KR100513250B1 - Pipe construction method and construction device for air conditioner - Google Patents

Pipe construction method and construction device for air conditioner Download PDF

Info

Publication number
KR100513250B1
KR100513250B1 KR10-2003-0078909A KR20030078909A KR100513250B1 KR 100513250 B1 KR100513250 B1 KR 100513250B1 KR 20030078909 A KR20030078909 A KR 20030078909A KR 100513250 B1 KR100513250 B1 KR 100513250B1
Authority
KR
South Korea
Prior art keywords
refrigerant circulation
pipe
air conditioner
connecting means
circulation pipe
Prior art date
Application number
KR10-2003-0078909A
Other languages
Korean (ko)
Other versions
KR20050044821A (en
Inventor
이광성
Original Assignee
주식회사 에이티에이
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 주식회사 에이티에이 filed Critical 주식회사 에이티에이
Priority to KR10-2003-0078909A priority Critical patent/KR100513250B1/en
Publication of KR20050044821A publication Critical patent/KR20050044821A/en
Application granted granted Critical
Publication of KR100513250B1 publication Critical patent/KR100513250B1/en

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F1/00Room units for air-conditioning, e.g. separate or self-contained units or units receiving primary air from a central station
    • F24F1/06Separate outdoor units, e.g. outdoor unit to be linked to a separate room comprising a compressor and a heat exchanger
    • F24F1/26Refrigerant piping
    • F24F1/32Refrigerant piping for connecting the separate outdoor units to indoor units
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01LMEASURING FORCE, STRESS, TORQUE, WORK, MECHANICAL POWER, MECHANICAL EFFICIENCY, OR FLUID PRESSURE
    • G01L7/00Measuring the steady or quasi-steady pressure of a fluid or a fluent solid material by mechanical or fluid pressure-sensitive elements

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Other Air-Conditioning Systems (AREA)

Abstract

본 발명은 에어컨 설치용 배관의 시공방법 및 시공장치에 관한 것으로서, 실내기 및 실외기 연결수단의 설치공정과, 연결수단간에 냉매순환관과 전선매입관 등을 설치하는 배관공정과, 냉매순환관에 대한 누수검사공정과, 연결수단의 매설공정 등의 공정에 의해 에어컨 설치용 배관의 시공이 완료되도록 하였으며, 본 발명의 시공장치는 제1,2 연결수단(10,10a), 냉매순환관(20), 전원선 매입관(30), 연결관(40), 밀폐캡(50), 압력게이지(60) 등의 구성요소로 이루어진다.The present invention relates to a construction method and a construction device for air conditioner installation piping, the installation process of the indoor unit and outdoor unit connection means, the piping process for installing a refrigerant circulation tube and wire buying tube between the connection means, and leakage to the refrigerant circulation tube The construction of the air conditioner installation pipe is completed by a process such as an inspection process and a buried process of the connecting means, and the factory of the present invention includes the first and second connecting means (10, 10a), the refrigerant circulation pipe (20), and the power supply. Pre-filled pipe 30, the connecting pipe 40, the sealing cap 50, consisting of components such as pressure gauge 60.

위와 같이 된 본 발명은 에어컨의 설치에 앞서 냉매순환관에 대한 누수검사를 선행할 수 있으므로 에어컨을 안전하게 설치할 수 있으며, 또한, 냉매순환 파이프나 전원선 등이 외부로 노출되지 않기 때문에 에어컨의 설치상태가 깔끔할 뿐만 아니라 외부 충격으로 인한 냉매순환 파이프나 전원선의 손상을 방지할 수 있다.The present invention as described above can be safely installed before the air conditioner installation before the air conditioner can be installed in the air conditioner, and also because the refrigerant circulation pipe or power line is not exposed to the outside installation state of the air conditioner Not only is it clean, but it also prevents damage to refrigerant circulation pipes or power lines due to external shocks.

Description

에어컨 설치용 배관의 시공방법 및 시공장치{PIPE CONSTRUCTION METHOD AND CONSTRUCTION DEVICE FOR AIR CONDITIONER}Construction method and construction device for air conditioner installation pipes {PIPE CONSTRUCTION METHOD AND CONSTRUCTION DEVICE FOR AIR CONDITIONER}

본 발명은 에어컨 설치용 배관의 시공방법 및 시공장치에 관한 것으로서, 더욱 상세하게는 실내기와 실외기 간에 연결되는 전원선과 냉매순환 파이프를 안전하고 깔끔하게 설치하기 위한 시공방법과 위 시공방법을 효율적으로 구현할 수 있도록 한 시공장치에 관한 것이다.The present invention relates to a construction method and a construction device of the air conditioner installation piping, and more particularly to efficiently implement the construction method and the above construction method for safely and neatly installing the power line and the refrigerant circulation pipe connected between the indoor unit and the outdoor unit. It relates to a construction device.

일반적으로 에어컨은 압축기, 응축기를 주장치로 하는 실외기와 팽창변, 증발기를 주장치로 하는 실내기 사이에 냉매의 이동로 역할을 하는 냉매순환 파이프와 전원을 공급하는 전원선을 연결하여 구성되어 진다.In general, an air conditioner is configured by connecting a refrigerant circulation pipe, which serves as a movement path of a refrigerant, between a compressor, a condenser outdoor unit, and an expansion valve, and an indoor unit having an evaporator as a main unit and a power line for supplying power.

상기한 기존의 에어컨은 전원선과 냉매순환 파이프 등이 바닥에 방치되거나 실내의 모서리부분에 노출되었기 때문에 미관상 좋지 못하였을 뿐만 아니라 외부 충격으로 인해 훼손될 우려도 있었으며, 또한, 경우에 따라서는 벽이나 문 또는 창틀 등에 배관의 인입을 위한 타공작업을 하여 설치하는 경우도 허다하여 건물까지 훼손하게 되는 등의 문제점을 안고 있었다. The conventional air conditioner is not only aesthetically ill because power lines and refrigerant circulation pipes are left on the floor or exposed to corners of the room, and may be damaged by external shocks, and in some cases, walls or doors. In addition, there are many problems such as damage to the building due to too many installation work for the introduction of the pipe to the window frame.

그리고, 서로 온도가 다른 냉매순환 파이프 및 전원선을 함께 인접시켜 테이핑 등의 수단으로 엮어 놓음으로서, 미관상 좋지 못할 뿐만 아니라 순환되는 냉매의 효율성이 떨어지고, 전원선이나 냉매순환 파이프의 훼손시 누수나 누전사고가 발생될 수 있다는 등의 문제점이 지적되어 왔다.In addition, by connecting the refrigerant circulation pipes and power lines having different temperatures adjacent to each other and weaving them together by means of taping or the like, they are not only aesthetically unfavorable but the efficiency of the circulating refrigerants is decreased, and water leakage or leakage is caused when the power lines or refrigerant circulation pipes are damaged. Problems have been pointed out that accidents can occur.

본 발명은 위와 같이 종래에 제반되는 문제점들을 한꺼번에 해결하기 위함에 그 기술적 과제를 두고 안출된 것으로, 전원선과 냉매순환관 파이프를 설치할 수 있는 전원선 매입관 및 냉매순환관 등을 시공하여 냉매순환관에 대한 누수검사를 선행한 다음 에어컨을 설치할 수 있도록 함으로써 에어컨 설치시에 발생되는 건물의 훼손을 방지하고 실내기와 실외기의 설치도 안전하고 간편하게 할 수 있도록 한 것인데, The present invention has been made in view of the above technical problems to solve all the problems in the prior art as described above, the refrigerant circulation pipe by constructing the power supply line and the refrigerant circulation pipe to install the power line and the refrigerant circulation pipe pipe It is possible to prevent damage to the building caused by air conditioner installation and to install the indoor and outdoor units safely and conveniently by allowing the air conditioner to be installed after the water leakage test.

첨부되는 도면과 함께 그 구성과 작용을 더욱 더 구체적으로 설명하자면 다음과 같다. The construction and operation thereof together with the accompanying drawings will be described in more detail as follows.

본 발명에서 제시하는 에어컨 설치용 배관의 시공방법은 실내기 및 실외기 연결수단의 설치공정과, 냉매순환관과 전원선 매입관 등을 설치하는 배관공정과, 냉매순환관에 대한 누수검사공정과, 연결수단의 매설공정 등으로 구성되는 바, 각 공정의 바람직한 실시는 하기와 같이 이루어진다.The construction method of the air conditioner installation pipe proposed in the present invention, the installation process of the indoor unit and outdoor unit connection means, the piping process for installing the refrigerant circulation pipe and the power supply line, etc., the leakage inspection process for the refrigerant circulation pipe, the connecting means It is comprised of the embedding process, etc., Preferred implementation of each process is performed as follows.

제1 공정 - 본 공정은 실내기를 연결하기 위한 제1 연결수단과 실외기를 연결하기 위한 제2 연결수단을 설치하기 위한 공정으로서, 건축물 등에 있어서 벽체가 시공될 영역(에어컨의 설치를 요하는 영역)에 제1 연결수단과 제2 연결수단을 이격되게 지지·고정한다.1st process-This process is a process for installing the 1st connection means for connecting an indoor unit, and the 2nd connection means for connecting an outdoor unit, The area | region to which a wall is constructed in a building etc. (area which requires installation of an air conditioner) The first connecting means and the second connecting means are spaced apart from each other.

이때, 상기 제1 연결수단과 제2 연결수단은 일면이 개방되는 중공 케이스의 형태를 이루도록 하되, 제1 연결수단의 개방부는 실내기의 설치방향으로 향하도록 하고 제2 연결수단의 개방부는 실외기의 설치방향으로 향하도록 한다.At this time, the first connecting means and the second connecting means to form a hollow case one side is open, the opening of the first connecting means is directed toward the installation direction of the indoor unit and the opening of the second connecting means is installed of the outdoor unit To the right direction.

제2 공정 - 제1 연결수단과 제2 연결수단에 이르는 냉매순환관과 전원선 매입관 등의 배관을 설치하기 위한 공정으로서, 제1 연결수단과 제2 연결수단간에 1조의 냉매순환관을 설치하여 각 냉매순환관의 단부가 제1,2 연결수단의 중공 영역에 각각 위치하도록 함과 아울러 전원선 매입관을 설치하여 그 양단이 제1,2 연결수단의 중공 영역에 위치하도록 한다.2nd process-A process for installing piping, such as a refrigerant circulation pipe and a power supply line, and the like connected to a 1st connection means and a 2nd connection means, A set of refrigerant circulation pipes are provided between a 1st connection means and a 2nd connection means. The end of each refrigerant circulation pipe is positioned in the hollow region of the first and second connection means, respectively, and a power line embedding pipe is installed so that both ends thereof are located in the hollow region of the first and second connection means.

제3 공정 - 본 공정은 냉매순환관의 누수상태를 검사하기 위한 공정으로서, 1조를 이루는 냉매순환관의 일측 각 단부를 연결관 등의 수단으로 연결시켜 냉매순환관이 단일의 파이프 형태를 이루도록 하고, 상기 냉매순환관의 타측 각 단부중 일단에 공기 주입수단을 결합하고 타단에는 주입된 공기의 압력을 측정할 수 있는 수단을 결합시킨 다음 공기를 주입하여 측정수단에서 측정된 압력을 통해 각 냉매순환관에 대한 누수검사를 실행한다.3rd process-This process is to check the leakage state of the refrigerant circulation pipe, and each end of one set of refrigerant circulation pipes are connected by means of a connecting pipe or the like so that the refrigerant circulation pipes form a single pipe shape. And combining air injecting means with one end of each other end of the refrigerant circulation tube and combining means for measuring the pressure of the injected air at the other end, and then injecting air into each refrigerant through the pressure measured by the measuring means. Perform a leak test on the circulation tube.

제4 공정 - 본 공정은 제1,2 연결수단을 매설하기 위한 공정으로서, 제1,2 연결수단의 주변 영역에 콘크리트를 타설하여 벽체를 시공함으로써 제1,2 연결수단 및 그들을 잇고 있는 각 배관이 콘크리트에 매설되도록 한다.4th process-This process is to bury the first and second connecting means. The concrete is installed in the peripheral area of the first and second connecting means to construct the wall to connect the first and second connecting means and each pipe connecting them. It is to be buried in this concrete.

이때, 상기 제1,2 연결수단의 개방부는 타설된 콘크리트의 표면에 드러나도록 한다.At this time, the opening of the first and second connecting means is exposed on the surface of the poured concrete.

이상의 구성으로 된 본 발명은 냉매순환관에 결합된 연결관, 밀폐캡, 압력게이지 등의 수단을 제거한 상태에서 제1 연결수단의 중공 영역에 위치한 냉매순환관의 단부에 실내기와 연결되는 냉매순환 파이프를 결합시킴과 아울러 제2 연결수단의 중공 영역에 위치하는 냉매순환관의 단부에 실외기와 연결되는 냉매순환 파이프를 결합하고, 제1,2 연결수단 사이에 설치된 전원선 매입관에 에어컨의 운용에 필요한 전원선을 매입시켜 에어컨을 설치할 수 있도록 한 것이다.The present invention having the above configuration is a refrigerant circulation pipe connected to the indoor unit at the end of the refrigerant circulation pipe located in the hollow region of the first connection means in a state in which the connection pipe, the sealing cap, and the pressure gauge coupled to the refrigerant circulation pipe are removed. Coupling the refrigerant circulation pipe connected to the outdoor unit to the end of the refrigerant circulation pipe located in the hollow region of the second connection means, and operating the air conditioner to the power line embedding pipe installed between the first and second connection means. The necessary power line was purchased to install the air conditioner.

본 발명은 에어컨의 설치에 앞서 냉매순환관에 대한 누수검사를 선행할 수 있으므로 에어컨을 안전하게 설치할 수 있으며, 또한, 냉매순환 파이프나 전원선 등이 외부로 노출되지 않기 때문에 에어컨의 설치상태가 깔끔할 뿐만 아니라 외부 충격으로 인한 냉매순환 파이프나 전원선의 손상을 방지할 수 있다.According to the present invention, the air conditioner can be safely installed before the air conditioner can be installed before the air conditioner can be leak-tested. Also, since the refrigerant circulation pipe or the power line is not exposed to the outside, the air conditioner can be neatly installed. In addition, damage to the refrigerant circulation pipe or power line due to external impact can be prevented.

도 1에 도시된 본 발명에서 제시하는 시공장치(1)의 바람직한 실시예가 도시되는데, 도시된 바와 같이 본 발명의 시공장치는 제1,2 연결하우징(10,10a), 냉매순환관(20), 전원선 매입관(30), 연결관(40), 공기 주입장치(50), 압력게이지(60) 등의 구성요소로 대분하여 구성된다.A preferred embodiment of the construction apparatus 1 shown in the present invention shown in Figure 1 is shown, as shown in the factory factory of the present invention, the first and second connecting housings (10, 10a), the refrigerant circulation pipe 20 And a power line embedding tube 30, a connecting tube 40, an air injection device 50, and a pressure gauge 60.

상기 제1 연결하우징(10)은 실내기를 연결하기 위한 구성요소로서 일면에 개구(11)가 형성되는 중공의 케이스 형태로 이루어지고, 제2 연결하우징(10a)은 실외기를 연결하기 위한 구성요소로서 일면에 개구(11a)가 형성되는 중공의 케이스 형태로 이루어지며, 상기 제1,2 연결하우징(10,10a)의 측면과 하방에는 수평상태와 위치를 조절해주기 위한 조절수단(12,12a)을 설치한다. 이때, 상기 제1,2 연결하우징(10,10a)의 하방에는 배수관(13,13a)을 설치하여 냉매순환관이나 냉매순환 파이프의 작동과정에 발생되는 수분이나 실내기에서 발생된 수분을 배출시켜 줄 수 있도록 함이 바람직하다.The first connection housing 10 is a component for connecting an indoor unit, and is formed in a hollow case form in which an opening 11 is formed on one surface, and the second connection housing 10a is a component for connecting an outdoor unit. It is formed in the form of a hollow case in which the opening (11a) is formed on one side, and adjusting means (12, 12a) for adjusting the horizontal state and position on the side and the lower side of the first and second connection housing (10, 10a) Install. At this time, the drain pipes 13 and 13a are installed below the first and second connection housings 10 and 10a to discharge moisture generated in the operation process of the refrigerant circulation pipe or the refrigerant circulation pipe or water generated in the indoor unit. It is desirable to be able to.

상기 냉매순환관(20)은 제1,2 연결하우징(10,10a) 간에 설치되며 상,하 1조로 구성되는데, 각 냉매순환관(20)의 양단부는 제1,2 연결하우징(10,10a)의 중공 영역내에 위치되도록 한다. The refrigerant circulation tube 20 is installed between the first and second connection housings 10 and 10a and includes a pair of upper and lower ones, and both ends of each refrigerant circulation tube 20 are connected to the first and second connection housings 10 and 10a. Position in the hollow area of the

상기 전원선 매입관(30)은 제1,2 연결하우징(10,10a) 간에 설치되며, 전원선 매입관(30)의 양단부는 제1,2 연결하우징(10,10a)의 중공 영역내에 위치되도록 한다.The power line embedding tube 30 is installed between the first and second connection housings 10 and 10a, and both ends of the power line embedding tube 30 are located in the hollow area of the first and second connection housings 10 and 10a. Be sure to

상기 연결관(40)은 냉매순환관(20)의 일측 양단에 결합되어 상,하 1조의 냉매순환관(20)이 단일체의 파이프 형태를 유지하도록 하여 준다.The connection pipe 40 is coupled to both ends of the refrigerant circulation pipe 20 to allow the upper and lower sets of refrigerant circulation pipe 20 to maintain a single pipe shape.

상기 공기주입장치(50)는 냉매순환관(20)의 타측 일단에 체결되는 것으로, 연결관(40)에 의해 일체의 형태를 이루게 되는 냉매순환관(20)내로 외부 공기를 주입시켜 주게 된다.The air injection device 50 is fastened to one end of the other side of the refrigerant circulation tube 20, and injects external air into the refrigerant circulation tube 20, which is integrally formed by the connection tube 40.

상기 압력게이지(60)는 냉매순환관(20)의 타측 타단에 체결되는 것으로, 연결관(40)에 의해 일체의 형태를 이루게 되는 냉매순환관(20)을 밀폐시켜줌과 아울러 공기주입장치(50)에 의해 공급된 공기의 압력을 계측하여 주기 위한 것이다. The pressure gauge 60 is fastened to the other end of the refrigerant circulation tube 20, and seals the refrigerant circulation tube 20, which is integrally formed by the connection tube 40, with the air injection device 50. This is to measure the pressure of the air supplied by).

이상의 구성으로 된 본 발명은 건축물 등의 벽체에 매설하여 제1,2 연결하우징(10,10a)의 개구(11,11a)가 외부로 드러나도록 하여 사용되는 것으로서, 일측 냉매순환관(20)에 설치된 공기주입장치(50)를 통해 공기를 주입하게 되면 연결관(40)에 의해 연결된 타측 냉매순환관(20)의 압력게이지(60)에 의해 공압이 계측되므로 주입되는 공기의 압력과 계측된 공기의 압력을 비교하여 각 냉매순환관(20)의 누수상태를 확인할 수 있다.The present invention having the above configuration is used to bury the openings 11 and 11a of the first and second connection housings 10 and 10a by embedding them in a wall of a building or the like. When air is injected through the installed air injection device 50, pneumatic pressure is measured by the pressure gauge 60 of the other refrigerant circulation pipe 20 connected by the connection pipe 40, so that the pressure of the injected air and the measured air are measured. The leakage state of each refrigerant circulation tube 20 can be confirmed by comparing the pressures of the refrigerant.

상기와 같이 누수검사가 완료된 후 제1 연결하우징(10) 내의 중공 영역에 위치한 냉매순환관(20)의 단부에 결합된 구성요소를 제거한 다음 실내기(2)와 연결되는 냉매순환 파이프(P1)를 결합시킴과 아울러 제2 연결하우징(10a)의 중공 영역에 위치하는 냉매순환관(20)의 단부에 결합된 구성요소를 제거한 다음 실외기(3)와 연결되는 냉매순환 파이프(P2)를 결합하고, 제1,2 연결하우징(10,10a)간에 설치된 전원선 매입관(30)에 에어컨의 운용에 필요한 전원선(C)을 매입시키면 에어컨의 설치가 완료되는 것이다.After the leak test is completed as described above, the components coupled to the ends of the refrigerant circulation pipe 20 located in the hollow region in the first connection housing 10 are removed, and then the refrigerant circulation pipe P1 connected to the indoor unit 2 is removed. In addition to coupling and remove the components coupled to the end of the refrigerant circulation pipe 20 located in the hollow region of the second connection housing (10a) and then coupled to the refrigerant circulation pipe (P2) connected to the outdoor unit (3), If the power supply line (C) necessary for the operation of the air conditioner is purchased in the power supply line (30) installed between the first and second connection housings (10, 10a) is the installation of the air conditioner.

본 발명은 에어컨의 설치에 앞서 냉매순환관에 대한 누수검사를 선행할 수 있으므로 에어컨을 안전하게 설치할 수 있으며 또한, 실외기와 실내기를 연결하는 냉매순환 파이프나 전원선 등이 외부로 노출되지 않기 때문에 에어컨의 설치상태가 깔끔할 뿐만 아니라 외부 충격으로 인한 냉매순환 파이프나 전원선의 손상을 방지할 수 있으므로 누수나 누전사고 등을 사전에 방지할 수 있는 등의 효과가 있는 것이다.According to the present invention, the air conditioner can be safely installed prior to the installation of the air conditioner, so that the air conditioner can be safely installed and the refrigerant circulation pipe or power line connecting the outdoor unit to the indoor unit is not exposed to the outside. The installation is not only clean, but also prevents damage to the refrigerant circulation pipe or power line due to external shocks, so that it is possible to prevent leakage or leakage.

또한, 본 발명은 순환되는 냉매의 이동통로인 각 냉매순환관과 전원선 매입과 등을 이격시켜 놓음으로써 냉각효율을 향상시킬 수 있는 효과를 득할 수 있는 것이다.In addition, the present invention can obtain the effect of improving the cooling efficiency by separating each refrigerant circulation pipe and the power supply line and the like which is the moving passage of the circulating refrigerant.

도 1은 본 발명에서 제시하는 시공장치의 일실시예를 도시한 일부 파절 정면도.1 is a fragmentary front view showing an embodiment of the construction apparatus proposed in the present invention.

도 2는 본 발명에 의한 에어컨의 설치상태를 도시한 참고 사시도.Figure 2 is a reference perspective view showing the installation of the air conditioner according to the present invention.

▣ 도면의 주요부분에 사용된 부호의 설명 ▣▣ Explanation of symbols used in main part of drawing

2 : 실내기 3 : 실외기2: indoor unit 3: outdoor unit

10 : 제1 연결하우징 10a : 제2 연결하우징10: first connecting housing 10a: second connecting housing

11,11a : 개구 12,12a : 조절수단11,11a: opening 12,12a: adjusting means

13,13a : 배수관 20 : 냉매순환관13,13a: drain pipe 20: refrigerant circulation pipe

30 : 전원선 매입관 40 : 연결관30: power line embedding pipe 40: connector

50 : 공기 주입장치 60 : 압력게이지50: air injector 60: pressure gauge

C : 전원선 P1,P2 : 냉매순환 파이프C: Power line P1, P2: Refrigerant circulation pipe

Claims (2)

벽체가 시공될 영역(에어컨의 설치를 요하는 영역)에 개방부를 갖는 제1 연결수단과 제2 연결수단을 이격되게 지지·고정하는 단계;Supporting and fixing the first connecting means and the second connecting means having an opening in an area in which the wall is to be constructed (an area requiring installation of the air conditioner); 제1 연결수단과 제2 연결수단 간에 1조의 냉매순환관을 설치하여 각 냉매순환관의 단부가 제1,2 연결수단의 중공 영역에 각각 위치하도록 함과 아울러 전원선 매입관을 설치하여 그 양단이 제1,2 연결수단 중공 영역에 위치하도록 하는 단계;A set of refrigerant circulation tubes are installed between the first and second connecting means so that the end of each refrigerant circulation tube is located in the hollow region of the first and second connecting means, and a power line embedding tube is installed at both ends thereof. Positioning said first and second connecting means in a hollow region; 냉매순환관의 일측 각 단부를 연결관 등의 수단으로 연결하고, 냉매순환관의 타측 각 단부에 공기주입 수단과 압력측정 수단 등을 결합시킨 다음 공기를 주입하여 측정된 압력을 통해 냉매순환관에 대한 누수검사를 실행하는 단계;One end of each of the refrigerant circulation pipes is connected by means of a connecting pipe, etc., and an air injection means and a pressure measuring means are coupled to each other end of the refrigerant circulation pipe, and then air is injected into the refrigerant circulation pipe through the measured pressure. Performing a leak test for the; 제1,2 연결수단과 각 배관의의 주변 영역에 콘크리트를 타설하되, 제1,2 연결수단의 개방부는 타설된 콘크리트의 표면에 드러나도록 하는 단계 등을 포함하는 것을 특징으로 하는 에어컨 설치용 배관의 시공방법.Placing concrete in the peripheral region of the first and second connecting means and each pipe, wherein the opening of the first and second connecting means is to be exposed to the surface of the poured concrete, etc. Construction method. 일면에 개구(11,11a)가 형성된 중공체의 제1,2 연결하우징(10,10a);First and second connection housings 10 and 10a of the hollow body having openings 11 and 11a formed on one surface thereof; 상기 제1,2 연결하우징(10,10a) 간에 설치되며, 그 양측 단부가 제1,2 연결하우징(10,10a)의 중공 영역내에 위치되도록 한 1조의 냉매순환관(20);A set of refrigerant circulation pipes 20 installed between the first and second connection housings 10 and 10a and having both ends thereof located in hollow areas of the first and second connection housings 10 and 10a; 상기 제1,2 연결하우징(10,10a) 간에 설치되며, 그 양측 단부가 제,1,2 연결하우징(10,10a)의 중공 영역에 위치되도록 한 전원선 매입관(30);A power line embedding tube (30) installed between the first and second connection housings (10, 10a), the both ends of which are located in the hollow region of the first and second connection housings (10, 10a); 상기 냉매순환관(20)의 일측 양단에 체결되는 연결관(40);A connection pipe 40 fastened to both ends of the refrigerant circulation pipe 20; 상기 냉매순환관(20)의 타측 일단에 체결되는 공기주입장치(50)와, 타단에 체결되는 압력게이지(60) 등으로 구성되어짐을 특징으로 하는 에어컨 설치용 배관 시공장치.An air injection device (50) fastened to the other end of the refrigerant circulation pipe (20), and a pressure gauge (60) fastened to the other end of the piping installation device, characterized in that consisting of.
KR10-2003-0078909A 2003-11-08 2003-11-08 Pipe construction method and construction device for air conditioner KR100513250B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR10-2003-0078909A KR100513250B1 (en) 2003-11-08 2003-11-08 Pipe construction method and construction device for air conditioner

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR10-2003-0078909A KR100513250B1 (en) 2003-11-08 2003-11-08 Pipe construction method and construction device for air conditioner

Related Child Applications (1)

Application Number Title Priority Date Filing Date
KR20-2003-0035558U Division KR200342024Y1 (en) 2003-11-13 2003-11-13 Pipe construction device for air conditioner

Publications (2)

Publication Number Publication Date
KR20050044821A KR20050044821A (en) 2005-05-13
KR100513250B1 true KR100513250B1 (en) 2005-09-07

Family

ID=37244680

Family Applications (1)

Application Number Title Priority Date Filing Date
KR10-2003-0078909A KR100513250B1 (en) 2003-11-08 2003-11-08 Pipe construction method and construction device for air conditioner

Country Status (1)

Country Link
KR (1) KR100513250B1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101037106B1 (en) * 2008-12-03 2011-05-26 (주)무한 The pressure measuring device of for air conditioner buried piping

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108518758A (en) * 2018-05-30 2018-09-11 广东美的制冷设备有限公司 The communicating pipe of air conditioner and air conditioner
CN108709259A (en) * 2018-05-30 2018-10-26 广东美的制冷设备有限公司 The communicating pipe of air conditioner and air conditioner
KR102011685B1 (en) * 2019-06-03 2019-08-19 주식회사 비엠티 Structure of multi cable connecting indoor unit and outdoor unit in air-conditioning system

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101037106B1 (en) * 2008-12-03 2011-05-26 (주)무한 The pressure measuring device of for air conditioner buried piping

Also Published As

Publication number Publication date
KR20050044821A (en) 2005-05-13

Similar Documents

Publication Publication Date Title
KR100513250B1 (en) Pipe construction method and construction device for air conditioner
KR20120085069A (en) Leakage inspection device
CN109899956B (en) Installation method of multi-connected air conditioning system
KR101620279B1 (en) Pipe connect tube for tightness test, stainless pipe and stainless pipe formation method thereof
KR200342024Y1 (en) Pipe construction device for air conditioner
KR101089588B1 (en) Device for connecting pipe of air conditioner
KR200415779Y1 (en) Terminal box for connecting pipes of air conditioner
KR200437907Y1 (en) Pipe connecting device of air conditioner
JP2003254564A (en) Piping structure of air conditioner
KR100493391B1 (en) Expansion/contraction joint apparatus for Pre insulated piping
KR101545534B1 (en) a air conditioner piping constructed method
KR200438741Y1 (en) A plug for air conditioner piping fitting
JP2639152B2 (en) Refrigerated display case
CN213455990U (en) Central air conditioning heat exchange tube leak source detection device
KR20130115787A (en) Built-in structure for connecting pipes of air-conditioner
KR200435127Y1 (en) Piping inspect of a wall reclamation style
KR100822598B1 (en) A compact type piping test system for air conditioner
KR20210025174A (en) leakage detection apparatus of capillary tube unit
CN220027047U (en) Walk-in high-low temperature test box
KR20230000705U (en) Pipe sealing assembly for airconditioner
CN212177871U (en) Device for preventing water from entering motor by positive pressure method
KR20080051390A (en) Built-in type joint box for air-couditioner coolantpipe connecting
CN111473537A (en) Liquid spraying structure and refrigerating system
KR20100000923U (en) .Refrigerant pipe fixing device of air conditioner
KR200459475Y1 (en) Connecting structure for refrigerant pipe of airconditioner

Legal Events

Date Code Title Description
A201 Request for examination
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
LAPS Lapse due to unpaid annual fee