KR100523322B1 - Freely cremation furnace - Google Patents

Freely cremation furnace Download PDF

Info

Publication number
KR100523322B1
KR100523322B1 KR10-2003-0033401A KR20030033401A KR100523322B1 KR 100523322 B1 KR100523322 B1 KR 100523322B1 KR 20030033401 A KR20030033401 A KR 20030033401A KR 100523322 B1 KR100523322 B1 KR 100523322B1
Authority
KR
South Korea
Prior art keywords
chamber
main combustion
combustion chamber
ashes
reburn
Prior art date
Application number
KR10-2003-0033401A
Other languages
Korean (ko)
Other versions
KR20040101699A (en
Inventor
원영상
Original Assignee
합자회사 세화산업사
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 합자회사 세화산업사 filed Critical 합자회사 세화산업사
Priority to KR10-2003-0033401A priority Critical patent/KR100523322B1/en
Publication of KR20040101699A publication Critical patent/KR20040101699A/en
Application granted granted Critical
Publication of KR100523322B1 publication Critical patent/KR100523322B1/en

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F23COMBUSTION APPARATUS; COMBUSTION PROCESSES
    • F23GCREMATION FURNACES; CONSUMING WASTE PRODUCTS BY COMBUSTION
    • F23G1/00Furnaces for cremation of human or animal carcasses
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F23COMBUSTION APPARATUS; COMBUSTION PROCESSES
    • F23GCREMATION FURNACES; CONSUMING WASTE PRODUCTS BY COMBUSTION
    • F23G5/00Incineration of waste; Incinerator constructions; Details, accessories or control therefor
    • F23G5/008Incineration of waste; Incinerator constructions; Details, accessories or control therefor adapted for burning two or more kinds, e.g. liquid and solid, of waste being fed through separate inlets
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F23COMBUSTION APPARATUS; COMBUSTION PROCESSES
    • F23GCREMATION FURNACES; CONSUMING WASTE PRODUCTS BY COMBUSTION
    • F23G5/00Incineration of waste; Incinerator constructions; Details, accessories or control therefor
    • F23G5/38Multi-hearth arrangements
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F23COMBUSTION APPARATUS; COMBUSTION PROCESSES
    • F23GCREMATION FURNACES; CONSUMING WASTE PRODUCTS BY COMBUSTION
    • F23G5/00Incineration of waste; Incinerator constructions; Details, accessories or control therefor
    • F23G5/44Details; Accessories
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F23COMBUSTION APPARATUS; COMBUSTION PROCESSES
    • F23GCREMATION FURNACES; CONSUMING WASTE PRODUCTS BY COMBUSTION
    • F23G2900/00Special features of, or arrangements for incinerators
    • F23G2900/70Incinerating particular products or waste
    • F23G2900/7009Incinerating human or animal corpses or remains

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Gasification And Melting Of Waste (AREA)
  • Non-Flushing Toilets (AREA)
  • Incineration Of Waste (AREA)

Abstract

화장로(1)를 형성하는 주연소실(2)과 직립일체형으로 축조되어 형성된 중간연도의 상부에, 재연소실(4)을 직립분리결합형으로 축조하며, 주연소실(2)의 전방양측 주벽으로 배출구(22)(22a)를 형성하여 중간연도(3)와 연통하는 배출통로(23)(23a)가 형성되도록 착탈실 막이벽(24)(24a)으로 조립설치하였으며, 주연소실(2)과 일련의 구성으로 설치되는 냉각전실(15)의 일측주벽으로 배기통(27)과 연통되는 세로장방형 흡배기구(26)를 형성하여 결합 구성한 측방향배기형 냉각전실을 갖는 분리 결합형 화장로에 관한 것으로, 유골수거 작업시에 작업자가 뜨거운 열기나 분진등으로부터 보호되어 유골수거작업을 안전하고 용이하게 할 수 있도록 하며 장기간 사용시에 고열에 의하여 화장로의 내부가 훼손될 경우에는 착탈식 막이벽(24)(24a)과 재연소실(4)의 탈이시켜 내부벽의 수리교체 작업을 용이하게 함으로써 유골의 수거 작업을 안전하고 용이하게 하며, 보수 비용의 절감에 따른 화장로의 설치비용을 절감하여 경제성을 향상할 수 있도록 한 것임.The reburn chamber 4 is constructed in an upright separate coupling type on the upper part of the middle flue formed by being built upright with the main combustion chamber 2 forming the cremation furnace 1, and the front walls of the main combustion chamber 2 in front and rear sides. The outlet 22 and 22a were formed to be assembled and installed with the detachable compartment closing wall 24 and 24a to form the discharge passage 23 and 23a communicating with the intermediate year 3, and the main combustion chamber 2 and The present invention relates to a separable combined toilet having a lateral exhaust-type cooling chamber formed by forming a vertical rectangular intake and exhaust port 26 communicating with an exhaust cylinder 27 as one circumferential wall of the cooling chamber 15 installed in a series of configurations. When the ashes are collected, the worker is protected from hot heat or dust, so that the ashes can be safely and easily collected. When the interior of the crematory is damaged by high heat during long-term use, the removable membrane wall 24 (24a) ) And reburn chamber (4) By facilitating the repair and replacement of the wall safely and facilitate the task of collecting the ashes, it will have to reduce the installed cost of a cremation in accordance with the reduction of maintenance costs to improve the economy.

Description

측방향배기형 냉각전실을 갖는 분리결합형 화장로{FREELY CREMATION FURNACE}Separating combined toilet with lateral exhaust type cooling chamber {FREELY CREMATION FURNACE}

본 발명은 주연소실의 상부로 중간연도와 재연소실 및 연도를 서로 연통되도록 설치하여 축조시킨 화장로의 전방으로 화장문이 설치되고, 후방으로는 각 연소 실용버너와 점검투시구를 설치하여 결합된 통상의 구성에 있어서, 상기 주연소실과 직립일체형으로 축조형성된 중간연도의 상부에 재연소실을 직립분리형으로 형성하며, 상기 주연소실의 전방 양측 주벽으로 배출구를 형성하여 중간연도와 연통되는 배출통로가 형성되도록 착탈식 막이벽으로 조립 설치한 구성과, 화장로의 전방으로 설치되는 냉각전실의 일측 주벽의 중간 높이에 세로 장방형 흡배출구를 형성하여 배기통과 연통하여 결합시켜 구성한 측방향 배기형 냉각전실을 갖는 분리결합형 화장로에 관한 것으로, 장기간 사용시에 고열에 의하여 화장로 내부가 훼손되었을 경우에는 착탈식 막이벽이나 재연소실을 탈이시켜 보수작업을 용이하게 할 수 도록 하며, 버너의 화열이 시체관의 후방과 전방 둘레부를 감싸돌면서 시체관의 전체부를 고르고 확실하게 연소시킬 수 있도록 하며, 또한, 통상의 로내대차의 구동에 의하여 주연소실로부터 반출되어 실려 나온 화장이 완료된 유골의 수거작업을 용이하게 함으로서 일련의 화장작업을 신속하고 확실하게 완료하여 경제성을 향상할 수 있도록 함과 환경공해를 방지하여 주변의 분위기를 고취시킬 수 있도록 제안된 것이다.The present invention is installed in the upper part of the main combustion chamber to the middle flue, reburn chamber and the flue to communicate with each other is installed in the front of the crematorium is built, and in the rear is combined by installing each combustion utility burner and inspection sight hole In a typical configuration, the reburn chamber is formed in an upright separation type on the upper part of the intermediate flue which is formed in an upright unitary form with the main combustion chamber, and an outlet passage is formed in both front walls of the main combustion chamber in front of the main combustion chamber to form a discharge passage communicating with the intermediate flue. Separation combination with a side exhaust type cooling chamber constructed by assembling and detaching a wall as possible, and forming a vertical rectangular inlet and outlet at the middle height of one side wall of the cooling chamber installed in front of the toilet to communicate with the exhaust pipe. It relates to a mold toilet, and wears when the interior of the toilet is damaged by high heat during long-term use. Desorption of the barrier wall or reburn chamber to facilitate maintenance work, and the burner's heat surrounds the rear and front circumferences of the carcass tube so that the entire part of the carcass tube can be evenly and reliably burned. It facilitates the collection work of the ashes that have been taken out from the main combustion chamber by the operation of a conventional furnace truck, so that a series of make-up works can be completed quickly and surely to improve economic efficiency and prevent environmental pollution. It is suggested to inspire the surrounding atmosphere.

종래의 화장로는 도4 내지 도5에 도시한 바와 같이 주연소실(2)과 중간연도(3)에 연통하는 배출구(22)와 배출통로(23)를 주연소실의 전방 수직상부로 관통시킨 구조이며, 중간연도(3)와 연통되는 재연소실(4)은 중간연도(3)의 상부에 이중벽을 축조하여 "ㄷ"자형이 되도록 고정설치하였으므로 전체적으로 불안정하여 사용시에 중간연도(3)와 재연소실(4)을 연결하는 축조부(J)가 고열에 쉽게 훼손되는 불안전한 결점이 있으며, 화장시에는 주연소버너(7)의 화열이 주연소실(2)의 내부를 수평으로 진행하면서 수직상승게 됨으로 주연소실(2)의 로내대차(20)에 탑재된 시체관(21)의 전방 하부의 양측부에 화열의 사각지대(K)가 발생하게 되어 시체관(21)의 후방부와 몸체부의 연소상태는 양호하지만 시체관(21)의 전방 하부의 양측부의 연소 상태가 불량하게 되어 화장시간 길어짐에 따라 연료비의 증가 및 화장로가 쉽게 노후화되는 결점이 있었으며, 보수작업이 복잡하여 화장로의 전체를 교체하여야 되므로 비경제적인 결점이 있었으며, 또한, 화장로와는 별도로 설치되어 사용되고 있는 냉각전실(15)의 배기통이 냉각전실의 중앙 상부에 설치된 구조이므로 시체관(21)의 화장이 완료되어 로내대차(20)의 구동에 의하여 반출되어 실려 나온 유골의 수거 작업시에 발생되는 고열이나 미세유골분등의 분진이 작업자의 위치와 가까운 중앙부로 모이게 되어 작업자의 안전에 위험한 결점이 있었다.4 and 5, the conventional cosmetic furnace has a structure in which the outlet 22 and the discharge passage 23 communicating with the main combustion chamber 2 and the intermediate flue 3 pass through the front vertical portion of the main combustion chamber. The reburn chamber (4) communicating with the middle flue (3) has a double wall on the upper part of the middle flue (3). (4) There is an unstable defect that the construction part (J) connecting (4) is easily damaged by high heat, and during cremation, the heat of the main combustion burner (7) proceeds vertically while the interior of the main combustion chamber (2) moves horizontally. Therefore, the blind spots K are generated at both sides of the front lower portion of the carcass tube 21 mounted in the furnace trolley 20 of the main combustion chamber 2 to burn the rear part and the body part of the carcass tube 21. The condition is good, but the combustion state of both sides of the front lower part of the carcass tube 21 becomes poor, As the length became longer, there was a drawback of increasing fuel cost and the aging of the toilet easily, and it was an uneconomical defect because the whole of the toilet had to be replaced due to the complicated repair work. Since the exhaust pipe of (15) is installed in the upper center of the cooling chamber, the cremation of the carcass tube 21 is completed and the high temperature or fine ash generated during the collection work of the ashes carried out by the operation of the furnace truck 20 is carried out. Dust, such as dust, collects in the central area close to the worker's location, which is a dangerous flaw for the worker's safety.

삭제delete

삭제delete

본 발명은 이와 같은 종래의 결점을 해결하기 위하여 제안된 것으로 화장로를 형성하는 주연소실과 직립일체형으로 축조형성된 중간연도의 상부에 재연소실을 직립분리형으로 형성하며, 주연소실의 내측 전방 양측주벽으로 형성되는 배출구로부터 중간연도와 연동되는 배출통로를 착탈식 막이벽으로 조립설치하여 결합시킨 구성을 특징으로 하여 연소시에 버너의 화열이 주연소실의 전방 양측 하방을 돌아 상기 양측 배출구멍으로 배출되어 화열의 사각지대가 없이 시체관의 전체를 고르고 신속하게 연소시켜 연소효율 및 열효율을 향상시키도록 하며, 착탈식 막이벽을 탈이하여 보수작업을 용이하게 하므로써, 보수작업에 따른 보수비용을 절감할 수 있으며, 또한, 화장로와 일체형으로 설치한 냉각전실의 일측주벽의 중앙부로 세로 장방형 흡배기구를 설치하여 냉각전실의 뜨거운 열기 또는 유분이나 분진 등의 위험으로부터 안전을 보호받으면서 유골의 수거작업을 용이하게 할 수 있도록 함으로서 화장시간 및 유골의 수거작업을 단축하여 경제성을 향상시킬 수 있도록 함에 목적이 있다.The present invention has been proposed in order to solve the above-mentioned shortcomings, and the recombustion chamber is formed in an upright separation type on the upper part of the middle flue formed in an upright integral form with the main combustion chamber forming the crematory furnace, and the inner front both side walls of the main combustion chamber. It is characterized in that the discharge passage which is interlocked with the intermediate flue from the discharge outlet formed is assembled and assembled by a detachable membrane wall, so that the combustion heat of the burner is discharged to both discharge holes at both sides of the front of the main combustion chamber at the time of combustion. Without dead zones, the whole body can be evenly and quickly burned to improve combustion efficiency and thermal efficiency, and by eliminating the detachable membrane wall, it is easy to carry out repair work. In addition, the vertical rectangular intake and exhaust in the center of the circumferential wall of one side of the cooling chamber installed integrally with the toilet The purpose is to improve the economics by shortening the cremation time and the collection work of the ashes by facilitating the collection work of the ashes while protecting the safety from the risk of hot heat or the danger of oil or dust. have.

삭제delete

본 발명은 주연소실(2)의 상부로 직립 일체형으로 축조된 중간연도(3)와 중앙부에 화염유도구멍(25a) 및 상,하지그재그형 배기통로(25)를 형성하는 수개의 축열벽(26)을 축조 설치한 재연소실(4) 및 연도(5)를 서로 연통되도록 설치하여 축조시킨 화장로(1)의 전방으로 화장문(6)이 설치되고, 상기 화장로(1)의 후방으로는 주연소버너(7)와 재연소버너(8) 및 각 점점구(2a)(3a)(4a)가 설치되었으며, 상기 주연소실(2)의 내부에는 후방으로 종동체인기어(9)를 축착한 다수의 내부로울러(10)를 수평으로 배열 설치하여 감속기모우터(11)에 축착한 원동체인기어(12)와 체인(13)으로 걸어물림시켜 구동하는 내부로울러장치(14)가 결합 설치된 화장로(1) 및 이와는 별도의 냉각전실(15)의 구조로서 좌,우로 회전문(16)과 미닫이문(17)이 설치되고 전방으로 종동체인기어(9a)를 축착한 다수의 외부로울러(18)를 수평으로 배열 설치하여 감속기모우터(11a)에 축착한 원동체인기어(12a)와 체인(13a)으로 걸어물림시켜 구동되는 로내대차수평이송장치(19)가 결합설치되어 시체관(21)을 탑재한 로내대차(20)를 주연소실(2)의 내외부로 출입이송시키면서 시체관(21)을 화장하고 유골을 수거하는 통상의 구성에 있어서,According to the present invention, several heat storage walls (26) forming a flame-inducing hole (25a) and an upper and lower zigzag type exhaust passage (25) are formed in the middle of the main combustion chamber (2), the middle flue (3), which is built upright, and in the center. ), And the toilet door 6 is installed in front of the crematorium 1, which is installed by making the reburning chamber 4 and the flue 5 communicate with each other. The main combustion burner (7), the reburn burner (8), and each gradually-opening sphere (2a) (3a) (4a) were installed, and the driven chain gear (9) was condensed in the rear of the main combustion chamber (2). A cremation furnace in which a plurality of internal rollers 10 are arranged in a horizontal manner and are coupled to a drive chain gear 12 fixed to the reduction gear motor 11 and an internal roller device 14 driven by being engaged by a chain 13. (1) and the structure of the separate cooling chamber 15, the left and right revolving door 16 and the sliding door 17 is installed and the driven chain gear 9a is condensed forward. A plurality of external rollers 18 are arranged in a horizontal manner so that the inner chain horizontal conveying device 19 driven by being engaged by the chain chain gear 12a fixed to the reduction gear motor 11a and the chain 13a is installed. In the conventional configuration in which the carcass tube 21 is cremated and the ashes are collected while the inner and outer trolleys 20 equipped with the carcass tube 21 are moved in and out of the main combustion chamber 2,

삭제delete

상기 주연소실(2)과 직립일체형으로 축조된 통상의 중간연도(3)의 상부에 통상의 내화벽돌(31)로 축조된 둘레부에 시리카보드(34)를 층접하여 착탈이 가능한 결착부(1a)의 구조로 결합시킨 재연소실(4)을 착탈이 가능하도록 직립 분리형으로 조립 설치한 구성과;상기 주연소실(2)의 전방 양측 주벽으로 배출구(22)(22a)를 형성하였으며, 상기 배출구(22)(22a)로부터 중간연도(3)와 연통하는 배출통로(23)(23a)가 형성되도록 세라믹화이버(33)와 시리카보드(34)를 내,외부로 층접하여 착탈이 가능한 결착부(1a)의 구조로 결합시킨 착탈식 막이벽(24)(24a)으로 착탈이 가능하도록 조립설치한 구성과;냉각전실(15)은 냉각전실(15)을 형성하는 일측 주벽의 중간 높이에 세로장방형흡배기구(27)를 형성하여 배기통(28)과 연통시켜 결합시킨 구성을 특징으로 한다.The binding part 1a which can be attached and detached by attaching the silica board 34 to the circumference of the upper part of the normal middle flue 3 constructed in the unitary type with the main combustion chamber 2 in the circumference of the normal firebrick 31. And a structure in which the reburn chamber (4) coupled in a structure of the assembly is assembled and installed in an upright detachable type so as to be detachable; and the outlets (22) and (22a) are formed on both front walls of the main combustion chamber (2), and the outlet ( 22a (22a), the binder (1a) that can be attached and detached by layering the ceramic fiber 33 and the silica board 34 in and out so that the discharge passage 23 (23a) communicating with the intermediate year (3) is formed (2) assembled to be detachable to the detachable membrane wall (24, 24a) coupled in a structure of; and the cooling chamber 15 is a vertical rectangular intake and exhaust at the middle height of one side wall forming the cooling chamber 15 (27) is formed in communication with the exhaust cylinder (28).

도면중 29는 화장로(1)의 중간연도(3)와 재연소실(4)의 주벽을 축조하는 " "형 이형내화벽돌, 30은 주연소실(2)이 주벽에 축조되는 " "형 이형내화벽돌, 32는 단열벽돌, 35는 캐스타블인 것으로, 화장로(1)를 축조하는 각 부의 구조물을 표시하는 것이며, 36은 냉각전실(15)에 설치한 유골수거 작업자의 디딤발판, J는 종래의 중간연도(3)와 재연소실(4)을 연결하는 축조부, K는 화열의 사각지대를 표시한 것이다.In the figure, 29 shows the construction of the middle wall 3 of the crematory 1 and the circumferential wall of the reburn chamber 4. "Type release refractory brick, 30 is the main combustion chamber (2) is built on the main wall" "Type release refractory brick, 32 is a heat insulation brick, 35 is a castable, it shows the structure of each part which constructs the crematory (1), 36 is the stepping stone of the ashes collection worker installed in the cooling chamber 15. Scaffolding, J is the construction unit connecting the conventional intermediate year (3) and the reburn chamber (4), K is the blind spot of the heat.

이와 같이 구성된 본 발명은 화장로(1)의 내부에 설치된 내부로울러장치(14)와 냉각전실(15)의 내부에 설치된 로내대차 수평이송장치(19)를 수평으로 나란하게 일련으로 설치하여 동시에 구동되도록 결합시킨 구성으로서 영구차에 실려온 시신이 입관된 시체관(21)을 전동주행대차(도시생략)에 탑재한 상태로 냉각전실(15)로 이동 진입시켜 로내대차수평이송장치(19)인 로내대차(20)의 상부로 이동 탑재시킨 다음 콘트롤박스(도시생략)의 스위치를 눌러줌으로서 화장문(6)이 열리면서 화장로(1)의 내부에 결합되어 설치된 내부로울러장치(14)와 감속기모우터(11), 원동체인기어(12), 체인(13), 내부로울러(10), 내부로울러장치(14), 로내대차수평이송장치(19) 및 감속기모우터(11a)가 상호 연관되어 작동하면서 시체관(21)이 탑재된 로내대차(20)가 주연소실(2)의 적정위치로 이송되어 정지되면, 주연소실(2)의 전방에 설치된 화장문(6)이 닫히게 됨에 따라서 주연소실(2)과 재연소실(4)에 설치된 주연소버너(7)와 재연소버너(8)가 가동되어 발화되는 화열에 의하여 시체관(21)을 연소시키면서 생성되는 화염은 주연소실(2)의 전방 양측주벽으로 뚫어 형성한 배출구(22)(22a)를 통하여 상기 배출구(22)(22a)와 연통되어 설치된 배출통로(23)(23a)에 안내되어 중간연도(3)를 따라 배출되게 되는데, 이때 상기 주연소실(2) 내부의 화열은 시체관(21)의 후방으로부터 연소시킴에 따라 화열의 흐름이 주연소실(2)의 전방 양측으로 형성된 배출구(22)(22a)를 따랄 좌,우로 분산되면서 시체관(21)의 후방을 감싸돌면서 연소시키게 되므로 화열의 사각지대(K)가 발생되는 일이 없이 시체관(21)을 신속하게 완전연소시키게 되는 것이다.According to the present invention configured as described above, the inner roller device 14 installed in the interior of the cremator 1 and the inside of the furnace horizontal conveying device 19 installed in the interior of the cooling chamber 15 are installed in series in parallel and in parallel to be driven simultaneously. Incorporating the body pipe 21, the body is loaded into the hearse, mounted on an electric driving truck (not shown), and moved into the cooling chamber 15 in a state in which the body loaded on the permanent vehicle is combined, so that the internal vehicle horizontal transfer device 19 is an internal bogie truck. The internal roller device 14 and the reduction gear motor installed by being coupled to the inside of the toilet 1 by opening the toilet door 6 by pressing the switch of the control box (not shown) after moving to the upper part of the mounting apparatus 20. (11), the drive chain gear 12, the chain 13, the inner roller 10, the inner roller device 14, the inner bogie horizontal transfer device 19 and the reducer motor 11a are operated in conjunction with each other The locomotive trolley 20 on which the body pipe 21 is mounted is an appropriate position of the main combustion chamber 2. The main combustion burner (7) and the reburn burner (8) installed in the main combustion chamber (2) and the reburn chamber (4) are closed as the toilet door (6) installed in front of the main combustion chamber (2) is closed. The flame generated while burning the body pipe 21 by the fire that is activated and ignited is discharged through the outlets 22 and 22a formed through the front circumferential walls of the main combustion chamber 2 and the outlets 22 and 22a. It is guided to the discharge passage (23) (23a) installed in communication with the discharge is to be discharged along the middle flue (3), wherein the heat of combustion inside the main combustion chamber (2) is burned from the rear of the body pipe 21 Since the flow of combustion is distributed to the left and right to follow the outlets 22 and 22a formed on both front sides of the main combustion chamber 2, and burns while enclosing the rear of the body pipe 21, the blind spot K of the fire is generated. The work body 21 will be completely burned quickly without work.

삭제delete

이와 같이 시체관(21)을 연소시키는 주연소버너(7)의 화열은 시신의 체액등을 연소시키면서 발생되는 다소 미연소상태의 매연이나 악취등으로 혼합되는 화염으로서 중간연도(3)를 따라 재연소실(4)로 유입되어 재연소실(4)의 화염유도구멍(25a)과 상하로 지그재그형 배기통로(25)를 형성하는 수개의 축열벽(26)을 통과하면서 재연소버너(8)의 화열에 의하여 연소효율을 높이면서 연소를 촉진하게되므로 미연소 상태의 매연이나 체액등의 취기가스를 완전히 연소시킨 다음, 연도(5)를 통하여 무연, 무취의 상태로 배기되게 되는 것이다.In this way, the heat of combustion of the main combustion burner 7 which burns the body pipe 21 is a flame which is mixed with the slightly unburned soot or odor generated by burning the body fluid of the body and replayed along the middle year (3). The heat of the reburn burner 8 is passed through the combustion chamber 4 and passes through several heat storage walls 26 forming the zigzag exhaust passage 25 up and down with the flame induction hole 25a of the reburn chamber 4. In this way, combustion is promoted while increasing combustion efficiency, so that odorous gases such as soot and body fluid in unburned state are completely burned, and then exhausted into smokeless and odorless state through the flue (5).

이때, 주연소실(2)에서부터 중간연도(3)까지의 온도를 800℃ 정도의 온도를 유지할 수 있으며, 재연소실(4)의 온도는 항상 700℃ 정도의 온도를 유지하게 된다.At this time, the temperature from the main combustion chamber (2) to the middle flue (3) can maintain a temperature of about 800 ℃, the temperature of the reburn chamber (4) will always maintain a temperature of about 700 ℃.

따라서, 주연소실(2)에서 배출되는 체액등의 취기가스는 중간연도(3)에서 800℃의 고열에 의하여 열분해되고, 재연소실(4)의 700℃의 고온에 의하여 재차로 열분해되기 때문에 배출연도를 통하여 배기되는 배기가스는 악취나 매연이 없는 완전히 연소된 청정한 상태로서 배출되게 되는 것이므로 환경공해의 요인이 제거되며 환경오염을 방지할 수 있는 것이다.Therefore, odor gas such as a body fluid discharged from the main combustion chamber 2 is thermally decomposed by a high temperature of 800 ° C. in the middle flue 3, and thermally decomposed again by a high temperature of 700 ° C. of the reburn chamber 4. Exhaust gas exhausted through is to be discharged as a completely burned clean state without odor or smoke so that the cause of environmental pollution is eliminated and to prevent environmental pollution.

이와 같이 시체관(21)이 완전히 연소되어 화장이 완료가 되면, 주연소실(2)의 내부에 별도로 설치된 통상의 연소 상태감지센서(도시생략)에 의해 감지되어 주연소실(2)의 전방에 설치된 화장문(6)이 열리게 되고, 화장로(1)의 내부에 설치된 내부로울러장치(14)와 냉각전실(15)의 내부에 설치된 로내대차수평이송장치(19)를 전후방으로 수평으로 나란하게 일련으로 결합 설치하여 구성시킨 로내대차수평이송장치(19)를 구동시키는 감속기모우터(11a)와 내부로울러장치(14)를 작동시키는 감속기모우터(11)가 동시에 작동하면서 내부로울러장치(14)의 상부에 완전 연소된 상태의 유골을 탑재한 로내대차(20)는 화장로(1)의 전방에 설치된 냉각전실(15)의 설치된 로내대차수평이송장치(19)측으로 이송되어 냉각전실(15)의 적정위치에 정지된 상태에서 로내대차(20)의 상부에 탑재된 유골의 수거작업을 하게 되는데, 이때, 작업자의 유골의 수거작업을 용이하게 하기 위하여 냉각전실(15)의 양측으로 설치된 미닫이문(17)을 통하여 출입을 하면서 디딤발판(36)에 올라서서 유골의 수거작업을 할 때에 상기 주연소실(2)에서 인출된 로내대차(20)에서 발생하는 뜨거운 열기를 냉각전실(15)의 일측주벽의 중간높이에 설치한 세로장방형흡배기구(27)로 흡입되어 유골수거 작업자의 위치로부터 타측 방향이 되는 배기통(28)으로 신속하게 배기되게 함으로써 로내대차(20)로부터 발생되는 뜨거운 열기가 유골을 수거하는 작업자로부터 가능한 먼 방향으로 대류하면서 배출되어버리므로 유골을 수거하는 작업자가 뜨거운 열기를 피하면서 유골의 수골작업을 용이하고 안전하게 할 수 있는 것이다.When the body pipe 21 is completely burned in this manner and makeup is completed, it is detected by a normal combustion state sensor (not shown) installed separately in the main combustion chamber 2 and installed in front of the main combustion chamber 2. The toilet door 6 is opened, and the inner roller horizontal transfer device 19 installed inside the cooling chamber 15 and the inner roller device 14 installed in the interior of the toilet 1 are arranged side by side in a horizontal direction. Of the inner roller device 14 while the reducer motor 11a for driving the inner balance horizontal transfer device 19 and the reducer motor 11 for operating the inner roller device 14 are operated simultaneously. The furnace bogie 20 loaded with ashes in the state of being completely burned on the upper part is transferred to the furnace bogie horizontal transfer device 19 installed in the cooling chamber 15 installed in front of the crematory 1 so that The upper part of the furnace bogie 20 in the state stopped at the appropriate position. The collection work of the ashes mounted on it is to be carried out. At this time, in order to facilitate the work of collecting the ashes of the worker, ascending and exiting through the sliding door 17 installed on both sides of the cooling chamber 15, the ascending step on the footrest 36. When the ashes are collected and standing, the hot heat generated from the furnace bogie 20 drawn out from the main combustion chamber 2 is transferred to the vertical rectangular intake and exhaust mechanism 27 installed at the middle height of one circumferential wall of the cooling chamber 15. The hot air generated from the furnace trolley 20 is discharged while convection in the direction as far as possible from the worker collecting the ashes by being sucked and quickly discharged from the position of the ashes worker to the other side of the exhaust cylinder 28. The worker who collects can easily and safely work the bones of the ashes while avoiding hot heat.

삭제delete

삭제delete

이와 같은 본 발명은 장기간 사용중에 고열의 영향을 가장 심하게 받은 부분인 배출통로(23)(23a)와 재연소실(4)의 내주벽이 훼손되면 도2에 도시한 바와 같이 재연소실(4)가 착탈식 막이벽(24)(24a)을 층접하여 착탈구조로 결합시킨 결착부(1a)에 의하여 상기 재연소실(4)과 착탈식 막이벽(24)(24a)을 탈이시켜 훼손된 내주벽을 용이하게 보수한 다음 다시 재연소실(4)이나 착탈식 막이벽(24)(24a)을 결착시켜 주므로써 보수작업이 완료되는 것으로 화장로(1)의 전체를 교체하는 일이 없이 용이한 보수작업에 따른 보수작업 비용의 절감은 물론 화장로의 설치 비용을 트게 절감할 수 있는 효과가 있다.In the present invention, when the inner passage wall of the discharge passage 23 (23a) and the reburn chamber (4), which are the parts which are severely affected by high heat during long-term use, are damaged, the reburn chamber (4) is shown in FIG. The inner combustion wall is easily detached by detaching the reburn chamber 4 and the detachable barrier wall 24 and 24a by a binding part 1a which is attached to the detachable barrier wall 24 and 24a in a detachable structure. After repairing, repair work is completed by binding the reburn chamber (4) or the detachable barrier wall (24) (24a) again. As well as reducing the work cost, there is an effect that can significantly reduce the installation cost of the toilet.

이와 같이 된 본 발명은 시체관을 연소시키기 위하여 주연소버너에서 발화되는 화열의 흐름이 주연소실의 내측 전방 양측주벽으로 뚫어 설치한 배출구와 배출통로측으로 분산되므로 상기 주연소실의 내부에 화열이 미치지 않은 사각지지대가 발생되는 일이 없이 시체관을 고르고 신속하게 연소시킬 수 있으며, 재연소실로 유입되는 화염은 해부에 화염유도구멍과 상하로 지그재그형 배기통로가 형성되도록 설치한 수개의 축열벽에 의하여 상하 지그재그로 회류하면서 미연소상태의 매연이나 체액 등의 취기가스를 재차연소시켜 무연,무취의 배기상태로 배출시켜 환경이 오염되는 일이 없으며, 또한 화장로와 일체형으로 설치한 냉각전실의 타측주벽의 중간높이로 세로장방형 흡배기구와 배기통을 설치하므로서 주연소실로부터 유골을 싣고 이송되어 나온 로내대차로부터 발산되는 열기나 유분등의 분진이 작업자로부터 타측으로 흡출되어 배출되므로 안전하고 신속한 유골수거작업을 완료할 수 있는 효과가 있으며, 버너의 화열을 효율적으로 활용하여 시체관의 연소시간을 단축할 수 있으며, 또한, 장기간 사용으로 인하여 고열의 영향을 심하게 받은 부분이 되는 배출통로와 재연소실의 내주벽이 훼손될 경우에는 배출통로와 재연소실의 둘레부에 시리카보드를 층접하여 착탈이 가능하도록 결합시킨 구조의 결착부에 의하여 착탈식 막이벽이나 재연소실을 간편하게 탈이시켜 훼손된 내주벽의 보수작업을 용이하게 완료함으로써, 화장로의 전체를 교체하는 일이 없으므로 보수작업에 따른 보수작업비용의 절감은 물론 화장로의 설치비용을 크게 절감할 수 있는 효과가 있는 것이다.In the present invention as described above, since the flow of the heat of fire ignited by the main combustion burner is burned to the discharge port and the discharge passage installed through the inner front both side walls of the main combustion chamber, the heat does not reach the inside of the main combustion chamber. The body tube can be burned and burned quickly without the occurrence of blind spots, and the flame flowing into the recombustion chamber is formed by several regenerative walls arranged to form a zigzag exhaust passage up and down with the flame guide hole in the anatomy. While zigzag flows, unburned fumes and bodily fluids such as body fluids are re-burned and discharged as smokeless and odorless exhausts, so that the environment is not contaminated and the other circumferential wall of the cooling chamber installed integrally with the toilet. By installing a vertical rectangular inlet and outlet at a medium height, the ashes are transported from the main combustion chamber. As dust and heat emitted from the internal furnace boil out are extracted and discharged from the worker to the other side, it is effective to complete the safe and quick collection of ashes, and the combustion time of the body pipe is effectively utilized by utilizing the heat of the burner efficiently. If the discharge passage and the inner circumferential wall of the reburn chamber are damaged due to high heat due to long-term use, it is possible to attach and detach the silica board in the circumference of the discharge passage and the reburn chamber. The detachable wall or reburn chamber is easily detached by the binding part of the combined structure so as to easily repair the damaged inner circumferential wall. Of course, there is an effect that can greatly reduce the installation cost of the toilet.

도1은 본 발명의 측면구조를 보인 단면도.1 is a cross-sectional view showing a side structure of the present invention.

도2는 본 발명의 요부를 분리하여 보인 A-A선 단면도.Figure 2 is a cross-sectional view taken along line A-A showing the main portion of the present invention.

도3은 도1의 B-B선 단면도.3 is a cross-sectional view taken along the line B-B in FIG.

도4는 종래 화장로의 측면구조를 보인 단면도.Figure 4 is a cross-sectional view showing a side structure of a conventional makeup.

도5는 도4의 C-C선 단면도.5 is a cross-sectional view taken along the line C-C in FIG.

* 도면의 주요부분에 대한 부호의 설명 *Explanation of symbols on main parts of drawing

1 화장로 1a 결합부 2 주연소실1 cremation furnace 1a joint 2 main combustion chamber

3 중간연도 4 재연소실3 Mid Year 4 Reburn Chamber

2a,3a,4a 점검투시구 5 연도2a, 3a, 4a inspection hole 5 years

6 화장문 7 주연소버너6 cremation 7 main combustion burner

8 재연소버너 9,9a 종동체인기어8 Reburn Burner 9,9a Follow Chain

10 내부로울러 11,11a 감속기모우터10 Internal roller 11,11a reducer motor

12,12a 원동체인기어 13,13a 체인12,12a Drive chain gear 13,13a chain

14 내부로울러장치 15 냉각전실14 Internal roller unit 15 Cooling chamber

16 회신문 17 미닫이문16 replies 17 sliding doors

18 외부로울러 19 로내대차 수평이송장치 18 Outer Roller 19 Inner Balance Horizontal Feeder

20 로내대차 21 시체관20 Rona Balance 21 Corpse Pipe

22,22a 배출구 23,23a 배출통로22,22a outlet 23,23a outlet

24,24a 착탈식막이벽 25 지그재그형 배기통로24, 24a Removable curtain wall 25 Zig-zag exhaust passage

25a 화염유도구멍 26 축열벽25a flame guide hole 26 heat storage wall

27 세로장방형흡배기구 28 배기통 27 Longitudinal rectangular intake and exhaust 28

Claims (3)

주연소실(2)의 상부로 직립일체형으로 축조된 중간연도(3)와 중앙부에 화염유도구멍(25a) 및 상,하 지그재그형 배기통로(25)를 형성하는 수개의 축열벽(26)을 축조 설치한 재연소실(4) 및 연도(5)를 서로 연통되도록 설치하여 축조시킨 화장로(1)의 전방으로 화장문(6)이 설치되고, 상기 화장로(1)의 후방으로는 주연소버너(7)와 재연소버너(8) 및 각 점검구(2a)(3a)(4a)가 설치되었으며, 상기 주연소실(2)의 전방 양측의 측벽으로는 배출구(22)(22a)가 형성되며, 내부 하방으로는 종동체인기어(9)를 축착한 다수의 내부로울러(10)를 수평으로 배열 설치하여 감속기모우터(11)에 축착한 원통체인기어(12)와 체인(13)으로 걸어물림시켜 구동되는 내부로울러장치(14)가 결합설치된 화장로(1) 및 이와는 별도의 냉각전실(15)의 구조로서 회전문(16)과 미닫이문(17)이 설치되고, 전방으로 종동체인기어(9a)를 축착한 다수의 외부로울러(18)를 수평으로 배열설치하여 감속기모우터(11a)에 축착한 원동체인기어(12a)와 체인(13a)으로 걸어물림시켜 구동되는 로내대차수평이송장치(19)가 결합설치되어 시체관(21)과 유골을 탑재한 로내대차(20)를 주연소실(2)의 내부로 출입이송시키면서 시체관(21)을 화장하고 유골을 수거하는 통상의 구성에 있어서, The intermediate flue 3, which is built upright in the upper part of the main combustion chamber 2, and the several heat storage walls 26 that form the flame guide hole 25a and the upper and lower zigzag exhaust passages 25 in the center are constructed. A cremation door 6 is installed in front of the refurbishing furnace 1 which is installed and installed so that the installed reburning chamber 4 and the flue 5 communicate with each other, and a main combustion burner behind the refurbishing furnace 1. (7) and the reburn burner (8) and each inspection opening (2a) (3a) (4a) is provided, the outlet openings 22, 22a are formed on the side walls of both front sides of the main combustion chamber (2), Inwardly installed, a plurality of internal rollers 10 are arranged horizontally in which the driven chain gears 9 are condensed horizontally to be engaged by the cylindrical chain gear 12 and the chain 13 condensed on the reduction gear motor 11. The revolving door 16 and the sliding door 17 are installed as a structure of the toilet 1 and a separate cooling chamber 15 in which the driven internal roller device 14 is installed. Inner furnace driven by horizontally arranging a plurality of external rollers 18 on which the driven chain gear 9a is condensed and engaged by the drive chain gear 12a and the chain 13a condensed on the reduction gear motor 11a. Balance horizontal transfer device 19 is installed and the body pipe 21 and the internal bore 20 equipped with the ashes while the interior of the main combustion chamber (2) while moving in and out of the body pipe 21 to collect the ashes In a typical configuration, 상기 중간연도(3)의 상부에 재연소실(4)을 착탈이 가능하도록 직립분리형으로 조립 설치한 구성과;A configuration in which the reburn chamber (4) is assembled and installed in an upright detachable type so as to be detachable at an upper portion of the intermediate year (3); 상기 주연소실(2)의 전방양측주벽으로 형성시킨 배출구(22)(22a)로부터 중간연도(3)와 연통하는 배출통로(23)(23a)가 형성되도록 착탈식 막이벽(24)(24a)을 착탈이 가능하도록 조립 설치하여 결합킨 구성을 특징으로 한 측방향 배기형 냉각전실을 갖는 분리 결합형 화장로.Removable closing walls (24, 24a) are formed so that discharge passages (23) (23a) communicating with the intermediate flue (3) are formed from discharge ports (22) (22a) formed by the front peripheral walls of the main combustion chamber (2). A separable combined toilet having a lateral exhaust-type cooling chamber, which is assembled and installed so as to be detachable. 삭제delete 제1항에 있어서, 냉각전실(15)을 형성하는 일측주벽의 중간높이에 세로장방형 흡배기구(27)를 형성한 것을 특징으로 한 측방향배기형 냉각전실을 갖는 분리결합형 화장로.2. The separable combined toilet of claim 1, wherein a vertical rectangular intake and exhaust mechanism (27) is formed at the middle height of one side wall forming the cooling chamber (15).
KR10-2003-0033401A 2003-05-26 2003-05-26 Freely cremation furnace KR100523322B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR10-2003-0033401A KR100523322B1 (en) 2003-05-26 2003-05-26 Freely cremation furnace

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR10-2003-0033401A KR100523322B1 (en) 2003-05-26 2003-05-26 Freely cremation furnace

Related Child Applications (1)

Application Number Title Priority Date Filing Date
KR20-2003-0016639U Division KR200323431Y1 (en) 2003-05-28 2003-05-28 Freely cremation furnace

Publications (2)

Publication Number Publication Date
KR20040101699A KR20040101699A (en) 2004-12-03
KR100523322B1 true KR100523322B1 (en) 2005-10-25

Family

ID=37378352

Family Applications (1)

Application Number Title Priority Date Filing Date
KR10-2003-0033401A KR100523322B1 (en) 2003-05-26 2003-05-26 Freely cremation furnace

Country Status (1)

Country Link
KR (1) KR100523322B1 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR102072918B1 (en) * 2018-09-19 2020-02-03 세종특별자치시 시설관리공단 Exhaust duct for furnace
KR102516042B1 (en) * 2021-11-04 2023-03-30 김한종 Animal corpse cremation vehicle

Also Published As

Publication number Publication date
KR20040101699A (en) 2004-12-03

Similar Documents

Publication Publication Date Title
KR100824597B1 (en) Mouable crematories device being odorless enuironmentally sonnd
JP4382470B2 (en) Waste pyrolysis treatment equipment
KR19990046664A (en) Mechanism of heat-exchanging cooling type cremator with apparatus for conveying horizontally the remains of the dead
KR100523322B1 (en) Freely cremation furnace
JPH05231626A (en) Incinerating furnace
KR101448434B1 (en) The cinerator apparatus for ashes
US20110165524A1 (en) Heat retaining hood assemblies, air curtain destructors with heat retaining hood assemblies, and methods for using the same
KR200323431Y1 (en) Freely cremation furnace
CN213019638U (en) Novel remains cremation device
KR100777436B1 (en) Energy saving and enviroment-frendly type cremator
CN105333437A (en) Cremation machine powered by oil and gas
KR20080041561A (en) A cremation truck for animals and a cremator for animals
KR101286604B1 (en) Portable cremator system
KR20080000207A (en) The incinerator for animal's dead body and waste wood
KR100523730B1 (en) Cremation furnace
KR101286601B1 (en) Portable cremator
CN217503675U (en) Remains cremation device with disposable combustible longevity decoration
JP3933771B2 (en) Large capacity carbonization equipment
CN218209580U (en) Garbage incinerator for treating medical and domestic garbage
CN216203356U (en) Cremation machine with double negative pressure smoke discharging device
CN215294910U (en) Lower smoke-discharging type ash-picking cremator
CN220229196U (en) Waste gas combustion furnace
JP3228408U (en) In-vehicle pet body incinerator
KR200241226Y1 (en) Coffin supporter of cremation burner
CN218993415U (en) Garbage incinerator

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20130114

Year of fee payment: 9

FPAY Annual fee payment

Payment date: 20131204

Year of fee payment: 10

FPAY Annual fee payment

Payment date: 20141222

Year of fee payment: 11

FPAY Annual fee payment

Payment date: 20171016

Year of fee payment: 13

FPAY Annual fee payment

Payment date: 20181015

Year of fee payment: 14

FPAY Annual fee payment

Payment date: 20191014

Year of fee payment: 15