KR100499092B1 - Cable consistency system and control method - Google Patents

Cable consistency system and control method Download PDF

Info

Publication number
KR100499092B1
KR100499092B1 KR10-2002-0025549A KR20020025549A KR100499092B1 KR 100499092 B1 KR100499092 B1 KR 100499092B1 KR 20020025549 A KR20020025549 A KR 20020025549A KR 100499092 B1 KR100499092 B1 KR 100499092B1
Authority
KR
South Korea
Prior art keywords
cable
information
design
program
purchase
Prior art date
Application number
KR10-2002-0025549A
Other languages
Korean (ko)
Other versions
KR20030087690A (en
Inventor
김태우
김재용
Original Assignee
현대삼호중공업 주식회사
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 현대삼호중공업 주식회사 filed Critical 현대삼호중공업 주식회사
Priority to KR10-2002-0025549A priority Critical patent/KR100499092B1/en
Publication of KR20030087690A publication Critical patent/KR20030087690A/en
Application granted granted Critical
Publication of KR100499092B1 publication Critical patent/KR100499092B1/en

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F2113/00Details relating to the application field
    • G06F2113/16Cables, cable trees or wire harnesses

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Computer Hardware Design (AREA)
  • Evolutionary Computation (AREA)
  • Geometry (AREA)
  • General Engineering & Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Electric Cable Installation (AREA)

Abstract

본 발명은 전장설계시 케이블에 대한 설계, 구매, 설치등에 대한 정보를 통합관리하고 일관성 있게 관리하도록 한 전장설계용 일관성시스템 및 그 관리방법에 관한 것으로서, 그러한 관리방법은 전장설계시 케이블에 대한 설계, 구매, 설치에 대한 정보를 통합관리하는 방법에 있어서, 상기 전장설계에 필요한 케이블의 기본정보 입력후에 설계작업에 필요한 케이블의 각 노드별 데이터가 입력되면 그 노드별 데이터에 따라 최적화된 케이블 포설경로가 생성되고, 상기 선행포설을 위한 설치정보가 야드척도를 기반으로 구성되는 과정; 상기 설치정보 구성에 의하여 생성된 케이블 드럼정보를 참조하여 케이블 절단정보와 드럼정보가 결정되는 과정; 및 상기 케이블 절단정보와 드럼정보를 근거로 실제 작업이 행해지거나 또는 구매자로부터 상기 케이블 절단정보와 드럼정보의 구매발생시에 소정 프로그램에 의해 구매가 진행되는 과정으로 이루어지는 것에 의하여 달성된다.The present invention relates to a coherent system for a battlefield design and a management method for integrated management and consistent management of information on the design, purchase, installation, and the like of a cable during a battlefield design. In the method of integrated management of information about purchase, installation, and input of basic information of cables required for the electrical equipment design, when data of each node of the cable required for design work is input, the cable laying path is optimized according to the data of each node. Is generated and the installation information for the preceding installation is configured based on a yard scale; Determining cable cutting information and drum information with reference to the cable drum information generated by the installation information configuration; And a process in which an actual operation is performed based on the cable cutting information and drum information, or a purchase is made by a predetermined program when a purchase of the cable cutting information and drum information occurs from a purchaser.

이에 따라, 케이블 관련정보를 입력저장하면 그에 따른 케이블 포설과 절단도면이 자동생성됨은 물론 구매의뢰 발생시 관련데이터를 자동생성시킴으로써, 전장설계업무와 현장업무 상호간을 일관성있게 진행시킬 수 있고 케이블 데이터를 체계적으로 관리할 수 있는 잇점이 있다.Accordingly, when the cable-related information is input and stored, cable laying and cutting drawings are automatically generated accordingly, and related data are automatically generated when a purchase request is generated, so that the battlefield design work and field work can be carried out consistently and the cable data is systematically organized. There is an advantage to manage.

Description

전장설계용 일관성시스템 및 그 관리방법{CABLE CONSISTENCY SYSTEM AND CONTROL METHOD}CABLE CONSISTENCY SYSTEM AND CONTROL METHOD}

본 발명은 전장설계용 일관성시스템 및 그 관리방법에 관한 것으로서, 보다 상세하게는 전장설계의 기본단계인 설계에서부터 케이블 포설에 이르는 설치작업까지 케이블 관련정보를 일관되게 적용시킴과 아울러 소정 프로그램에 따라 케이블에 대한 데이터작성·구매·생산에 관련된 정보를 일관성 있게 관리하도록 한 전장설계용 일관성시스템 및 그 관리방법에 관한 것이다.The present invention relates to a consistency system for electric equipment design and a management method thereof. More specifically, the cable related information is consistently applied from the design stage, which is the basic stage of the electric equipment design, to the installation of the cable, and the cable according to a predetermined program. The present invention relates to a consistency system for battlefield design and a method of managing the same, which consistently manage information related to data production, purchase, and production.

주지된 바와 같이 자동차·항공기·선박 등에 장착되는 각종 전자, 제어장비들의 구성이 복잡해지고, 다양한 사양의 제품을 설계하고 생산하기 위해서는, 그러한 구성요소를 이루는 소자들의 위치와 그 상관관계가 결정되어야 하는 전장설계 과정이 필연적으로 이루어져야 한다.As is well known, the configuration of various electronic and control equipments mounted on automobiles, aircrafts, ships, etc. becomes complicated, and in order to design and produce products having various specifications, the positions and correlations of the elements constituting such components must be determined. The battlefield design process is inevitable.

그러한 일정 객체를 이루기 위한 설계과정에서 전장설계과정은 어느 한 요소의 설계가 변경되면 상기 전장설계 역시 변경되어야 하기 때문에, 잦은 설계변경을 감소하기 위하여 상기 전장설계는 설계단계의 최종단계에 이르러 수행되고 있다.In the design process for achieving such a constant object, the electrical design is to be changed when the design of any one element changes, so that the electrical design is carried out to the final stage of the design phase to reduce the frequent design changes. have.

즉, 그러한 전장설계과정에서 케이블 포설을 위해 수행되는 일련의 과정을 나타내고 있는 도 1에 도시된 바와 같이, 일정 객체에 대한 케이블 포설작업을 수행하기 위해서 먼저 케이블에 대한 기본 사양을 결정하고, 해당 객체의 트레이(tray)의 길이를 측정하여 설치를 작성한다(단계 10,20). 이후, 케이블 스케쥴(Schedule)·케이블 플랜(Plan)·선행포설을 위한 팰렛(Pallet) 구성을 위한 수작업 수행후, 그 수행된 데이터를 근거로 케이블을 소정 길이로 절단하고 드럼포인트(Drum Point) 결정을 위한 작업을 수행하게 된다(단계 30-50).That is, as shown in FIG. 1, which shows a series of processes performed for cable laying in such an electric equipment design process, in order to perform cable laying work for a certain object, first, a basic specification for a cable is determined, and the object The length of the tray is measured to create an installation (steps 10 and 20). Then, after manually performing the construction of a pallet for cable schedule, cable plan, and lead installation, the cable is cut to a predetermined length based on the data and the drum point is determined. To perform the operation (step 30-50).

상기와 같은 작업이 완료된 후에는 케이블 포설 및 케이블 절단을 위한 도면을 수작업으로 진행한 후 실제 케이블을 절단하고 포설작업을 하게 된다(단계 60,70).After the above work is completed, the drawings for cable laying and cable cutting are manually performed, and then the actual cable is cut and laid (steps 60 and 70).

그러나, 전술한 전장설계방법은 일정 케이블을 절단하고 포설하기 위한 일련의 과정이 모두 수작업으로 진행되기 때문에, 케이블 포설 및 케이블 절단을 위한 소정 데이터값 산출시 작업시간이 오래 걸리는 것은 물론, 상기 수작업에 따른 오류발생율이 적지 않게 발생되기 때문에 이를 다시처리해야 하는 등과 같이 시간 및 경제적인 부담이 가중되는 문제점이 있었다.However, in the above-mentioned electric field design method, since a series of processes for cutting and laying a predetermined cable are all performed manually, it takes a long time to calculate a predetermined data value for laying a cable and cutting a cable, and of course, Since the error rate is not generated a lot, there is a problem that the time and economic burden is increased, such as the need to be reprocessed.

즉, 종래방법에서는 케이블 설치를 위한 경로 데이터를 수작업으로 입력하고, P/L 및 드럼데이터를 수정할 수가 없음은 물론 드럼 재생성시에 케이블 절단작업이 어려우며, 작업 진행 대부분이 수작업으로 이루어지기 때문에 데이터 입/출력 및 편집과 관리가 쉽지 않고 케이블 관련정보를 조회하는데도 번거로운 점이 있었다.That is, in the conventional method, the path data for cable installation is manually input, and the P / L and drum data cannot be modified, and the cable cutting is difficult at the time of drum regeneration, and most of the work is performed manually. It was difficult to print, edit, and manage, and it was cumbersome to look up cable information.

따라서, 본 발명은 상기한 문제점을 해결하기 위하여 안출된 것으로서, 전장설계시 케이블과 관련된 모든 데이터의 공유작업을 통해 생산까지 일관되게 유지함은 물론 케이블의 기본 데이터의 입력 및 편집과정을 소정 프로그램에 따라 자동화하여 케이블 경로 등을 최적화시키고, 구매정보·설치정보(POR·P/L)데이터를 자동생성하도록 함으로써, 전장설계업무와 현장업무 상호간을 일관성있게 진행할 수 있도록 한 전장설계용 일관성시스템 및 그 관리방법을 제공함에 그 목적이 있다.Accordingly, the present invention has been made to solve the above-mentioned problems, in the design of the overall length of the cable through the operation of sharing all the data related to the cable and maintain the consistent data as well as input and edit the basic data of the cable according to a predetermined program Consistent system and its management for electric equipment design to optimize the cable route and automatically generate purchase information and installation information (POR / P / L) data so that the electric equipment design work and the field work can be carried out consistently. The purpose is to provide a method.

상기한 목적을 달성하기 위하여 본 발명의 전장설계를 위한 일관성시스템은, 전장설계시 케이블에 대한 설계, 구매, 설치에 대한 정보를 통합관리하도록 한 전장설계용 일관성시스템에 있어서, 설계기초정보를 근거로 케이블의 설치경로를 최적화시켜 자동으로 산출하고 포설정보를 생성하는 케이블경로최적화부와 케이블포설정보생성모듈부, 상기 설치경로와 포설정보를 생성하기 위하여 포설하고자 하는 케이블 정보의 입력에 따라 실제 포설에 필요한 케이블 데이터를 절단하여 제공하도록 프로그램을 제공하는 프로그램제공부가 구비되며; 상기 프로그램제공부는, 전장설계시 결정된 케이블 기본사양에 따른 케이블 관련 데이터를 편집하는 편집프로그램, 상기 케이블경로최적화부와 연계되어 상기 케이블 경로를 최적화하는 자동경로산출프로그램, 상기 케이블의 각 노드별 데이터를 작성하는 노드플랜작성프로그램, 상기 케이블 포설을 위한 태그마크생성프로그램, 상기 케이블의 호선포설을 위한 P/L구성프로그램, 케이블 절단을 위한 케이블절단포인트프로그램, 케이블 관련 데이터를 조회하는 조회프로그램, 및 케이블 구매를 위한 구매정보생성/전송프로그램으로 구성되는 것을 특징으로 한다.In order to achieve the above object, the coherence system for electrical equipment design of the present invention is based on the design basis information in the electrical equipment coherence system for integrated management of information on the design, purchase, installation of the cable in the electrical equipment design Cable routing optimizer and cable configuration generating module unit for automatically calculating and generating setup beams by optimizing the installation route of the furnace cable, and actual laying according to the input of the cable information to be installed to generate the installation paths and setup beams A program providing unit for providing a program to cut and provide cable data necessary for a; The program providing unit, an editing program for editing cable-related data according to the basic specifications of the cable determined at the time of design, automatic path calculation program for optimizing the cable path in conjunction with the cable path optimization unit, the data for each node of the cable Node plan creation program to create, tag mark generation program for cable laying, P / L configuration program for cable laying of cable, cable cutting point program for cable cutting, inquiry program for querying cable related data, and cable Characterized in that the purchase information generation / transmission program for the purchase.

삭제delete

또한, 상기한 목적을 달성하기 위하여 본 발명의 전장설계용 일관성시스템의 관리방법은, 전장설계시 케이블에 대한 설계, 구매, 설치에 대한 정보를 통합관리하는 방법에 있어서, 상기 전장설계에 필요한 케이블의 기본정보 입력후에 설계작업에 필요한 케이블의 각 노드별 데이터가 입력되면 그 노드별 데이터에 따라 최적화된 케이블 포설경로가 생성되고, 상기 선행포설을 위한 설치정보가 야드척도를 기반으로 구성되는 과정; 상기 설치정보 구성에 의하여 생성된 케이블 드럼정보를 참조하여 케이블 절단정보와 드럼정보가 결정되는 과정; 상기 케이블 절단정보와 드럼정보를 근거로 실제 작업이 행해지거나 또는 구매자로부터 상기 케이블 절단정보와 드럼정보의 구매발생시에 소정 프로그램에 의해 구매가 진행되는 과정으로 이루어지는 것을 특징으로 한다.In addition, in order to achieve the above object, the management method of the electrical system design consistency system of the present invention, in the method of integrated management of information on the design, purchase, installation of the cable in the electrical design, the cable required for the electrical design When data for each node of the cable required for design work is input after inputting basic information of the cable, an optimized cable laying path is generated according to the data of the node, and the installation information for the preceding laying is constructed based on a yard scale; Determining cable cutting information and drum information with reference to the cable drum information generated by the installation information configuration; It is characterized in that the actual operation is performed based on the cable cutting information and the drum information, or the purchase proceeds by a predetermined program when the purchase of the cable cutting information and drum information from the purchaser.

이하, 본 발명의 바람직한 실시예를 첨부된 도면을 참조하여 상세하게 설명하면 다음과 같다.Hereinafter, exemplary embodiments of the present invention will be described in detail with reference to the accompanying drawings.

도 2는 본 발명의 바람직한 실시예에 따른 전장설계용 일관성시스템을 나타내고 있는 블록구성도, 도 3은 도 2의 프로그램제공부의 상세 블록구성도이다. FIG. 2 is a block diagram showing a consistency system for electric field design according to a preferred embodiment of the present invention, and FIG. 3 is a detailed block diagram showing a program providing unit of FIG.

이에 도시된 바와 같이 본 발명의 전장설계용 일관성시스템은, 일정 객체에 대한 전장설계 작업시 케이블에 대한 기본사양을 결정하고 케이블관련정보를 작성하는 케이블작성모듈부(102), 그 케이블작성모듈부(102)에 의해 산출된 데이터값에 따라 케이블포설을 위한 최단경로를 산출하는 케이블경로최적화부(104), 그 케이블경로최적화부(104)에 의한 경로데이터를 근거로 케이블 포설을 위한 선행포설데이터를 생성하는 케이블포설정보생성모듈부(106)가 구비되는 운영모듈부(100)와, 상기 운영모듈부(100)에 의해 산출된 각종 데이터를 저장하는 데이터베이스(110)와, 상기 운영모듈부(100)에 의한 케이블 설계 및 선행포설을 위한 데이터의 입력/편집에 관련된 일련의 작업을 자동으로 수행할 수 있도록 각종 프로그램이 구비되는 프로그램제공부(120)가 포함되어 구성된다.As shown therein, the system for designing a battlefield according to the present invention includes a cable creation module unit 102 for determining a basic specification for a cable and creating cable related information during a battlefield design work for a certain object. The cable laying optimizer 104 which calculates the shortest route for laying the cable according to the data value calculated by the 102, and the preceding laying data for laying the cable based on the route data by the cable route optimization unit 104. The operation module unit 100 is provided with a cable configuration setting generation module unit 106 for generating a database, a database 110 for storing various data calculated by the operation module unit 100, and the operation module unit ( Includes a program providing unit 120 is provided with a variety of programs to automatically perform a series of tasks related to the input and editing of data for cable design and pre-deployment by 100) It is controlled configuration.

그리고, 상기 프로그램제공부(120)는 상기 전장설계시 케이블 관련 데이터를 편집하는 편집프로그램(120a), 케이블 경로를 최적화하는 자동경로산출프로그램(120b), 케이블 포설시 그 기준이 되는 노드플랜작성프로그램(120c), 케이블 포설을 위한 태그마크(Tag Mark)생성프로그램(120d) 및 케이블의 호선포설을 위한 P/L구성프로그램(120e), 케이블 구매를 위한 구매정보생성/전송프로그램(120f), 상기 케이블 포설시 케이블 절단을 위한 케이블절단포인트프로그램(120g), 케이블 관련 데이터를 조회하는 조회프로그램(120h) 등이 포함된다.In addition, the program providing unit 120 edits the cable-related data during the design of the electric field (120a), automatic path calculation program (120b) for optimizing the cable path, the node plan creation program as a reference when laying the cable 120c, a tag mark generation program 120d for cable laying, a P / L configuration program 120e for laying a cable, and a purchase information generation / transmission program 120f for buying a cable; The cable cutting point program 120g for cable cutting at the time of cable laying, the inquiry program 120h for inquiring cable-related data, and the like are included.

그리고, 상기 선행포설을 위한 설치정보(P/L)팰럿구성시 야드척도(Yard Rule)를 기반으로 하여 선행포설 데크(Deck)를 결정하게 된다.Then, when the installation information (P / L) pallet for the preceding installation is configured based on the yard scale (Yard Rule) to determine the prior installation deck (Deck).

미설명 부호 130은 구매자이다.Reference numeral 130 is a buyer.

그와같이 구성된 전장설계용 일관성시스템의 관리방법을 설명한다.It explains how to manage the consistency system for such a battlefield design.

먼저, 소정 객체에 대한 전장설계작업시 설계자는 케이블 포설작업을 위한 우선 과제로 포설하고자 하는 케이블의 기본사양을 결정하고 편집프로그램(120a) 구동에 따라 케이블 정보를 입력저장한다(단계 200). 상기 케이블 정보는 케이블 타입(Cable Type) 및 장비위치에서부터 케이블 포설에 관한 기본적인 데이터가 모두 포함된다.First, when designing a battlefield for a predetermined object, the designer determines a basic specification of a cable to be laid as a priority task for cable laying and inputs and stores cable information according to the operation of the editing program 120a (step 200). The cable information includes all the basic data regarding the cable installation from the cable type and equipment location.

그와같이, 케이블의 기본 정보가 입력되면 포설작업시 필요한 케이블의 각 노드(Node)별에 따른 데이터, 예컨대 노드간 연결정보와 시작부위 및 끝부위 등에 관한 데이터를 노드플랜작성프로그램(120c)에 의하여 입력하게 되고(단계 202), 자동경로산출프로그램(120b)은 상기 노드플랜작성프로그램(120c)에 의해 산출된 데이터를 참조하여 케이블 포설시 가장 적합한 경로(Auto Routing)를 생성하게 된다(단계 204).As such, when the basic information of the cable is input, data according to each node of the cable required for laying work, for example, connection information between the nodes, data about the start point and the end point, etc., are sent to the node plan creation program 120c. By inputting (step 202), the automatic route calculation program 120b refers to the data calculated by the node plan creation program 120c to generate the most suitable route (Auto Routing) when laying the cable (step 204). ).

이후, 선행 포설을 위한 설치정보(P/L)을 구성하는바, P/L구성프로그램(120e)에 의하여 상기 설치정보구성은 야드척도(Yard Rule)를 기반으로 하여 선행포설할 데크(Deck)를 결정한 후 구성된다(단계 206).Thereafter, the installation information (P / L) for the preceding installation is configured, the installation information configuration by the P / L configuration program (120e) deck to be installed in advance based on the yard scale (Yard Rule) (Deck) It is configured after determining (step 206).

상기 설치정보 구성이 완료되면, 케이블 절단정보 및 드럼 포인트 등을 결정하는 케이블 드럼정보가 생성되고(단계 208), 따라서 케이블 포설도면 및 케이블 절단도면이 케이블절단/포인트프로그램(120g)에 의하여 자동생성된다(단계 210). 그 생성된 케이블 포설도면 및 절단도면을 참조하여 현장에서 실제 사용되는 케이블을 절단하게 되고 그 케이블을 설계도면에 따라 직접 포설작업을 수행하게 되는 것이다(단계 212).When the installation information configuration is completed, cable drum information for determining cable cutting information and drum points is generated (step 208), and thus cable laying drawings and cable cutting drawings are automatically generated by the cable cutting / point program 120g. (Step 210). The cable actually used in the field is cut by referring to the generated cable laying drawing and the cutting drawing, and the cable is directly laid according to the design drawing (step 212).

그리고, 상기 케이블 드럼정보가 생성된 상태에서 구매자(120)로부터 구매의뢰가 발생되면(단계 220), 구매정보생성/전송프로그램(120f)에 의하여 구매하고자 하는 케이블 사양 및 케이블 관련정보가 입력되고, 운영모듈부(100)는 상기 관련정보에 의거하여 실제 포설에 필요한 케이블을 절단 제공하게 된다. 이때 상기 구매자(130)는 온/오프라인을 매개하여 케이블 포설에 관련된 일련의 구매 행위를 의뢰할 수 있는바, 예컨대 온라인 매체를 통해 구매정보를 입력하고자 하는 경우에는 구매자가 소유하고 있는 단말장치에 별도의 구매정보프로그램을 설치한 후 입력하는 것과 같은 온라인 주문방식을 행할 수 있다(단계 224).Then, when a purchase request is generated from the purchaser 120 in the state where the cable drum information is generated (step 220), the cable specification and the cable related information to be purchased are input by the purchase information generation / transmission program 120f. The operation module unit 100 cuts and provides a cable required for actual laying based on the related information. In this case, the purchaser 130 may request a series of purchasing activities related to cable laying through on / offline. For example, when a purchaser wants to input purchase information through an online medium, the purchaser 130 separately purchases the terminal device owned by the purchaser. The online ordering method such as inputting after installing the purchase information program of the user may be performed (step 224).

상기 구매의뢰에 따라 발생된 구매정보는 운영모듈부(100)에 의하여 처리된 후 구매자에게 재전송된다(단계 228). 이때 구매자는 통상의 전자상거래 방식에 의하여 구매의뢰건에 대한 결제과정을 수행해야함은 물론이며, 구매과정은 모두 전산처리동작에 의하여 자동으로 이루어진다.The purchase information generated according to the purchase request is processed by the operation module unit 100 and then retransmitted to the buyer (step 228). At this time, the buyer should not only perform a payment process for the purchase request by a normal electronic commerce method, but the purchase process is automatically performed by a computer processing operation.

한편, 상기와 같이 케이블 선행포설에 관련하여 생성된 모든 데이터는 운영모듈부(100)의 제어동작에 따라 관련 데이터베이스(110)에 저장되게 되며, 이후 작업자는 조회프로그램(120h)을 이용하여 손쉽게 조회하고자 하는 케이블 정보를 조회할 수 있다.On the other hand, all the data generated in connection with the cable prior installation as described above is stored in the relevant database 110 in accordance with the control operation of the operation module unit 100, after which the operator can easily look up using the inquiry program (120h) You can search the cable information you want.

이상에서 설명한 바와 같이, 본 발명의 전장설계용 일관성시스템 및 그 관리방법에 따르면, 전장설계시 케이블과 관련된 모든 데이터의 입력 및 편집과정을 일정 프로그램에 의하여 자동화시켜 케이블 선행포설작업데이터 및 구매정보·설치정보(POR·P/L)데이터를 자동생성하도록 함으로써, 전장설계업무와 현장업무 상호간을 일관성있게 진행시킬 수 있도록 하여 작업진행시간을 단축시킬수 있음은 물론, 종래 수작업에 의해 진행되었던 것에 비하여 작업 에러 발생건수를 극소화시킴으로서 업무능률이 효율적으로 향상됨을 기대할 수 있는 효과가 있다.As described above, according to the consistency system for electrical equipment design of the present invention and its management method, the cable advance laying operation data and purchase information By automatically generating installation information (POR / P / L) data, it is possible to make the progress of the battlefield design work and the field work consistently, shortening the work progress time and working compared to the conventional manual work. By minimizing the number of error occurrences, the efficiency of work can be expected to be improved efficiently.

또한, 케이블 관련 정보가 모두 전산처리되기 때문에 데이터 관리 및 케이블 관련정보의 관리 및 조회가 용이해지고 데이터 입/출력과 편집이 간단해지는 잇점이 있다.In addition, since all cable-related information is computerized, data management and cable-related information can be easily managed and inquired, and data input / output and editing can be simplified.

도 1은 일반적인 전장설계시 케이블 포설을 위해 수행되는 일련의 과정을 나타내고 있는 흐름도,1 is a flow chart showing a series of processes performed for cable laying in a general electrical design,

도 2는 본 발명의 바람직한 실시예에 따른 전장설계용 일관성시스템을 나타내고 있는 블록구성도,2 is a block diagram showing a coherence system for electrical design according to a preferred embodiment of the present invention;

도 3은 도 2의 프로그램제공부를 보이고 있는 블록구성도,3 is a block diagram showing the program providing unit of FIG.

도 4는 본 발명의 바람직한 실시예에 따른 전장설계용 일관성시스템을 이용한 관리방법 나타내고 있는 흐름도이다.4 is a flowchart illustrating a management method using a consistency system for electric field design according to a preferred embodiment of the present invention.

*도면의 주요부분에 대한 부호의 설명** Description of the symbols for the main parts of the drawings *

100 : 운영모듈부, 102 : 케이블작성모듈부,100: operation module unit, 102: cable creation module unit,

104 : 케이블경로최적화부, 106 : 케이블포설정보생성모듈부,104: cable path optimization unit, 106: cable routing setting module unit,

110 : 데이터베이스, 120 : 프로그램제공부.110: database, 120: program provider.

Claims (4)

전장설계시 케이블에 대한 설계, 구매, 설치에 대한 정보를 통합관리하도록 한 전장설계용 일관성시스템에 있어서, 설계기초정보를 근거로 케이블의 설치경로를 최적화시켜 자동으로 산출하고 포설정보를 생성하는 케이블경로최적화부와 케이블포설정보생성모듈부, 상기 설치경로와 포설정보를 생성하기 위하여 포설하고자 하는 케이블 정보의 입력에 따라 실제 포설에 필요한 케이블 데이터를 절단하여 제공하도록 프로그램을 제공하는 프로그램제공부가 구비되며; 상기 프로그램제공부는, 전장설계시 결정된 케이블 기본사양에 따른 케이블 관련 데이터를 편집하는 편집프로그램, 상기 케이블경로최적화부와 연계되어 상기 케이블 경로를 최적화하는 자동경로산출프로그램, 상기 케이블의 각 노드별 데이터를 작성하는 노드플랜작성프로그램, 상기 케이블 포설을 위한 태그마크생성프로그램, 상기 케이블의 호선포설을 위한 P/L구성프로그램, 케이블 절단을 위한 케이블절단포인트프로그램, 케이블 관련 데이터를 조회하는 조회프로그램, 및 케이블 구매를 위한 구매정보생성/전송프로그램으로 구성되는 것을 특징으로 하는 전장설계용 일관성시스템.In the electrical design system, the integrated design system for the design, purchase, and installation of the cable is integrated and managed in the battlefield design. A path providing unit and a cable setting generating module unit, and a program providing unit providing a program to cut and provide cable data necessary for actual laying according to input of cable information to be installed in order to generate the installation path and setting beam. ; The program providing unit, an editing program for editing cable-related data according to the basic specifications of the cable determined at the time of design, automatic path calculation program for optimizing the cable path in conjunction with the cable path optimization unit, the data for each node of the cable Node plan creation program to create, tag mark generation program for cable laying, P / L configuration program for cable laying of cable, cable cutting point program for cable cutting, inquiry program for querying cable related data, and cable Consistency system for battlefield design, characterized in that consisting of purchase information generation / transmission program for purchase. 삭제delete 전장설계시 케이블에 대한 설계, 구매, 설치에 대한 정보를 통합관리하는 방법에 있어서, In the method of integrated management of information on the design, purchase, and installation of cables in the battlefield design, 상기 전장설계에 필요한 케이블의 기본정보 입력후에 설계작업에 필요한 케이블의 각 노드별 데이터가 입력되면 그 노드별 데이터에 따라 최적화된 케이블 포설경로가 생성되고, 상기 선행포설을 위한 설치정보가 야드척도를 기반으로 구성되는 과정; If data for each node of the cable required for the design work is input after the basic information of the cable required for the electric field design is input, an optimized cable laying path is generated according to the data for the node, and the installation information for the preceding laying has a yard scale. A process that is based on; 상기 설치정보 구성에 의하여 생성된 케이블 드럼정보를 참조하여 케이블 절단정보와 드럼정보가 결정되는 과정; 및Determining cable cutting information and drum information with reference to the cable drum information generated by the installation information configuration; And 상기 케이블 절단정보와 드럼정보를 근거로 실제 작업이 행해지거나 또는 구매자로부터 상기 케이블 절단정보와 드럼정보의 구매발생시에 소정 프로그램에 의해 구매가 진행되는 과정으로 이루어지는 것을 특징으로 하는 전장설계용 일관성시스템의 관리방법.The actual operation is performed based on the cable cutting information and the drum information, or when the purchase of the cable cutting information and drum information from the purchase is made by a predetermined program characterized in that the process of the purchase proceeds by a predetermined program. How to manage. 삭제delete
KR10-2002-0025549A 2002-05-09 2002-05-09 Cable consistency system and control method KR100499092B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR10-2002-0025549A KR100499092B1 (en) 2002-05-09 2002-05-09 Cable consistency system and control method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR10-2002-0025549A KR100499092B1 (en) 2002-05-09 2002-05-09 Cable consistency system and control method

Publications (2)

Publication Number Publication Date
KR20030087690A KR20030087690A (en) 2003-11-15
KR100499092B1 true KR100499092B1 (en) 2005-07-01

Family

ID=32382149

Family Applications (1)

Application Number Title Priority Date Filing Date
KR10-2002-0025549A KR100499092B1 (en) 2002-05-09 2002-05-09 Cable consistency system and control method

Country Status (1)

Country Link
KR (1) KR100499092B1 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102156776A (en) * 2011-04-08 2011-08-17 中国核电工程有限公司 Method for establishing cable bridge network by using relational database
KR101279102B1 (en) 2012-04-09 2013-06-26 현대삼호중공업 주식회사 Management method for the install information of shipboard cable
KR20150046442A (en) * 2013-10-21 2015-04-30 대우조선해양 주식회사 Method for notifing cable danger and recofding medium storing program to execute the method

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107818233B (en) * 2017-11-30 2021-03-02 中广核工程有限公司 Nuclear power plant cable laying design path optimization method and system
KR102190128B1 (en) * 2019-04-17 2020-12-11 현대중공업 주식회사 Design apparatus power system of ship, and computer-readable storage medium
KR102223385B1 (en) * 2020-08-21 2021-03-08 준성엔지니어링(주) Method of setting the optimal route for ship cables and program thereof
KR102236536B1 (en) * 2020-08-21 2021-04-06 준엔지니어링(주) Ship cable optimal route setting system
CN112698137B (en) * 2020-12-24 2024-03-26 陕西华达科技股份有限公司 Method and system for testing consistency of amplitude and phase along with temperature variation

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09259157A (en) * 1996-03-22 1997-10-03 Ricoh Co Ltd Design supporting system
KR19980041010A (en) * 1996-11-30 1998-08-17 김영귀 Wire harness design support device and method of vehicle
KR19980043957A (en) * 1996-12-05 1998-09-05 박병재 How to design wires used in the battlefield of the car
KR19980056338A (en) * 1996-12-28 1998-09-25 배순훈 Automated path creation device with history of design change management and its history management method
KR19980059097A (en) * 1996-12-30 1998-10-07 이대원 Drawing revision history management device and method
KR19990008692A (en) * 1997-07-03 1999-02-05 박병재 Electric design system according to operation of option code in 3D CAD system
JP2000163453A (en) * 1998-11-30 2000-06-16 Yazaki Corp Device and method for designing wire harness wiring
KR20030009883A (en) * 2001-07-24 2003-02-05 한국항공우주산업 주식회사 System for managing over-all length design data

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09259157A (en) * 1996-03-22 1997-10-03 Ricoh Co Ltd Design supporting system
KR19980041010A (en) * 1996-11-30 1998-08-17 김영귀 Wire harness design support device and method of vehicle
KR19980043957A (en) * 1996-12-05 1998-09-05 박병재 How to design wires used in the battlefield of the car
KR19980056338A (en) * 1996-12-28 1998-09-25 배순훈 Automated path creation device with history of design change management and its history management method
KR19980059097A (en) * 1996-12-30 1998-10-07 이대원 Drawing revision history management device and method
KR19990008692A (en) * 1997-07-03 1999-02-05 박병재 Electric design system according to operation of option code in 3D CAD system
JP2000163453A (en) * 1998-11-30 2000-06-16 Yazaki Corp Device and method for designing wire harness wiring
KR20030009883A (en) * 2001-07-24 2003-02-05 한국항공우주산업 주식회사 System for managing over-all length design data

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102156776A (en) * 2011-04-08 2011-08-17 中国核电工程有限公司 Method for establishing cable bridge network by using relational database
KR101279102B1 (en) 2012-04-09 2013-06-26 현대삼호중공업 주식회사 Management method for the install information of shipboard cable
KR20150046442A (en) * 2013-10-21 2015-04-30 대우조선해양 주식회사 Method for notifing cable danger and recofding medium storing program to execute the method
KR102044269B1 (en) 2013-10-21 2019-11-14 대우조선해양 주식회사 Method for notifing cable danger and recofding medium storing program to execute the method

Also Published As

Publication number Publication date
KR20030087690A (en) 2003-11-15

Similar Documents

Publication Publication Date Title
US20070038415A1 (en) Cable quantity totalizing device, cable quantity totalizing method and cable quantity totalizing program
US6984198B2 (en) Experiment management system, method and medium
US20180164783A1 (en) Generating optimized tool paths and machine commands for beam cutting tools
KR100499092B1 (en) Cable consistency system and control method
KR102111430B1 (en) PLM Apparatus and Managing Method Thereof
Rabelo et al. Supply chain and hybrid simulation in the hierarchical enterprise
JP6544407B2 (en) INFORMATION PROCESSING APPARATUS, CONTROL METHOD THEREOF, AND PROGRAM
US10699035B2 (en) Part management system
US7496420B2 (en) Systems and methods for efficiently implementing an N-step manufacturing process for producing a mechanical part
US20030101098A1 (en) Process and device for managing automatic data flow between data processing units for operational order processing
Ghali et al. Unique transfer of functional requirements into manufacturing dimensions in an interactive design context
CN116107549B (en) Logic arrangement and change service logic processing method, system and storage medium
JP7080199B2 (en) Production planning support system equipped with work man-hour prediction system and work man-hour prediction system
CN112967032A (en) Sales bill of materials management method, system, equipment and storage medium
US12118485B2 (en) Computer system and method for tracking the impact of a change event
KR20130134590A (en) Method and system for managing an information of material in the ship
KR102383682B1 (en) Planning management system for cutting rebar
KR20000063910A (en) Interior material electronic commerce system and method using the internet
KR20140075984A (en) Cable design and management of computerization systems
KR20210130499A (en) Device and method for automatically generating engineering results linked between results
KR20130093858A (en) System for managing stocking list
Kuehn Digital factory: Integration of simulation from product and production planning towards operative control
JP4519566B2 (en) Production management system and computer production management program
Nejad et al. Integrated dynamic process planning and scheduling in flexible manufacturing systems via autonomous agents
Sodhi et al. Heuristics for determining economic processing rates in a flexible manufacturing system

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20130611

Year of fee payment: 9

FPAY Annual fee payment

Payment date: 20140603

Year of fee payment: 10

FPAY Annual fee payment

Payment date: 20150604

Year of fee payment: 11

FPAY Annual fee payment

Payment date: 20160602

Year of fee payment: 12

FPAY Annual fee payment

Payment date: 20170602

Year of fee payment: 13

FPAY Annual fee payment

Payment date: 20190604

Year of fee payment: 15