KR100488624B1 - Expansion and contraction joint having means for absorbing noise/ shock and preventing relaxation of bolt/nut, and constructing method thereof - Google Patents

Expansion and contraction joint having means for absorbing noise/ shock and preventing relaxation of bolt/nut, and constructing method thereof Download PDF

Info

Publication number
KR100488624B1
KR100488624B1 KR1020040025484A KR20040025484A KR100488624B1 KR 100488624 B1 KR100488624 B1 KR 100488624B1 KR 1020040025484 A KR1020040025484 A KR 1020040025484A KR 20040025484 A KR20040025484 A KR 20040025484A KR 100488624 B1 KR100488624 B1 KR 100488624B1
Authority
KR
South Korea
Prior art keywords
bolt
upper cover
cover plate
key member
key
Prior art date
Application number
KR1020040025484A
Other languages
Korean (ko)
Inventor
이해익
이두성
Original Assignee
주식회사 동아기술공사
주식회사 일원티이씨
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 주식회사 동아기술공사, 주식회사 일원티이씨 filed Critical 주식회사 동아기술공사
Priority to KR1020040025484A priority Critical patent/KR100488624B1/en
Application granted granted Critical
Publication of KR100488624B1 publication Critical patent/KR100488624B1/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/06Arrangement, construction or bridging of expansion joints
    • E01D19/065Joints having sliding plates
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/08Damp-proof or other insulating layers; Drainage arrangements or devices ; Bridge deck surfacings
    • E01D19/086Drainage arrangements or devices
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16BDEVICES FOR FASTENING OR SECURING CONSTRUCTIONAL ELEMENTS OR MACHINE PARTS TOGETHER, e.g. NAILS, BOLTS, CIRCLIPS, CLAMPS, CLIPS OR WEDGES; JOINTS OR JOINTING
    • F16B39/00Locking of screws, bolts or nuts
    • F16B39/02Locking of screws, bolts or nuts in which the locking takes place after screwing down

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Road Paving Structures (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

본 발명에 따른 소음/충격 완화 및 볼트/너트 풀림방지 수단을 구비한 신축 이음장치는, 교량이나 고가도로 등의 이음부에 설치되는 것으로, 상호 맞물림 결합되어 온도변화에 따라 신축작용하는 신축이음부가 형성되어 있는 상부 덮개판과, 그 상부 덮개판을 지지 및 고정하는 키부재와, 그 키부재를 콘크리트 구조체에 고정하는 고정부재와, 상기 상부 덮개판 하부에 설치되며 이물질 수거 및 빛물 받이용 고무판 부재를 구비하는 신축 이음장치에 있어서, 상기 상부 덮개판은 볼트에 의해 상기 키부재에 고정되되, 볼트에는 그 일측면은 볼트의 나사산 각도보다 큰 각도로 형성되어 있는 다수의 캠들로 구성되고, 타측면은 톱니로 구성되어 있는 와셔 2개가 캠들이 서로 마주보도록 쌍을 이루어 체결되고, 상기 키부재를 콘크리트 구조체에 수직 및 수평방향으로 고정시키는 수직 및 수평 고정부재중 수평 고정부재와 키부재의 결합이 볼트/너트 체결방식으로 결합되며, 상기 고무판 부재는 그 몸체의 일부가 상기 상부 덮개판과 키부재 사이에 개재됨으로써 차량의 주행에 따른 충격 및 소음을 완화할 수 있도록 고무판부재의 양단에 형성되어 있는 키부재와의 결합용 돌기의 외측으로 키부재의 상면부 넓이만큼 더 연장되어 형성된다.Expansion joints equipped with noise / impact mitigation and bolt / nut loosening means according to the present invention is to be installed in the joints, such as bridges and overpasses, expansion joints are interlocked and stretched in response to temperature changes An upper cover plate formed thereon, a key member for supporting and fixing the upper cover plate, a fixing member for fixing the key member to the concrete structure, and a rubber plate member disposed below the upper cover plate for collecting foreign substances and receiving light In the expansion joint having a, the upper cover plate is fixed to the key member by a bolt, one side of the bolt is composed of a plurality of cams formed at an angle greater than the thread angle of the bolt, the other side Two washers consisting of silver teeth are fastened in pairs so that the cams face each other, and the key member is vertically and horizontally mounted on the concrete structure. Of the vertical and horizontal fixing members fixed in the direction, the combination of the horizontal fixing member and the key member is coupled in a bolt / nut fastening manner, and the rubber plate member is part of the body interposed between the upper cover plate and the key member to drive the vehicle. In order to alleviate the impact and noise caused by the rubber plate member is formed to extend further to the outside of the upper surface of the key member to the outside of the engaging projection with the key member formed on both ends.

Description

소음/충격 완화 및 볼트/너트 풀림방지 수단을 구비한 신축 이음장치 및 그 시공방법{Expansion and contraction joint having means for absorbing noise/ shock and preventing relaxation of bolt/nut, and constructing method thereof} Expansion and contraction joint having means for absorbing noise / shock and preventing relaxation of bolt / nut, and constructing method

본 발명은 교량이나, 고가도로 등의 신축 이음매 부분에 사용되는 신축 이음장치에 관한 것으로서, 더 상세하게는 교량이나 고가도로 등의 신축 이음매 부위에 설치되어 차량의 주행에 따라 그 신축 이음매 부위에서 발생되는 소음을 완화하고, 신축 이음장치로서 서로 맞물림 결합된 핑거 플레이트를 고정하고 있는 볼트 및 너트의 체결에 있어서 차량의 주행에 따른 진동으로 볼트 및/또는 너트가 풀리는 것을 방지할 수 있는 소음/충격 완화 및 볼트/너트 풀림방지 수단을 구비한 신축 이음장치 및 그 시공방법에 관한 것이다.The present invention relates to expansion joints for use in expansion joints such as bridges and overpasses, and more particularly, is installed at expansion joints such as bridges and overpasses, and noise generated at the expansion joints as the vehicle travels. Noise and shock mitigation and bolts which can prevent the bolts and / or nuts from loosening due to vibrations of the vehicle in the fastening of the bolts and nuts holding the finger plates engaged with each other as expansion joints. An expansion joint provided with a nut-unlocking means and a construction method thereof.

일반적으로, 다수의 교각을 가지는 비교적 길이가 긴 교량에는 온도 변화에 따른 교량의 팽창 및 수축에 대응하기 위하여 교량의 상판을 교량의 길이 방향으로 여러 개의 부분으로 나누고, 각 분할된 상판부 사이에는 신축 이음장치를 설치하게 된다.In general, a relatively long bridge having a plurality of bridges is divided into a plurality of sections in the longitudinal direction of the bridge in order to respond to the expansion and contraction of the bridge according to temperature changes, and between each divided top plate You will install the device.

도 1 및 도 2는 종래의 교량용 신축 이음장치를 나타낸 것으로서, 도 1은 평면도이고, 도 2는 정단면도이다. 1 and 2 show a conventional expansion joint for a bridge, Figure 1 is a plan view, Figure 2 is a front sectional view.

도 1 및 도 2를 참조하면, 종래의 교량용 신축 이음장치는 분할된 상판부의 대면하는 단부에 상호 맞물림 결합되도록 각각 설치되어, 온도 변화에 따라 신축 작용하는 핑거형(finger type) 상부 덮개판(101a)(101b)과, 그 상부 덮개판(101a) (101b)을 하부에서 지지하는 한편 볼트(105)에 의해 각각 고정하는 키(key)부재 (102a)(102b)와, 키부재(102a)(102b)에 결합되어 키부재(102a)(102b)를 콘크리트 구조체(106)에 고정하는 다수의 다우얼 바(dowel bar)(103a)(103b)와, 상기 양측 키부재(102a)(102b)에 그 단부가 각각 결합되도록 설치된 이물질 수거용 고무판 부재(104)로 구성되어 있다. 1 and 2, conventional bridge expansion joints are respectively installed so as to be engaged with each other at the end portion facing the divided upper plate portion, the finger-type upper cover plate (stretching and acting according to the temperature change ( 101a, 101b, key members 102a and 102b supporting the upper cover plates 101a and 101b from the bottom and fixed by bolts 105, respectively, and key members 102a. A plurality of dowel bars 103a and 103b coupled to the 102b to secure the key members 102a and 102b to the concrete structure 106, and the two key members 102a and 102b. It is composed of a rubber plate member 104 for collecting foreign matter so that the ends thereof are coupled to each other.

한편, 이상과 같은 구성의 종래 교량용 신축 이음장치에 있어서, 상부 덮개판(101a)(101b) 부위에는 차량의 타이어에 의한 충격으로 많은 이동하중이 걸리는 한편 지속적인 진동과 소음이 발생하게 된다. 따라서, 그와 같은 지속적인 진동으로 상기 핑거형 상부 덮개판(101a)(101b)을 키부재(102a)(102b)에 고정시키는 볼트 (105)(혹은 너트)의 조임 상태가 느슨해져 풀리는 사태가 발생될 수 있다. 볼트 (105)가 풀릴 경우, 그 볼트(105)는 상부 덮개판(101a)(101b)의 표면보다 더 위로 돌출하게 되는 바, 그로 인해 주행 차량의 타이어를 펑크나게 하는 등 차량에 손상을 주는 한편, 심할 경우 상부 덮개판(101a)(101b)의 고정상태가 와해되어 더 큰 교통사고를 유발할 수도 있다. 그리고, 지속적으로 발생되는 진동 및 소음으로 인해 주행 차량의 실내에서의 승차감을 저하시키고 생활 환경에서의 소음 공해를 일으키는 문제가 있다. On the other hand, in the conventional bridge joint expansion device having the configuration described above, the upper cover plate (101a, 101b) is subjected to a lot of moving load due to the impact of the tire of the vehicle while generating a continuous vibration and noise. Accordingly, such a continuous vibration may cause loosening and loosening of the tightening state of the bolt 105 (or nut) that fixes the finger-type upper cover plates 101a and 101b to the key members 102a and 102b. Can be. When the bolt 105 is loosened, the bolt 105 protrudes higher than the surface of the top cover plates 101a and 101b, thereby damaging the vehicle such as flattening the tire of the driving vehicle. In severe cases, the fixing state of the upper cover plates 101a and 101b may be broken, thereby causing a greater traffic accident. In addition, there is a problem of lowering the riding comfort in the interior of the driving vehicle and noise pollution in the living environment due to the vibration and noise continuously generated.

또한, 상기 키부재(102a)(102b)를 콘크리트 구조체(106)에 고정하는 고정부재로서의 다수의 다우얼 바(103a)(103b) 중 수평 다우얼 바(103a)와 키부재(102a) (102b)의 결합 메커니즘을 보면, 키부재(102a)(102b)의 하면부에 보강철판(107a) (107b)이 수직으로 용접 결합되고, 그 보강철판(107a)(107b)에 수평으로 수평 다우얼 바(103a)가 다시 용접 결합되어 있는 바, 따라서 시공시 일일이 용접 작업을 해야하는 번거로움이 따르고 그로 인해 작업 능률이 떨어지는 문제가 있다. Further, a horizontal dial bar 103a and a key member 102a and 102b among a plurality of dial bars 103a and 103b as fixing members for fixing the key members 102a and 102b to the concrete structure 106. ), The reinforcing steel plates 107a and 107b are vertically welded to the lower surface portions of the key members 102a and 102b, and horizontally horizontal dowel bars to the reinforcing steel plates 107a and 107b. Since the bar 103a is welded again, there is a problem in that the welding work is performed during construction, thereby reducing the work efficiency.

본 발명은 이상과 같은 종래 신축이음 장치에서의 문제점을 개선하기 위하여 창출된 것으로서, 교량이나 고가도로 등의 신축 이음매 부위에 설치되어 차량의 주행에 따라 그 신축 이음매 부위에서 발생되는 충격 및 소음을 완화하고, 신축 이음장치로서 서로 맞물림 결합된 핑거 플레이트를 고정하고 있는 볼트 및 너트의 체결에 있어서 차량의 주행에 따른 진동으로 볼트 및/또는 너트가 풀리는 것을 방지할 수 있는 소음/충격 완화 및 볼트/너트 풀림방지 수단을 구비한 신축 이음장치 및 그 시공방법을 제공함에 그 목적이 있다.The present invention was created to improve the problems in the conventional expansion joint device as described above, is installed in the expansion joints, such as bridges and overpasses to mitigate the impact and noise generated in the expansion joints as the vehicle runs , Noise / impact mitigation and bolt / nut loosening, which can prevent the bolt and / or nut from loosening due to the vibration of the vehicle in the fastening of the bolt and nut fixing the finger plate engaged with each other as expansion joints. An object of the present invention is to provide an expansion joint device having a prevention means and a construction method thereof.

본 발명의 다른 목적은 신축 이음장치에 있어서의 키부재를 콘크리트 구조체에 고정시키는 수평 고정부재와 키부재의 결합을 한층 용이하게 할 수 있도록 그 결합 메커니즘을 개선함으로써 시공시 작업 능률을 향상시킬 수 있는 소음/충격 완화 및 볼트/너트 풀림방지 수단을 구비한 신축 이음장치 및 그 시공방법을 제공함에 있다. Another object of the present invention is to improve the work efficiency during construction by improving the coupling mechanism to facilitate the combination of the horizontal member and the key member to secure the key member in the expansion joint to the concrete structure The present invention provides an expansion joint device having a noise / impact mitigation and bolt / nut loosening means and a construction method thereof.

상기의 목적을 달성하기 위하여 본 발명에 따른 소음/충격 완화 및 볼트/너트 풀림방지 수단을 구비한 신축 이음장치는,In order to achieve the above object, the expansion joint according to the present invention is provided with a noise / impact mitigation and bolt / nut loosening means.

교량이나 고가도로 등의 이음부에 설치되는 것으로, 상호 맞물림 결합되어 온도변화에 따라 신축작용하는 신축이음부가 형성되어 있는 상부 덮개판과, 그 상부 덮개판을 지지 및 고정하는 키부재와, 그 키부재를 콘크리트 구조체에 고정하는 고정부재와, 상기 상부 덮개판 하부에 설치되며 이물질 수거 및 빛물 받이용 고무판 부재를 구비하는 신축 이음장치에 있어서,It is installed in the joints such as bridges and overpasses, the upper cover plate is formed with expansion joints that are interlocked and expand and contract according to the temperature change, the key member for supporting and fixing the upper cover plate, and the key In the expansion joint having a fixing member for fixing the member to the concrete structure, and the rubber plate member for collecting the foreign matter and the light receiving is installed under the upper cover plate,

상기 상부 덮개판은 볼트에 의해 상기 키부재에 고정되되, 볼트에는 볼트/너트의 풀림을 방지하기 위한 것으로, 그 일측면은 볼트의 나사산 각도보다 큰 각도로 형성되어 있는 다수의 캠들로 구성되고, 타측면은 톱니로 구성된 볼트/너트 풀림 방지용 와셔 2개가 캠들이 서로 마주보도록 쌍을 이루어 체결되고, 상기 키부재를 콘크리트 구조체에 수직 및 수평방향으로 고정시키는 수직 및 수평 고정부재중 수평 고정부재와 키부재의 결합이 볼트/너트 체결방식으로 결합되며, 상기 고무판 부재는 그 몸체의 일부가 상기 상부 덮개판과 키부재 사이에 개재됨으로써 차량의 주행에 따른 충격 및 소음을 완화할 수 있도록 고무판부재의 양단에 형성되어 있는 키부재와의 결합용 돌기의 외측으로 키부재의 상면부 넓이만큼 더 연장되어 형성되어 있는 점에 그 특징이 있다. The upper cover plate is fixed to the key member by a bolt, the bolt to prevent loosening of the bolt / nut, one side is composed of a plurality of cams formed at an angle greater than the thread angle of the bolt, On the other side, two bolt / nut loosening washers composed of teeth are fastened in pairs so that the cams face each other, and the horizontal fixing member and the key member among the vertical and horizontal fixing members for fixing the key member in the vertical and horizontal directions to the concrete structure. Is coupled in a bolt / nut fastening manner, and the rubber plate member is interposed between the upper cover plate and the key member so that both ends of the rubber plate member can alleviate the impact and noise caused by the driving of the vehicle. At the point where the upper surface portion of the key member extends further to the outside of the engaging projection with the formed key member. There is a characteristic.

삭제delete

또한, 상기의 목적을 달성하기 위하여 본 발명에 따른 소음/충격 완화 및 볼트/너트 풀림방지 수단을 구비한 신축 이음장치의 시공방법은,In addition, in order to achieve the above object, the construction method of the expansion joint device having a noise / impact mitigation and bolt / nut loosening means according to the present invention,

기존의 교량이나 고가도로, 또는 신설 교량이나 고가도로의 신축이음부에 본 발명의 신축 이음장치를 시공하기 위한 방법에 있어서, In the method for constructing the expansion joint of the present invention to an existing bridge or overpass, or to a new bridge or overpass.

a) 상기 신축이음부의 양측 대면부를 콘크리트 깨기 작업에 의해 콘크리트를 깨어내어 소정 공간을 확보하는 단계; a) securing a predetermined space by smashing the concrete by the concrete breaking operation of both facing portions of the expansion joint;

b) 상부 덮개판의 지지 및 고정을 위한 키부재에 앙카 볼트형의 수직 및 수평 고정부재의 일단을 각각 고정하여 키부재와 고정부재의 조립구조체를 만드는 단계;b) fixing one end of the anchor bolt vertical and horizontal fixing members to the key members for supporting and fixing the upper cover plate, respectively, to form an assembly structure of the key member and the fixing member;

c) 상기 키부재와 고정부재의 조립구조체를 상기 신축이음부의 양측 대면부에 각각 위치시키고, 수직 및 수평 고정부재의 타단을 상기 확보된 공간 내부에 드러난 철근에 각각 고정하는 한편 키부재의 하부 개방벽면부에 거푸집 또는 백업 (back up)재를 설치하는 단계; c) placing the assembly structure of the key member and the fixing member on opposite sides of the expansion joint, respectively, and fixing the other ends of the vertical and horizontal fixing members to the reinforcing bars exposed inside the secured space, respectively, Installing formwork or back up material on the open wall;

d) 상기 양측 키부재 사이에 고무판 부재를 설치하고, 고무판 부재가 덮여 있는 양측 키부재의 상면에 상부 덮개판을 각각 안착하여 상호 맞물림 결합된 상태에서 상부 덮개판에 볼트를 체결하여 상부 덮개판을 키부재에 고정하는 단계; 및 d) A rubber plate member is installed between the key members on both sides, and the upper cover plate is seated on the upper surface of both key members covered with the rubber plate member, and the bolts are fastened to the upper cover plate while being engaged with each other. Fixing to the key member; And

e) 상기 배근 철근이 드러난 공간에 콘크리트를 타설하고 소정 시간 양생하여 작업을 마무리하는 단계를 포함하여 구성된 점에 그 특징이 있다. e) It is characterized in that it comprises the step of finishing the work by pouring concrete and curing for a predetermined time in the space where the reinforcement bar is exposed.

이하 첨부된 도면을 참조하면서 본 발명의 실시예를 상세히 설명한다.Hereinafter, exemplary embodiments of the present invention will be described in detail with reference to the accompanying drawings.

도 3 내지 도 5는 본 발명에 따른 소음/충격 완화 및 볼트/너트 풀림방지 수단을 구비한 신축 이음장치를 나타낸 것으로서, 도 3은 신축 이음장치의 전체 구조를 보여주는 도면이고, 도 4는 고무판 부재 및 상부 덮개판이 분리된 상태를 보여주는 도면이며, 도 5는 도 4의 고무판 부재 및 상부 덮개판이 조립된 상태를 보여주는 도면이다.3 to 5 show the expansion joint having a noise / impact mitigation and bolt / nut loosening means according to the present invention, Figure 3 is a view showing the overall structure of the expansion joint, Figure 4 is a rubber plate member And a top cover plate separated from each other, and FIG. 5 is a view illustrating a state in which the rubber plate member and the top cover plate of FIG. 4 are assembled.

도 3 내지 도 5를 참조하면, 본 발명에 따른 소음/충격 완화 및 볼트/너트 풀림방지 수단을 구비한 신축 이음장치는, 교량이나 고가도로 등의 이음부에 설치되는 것으로, 상호 맞물림 결합되어 온도변화에 따라 신축작용하는 신축이음부가 형성되어 있는 상부 덮개판(301a)(301b)과, 그 상부 덮개판(301a)(301b)을 지지 및 고정하는 키부재(302a)(302b)와, 그 키부재(302a)(302b)를 콘크리트 구조체에 고정하는 고정부재(303a)(303b)와, 상기 상부 덮개판(301a)(301b) 하부에 설치되며 이물질 수거 및 빛물 받이용 고무판 부재(304)를 기본적으로 구비한다.3 to 5, the expansion joint having a noise / impact mitigation and bolt / nut loosening means according to the present invention is installed in the joints, such as bridges and overpass, the interlocking coupling and temperature change The upper cover plates 301a and 301b in which the expansion and contraction portions which expand and contract are formed, the key members 302a and 302b which support and fix the upper cover plates 301a and 301b, and the keys. Fixed members 303a and 303b for fixing the members 302a and 302b to the concrete structure, and rubber plate members 304 installed below the upper cover plates 301a and 301b to collect foreign substances and receive water. It is equipped with.

그러나, 본 발명의 경우 상기 상부 덮개판(301a)(301b)은 볼트(305)에 의해 상기 키부재(302a)(302b)에 고정되되, 볼트(305)에는 볼트/너트의 풀림을 방지할 수 있는 특정 구조를 갖는 볼트/너트 풀림 방지용 와셔(601)가 체결되는 바, 이 볼트/너트 풀림 방지용 와셔(601)는 도 6 및 도 7에 도시된 바와 같이, 그 일측면은 볼트의 나사산 각도(β)보다 큰 각도(α)로 경사면이 형성되어 있는 다수의 캠들로 구성되고, 타측면은 톱니로 구성되며, 이와 같은 구조를 갖는 와셔(601a)(601b) 2개가 캠들이 서로 마주보도록 쌍을 이루어 체결된다. 그리고, 상기 키부재(302a) (302b)를 콘크리트 구조체에 수직 및 수평방향으로 고정시키는 수직 및 수평 고정부재(303a)(303b)중 수평 고정부재(303b)와 키부재(302a)(302b)의 결합이 볼트/너트 체결방식으로 결합되며, 상기 고무판 부재(304)는 그 몸체의 일부가 상기 상부 덮개판(301a)(301b)과 키부재(302a)(302b) 사이에 개재됨으로써 차량의 주행에 따른 충격 및 소음을 완화할 수 있도록 고무판 부재(304)의 양단에 형성되어 있는 키부재와의 결합용 돌기(304t)의 외측으로 키부재(302a)(302b)의 상면부 넓이만큼 더 연장되어 형성되어 있는 점에 특징이 있다. However, in the present invention, the upper cover plate 301a, 301b is fixed to the key members 302a, 302b by the bolt 305, the bolt 305 can prevent the bolt / nut from loosening. The bolt / nut loosening washer 601 having a specific structure is fastened, and the bolt / nut loosening washer 601 is shown in FIGS. 6 and 7, and one side thereof has a thread angle of the bolt ( It consists of a plurality of cams in which the inclined surface is formed at an angle (α) greater than β), the other side is composed of teeth, and two washers (601a) and 601b having such a structure are paired so that the cams face each other. Is fastened. The vertical and horizontal fixing members 303a and 302b of the vertical and horizontal fixing members 303a and 303b which fix the key members 302a and 302b to the concrete structure in the vertical and horizontal directions. Coupling is coupled in a bolt / nut fastening method, the rubber plate member 304 is part of the body is interposed between the upper cover plate (301a) 301b and the key member (302a) (302b) to drive the vehicle. To extend the width of the upper surface portion of the key members 302a and 302b to the outside of the engaging projection 304t with the key member formed on both ends of the rubber plate member 304 so as to alleviate the impact and noise. There is a characteristic in that it becomes.

그러면, 이상과 같은 구성을 갖는 본 발명에 따른 소음/충격 완화 및 볼트/너트 풀림방지 수단을 구비한 신축 이음장치의 시공방법에 대하여 도 3 내지 도 5를 다시 참조하면서 설명해 보기로 한다. Then, the construction method of the expansion joint device having a noise / impact mitigation and bolt / nut loosening means according to the present invention having the configuration as described above will be described with reference to FIGS.

먼저, 기존의 교량이나 고가도로, 또는 신설 교량이나 고가도로의 신축이음부에 본 발명의 신축 이음장치를 시공하기 위하여 신축이음부의 양측 대면부를 콘크리트 깨기 작업에 의해 콘크리트를 깨어내어 소정 공간을 확보한다. 즉, 교량이나 고가도로의 신축이음부의 양측 콘크리트 슬라브의 대면부를 콘크리트 드릴이나 콘크리트 파쇄기 등을 이용하여 파쇄하여 상면과 일측면(대향면)이 개방된 대략 L-형 공간을 확보하는 것이다. First, in order to construct the expansion joint of the present invention on an existing bridge or an elevated roadway or a new bridge or an elevated roadway, a concrete space is secured by breaking the concrete by breaking the concrete at both sides of the expansion joint. In other words, the large portions of the concrete slab on both sides of the bridge or the elevated joint of the elevated joint are crushed by using a concrete drill or concrete crusher to secure an approximately L-shaped space in which the upper surface and one side (the opposite surface) are opened.

이렇게 하여 콘크리트 파쇄작업이 완료되면, 상부 덮개판(301a)(301b)의 지지 및 고정을 위한 키부재(302a)(302b)에 앙카 볼트형의 수직 및 수평 고정부재 (303a)(303b)의 일단을 각각 고정하여 키부재(302a)(302b)와 고정부재(303a)(303b)의 조립구조체를 만든다. 이때, 수평 고정부재(303b)와 키부재(302a)(302b)의 결합은 볼트/너트 체결방식으로 결합된다. 따라서, 조립 작업이 종래의 용접방식에 비해 한결 수월해 진다. When the concrete crushing operation is completed in this way, one end of the anchor bolt-type vertical and horizontal fixing members 303a and 303b to the key members 302a and 302b for supporting and fixing the upper cover plates 301a and 301b. Fix each of the key members 302a and 302b to form an assembly structure of the fixing members 303a and 303b. At this time, the coupling between the horizontal fixing member 303b and the key members 302a and 302b is coupled in a bolt / nut fastening manner. Therefore, the assembly work is easier than the conventional welding method.

이상에 의해 키부재(302a)(302b)와 고정부재(303a)(303b)의 조립작업이 완료되면, 그 키부재(302a)(302b)와 고정부재(303a)(303b)의 조립구조체를 상기 신축이음부의 확보된 공간의 양측 대면부에 각각 위치시키고, 수직 및 수평 고정부재 (303a)(303b)의 타단을 상기 확보된 공간 내부에 드러난 철근에 각각 고정하는 한편 키부재(302a)(302b)의 하부 개방 측벽면부에 거푸집 또는 백업(back up)재를 설치한다. 여기서, 콘크리트 파쇄에 의해 확보된 공간 내부에 처음부터 철근 배근이 되어 있지 않거나, 배근이 되어 있어도 부실하게 되어 있을 경우에는 강도 보강을 위해 철근을 추가로 보강하여 설치한다. When the assembling work of the key members 302a and 302b and the fixing members 303a and 303b is completed, the assembly structure of the key members 302a and 302b and the fixing members 303a and 303b is described. It is located on both side portions of the secured space of the expansion joint, respectively, and secures the other ends of the vertical and horizontal fixing members 303a and 303b to the reinforcing bars exposed inside the secured space, respectively, while the key members 302a and 302b. Formwork or back-up material is installed in the lower open sidewall surface of the Here, if the reinforcement is not reinforcement from the beginning inside the space secured by the concrete crushing, or if the reinforcement is inadequate even if the reinforcement is installed by reinforcing the additional reinforcement for strength.

이렇게 하여 키부재(302a)(302b)와 고정부재(303a)(303b)의 조립구조체의 고정작업이 완료되면, 상기 양측 키부재(302a)(302b) 사이에 고무판 부재(304)를 설치하고, 고무판 부재(304)가 덮여 있는 양측 키부재(302a)(302b)의 상면에 상부 덮개판(301a)(301b)을 각각 안착하여 상호 맞물림 결합된 상태에서 상부 덮개판 (301a)(301b)에 볼트(305)를 체결하여 상부 덮개판(301a)(301b)을 키부재(302a) (302b)에 고정한다. 이때, 볼트(305)를 체결함에 있어서, 도 6 및 도 7에 도시된 바와 같이, 그 일측면은 볼트의 나사산 각도(β)보다 큰 각도(α)로 경사면이 형성되어 있는 다수의 캠들로 구성되고, 타측면은 톱니로 구성되어 있는 와셔(601a) (601b) 2개를 캠들이 서로 마주보도록 하여 볼트(305)에 먼저 체결하고, 그 상태의 볼트(305)를 상부 덮개판(301a)(301b)에 체결한다. 이는 볼트(305)의 풀림을 원천적으로 방지하기 위한 것이다. 즉, 이와 같은 구조의 와셔(601a)(601b)가 체결된 상태에서, 볼트나 너트가 조여질 경우 와셔(601a)(601b)의 톱니는 와셔(601a) (601b) 몸체를 어느 정도 움직이게 하여 캠들의 경사진 접촉면을 제자리에 안착시키게 된다. 이에 따라, 고정 이후의 와셔들(601a)(601b)은 캠의 경사면을 따라 움직일 수 밖에 없게 되는데, 캠의 경사각도(α)가 볼트의 나사산의 경사각도(β)보다 크게 되어 있어 볼트의 풀림을 가능하게 하는 회전토오크에 비해 반대방향으로 작용하는 와셔(601a)(601b)의 저항력이 더 크며, 따라서 볼트의 풀림을 원천적으로 방지할 수 있게 되는 것이다. 여기서, 또한 상기 볼트(305)를 체결함에 있어서, 볼트(305)는 상부 덮개판(301a)(301b) 및 고무판 부재(304)를 모두 관통하여 키부재 (302a)(302b)에 체결되는데, 따라서 고무판 부재(304)에는 볼트(305)의 삽입을 위한 구멍을 미리 뚫어야 한다. 종래에는 통상 정과 망치를 사용하여 수동작업으로 구멍을 형성했는 바, 따라서 구멍의 형성이 일정하지 않고 작업이 비능률적인 점을 고려하여 본 발명에서는 전동드릴을 도입한 전동작업에 의해 구멍을 뚫는다. 즉, 전동드릴의 드릴척에 특수제작한 원통형의 칼날식 고무 천공기(800)(도 8 및 도 9참조)를 장착하여 천공작업을 수행하는 것이다. 이에 따라 구멍의 형성이 일정하고, 작업의 능률이 한층 향상될 수 있다. In this manner, when the fixing operation of the assembly structure of the key members 302a and 302b and the fixing members 303a and 303b is completed, a rubber plate member 304 is installed between the two key members 302a and 302b. The upper cover plates 301a and 301b are respectively seated on the upper surfaces of both key members 302a and 302b covered with the rubber plate members 304 and bolted to the upper cover plates 301a and 301b. 305 is fastened to fix the upper cover plates 301a and 301b to the key members 302a and 302b. At this time, in fastening the bolt 305, as shown in Figures 6 and 7, one side thereof is composed of a plurality of cams in which the inclined surface is formed at an angle (α) greater than the thread angle (β) of the bolt. On the other side, two washers 601a and 601b, each of which has teeth, are fastened to the bolt 305 with the cams facing each other, and the bolt 305 in the state is attached to the upper cover plate 301a ( 301b). This is to prevent the loosening of the bolt 305 at source. That is, in the state in which the washers 601a and 601b of this structure are fastened, when the bolt or nut is tightened, the teeth of the washers 601a and 601b move the washer 601a and 601b to some extent so that the cam is moved. Their inclined contact surfaces will be seated in place. Accordingly, the washers 601a and 601b after the fixing are forced to move along the inclined surface of the cam. The inclination angle α of the cam is larger than the inclination angle β of the thread of the bolt, so that the bolt is loosened. Compared to the rotational torque to enable the washer 601a (601b) acting in the opposite direction is greater, and thus will be able to prevent the loosening of the bolt at the source. Here, in the fastening of the bolt 305, the bolt 305 is fastened to the key members 302a and 302b through both the upper cover plates 301a and 301b and the rubber plate member 304, The rubber plate member 304 should be drilled in advance for the insertion of the bolt 305. Conventionally, a hole was formed by manual work using a chisel and a hammer. Therefore, in the present invention, in view of the fact that the hole formation is not constant and the work is inefficient, the hole is drilled by an electric work incorporating a power drill. In other words, the drilling chuck of the drill is a specially manufactured cylindrical blade type rubber perforator 800 (see Figs. 8 and 9) is mounted to perform the drilling operation. Thereby, formation of a hole is constant and work efficiency can be improved further.

이상에 의해 상부 덮개판(301a)(301b)의 조립까지 완료되면, 상기 배근 철근이 드러난 공간에 콘크리트를 타설하고 소정 시간 양생하여 작업을 마무리한다. 여기서, 타설되는 콘크리트로는 바람직하게는 무수축 몰탈 또는 무수축 콘크리트를 사용한다.When the assembly of the upper cover plates 301a and 301b is completed by the above, the concrete is poured into a space where the reinforcing bar is exposed, and curing is completed for a predetermined time to finish the work. Here, the concrete to be poured is preferably non-condensed mortar or non-condensed concrete.

한편, 도 8 및 도 9는 본 발명의 시공방법에 도입되는 고무 천공기를 나타낸 것으로서, 도 8은 전체적인 구조를 보여주는 외관사시도이고, 도 9는 홀 커팅부의 내부 구조를 보여주는 부분 단면도이다.On the other hand, Figures 8 and 9 shows a rubber perforator introduced into the construction method of the present invention, Figure 8 is an external perspective view showing the overall structure, Figure 9 is a partial cross-sectional view showing the internal structure of the hole cutting portion.

도 8 및 도 9를 참조하면, 본 발명의 시공방법에 도입되는 고무 천공기(800)는 섕크부(801), 몸체부(802) 및 홀 커팅부(803)로 크게 구성된다. 8 and 9, the rubber perforator 800 introduced into the construction method of the present invention is largely composed of a shank portion 801, a body portion 802, and a hole cutting portion 803.

상기 섕크부(801)는 전동드릴의 드릴척부에 결합되는 부위로서, 원기둥형이나 육각기둥형으로 가공 제작된다. 본 도면에서는 육각기둥형으로 가공된 형태를 보여준다.The shank portion 801 is a portion coupled to the drill chuck portion of the power drill, and is manufactured in a cylindrical or hexagonal column shape. This figure shows the shape processed into a hexagonal columnar shape.

상기 몸체부(802)는 섕크부(801)와 일체로 섕크부(801)의 일단에 연장되어 형성된다. 이 몸체부(802)는 보통 원기둥형으로 가공되나, 경우에 따라서는 사각기둥이나 육각기둥과 같이 다각 기둥형으로 가공 제작될 수도 있다. The body portion 802 is formed to extend to one end of the shank portion 801 integrally with the shank portion 801. The body portion 802 is usually processed into a cylindrical shape, but in some cases, may be manufactured into a polygonal column shape such as a square column or a hexagonal column.

상기 홀 커팅부(803)는 몸체부(802)와 일체로 몸체부(802)의 일단에 연장되어 형성되는 것으로, 원통형의 몸체를 가지며 그 하단부에는 대상 물체에의 구멍 천공을 위한 칼날형 홀 커터날(803c)이 형성된다. 여기서, 또한 바람직하게는 이 홀 커팅부(803)의 원통형 몸체의 원주면에는 적어도 하나의 관통공(803h)이 형성된다. 이와 같이 관통공(803h)을 형성하는 이유는 천공작업에 따른 홀 커팅부(803)와 대상 물체와의 마찰에 의해 홀 커팅부(803)에서 발생되는 열을 보다 원활히 냉각시키는 한편, 천공작업에 의해 홀 커팅부(803)가 대상 물체의 몸체 내부로 어느 정도 깊이 삽입되었을 경우 홀 커팅부(803)의 원통형 몸체 내부의 밀폐된 공간과 외부와의 기압차에 의해 홀 커팅부(803)가 대상 물체로부터 잘 빠져나오지 않는 것을 방지하기 위한 것이다.The hole cutting part 803 is formed integrally with the body part 802 and extends at one end of the body part 802, and has a cylindrical body, and a lower end of the knife-type hole cutter for drilling holes in the target object. The blade 803c is formed. Here, preferably, at least one through hole 803h is formed in the circumferential surface of the cylindrical body of the hole cutting portion 803. The reason why the through hole 803h is formed in this manner is that the heat generated from the hole cutting portion 803 is more smoothly cooled by friction between the hole cutting portion 803 and the object in accordance with the drilling operation. When the hole cutting portion 803 is inserted into the body of the object to some depth, the hole cutting portion 803 is subjected to the air pressure difference between the sealed space inside the cylindrical body of the hole cutting portion 803 and the outside. This is to prevent it from falling out of the object.

도 10은 이상과 같은 구성을 갖는 고무 천공기를 이용하여 대상 물체에 천공작업을 수행하는 과정을 보여주는 도면이다.10 is a view showing a process of performing a drilling operation on the target object by using a rubber perforator having the above configuration.

도 10을 참조하면, 먼저 (가)에서와 같이 전동드릴(900)의 드릴척부에 고무천공기(800)를 장착한 상태에서 대상 물체(901)(예를 들면, 교량용 신축 이음장치에 채용되는 이물질 및 빗물 수거용 고무판 부재)의 구멍 천공 표시 부위에 홀 커팅부(803)의 홀 커터날(803c)을 정확히 위치시킨 후, 전동드릴(900)을 작동시킴과 동시에 적당한 힘으로 내리누르면 커터날(803c)의 마찰에 의해 천공작업을 수행한다. 그러면, 홀 커터날(803c)의 회전에 의해 대상 물체(901)는 원형으로 절삭되면서 홀 커팅부(803)가 부드럽게 대상 물체(901) 속으로 어느 정도 깊이까지 들어가게 된다. 이에 따라 작업자는 구멍이 천공된 것을 알고, (나)에서와 같이 전동드릴(900)을 다시 들어올려 홀 커팅부(803)를 대상 물체(901)로부터 빼낸다. 이때 전동드릴(900)의 작동을 멈춘 상태에서 빼낼 수도 있지만, 잘 안빠질 경우 전동드릴을 역회전 동작시키면서 빼내면 한결 수월하게 잘 빠질 수 있다. 홀 커팅부(803)가 대상 물체(901)로부터 빠져나오면 그 자리에는 원형의 깨끗한 구멍이 형성되어 있음을 확인할 수 있고, 최종적으로, (다)에서와 같이 홀 커팅부(803)의 원통형 몸체 내부에 박혀 있는 천공부산물(902)을 제거함으로써 일련의 작업이 완료된다.Referring to FIG. 10, first, as in (a), the rubber chuck 800 is mounted on the drill chuck of the electric drill 900, and the target object 901 (for example, the expansion joint device for the bridge is employed). After accurately positioning the hole cutter blade 803c of the hole cutting portion 803 on the hole-drilling display portion of the foreign matter and the rainwater collecting rubber plate member, the power drill 900 is operated and pressed down with an appropriate force. The drilling operation is performed by friction of 803c). Then, the object 901 is cut in a circular shape by the rotation of the hole cutter blade 803c, and the hole cutting portion 803 smoothly enters the object 901 to a certain depth. Accordingly, the worker knows that the hole is drilled, and as shown in (b), the worker lifts the power drill 900 again and pulls out the hole cutting portion 803 from the target object 901. At this time, but can be pulled out in the state of stopping the operation of the electric drill 900, it can be easily pulled out if you pull out while operating the reverse rotation of the electric drill if not well. When the hole cutting portion 803 is released from the target object 901, it can be seen that a circular clean hole is formed therein, and finally, as shown in (c), the inside of the cylindrical body of the hole cutting portion 803 The series of operations is completed by removing the perforated byproduct 902 that is lodged in.

이상의 설명에서와 같이, 본 발명에 따른 소음/충격 완화 및 볼트/너트 풀림방지 수단을 구비한 신축 이음장치는 상부 덮개판을 볼트 체결에 의해 고정하되, 그 일측면은 볼트의 나사산 각도보다 큰 각도로 경사면이 형성되어 있는 다수의 캠들로 구성되고, 타측면은 톱니로 구성되어 있는 와셔 2개를 캠들이 서로 마주보도록 하여 볼트에 먼저 체결한 상태에서 볼트를 체결하므로, 차량의 주행에 따른 진동으로 볼트의 풀림을 유도하는 회전토오크가 발생된다 하더라도 상기 와셔들에 의한 반대방향으로의 저항력이 더 크게 작용하여 볼트의 풀림을 원천적으로 방지할 수 있다. 그리고, 신축 이음부 사이의 틈새로 낙하되는 이물질이나 빗물을 수거하기 위한 고무판 부재에 있어서, 키부재의 상면부를 충분히 덮을 수 있는 넓이로 연장면부가 형성되어 있어 키부재와 상부 덮개판 사이에 개재되어 일종의 완충 패드 역할을 하므로 차량의 주행에 따라 신축 이음매 부위에서 발생되는 충격 및 소음을 한층 완화할 수 있다. 또한, 키부재를 콘크리트 구조체에 고정시키는 수평 고정부재와 키부재의 결합 메커니즘이 볼트/너트 체결방식으로 되어 있어 시공시 작업 능률을 향상시킬 수 있는 한편, 시공 이후 유지 보수시 키부재를 교체할 경우 상부 덮개판을 고정하고 있는 볼트와, 수평 고정부재에 체결되었던 너트만을 풀면 간단히 키부재를 이탈시킬 수 있어 유지 보수 작업이 용이한 장점이 있다. As described above, the expansion joint having a noise / shock mitigation and bolt / nut loosening means according to the present invention is fixed to the upper cover plate by bolting, one side of the angle is larger than the thread angle of the bolt The inclined surface is formed of a plurality of cams, the other side is the two washers consisting of the teeth to face each other, so that the cams are fastened to the bolts in the first fastening state, the vibration caused by the driving of the vehicle Even if a rotational torque for inducing bolts is generated, the resistance in the opposite direction by the washers acts more to prevent the bolts from loosening. In addition, in the rubber plate member for collecting foreign matter or rainwater falling into the gap between the expansion joints, an extended surface portion is formed to an extent that can sufficiently cover the upper surface portion of the key member, and is interposed between the key member and the upper cover plate. It acts as a cushioning pad, which can further reduce the impact and noise generated at the expansion joints as the vehicle travels. In addition, the coupling mechanism between the horizontal fixing member and the key member that fixes the key member to the concrete structure is bolt / nut fastening method, which can improve work efficiency during construction, and replace the key member during maintenance after construction. The bolt holding the upper cover plate and the nut fastened only to the horizontal fixing member can be easily detached from the key member, so there is an advantage in that maintenance work is easy.

도 1은 종래의 교량용 신축 이음장치의 구조를 보여주는 평면도. 1 is a plan view showing the structure of a conventional expansion joint for a bridge.

도 2는 종래의 교량용 신축 이음장치의 구조를 보여주는 정단면도.Figure 2 is a front sectional view showing the structure of a conventional expansion joint for bridges.

도 3은 본 발명에 따른 소음/충격 완화 및 볼트/너트 풀림방지 수단을 구비한 신축 이음장치의 전체 구조를 보여주는 사시도. Figure 3 is a perspective view showing the overall structure of the expansion joint having a noise / impact mitigation and bolt / nut loosening means according to the present invention.

도 4는 도 3의 신축 이음장치에서 고무판 부재 및 상부 덮개판이 분리된 상태를 보여주는 정단면도.Figure 4 is a front sectional view showing a state in which the rubber plate member and the upper cover plate separated in the expansion joint of Figure 3;

도 5는 도 4의 고무판 부재 및 상부 덮개판이 조립된 상태를 보여주는 정단면도.Figure 5 is a front sectional view showing a state in which the rubber plate member and the upper cover plate of Figure 4 assembled.

도 6은 본 발명에 따른 소음/충격 완화 및 볼트/너트 풀림방지 수단을 구비한 신축 이음장치에 채용되는 와셔의 구조를 보여주는 도면. Figure 6 is a view showing the structure of the washer employed in the expansion joint having a noise / impact mitigation and bolt / nut loosening means according to the present invention.

도 7은 도 6에 도시된 와셔가 볼트에 체결된 상태를 보여주는 도면.7 is a view showing a state in which the washer shown in Figure 6 is fastened to the bolt.

도 8은 본 발명의 시공방법에 도입되는 고무천공기의 전체적인 구조를 보여주는 외관사시도. Figure 8 is an external perspective view showing the overall structure of the rubber perforator introduced into the construction method of the present invention.

도 9는 도 8의 고무천공기의 홀 커팅부의 내부 구조를 보여주는 부분 단면도.9 is a partial cross-sectional view showing the internal structure of the hole cutting portion of the rubber perforator of FIG.

도 10은 도 8의 고무천공기를 이용하여 대상 물체에 천공작업을 수행하는 과정을 보여주는 도면.FIG. 10 is a view illustrating a process of performing a drilling operation on a target object using the rubber puncher of FIG. 8.

<도면의 주요 부분에 대한 부호의 설명><Explanation of symbols for the main parts of the drawings>

101a,101b,301a,301b...상부 덮개판 102a,102b,302a,302b...키부재101a, 101b, 301a, 301b ... upper cover plate 102a, 102b, 302a, 302b ... key member

103a,103b...다우얼 바 104,304...고무판 부재103a, 103b ... Dial Bar 104,304 ... Rubber Plate Member

105,305...볼트 106...콘크리트 구조체105,305 ... Bolt 106 ... Concrete Structure

107a,107b...보강철판 303a,303b...수직,수평 고정부재107a, 107b ... reinforced steel plate 303a, 303b ... vertical, horizontal fixing member

304t...결합용 돌기 601...와셔304t ... Matching protrusion 601 ... Washer

800...고무천공기 801...섕크부 800 ... rubber puncher 801

802...몸체부 803...홀 커팅부802 Body 803 Hole Cutting

803h...관통공 900...전동드릴803h ... through hole 900 ... power drill

901...대상 물체 902...천공 부산물901 Object ... 902 Perforated By-Products

Claims (9)

교량이나 고가도로 등의 이음부에 설치되는 것으로, 상호 맞물림 결합되어 온도변화에 따라 신축작용하는 신축이음부가 형성되어 있는 상부 덮개판과, 그 상부 덮개판을 지지 및 고정하는 키부재와, 그 키부재를 콘크리트 구조체에 고정하는 고정부재와, 상기 상부 덮개판 하부에 설치되며 이물질 수거 및 빛물 받이용 고무판 부재를 구비하는 신축 이음장치에 있어서,It is installed in the joints such as bridges and overpasses, the upper cover plate is formed with expansion joints that are interlocked and expand and contract according to the temperature change, the key member for supporting and fixing the upper cover plate, and the key In the expansion joint having a fixing member for fixing the member to the concrete structure, and the rubber plate member for collecting the foreign matter and the light receiving is installed under the upper cover plate, 상기 상부 덮개판은 볼트에 의해 상기 키부재에 고정되되, 볼트에는 볼트/너트의 풀림을 방지하기 위한 것으로, 그 일측면은 볼트의 나사산 각도보다 큰 각도로 형성되어 있는 다수의 캠들로 구성되고, 타측면은 톱니로 구성된 볼트/너트 풀림 방지용 와셔 2개가 캠들이 서로 마주보도록 쌍을 이루어 체결되고, 상기 키부재를 콘크리트 구조체에 수직 및 수평방향으로 고정시키는 수직 및 수평 고정부재중 수평 고정부재와 키부재의 결합이 볼트/너트 체결방식으로 결합되며, 상기 고무판 부재는 그 몸체의 일부가 상기 상부 덮개판과 키부재 사이에 개재됨으로써 차량의 주행에 따른 충격 및 소음을 완화할 수 있도록 고무판부재의 양단에 형성되어 있는 키부재와의 결합용 돌기의 외측으로 키부재의 상면부 넓이만큼 더 연장되어 형성되어 있는 것을 특징으로 하는 소음/충격 완화 및 볼트/너트 풀림방지 수단을 구비한 신축 이음장치.The upper cover plate is fixed to the key member by a bolt, the bolt to prevent loosening of the bolt / nut, one side is composed of a plurality of cams formed at an angle greater than the thread angle of the bolt, On the other side, two bolt / nut loosening washers composed of teeth are fastened in pairs so that the cams face each other, and the horizontal fixing member and the key member among the vertical and horizontal fixing members for fixing the key member in the vertical and horizontal directions to the concrete structure. Is coupled in a bolt / nut fastening manner, and the rubber plate member is interposed between the upper cover plate and the key member so that both ends of the rubber plate member can alleviate the impact and noise caused by the driving of the vehicle. It extends further by the width of the upper surface portion of the key member to the outside of the engaging projection with the key member is formed An expansion joint comprising a sound / shock absorber and a bolt / nut locking means for the. 삭제delete a) 기존의 교량이나 고가도로, 또는 신설 교량이나 고가도로의 신축이음부의 양측 대면부를 콘크리트 깨기 작업에 의해 콘크리트를 깨어내어 소정 공간을 확보하는 단계; a) securing a predetermined space by breaking concrete by the concrete breaking operation of both sides of existing bridges or overpasses, or new bridges or overpass joints; b) 상부 덮개판의 지지 및 고정을 위한 키부재에 앙카 볼트형의 수직 및 수평 고정부재의 일단을 각각 고정하여 키부재와 고정부재의 조립구조체를 만드는 단계;b) fixing one end of the anchor bolt vertical and horizontal fixing members to the key members for supporting and fixing the upper cover plate, respectively, to form an assembly structure of the key member and the fixing member; c) 상기 키부재와 고정부재의 조립구조체를 상기 신축이음부의 양측 대면부에 각각 위치시키고, 수직 및 수평 고정부재의 타단을 상기 확보된 공간 내부에 드러난 철근에 각각 고정하는 한편 키부재의 하부 개방벽면부에 거푸집 또는 백업 (back up)재를 설치하는 단계; c) placing the assembly structure of the key member and the fixing member on opposite sides of the expansion joint, respectively, and fixing the other ends of the vertical and horizontal fixing members to the reinforcing bars exposed inside the secured space, respectively, Installing formwork or back up material on the open wall; d) 상기 양측 키부재 사이에 고무판 부재를 설치하고, 고무판 부재가 덮여 있는 양측 키부재의 상면에 상부 덮개판을 각각 안착하여 상호 맞물림 결합된 상태에서 상부 덮개판에 볼트를 체결하여 상부 덮개판을 키부재에 고정하는 단계; 및 d) A rubber plate member is installed between the key members on both sides, and the upper cover plate is seated on the upper surface of both key members covered with the rubber plate member, and the bolts are fastened to the upper cover plate while being engaged with each other. Fixing to the key member; And e) 상기 배근 철근이 드러난 공간에 콘크리트를 타설하고 소정 시간 양생하여 작업을 마무리하는 단계를 포함하여 구성된 것을 특징으로 하는 소음/충격 완화 및 볼트/너트 풀림방지 수단을 구비한 신축 이음장치의 시공방법.e) Construction method of the expansion joint device equipped with noise / impact mitigation and bolt / nut loosening means comprising the step of finishing the work by placing concrete in the space where the reinforcement bar is exposed and curing for a predetermined time . 제3항에 있어서,The method of claim 3, 상기 단계 b)에서 수평 고정부재와 키부재의 결합은 볼트/너트 체결방식으로 결합하는 것을 특징으로 하는 소음/충격 완화 및 볼트/너트 풀림방지 수단을 구비한 신축 이음장치의 시공방법.In the step b), the horizontal fixing member and the key member is coupled to the bolt / nut fastening method characterized in that the construction of the expansion joint with a noise / shock mitigation and bolt / nut loosening means. 제3항에 있어서,The method of claim 3, 상기 단계 d)에서 고무판 부재로는 그 몸체의 일부가 상기 상부 덮개판과 키부재 사이에 개재됨으로써 차량의 주행에 따른 충격 및 소음을 완화할 수 있도록 고무판 부재의 양단에 형성되어 있는 키부재와의 결합용 돌기의 외측으로 키부재의 상면부 넓이만큼 더 연장되어 형성되어 있는 고무판 부재가 사용되는 것을 특징으로 하는 소음/충격 완화 및 볼트/너트 풀림방지 수단을 구비한 신축 이음장치의 시공방법.In the step d), the rubber plate member is provided with a key member formed at both ends of the rubber plate member so that a part of the body is interposed between the upper cover plate and the key member so as to alleviate the impact and noise caused by the running of the vehicle. A rubber plate member which is formed to extend further by the width of the upper surface portion of the key member to the outside of the engaging projection is used, the construction method of the expansion joint device with a noise / impact mitigation and bolt / nut loosening means. 제3항에 있어서,The method of claim 3, 상기 단계 d)에서 상부 덮개판에 볼트를 체결함에 있어서, 그 일측면은 볼트의 나사산 각도(β)보다 큰 각도(α)로 경사면이 형성되어 있는 다수의 캠들로 구성되고, 타측면은 톱니로 구성되어 있는 와셔 2개를 캠들이 서로 마주보도록 하여 볼트에 먼저 체결하고, 그 상태의 볼트를 상부 덮개판에 체결하는 것을 특징으로 하는 소음/충격 완화 및 볼트/너트 풀림방지 수단을 구비한 신축 이음장치의 시공방법.In fastening the bolt to the upper cover plate in step d), one side thereof is composed of a plurality of cams having an inclined surface formed at an angle (α) greater than the thread angle (β) of the bolt, the other side is a tooth Expansion joints with noise / impact mitigation and bolt / nut loosening means characterized by fastening the two washers with the cams facing each other to the bolt first, and then fastening the bolt to the upper cover plate. Construction method of the device. 제3항에 있어서,The method of claim 3, 상기 단계 d)에서의 상부 덮개판의 볼트 체결과 관련하여, 상부 덮개판 및 그 상부 덮개판과 그 하부의 키부재 사이에 개재된 상기 고무판 부재를 볼트가 관통할 수 있도록 천공작업을 수행함에 있어서 전동드릴을 이용한 전동작업으로 구멍을 뚫되, 전동드릴의 드릴척에 특수 제작한 원통형의 칼날식 고무 천공기를 장착하여 천공작업을 수행하는 것을 특징으로 하는 소음/충격 완화 및 볼트/너트 풀림방지 수단을 구비한 신축 이음장치의 시공방법. In connection with the bolt fastening of the upper cover plate in step d), in performing the drilling operation so that the bolt can penetrate the upper cover plate and the rubber plate member interposed between the upper cover plate and the lower key member. It is equipped with a noise / impact mitigation and bolt / nut loosening means, which are drilled by electric work using a power drill, and performs drilling by mounting a specially manufactured cylindrical blade-type rubber perforator on the drill chuck of the power drill. Construction method of one expansion joint. 제7항에 있어서, 상기 고무 천공기는 The method of claim 7, wherein the rubber perforator 상기 전동드릴의 드릴척부에 결합되는 섕크부;Shank portion coupled to the drill chuck portion of the power drill; 상기 섕크부와 일체로 섕크부의 일단에 연장되어 형성되는 몸체부; 및A body portion which is formed integrally with the shank portion and extends at one end of the shank portion; And 상기 몸체부와 일체로 몸체부의 일단에 연장되어 형성되며, 그 하단부에는 대상 물체에의 구멍 천공을 위한 칼날형 홀 커터날이 형성되어 있는 원통형의 홀 커팅부를 포함하여 구성된 것을 특징으로 소음/충격 완화 및 볼트/너트 풀림방지 수단을 구비한 신축 이음장치의 시공방법. Noise and shock mitigation, characterized in that it is formed integrally with the body portion is extended to one end of the body portion, the lower end portion comprises a cylindrical hole cutting portion formed with a blade-type hole cutter blade for drilling holes in the target object And Construction method of expansion joint device provided with bolt / nut loosening prevention means. 제8항에 있어서,The method of claim 8, 상기 홀 커팅부의 원통형 몸체의 원주면에는 적어도 하나의 관통공이 형성되어 있는 것을 특징으로 하는 소음/충격 완화 및 볼트/너트 풀림방지 수단을 구비한 신축 이음장치의 시공방법. At least one through-hole is formed in the circumferential surface of the cylindrical body of the hole-cutting portion, the construction method of the expansion joint device having a noise / impact mitigation and bolt / nut loosening means.
KR1020040025484A 2004-04-13 2004-04-13 Expansion and contraction joint having means for absorbing noise/ shock and preventing relaxation of bolt/nut, and constructing method thereof KR100488624B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020040025484A KR100488624B1 (en) 2004-04-13 2004-04-13 Expansion and contraction joint having means for absorbing noise/ shock and preventing relaxation of bolt/nut, and constructing method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020040025484A KR100488624B1 (en) 2004-04-13 2004-04-13 Expansion and contraction joint having means for absorbing noise/ shock and preventing relaxation of bolt/nut, and constructing method thereof

Related Child Applications (1)

Application Number Title Priority Date Filing Date
KR20-2004-0010239U Division KR200356028Y1 (en) 2004-04-13 2004-04-13 Expansion and contraction joint having means for absorbing noise/ shock and preventing relaxation of bolt/nut

Publications (1)

Publication Number Publication Date
KR100488624B1 true KR100488624B1 (en) 2005-05-11

Family

ID=37302456

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020040025484A KR100488624B1 (en) 2004-04-13 2004-04-13 Expansion and contraction joint having means for absorbing noise/ shock and preventing relaxation of bolt/nut, and constructing method thereof

Country Status (1)

Country Link
KR (1) KR100488624B1 (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101028507B1 (en) * 2008-06-12 2011-04-11 (주)엠피기술산업 Expansion joint without reinforced concrete for a bridge structure and construction method thereof
CN102691261A (en) * 2012-05-27 2012-09-26 张保忠 Telescopic device of rail transit bridge
CN110029575A (en) * 2019-05-20 2019-07-19 陕西国防工业职业技术学院 A kind of Bridge Seismic expansion joint
KR102308948B1 (en) 2020-12-11 2021-10-06 이두성 Expansion joint device minimizing the occurrence of Post-placing concrete concrete cavity and its manufacturing and construction method

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101028507B1 (en) * 2008-06-12 2011-04-11 (주)엠피기술산업 Expansion joint without reinforced concrete for a bridge structure and construction method thereof
CN102691261A (en) * 2012-05-27 2012-09-26 张保忠 Telescopic device of rail transit bridge
CN110029575A (en) * 2019-05-20 2019-07-19 陕西国防工业职业技术学院 A kind of Bridge Seismic expansion joint
CN110029575B (en) * 2019-05-20 2020-10-27 陕西国防工业职业技术学院 Bridge shock attenuation expansion joint
KR102308948B1 (en) 2020-12-11 2021-10-06 이두성 Expansion joint device minimizing the occurrence of Post-placing concrete concrete cavity and its manufacturing and construction method

Similar Documents

Publication Publication Date Title
KR100696398B1 (en) Expansion joint for highways, bridges and the like and assembling method for use the same
EA007891B1 (en) Attachment means for drilling equipment
KR100488624B1 (en) Expansion and contraction joint having means for absorbing noise/ shock and preventing relaxation of bolt/nut, and constructing method thereof
JP6771987B2 (en) Floor slab replacement method for steel synthetic girders and PC floor slab
JP6074378B2 (en) Expansion device replacement method and temporary lining plate structure
KR200356028Y1 (en) Expansion and contraction joint having means for absorbing noise/ shock and preventing relaxation of bolt/nut
KR100553353B1 (en) Drill aid apparatus for narrow portion and reparing and reinforcing method of structure by using the drill aid apparatus
JP2007177436A (en) Joint repairing method
KR200233313Y1 (en) a bolt coupling method of the head reinforcement structure for H-pile
JP6792415B2 (en) How to remove concrete slab and how to install new concrete slab
KR100615922B1 (en) Removal method of building
KR200494837Y1 (en) Shear connector for steel frame structure and bridge structure with the same
JP5041481B2 (en) Updating method and structure of existing bearing device
KR20050076286A (en) Method for extending and removing wall of subway structure in subway service line
JP2005061081A (en) Joint structure of pre-cast slab, and joining method thereof
JP3699936B2 (en) Road bridge joint structure, method of constructing expansion joints on road bridge joints, and repair method of road bridge joints
KR20050071444A (en) Protection wall of bridge
JP2003227106A6 (en) Installation method for concrete bridges and retrofitting members
KR100564093B1 (en) A flexible connection structure of a bridge using expandable rubber
KR101017894B1 (en) A post for temporary soundproofing walls
KR20180065435A (en) Method of removing and replacing sleeper on concrete railroad bed by re-using waste products
KR200224501Y1 (en) Joint structure using a prominence and depression anchor bolt of bridge
KR200201606Y1 (en) The psc bridge beam which can institute slab mold and safety net
KR102304230B1 (en) Demountable shear connector apparatus and bridge structure with the same, and bridge concrete slab construction method using the same
KR200335100Y1 (en) Support device for repairing the brickwall of a building

Legal Events

Date Code Title Description
A201 Request for examination
A302 Request for accelerated examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20130503

Year of fee payment: 9

FPAY Annual fee payment

Payment date: 20140507

Year of fee payment: 10

FPAY Annual fee payment

Payment date: 20150504

Year of fee payment: 11

FPAY Annual fee payment

Payment date: 20160503

Year of fee payment: 12

FPAY Annual fee payment

Payment date: 20170504

Year of fee payment: 13

FPAY Annual fee payment

Payment date: 20190429

Year of fee payment: 15