KR100525930B1 - Lagging member structure for concrete slab work of appartment house - Google Patents

Lagging member structure for concrete slab work of appartment house Download PDF

Info

Publication number
KR100525930B1
KR100525930B1 KR1020050023553A KR20050023553A KR100525930B1 KR 100525930 B1 KR100525930 B1 KR 100525930B1 KR 1020050023553 A KR1020050023553 A KR 1020050023553A KR 20050023553 A KR20050023553 A KR 20050023553A KR 100525930 B1 KR100525930 B1 KR 100525930B1
Authority
KR
South Korea
Prior art keywords
wire
curing
film
concrete
curing film
Prior art date
Application number
KR1020050023553A
Other languages
Korean (ko)
Inventor
이택준
Original Assignee
(주)에이프러스 씨엠 건축사사무소
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by (주)에이프러스 씨엠 건축사사무소 filed Critical (주)에이프러스 씨엠 건축사사무소
Priority to KR1020050023553A priority Critical patent/KR100525930B1/en
Application granted granted Critical
Publication of KR100525930B1 publication Critical patent/KR100525930B1/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/24Safety or protective measures preventing damage to building parts or finishing work during construction
    • E04G21/246Safety or protective measures preventing damage to building parts or finishing work during construction specially adapted for curing concrete in situ, e.g. by covering it with protective sheets
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/24Safety or protective measures preventing damage to building parts or finishing work during construction
    • E04G21/242Safety or protective measures preventing damage to building parts or finishing work during construction for temporarily covering the whole worksite, e.g. building, trench
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/24Safety or protective measures preventing damage to building parts or finishing work during construction
    • E04G21/28Safety or protective measures preventing damage to building parts or finishing work during construction against unfavourable weather influence
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/24Safety or protective measures preventing damage to building parts or finishing work during construction
    • E04G21/30Safety or protective measures preventing damage to building parts or finishing work during construction against mechanical damage or dirt, e.g. guard covers of stairs

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

본 발명은 공동주택 콘크리트 타설 공사용 양생막에 관한 것으로서, 특히 겨울철에 콘크리트를 타설하고 그 콘크리트 슬랩을 덮는 양생막을 대형화로 제작하여 콘크리트 슬랩에 대한 양생이 순조롭게 진행되고, 양생 효율화를 도모할 수 있도록 하는 공동주택 콘크리트 타설 공사용 양생막 구조에 관한 것이다.The present invention relates to a curing film for concrete placing construction of apartment houses, in particular, by placing concrete in winter and curing the curing film covering the concrete slab in a large size to facilitate the curing of the concrete slab smoothly, and to improve the curing efficiency The present invention relates to a curing film structure for concrete pouring of apartment houses.

본 발명은, 공동주택 콘크리트 타설 공사용 양생막에 있어서, The present invention, in the curing film for concrete concreting construction of apartment house,

상기 양생막은 타워 크레인의 붐대를 따라 이동되는 활차에 연결된 도르래와 와이어를 연결시켜 콘크리트가 타설되는 콘크리트 슬랩의 상부에 설치되는 양생막을 설치 및 해체가 가능한 한편, 상기 도르래에는 승,하강이 별개로 작동되는 와이어가 결합되고, 상기 와이어에는 끝에 연결 고리가 형성되어 양생막에 설치된 다른 와이어가 결합되며, 상기 양생막은 보온막(300)의 폭 방향에 5개의 보강바 연결홀(320)이 형성되고, 그 보강바 연결홀(320)이 형성된 내측 3개에 각각 원형 고리(310)가 상부로 돌출되도록 형성되며, 그 보강바 연결홀(320)의 내측에 금속 또는 플라스틱 재질로 제작된 파이프형 보강바(330)가 삽입되고, 그 보온막(300)의 길이방향 양측에 각각 측면판(340)이 낚시줄 등으로 밖음질된 박음선(324)이 형성되며, 상기 양생막(390)의 보온막(300)은, 중앙 원형 고리(310)가 와이어(250')에 고정되고, 양측의 원형 고리(310)가 와이어(250)에 고정되어, 그 와이어(250)(250')가 각각 2개의 도르래(210)(210')에 연결되며, 상기 측면판(340)은, 하부가 내측으로 절곡된 형태로, 콘크리트 슬랩의 양 측면 거푸집에 밀착되어 지지되고, 상기 양생막(390)의 중앙 보강바(330)를 지지하는 받침 부재(400)는, 하부에 직사각형 형태로 받침판부(410)가 형성되고, 그 받침판부(410)의 상부에 수직봉부(420)가 입설되며, 그 수직봉부(420)의 상부에 라운딩되도록 안착부(430)가 형성되며, 상기 타워 크레인의 도르래와 연결된 와이어의 작동에 따라 양생막의 설치 및 해체가 가능한 것을 특징으로 하는 공동주택 콘크리트 타설 공사용 양생막 구조를 제공한다.The curing film is connected to the pulley connected to the pulley that is moved along the boom of the tower crane and the wire can be installed and dismantled curable film is installed on top of the concrete slab in which concrete is poured, while the pulley is operated separately from the pulley Is connected to the wire is connected to the wire is formed at the end of the other wire is connected to the other wire installed in the curing film, the curing film is formed of five reinforcing bar connecting holes 320 in the width direction of the insulating film 300, The circular ring 310 is formed to protrude upward from each of the three inner bars in which the reinforcing bar connecting holes 320 are formed, and the pipe-type reinforcing bar made of metal or plastic material inside the reinforcing bar connecting holes 320. 330 is inserted, and a seam-line 324 in which the side plates 340 are sounded by a fishing line or the like is formed at both sides in the longitudinal direction of the thermal insulation film 300, and the thermal insulation film of the curing film 390 is formed. 300), The central circular ring 310 is fixed to the wire 250 ', and the circular ring 310 at both sides is fixed to the wire 250, so that the wires 250 and 250' are each of two pulleys 210 ( 210 '), the side plate 340, the lower portion is bent inwardly, is supported in close contact with both side formwork of the concrete slab, the central reinforcing bar 330 of the curing film 390 The supporting member 400 to support the support plate portion 410 is formed in a rectangular shape at the bottom, the vertical rod portion 420 is placed on the upper portion of the support plate portion 410, the upper portion of the vertical rod portion 420 A seating portion 430 is formed to be rounded, and provides a cured membrane structure for consolidation construction of a multi-family house according to the operation of a wire connected to the pulley of the tower crane.

Description

공동주택 콘크리트 타설 공사용 양생막 구조{LAGGING MEMBER STRUCTURE FOR CONCRETE SLAB WORK OF APPARTMENT HOUSE}Curing membrane structure for concrete pouring in apartment house {LAGGING MEMBER STRUCTURE FOR CONCRETE SLAB WORK OF APPARTMENT HOUSE}

본 발명은 공동주택 콘크리트 타설 공사용 양생막에 관한 것으로서, 특히 겨울철에 콘크리트를 타설하고 그 콘크리트 슬랩을 덮는 양생막을 타워 크레인에 와이어로 연결시킬 수 있도록 대형화로 제작하여 콘크리트 슬랩에 대한 양생이 순조롭게 진행되고, 콘크리트의 동파를 방지하게 되므로 양생 효율화를 도모할 수 있도록 하는 공동주택 콘크리트 타설 공사용 양생막 구조에 관한 것이다.The present invention relates to a curing film for concrete pouring construction of apartments, and in particular, the curing of concrete slab proceeds smoothly by making it large in size so as to connect the curing film covering the concrete slab with a wire to the tower crane in winter. In order to prevent the freezing of concrete, it is related to the cured membrane structure for concrete concreting construction for the apartment house which can promote curing efficiency.

대부분 공동주택을 시공하는 경우, 콘크리트를 타설하여 벽체, 기둥, 보 및 콘크리트 슬랩을 시공하게 되며, 특히 겨울철에 공동주택을 시공하는 때는 콘크리트가 얼어버리지 않도록 양생막을 설치한다.In most apartment buildings, concrete, walls, columns, beams, and concrete slabs are installed. Especially, when building apartment houses in winter, curing films are installed to prevent the concrete from freezing.

상기 양생막은 대부분 비닐이 이용되고, 상기 비닐을 이용하여 콘크리트 슬랩을 덮고 내부에 불을 피워 콘크리트가 동파되지 않도록 양생을 실시하고 있다.Most of the curing film is vinyl, and the vinyl is used to cover the concrete slab and to ignite the fire to prevent the concrete from freezing.

그러나, 상기 공동주택이 고층으로 시공되는 경우, 고층에 양생막으로 비닐을 설치하게 되면, 바람에 의해 비닐을 고정시킨 부위가 파손되어 관리자가 관리를 소홀하게 되면 콘크리트가 동파되어 강도가 저하되는 등 많은 문제점이 발생된다.However, when the multi-family house is constructed at a high floor, when vinyl is installed as a curing film on the high floor, the area where the vinyl is fixed by the wind is broken, and when the manager neglects management, the concrete freezes and the strength is lowered. Many problems arise.

본 발명은 상술한 문제점을 감안하여, 본 발명은, 겨울철에 콘크리트를 타설하여 시공되는 콘크리트 슬랩을 덮는 양생막을 타워 크레인에 와이어로 연결시킬 수 있도록 대형화로 제작하여 콘크리트 슬랩에 대한 양생이 순조롭게 진행되고, 콘크리트의 동파를 방지하게 되므로 양생 효율화를 도모할 수 있도록 하는 공동주택 콘크리트 타설 공사용 양생막 구조를 제공함을 그 목적으로 한다.In view of the above-described problems, the present invention, the curing process for the concrete slab is proceeding smoothly by making the curable film covering the concrete slab to be installed in the winter season to connect the wire to the tower crane by wire The purpose of the present invention is to provide a cured membrane structure for concrete concreting for apartment houses that can prevent freezing of concrete, thereby improving curing efficiency.

본 발명은 상술한 목적 달성을 위해, 본 발명은, 타워 크레인에 연결되는 도르래에 와이어가 연결되고, 상기 와이어 하부의 연결 고리에 양생막에 결합된 다른 와이어가 연결되며, 상기 양생막은 보온막의 폭 방향에 다수개의 보강바가 삽입되고, 양측에 측면판이 설치되는 한편, 상기 도르래의 작동에 따라 와이어가 승,하강되어 양생막이 설치 및 해체가 되고, 상기 양생막의 중앙 보강바의 하부에 받침 부재가 설치되어 양생막이 지지되도록 설치되는 것을 특징으로 하는 양생막 구조를 제공한다.The present invention, in order to achieve the above object, the present invention, the wire is connected to the pulley connected to the tower crane, the other wire coupled to the curing film is connected to the connecting ring of the lower wire, the curing film is the width of the insulating film A plurality of reinforcing bars are inserted in the direction, and side plates are installed at both sides, while wires are lifted and lowered according to the operation of the pulley to install and dismantle the curing membrane, and a supporting member is installed at the lower part of the central reinforcing bar of the curing membrane. It provides a curing membrane structure characterized in that the curing membrane is installed to be supported.

이하, 첨부 도면을 참조하여 본 발명의 구성을 설명한다.EMBODIMENT OF THE INVENTION Hereinafter, the structure of this invention is demonstrated with reference to an accompanying drawing.

도 1은 본 발명의 콘크리트 타설 공사용 양생막의 측단면 상태도이고, 도 2는 본 발명의 콘크리트 타설 공사용 양생막을 나타내는 사시도이며, 도 3은 본 발명의 콘크리트 타설 공사용 양생막의 철거 상태를 나타내는 도면이다.1 is a side cross-sectional state diagram of the cured membrane for concrete pouring construction of the present invention, Figure 2 is a perspective view showing the cured membrane for concrete pouring construction of the present invention, Figure 3 is a view showing the demolition state of the cured membrane for concrete pouring construction of the present invention.

타워 크레인(200)에는 활차와 연결된 도르래(210)(210')에 와이어(230)(230')가 연결되고, 그 와이어(230)(230')의 끝에 연결된 연결 고리(240)가 양생막(390)에 설치된 다른 와이어(250)에 연결되며, 상기 양생막(390)은 받침 부재(400)에 의해 보강바(330)가 지지되도록 설치된다.The tower crane 200 has wires 230 and 230 'connected to the pulleys 210 and 210' connected to the pulley, and a connecting ring 240 connected to the ends of the wires 230 and 230 'is cured. It is connected to the other wire 250 installed in the 390, the curing film 390 is installed so that the reinforcing bar 330 is supported by the support member 400.

즉, 상기 타워 크레인(200)에는 도르래(210)(210')에 와이어(230)(230')가 연결되고, 그 와이어(230)(203')에는 끝에 연결 고리(240)가 일체로 연결되며, 상기 양생막(390)은 보온막(300)의 보강바 연결홀(320)의 내측에 보강바(330)가 삽입되어 고정되고, 그 보강바(330)가 삽입된 보온막(300)에 다수개의 연결 고리(310)가 폭 방향으로 형성되고, 그 보온막(300)의 양측에 측면판(340)이 낚시줄에 의해 고정되는 박음선(324)이 형성되며, 상기 양생막(390)은 보강바(330)가 삽입된 하부에 받침 부재(400)가 설치되어 지지되도록 설치된다.That is, the tower crane 200 is connected to the wires 230 and 230 'to the pulleys 210 and 210', and the connection ring 240 is integrally connected to the wires 230 and 203 'at the end. The curing film 390 is fixed to the reinforcing bar 330 is inserted into the inside of the reinforcing bar connecting hole 320 of the insulating film 300, the insulating film 300 is inserted into the reinforcing bar 330 A plurality of connection rings 310 are formed in the width direction, and a seam line 324 in which side plates 340 are fixed by fishing lines is formed on both sides of the insulating film 300, and the curing film 390 is formed. The support member 400 is installed at the lower portion where the reinforcing bar 330 is inserted and is installed to be supported.

상기 보온막(300)은, 플라스틱 또는 금속 등의 재질로 제작이 가능하며, 상기 보강바(330)는, 파이프형 부재로, 보강바 연결홀(320)의 내측에 삽입되어 고정된다.The thermal insulation film 300 may be made of a material such as plastic or metal, and the reinforcement bar 330 is a pipe-shaped member and is inserted into and fixed to the inside of the reinforcement bar connection hole 320.

상기 양생막(390)은 보온막(300)와 그 보온막(300)에 결합되는 부재를 포함한 구성으로, 보온막(300)의 폭 방향에 5개의 보강바 연결홀(320)이 형성되고, 그 보강바 연결홀(320)이 형성된 내측 3개에 각각 원형 고리(310)가 상부로 돌출되도록 형성되며, 그 보강바 연결홀(320)의 내측에 금속 또는 플라스틱 재질로 제작된 파이프형 보강바(330)가 삽입되고, 그 보온막(300)의 길이방향 양측에 각각 측면판(340)이 밖음질로 고정된다.The curing film 390 includes a thermal insulation film 300 and a member coupled to the thermal insulation film 300, and five reinforcing bar connection holes 320 are formed in the width direction of the thermal insulation film 300, The circular ring 310 is formed to protrude upward from each of the three inner bars in which the reinforcing bar connecting holes 320 are formed, and the pipe-type reinforcing bar made of metal or plastic material inside the reinforcing bar connecting holes 320. 330 is inserted, and the side plates 340 are fixed to the outside sound quality on both sides in the longitudinal direction of the thermal insulation film 300.

상기 양생막(390)을 구성하는 보온막(300)은, 중앙 원형 고리(310)가 와이어(250')에 고정되고, 양측의 원형 고리(310)가 와이어(250)에 고정되어, 그 와이어(250)(250')가 각각 2개의 도르래(210)(210')에 연결된다.In the thermal insulation film 300 constituting the curing film 390, a central circular ring 310 is fixed to the wire 250 ′, and both circular circular rings 310 are fixed to the wire 250. 250 and 250 'are each connected to two pulleys 210 and 210'.

즉, 상기 양생막(390)은, 보온막(300)의 중앙을 들어올릴 때 중앙부 와이어(250')와 연결된 도르래(210')를 잡아당기고, 보온막(300)의 양측을 들어올릴 때 양측 와이어(250)와 연결된 도르래(210)를 잡아당기면, 와이어(230)가 상부로 들어올려지게 된다.That is, the curing film 390 pulls the pulley 210 'connected to the central wire 250' when lifting the center of the insulating film 300, and both sides when lifting both sides of the insulating film 300. When pulling the pulley 210 connected to the wire 250, the wire 230 is lifted upward.

상기 양생막(390)의 측면판(340)은, 하부가 내측으로 절곡된 형태로, 콘크리트를 타설하여 시공되는 콘크리트 슬랩의 양 측면 거푸집에 밀착되어 지지된다.The side plate 340 of the curing film 390 is supported by being in close contact with both side formwork of the concrete slab to be constructed by pouring concrete in the form bent inward.

상기 받침 부재(400)는, 하부에 직사각형 형태로 받침판부(410)가 형성되고, 그 받침판부(410)의 상부에 수직봉부(420)가 수직하게 입설되며, 그 수직봉부(420)의 상부에 라운딩되도록 안착부(430)가 형성된다.The supporting member 400 has a supporting plate portion 410 formed in a rectangular shape at a lower portion thereof, and a vertical rod portion 420 is vertically inserted into an upper portion of the supporting plate portion 410, and an upper portion of the vertical rod portion 420. The seating portion 430 is formed to be rounded.

즉, 상기 받침 부재(400)는, 안착부(430)에 양생막(390)의 내측 3개의 보강바(330)중 중앙의 보강바가 안착되어 지지된다.That is, the supporting member 400 is supported by the center of the reinforcing bar is seated on the mounting portion 430 of the three inner reinforcement bar 330 of the curing film 390.

상술한 설명에서 알 수 있듯이, 상기 타워 크레인(200)에는 활차 시스템과 연결되어 각각 작동되도록 설치된 도르래(210)(210')에 와이어(230)(230')가 연결되어 하부 양생막(390)을 승,하강시킬 수 있게 되고, 상기 양생막(390)은 받침 부재(400)로 지지하여 콘크리트가 타설된 외부에 설치될 수 있게 된다.As can be seen in the above description, the tower crane 200 is connected to the pulley system and the wires 230 and 230 'are connected to the pulleys 210 and 210' installed to operate, respectively, and the lower curing film 390. It can be raised and lowered, the curing film 390 is supported by the support member 400 can be installed outside the concrete is poured.

이러한 상기 양생막(390)은 공동주택(A)을 시공하는 경우 넓은 공간에 설치될 수 있게 대형화로 설치가 가능한 한편, 상기 타워 크레인(200)에 연결되어 양생막(390)이 승,하강되는 구조를 가지는 바, 고층의 공동주택을 시공하는 경우 타워 크레인(200)과 연결시켜 손쉽게 사용이 가능하다 할 것이다.The curing film 390 can be installed in a large size to be installed in a large space when constructing a multi-family housing (A), while the curing film 390 is raised and lowered by being connected to the tower crane 200. Bar having a structure, when constructing a high-rise apartment house will be able to be easily used by connecting to the tower crane 200.

또한, 상기 양생막(390)은 타워 크레인(200)의 도르래(210)(210')와 연결된 와이어(230)(230')와 다른 와이어(250)(250')에 의해 승강 및 하강이 되어 해체 및 설치가 가능하게 되는 바, 대형화된 양생막(390)을 이용하여 공동주택(A)에 대한 양생 효율을 향상시킬 수 있게 된다.In addition, the curing film 390 is raised and lowered by the wires 230 and 230 'and the other wires 250 and 250' connected to the pulleys 210 and 210 'of the tower crane 200. Disassembly and installation is possible, it is possible to improve the curing efficiency for the multi-family housing (A) by using the enlarged curing film 390.

특히, 상기 양생막(390)에는 전,후방에 오픈된 측으로 비닐 또는 포대를 설치하여 사용할 수 있음은 당연하다 할 것이다.In particular, the curing film 390 may be used to install a vinyl or bag to the front and rear open side will be natural.

상술한 본 발명의 구성에 따른 효과를 설명한다.The effect by the structure of this invention mentioned above is demonstrated.

본 발명은, 겨울철에 콘크리트를 타설하여 시공되는 콘크리트 슬랩을 덮는 양생막을 타워 크레인에 와이어로 연결시킬 수 있도록 대형화로 제작하여 콘크리트 슬랩에 대한 양생이 순조롭게 진행되고, 콘크리트의 동파를 방지하게 되므로 양생 효율화를 도모할 수 있는 효과를 갖는다.The present invention, the curing film for the concrete slab proceeds smoothly by making the curable film covering the concrete slab to be installed by pouring concrete in the winter in a large size to connect the wire to the tower crane, and prevents the freezing of the concrete efficiency It has an effect that can be planned.

도 1은 본 발명의 콘크리트 타설 공사용 양생막의 측단면 상태도.1 is a side cross-sectional view of the curing film for concrete pouring construction of the present invention.

도 2는 본 발명의 콘크리트 타설 공사용 양생막을 나타내는 사시도.Figure 2 is a perspective view of the curing film for concrete pouring construction of the present invention.

도 3은 본 발명의 콘크리트 타설 공사용 양생막의 철거 상태를 나타내는 도면.Figure 3 is a view showing the demolition state of the curing film for concrete pouring construction of the present invention.

< 도면의 주요 부분에 대한 부호의 설명 ><Description of Symbols for Main Parts of Drawings>

200: 타워 크레인 210: 도르래200: tower crane 210: pulley

230,250: 와이어 240,310: 연결 고리230,250: Wire 240,310: Hook

300: 보온막 320: 원형홀300: heat insulating film 320: circular hole

330: 보강 바 340: 측면판330: reinforcing bar 340: side plate

400: 받침 부재 410: 받침판부400: support member 410: support plate

420: 수직봉부 430: 안착부420: vertical rod 430: seating portion

Claims (1)

공동주택 콘크리트 타설 공사용 양생막에 있어서, In the curing film for concrete pouring construction of apartment houses, 상기 양생막은 타워 크레인의 붐대를 따라 이동되는 활차에 연결된 도르래와 와이어를 연결시켜 콘크리트가 타설되는 콘크리트 슬랩의 상부에 설치되는 양생막을 설치 및 해체가 가능한 한편, The curing film is connected to the pulley and the wire connected to the pulley that is moved along the boom of the tower crane can install and dismantle the curing film is installed on top of the concrete slab on which concrete is poured, 상기 도르래에는 승,하강이 별개로 작동되는 와이어가 결합되고, 상기 와이어에는 끝에 연결 고리가 형성되어 양생막에 설치된 다른 와이어가 결합되며, The pulley is coupled to the wire that is operated separately, the rising and falling, the wire is connected to the other wire is formed on the curing film is formed at the end of the connecting ring, 상기 양생막은 보온막(300)의 폭 방향에 5개의 보강바 연결홀(320)이 형성되고, 그 보강바 연결홀(320)이 형성된 내측 3개에 각각 원형 고리(310)가 상부로 돌출되도록 형성되며, 그 보강바 연결홀(320)의 내측에 금속 또는 플라스틱 재질로 제작된 파이프형 보강바(330)가 삽입되고, 그 보온막(300)의 길이방향 양측에 각각 측면판(340)이 낚시줄 등으로 밖음질된 박음선(324)이 형성되며, The curing film has five reinforcing bar connecting holes 320 are formed in the width direction of the thermal insulation film 300, so that the circular ring 310 protrudes upward in each of the three inner side in which the reinforcing bar connecting holes 320 are formed. The pipe-shaped reinforcement bar 330 made of a metal or plastic material is inserted into the reinforcing bar connecting hole 320, and the side plates 340 are respectively provided at both sides in the longitudinal direction of the thermal insulation film 300. Out of seam 324 is formed by a fishing line, etc., 상기 양생막(390)의 보온막(300)은, 중앙 원형 고리(310)가 와이어(250')에 고정되고, 양측의 원형 고리(310)가 와이어(250)에 고정되어, 그 와이어(250)(250')가 각각 2개의 도르래(210)(210')에 연결되며, The heat insulating film 300 of the curing film 390, the central circular ring 310 is fixed to the wire 250 ', both circular rings 310 are fixed to the wire 250, the wire 250 ) 250 'are each connected to two pulleys 210 and 210', 상기 측면판(340)은, 하부가 내측으로 절곡된 형태로, 콘크리트 슬랩의 양 측면 거푸집에 밀착되어 지지되고, The side plate 340, the lower portion is bent inwardly, is supported in close contact with both side formwork of the concrete slab, 상기 양생막(390)의 중앙 보강바(330)를 지지하는 받침 부재(400)는, 하부에 직사각형 형태로 받침판부(410)가 형성되고, 그 받침판부(410)의 상부에 수직봉부(420)가 입설되며, 그 수직봉부(420)의 상부에 라운딩되도록 안착부(430)가 형성되며, The supporting member 400 supporting the central reinforcing bar 330 of the curing film 390 has a supporting plate portion 410 formed in a rectangular shape at a lower portion thereof, and a vertical rod portion 420 on the supporting plate portion 410. ) Is placed, and the seating portion 430 is formed to be rounded on top of the vertical rod 420, 상기 타워 크레인의 도르래와 연결된 와이어의 작동에 따라 양생막의 설치 및 해체가 가능한 것을 특징으로 하는 공동주택 콘크리트 타설 공사용 양생막 구조.Curing membrane construction for concrete housing construction, it characterized in that the installation and disassembly of the curing film according to the operation of the wire connected to the pulley of the tower crane.
KR1020050023553A 2005-03-22 2005-03-22 Lagging member structure for concrete slab work of appartment house KR100525930B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020050023553A KR100525930B1 (en) 2005-03-22 2005-03-22 Lagging member structure for concrete slab work of appartment house

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020050023553A KR100525930B1 (en) 2005-03-22 2005-03-22 Lagging member structure for concrete slab work of appartment house

Publications (1)

Publication Number Publication Date
KR100525930B1 true KR100525930B1 (en) 2005-11-03

Family

ID=37305879

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020050023553A KR100525930B1 (en) 2005-03-22 2005-03-22 Lagging member structure for concrete slab work of appartment house

Country Status (1)

Country Link
KR (1) KR100525930B1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100750589B1 (en) 2006-08-14 2007-08-21 동방엔지니어링 주식회사 Structure for steam curing of precast member
KR102256813B1 (en) * 2020-12-15 2021-05-28 경북대학교 산학협력단 Construction equipment for structures with curvature

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100750589B1 (en) 2006-08-14 2007-08-21 동방엔지니어링 주식회사 Structure for steam curing of precast member
KR102256813B1 (en) * 2020-12-15 2021-05-28 경북대학교 산학협력단 Construction equipment for structures with curvature

Similar Documents

Publication Publication Date Title
US6536168B1 (en) Apparatus and methods for moldable and customizable structures
KR101776129B1 (en) Built-up type precast double structure for slab and wall and double precast wall construction method using the same
US4144685A (en) Building construction
KR100521647B1 (en) Panel assembly for construction and wall structure thereof
KR100525930B1 (en) Lagging member structure for concrete slab work of appartment house
CN206956979U (en) A kind of Linear shear wall with fore-set
CN109629732B (en) Cast-in-place concrete hidden beam floor with separated pipelines and construction method
CN208039579U (en) Load module formula concrete folding plate
JP5508566B2 (en) Construction method of concrete container house
CN108560797A (en) Load module formula concrete folding plate
CN210529916U (en) Low-rise assembled steel concrete structure building
CN203113514U (en) Combined split-mounting-type house device
JP4130810B2 (en) Construction method of water structure
KR20090066562A (en) Vertically-prestressed precast retaining wall and construction method of the same
CN104988941B (en) Large bearing platform type foundation hanging formwork and construction method thereof
CN219081001U (en) Turnover supporting frame for pit formwork
CN221567578U (en) Solid pouring structure of heavy and light steel
CN218116846U (en) Heat-insulating wall
CN213926679U (en) Full prefabricated assembled balcony of building
CN217711263U (en) Concrete wall
CN211948837U (en) Prefabricated balcony of assembled and balcony baffle
CN1932188B (en) Permanent form constructional member
CN2469089Y (en) Two direction, light steel reinforced concrete type condensed ribbed floor
CN100449072C (en) Combined reinforced concrete hollow floorslab
CN116254953A (en) Prefabricated sound insulation floor structure

Legal Events

Date Code Title Description
A201 Request for examination
A302 Request for accelerated examination
N231 Notification of change of applicant
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20111025

Year of fee payment: 7

LAPS Lapse due to unpaid annual fee