KR100549648B1 - An apparatus for cracking the base rock - Google Patents

An apparatus for cracking the base rock Download PDF

Info

Publication number
KR100549648B1
KR100549648B1 KR1020030017391A KR20030017391A KR100549648B1 KR 100549648 B1 KR100549648 B1 KR 100549648B1 KR 1020030017391 A KR1020030017391 A KR 1020030017391A KR 20030017391 A KR20030017391 A KR 20030017391A KR 100549648 B1 KR100549648 B1 KR 100549648B1
Authority
KR
South Korea
Prior art keywords
main body
rock
hydraulic
passage
excavation
Prior art date
Application number
KR1020030017391A
Other languages
Korean (ko)
Other versions
KR20040082741A (en
Inventor
서동소
Original Assignee
서동소
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 서동소 filed Critical 서동소
Priority to KR1020030017391A priority Critical patent/KR100549648B1/en
Publication of KR20040082741A publication Critical patent/KR20040082741A/en
Application granted granted Critical
Publication of KR100549648B1 publication Critical patent/KR100549648B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21CMINING OR QUARRYING
    • E21C37/00Other methods or devices for dislodging with or without loading
    • E21C37/06Other methods or devices for dislodging with or without loading by making use of hydraulic or pneumatic pressure in a borehole
    • E21C37/08Devices with pistons, plungers, or the like, pressed locally against the wall of the borehole
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F15FLUID-PRESSURE ACTUATORS; HYDRAULICS OR PNEUMATICS IN GENERAL
    • F15BSYSTEMS ACTING BY MEANS OF FLUIDS IN GENERAL; FLUID-PRESSURE ACTUATORS, e.g. SERVOMOTORS; DETAILS OF FLUID-PRESSURE SYSTEMS, NOT OTHERWISE PROVIDED FOR
    • F15B15/00Fluid-actuated devices for displacing a member from one position to another; Gearing associated therewith
    • F15B15/08Characterised by the construction of the motor unit
    • F15B15/14Characterised by the construction of the motor unit of the straight-cylinder type
    • F15B15/1404Characterised by the construction of the motor unit of the straight-cylinder type in clusters, e.g. multiple cylinders in one block

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Earth Drilling (AREA)

Abstract

본 발명은 암반 균열장치에 관한 것으로, 균열장치의 본체 타측에 굴착부를 장착하여 암반의 굴착작업과 암반의 균열작업을 동시에 수행할 수 있도록, 환봉형태를 이루는 본체의 일측에 드릴이나 굴착기가 장착되고 타측에는 굴착부가 장착 되어지는 암반 균열장치에 있어서, 상기 본체 내에 일정 간격을 두고 동일 방향으로 형성된 각각의 작동유압로와 복귀유압로가 연결된 다수의 유압실이 형성되고 상기 유압실 내부에는 유압에 의해 왕복운동하는 해머가 설치되어지되, 상기 본체의 상부에는 에어나 물이 유입되는 공급로가 관통되어지고 상기 본체가 유체공급부 내에서 공회전되도록, 상기 공급로와 작동유압로 및 복귀유압로가 유체공급부내에 형성된 안내홈에 연결되며, 상기 본체의 타측에는 상기 관통된 공급로와 연결된 배출로가 형성되고 하부에는 다수의 굴착날이 방사상으로 형성된 굴착부가 장착됨을 특징으로 하는 암반 균열장치이다.The present invention relates to a rock cracking apparatus, and a drill or excavator is mounted on one side of the main body forming a round bar shape so that the drilling part and the rock cracking work can be simultaneously performed by mounting an excavation part on the other side of the main body of the cracking device. In the rock cracking device in which the excavation part is mounted on the other side, a plurality of hydraulic chambers are formed in the main body in which the working hydraulic passages and the return hydraulic passages formed in the same direction at regular intervals are formed. A reciprocating hammer is installed, and the supply passage, the working hydraulic passage and the return hydraulic passage supply the fluid so that a supply passage through which air or water is introduced is passed through the upper portion of the main body and the body is idle in the fluid supply portion. Is connected to the guide groove formed in the part, the other side of the main body is formed with a discharge passage connected to the penetrated supply passage The lower part is a rock cracker, characterized in that the drilling portion is equipped with a plurality of drilling blades radially mounted.

그리고, 상기 본체는 일정부분이 분할되어 연결부에 의해 탈착 가능하게 되어질 수 있다.In addition, the main body may be divided by a predetermined portion to be detachable by the connecting portion.

또한, 상기 유압실의 해머가 경사지게 설치되도록 유압실이 경사지게 형성되어질 수 있다.In addition, the hydraulic chamber may be formed to be inclined so that the hammer of the hydraulic chamber is inclined.

본체, 유체공급부, 굴착부, 굴착날, 해머Main body, fluid supply part, excavation part, excavation blade, hammer

Description

암반 균열장치 {An apparatus for cracking the base rock} Rock cracking device {An apparatus for cracking the base rock}             

도 1은 본 발명인 암반 균열장치의 구성을 나타낸 분해 사시도이다.1 is an exploded perspective view showing the configuration of the rock cracking device of the present invention.

도 2는 본 발명의 내부 구성를 나타낸 종 단면도이다.2 is a longitudinal cross-sectional view showing an internal configuration of the present invention.

도 3은 본 발명의 작동상태를 나타낸 평 단면도이다.3 is a cross-sectional view showing an operating state of the present invention.

도 4및 도 5는 본 발명인 암반 균열장치의 요부를 확대한 확대 단면도이다. 4 and 5 are enlarged cross-sectional views enlarging main parts of the rock cracking device of the present invention.

도 6은 본 발명의 다른 실시예를 나타낸 부분 확대 단면도이다.6 is a partially enlarged cross-sectional view showing another embodiment of the present invention.

도 7은 본 발명의 또 다른 실시예를 나타낸 부분 확대 단면도이다.7 is a partially enlarged cross-sectional view showing another embodiment of the present invention.

도 8은 본 발명의 또 다른 실시예를 나타낸 부분 확대 단면도이다.8 is a partially enlarged cross-sectional view showing another embodiment of the present invention.

도 9는 본 발명의 또 다른 실시예를 나타낸 부분 확대 단면도이다.9 is a partially enlarged cross-sectional view showing yet another embodiment of the present invention.

* 도면의 주요부분에 관한 부호의 설명** Explanation of symbols on main parts of drawings *

A - 암반균열장치 10 - 본체A-Rock Cracker 10-Body

11 - 작동유압로 12 - 복귀유압로11-working hydraulic furnace 12-return hydraulic furnace

13 - 유압실 14 - 해머13-Hydraulic Chamber 14-Hammer

16 - 공급로 20 - 유체공급부16-supply path 20-fluid supply

21,21',21" - 안내홈 30 - 굴착부21,21 ', 21 "-Guide groove 30-Excavations

31 - 배출로 32 - 굴착날31-exhaust furnace 32-drilling rig

본 발명은 암반 균열장치에 관한 것으로, 더욱 상세하게는 균열장치의 선단에 굴착부를 장착하여 암반의 굴착작업과 암반의 균열작업을 동시에 수행할 수 있는 암반 균열장치에 관한 것이다.The present invention relates to a rock cracking device, and more particularly, to a rock cracking device capable of simultaneously carrying out rock drilling and rock cracking by mounting an excavation portion at the tip of the cracking device.

일반적으로 토목·건설·도로·지하철 공사 등에서의 터파기 작업을 할 때 암반이 출현하게 되는바, 상기 출현된 암반을 굴착하기 위해서는 암반상에 일정크기의 구멍을 천공함과 아울러 상기 구멍에 화약류나 암반 균열장치 등을 투입하여 암반이 적정하게 균열되도록 하는 것인바, 종래의 암반 균열장치는 주지된 바와 같이 봉형상으로 형성되는 본체 내에 일정 간격을 두고 동일 방향으로 형성된 각각의 오일공급로와 오일배출로가 연결되어 유로를 형성하는 다수의 유압실이 형성되고, 상기 유압실 내부에 삽입되어 작용하는 유압력에 의해 왕복운동하는 해머로 구성되어 있다.In general, rock formations occur during the excavation work in civil engineering, construction, roads, subway construction, etc. In order to excavate the emerged rocks, a hole of a certain size is drilled in the rock, and The rock cracking device is inputted so that the rock is properly cracked. In the conventional rock cracking device, as is well known, each oil supply passage and oil discharged in the same direction at regular intervals in a main body formed in a rod shape are discharged. A plurality of hydraulic chambers are formed to connect the furnaces to form a flow path, and are composed of hammers reciprocating by the hydraulic force inserted and acting inside the hydraulic chamber.

상기와 같이 구성되는 암반 균열장치를 이용하여 암반을 균열시키기 위해서는 먼저, 도시하지 않은 드릴이나 굴착기를 사용하여 암반상에 적정크기의 구멍을 천공한다. 그리고, 상기 천공된 구멍 내측으로 암반 균열장치를 투입하여 사용하고 있는바, 상기 암반 균열장치를 투입하기 위해서는 별도로 드릴작업을 하여 구멍을 천공해야 하므로 드릴작업과 균열작업을 별도의 공정을 거쳐 행해야 한다는 매우 번거로운 문제점이 있었고, 또한 작업의 시간이 지연되어 이에 따른 인건비 등이 상승되는 문제점이 있게 되는 것이다.In order to crack the rock using the rock cracking device configured as described above, a hole of a suitable size is drilled on the rock using a drill or excavator not shown. In addition, since the rock cracking device is put into the perforated hole and used, the rock cracking device needs to be drilled separately in order to insert the rock cracking device. There was a very troublesome problem, and there is also a problem that the labor time is increased due to the delay of the work.

본 고안은 상기와 같은 종래의 제반 문제점을 해소하기 위하여 안출된 것으로서, 본 고안의 목적은 본체 선단에 굴착부를 장착한 암반 균열기를 드릴이나 굴착기에 설치하여 드릴작업과 균열작업을 동시에 수행할 수 있는 암반 균열기를 제공함에 있다.The present invention is devised to solve the above-mentioned conventional problems, the object of the present invention is to install a rock cracker equipped with an excavation in the tip of the main body to the drill or excavator to perform drill and cracking work at the same time Providing rock crackers.

본 발명의 다른 목적은 상기 암반 균열기를 착탈 가능하게 형성하여 분해·보관이 용이한 암반 균열기를 제공함에 있다.Another object of the present invention is to provide a rock cracker that is easy to disassemble and store by forming the rock cracker detachably.

본 발명의 또다른 목적은 상기 유압실의 해머가 경사지게 설치되도록 유압실이 경사지게 형성되어 사용시 암반에 균열을 가하는 해머가 상기 암반에서 분리가 용이하도록 한 암반 균열기를 제공함에 있다.Still another object of the present invention is to provide a rock cracker in which the hydraulic chamber is formed to be inclined so that the hammer of the hydraulic chamber is inclined so that the hammer which cracks the rock during use can be easily separated from the rock.

상기와 같은 목적을 달성하기 위한 본 발명은 드릴이나 굴착기가 장착되는 환봉형태를 갖는 본체(10) 내에 일정 간격을 두고 동일 방향으로 형성된 각각의 작동유압로(11)와 복귀유압로(12)가 연결된 다수의 유압실(13)이 형성되고, 상기 유압실(13)의 내부에는 유압에 의해 왕복운동하는 해머(14)가 경사지게 설치되어지고, 상기 본체(10)의 상부에 에어나 물이 유입되는 공급로(16)를 형성하여 그 하부로 형성된 배출로(31)에 연결되어지도록 구성하고, 상기 본체(10)의 하부에 다수의 굴착날(32)이 방사상으로 형성된 굴착부(30)가 장착되어지는 암반 균열장치(A)에 있어서, 상기 본체(10)는 유체공급부(20) 내에서 공회전되도록 베어링(22)에 의하여 지지되어지도록 구성하고, 상기 공급로(16)와 작동유압로(11) 및 복귀유압로(12)가 유체공급부(20)내에 형성된 안내홈(21)(21')(21")에 연결되어지도록 구성하되, 상기 각각의 안내홈(21)(21')(21") 사이에 오링(21b)이 개재되어지도록 구성됨을 특징으로 한다.
또한, 상기 본체(10)는 일정부분이 분할되어 연결부(19)(19')에 의해 서로 탈착 가능하게 결합되어지는 것을 특징으로 한다.
The present invention for achieving the above object is that each working hydraulic passage 11 and the return hydraulic passage 12 is formed in the same direction at regular intervals in the main body 10 having a round bar shape is equipped with a drill or excavator A plurality of hydraulic chambers 13 connected to each other are formed, and a hammer 14 reciprocating by hydraulic pressure is inclined in the hydraulic chamber 13, and air or water flows into the upper portion of the main body 10. The supply path 16 is formed to be connected to the discharge path 31 formed at its lower portion, and the excavation portion 30 formed with a plurality of drilling blades 32 radially in the lower portion of the main body 10 In the rock cracker (A) to be mounted, the main body 10 is configured to be supported by the bearing 22 so as to be idle in the fluid supply portion 20, the supply path 16 and the working hydraulic path ( 11) and a guide groove 21 in which the return hydraulic passage 12 is formed in the fluid supply portion 20. (21 ') and 21 ", but the O-ring 21b is interposed between the guide grooves 21, 21' and 21".
In addition, the main body 10 is characterized in that a predetermined portion is separated and coupled to each other detachably by the connecting portion (19, 19 ').

삭제delete

삭제delete

이하, 본 발명이 속하는 기술분야에서 통상의 지식을 가진자가 본 발명을 용이하게 실시할 수 있을 정도로 본 발명의 바람직한 실시예를 첨부된 도면을 참조하여 상세하게 설명하면 다음과 같다.Hereinafter, preferred embodiments of the present invention will be described in detail with reference to the accompanying drawings such that those skilled in the art can easily implement the present invention.

도 1은 본 발명의 외관을 나타낸 사시도이고, 도 2는 본 발명의 내부 구성을 나타낸 종 단면도이며, 도 3은 본 발명의 작동상태를 나타낸 평 단면도이고, 도 4 및 도 5는 본 발명인 암반 균열장치의 요부를 확대한 확대단면도이다. 1 is a perspective view showing the appearance of the present invention, Figure 2 is a longitudinal cross-sectional view showing the internal configuration of the present invention, Figure 3 is a flat cross-sectional view showing the operating state of the present invention, Figures 4 and 5 is a rock fracture of the present invention An enlarged cross-sectional view of an enlarged main portion of the apparatus.

도 1 ~ 도 5의 도시와 같이 본 발명인 암반 균열장치(A)가 도시되어 있다.1 to 5, the rock cracking device A of the present invention is shown.

상기 암반 균열장치(A)는 크게 본체(10), 유체공급부(20), 굴착부(30)로 이루어져 있다.The rock cracking device (A) is composed of a main body 10, the fluid supply unit 20, the excavation unit 30.

상기한 본체(10)는 사방에 절삭면(10a)을 갖는 봉 형태로 되며 내부에는 일정 간격을 두고 동일 방향으로 형성된 각각의 작동유압로(11)와 복귀유압로(12)가 연결되어 유로를 형성하는 다수의 유압실(13)이 형성된다. 상기 유압실(13)과 연장되어 개방되도록 본체(10)의 전면에는 실린더삽입부(13a)가 형성되고 상기 실린더 삽입부(13a)에 삽입되는 실린더(14a)의 선단에는 해머(14)가 일체로 형성되며 상기 실린더(14a)가 외부로 빠지는 것을 방지하는 실린더체결너트부(13b)가 본체의 개방단에 나사 체결되어 있다. 그리고, 상기 본체(10)의 일측에는 미도시된 드릴이나 굴착기의 구동축에 연결되어 상기 구동축이 구동하는 것에 의해 같이 구동되도록 나사 결합되는 제 1결합부(15a)가 형성되고, 하면에는 후술될 굴착부(30)가 연결될 제 2결합부(15b)가 각각 형성되며 상기 제 1,2결합부(15a)(15b) 사이를 관통하여 공기나 물이 공급되는 공급로(16)가 형성되어 본체(10)를 이룬다.The main body 10 is in the form of a rod having a cutting surface 10a on all sides, and each working hydraulic passage 11 and the return hydraulic passage 12 formed in the same direction at a predetermined interval therein are connected to the flow path. A plurality of hydraulic chambers 13 to be formed are formed. A cylinder inserting portion 13a is formed on the front surface of the main body 10 so as to extend and open with the hydraulic chamber 13, and a hammer 14 is integrated at the tip of the cylinder 14a inserted into the cylinder inserting portion 13a. And a cylinder fastening nut portion 13b which prevents the cylinder 14a from falling out, is screwed to the open end of the main body. In addition, one side of the main body 10 is connected to a drive shaft of a drill or excavator not shown, and a first coupling part 15a screwed to be driven together by driving the drive shaft is formed. The second coupling part 15b to which the part 30 is connected is formed, respectively, and the supply path 16 through which the air or water is supplied is formed through the first and second coupling parts 15a and 15b. 10) is achieved.

상기한 유체공급부(20)는 상기 본체(10)의 상부 둘레를 감싸며 형성되고, 본체(10) 내부의 작동유압로(11)와 복귀유압로(12) 및 공급로(16)에 유체를 공급할 수 있도록 내면 둘레를 따라 형성된 각각의 안내홈(21)(21")(21")이 외부에 연결되도록 연결공(21a)이 형성되어 본체(10)에 형성된 각각의 작동유압로(11)와 복귀유압로(12) 및 공급로(16)의 위치에 대응되도록 설치 되어지데, 상기 본체(10)가 유체공급부(20) 내에서 공회전 되어지도록 설치된다. 이는 상기 본체(10)가 공회전하는 것에 의해 상기 연결공(21a)에 설치되는 호스 등이 말리는 것을 방지하는 것이다. 또한, 상기 각각의 안내공(21)(21')(21")에 공급되는 유체의 기밀을 유지하기 위하여 각각의 안내공(21)(21')(21") 사이에는 오링(21b)이 설치되어지는 것이 바람직하며, 상기 유체공급부(20)에서 본체(10)가 회전하는 것이 용이하도록 베어링(22)을 설치할 수 있음은 물론이다.The fluid supply unit 20 is formed to surround the upper circumference of the main body 10 and supply fluid to the working hydraulic passage 11, the return hydraulic passage 12, and the supply passage 16 inside the main body 10. The connecting hole 21a is formed such that each of the guide grooves 21, 21 ″, 21 ″ formed along the inner circumference thereof is connected to the outside, and the respective hydraulic pressure paths 11 formed in the main body 10 and It is installed to correspond to the position of the return hydraulic path 12 and the supply path 16, the main body 10 is installed to be idle in the fluid supply unit 20. This prevents the hose or the like installed in the connection hole 21a from curling by the main body 10 being idling. In addition, an O-ring 21b is provided between each of the guide holes 21, 21 ′, 21 ″ to maintain the airtightness of the fluid supplied to each of the guide holes 21, 21 ′, 21 ″. It is preferable to be installed, and of course, the bearing 22 may be installed to facilitate the rotation of the main body 10 in the fluid supply unit 20.

상기한 굴착부(30)는 본체(10)의 타측에 형성된 제2결합부(15b)에 결합될 수 있도록 상기 결합부(15b)에 대응되는 나사부(15c)가 형성되고, 그 내부에는 상기 본체(10) 내에 관통되어지도록 형성된 공급로(16)에 연결되어 상기 공급되는 에어 나 물을 배출할 수 있는 배출로(31)를 형성하며 그 하부에는 방사상으로 형성된 다수의 굴착날(32)을 형성하여 굴착부(30)를 이룬다.The excavation part 30 is formed with a screw portion 15c corresponding to the coupling portion 15b to be coupled to the second coupling portion 15b formed on the other side of the main body 10, and the main body therein. It is connected to the supply passage 16 formed to penetrate in the (10) to form a discharge passage 31 for discharging the air or water supplied therein, and a plurality of radially excavated blades 32 formed at the bottom thereof To form an excavation (30).

상기와 같은 구성으로 되는 본 발명에 의한 암반 균열기의 실시작동상태에 대해 설명한다.The working operation state of the rock cracker according to the present invention having the above configuration will be described.

본체(10)를 드릴이나 굴착기에 설치하여 구동시키게 되면 상기 본체(10)가 드릴이나 굴착기의 구동축에 연결되어 있기 때문에 같이 구동하게 된다. 즉, 상기 본체(10)의 하부에는 굴착날(32)이 설치된 굴착부(30)가 장착되어 있어 상기 굴착날(32)에 의해 구멍을 뚫을 수 있게 되며, 이때 외부에서 공급되는 에어나 물 등의 유체를 공급하여 줌으로써 발생되는 먼지나 소음을 감소시킬 수 있게 되며, 상기 에어와 물 등의 유체가 용이하게 배출될 수 있도록 본체의 사방면이 절삭되어 있어 그 절삭면(10a)에 의해 통로를 확보할 수 있게 되므로 상기 통로로 유체가 배출되면서 구멍이 천공되는 것이며, 이때 발생되는 먼지 등은 별도로 집진시설을 설치하여 사용할 수 있음은 물론이다.When the main body 10 is installed and driven by a drill or excavator, the main body 10 is driven together because it is connected to the drive shaft of the drill or excavator. That is, the lower portion of the main body 10 is equipped with an excavation portion 30 is provided with an excavation blade 32 can be drilled by the excavation blade 32, at this time, such as air or water supplied from the outside It is possible to reduce the dust and noise generated by supplying the fluid of the four sides of the main body is cut so that the fluid such as air and water can be easily discharged, the passage by the cutting surface (10a) Since it is possible to ensure that the hole is perforated as the fluid is discharged into the passage, the dust generated at this time can be used to install a separate dust collector, of course.

그리고, 상기 구멍을 천공한 상태에서 별도로 설치된 유압펌프의 고압유압이 작동유압로(11)로 공급되면 실린더(14a)를 고압으로 압송하여 이에 설치된 해머(14)를 본체(10)의 외부로 압출하게 된다. 이렇게 압출되는 해머(14)의 작용에 의하여 암반에 균열을 일으키게 할 수 있으며 위와 같이 작동유압로(11)부터 공급되는 유압의 힘으로 실린더(14a)를 이송시키는 과정에서 복귀유압로(12)로 공급된 유압은 그 압력이 해소된 상태로서 그 유압오일은 역류하여 빠져나가게 되고, 이 복귀유압로(12)로 유압을 공급하면 실린더(14a)를 반대방향으로 작동시켜서 실린더(14a)와 일체인 해머(14)가 본체(10)의 내부로 원위치하게 되는 것이다. Then, when the high pressure hydraulic pressure of the hydraulic pump separately installed in the punctured state is supplied to the working hydraulic passage 11, the cylinder 14a is pressurized at high pressure to extrude the hammer 14 installed therein to the outside of the main body 10. Done. By the action of the hammer 14 to be extruded in this way can cause cracks in the rock and to the return hydraulic path (12) in the process of transporting the cylinder (14a) by the hydraulic power supplied from the working hydraulic path (11) as described above The supplied hydraulic pressure is in a state in which the pressure is released, and the hydraulic oil flows back out of the hydraulic oil. When the hydraulic pressure is supplied to the return hydraulic path 12, the cylinder 14a is operated in the opposite direction to be integrated with the cylinder 14a. The hammer 14 is to be returned to the interior of the main body 10.

도 6은 본 발명의 다른 실시예를 나타낸 단면도로서 도시한 바와 같이 본 발명에 의한 암반 균열장치(A)는 일정부분이 분할되어 탈착 가능하게 되어질 수 있다. 이는 본체(10)를 부분적으로 분리하여 상호 탈착되는 부분에 나사 등의 연결부(19)(19')를 형성하여 탈착 할 수 있도록 함으로써 이동 및 보관이 용이함은 물론, 사용중 마모되어 사용할 수 없게 되면 그 부분만 교체하여 사용할 수 있도록 한 것이다.6 is a cross-sectional view showing another embodiment of the present invention, the rock cracking device (A) according to the present invention may be detachably separated by a predetermined portion. This is because the main body 10 can be separated and formed to be detachable by forming connecting parts 19 and 19 'such as screws on the parts that are mutually detached. Only parts can be replaced.

도 7은 본 발명의 또 다른 실시예를 나타낸 확대 단면도로서 상기 유압실(13)은 경사지게 형성되어 상기 유압실(13) 내에 삽입되는 해머(14)가 경사지게 노출될 수 있음을 밝혀둔다. 이는 사용시 암반에 균열을 가하는 해머(14)가 상기 암반에서 분리가 용이하도록 한 것으로 유압실(13)및 실린더체결너트부(13b)를 경사지게 형성하여 해머(14)를 삽입 하게 되면 상기 해머(14) 역시 경사지게 삽입되어 노출될 때에도 소정의 경사면을 갖고 노출되게 되는 것이다.7 is an enlarged cross-sectional view illustrating another embodiment of the present invention, and the hydraulic chamber 13 is formed to be inclined so that the hammer 14 inserted into the hydraulic chamber 13 may be exposed to be inclined. This is because the hammer 14 that cracks the rock during use is easy to separate from the rock. The hydraulic chamber 13 and the cylinder fastening nut portion 13b are inclined to insert the hammer 14 when the hammer 14 is inserted. ) Is also to be exposed with a predetermined inclined surface even when it is inserted obliquely exposed.

도 8은 본 발명의 또다른 실시예를 나타낸 요부확대 단면도로서,8 is an enlarged cross-sectional view illustrating main parts of another embodiment of the present invention;

상기 본체(10')의 상부에 형성되는 제 1결합부(15a')에는 도시한 바와같이 별도의 연결구(40)를 형성하여 결합될 수 있음을 밝혀둔다.Note that the first coupling portion 15a 'formed on the upper portion of the main body 10' can be coupled by forming a separate connector 40 as shown.

이는 마모등으로 인하여 사용하지 못하게 되면 상기 마모된 부분을 교체하여 제품의 전체적인 수명을 연장 시킬 수 있게 하기 위한 것인바, 즉 상기 제1결합부(15a')의 외부에는 나사부(41)를 형성하고, 내부에는 육각의 모양으로 되는 구멍(42)을 형성하여 상기 구멍(42)에 삽입되어 회동이 불가능하도록 동일한 육 각으로 되는 연결구(40)를 마련하되, 상부에 드릴이나 굴착기를 설치할 수 있도록 하여 외부에서 본체(10')와 연결구(40)를 너트(43)에 의해 고정함으로써 가능한 것인바, 상기 사용중 연결구(40)가 마모되면 너트(43)를 풀른뒤 상기 연결구(40)만 교체하여 사용할 수 있게 되며, 이러한 구성은 본체(10')의 하부에 형성된 제2결합부(15b')도 같은 구성으로 할 수 있음은 물론이며, 또한 상기 본체(10')와 상기 본체(10')의 상부에 설치되는 유체공급부(20') 사이에도 별도의 붓싱(50)을 설치할 수 있음을 밝혀둔다. 이는 상기 본체(10')와 유체공급부(20')중 어느 한쪽의 마모로 사용할 수 없기 되는 것을 방지한 것인바, 상기 붓싱(50)이 본체(10')에 고정되도록 설치하여 마모시 상기 붓싱(50)만 교환하여 사용하도록 함으로 본체(10')와 유체공급부(20')는 마모가 발생되지 않게 한 것이다.This is to replace the worn portion when not available due to wear, etc. to extend the overall life of the product, that is, to form a screw portion 41 on the outside of the first coupling portion (15a ') and To form a hole 42 having a hexagonal shape therein, the connector 42 is formed in the same hexagon to be inserted into the hole 42 so that rotation is impossible, so that a drill or an excavator can be installed on the upper portion thereof. It is possible by fixing the main body 10 'and the connector 40 from the outside by the nut 43, when the connector 40 is worn out during use, loosen the nut 43 and then replace the connector 40 only. In this configuration, of course, the second coupling part 15b 'formed at the lower portion of the main body 10' may also have the same configuration, and also, the main body 10 'and the main body 10' Between the fluid supply part 20 'installed in the upper portion It turns out that you can install a separate bushing (50). This is to prevent the use of any one of the main body 10 'and the fluid supply portion 20' can not be used, the bushing 50 is installed to be fixed to the main body 10 'to the bushing when worn By using only the exchange 50, the body 10 'and the fluid supply 20' is to prevent wear.

도 9는 본 발명의 또다른 실시예를 나타낸 요부확대 단면도로서,9 is an enlarged cross-sectional view showing main parts of another embodiment of the present invention;

도시한 바와 같이 본체(10')의 타측에 형성된 제 2결합부(15b') 내에도 마모시 교체하여 사용할 수 있도록 내부에는 육각의 구멍(61)을 형성하고 하단에는 나사부(62)를 형성하며, 상기 구멍(61)에 삽입되어 회동이 불가능하도록 상기 구멍(61)과 동일한 육각의 형태를 갖는 연결구(60)가 본체(10') 내에서 돌출되도록 결합되고, 상기 연결구(60)가 이탈되지 않도록 마감하는 너트(62)가 상기 구멍(61)의 하단에 형성된 나사(61a)에 조립되어 마감하되, 중앙에는 관통공(62a)을 형성하여 상기 관통공(62a)에 굴착부(30')를 삽입하여 연결구(60)에 결합하여 마모시 그 부분만 교체하여 사용할 수 있도록 한 구성이다. As shown in the figure, a hexagonal hole 61 is formed therein and a threaded portion 62 is formed at the bottom thereof so that the second coupling portion 15b 'formed at the other side of the main body 10' may be replaced when worn. The connector 60 is inserted into the hole 61 to be rotatable so that the connector 60 having the same hexagonal shape as the hole 61 is protruded in the main body 10 ′, and the connector 60 is not detached. The nut 62 to be finished is assembled to the screw 61a formed at the lower end of the hole 61 to finish, and the through hole 62a is formed at the center to form the excavation part 30 'in the through hole 62a. It is a configuration that can be used to replace only the part when worn by coupling to the connector 60 by inserting.

이상에서와 같이 본 발명은 비록 상기의 실시 예에 한하여 설명하였지만 반 드시 여기에만 한정되는 것은 아니며 본 발명의 범주와 사상을 벗어나지 않는 범위내에서 다양한 변형실시가 가능함은 물론이다.As described above, although the present invention has been described with reference to the above embodiments, it should be understood that various modifications may be made without departing from the scope and spirit of the present invention.

이상의 설명에서 분명히 알 수 있듯이 본 발명의 암반 균열장치에 의하면,As apparent from the above description, according to the rock cracking apparatus of the present invention,

본체의 타측에 굴착부를 장착한 암반 균열기를 드릴이나 굴착기에 설치하여 드릴작업과 균열작업을 동시에 수행할 수 있게 하여 작업성의 향상을 기대할 수 있게 되며, 전체적인 작업시간이 단축되어 이에 따른 인건비 등의 절감을 꾀할 수 있음은 물론, 상기 암반 균열기를 탈착 가능하게 형성하여 분해·보관이 용이하며, 사용중 마모 등으로 인하여 분해하여 교체할 수 있도록 하여 전체적으로 수명을 연장할 수 있는 등의 효과가 발생한다.By installing a rock cracker equipped with an excavation part on the other side of the main body in a drill or excavator, it is possible to perform drill work and crack work at the same time, and it is possible to expect workability improvement, and the overall work time is shortened, thereby reducing labor costs. In addition, the rock cracker is detachably formed to facilitate the disassembly and storage, and it is possible to disassemble and replace it due to wear during use, thereby extending the life of the whole.

Claims (3)

드릴이나 굴착기가 장착되는 환봉형태를 갖는 본체(10) 내에 일정 간격을 두고 동일 방향으로 형성된 각각의 작동유압로(11)와 복귀유압로(12)가 연결된 다수의 유압실(13)이 형성되고, 상기 유압실(13)의 내부에는 유압에 의해 왕복운동하는 해머(14)가 경사지게 설치되어지고, 상기 본체(10)의 상부에 에어나 물이 유입되는 공급로(16)를 형성하여 그 하부로 형성된 배출로(31)에 연결되어지도록 구성하고, 상기 본체(10)의 하부에 다수의 굴착날(32)이 방사상으로 형성된 굴착부(30)가 장착되어지는 암반 균열장치(A)에 있어서,A plurality of hydraulic chambers 13 are formed in the main body 10 having a round bar shape on which a drill or an excavator is mounted, in which the working hydraulic passages 11 and the return hydraulic passages 12 are formed in the same direction at regular intervals. In the hydraulic chamber 13, a hammer 14 reciprocating by hydraulic pressure is inclined, and a supply path 16 through which air or water flows is formed in an upper portion of the main body 10 to form a lower portion thereof. In the rock-cracking device (A) is configured to be connected to the discharge path 31 formed in the lower part of the main body 10 is equipped with the excavation portion 30 is formed with a plurality of excavation blades (32) radially , 상기 본체(10)는 유체공급부(20) 내에서 공회전되도록 베어링(22)에 의하여 지지되어지도록 구성하고, 상기 공급로(16)와 작동유압로(11) 및 복귀유압로(12)가 유체공급부(20)내에 형성된 안내홈(21)(21')(21")에 연결되어지도록 구성하되, 상기 각각의 안내홈(21)(21')(21") 사이에 오링(21b)이 개재되어지도록 구성됨을 특징으로 하는 암반 균열장치.The main body 10 is configured to be supported by the bearing 22 to be idle in the fluid supply unit 20, the supply path 16, the working hydraulic passage 11 and the return hydraulic passage 12 is a fluid supply portion It is configured to be connected to the guide grooves 21, 21 ', 21 "formed in the (20), the O-ring (21b) is interposed between each of the guide grooves 21, 21' (21") Rock cracking device, characterized in that configured to. 제 1항에 있어서,The method of claim 1, 상기 본체(10)는 일정부분이 분할되어 연결부(19)(19')에 의해 서로 탈착 가능하게 결합되어지는 것을 특징으로 하는 암반 균열장치.The main body 10 is a rock cracking device, characterized in that a predetermined portion is separated and coupled to each other by a connecting portion (19, 19 '). 삭제delete
KR1020030017391A 2003-03-20 2003-03-20 An apparatus for cracking the base rock KR100549648B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020030017391A KR100549648B1 (en) 2003-03-20 2003-03-20 An apparatus for cracking the base rock

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020030017391A KR100549648B1 (en) 2003-03-20 2003-03-20 An apparatus for cracking the base rock

Related Child Applications (1)

Application Number Title Priority Date Filing Date
KR20-2003-0008330U Division KR200317939Y1 (en) 2003-03-20 2003-03-20 An apparatus for cracking the base rock

Publications (2)

Publication Number Publication Date
KR20040082741A KR20040082741A (en) 2004-09-30
KR100549648B1 true KR100549648B1 (en) 2006-02-13

Family

ID=37366487

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020030017391A KR100549648B1 (en) 2003-03-20 2003-03-20 An apparatus for cracking the base rock

Country Status (1)

Country Link
KR (1) KR100549648B1 (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR102143752B1 (en) * 2018-08-29 2020-08-13 (주)신안수중 A auxilliary lifting device for block of massive concrete structures using lifting device
CN111594210A (en) * 2020-05-29 2020-08-28 中铁工程装备集团有限公司 Hard rock tunnel construction method
CN113431575B (en) * 2021-06-11 2024-04-26 中铁六局集团有限公司 Construction method for assisting stone cutting excavation by plunger type rock hydraulic splitter

Also Published As

Publication number Publication date
KR20040082741A (en) 2004-09-30

Similar Documents

Publication Publication Date Title
KR101406159B1 (en) Pile hole drilling apparatus
US11555351B2 (en) Spiral impact drilling machine applicable to rock and soil and construction method
JP2011026955A (en) Earth excavating hammer and rotary excavator with the same
JP5049913B2 (en) Drilling machine
JP4628413B2 (en) Underground excavation hammer and rotary excavator provided with the same
KR100549648B1 (en) An apparatus for cracking the base rock
KR200317939Y1 (en) An apparatus for cracking the base rock
CN113631793B (en) Rock drill bit for percussive drilling
KR101441313B1 (en) Rock drilling equipment for the crane combined
RU111882U1 (en) BOTTOM DRILLER
CA2619175A1 (en) Method and device for releasing a block on a bore-crown during a boring process
RU96903U1 (en) BLADE CHISEL
KR960002678Y1 (en) Drill hammer bit
KR20150140073A (en) Excavating bit having air-hammer and screw for excavating ground composed by earth, sand, soft rock and boulder
US11834929B2 (en) Down the hole drilling assembly and apparatus
KR100231472B1 (en) Bit for a hamma drill body of a ground excavator
RU77630U1 (en) DRILLING COMPLEX
KR20090012432U (en) Bit for boring machine
US3485301A (en) Method of drilling wells in rock
RU2164582C2 (en) Configuration of lower part of drill pipe string to drive inclined or horizontal holes by screw face motor
RU2579821C1 (en) Drilling bit
RU2470135C1 (en) Drilling bit
KR200205638Y1 (en) The piercing maching of underground
JPH06264435A (en) Cement milk injection type down-hole hammer
RU89588U1 (en) DEVICE FOR DRILLING WELLS AND PRODUCTION

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20101210

Year of fee payment: 6

LAPS Lapse due to unpaid annual fee