inspection and maintenance work in the old tank B through the above-described method, the first rope pulley 400 and the second rope pulley 400a are brought into close proximity. , The rope 500 is in a state that is wound a lot on the bobbin 710. Contrary to the above, when the driving motor 700 reversely rotates, the bobbin 710 slowly loosens the rope 500, and the first rope pulley 400 and the second rope pulley 410 move away from each other, thereby moving the work bench 310. It will be descended.

이상에서 살펴본 바와 같이 본 발명에 의하면, 조립식 비계 시스템에 별도의 회전장치가 설치되어 있고, 이 회전장치에 의해 작업자가 탑승한 작업대가 상하 회전하기 때문에 효율적으로 구형 탱크 내부를 검사 및 보수할 수 있는 등의 효과가 있는 것이다.As described above, according to the present invention, since the separate scaffolding system is installed in the assembled scaffolding system, the work platform on which the operator boards rotates up and down, so that the inside of the old tank can be inspected and repaired efficiently. This is the effect.

이상에서는 본 발명을 특정의 바람직한 실시예를 참고하여 설명하였으나, 본 발명은 상기한 실시예에 한정되지 아니하며 본 발명의 요지를 벗어나지 않는 범위에서 통상의 지식을 가진자에 의해 다양한 변경과 수정이 이루어질 수 있는 것임을 밝혀둔다.The present invention has been described above with reference to specific preferred embodiments, but the present invention is not limited to the above embodiments and various changes and modifications may be made by those skilled in the art without departing from the gist of the present invention. Make sure you can.

Claims (2)

삭제delete 구형 탱크(B) 내부에 수직으로 설치된 샤프트(100) 중간에 일체로 체결 고정되는 베이스 프레임(200)과; 상기 베이스 프레임(200)의 좌우측에 일정한 길이를 가지고 형성되고 일단은 베이스 프레임(200) 중간에 힌지(320) 결합되며 타단은 사용자가 탑승하는 작업대(310)는 이동프레임(300)과; 상기 이동프레임(300)의 바깥쪽과 샤프트(100) 상단에 각각 형성되는 걸림고리(600)(610)에 각기 독립적으로 체결 고정되며 작업대(600)의 작업위치에 따라 서로 근접되고 멀어지는 제1로프풀리(400) 및 제2로프풀리(400a)와; 일단은 보빈(710)에 연결되고 타단은 상기 제1로프풀리(400) 및 제2로프풀리(400a)와 유기적으로 연결되는 로프(500)와; 상기 로프(500)를 보빈(710)에 감기게 하거나 풀리게 하면서 작업대(310)가 작업위치로 상하 회전되게 하는 구동모터(700)로 구성되는 것을 특징으로 하는 구형 탱크의 내부 검사 및 보수용 조립식 비계 시스템에서의 작업대 상하 회전장치에 있어서, 상기 제1로프풀리(400)와 제2로프풀리(400a)는 일정한 길이를 갖는 연결대(410)(410a)와; 상기 연결대(410)(410a) 내부에 위치하고 일정한 간격을 가지고 차례로 회전 가능하게 설치되는 큰풀리(430)(430a), 중간풀리(440)(440a) 및 작은풀리(450)(450a)와; 상기 연결대(410)(410a) 한쪽에 형성되어 제1로프풀리(400)와 제2로프풀리(400a)를 각각의 걸림고리(600)(610)에 고정되게 하는 고정부(420)(420a)로 구성되는 것을 특징으로 하는 구형 탱크의 내부 검사 및 보수용 조립식 비계 시스템에서의 작업대 상하 회전장치.A base frame 200 which is integrally fastened and fixed in the middle of the shaft 100 installed vertically inside the spherical tank B; It is formed with a predetermined length on the left and right sides of the base frame 200, one end is coupled to the hinge 320 in the middle of the base frame 200, the other end of the work platform 310, the user boards the moving frame 300; First ropes that are independently fastened and fixed to the hooks 600 and 610 respectively formed on the outer side of the moving frame 300 and the upper end of the shaft 100 and close to each other according to the working position of the worktable 600. A pulley 400 and a second rope pulley 400a; A rope 500 having one end connected to the bobbin 710 and the other end organically connected to the first rope pulley 400 and the second rope pulley 400a; Prefabricated scaffolding for the internal inspection and repair of the old tank, characterized in that consisting of a drive motor 700 to the workbench 310 is rotated up and down to the working position while winding or loosening the rope 500 to the bobbin 710. In the above system up and down rotating apparatus, the first rope pulley (400) and the second rope pulley (400a) is a connecting rod (410, 410a) having a constant length; Large pulleys 430, 430a, intermediate pulleys 440, 440a, and small pulleys 450, 450a which are positioned inside the connecting table 410, 410a and are rotatably installed at regular intervals; Fixing portions 420 and 420a which are formed at one side of the connecting table 410 and 410a to fix the first rope pulley 400 and the second rope pulley 400a to the respective hooks 600 and 610. Workbench vertical rotation device in the assembled scaffolding system for the internal inspection and repair of the old tank, characterized in that consisting of.
KR1020030018801A 2003-03-26 2003-03-26 Work party up-and- down rotary apparatus in the prefabricated scaffolding system KR100564721B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020030018801A KR100564721B1 (en) 2003-03-26 2003-03-26 Work party up-and- down rotary apparatus in the prefabricated scaffolding system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020030018801A KR100564721B1 (en) 2003-03-26 2003-03-26 Work party up-and- down rotary apparatus in the prefabricated scaffolding system

Related Child Applications (1)

Application Number Title Priority Date Filing Date
KR20-2003-0009012U Division KR200317496Y1 (en) 2003-03-26 2003-03-26 Work party up-and- down rotary apparatus in the prefabricated scaffolding system

Publications (2)

Publication Number Publication Date
KR20040084023A KR20040084023A (en) 2004-10-06
KR100564721B1 true KR100564721B1 (en) 2006-03-31

Family

ID=37367650

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020030018801A KR100564721B1 (en) 2003-03-26 2003-03-26 Work party up-and- down rotary apparatus in the prefabricated scaffolding system

Country Status (1)

Country Link
KR (1) KR100564721B1 (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107363805B (en) * 2017-07-20 2023-04-07 西南交通大学 Work platform for detecting inside of spherical tank
CN109455642A (en) * 2018-11-23 2019-03-12 东莞市华楠骏业机械制造有限公司 Large-size spherical tank detection maintenance intelligent flexible chassis
CN109911438A (en) * 2019-03-15 2019-06-21 大连理工大学 A kind of horizontal tank inside regular inspection uses manned device

Also Published As

Publication number Publication date
KR20040084023A (en) 2004-10-06

Similar Documents

Publication Publication Date Title
JP5349411B2 (en) Maintenance method for wind turbine blades of wind power generation equipment
US8291564B2 (en) Telescoping tool assembly and method for refurbishing welds of a core shroud of a nuclear reactor vessel
JP2005002875A (en) Repair method and repair device for wind power generation tower
KR100564721B1 (en) Work party up-and- down rotary apparatus in the prefabricated scaffolding system
JP3592313B2 (en) Internal wall work equipment for tower tank
KR200317496Y1 (en) Work party up-and- down rotary apparatus in the prefabricated scaffolding system
JP2003326390A5 (en)
KR100525657B1 (en) The prefabricated scaffolding
KR200317494Y1 (en) The prefabricated scaffolding
CN109721013A (en) The program-controlled cleaning of spherical tank and inside and outside inspection detection device
KR200354693Y1 (en) The prefabricated scaffolding system
KR100475544B1 (en) Wall form climbing system for constructing concrete wall of high-rise buldings
KR100581499B1 (en) The prefabricated scaffolding system
KR100951891B1 (en) Worktable carriage for a storage tank
CN210207861U (en) Brazing filler metal cleaning production line
JPH09144303A (en) Inner surface inspection and repairing device of tank
JP7037106B2 (en) Inspection workbench for dust remover
KR100581498B1 (en) Work party right and left rotaly apparatus in the prefabricated scaffolding system
KR100525658B1 (en) Work party right and left rotary apparatus in the prefabricated scaffolding system
CN112777521A (en) Special device and method for removing and reinstalling overhaul impeller of pump station unit in overhaul
CN109970008A (en) A kind of large scale electrical power unit installation lifting debugging platform
KR200354692Y1 (en) Work party right and left rotaly apparatus in the prefabricated scaffolding system
JP4839052B2 (en) Rotating dismantling method of storage tank
CN216038513U (en) Communication base station is maintained with overhauing construction appurtenance
KR20050100846A (en) The prefabricated scaffolding system

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20130308

Year of fee payment: 8

FPAY Annual fee payment

Payment date: 20140320

Year of fee payment: 9

FPAY Annual fee payment

Payment date: 20160318

Year of fee payment: 11

FPAY Annual fee payment

Payment date: 20170321

Year of fee payment: 12

FPAY Annual fee payment

Payment date: 20190404

Year of fee payment: 14

FPAY Annual fee payment

Payment date: 20200120

Year of fee payment: 15