KR100534603B1 - Apparatus for Retaining Wall Using a Ground Anchor And the Method Using the Same - Google Patents

Apparatus for Retaining Wall Using a Ground Anchor And the Method Using the Same Download PDF

Info

Publication number
KR100534603B1
KR100534603B1 KR10-2003-0013205A KR20030013205A KR100534603B1 KR 100534603 B1 KR100534603 B1 KR 100534603B1 KR 20030013205 A KR20030013205 A KR 20030013205A KR 100534603 B1 KR100534603 B1 KR 100534603B1
Authority
KR
South Korea
Prior art keywords
anchor
retaining wall
base plate
sleeve
steel pipe
Prior art date
Application number
KR10-2003-0013205A
Other languages
Korean (ko)
Other versions
KR20030028518A (en
Inventor
이기환
Original Assignee
이기환
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 이기환 filed Critical 이기환
Priority to KR10-2003-0013205A priority Critical patent/KR100534603B1/en
Publication of KR20030028518A publication Critical patent/KR20030028518A/en
Application granted granted Critical
Publication of KR100534603B1 publication Critical patent/KR100534603B1/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/74Means for anchoring structural elements or bulkheads
    • E02D5/80Ground anchors
    • E02D5/808Ground anchors anchored by using exclusively a bonding material
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66FHOISTING, LIFTING, HAULING OR PUSHING, NOT OTHERWISE PROVIDED FOR, e.g. DEVICES WHICH APPLY A LIFTING OR PUSHING FORCE DIRECTLY TO THE SURFACE OF A LOAD
    • B66F19/00Hoisting, lifting, hauling or pushing, not otherwise provided for
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/02Foundation pits
    • E02D17/04Bordering surfacing or stiffening the sides of foundation pits
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2250/00Production methods
    • E02D2250/0007Production methods using a mold
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2250/00Production methods
    • E02D2250/0023Cast, i.e. in situ or in a mold or other formwork
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2600/00Miscellaneous
    • E02D2600/40Miscellaneous comprising stabilising elements

Abstract

본 발명은 엄지말뚝의 플랜지면과 웨이브면에 앙카체가 들어갈 수 있는 천공각도 방향의 앙카체 구멍을 형성한 엄지말뚝을 사용하여, 앙카용 띠장을 사용하지 않고 앙카 인장력을 직접 엄지말뚝에 전달할 수 있는 슬리브와, 콘크리트 옹벽 시공 후 엄지말뚝의 부식 등으로 응력재 역할의 내구 연한이 다 될 경우 콘크리트 옹벽이 외부 하중에 버틸 수 있도록 콘크리트 옹벽내 설치되는 앙카 하중 지지판인 앙카 베이스 플래이트로 구성되어 앙카용 띠장을 사용한 종래 공법에 비해 콘크리트량을 줄일 수 있어 경제적이며, 콘크리트 옹벽 시공시 주철근의 조립이 간편하여 시공성이 좋고, 콘크리트 옹벽의 균열을 최소화 하고 앙카 강선의 부식을 완전히 방지 할 수 있으며, 엄지말뚝 및 콘크리트 옹벽에 앙카 인장력을 전달 할 수 있어 일반 공법 보다 장기적인 안정성이 크게 증가되는 것을 특징으로 한다.The present invention can be used to directly transfer the tension of the anchor directly to the thumb pile without using an anchor belt using the thumb pile formed by the anchor angle hole in the direction of the perforated angle that can be inserted into the flange surface and wave surface of the thumb pile. Anchor band consisting of an anchor base plate, which is an anchor load supporting plate installed in the concrete retaining wall so that the concrete retaining wall can withstand the external load when the sleeve and the durability of the role of the stress member are exhausted due to the corrosion of the thumb pile after the construction of the retaining wall. It is economical because it can reduce the amount of concrete compared to the conventional method using the steel, and it is easy to assemble the main reinforcing bar when constructing the concrete retaining wall, and it has good workability.It can minimize the crack of the concrete retaining wall and prevent the corrosion of the anchor steel wire. Anchor tension can be transmitted to concrete retaining walls It is characterized in that the stability is greatly increased.

Description

영구앙카 옹벽장치 및 그 시공방법{Apparatus for Retaining Wall Using a Ground Anchor And the Method Using the Same}Apparatus for Retaining Wall Using a Ground Anchor And the Method Using the Same}

본 발명은 영구앙카 옹벽장치 및 그 시공방법에 관한 것이다, 더욱 구체적으로 엄지말뚝(H-PILE)에 지보재인 그라운드 앙카(영구 앙카)를 사용하여 흙막이 공사를 시행 후, 흙막이 벽체 앞에 콘크리트 옹벽의 합벽 시공을 실시하는 영구 앙카 옹벽 및 그 시공방법에 관한 것이다.콘크리트 옹벽 공사는 일반적으로 콘크리트 옹벽을 설치한 후 옹벽 배면에 흙을 채우는 과정으로 이루어진다. 그러나 공사 현장에 따라서는 부지 여건상 옹벽 저판길이를 확보할 수 없는 경우가 많다. 이 경우 옹벽 설치를 위해 엄지말뚝(H-PILE) 및 그라운드 앙카(영구 앙카)를 사용하여 흙막이 공사를 수행한 후 전면에 콘크리트 옹벽을 합벽으로 시공하여 영구 앙카 옹벽을 형성 한다.도 1a는 종래의 영구 앙카 공법에 의하여 시공된 단면도이고, 도 1b는 종래의 영구 앙카 옹벽이 설치된 단면의 상세도를 나타낸 것으로 그 시공 순서는, 지중에 엄지말뚝(1)을 오거 등을 사용하여 천공 후 삽입하고, 토류판 또는 숏크리트(6) 등을 사용하여 배면토의 유실을 방지하여 굴착하고, 앙카체 설치를 위한 천공을 실시하여 앙카체(2)를 삽입, 그라우팅을 실시하고, 띠장용 브라켓(5)을 설치하고, 띠장(4)을 설치한 후 앙카헤드와 강선 쐐기로 강선을 인장하여 띠장에 고정시키고, 앙카체 선단부를 앙카헤드 덮개(15)로 덮고, 주철근(21) 및 배력근(22)을 배근하고,거푸집을 설치하여 앙카 헤드부 및 띠장이 옹벽내에 설치되도록 콘크리트를 타설하여 영구 앙카 옹벽을 형성 한다.The present invention relates to a permanent anchor retaining wall device and a construction method thereof, and more specifically, after the construction of the retaining wall using the ground anchor (permanent anchor), which is supported by the thumb pile (H-PILE), the plywood of the concrete retaining wall in front of the retaining wall The present invention relates to a permanent anchor retaining wall for construction and a construction method thereof. Concrete retaining wall construction generally includes a process of filling soil on the back of a retaining wall after installing a concrete retaining wall. However, depending on the construction site, it is often impossible to secure the retaining wall bottom length due to site conditions. In this case, after constructing the retaining wall using the thumb pile (H-PILE) and ground anchor (permanent anchor) to install the retaining wall, the concrete retaining wall is constructed with plywood on the front to form a permanent anchor retaining wall. Figure 1b is a cross-sectional view of the construction by the permanent anchor method, Figure 1b shows a detailed view of the cross-section in which the conventional permanent anchor retaining wall is installed, the construction sequence, insert the thumb pile (1) in the ground after drilling using auger, etc., The earth plate or shotcrete (6) is used to prevent the excavation of the backing soil and to excavate. Then, the anchoring (2) is inserted and grouted by the drilling for installing the anchoring body. , After installing the strip (4) to tension the steel wire with the anchor head and the steel wire wedge, and fixed to the strip, cover the tip of the anchor body with the anchor head cover (15), and reinforce the cast iron (21) and the reinforcement (22) Formwork Value to the anchor head and the band sheets to be provided in the retaining wall, pouring concrete to form a permanent retaining wall anchor.

상기 종래와 같이 시공시 발생되는 문제점은, 첫째, 엄지말뚝을 주 응력재로 사용하므로 지하수에 노출되어 부식이 발생되므로 장기적인 안정성을 확보 할 수 없으며 둘째, 띠장(WALE BEAM,4)이 콘크리트 옹벽내에 설치되므로 지하수 유입에 따른 부식으로 옹벽의 균열이 예상되고 옹벽 주철근 설치 시 띠장(4)으로 인한 간섭으로 띠장(4)에 주철근 구멍을 내는 등 시공이 어려우며 셋째, 옹벽 배면에 지하수가 앙카체(2)를 따라 옹벽내로 스며드는 것을 방지할 수 없고, 강선의 부식을 방지 할 수 없어 장기적으로는 영구 옹벽으로서 기능을 상실 할 수도 있는 등 많은 문제점이 있었다.Problems that occur during the construction as in the prior art, first, because the thumb pile is used as the main stress material is exposed to groundwater and corrosion occurs, so long-term stability can not be secured, and second, the WALE BEAM (4) is in the concrete retaining wall As it is installed, the retaining wall is expected to be cracked due to corrosion due to the inflow of groundwater, and when the retaining wall is installed, it is difficult to install the main reinforcing bars in the strip (4) due to the interference caused by the strip (4). Permeation into the retaining wall), and the corrosion of the steel wire could not be prevented, and in the long term, there could be a loss of function as a permanent retaining wall.

본 발명은 상기와 같은 종래 기술의 문제점을 해결하기 위한 것으로써,The present invention is to solve the problems of the prior art as described above,

본 발명의 목적은 엄지말뚝의 부식으로 인한 주응력재의 기능 상실분만큼 콘크리트 옹벽이 외부 하중을 부담하고 엄지말뚝의 응력재로서 기능을 상실시 콘크리트 옹벽이 모든 하중을 지지하는 구조로 되어 장기적인 안정성 확보가 가능한 영구앙카 옹벽장치 및 그 시공방법을 제공하는 것이다.The purpose of the present invention is to ensure the long-term stability of the concrete retaining wall is to support all the load as the concrete retaining wall bears the external load as the loss of the function of the main stress material due to the corrosion of the thumb pile and act as a stress material of the thumb pile. It is possible to provide a permanent anchor retaining wall device and a construction method thereof.

본 발명의 다른 목적은 앙카용 띠장을 사용하지 않아 부식에 따른 콘크리트 구조물의 균열을 방지 할 수 있으며, 옹벽 주철근 설치가 용이하고, 콘크리트량을 줄일 수 있으며, 지하수 침투 유입을 방지 할 수 있는 슬리브를 구비하여 앙카 강선의 부식을 방지하는 영구앙카 옹벽장치 및 그 시공방법을 제공하는 것이다.Another object of the present invention is to prevent the use of anchor belts to prevent cracking of concrete structures due to corrosion, easy to install retaining wall cast steel, reduce the amount of concrete, sleeves that can prevent groundwater ingress It is provided to provide a permanent anchor retaining wall device for preventing corrosion of the anchor steel wire and its construction method.

이하, 본 발명의 바람직한 실시예들을 첨부된 도면에 의거하여 설명하면 다음과 같다. 도 2a 및 도 2b는 본 발명의 실시예 1에 의한 영구앙카옹벽장치 및 상기 영구앙카옹벽이 설치된 단면을 도시한 것이며, 도 3a는 상기 실시예 1의 앙카 헤드(13) 및 슬리브(17) 그리고 앙카체 구멍(24)을 구비한 엄지말뚝의 상세 사시도이며, 도 3b는 슬리브(17)와 앙카 베이스 플래이트(20)의 연결 단면도이며, 도 4a는 본 발명에 의한 영구 앙카 옹벽의 정면도이며, 도 4b는 종래 영구 앙카 옹벽의 굴착 완료된 정면도이며, 도 5a 및 도 5b는 본 발명의 실시예 2에 따른 영구앙카옹벽장치의 상세 사시도 및 상기 영구앙카옹벽장치가 설치된 사면 절취부 영구앙카옹벽의 설치 단면도이다. 본 발명의 영구앙카옹벽장치에 관한 실시예 1은 엄지말뚝(H-PILE 또는 강관 PILE,1)에 앙카체 형성 각도 방향으로 형성된 앙카체 구멍(24); 상기 앙카체 구멍(24)으로 인한 단면계수 감소 방지를 위해 엄지말뚝 2개의 플랜지면에 사이에 설치된 스티프너(23); 상기 엄지말뚝의 전면 플랜지면에 용접에 의해 설치되어 앙카체의 인장력을 엄지말뚝에 전달하고 외주면에 지수플레이트(WATER STOP PLATE,19))가 설치되고 저부로부터 몰탈, 에폭시, 그리스로 순으로 채워 지하수의 침투 유입 방지가 가능한 슬리브(17); 상기 슬리브(17)의 전면에 설치되는 트럼펫(18)을 구비한 앙카 베이스 플래이트(20); 상기 앙카 베이스 플래이트(20) 위에 설치되어 강선을 인장하여 고정하기 위한 앙카 헤드(13) 및 강선 쐐기(14); 및 상기 강선 쐐기(14), 강선의 부식을 방지하기 위한 앙카헤드덮개(15);로 구성되며, 상기 실시예 1을 이용한 영구앙카 옹벽장치 시공방법은 엄지말뚝 플랜지면 및 웨이브면에 앙카 형성 각도 방향으로 앙카체가 설치될 위치에 플랜지면 강재를 잘라내어 앙카체 구멍을 형성시키고(s1), 상기 플랜지면 사이를 스티프너(철판)로 보강하고(s2), 천공기를 이용하여 지중에 엄지말뚝을 삽입할 수 있도록 천공홀을 형성시키고(s3), 상기 천공홀에 상기 엄지말뚝을 삽입하고(s4), 배면을 굴착 실시하며 토류판 또는 숏크리트로 배면의 흙 유실을 방지하고(s5), 상기 배면에 앙카 설치를 위하여 앙카홀을 형성하고(s6), 앙카체를 상기 앙카홀에 삽입하되 상기 엄지말뚝의 앙카체 구멍을 관통하여 앙카두부가 앙카체 구멍으로부터 돌출되도록 설치하고(s7), 상기 앙카홀에 그라우팅을 실시하고(s8), 상기 엄지말뚝의 앙카체 구멍이 있는 플랜지면에, 앙카두부가 내부로부터 돌출되어 위치하도록 앙카체 형성 각도 방향으로 엄지말뚝 및 주철근 설치 방향과 같은 방향의 단면을 갖는 원통형의 강관 파이프; 및 상기 강관 파이프의 외주면에 설치되어 지하수 유입을 차단하기 위한 지수플레이트(WATER STOP PLATE);로 구성된 슬리브를 용접 설치하고(s9), 상기 슬리브에 저부로부터 몰탈, 에폭시, 그리스 순으로 채우고(s10), 슬리브 내경 지름과 같은 외경의 트럼펫을 구비하여 슬리브에 끼워져 설치 할 수 있도록 구성된 앙카 베이스 플래이트를 설치하고(s11), 그라우팅이 고결되면 앙카의 강선을 인장하여 강선 쐐기를 사용 앙카두부에 설치된 앙카헤드에 고정시키고(s12), 앙카두부를 그리스로 채워진 앙카 헤드 덮개로 용접에 의해 앙카 베이스 플래이트에 덮고(s13), 상기와 같은 순서로 단계별로 굴착 및 앙카를 설치하여 굴착공사를 완료하고(s14), 상기 앙카 베이스 플레이트 앞에 옹벽용 주철근을 조립하고(s15), 거푸집을 설치하여 앙카 베이스 플래이트, 슬리브가 매설되도록 콘크리트 타설에 의하여 옹벽을 설치한 후, 양생을 하여 영구 앙카 옹벽을 설치하는 단계(s16)로 구성된다. 이하 영구앙카 옹벽장치 시공방법을 기준으로 실시예 1을 살펴본다. 상기 s1 내지 s5 단계는 본 발명의 영구앙카정착장치에 사용되는 앙카체 구멍이 형성된 엄지말뚝 제작한 후 지중에 천공홀을 형성시켜 상기 천공홀에 엄지말뚝을 설치하는 단계이며, s6 내지 s13 단계는 상기 영구앙카정착장치를 설치하는 단계이며, s14 내지 s16단계는 영구앙카정착장치가 매설되도록 철근콘크리트를 이용하여 옹벽을 설치하는 단계이다. 먼저, 도 2a 및 도 3a와 같이 엄지말뚝(1)을 제작하게 된다. 상기 엄지말뚝(1)은 통상의 I형강을 이용하며, 플랜지면(25), 웨이브면(26)으로 구성된다. 앙카 형성 각도 방향 즉, 예컨대, 좌측 상단으로부터 우측 하방으로 앙카체가 경사져 설치되는 각도로 양 플랜지면(강재)을 잘라내어 앙카체 구멍(24)이 형성되도록 한다.이때 앙카체 구멍(24)으로 인한 단면계수 감소 방지를 위해 엄지말뚝 2개의 플랜지면 사이에 스티프너(23)를 설치하게 된다. 상기 앙케체 구멍(24)을 관통하여 앙카체가 경사져 설치되며, 최종적으로 앙카체가 배면에 형성된 앙카홀에 삽입되도록 한다. 다음으로는 지중에 앙카체 구멍(24)이 형성된 엄지말뚝을 오거 등을 사용하여 지중에 천공홀을 형성시킨 후 엄지말뚝을 삽입시키게 된다. 다음으로는 토류판 또는 숏크리트(6)를 사용하여 배면토의 유실을 방지하도록 하면서 굴착하게 된다. 다음으로는 앙카체(2) 설치를 위하여 배면에 천공을 실시하여 영구 앙카체를 삽입시키기 위한 앙카홀을 형성시키게 된다. 이러한 앙카홀은 엄지말뚝에 형성된 앙카체 구멍(24)과 대응한 위치가 되도록 한다. 앙카홀에 앙카체(2)를 삽입 설치하게 되며, 앙카체 선단부가 앙카홀 선단까지 다다르도록 한 상태에서 그 반대쪽 앙카두부가 엄지말뚝의 앙카체 구멍을 관통하여 엄지말뚝 플랜지면(25)으로부터 돌출되어 위치하도록 앙카체의 길이가 조정된다. 다음으로는 앙카홀 내부로 그라우팅을 실시한 후, 본 발명의 슬리브(17)를 설치하게 되며, 상기 슬리브(17)는 앙카체 형성 각도 방향으로 엄지말뚝 및 주철근 설치 방향과 같은 방향의 단면을 갖는 원통형의 강관 파이프(17a); 및 상기 강관 파이프의 외주면에 설치되어 지하수 유입을 차단하기 위한 지수플레이트(WATER STOP PLATE,19);로 구성된다. 먼저, 슬리브(17)를 구성하는 강관파이프(17a)를 엄지말뚝의 플랜지면(25)에 용접하여 설치하되 앙카체 형성각도에 맞추어 경사지게 설치한다. 이때 상기 강관파이프 외주면에는 이를 둘러싸고 있는 콘크리트 옹벽에 지하수 유입을 차단하기 위한 지수플레이트(WATER STOP PLATE,19)를 설치하게 된다.다음으로는 강관파이프(17a) 내부를 저부로부터 슬리브내 방수를 위한 몰탈, 에폭시, 그리스를 순서대로 채우고, 상기 슬리브의 전면에 강관파이프 내경 지름과 같은 외경으로 설치되는 트럼펫(18)을 구비한 앙카 베이스 플래이트(20)를 강관파이프(17a)에 삽입 설치하게 된다. 이때 상기 앙카 베이스 플래이트(20)는 후술되는 옹벽용 주철근(21) 전면에 위치하도록 설치된다. 다음으로는 앙카두부에 설치된 앙카헤드(13)와 강선 쐐기(14)로 앙카체를 구성하는 강선(12)을 인장하여 앙카 베이스 플래이트(20)에 고정시키고, 부식방지용 그리스가 채워진 앙카두부를 앙카헤드 덮개(15)로 덮어둔다. 다음으로는 주철근(21) 및 배력근(22)을 엄지말뚝의 플랜지면 전면에 배근하되 특히 앙카 베이스 플래이트(20)가 콘크리트 옹벽의 주철근(21) 앞에 놓이도록 한 상태에서 거푸집을 설치하고, 콘크리트를 타설하여 앙카체 두부 및 슬리브(17)가 콘크리트 옹벽내에 설치 되도록 하여 철근콘크리트로 제작된 영구 앙카 옹벽장치를 형성시키게 된다. 이로서 도 4b와 같이 종래의 앙카용 띠장(4)으로 인하여 주철근(21)의 설치가 안 되므로 띠장에 주철근 구멍을 뚫거나 띠장을 잘라내어 주철근(21)을 설치하는 종래의 옹벽시공상의 시공성 저하문제를 본 발명에서는 도 4a와 같이 앙카용 띠장(4)을 사용을 배제함으로서 결국 주철근(21)의 배근이 용이하다는 장점이 발현되어 시공성이 증진된다. 본 발명의 영구 앙카 옹벽 장치의 실시예 2는 도 5a 및 도 5b와 같이, 숏크리트면(29) 또는 지반에 설치되는 1차 앙카 베이스 플래이트(20b); 상기 1차 앙카 베이스 플래이트(20b) 위에 용접으로 설치되어 앙카체의 인장력을 전달하고 외주면에 지수플레이트(WATER STOP PLATE,19)가 설치되고 저부로부터 몰탈, 에폭시, 그리스로 순으로 채워 지하수의 침투 유입 방지가 가능한 슬리브(17); 상기 슬리브(17)의 전면에 설치되어 장기적으로 콘크리트 옹벽에 앙카 하중을 전달하기 위한 트럼펫(18)을 구비한 2차 앙카 베이스 플래이트(20a); 상기 2차 베이스 플래이트(20a) 위에 설치되어 강선을 인장하여 고정하기 위한 앙카 헤드(13) 및 강선 쐐기(14); 및 상기 강선 쐐기(14) 및 강선의 부식을 방지하기 위한 앙카헤드덮개(15);로 구성되며, 실시예 2에 의한 영구앙카 옹벽장치 시공방법은 사면 굴착과 동시에 숏크리트(29)를 타설하고(s1), 상기 숏크리트에 앙카체 설치를 위한 앙카홀을 형성시키고(s2), 앙카체를 상기 앙카홀에 삽입하고(s3), 상기 앙카홀에 그라우팅을 실시하고(s4), 앙카체 형성 각도 방향으로 사면 절토 방향과 같은 방향의 단면을 갖는 원통형의 강관 파이프(17); 상기 강관 파이프의 외주면에 설치되어 지하수 유입을 차단하기 위한 지수플레이트(WATER STOP PLATE,19);상기 강관 파이프의 단부에 설치되어 앙카체 구멍을 갖고 있고 강관 파이프와 용접으로 일체화된 사각의 1차 앙카 베이스 플래이트(20b);로 구성된 슬리브(17)를 1차 앙카 베이스 플래이트 및 강관파이프 일부가 숏크리트(29)에 매설되도록 설치하고(s5), 상기 슬리브(17)에 저부로부터 몰탈, 에폭시, 그리스로 순으로 채우고(s6), 슬리브 내경 지름과 같은 외경의 트럼펫(18)을 구비하여 상기 강관파이프에 끼워서 설치 할 수 있도록 구성된 2차 앙카 베이스 플래이트(20a)를 설치하고(s7), 상기 그라우팅이 고결되면 앙카체를 구성하는 강선을 인장하여 강선 쐐기(14)를 사용 앙카두부에 설치된 앙카헤드(13)에 고정시키고(s8), 앙카두부를 그리스로 채워진 앙카 헤드 덮개(15)로 용접에 의해 2차 앙카 베이스 플래이트(20a)에 덮고(s9), 상기와 같은 순서로 단계별로 굴착 및 앙카체를 설치하여 굴착공사를 완료하고(s10), 상기 2차 앙카 베이스 플레이트 앞에 옹벽용 주철근(21)을 조립하고(s11), 거푸집을 설치하여 2차 앙카베이스플레이트 및 슬리브가 매설되도록 콘크리트 타설에 의하여 옹벽을 설치한 후, 양생을 하여 영구 앙카 옹벽을 설치하는 단계(s12)로 구성된다. 상기 s1 내지 s4 단계는 실시예 1과는 달리 엄지말뚝(1)을 설치하지 않고, 숏크리트(29)면에 앙카홀을 형성시킨 후 앙카체를 앙카홀에 삽입 설치하는 단계이며, s6 내지 s10 단계는 실싱예 2의 영구앙카정착장치를 설치하는 단계이며, s11 및 s12단계는 실시예 2의 영구앙카정착장치가 매설되도록 철근콘크리트를 이용하여 옹벽을 설치하는 단계이다. 도 5a는 본 발명의 실시예 2의 영구앙카정착장치로써, 실시예 1과 다른 점은 1차 앙카베이스 플래이트(20b)가 더 설치되어 구성된다는 것이며, 강관파이프(17a)에 지수플레이트(19)가 설치되며, 실시예 1의 앙카베이스 플래이트(20)에 해당하는 2차 앙카베이스 플래이트(20b)가 설치되고, 앙카헤드(13)가 2차 앙카베이스 플래이트(20b)에 설치된다는 점은 동일하다. 종래의 영구 앙카 공법은 사면을 일정구간 절취 후 콘크리트 옹벽을 설치하고 영구 앙카를 옹벽에 설치 인장하며, 사면 안정을 취하면서 하단으로 단계적으로 내려오게 되는 역타설 옹벽 공법으로 시공하는데 이러한 역타설 공법은 위에서부터 콘크리트를 끊어 치게 됨으로 주철근(21)의 연결이 어렵고 공기 및 공사비가 많이 들게 된다는 문제점이 있었으나, 본 발명의 실시예 2에 의한 앙카 공법 적용시에는 도 5b의 사면 절취부 영구 앙카 옹벽의 설치 단면도와 같이 일정 구간 사면 굴착과 동시에 숏크리트(29)를 타설하고 이중의 앙카 베이스 플래이트(20a, 20b)를 구비한 슬리브(17)를 설치함으로써 콘크리트 옹벽 설치전 앙카체의 강선을 인장하여 사 면의 안정을 취하며, 단계적으로 사면 위로부터 내려오면서 사면 전체를 안정시킨 후 영구앙카옹벽을 밑에서부터 위로 단계적으로 콘크리트를 끊어쳐 옹벽 전체를 완성하게 된다는 점에 그 기술적 특징이 있다. 이로써 실시예 2에서는 엄지말뚝을 사용하지 않아 슬리브를 고정시킬 대상이 숏크리트(29)면이 된다. 이에 실시예 2에서는 슬리브(17)에 2개의 앙카베이스 플래이트(20a,20b)가 설치되며 본 발명에서는 숏크리트(29)면에 설치되는 앙카베이스 플래이트를 1차 앙카베이스 플래이트(20b)로 슬리브 전면에 설치되는 앙카베이스 플래이트를 2차 앙카베이스 플래이트(20b)로 지칭한다. 즉, 2차 앙카베이스 플래이트(20a)는 위에서 살펴본 실시예 1과 동일하게 도 5a 및 도 5b와 같이 슬리브를 구성하는 강관파이프(17a)에 설치되며, 1차 앙카베이스 플래이트(20b)는 숏크리트(29)면에 매설되어 설치될 수 있도록 한다. 이로서 슬리브(17)가 숏크리트(29)면에 고정 설치될 수 있게 된다. 이하 실시예 2에 따른 영구앙카 옹벽장치 시공방법을 살펴본다. 먼저, 사면 굴착을 하고, 동시에 숏크리트를 타설하여 사면을 안정시키게 된다. 이로써 실시예 1과는 달리 엄지말뚝 및 토류판의 설치가 생략될 수 있게 된다. 다음으로는 상기 숏크리트(29)에 앙카체 설치를 위한 앙카홀을 형성시키게 되며, 강선을 포함하는 앙카체를 상기 앙카홀에 삽입, 설치하게 된다. 역시 앙카체 선단부가 앙카홀 선단까지 다다르도록 한 상태에서 그 반대쪽 앙카두부가 후술되는 옹벽용 주철근의 앞에까지 돌출되어 위치하도록 앙카체의 길이가 조정된다. 다음으로는 상기 앙카홀에 그라우팅을 실시하고, 본 발명의 슬리브(17)를 설치하게 되며, 상기 슬리브(17)는 위에서 살펴본 것과 같이 앙카체 형성 각도 방향으로 사면 절토 방향과 같은 방향의 단면을 갖는 원통형의 강관 파이프(17a); 상기 강관 파이프의 외주면에 설치되어 지하수 유입을 차단하기 위한 지수플레이트(WATER STOP PLATE,19);상기 강관 파이프의 단부에 설치되어 앙카체 구멍을 갖고 있고 강관 파이프와 용접으로 일체화된 사각의 1차 앙카 베이스 플래이트(20b);로 구성된다. 먼저, 슬리브(17)를 구성하는 1차 앙카 베이스 플래이트(20b) 및 강관파이프(17a)일부가 숏크리트(29)에 매설되도록 설치하되 앙카체 형성각도에 맞추어 경사지게 설치한다. 이때 상기 강관파이프 외주면에는 이를 둘러싸고 있는 콘크리트 옹벽에 지하수 유입을 차단하기 위한 지수플레이트(WATER STOP PLATE,19)를 설치하게 된다. 다음으로는 강관파이프(17a) 내부를 저부로부터 슬리브내 방수를 위한 몰탈, 에폭시, 그리스를 순서대로 채우고, 상기 슬리브의 전면에 강관파이프 내경 지름과 같은 외경으로 설치되는 트럼펫(18)을 구비한 2차 앙카 베이스 플래이트(20a)를 강관파이프(17a)에 삽입 설치하게 된다. 이때 상기 1차 앙카 베이스 플래이트(20a) 역시 후술되는 옹벽용 주철근(21) 전면에 위치하도록 설치된다. 다음으로는 앙카두부에 설치된 앙카헤드(13)와 강선 쐐기(14)로 앙카체를 구성하는 강선(12)을 인장하여 1차 앙카 베이스 플래이트(20a)에 고정시키고, 부식방지용 그리스가 채워진 앙카두부를 앙카헤드 덮개(15)로 덮어둔다.실시예 2에서는 숏크리트에 의하여 사면이 안정되어 있으므로 옹벽 하부 위치로부터 상방으로 주철근(21) 및 배력근(22)을 숏크리트 전면에 배근하되 특히 1차 앙카 베이스 플래이트(20a)가 콘크리트 옹벽의 주철근(21) 앞에 놓이도록 한 상태에서 거푸집을 설치하고, 콘크리트를 타설하여 앙카두부 및 슬리브(17)가 콘크리트 옹벽내에 설치 되도록 하여 영구 앙카 옹벽을 형성시키게 된다.Hereinafter, preferred embodiments of the present invention will be described with reference to the accompanying drawings. 2A and 2B illustrate a cross section in which the permanent anchor retaining wall device and the permanent anchor retaining wall according to the first embodiment of the present invention are installed, and FIG. 3A shows the anchor head 13 and the sleeve 17 of the first embodiment. A detailed perspective view of a thumb pile with an anchor hole 24, FIG. 3B is a cross sectional view of the sleeve 17 and anchor base plate 20, and FIG. 4A is a front view of the permanent anchor retaining wall according to the present invention. 4b is an excavated front view of the conventional permanent anchor retaining wall, Figures 5a and 5b is a detailed perspective view of the permanent anchor retaining wall device according to the second embodiment of the present invention and the installation cross-sectional view of the permanent cut retaining anchoring wall is installed to be. Embodiment 1 relates to a permanent anchor retaining wall device of the present invention is an anchor hole formed in the thumb pile (H-PILE or steel pipe PILE, 1) in the direction of forming the anchor body; A stiffener (23) disposed between two flange faces of the thumb pile to prevent a decrease in the section coefficient due to the anchor hole (24); It is installed by welding on the front flange of the thumb pile to transfer the tension force of the anchor body to the thumb pile, and a water stop plate (WATER STOP PLATE, 19) is installed on the outer circumferential surface and is filled with mortar, epoxy and grease in order from the bottom. Sleeve 17 capable of preventing the ingress of water; An anchor base plate 20 having a trumpet 18 mounted to the front of the sleeve 17; An anchor head 13 and a steel wire wedge 14 installed on the anchor base plate 20 to tension and fix the steel wire; And the steel wire wedge 14 and an anchor head cover 15 for preventing corrosion of the steel wire. The method of constructing a permanent anchor retaining wall device using the first embodiment includes an anchor formation angle at the thumb pile flange surface and the wave surface. Cut the flange face steel at the position where the anchor is to be installed in the direction to form an anchor hole (s1), reinforce the gap between the flange faces with a stiffener (steel plate) (s2), and insert the thumb pile into the ground using a perforator. To form a perforation hole (s3), insert the thumb pile into the perforation hole (s4), excavate the back and prevent the loss of soil on the back with a earth plate or shotcrete (s5), the anchor installed on the back An anchor hole is formed for (s6), and an anchor is inserted into the anchor hole, and the anchor hole is installed to protrude from the anchor hole through the anchor hole of the thumb pile (s7). Grouting (s8), a cylindrical shape having a cross section in the same direction as the thumb pile and cast iron installation direction in the direction of the anchor body forming angle so that the anchor head protrudes from the inside on the flange face with the anchor hole of the thumb pile Steel pipes of pipes; And installed on the outer circumferential surface of the steel pipe pipe (WATER STOP PLATE) for blocking the inflow of groundwater; welded to the sleeve consisting of (s9), from the bottom to the mortar, epoxy, grease in order to fill the sleeve (s10) An anchor head mounted on the anchor head is provided with an anchor base plate provided with a trumpet having an outer diameter equal to the inner diameter of the sleeve, and configured to be installed in the sleeve (s11). Fixed to the (s12), and cover the anchor head to the anchor base plate by welding with an anchor head filled with grease (s13), install the excavation and anchor step by step in the same order as described above to complete the excavation work (s14) In order to assemble the retaining wall cast steel in front of the anchor base plate (s15), install the formwork and the anchor base plate, sleeve After the installation install the retaining wall by the concrete so that, in the curing step consists of (s16) to install a permanent retaining wall anchor. Hereinafter, Example 1 will be described based on a method for constructing a permanent anchor retaining wall device. Steps s1 to s5 are steps of installing a thumb pile in the ground by manufacturing a thumb pile formed with an anchor hole used in the permanent anchoring device of the present invention, and then installing the thumb pile in the drilling hole, and the steps s6 to s13 are The permanent anchoring device is installed, and steps s14 to s16 are the steps of installing the retaining wall using reinforced concrete so that the permanent anchoring device is embedded. First, the thumb pile 1 is produced as shown in FIGS. 2a and 3a. The thumb pile 1 uses a conventional I-shaped steel, and is composed of a flange face 25 and a wave face 26. Both flange faces (steels) are cut out at the angle of the anchor formation angle, that is, at an angle at which the anchor is inclined from the upper left to the lower right, for example, so that the anchor holes 24 are formed. The stiffener 23 is installed between two flange faces of the thumb pile to prevent the coefficient of reduction. An anchor is inclined to penetrate through the anchor hole 24, and the anchor is finally inserted into the anchor hole formed on the rear surface. Next, after forming a drill hole in the ground using the auger or the like, the thumb pile formed with the anchor hole 24 in the ground is inserted into the thumb pile. Next, using the earth plate or shotcrete (6) is excavated while preventing the loss of the backing soil. Next, a perforation is performed on the rear surface for the installation of the anchor body 2 to form an anchor hole for inserting the permanent anchor body. This anchor hole is to be a position corresponding to the anchor hole 24 formed in the thumb pile. The anchor hole (2) is inserted into the anchor hole, and the opposite anchor head penetrates through the anchor hole of the thumb pile from the thumb pile flange surface (25) while the anchor body tip reaches the tip of the anchor hole. The length of the anchor is adjusted so as to protrude. Next, after grouting into the anchor hole, the sleeve 17 of the present invention is installed, and the sleeve 17 has a cylindrical shape having a cross section in the same direction as the thumb pile and the main reinforcing rod installation direction in the direction of forming the anchor body. Steel pipe pipe 17a; And an index plate (WATER STOP PLATE) 19 installed on an outer circumferential surface of the steel pipe to block groundwater inflow. First, the steel pipe (17a) constituting the sleeve 17 is installed by welding to the flange surface 25 of the thumb pile, but is installed inclined according to the angle of forming the anchor body. At this time, a water stop plate (WATER STOP PLATE) 19 is installed on the outer circumferential surface of the steel pipe pipe to block the inflow of groundwater to the concrete retaining wall surrounding the steel pipe. , An epoxy base and a grease are filled in order, and the anchor base plate 20 having a trumpet 18 installed on the front surface of the sleeve with an outer diameter equal to the inner diameter of the steel pipe is inserted into the steel pipe pipe 17a. At this time, the anchor base plate 20 is installed so as to be located in front of the retaining wall cast reinforcing bar 21 to be described later. Next, the steel head 12 constituting the anchor body is tensioned with the anchor head 13 and the steel wire wedge 14 installed on the anchor head to fix the anchor wire 12 to the anchor base plate 20, and the anchor head filled with corrosion preventing grease is anchored. Cover with the head cover (15). Next, cast the reinforcing bar 21 and the reinforcement bar 22 in front of the flange surface of the thumb pile, and in particular, the formwork is installed with the anchor base plate 20 placed in front of the main reinforcing bar 21 of the concrete retaining wall, By pouring the anchor head and sleeve 17 to be installed in the concrete retaining wall to form a permanent anchor retaining wall device made of reinforced concrete. As shown in FIG. 4B, since the main reinforcing bar 21 is not installed due to the conventional anchoring strip 4, a problem of deterioration in constructability in the conventional retaining wall construction in which the main reinforcing bar 21 is installed by drilling the main reinforcing bar or cutting the strip is installed. In the present invention, by eliminating the use of the anchor belt 4 as shown in Figure 4a, the advantage that the reinforcement of the cast iron bar 21 is easily expressed, thereby improving the workability. Embodiment 2 of the permanent anchor retaining wall device of the present invention, the primary anchor base plate 20b is installed on the shotcrete surface 29 or the ground, as shown in Figure 5a and 5b; It is installed by welding on the primary anchor base plate 20b to transmit the tensile force of the anchor body, and a water stop plate 19 is installed on the outer circumferential surface and fills with mortar, epoxy, and grease from the bottom in order to penetrate groundwater. Preventable sleeve 17; A secondary anchor base plate (20a) installed at the front of the sleeve (17) and having a trumpet (18) for transmitting the anchor load to the concrete retaining wall in the long term; An anchor head 13 and a steel wire wedge 14 installed on the secondary base plate 20a to tension and fix the steel wire; And an anchor head cover 15 for preventing corrosion of the steel wire wedge 14 and the steel wire. The method of constructing a permanent anchor retaining wall device according to the second embodiment includes pouring a shotcrete 29 at the same time as a slope excavation ( s1), an anchor hole is formed in the shotcrete for mounting the anchor (s2), the anchor is inserted into the anchor hole (s3), the grout is applied to the anchor hole (s4), and the angle of the anchor formation is A cylindrical steel pipe pipe 17 having a cross section in the same direction as the slope cut direction; A water stop plate (WATER STOP PLATE, 19) installed on an outer circumferential surface of the steel pipe to block groundwater inflow; a square primary anchor installed at the end of the steel pipe having an anchor hole and integrated with steel pipe and welding A base 17 comprising a base plate 20b so that a portion of the primary anchor base plate and the steel pipe may be embedded in the shotcrete 29 (s5), and the sleeve 17 may be provided with mortar, epoxy and grease from the bottom. In order (s6), the secondary anchor base plate (20a) is provided with a trumpet (18) having an outer diameter equal to the diameter of the sleeve inner diameter so as to be inserted into the steel pipe (s7), the grouting is solidified When the steel wire constituting the anchor body is tensioned, the steel wire wedge 14 is fixed to the anchor head 13 installed on the anchor head (s8), and the anchor head is filled with grease. Cover the secondary anchor base plate 20a by welding with a dog (15) (s9), install the excavation and anchor body step by step in the same order as described above to complete the excavation work (s10), and the secondary anchor base Assembling the main reinforcing bar 21 for the retaining wall in front of the plate (s11), and install the formwork to install the retaining wall by concrete pouring so that the secondary anchor base plate and the sleeve is embedded, and then curing to install a permanent anchor retaining wall ( s12). The step s1 to s4 is a step of forming an anchor hole on the shotcrete 29 and then inserting the anchor body into the anchor hole, without installing the thumb pile 1 unlike in the first embodiment, and steps s6 to s10. Is a step of installing the permanent anchor fixing device of the sealing example 2, step s11 and s12 is a step of installing the retaining wall using reinforced concrete so that the permanent anchor fixing device of Example 2. 5A is a permanent anchoring device according to the second embodiment of the present invention, which is different from the first embodiment in that the primary anchor base plate 20b is further installed, and the index plate 19 is formed on the steel pipe pipe 17a. Is installed, the secondary anchor base plate 20b corresponding to the anchor base plate 20 of Embodiment 1 is installed, and the anchor head 13 is installed on the secondary anchor base plate 20b. . The conventional permanent anchor construction method is to install the concrete retaining wall after cutting the slope for a certain period, and install the permanent retaining anchor on the retaining wall, and install it as a reverse pouring retaining wall construction that descends to the bottom while stabilizing the slope. There was a problem that the connection of the main reinforcing bar (21) is difficult and the air and construction costs are high because the concrete is cut from the top, but when the anchor construction method according to the second embodiment of the present invention is applied, the permanent cut retaining wall of FIG. 5B is installed. As shown in the cross-sectional view, the shotcrete 29 is placed at the same time as the excavation of the slope, and the sleeve 17 having the double anchor base plates 20a and 20b is installed to tension the steel wire of the anchor body before installing the concrete retaining wall. The technical features are that the surface is stabilized, and the slope is lowered from the top of the slope to stabilize the entire slope, and then the concrete retaining wall is cut off from the bottom of the permanent anchor retaining wall in stages to complete the entire retaining wall. As a result, in Example 2, the object to which the sleeve is fixed without using the thumb pile is the shotcrete 29 surface. Therefore, in Embodiment 2, two anchor base plates 20a and 20b are installed on the sleeve 17. In the present invention, the anchor base plate installed on the shotcrete 29 surface is formed on the front surface of the sleeve with the primary anchor base plate 20b. The anchor base plate to be installed is referred to as secondary anchor base plate 20b. That is, the secondary anchor base plate 20a is installed in the steel pipe pipe 17a constituting the sleeve as shown in FIGS. 5A and 5B as in the first embodiment described above, and the primary anchor base plate 20b is a shotcrete ( 29) It is to be installed on the surface. This allows the sleeve 17 to be fixed to the shotcrete 29 surface. Hereinafter, the construction method of the permanent anchor retaining wall device according to the second embodiment. First, the slope is excavated, and at the same time, shotcrete is poured to stabilize the slope. As a result, unlike the first embodiment, the installation of the thumb pile and the earth plate may be omitted. Next, an anchor hole for installing an anchor body is formed in the shotcrete 29, and an anchor including a steel wire is inserted into and installed in the anchor hole. In addition, the length of the anchor is adjusted so that the opposite anchor head protrudes to the front of the retaining wall cast reinforcing bar, which will be described later, while the front end of the anchor body reaches the tip of the anchor hole. Next, grouting is performed in the anchor hole, and the sleeve 17 of the present invention is installed, and the sleeve 17 has a cross section in the same direction as the slope cut direction in the direction of forming the anchor body as described above. Cylindrical steel pipe pipe 17a; A water stop plate (WATER STOP PLATE, 19) installed on an outer circumferential surface of the steel pipe to block groundwater inflow; a square primary anchor installed at the end of the steel pipe having an anchor hole and integrated with steel pipe and welding The base plate 20b. First, a portion of the primary anchor base plate 20b and the steel pipe pipe 17a constituting the sleeve 17 are installed to be embedded in the shotcrete 29, but are installed to be inclined to the angle of forming the anchor body. At this time, on the outer circumferential surface of the steel pipe pipe is installed an index plate (WATER STOP PLATE, 19) for blocking the inflow of groundwater on the concrete retaining wall surrounding it. Next, the inside of the steel pipe 17a is filled with mortar, epoxy, and grease in order from the bottom to waterproof in the sleeve, and a trumpet 18 having an outer diameter equal to the inner diameter of the steel pipe is installed on the front of the sleeve. The car anchor base plate 20a is inserted into the steel pipe pipe 17a. At this time, the primary anchor base plate 20a is also installed to be located in front of the retaining wall cast reinforcing bar 21 to be described later. Next, the anchor head 13 and the steel wire wedge 14 provided on the anchor head are tensioned and fixed to the primary anchor base plate 20a to secure the steel wire 12 constituting the anchor body. In the second embodiment, since the slope is stabilized by the shotcrete, the main reinforcing bar 21 and the reinforcing bar 22 are placed on the front surface of the shotcrete upward from the lower portion of the retaining wall. The formwork is installed in a state in which the plate 20a is placed in front of the main reinforcing bar 21 of the concrete retaining wall, and the concrete is poured to allow the anchor head and the sleeve 17 to be installed in the concrete retaining wall to form a permanent anchor retaining wall.

삭제delete

삭제delete

삭제delete

삭제delete

삭제delete

삭제delete

삭제delete

삭제delete

삭제delete

삭제delete

삭제delete

본 발명의 영구 앙카 옹벽은 첫째, 엄지말뚝을 사용 년한 까지만 응력재로 사용하고 그 후 콘크리트 옹벽이 모든 하중을 부담할 수 있는 이중 구조이므로 장기적으로 안정하다.The permanent anchor retaining wall of the present invention is, firstly, a double pile structure that can be used as a stress material until the use of the thumb pile and then the concrete retaining wall can bear all loads.

둘째, 앙카용 띠장(WALE BEAM)을 사용하지 않아 콘크리트 옹벽내에 설치된 띠장의 부식에 따른 옹벽의 균열을 방지할 수 있으며 옹벽 주철근 설치가 용이하다.셋째, 옹벽 배면에 지하수의 유입을 방지할 수 있는 슬리브로 인하여 강선의 부식을 방지 할 수 있어 장기적인 안정성을 확보 할 수 있다.Second, it does not use the WALE BEAM, so it is possible to prevent the crack of the retaining wall due to the corrosion of the strip installed in the concrete retaining wall, and to install the retaining wall cast steel rebar. Third, to prevent the inflow of groundwater to the back wall of the retaining wall. The sleeve prevents corrosion of the steel wire and ensures long-term stability.

삭제delete

넷째, 일반 영구 앙카 공법보다 콘크리트량이 감소하므로 경제적이다.넷째, 일반 영구 앙카 공법보다 콘크리트량이 감소하므로 경제적이다.Fourth, it is economical because the amount of concrete decreases than the general permanent anchor method. Fourth, it is economical because the amount of concrete is reduced than the general permanent anchor method.

도 1a는 종래의 영구 앙카 옹벽 공법의 시공 단면도이다.1A is a construction sectional view of a conventional permanent anchor retaining wall method.

도 1b는 종래의 영구 앙카 옹벽이 설치된 단면의 상세도이다.1B is a detailed view of a cross section in which a conventional permanent anchor retaining wall is installed.

도 2a 및 도 2b는 본 발명에 의한 영구 앙카 옹벽 공법의 단면도이다.2A and 2B are sectional views of the permanent anchor retaining wall method according to the present invention.

도 3a는 본 발명의 앙카 헤드 및 슬리브 그리고 앙카체 구멍을 구비한 엄지말뚝의 상세 사시도이다.3A is a detailed perspective view of a thumb pile with an anchor head and sleeve and an anchor hole of the present invention.

도 3b는 본 발명의 슬리브와 앙카 베이스 플래이트의 연결 단면도이다.3B is a cross sectional view of the sleeve and anchor base plate of the present invention.

도 4a는 본 발명에 의한 영구 앙카 옹벽의 정면도이다.4A is a front view of a permanent anchor retaining wall according to the present invention.

도 4b는 종래 영구 앙카 옹벽의 정면도이다.4B is a front view of a conventional permanent anchor retaining wall.

도 5a는 본 발명에 의한 영구 앙카 옹벽 공법의 다른 실시예의 상세 사시도이다.Figure 5a is a detailed perspective view of another embodiment of a permanent anchor retaining wall method according to the present invention.

도 5b는 본 발명의 상기 다른 실시예에 따른 사면 절취부 영구 앙카 옹벽의 설치 단면도이다.5B is a cross-sectional view illustrating an installation of a slope cut permanent anchor retaining wall according to another exemplary embodiment of the present invention.

<도면의 부호에 대한 간단한 설명><Brief description of the symbols in the drawings>

1: 엄지말뚝(H-PILE, 강관 PILE) 2: 영구 앙카체1: thumb pile (H-PILE, steel pipe PILE) 2: permanent anchor

3: 콘크리트 옹벽 4: 띠장(WALE BEAM)3: concrete retaining wall 4: wale beam

5: 띠장 브라켓 6: 토류판 또는 숏크리트5: Sash bracket 6: Earth plate or shotcrete

11: 쉬스관 12: 강선11: sheath pipe 12: liner

13: 앙카 헤드 14: 강선 쐐기13: anchor head 14: steel wire spokes

15: 앙카 헤드 덮개 16: 천공홀15: anchor head cover 16: hole

17,17a:슬리브,강관파이프 18: 트럼펫17,17a: sleeve, steel pipe 18: trumpet

22: 제거식 쐐기 23: 선단 앙카헤드 구멍22: removable wedge 23: tip anchor head hole

19: WATER STOP PLATE 20: 앙카 베이스 플래이트19: WATER STOP PLATE 20: Anchor Base Plate

20a: 2차 앙카 베이스 플래이트 20b: 1차 앙카 베이스 플래이트20a: 2nd anchor base plate 20b: 1st anchor base plate

21: 주철근 22: 배력근21: cast iron 22: heavy bar

23: 스티프너 24: 앙카체 구멍23: stiffener 24: ancache hole

25: 플랜지면 26: 웨이브면25: flange face 26: wave face

27: 지반 28: 와이어메쉬(WIRE MESH)27: ground 28: wire mesh

29: 숏크리트29: Shotcrete

Claims (7)

엄지말뚝(H-PILE 또는 강관 PILE,1)에 앙카체 형성 각도 방향으로 형성된 앙카체 구멍;An anchor hole formed in the direction of the anchor formation angle in the thumb pile (H-PILE or steel pipe PILE, 1); 상기 앙카체 구멍으로 인한 단면계수 감소 방지를 위해 엄지말뚝 2개의 플랜지면에 사이에 설치된 스티프너;A stiffener installed between two flange faces of the thumb pile to prevent a decrease in the section coefficient due to the anchor hole; 상기 엄지말뚝의 전면 플랜지면에 용접에 의해 설치되어 앙카체의 인장력을 엄지말뚝에 전달하고 외주면에 지수플레이트(WATER STOP PLATE)가 설치되고 저부로부터 몰탈, 에폭시, 그리스로 순으로 채워 지하수의 침투 유입 방지가 가능한 슬리브;It is installed by welding on the front flange of the thumb pile to transmit the tension force of the anchor body to the thumb pile, and a water stop plate is installed on the outer circumferential surface and fills with mortar, epoxy, and grease from the bottom in order to penetrate groundwater. Preventable sleeves; 상기 슬리브의 전면에 설치되는 트럼펫을 구비한 앙카 베이스 플래이트;An anchor base plate having a trumpet installed in front of the sleeve; 상기 앙카 베이스 플래이트 위에 설치되어 강선을 인장하여 고정하기 위한 앙카 헤드 및 강선 쐐기; 및 An anchor head and steel wire wedge installed on the anchor base plate to tension and fix the steel wire; And 상기 강선 쐐기, 강선의 부식을 방지하기 위한 앙카헤드덮개;로 구성되는 것을 특징으로 하는 영구 앙카 옹벽 장치.Permanent anchor retaining wall device, characterized in that consisting of; steel wire wedge, anchor head cover for preventing corrosion of the steel wire. 숏크리트면 또는 지반에 설치되는 1차 앙카 베이스 플래이트;Primary anchor base plate installed on the shotcrete surface or ground; 상기 1차 앙카 베이스 플래이트 위에 용접으로 설치되어 앙카체의 인장력을 전달하고 외주면에 지수플레이트(WATER STOP PLATE)가 설치되고 저부로부터 몰탈, 에폭시, 그리스로 순으로 채워 지하수의 침투 유입 방지가 가능한 슬리브;A sleeve which is installed by welding on the primary anchor base plate to transmit the tensile force of the anchor body and a water stop plate is installed on the outer circumferential surface thereof and fills with mortar, epoxy, and grease in order from the bottom to prevent penetration of groundwater; 상기 슬리브의 전면에 설치되어 장기적으로 콘크리트 옹벽에 앙카 하중을 전달하기 위한 트럼펫을 구비한 2차 앙카 베이스 플래이트;A secondary anchor base plate installed on the front of the sleeve and having a trumpet for transmitting the anchor load to the concrete retaining wall in the long term; 상기 2차 베이스 플래이트 위에 설치되어 강선을 인장하여 고정하기 위한 앙카 헤드 및 강선 쐐기; 및An anchor head and steel wire wedge installed on the secondary base plate to tension and secure the steel wire; And 상기 강선 쐐기 및 강선의 부식을 방지하기 위한 앙카헤드덮개;로 구성되는 것을 특징으로 하는 영구 앙카 옹벽 장치.Permanent anchor retaining wall device, characterized in that consisting of; steel head wedge and anchor head cover for preventing corrosion of the steel wire. 제 1항에 있어서, 상기 슬리브는, 앙카체 형성 각도 방향으로 엄지말뚝 및 주철근 설치 방향과 같은 방향의 단면을 갖는 원통형의 강관 파이프; 및 상기 강관 파이프의 외주면에 설치되어 지하수 유입을 차단하기 위한 지수플레이트(WATER STOP PLATE);로 구성되는 것을 특징으로 하는 영구 앙카 옹벽 장치.The method of claim 1, wherein the sleeve comprises: a cylindrical steel pipe having a cross section in the same direction as the thumb pile and cast steel reinforcement direction in the direction of the anchor body forming angle; And an index plate (WATER STOP PLATE) installed on an outer circumferential surface of the steel pipe to block groundwater inflow. 제 2항에 있어서, 상기 슬리브는, 앙카체 형성 각도 방향으로 사면 절토 방향과 같은 방향의 단면을 갖는 원통형의 강관 파이프; 상기 강관 파이프의 외주면에 설치되어 지하수 유입을 차단하기 위한 지수플레이트(WATER STOP PLATE); 상기 강관 파이프의 단부에 설치되어 앙카체 구멍을 갖고 있고 강관 파이프와 용접으로 일체화된 사각의 1차 앙카 베이스 플래이트;로 구성되는 것을 특징으로 하는 영구 앙카 옹벽 장치.The method of claim 2, wherein the sleeve comprises: a cylindrical steel pipe having a cross section in the same direction as the slope cut direction in the direction of the anchor forming angle; An index plate (WATER STOP PLATE) installed on an outer circumferential surface of the steel pipe to block groundwater inflow; Permanent anchor retaining wall device, characterized in that consisting of; a rectangular primary anchor base plate is installed at the end of the steel pipe pipe having an anchor hole and integrally welded with the steel pipe pipe. 제 1항 또는 제 2항에 있어서, 상기 앙카 베이스 플래이트 및 2차 앙카 베이스 플래이트는 슬리브 내경 지름과 같은 외경의 트럼펫을 구비하여 슬리브에 끼워서 설치 할 수 있도록 구성되는 것을 특징으로 하는 영구앙카 옹벽장치.3. The permanent anchor retaining wall device according to claim 1 or 2, wherein the anchor base plate and the secondary anchor base plate have a trumpet having an outer diameter equal to that of the sleeve inner diameter so as to be installed in the sleeve. 엄지말뚝 플랜지면 및 웨이브면에 앙카 형성 각도 방향으로 앙카체가 설치될 위치에 플랜지면 강재를 잘라내어 앙카체 구멍을 형성시키고,Anchorage holes are formed by cutting the flange face steel at the position where the anchor pile is to be installed in the direction of forming the anchor in the thumb pile flange surface and the wave surface, 상기 플랜지면 사이를 스티프너(철판)로 보강하고,Reinforced between the flange surfaces with a stiffener (iron plate), 천공기를 이용하여 지중에 엄지말뚝을 삽입할 수 있도록 천공홀을 형성시키고,Using a puncher to form a drill hole to insert the thumb pile in the ground, 상기 천공홀에 상기 엄지말뚝을 삽입하고,Insert the thumb pile into the drilling hole, 배면을 굴착 실시하며 토류판 또는 숏크리트로 배면의 흙 유실을 방지하고,Excavate the back and prevent soil loss on the back with earth plate or shotcrete, 상기 배면에 앙카 설치를 위하여 앙카홀을 형성하고,An anchor hole is formed on the back for anchor installation, 앙카체를 상기 앙카홀에 삽입하되 상기 엄지말뚝의 앙카체 구멍을 관통하여 앙카두부가 앙카체 구멍으로부터 돌출되도록 설치하고,Insert an anchor into the anchor hole and install the anchor head to protrude from the anchor hole through the anchor hole of the thumb pile. 상기 앙카홀에 그라우팅을 실시하고,Grouting the anchor hole, 상기 엄지말뚝의 앙카체 구멍이 있는 플랜지면에, 앙카두부가 내부로부터 돌출되어 위치하도록 앙카체 형성 각도 방향으로 엄지말뚝 및 주철근 설치 방향과 같은 방향의 단면을 갖는 원통형의 강관 파이프; 및 상기 강관 파이프의 외주면에 설치되어 지하수 유입을 차단하기 위한 지수플레이트(WATER STOP PLATE);로 구성된 슬리브를 용접 설치하고,A cylindrical steel pipe having a cross section in the same direction as the installation direction of the thumb pile and the main reinforcing bar in the angle of the anchor formation so that the anchor head protrudes from the inside on the flange surface with the anchor hole of the thumb pile; And a water stop plate (WATER STOP PLATE) installed on the outer circumferential surface of the steel pipe to block groundwater inflow; 상기 슬리브에 저부로부터 몰탈, 에폭시, 그리스 순으로 채우고,Filling the sleeve in the order from bottom to mortar, epoxy, grease, 슬리브 내경 지름과 같은 외경의 트럼펫을 구비하여 슬리브에 끼워져 설치 할 수 있도록 구성된 앙카 베이스 플래이트를 설치하고,Install an anchor base plate that has a trumpet with the same outer diameter as the inner diameter of the sleeve, 그라우팅이 고결되면 앙카의 강선을 인장하여 강선 쐐기를 사용 앙카두부에 설치된 앙카헤드에 고정시키고,When the grouting is solidified, tension the anchor's steel wire and fix the steel wedge to the anchor head installed on the anchor head using 앙카두부를 그리스로 채워진 앙카 헤드 덮개로 용접에 의해 앙카 베이스 플래이트에 덮고,Cover the anchor head to the anchor base plate by welding with the anchor head cover filled with grease, 상기와 같은 순서로 단계별로 굴착 및 앙카를 설치하여 굴착공사를 완료하고,Complete the excavation work by installing excavation and anchor in each step in the same order as above. 상기 앙카 베이스 플레이트 앞에 옹벽용 주철근을 조립하고,Assembling the retaining wall cast steel in front of the anchor base plate, 거푸집을 설치하여 앙카 베이스 플래이트, 슬리브가 매설되도록 콘크리트 타설에 의하여 옹벽을 설치한 후, 양생을 하여 영구 앙카 옹벽을 설치하는 단계로 구성되는 것을 특징으로 하는 영구앙카 옹벽장치 시공방법.A method of constructing a permanent anchor retaining wall device, comprising the step of installing a retaining wall by placing concrete to install an anchor base plate and a sleeve, and then installing a permanent anchor retaining wall by curing. 사면 굴착과 동시에 숏크리트를 타설하고,At the same time excavation of slopes, pouring shotcrete, 상기 숏크리트에 앙카체 설치를 위한 앙카홀을 형성시키고,Forming an anchor hole for installing an anchor on the shotcrete, 앙카체를 상기 앙카홀에 삽입하고,Insert the anchor into the anchor hole, 상기 앙카홀에 그라우팅을 실시하고,Grouting the anchor hole, 앙카체 형성 각도 방향으로 사면 절토 방향과 같은 방향의 단면을 갖는 원통형의 강관 파이프; 상기 강관 파이프의 외주면에 설치되어 지하수 유입을 차단하기 위한 지수플레이트(WATER STOP PLATE);상기 강관 파이프의 단부에 설치되어 앙카체 구멍을 갖고 있고 강관 파이프와 용접으로 일체화된 사각의 1차 앙카 베이스 플래이트;로 구성된 슬리브를 1차 앙카 베이스 플래이트 및 강관파이프 일부가 숏크리트에 매설되도록 설치하고,A cylindrical steel pipe pipe having a cross section in the same direction as the slope cut direction in the direction of forming the anchor body; Water stop plate (WATER STOP PLATE) is installed on the outer circumferential surface of the steel pipe pipe (WATER STOP PLATE); Square primary anchor base plate is installed at the end of the steel pipe pipe having an anchor hole and integrally welded with the steel pipe pipe A sleeve consisting of; installed so that a portion of the primary anchor base plate and the steel pipe is embedded in the shotcrete, 상기 슬리브에 저부로부터 몰탈, 에폭시, 그리스로 순으로 채우고,Fill the sleeve in the order from bottom to top with mortar, epoxy, grease, 슬리브 내경 지름과 같은 외경의 트럼펫을 구비하여 상기 강관파이프에 끼워서 설치 할 수 있도록 구성된 2차 앙카 베이스 플래이트를 설치하고,Install a secondary anchor base plate which is provided with a trumpet having the same outer diameter as the sleeve inner diameter so that it can be inserted into the steel pipe and installed. 상기 그라우팅이 고결되면 앙카체를 구성하는 강선을 인장하여 강선 쐐기를 사용 앙카두부에 설치된 앙카헤드에 고정시키고,When the grouting is solidified, the steel wire constituting the anchor body is tensioned to fix the steel wire wedge to the anchor head installed on the anchor head using the steel wire wedge. 앙카두부를 그리스로 채워진 앙카 헤드 덮개로 용접에 의해 2차 앙카 베이스 플래이트에 덮고,Cover the anchor head to the secondary anchor base plate by welding with an anchor head cover filled with grease, 상기와 같은 순서로 단계별로 굴착 및 앙카체를 설치하여 굴착공사를 완료하고,Complete the excavation work by installing excavation and anchor in each step in the same order as above. 상기 2차 앙카 베이스 플레이트 앞에 옹벽용 주철근을 조립하고,Assembling the retaining wall cast iron in front of the secondary anchor base plate, 거푸집을 설치하여 2차 앙카베이스플레이트 및 슬리브가 매설되도록 콘크리트 타설에 의하여 옹벽을 설치한 후, 양생을 하여 영구 앙카 옹벽을 설치하는 단계로 구성되는 것을 특징으로 하는 영구앙카 옹벽장치 시공방법.A method of constructing a permanent anchor retaining wall device, comprising the step of installing a retaining wall by concrete placing so that the secondary anchor base plate and the sleeve are embedded by installing a formwork, and then installing a permanent anchor retaining wall.
KR10-2003-0013205A 2003-03-03 2003-03-03 Apparatus for Retaining Wall Using a Ground Anchor And the Method Using the Same KR100534603B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR10-2003-0013205A KR100534603B1 (en) 2003-03-03 2003-03-03 Apparatus for Retaining Wall Using a Ground Anchor And the Method Using the Same

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR10-2003-0013205A KR100534603B1 (en) 2003-03-03 2003-03-03 Apparatus for Retaining Wall Using a Ground Anchor And the Method Using the Same

Publications (2)

Publication Number Publication Date
KR20030028518A KR20030028518A (en) 2003-04-08
KR100534603B1 true KR100534603B1 (en) 2005-12-07

Family

ID=29578650

Family Applications (1)

Application Number Title Priority Date Filing Date
KR10-2003-0013205A KR100534603B1 (en) 2003-03-03 2003-03-03 Apparatus for Retaining Wall Using a Ground Anchor And the Method Using the Same

Country Status (1)

Country Link
KR (1) KR100534603B1 (en)

Families Citing this family (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100614847B1 (en) * 2004-01-10 2006-08-25 불독 (주) Assembly pile for method of ground improvement, and pile for settlement of anchor
KR100917044B1 (en) * 2007-05-31 2009-09-10 (주)유니트엔지니어링 Concrete retaining wall construction method with dual wall jointed by anchor
KR101053070B1 (en) * 2009-05-13 2011-08-01 (주)이지이앤티 Distance maintenance h-pile with double layer type coating and soil retaining wall and soil retaining wall constructing method using the same
KR100985947B1 (en) * 2010-02-12 2010-10-06 윤진효 Apparatus for protecton of street tree
CN113216202A (en) * 2021-04-20 2021-08-06 中铁第一勘察设计院集团有限公司 Small-sized steel pipe concrete pile supporting system and construction method thereof
KR102383835B1 (en) * 2021-06-07 2022-04-08 이기환 Retaining Wall without Wale Beam, Wall Structure combined such Retaining Wall and Concrete Wall, and Constructing Method thereof
CN113802574B (en) * 2021-09-30 2022-12-23 王宝林 Roadbed rapid supporting structure for roadbed-side foundation pit construction and construction method thereof
CN115059087A (en) * 2022-06-30 2022-09-16 中冶建工集团有限公司 Construction method for foundation pit of vehicle-driving ground channel

Also Published As

Publication number Publication date
KR20030028518A (en) 2003-04-08

Similar Documents

Publication Publication Date Title
KR100917044B1 (en) Concrete retaining wall construction method with dual wall jointed by anchor
KR100910576B1 (en) Embed anchor and construction method of composite basement wall using the same
KR101696916B1 (en) Construction method of permanent wall with retaining wall combined PHC pile and steel pipe
KR101973565B1 (en) Sheathing method for constructing both sheathing wall and cutoff collar by welding cutoff plate to phc pile with longitudinal plate
KR100862977B1 (en) Precast concrete file and method for constructing thereof
KR100534603B1 (en) Apparatus for Retaining Wall Using a Ground Anchor And the Method Using the Same
KR20090116452A (en) Composite wall using angled channel
KR102223856B1 (en) Foundation structure of waste landfill site and construction method thereof
JP2000265484A (en) CONSTRUCTION METHOD FOR UNDERGROUND STRUCTURE BY PCa PILE UNDERGROUND WALL
KR102113291B1 (en) Soil retaining wall using phc pile and construction method thererof
JP3829319B2 (en) Construction method of underground hollow structure and its underground hollow structure
JP5480744B2 (en) Foundation for structure and its construction method
US20060177279A1 (en) Reinforcing wall in a deep excavation site
JP4485006B2 (en) Construction method for underground structures
KR20190137432A (en) Soil retaining wall for phc pile
KR200363400Y1 (en) Frame to draw out H beam
JP5280150B2 (en) Yamadome retaining wall and method of forming Yamadome retaining wall
KR100400853B1 (en) Removable soil nailing method and its nail assembly
JP2006057312A (en) Joint method of pile body and pre-cast slab
KR100969778B1 (en) Composite Wall Using Angled Channel and Constructing Method thereof
KR100429283B1 (en) Construction Method using Precast Concrete for Diaphragm Wall
KR20090078684A (en) Composite wall using angled channel and constructing method thereof
JP2004211346A (en) Reinforcement structure and reinforcement method for rectangular sectional underground structure
KR100327547B1 (en) Composite retaining wall construction method
KR100495243B1 (en) Self supporting retaining wall construction method

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20121128

Year of fee payment: 8

FPAY Annual fee payment

Payment date: 20131202

Year of fee payment: 9

FPAY Annual fee payment

Payment date: 20141201

Year of fee payment: 10

FPAY Annual fee payment

Payment date: 20171207

Year of fee payment: 13

FPAY Annual fee payment

Payment date: 20181101

Year of fee payment: 14

FPAY Annual fee payment

Payment date: 20190923

Year of fee payment: 15