KR100476917B1 - Repairing and reinforcing member for repairing and reinforcing ferro-concrete structures by fabricating umbrella rib anchors and unit reinforced FRP panels, and method for repairing and reinforcing using the member - Google Patents

Repairing and reinforcing member for repairing and reinforcing ferro-concrete structures by fabricating umbrella rib anchors and unit reinforced FRP panels, and method for repairing and reinforcing using the member Download PDF

Info

Publication number
KR100476917B1
KR100476917B1 KR10-2003-0028591A KR20030028591A KR100476917B1 KR 100476917 B1 KR100476917 B1 KR 100476917B1 KR 20030028591 A KR20030028591 A KR 20030028591A KR 100476917 B1 KR100476917 B1 KR 100476917B1
Authority
KR
South Korea
Prior art keywords
reinforcement
reinforced
unit
concrete structure
frp
Prior art date
Application number
KR10-2003-0028591A
Other languages
Korean (ko)
Other versions
KR20040095001A (en
Inventor
이화선
Original Assignee
주식회사 엠티마스타
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 주식회사 엠티마스타 filed Critical 주식회사 엠티마스타
Priority to KR10-2003-0028591A priority Critical patent/KR100476917B1/en
Publication of KR20040095001A publication Critical patent/KR20040095001A/en
Application granted granted Critical
Publication of KR100476917B1 publication Critical patent/KR100476917B1/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G23/00Working measures on existing buildings
    • E04G23/02Repairing, e.g. filling cracks; Restoring; Altering; Enlarging
    • E04G23/0218Increasing or restoring the load-bearing capacity of building construction elements
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G9/00Forming or shuttering elements for general use
    • E04G9/02Forming boards or similar elements
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G23/00Working measures on existing buildings
    • E04G23/02Repairing, e.g. filling cracks; Restoring; Altering; Enlarging
    • E04G23/0218Increasing or restoring the load-bearing capacity of building construction elements
    • E04G2023/0251Increasing or restoring the load-bearing capacity of building construction elements by using fiber reinforced plastic elements

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Chemical & Material Sciences (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Electrochemistry (AREA)
  • Working Measures On Existing Buildindgs (AREA)

Abstract

본 발명은 철근 콘크리트 구조물인 교량 또는 건축물의 슬래브 또는 거더에 노후 및 열화로 인하여 발생된 부식 및 균열부분에 대하여 우산살 앵커와 단위 강화 FRP 판넬을 조립하여 철근 콘크리트 구조물을 보수보강하는 보수보강체 및 이를 이용한 보수보강 시공방법에 관한 것이다.The present invention provides a reinforcement for reinforcing reinforced concrete structures by assembling umbrella anchors and unit reinforced FRP panels against corrosion and cracks caused by deterioration and deterioration in a slab or girder of bridges or buildings that are reinforced concrete structures. It relates to a reinforcement construction method using the same.

철근 콘크리트 구조물의 표면에 천공홀을 형성하고 스크류 앵커를 삽입한 후에 상기 스크류 앵커내에 우산살 앵커를 삽입 설치한 후에 일정한 간격을 두고 몸체에 길이 방향으로 돌출부가 다수개 형성된 단위 강화 FRP 측벽 판넬을 철근 콘크리트 구조물의 길이방향으로 측벽에 설치하고, 상기 단위 강화 FRP 측벽 판넬의 하부에 형성된 연결부를 연결재의 몸체 일측에 삽입하고, 연결재의 몸체 타측에는 길이방향으로 돌출부가 다수개 형성된 단위 강화 FRP 바닥면 판넬을 삽입하는 작업을 수회반복하여 보수보강하고자하는 철근 콘크리트 구조물의 바닥면을 외부에서 감싸는 바닥면을 형성하도록 하여 상기 단위 강화 FRP측벽 판넬과 일체로된 단위 강화 FRP 바닥면 판넬로 이루어지게 형성하여 보수보강을 하고자하는 철근 콘크리트 구조물의 외측부를 둘러싸도록 형성하는 보수보강체를 설치한 후에 철근 콘크리트 구조물 표면과 상기 단위 강화 FRP판넬이 만나는 부분은 실링하고 철근 콘크리트 구조물과 상기 보수보강체 사이에는 충전재로 밀실하게 충전하여 철근 콘크리트 구조물에 대한 보수보강을 실시하는 것이다. After forming a hole in the surface of the reinforced concrete structure and inserting the screw anchor, insert the umbrella anchor into the screw anchor, and then install the reinforcing unit reinforced FRP side wall panel having a plurality of protrusions in the longitudinal direction at regular intervals. It is installed on the side wall in the longitudinal direction of the concrete structure, the connecting portion formed in the lower portion of the unit reinforced FRP side wall panel is inserted into one side of the body of the connecting member, the other side of the body of the connecting member unit reinforced FRP bottom panel having a plurality of protrusions in the longitudinal direction Repeat the operation of inserting a number of times to form the bottom surface of the reinforced concrete structure to be repaired from the outside to form a bottom surface united with the unit reinforced FRP side wall panel repaired by forming The outer part of the reinforced concrete structure to be reinforced After installing the reinforcing reinforcement body to form a wrap, the part where the surface of the reinforced concrete structure and the unit reinforced FRP panel meet is sealed, and the reinforcing reinforcement for the reinforcement concrete structure is tightly filled with filler between the reinforcement concrete structure and the reinforcing reinforcement body. Will be carried out.

Description

우산살 앵커와 단위 강화 FRP판넬을 조립하여 철근 콘크리트 구조물을 보수보강하는 보수보강체 및 이를 이용한 보수보강 시공방법{Repairing and reinforcing member for repairing and reinforcing ferro-concrete structures by fabricating umbrella rib anchors and unit reinforced FRP panels, and method for repairing and reinforcing using the member}        Repairing and reinforcing member for repairing and reinforcing ferro-concrete structures by fabricating umbrella rib anchors and unit reinforced FRP by assembling umbrella anchors and unit reinforced FRP panels panels, and method for repairing and reinforcing using the member}

본 발명은 철근 콘크리트 구조물인 교량 또는 건축물의 슬래브, 보 또는 거더에 노후 및 열화로 인하여 발생된 부식 및 균열부분에 대하여 우산살 앵커와 단위 강화 FRP 판넬을 조립하여 철근 콘크리트 구조물을 보수보강하는 보수보강체 및 이를 이용한 보수보강 시공방법에 관한 것이다.       The present invention repairs and reinforces reinforced concrete structures by assembling umbrella anchors and unit-reinforced FRP panels for corrosion and cracks caused by deterioration and deterioration in slabs, beams or girders of bridges or buildings that are reinforced concrete structures. It relates to a sieve and a reinforcement construction method using the same.

철근 콘크리트 구조물의 표면에 천공홀을 형성하고 스크류 앵커를 삽입한 후에 상기 스크류 앵커내에 우산살 앵커를 나사삽입 설치후에 일정한 간격을 두고 몸체에 길이 방향으로 돌출부가 다수개 형성된 단위 강화 FRP 측벽 판넬을 철근 콘크리트 구조물의 길이방향으로 측벽에 설치하고, 상기 단위 강화 FRP 측벽 판넬의 하부에 형성된 연결부를 연결재의 몸체 일측에 삽입하고, 연결재의 몸체 타측에는 길이방향으로 돌출부가 다수개 형성된 단위 강화 FRP 바닥면 판넬을 삽입하는 작업을 수회반복하여 보수보강하고자하는 철근 콘크리트 구조물의 바닥면을 외부에서 감싸는 바닥면을 형성하도록 하여 상기 단위 강화 FRP측벽 판넬과 일체로된 단위 강화 FRP 바닥면 판넬로 이루어지게 형성하여 보수보강을 하고자하는 철근 콘크리트 구조물의 외측부를 둘러싸도록 형성하는 보수보강체를 설치한 후에 철근 콘크리트 구조물 표면과 상기 단위 강화 FRP판넬이 만나는 부분은 실링하고 철근 콘크리트 구조물과 상기 보수보강체 사이에는 충전재로 밀실하게 충전하여 철근 콘크리트 구조물에 대한 보수보강을 실시하는 것이다.  After drilling holes are formed on the surface of the reinforced concrete structure and the screw anchors are inserted, the unit reinforcement FRP side wall panel is formed with a plurality of protrusions formed in the longitudinal direction at regular intervals after the installation of the umbrella anchor screw into the screw anchors. It is installed on the side wall in the longitudinal direction of the concrete structure, the connecting portion formed in the lower portion of the unit reinforced FRP side wall panel is inserted into one side of the body of the connecting member, the other side of the body of the connecting member unit reinforced FRP bottom panel having a plurality of protrusions in the longitudinal direction Repeat the operation of inserting a number of times to form the bottom surface of the reinforced concrete structure to be repaired from the outside to form a bottom surface united with the unit reinforced FRP side wall panel repaired by forming The outer part of the reinforced concrete structure to be reinforced After installing the reinforcing reinforcement body to form a wrap, the part where the surface of the reinforced concrete structure and the unit reinforced FRP panel meet is sealed, and the reinforcing reinforcement for the reinforcement concrete structure is tightly filled with filler between the reinforcement concrete structure and the reinforcing reinforcement body. Will be carried out.

상기 단위 강화 FRP 판넬인 단위 강화 FRP 바닥면 판넬과 단위 강화 FRP 측벽 판넬을 보수보강하고자하는 철근 콘크리트 구조물의 외측을 감싸게 연결재를 이용하여 설치할 경우, 철근 콘크리트 구조물의 외측부와 길이 및 폭이 맞지 않을 경우 간격 조절재의 일측에 간격 조절 연결재를 삽입하고 양측에 상기 단위 강화 FRP 판넬을 삽입 조립하여 보수보강하고자 하는 철근 콘크리트 구조물의 규격에 맞는 보수보강체를 설치하도록 한다.When the unit reinforced FRP panel, the unit reinforced FRP bottom panel and the unit reinforced FRP side wall panel, are installed using a connecting member to surround the outer side of the reinforced concrete structure to be reinforced, the length and width of the outer side of the reinforced concrete structure do not match. Insert a spacing control connector on one side of the spacing control material and insert and assemble the unit reinforced FRP panel on both sides to install the reinforcement body conforming to the specifications of the reinforced concrete structure to be repaired.

본 발명은 노후 또는 열화로 인하여 부식 또는 균열이 발생된 부분에 대하여 단위 강화 FRP 판넬을 연결재를 이용하여 연결조립하여 이를 거푸집으로 이용하고, 충전제와 밀실한 접착을 위하여 설치된 우산살 앵커와 단위 강화 FRP판넬 내부에 길이 방향으로 다수개 돌출 형성된 돌출부에 충전재를 충전하여 철근 콘크리트 구조물을 보수보강하는 시공방법에 관한 것으로서, 사전에 제작된 단위 강화 FRP 판넬과 연결재를 이용하여 보수보강하고자 하는 부분에 설치하고 충전재로 충전하면 시공이 완료되는 시공방법이므로 설치가 간단하면서 우산살 앵커와 단위 강화 FRP 판넬에 길이 방향으로 형성된 돌출부를 이용하여 철근 콘크리트 구조물의 표면과 상기 단위 강화 FRP 판넬이 충전재에 의해 밀착시공되어 박리될 우려가 없으며 보수보강체가 철근 콘크리트 구조물과 일체화되어 일체로 작용하므로서 확실한 보수보강이 이뤄지게 하는 시공방법을 제공하는데 그 목적이 있다.       In the present invention, a unit reinforced FRP panel is used as a formwork for connecting parts with corrosion or cracks due to deterioration or deterioration using a connecting material, and used as a formwork, and an umbrella anchor and unit reinforced FRP installed for tight adhesion with a filler. The construction method for reinforcing reinforced concrete structures by filling fillers in protrusions formed in a plurality of protrusions in the longitudinal direction inside the panel, and using the pre-fabricated unit-reinforced FRP panels and connecting materials, they are installed in the part to be repaired and reinforced. The installation method is simple when it is filled with the filling material, so the installation is simple, and the surface of the reinforced concrete structure and the unit reinforcing FRP panel are closely contacted by the filler using the umbrella anchor and the protrusion formed in the longitudinal direction on the unit reinforcing FRP panel. There is no risk of peeling and the reinforcing reinforcement is reinforced The purpose of the present invention is to provide a construction method in which the repair and reinforcement is achieved by being integrated with the lit structure.

종래에는 철근 콘크리트 구조물이 열화 또는 부식에 의하여 하중 지지력의 감소의 우려가 있는 경우 콘크리트 표면에 수지를 도포한 후에 토목섬유를 직접부착하여 지지력의 감소를 방지하기 위한 보수보강방법을 실시하여 왔으나, 외부의 온도 및 날씨에 따른 영향을 민감하게 받게되어 고온 , 혹한 또는 우천시에는 작업이 어려우며, 작업이 완료되어 일정한 시간이 경과되면 접착된 부분이 콘크리트 표면으로부터 박리 이탈되어 소기의 목적을 달성하지 못하는 문제점이 있으며, 또 다른 방법으로서 콘크리트 표면에 앵커를 이용하여 철판등을 부착설치하여 철근 콘크리트 구조물의 하중 지지력을 증강시키고자하는 보수보강방법을 사용하고 있으나 이러한 방법은 앵커를 박기 위하여 콘크리트 구조물에 천공을 하므로서 구조물에 손상을 주게되면서 외부의 습도에 많은 영향을 받게되어 강판의 부식등으로 인하여 지속적인 관리가 수행되어야 하는 문제점이 상존하여 왔다. Conventionally, when reinforced concrete structures are deteriorated or corroded, there is a possibility that the load bearing capacity may be reduced. After applying resin to the concrete surface, the geosynthetic fibers are directly attached to each other. It is difficult to work in high temperature, cold or rainy weather because it is sensitive to the temperature and weather of the weather, and after a certain time has elapsed, the bonded part is peeled off from the concrete surface and it is impossible to achieve its intended purpose. As another method, a reinforcing reinforcement method is used to increase the load bearing capacity of reinforced concrete structures by attaching and installing steel plates on the concrete surface using anchors. However, this method uses perforation to concrete structures to anchor anchors. If you damage the structure To receive a significant effect on the external corrosion due to moisture, such as steel and has a problem that ongoing maintenance to be performed linger.

본 발명은 이상과 같은 문제점을 감안하여 제안된 것으로서, 철근 콘크리트 구조물에 미리 제작된 단위 강화 FRP패널과 연결재를 이용하여 보수보강체를 거푸집으로 사용하여 철근 콘크리트 구조물에 설치된 우산살 앵커와 상기 단위 강화 FRP 판넬에 설치된 돌출부를 이용하여 접착력을 향상시켜 노후된 철근 콘크리트 구조물의 하중 지지력을 증강시키는 보수보강 시공방법을 제공하는 것이다.The present invention has been proposed in view of the above problems, using the reinforcement reinforcement as a formwork using unit reinforcement FRP panels and connecting materials prefabricated in reinforced concrete structures, umbrella anchors and the unit reinforcement installed in reinforced concrete structures It is to provide a repair reinforcement construction method to increase the load bearing capacity of the aged reinforced concrete structure by improving the adhesive force using the protrusions installed on the FRP panel.

상기의 목적을 달성하기 위하여 본 발명은 철근 콘크리트 구조물(10)의 표면에 천공홀(11)을 형성하고 스크류 앵커(12)를 삽입한 후에 상기 스크류 앵커(12)내에 우산살 앵커(80)를 나사삽입하여 설치한 후에 일정한 간격을 두고 몸체에 길이 방향으로 돌출부(70)가 다수개 형성된 단위 강화 FRP 측벽 판넬(50)을 철근 콘크리트 구조물(10)의 길이방향으로 측벽에 설치하고, 상기 단위 강화 FRP 측벽 판넬(50)의 하부에 형성된 연결부(55)를 연결재(60)의 몸체(31) 일측에 삽입하고, 연결재(60)의 몸체(31) 타측에는 길이방향으로 돌출부(70)가 다수개 형성된 단위 강화 FRP 바닥면 판넬(40)을 삽입하는 작업을 수회반복하여 보수보강하고자하는 철근 콘크리트 구조물(10)의 바닥면을 외부에서 감싸도록 하여 상기 단위 강화 FRP측벽 판넬(50)과 일체로된 단위 강화 FRP 바닥면 판넬(40)로 이루어지게 형성하여 보수보강을 하고자하는 철근 콘크리트 구조물(10)의 외측부를 둘러싸도록 형성하는 보수보강체(20)를 설치한 후에 철근 콘크리트 구조물(10) 표면과 상기 단위 강화 FRP판넬(30)이 만나는 부분은 실링하고 철근 콘크리트 구조물(10)과 상기 보수보강체(20) 사이에는 충전재로 밀실하게 충전하여 철근 콘크리트 구조물(10)에 대한 보수보강을 실시하는 것이다.In order to achieve the above object, the present invention forms a drill hole 11 on the surface of the reinforced concrete structure 10 and inserts the screw anchor 12, the umbrella anchor anchor 80 in the screw anchor 12 After the screw is installed, the unit reinforced FRP side wall panel 50 having a plurality of protrusions 70 formed in the longitudinal direction at a predetermined interval is installed on the side wall in the longitudinal direction of the reinforced concrete structure 10 at regular intervals. Insert the connecting portion 55 formed on the lower portion of the FRP side wall panel 50 to one side of the body 31 of the connecting member 60, the other side of the body 31 of the connecting member 60 a plurality of protrusions 70 in the longitudinal direction Repeatedly insert the formed unit reinforced FRP bottom panel 40 several times to wrap the bottom surface of the reinforced concrete structure 10 to be repaired from the outside to be integrated with the unit reinforced FRP side wall panel 50 Unit reinforcing FRP bottom plate After forming the reinforcing reinforcement body 20 formed so as to surround the outer portion of the reinforced concrete structure 10 to be made to be made to the reinforcement reinforcement (40) surface of the reinforced concrete structure (10) and the unit reinforced FRP panel ( The part where 30) meets is sealed and tightly filled with filler between the reinforced concrete structure 10 and the reinforcing reinforcement 20 to perform reinforcement for the reinforced concrete structure 10.

상기 단위 강화 FRP 판넬(30)인 단위 강화 FRP 바닥면 판넬(40)과 단위 강화 FRP 측벽 판넬(50)을 이용하여 연결재(60)를 이용하여 연결조립하여 설치한 보수보강체(20)가 보수보강하고자 하는 철근 콘크리트 구조물(10)의 규격과 맞지 않을 경우에는 간격 조절재(110)의 일측에 간격 조절 연결재(90)를 삽입하고 양측에 상기 단위 강화 FRP 판넬(30)을 길이에 맞게 삽입조립하여 보수보강하고자 하는 철근 콘크리트 구조물(10)의 규격에 맞는 보수보강체(20)를 설치하는 것에 특징이 있다. Repair reinforcement body 20 installed by assembling the connection using the connecting member 60 by using the unit reinforced FRP bottom panel 40 and the unit reinforced FRP side panel 50, which is the unit reinforced FRP panel 30 If it does not meet the specifications of the reinforced concrete structure 10 to be reinforced, insert the gap control connecting member 90 on one side of the gap adjusting member 110, and insert and assemble the unit reinforcement FRP panel 30 on both sides to the length It is characterized in that to install the reinforcing reinforcement body 20 that meets the standard of the reinforced concrete structure 10 to be repaired.

상기 보수보강체를 이용하여 시공하는 보수보강 시공방법은 다음과 같다.The repair reinforcement construction method constructed using the repair reinforcement body is as follows.

보수보강이 요구되는 철근 콘크리트 구조물(10)의 표면을 정리하는 단계와 상기 표면에 스크류 앵커(12)를 일정한 간격을 두고 설치하는 단계와 상기 스크류 앵커(12)에 우산살 앵커(80)를 설치하는 단계와 상기 보수보강이 요구되는 철근 콘크리트 구조물(10)의 측면에 단위 강화 FRP 측벽 판넬(50)을 설치하고 연결재(60)로 연결하면서 하부에는 단위 강화 FRP 바닥면 판넬(40)에 연결재(60)를 이용하여 보수보강하고자하는 규격의 보수보강체(20)를 설치하는 단계와 상기 철근 콘크리트 구조물(10)과 상기 단위 강화 FRP 판넬(20)이 만나는 부분에 실링을 하고 철근 콘크리트 구조물(10)과 보수보강체(20) 사이에 콘크리트와 같은 충전재를 밀실하게 타설하는 단계와 상기 철근 콘크리트 구조물(10)과 보수보강체(20) 사이에 설치된 우산살 앵커(80)와 단위 강화 FRP 판넬(30) 몸체(31)에 형성된 돌출부(70)가 충전재와 일체로 접착되어 철근 콘크리트 구조물(10)에 작용하는 하중에 일체로 작용하도록 양생하고 주변을 정리하는 단계로 이루어진 시공방법에 특징이 있다.       Arranging the surface of the reinforced concrete structure 10 that requires repair reinforcement, and installing the screw anchors 12 at regular intervals on the surface, and installing the umbrella anchor anchor 80 to the screw anchors 12. Steps and the unit reinforced FRP side wall panel 50 is installed on the side of the reinforced concrete structure 10 is required to repair and connected to the connecting member 60 while connecting to the unit reinforced FRP bottom panel 40 at the bottom ( Installing a reinforcing reinforcement body 20 of the standard to be repaired and reinforcement using a 60) and sealing the portion where the reinforced concrete structure 10 and the unit reinforced FRP panel 20 meets and reinforced concrete structure (10) And concretely filling the filling material, such as concrete, between the reinforcing reinforcement 20 and the reinforcement concrete structure 10 and the reinforcing reinforcement 20 and the umbrella reinforcement anchor 80 and the unit reinforced FRP panel ( 30) Projections 70 formed in the body 31 is integrally bonded with the filler is characterized in the construction method consisting of curing and cleaning the surroundings to work integrally with the load acting on the reinforced concrete structure (10).

상기 단계에서 단위 강화 FRP 바닥면 판넬(40)과 단위 강화 FRP 측벽 판넬(50)에 연결재(60)를 이용하여 연결조립하여 설치한 보수보강체(20)가 보수보강하고자 하는 철근 콘크리트 구조물(10)의 규격과 맞지 않을 경우에는 간격 조절재(110)의 일측에 간격 조절 연결재(90)를 삽입하고 양측에 상기 단위 강화 FRP 판넬(30)을 길이에 맞게 삽입조립하여 보수보강하고자 하는 철근 콘크리트 구조물(10)의 규격에 맞는 보수보강체(20)를 설치하는 단계를 더 포함하는 시공방법을 적용한다.       Reinforced concrete structure 10 to be repaired and reinforced by the reinforcing reinforcement body (20) installed by connecting the unit reinforced FRP bottom panel 40 and the unit reinforcement FRP side wall panel 50 using the connecting member 60 in the above step (10) If it does not meet the specifications of the), the reinforced concrete structure to be repaired and reinforced by inserting the spacing control connecting member 90 to one side of the spacing control member 110 and inserting the unit reinforcement FRP panel 30 to both sides to the length Apply the construction method further comprising the step of installing the reinforcing reinforcement body 20 in accordance with the standard (10).

이하, 본 발명의 구성 및 작용을 첨부된 도면에 의하여 상세히 설명하면 다음과 같다.        Hereinafter, the configuration and operation of the present invention will be described in detail by the accompanying drawings.

도 1은 본 발명의 보수보강체를 철근 콘크리트 구조물의 외부에 조립설치하여 보수보강을 실시하는 것을 보여주는 도면으로서, 철근 콘크리트 구조물(10)의 표면에 다수개의 천공홀(11)을 형성하고 스크류 앵커(12)를 삽입한 후에 상기 스크류 앵커(12)내에 우산살 앵커(80)를 나사삽입하여 설치하고, 일정한 간격을 두고 몸체(31)에 길이 방향으로 돌출부(70)가 다수개 형성된 단위 강화 FRP 측벽 판넬(50)을 철근 콘크리트 구조물(10)의 길이방향으로 측벽에 설치하고, 상기 단위 강화 FRP 측벽 판넬(50)의 하부에 형성된 연결부(55)를 연결재(60)의 몸체(31) 일측에 삽입하고, 연결재(60)의 몸체(31) 타측에는 길이방향으로 돌출부(70)가 다수개 형성된 단위 강화 FRP 바닥면 판넬(40)을 삽입하는 작업을 수회반복하여 보수보강하고자하는 철근 콘크리트 구조물(10)의 바닥면을 외부에서 감싸게 형성하도록 하여 상기 단위 강화 FRP측벽 판넬(50)과 일체로된 단위 강화 FRP 바닥면 판넬(40)로 이루어지게 형성하여 보수보강을 하고자하는 철근 콘크리트 구조물(10)의 외측부를 둘러싸도록 형성하는 보수보강체(20)를 설치한 후에 철근 콘크리트 구조물(10) 표면과 상기 단위 강화 FRP 판넬(30)이 만나는 부분은 실링하고 철근 콘크리트 구조물(10)과 상기 보수보강체(20) 사이에는 충전재로 밀실하게 충전하여 철근 콘크리트 구조물(10)에 대한 보수보강을 실시한다. 1 is a view showing the repair and reinforcement by assembling and installing the reinforcing reinforcement of the present invention to the outside of the reinforced concrete structure, forming a plurality of perforation holes (11) on the surface of the reinforced concrete structure 10 and screw anchor After inserting the 12, the screw anchor 12 is installed by screwing the umbrella anchor anchor 80, and the unit reinforcement FRP having a plurality of protrusions 70 formed in the longitudinal direction on the body 31 at regular intervals. The side wall panel 50 is installed on the side wall in the longitudinal direction of the reinforced concrete structure 10, and the connection part 55 formed at the lower portion of the unit reinforced FRP side wall panel 50 is provided on one side of the body 31 of the connection member 60. Reinforced concrete structure to be inserted and inserted into the body 31 of the other side of the connecting member 60 to reinforce the reinforcement by repeating the operation of inserting the unit reinforced FRP bottom panel 40 formed with a plurality of protrusions 70 in the longitudinal direction ( 10), bottom surface It is formed to surround the outer portion of the reinforced concrete structure 10 to be repaired by forming a wrap from the outside to form a unit reinforced FRP bottom panel 40 integrally with the unit reinforced FRP side wall panel 50 After the reinforcing reinforcement 20 is installed, a portion where the surface of the reinforced concrete structure 10 and the unit reinforcement FRP panel 30 are sealed and a filler is provided between the reinforcement concrete structure 10 and the reinforcing reinforcement 20. Fill tightly with the concrete to perform reinforcement for the reinforced concrete structure (10).

또한, 상기 단위 강화 FRP 판넬(30)인 단위 강화 FRP 바닥면 판넬(40)과 단위 강화 FRP 측벽 판넬(50)을 이용하여 연결재(60)를 이용하여 연결조립하여 설치한 보수보강체(20)가 보수보강하고자 하는 철근 콘크리트 구조물(10)의 규격과 맞지 않을 경우에는 간격 조절재(110)의 일측에 간격 조절 연결재(90)를 삽입하고 양측에 상기 단위 강화 FRP 판넬(30)을 길이에 맞게 삽입조립하여 보수보강하고자 하는 철근 콘크리트 구조물(10)의 규격에 맞는 보수보강체(30)를 설치하도록 한다.In addition, the reinforcing reinforcement body 20 is connected and assembled using the connecting member 60 by using the unit reinforced FRP bottom panel 40 and the unit reinforced FRP side panel 50, which is the unit reinforced FRP panel 30. If it does not meet the standard of the reinforced concrete structure 10 to be repaired reinforcement insert the gap adjusting connecting member 90 on one side of the gap adjusting member 110 and fit the unit reinforced FRP panel 30 on both sides to the length Insert reassembled to install the reinforcement reinforcement body 30 that meets the standard of the reinforced concrete structure (10) to be repaired.

상기 우산살 앵커(80)는 상기 보수보강체(30)의 내부에 설치된 것으로서 충전재와 밀실하게 접착이 될 수 있게 한 것으로서, 전체 길이에 나사홈(84)이 형성된 중앙 지지봉(83)의 하단부 일정 간격을 두고 다수개의 우산살(81)이 설치된 너트(82)를 설치하고 중앙 지지봉(83)의 하단부는 돌출되지 않도록 너트(82)의 밑면과 나란히 정리하며 중앙 지지봉(83)의 상부는 나사홈(84)을 이용하여 요구되는 길이 만큼 상기 스크류 앵커(12)내로 나사결합을 한다.The umbrella anchor anchor 80 is installed inside the maintenance reinforcement body 30 to be tightly adhered to the filling material, the lower end of the central support rod 83 is formed a screw groove 84 in the entire length constant Install the nut 82 with a plurality of umbrella ribs 81 at intervals, and arrange the lower end of the central support rod 83 side by side with the bottom surface of the nut 82 so that the upper portion of the central support rod 83 is a screw groove. Use 84 to screw into the screw anchor 12 to the required length.

상기 우산살 앵커(80)에 설치된 우산살(81)의 개수과 우산살(81)이 설치된 너트(82)의 설치 개수는 요구되는 응력에 따라 가감을 하여 설치한다. The number of umbrella strings 81 installed on the umbrella string anchor 80 and the number of installations of the nut 82 on which the umbrella strings 81 are installed are installed in accordance with the required stress.

도 2는 본 발명의 단위 강화 FRP 판넬의 단위 강화 FRP측벽 판넬을 보여주는 도면으로서, 토목섬유등과 같은 강화섬유에 수지를 여러개 층으로 함침시켜 제작한 것으로서 연결 조립할 수 있게 상기 단위 강화 FRP 측벽 판넬(50)의 일측단에는 양측에 돌기(56)가 외측으로 형성된 마름모꼴 형태의 지지대(57)가 형성되어 중앙에는 공간부가 형성된 연결부(55)가 설치되고 상기 단위 강화 FRP 측벽 판넬(50)의 몸체(31)와 직각으로 형성되게 타측단에 상기의 연결부(55)를 형성하며, 몸체(31)에는 상기 단위 강화 FRP 측벽 판넬(50)의 길이방향으로 몸체(31)에 연장되게 일정높이의 지지벽부(72)를 형성하되 일정간격을 두고 관통구(73)가 형성되도록하며 상기 지지벽부(72)의 끝부분에는 화살모양의 화살돌기(71)가 형성되어 보수보강하고자 하는 철근 콘크리트 구조물(10)과 상기 보수보강체(30)와의 사이에 설치되도록 한다.Figure 2 is a view showing the unit reinforced FRP side wall panel of the unit reinforced FRP panel of the present invention, as a fabric made by impregnating a plurality of layers of resin into the reinforcing fibers, such as geosynthetic fibers such that the unit reinforced FRP side wall panel ( One end of the 50 is formed with a support (57) in the shape of a lozenge having protrusions 56 formed on both sides thereof so that a connecting portion 55 having a space is formed at the center thereof, and the body of the unit reinforced FRP side wall panel 50 ( The connecting portion 55 is formed at the other end to be formed at right angles with the 31, and the body 31 has a support wall of a predetermined height so as to extend to the body 31 in the longitudinal direction of the unit reinforced FRP side wall panel 50. Reinforced concrete structure 10 to be formed to form a through hole (73) at a predetermined interval to form a (72) and the arrow-shaped arrow projection (71) is formed at the end of the support wall portion (72) And award To be installed between the maintenance reinforcement body 30.

이렇게 제작된 상기 단위 강화 FRP 측벽 판넬(50)은 보수보강하고자하는 철근 콘크리트 구조물(10)의 측벽에 설치되며, 그 길이를 연장할 때 상기 연결부(55)를 이용하여 후술하는 연결재(60)의 몸체(31)의 양측에 설치된 양측의 외측부(61)와 중앙에 설치된 중앙 지지부(63)에 의하여 형성된 공간부에 상기 지지대(57)를 삽입하면서 지지대(57)의 양측에 형성된 돌기(56)가 상기 연결재(60)의 외측부(61)에 형성된 홈(62)에 끼워져 보다 긴밀하게 연결되도록 한다.The unit-reinforced FRP side wall panel 50 manufactured as described above is installed on the side wall of the reinforced concrete structure 10 to be repaired and reinforced, and when the length thereof is extended, the connection member 60 will be described later. The projections 56 formed on both sides of the support 57 are inserted while the support 57 is inserted into the space formed by the outer side portions 61 on both sides of the body 31 and the central support portion 63 installed on the center. It fits into the groove 62 formed in the outer portion 61 of the connecting member 60 to be connected more closely.

또한, 보수보강체(30)와 철근 콘크리트 구조물(10)사이에 설치된 우산살 앵커(80)와 상기 단위 강화 FRP 측벽 판넬(50)의 몸체(31)에 설치된 길이방향의 돌출부(70)에 의하여 보다 더 긴밀하게 충전제와 일체화되도록 하기 위하여 설치한 것이며, 상기 돌출부(70)의 지지벽부(72)에 일정한 간격을 두고 형성된 다수개의 관통구(73) 또한 충전제와 긴밀하게 접착되는 것을 돕기 위하면서 중량을 줄이기 위하여 설치한 것이다. In addition, by the umbrella anchor anchor 80 installed between the reinforcement body 30 and the reinforced concrete structure 10 and the longitudinal protrusions 70 installed in the body 31 of the unit reinforced FRP side wall panel 50. It is installed to be more closely integrated with the filler, and the plurality of through holes 73 formed at regular intervals on the support wall portion 72 of the protrusion 70 also helps to adhere closely to the filler, It was installed to reduce the

도 3은 본 발명의 단위 강화 FRP 판넬의 단위 강화 FRP 바닥면 판넬을 보여주는 도면으로서, 토목섬유등과 같은 강화섬유에 수지를 여러개 층으로 함침시켜 제작한 것으로서 연결 조립할 수 있게 상기 단위 강화 FRP 바닥면 판넬(40)의 몸체(31)의 양측단에는 양측에 돌기(56)가 외측으로 형성된 마름모꼴 형태의 지지대(57)가 형성되어 중앙에는 공간부가 형성된 연결부(55)가 설치되고, 몸체(31)에는 상기 단위 강화 FRP 바닥면 판넬(40)의 길이방향으로 몸체(31)에서 연장된 일정높이의 지지벽부(72)를 형성하되 일정간격을 두고 관통구(73)가 형성되도록하며 상기 지지벽부(72)의 끝부분에는 화살모양의 화살돌기(71)가 형성되어 보수보강하고자 하는 철근 콘크리트 구조물(10)과 상기 보수보강체(30)와의 사이에 설치되도록 한다.Figure 3 is a view showing a unit reinforced FRP bottom panel of the unit reinforced FRP panel of the present invention, as a fabric made by impregnating a plurality of layers of resin into the reinforcing fibers, such as geosynthetic fibers, such that the unit reinforced FRP bottom surface At both ends of the body 31 of the panel 40, a support 57 is formed in the shape of a lozenge in which protrusions 56 are formed on both sides thereof, and a connection part 55 having a space is formed at the center thereof, and the body 31 is provided. There is formed a support wall portion 72 of a predetermined height extending from the body 31 in the longitudinal direction of the unit reinforced FRP bottom panel 40 so that the through hole 73 is formed at a predetermined interval and the support wall portion ( An arrow-shaped arrowhead 71 is formed at an end portion of the 72 to be installed between the reinforced concrete structure 10 to be repaired and the repaired reinforcement 30.

이렇게 제작된 상기 단위 강화 FRP 바닥면 판넬(40)은 보수보강하고자하는 철근 콘크리트 구조물(10)의 바닥면에 설치되며, 그 길이를 연장할 때 상기 연결부(55)를 이용하여 후술하는 연결재(60)의 몸체(31)의 양측에 설치된 양측의 외측부(61)와 중앙에 설치된 중앙 지지부(63)에 의하여 형성된 공간부에 상기 지지대(57)를 삽입하면서 지지대(57)의 양측에 형성된 돌기(56)가 상기 연결재(60)의 외측부(61)에 형성된 홈(62)에 끼워져 보다 긴밀하게 연결되도록 한다.The unit-reinforced FRP bottom panel 40 produced in this way is installed on the bottom surface of the reinforced concrete structure 10 to be repaired and reinforcement, when extending the length of the connecting member 60 to be described later using the connecting portion 55 Projections 56 formed on both sides of the support 57 while inserting the support 57 into the space formed by the outer portion 61 on both sides and the central support portion 63 installed at the center of the body 31 of ) Is inserted into the groove 62 formed in the outer portion 61 of the connecting member 60 to be connected more closely.

또한, 보수보강체(20)와 철근 콘크리트 구조물(10)사이에 설치된 우산살 앵커(80)와 상기 단위 강화 FRP 바닥면 판넬(40)의 몸체(31)에 설치된 길이방향의 돌출부(70)에 의하여 보다 더 긴밀하게 충전제와 일체화되도록 하기 위하여 설치한 것이며, 상기 돌출부(70)의 지지벽부(72)에 일정한 간격을 두고 형성된 다수개의 관통구(73) 또한 충전제와 긴밀하게 접착되는 것을 돕기 위하면서 중량을 줄이기 위하여 형성한 것이다.In addition, the umbrella anchor anchor 80 installed between the reinforcing reinforcement body 20 and the reinforced concrete structure 10 and the longitudinal projection 70 installed in the body 31 of the unit reinforced FRP bottom panel 40 It is installed to be more closely integrated with the filler by a plurality of through-holes 73 formed at regular intervals on the support wall portion 72 of the protruding portion 70, while also helping to closely adhere to the filler It is formed to reduce the weight.

도 4는 본 발명의 단위 강화 FRP 판넬을 상호 연결하여 보수보강체를 조립설치하기 위한 연결재를 보여주는 도면으로서 상기 도 2와 도 3에서 설명한 바와 같이 상기 단위 강화 FRP 판넬(30)을 보수보강하고자 하는 철근 콘크리트 구조물(10)의 규격에 맞게 조립하고자 할때 상기 단위 강화 FRP 측벽(50) 및 바닥면 판넬(40)을 상호 연결하기 위한 것이다. 4 is a view showing a connecting member for assembling and installing a reinforcing reinforcement by interconnecting the unit reinforcing FRP panel of the present invention as shown in FIG. 2 and FIG. 3 to reinforce the unit reinforcing FRP panel 30 When assembling to the specification of the reinforced concrete structure 10 is to interconnect the unit reinforced FRP side wall 50 and the bottom panel 40.

상기 연결재(60)는 몸체의 양측에 연결을 위한 장치가 형성된 것으로서, 일정한 높이에 홈(62)이 내측으로 형성된 외측부(61)가 양측에 형성되고 중앙부에는 상기 외측부(61)보다 길이가 짧은 중앙 지지부(63)가 형성되어 상기 외측부(61)와의 사이에 공간부가 복수개 형성되도록 한 것이다.The connecting member 60 is a device for connecting to both sides of the body is formed, the outer portion 61 is formed on both sides with a groove 62 is formed inward at a predetermined height in the center portion is shorter than the outer portion 61 in the center The support portion 63 is formed so that a plurality of space portions are formed between the outer portion 61.

이때, 외측부(61)의 일정 높이에 형성된 홈(62)은 상기 단위 강화 FRP 판넬(30)의 연결부(55)의 지지대(57)에 형성된 돌기(56)와 맞물려 접속되도록 하기 위한 것이며, 외측부(61)와 중앙 지지부(63)와의 사이에 형성된 복수개의 공간부는 상기 단위 강화 FRP 판넬(30)의 지지대(57)가 삽입되도록 한 것이다. At this time, the groove 62 formed at a predetermined height of the outer portion 61 is to be connected to the protrusion 56 formed on the support 57 of the connecting portion 55 of the unit reinforced FRP panel 30, the outer portion ( A plurality of spaces formed between the 61 and the central support portion 63 is to allow the support 57 of the unit reinforced FRP panel 30 is inserted.

도 5는 본 발명의 간격 조절재와 연결하여 단위 강화 FRP 판넬이 조립되어 형성된 보수보강체의 길이를 조절할 수 있게 하는 간격 조절 연결재를 보여주는 도면으로서, 상기 단위 강화 FRP 판넬(30)인 단위 강화 FRP 바닥면 판넬(40)과 단위 강화 FRP 측벽 판넬(50)에 연결재(60)를 이용하여 연결조립하여 설치한 보수보강체(20)가 보수보강하고자 하는 철근 콘크리트 구조물(10)의 규격과 맞지 않을 경우에는 간격 조절재(110)의 일측에 간격 조절 연결재(90)를 삽입하고 그 양측에 상기 단위 강화 FRP 판넬(30)을 길이에 맞게 삽입조립하여 보수보강하고자 하는 것이다. 5 is a view showing a gap control connecting member to adjust the length of the reinforcing reinforcement formed by assembling the unit reinforcement FRP panel is connected to the gap control member of the present invention, the unit reinforcement FRP panel 30 unit reinforcement FRP The reinforcing reinforcement 20 which is installed by assembling and connecting the bottom panel 40 and the unit reinforcement FRP side wall panel 50 using the connecting member 60 may not meet the specifications of the reinforced concrete structure 10 to be reinforced. In this case, the spacing control connector 90 is inserted into one side of the spacing control member 110, and both sides of the unit reinforcement FRP panel 30 is inserted into the assembly to fit the length of the maintenance.

간격 조절 연결재(90)의 일측에 형성된 일정 높이에 형성된 홈(62)을 갖는 외측부가 양측에 형성되면서 중앙부에는 외측부보다 다소 작은 중앙 지지부가 형성되어 마련된 공간부에 후술하는 도 7의 간격 조절재(110)의 몸체(31) 양측에 설치된 외측돌기(111)가 끼워져 조립되는 것으로서 몸체(31)의 일측에 상기 간격 조절재(110)의 외측돌기(111)에 끼워지는 일정 높이에 형성된 홈(62)을 갖는 외측부(61)가 양측에 형성되면서 중앙부에는 외측부(61)보다 다소 작은 중앙 지지부(63)가 형성되어 있고, 또 다른 일측에는 돌기(56)를 갖는 외측돌기(111)가 양측에 형성되어 있다.The gap adjusting member of FIG. 7 to be described later in the space portion provided with a central support portion which is formed on both sides of the outer portion having grooves 62 formed at a predetermined height formed on one side of the gap adjusting connecting member 90 is formed on both sides. The outer protrusions 111 installed on both sides of the body 31 of the 110 are fitted into the grooves formed at a predetermined height to be fitted to the outer protrusions 111 of the gap adjusting member 110 on one side of the body 31. The outer side 61 having the outer side 61 is formed on both sides, a central support portion 63 is formed at the center, which is somewhat smaller than the outer side 61, and on the other side, the outer side protrusion 111 having the protrusions 56 is formed on both sides. It is.

상기 간격 조절 연결재(90)의 일측에 형성된 외측 돌기(111)가 도 4의 연결재(60)에 삽입되고 타측에 형성된 공간부에는 간격 조절재(110)의 외측 돌기(111)가 삽입되게 하고 단위 강화 FRP 판넬(30)의 연결부(55)의 지지대(57)가 삽입조립되도록 한다.The outer protrusion 111 formed at one side of the gap adjusting connecting member 90 is inserted into the connecting member 60 of FIG. 4, and the outer protrusion 111 of the gap adjusting member 110 is inserted into the space portion formed at the other side. The support 57 of the connection portion 55 of the reinforced FRP panel 30 is inserted and assembled.

상기 연결조립하는 것은 현장의 상황에 맞게 선택적으로 연결조립하여 시공할 수 있다. Assembling the connection can be constructed by selectively assembling the connection according to the situation of the site.

도 6은 본 발명의 단위 강화 FRP 판넬을 상호 연결하여 보수보강체를 조립시 길이를 조절할 수 있는 간격 조절재를 보여주는 도면으로서, 몸체(31)의 양측에는 하단부에 돌기(56)가 형성된 복수개의 외측돌기(111)가 몸체(31)의 양측에 형성된 간격 조절재(110)이다. 상기 간격 조절재(110)의 조립과 역할은 이미 전술한 도 4와 도 5에서 설명한 바와 같으므로 본 도에서는 자세한 설명을 생략합니다.6 is a view showing a gap adjusting material that can adjust the length when assembling the reinforcing reinforcement by interconnecting the unit reinforced FRP panel of the present invention, a plurality of protrusions 56 formed on both sides of the lower body 31 The outer protrusion 111 is a gap adjusting member 110 formed on both sides of the body 31. Since the assembly and role of the gap adjusting member 110 are the same as described above with reference to FIGS. 4 and 5, detailed descriptions thereof will be omitted.

도 7은 본 발명의 간격 조절재(110)와 간격 조절 연결재(90)에 단위 강화 FRP 판넬(30)을 연결하여 규격에 맞게 조립한 것을 보여주는 도면으로서, 전술한 도 4내지 도 6에서 이미 상세하게 설명하였으므로 설명을 생략합니다. 7 is a view showing that the assembly unit according to the specification by connecting the unit reinforced FRP panel 30 to the gap control member 110 and the gap control connecting member 90 of the present invention, detailed in Figures 4 to 6 described above. The explanation is omitted, so the explanation is omitted.

상기 간격 조절재(110)와 간격 조절 연결재(90)는 모두 상기 단위 강화 FRP 판넬(30)의 재료인 강화 섬유에 수지를 함침시켜 제작한 것입니다.The spacing control member 110 and spacing control connecting member (90) are both manufactured by impregnating a resin in the reinforcing fiber which is the material of the unit reinforcing FRP panel (30).

상기 간격 조절재(110)와 간격 조절 연결재(90)에 형성된 외측돌기(111)는 마름모꼴 형상을 하고 있는 것으로서, 외측돌기(111)가 양측의 외측부(61)와 중앙에 중앙 지지부(63)에 의하여 형성된 공간부에 끼워져 조립되는 것으로서 정확하게 삽입연결되면서 긴밀하게 연결되도록 한 것이다. The outer protrusions 111 formed on the gap adjusting member 110 and the gap adjusting connecting member 90 have a rhombic shape, and the outer protrusions 111 are formed at both sides of the outer side portion 61 and the center support portion 63 at the center thereof. It is inserted into the space formed by the assembling is to be connected closely while being inserted correctly.

또한, 상기에서 언급한 상기 단위 강화 FRP 판넬(30), 연결재(60), 간격 조절재(110) 및 간격 조절 연결재(90)에는 FRP 판넬의 인장력 강화를 위하여 판넬의 사이에 와이어 메쉬등과 같은 인장력 강화장치를 설치하여 제작한 것도 당연히 포함된다는 것도 언급해두고자 한다. In addition, the above-mentioned unit reinforcement FRP panel 30, the connecting member 60, the gap adjusting member 110 and the gap adjusting connecting member 90, such as a wire mesh between the panels to strengthen the tensile force of the FRP panel, such as It is worth mentioning that the fabrication of a tension reinforcement device is also included.

이상에서 설명한 바와 같이 본 발명은 단위 강화 FRP판넬을 연결재로 조립설치하고 내부에 설치된 우산살 앵커와 돌출부가 충전재와 일체가 되도록 한 보수보강체를 이용하여 노후 또는 열화된 철근 콘크리트 구조물의 하중 지지력을 증강시키는 시공방법으로서, 보수보강체인 거푸집에 의하여 보수보강을 하게되어 보수보강체의 설치기간이 단축되므로서 공사비가 절감되는 경제적인 시공방법이며, 우산살 앵커와 보수보강체의 내부에 설치되는 돌출부에 의한 부착력이 뛰어나 보수보강효과가 매우 탁월한 시공방법인 것이다. As described above, the present invention uses a reinforcing reinforcement to assemble the unit reinforcement FRP panel as a connecting member and to install the umbrella anchor and the projection unit integrated with the filling material to support the load bearing capacity of the aged or deteriorated reinforced concrete structure As a construction method to reinforce, it is economical construction method to reduce construction cost by shortening installation period of repair reinforcement by reinforcement by formwork which is reinforcement reinforcement body, and projecting part installed inside umbrella anchor and reinforcement reinforcement body. It is a construction method with excellent adhesion and excellent reinforcing effect.

도 1은 본 발명의 보수보강체를 철근 콘크리트 구조물의 외부에 조립설치하여 보수보강을 실시하는 것을 보여주는 도면.1 is a view showing to perform the reinforcement by assembling and installing the reinforcement body of the present invention to the outside of the reinforced concrete structure.

도 2는 본 발명의 단위 강화 FRP 판넬의 단위 강화 FRP측벽 판넬을 보여주는 도면.Figure 2 shows a unit reinforced FRP side wall panel of the unit reinforced FRP panel of the present invention.

도 3은 본 발명의 단위 강화 FRP 판넬의 단위 강화 FRP 바닥면 판넬을 보여주는 도면.Figure 3 shows a unit reinforced FRP bottom panel of the unit reinforced FRP panel of the present invention.

도 4는 본 발명의 단위 강화 FRP 판넬을 상호 연결하여 보수보강체를 조립설치하기 위한 연결재를 보여주는 도면.4 is a view showing a connecting material for assembling and installing the reinforcing reinforcement by interconnecting the unit reinforced FRP panel of the present invention.

도 5는 본 발명의 간격 조절재와 연결하여 단위 강화 FRP 판넬을 연결할 수 있게 하는 간격 조절 연결재를 보여주는 도면.5 is a view showing a gap control connecting member to connect the unit reinforced FRP panel in connection with the gap adjusting member of the present invention.

도 6은 본 발명의 단위 강화 FRP 판넬을 상호 연결하여 보수보강체를 조립시 길이를 조절할 수 있게 하는 간격 조절재를 보여주는 도면.Figure 6 is a view showing a gap adjusting material to adjust the length when assembling the reinforcing reinforcement by interconnecting the unit reinforced FRP panel of the present invention.

도 7은 본 발명의 간격 조절재와 간격 조절 연결재에 단위 강화 FRP 판넬을 연결하여 규격에 맞게 조립한 것을 보여주는 도면.7 is a view showing that the assembly according to the standard by connecting the unit reinforced FRP panel to the gap control member and the gap control connector of the present invention.

*도면의 주요 부분에 대한 부호의 설명** Description of the symbols for the main parts of the drawings *

10... 철근 콘크리트 구조물 11... 천공홀10 ... reinforced concrete structures 11 ... drilled holes

12... 스크류 앵케 12 ... screw anchor

20... 보수보강체 20. Reinforcement Body

30... 단위 강화 FRP 판넬 31... 몸체30 ... unit reinforced FRP panel 31 ... body

40... 단위 강화 FRP 바닥면판넬 40 ... Unit Reinforced FRP Bottom Panel

50... 단위 강화 FRP 측벽판넬 55... 연결부50 ... Unit reinforced FRP side panels 55 ... Connections

56... 돌기 57... 지지대56 ... Turn 57 ... Support

60... 연결재 61... 외측부60 ... Connecting material 61 ... Outer part

62... 홈 63... 중앙 지지부62 ... home 63 ... center support

70... 돌출부 71... 화살돌기70 ... protrusion 71 ... arrow

72...지지 벽부 73... 관통구72 ... supporting wall 73 ... through hole

80... 우산살 앵커 81... 우산살80 ... Umbrella Anchor 81 ... Umbrella

82... 너트 83... 중앙 지지봉82 ... nut 83 ... center support

84... 나사홈84.Screw groove

90... 간격 조절 연결재 90 ... spacing connector

110... 간격 조절재 111... 외측돌기110 ... Spacer 111 ... Outer protrusion

Claims (10)

노후 또는 열화된 철근 콘크리트 구조물의 하중 지지력 증강을 위한 보수보강을 시공하는 장치에 있어서,In the device for constructing a reinforcement for reinforcement of load bearing capacity of aging or deteriorated reinforced concrete structure, 철근 콘크리트 구조물이 노후 또는 열화로 인하여 부식 또는 균열이 발생된 부분의 철근 콘크리트 구조물의 표면에 다수개의 천공홀을 형성하고 스크류 앵커를 삽입한 후에 상기 스크류 앵커내에 우산살 앵커를 나사삽입하여 설치하고, 일정한 간격을 두고 몸체에 길이 방향으로 돌출부가 다수개 형성된 단위 강화 FRP 측벽 판넬을 철근 콘크리트 구조물의 길이방향으로 측벽에 설치하고, 상기 단위 강화 FRP 측벽 판넬의 하부에 형성된 연결부를 연결재의 몸체 일측에 삽입하고, 연결재의 몸체 타측에는 길이방향으로 돌출부가 다수개 형성된 단위 강화 FRP 바닥면 판넬을 삽입하는 작업을 수회반복하여 보수보강하고자하는 철근 콘크리트 구조물을 일정한 간격을 두고 외부에서 감싸는 바닥면을 형성하도록 한 보수보강체를 형성하는 것을 특징으로 하는 우산살 앵커와 단위 강화 FRP 판넬을 조립하여 철근 콘크리트 구조물을 보수보강하는 보수보강체.After the reinforced concrete structure is formed with a plurality of perforation holes on the surface of the reinforced concrete structure where corrosion or cracking occurs due to aging or deterioration, and after inserting the screw anchors, the umbrella anchors are screwed into the screw anchors. Unit reinforcement FRP side wall panel having a plurality of protrusions in the longitudinal direction at the body spaced at regular intervals is installed on the side wall in the longitudinal direction of the reinforced concrete structure, and the connecting portion formed in the lower portion of the unit reinforced FRP side wall panel is inserted into one side of the body of the connecting member And, the other side of the body of the connecting member to repeat the operation of inserting the unit-reinforced FRP bottom panel formed with a plurality of protrusions in the longitudinal direction several times to form a bottom surface to surround the reinforced concrete structure to be repaired at regular intervals Forming a reinforcing reinforcement body Repair reinforcement body which reinforces reinforced concrete structure by assembling umbrella anchor and unit reinforced FRP panel. 제 1항에 있어서,       The method of claim 1, 상기 단위 강화 FRP 판넬인 단위 강화 FRP 바닥면 판넬과 단위 강화 FRP 측벽 판넬에 연결재를 이용하여 연결조립하여 설치한 보수보강체가 보수보강하고자 하는 철근 콘크리트 구조물의 규격과 맞지 않을 경우에는 간격 조절재와 간격 조절 연결재 및 상기 단위 강화 FRP 판넬을 길이에 맞게 선택적으로 삽입조립하여 보수보강하고자 하는 철근 콘크리트 구조물의 규격에 맞는 보수보강체를 설치하는 것을 특징으로 하는 우산살 앵커와 단위 강화 FRP 판넬을 조립하여 철근 콘크리트 구조물을 보수보강하는 보수보강체.If the repair reinforcement installed by connecting and connecting the unit reinforcement FRP bottom panel and the unit reinforcement FRP side wall panel using the connection material is not in accordance with the standard of the reinforced concrete structure to be repaired and reinforcement, the gap adjusting material and the spacing Reinforce the reinforcing bar umbrella and unit reinforcing FRP panel by installing a reinforcing reinforcing body conforming to the specification of the reinforced concrete structure to be repaired by selectively inserting and adjusting the control connector and the unit reinforced FRP panel according to the length. Repair reinforcement to reinforce concrete structure. 제 1항에 있어서,        The method of claim 1, 상기 단위 강화 FRP 측벽 판넬은 연결 조립할 수 있게 상기 단위 강화 FRP 측벽 판넬의 몸체의 일측단에는 양측에 돌기가 외측으로 형성된 마름모꼴 형태의 지지대가 형성되어 중앙에 공간부가 형성된 연결부가 설치되고 타측단에는 상기 단위 강화 FRP 측벽 판넬의 몸체와 직각으로 형성되게 상기의 연결부가 형성되되, 몸체에는 상기 단위 강화 FRP 측벽 판넬의 길이방향으로 몸체에서 연장된 일정높이의 지지벽부를 형성하되 일정간격을 두고 관통구가 형성되도록하며 상기 지지벽부의 끝부분에는 화살모양의 화살돌기가 형성되어 보수보강하고자 하는 철근 콘크리트 구조물과 상기 보수보강체와의 사이에 설치되도록 하는 것을 특징으로 하는 우산살 앵커와 단위 강화 FRP 판넬을 조립하여 철근 콘크리트 구조물을 보수보강하는 보수보강체.       The unit-reinforced FRP side wall panel is connected to the assembly of the unit portion is formed in the center of the unit reinforced FRP side wall panel is formed in the form of a rhombic shape formed with projections on both sides to the outside on both sides and the other end is the The connecting portion is formed to be formed at a right angle with the body of the unit reinforced FRP side wall panel, the body is formed with a support wall of a certain height extending from the body in the longitudinal direction of the unit reinforced FRP side wall panel with a through hole at a predetermined interval. An arrow-shaped arrowhead is formed at the end of the support wall to form an arrow-shaped anchor and unit reinforcement FRP panel, characterized in that it is installed between the reinforced concrete structure and the reinforcement to be repaired. Repair reinforcement to assemble and repair reinforced concrete structure. 제 1항에 있어서,         The method of claim 1, 상기 단위 강화 FRP 바닥면 판넬은 연결 조립할 수 있게 상기 단위 강화 FRP 바닥면 판넬의 몸체의 양측단에는 양측에 돌기가 외측으로 형성된 마름모꼴 형태의 지지대가 형성되어 중앙에는 공간부가 형성된 연결부가 설치되고, 몸체에는 상기 단위 강화 FRP 바닥면 판넬의 길이방향으로 몸체에 연장되게 일정높이의 지지벽부를 형성하되 일정간격을 두고 관통구가 형성되도록하며 상기 지지벽부의 끝부분에는 화살모양의 화살돌기가 형성되어 보수보강하고자 하는 철근 콘크리트 구조물과 상기 보수보강체와의 사이에 설치되도록 한 것을 특징으로 하는 우산살 앵커와 단위 강화 FRP 판넬을 조립하여 철근 콘크리트 구조물을 보수보강하는 보수보강체.       The unit-reinforced FRP bottom panel is connected to each other end of the body of the unit reinforced FRP bottom panel is formed in the form of a lozenge-shaped support with protrusions formed on both sides is formed in the center is the connection portion is formed in the center, There is formed a support wall of a certain height so as to extend to the body in the longitudinal direction of the unit reinforced FRP bottom panel, so that a through hole is formed at a predetermined interval and the arrow-shaped arrowhead is formed at the end of the support wall portion Repair reinforcement for reinforcing the reinforced concrete structure by assembling the umbrella anchor and the unit reinforced FRP panel, characterized in that installed between the reinforced concrete structure and the reinforcement to be reinforced. 제 1항에 있어서,        The method of claim 1, 상기 연결재는 일정한 높이에 홈이 내측으로 형성된 외측부가 양측에 형성되어 중앙부에는 상기 외측부보다 길이가 짧은 중앙 지지부가 형성되어 상기 외측부와의 사이에 공간부가 복수개 형성되도록 한 것이 몸체의 양측에 설치된 것을 특징으로 하는 우산살 앵커와 단위 강화 FRP 판넬을 조립하여 철근 콘크리트 구조물을 보수보강하는 보수보강체.       The connecting member is formed on both sides of the outer portion formed in the groove at a predetermined height on both sides, the central support is formed in the central portion shorter than the outer portion is formed so that a plurality of spaces formed between the outer portion is installed on both sides of the body Repair reinforcement for reinforcing reinforced concrete structures by assembling the umbrella anchor and unit reinforced FRP panel. 제 1항에 있어서,        The method of claim 1, 상기 돌출부는 상기 단위 강화 FRP 판넬의 몸체에서 연장되어 일정높이의 지지벽부(72)가 길이 방향으로 형성하되 지지벽부에는 일정간격을 두고 관통구(73)가 형성되도록하며 상기 지지벽부(72)의 끝부분에는 화살모양의 화살돌기(71)가 형성되어 있는 것을 특징으로 하는 우산살 앵커와 단위 강화 FRP 판넬을 조립하여 철근 콘크리트 구조물을 보수보강하는 보수보강체.        The protruding portion extends from the body of the unit reinforced FRP panel to form a support wall portion 72 of a predetermined height in the longitudinal direction, but the through-hole 73 is formed at a predetermined interval on the support wall portion of the support wall portion 72 The reinforcement for repairing the reinforced concrete structure by assembling the umbrella anchor and the unit reinforced FRP panel, characterized in that the arrow-shaped arrowhead 71 is formed at the end. 제 2항에 있어서,        The method of claim 2, 상기 간격 조절재는 복수개의 외측돌기가 몸체의 양측에 형성된 것을 특징으로 하는 우산살 앵커와 단위 강화 FRP 판넬을 조립하여 철근 콘크리트 구조물을 보수보강하는 보수보강체.       The spacing adjuster is a repair reinforcement to assemble the reinforced concrete structure by assembling the umbrella reinforcement anchor and unit reinforced FRP panel, characterized in that a plurality of outer protrusions formed on both sides of the body. 제 2항에 있어서,        The method of claim 2, 상기 간격 조절 연결재는 몸체의 일측에 돌기가 형성된 복수개의 외측돌기가 형성되고 타측에는 일정 높이에 홈이 내측으로 형성된 복수개의 외측부가 형성되고 그 내측에는 외측부보다 길이가 짧은 중앙 지지부가 설치되어 형성되는 복수개의 공간부로 이루어진 것을 특징으로 하는 우산살 앵커와 단위 강화 FRP 판넬을 조립하여 철근 콘크리트 구조물을 보수보강하는 보수보강체.       The gap adjusting connecting member is formed with a plurality of outer protrusions formed with protrusions on one side of the body, and a plurality of outer portions formed with grooves at a predetermined height on the other side thereof, and a central support portion having a shorter length than the outer portion is formed on the inner side thereof. Repair reinforcement for reinforcing the reinforced concrete structure by assembling the umbrella anchor and unit reinforced FRP panel, characterized in that consisting of a plurality of space. 철근 콘크리트 구조물이 노후 또는 열화되어 부식 및 균열이 발생되어 보수보강을 통하여 하중 지지력을 증강시키기 위하여 실시하는 시공방법에 있어서,        In the construction method performed to enhance the load bearing capacity through the reinforcement of the reinforced concrete structure due to the aging or deterioration of corrosion and cracks, a) 보수보강이 요구되는 철근 콘크리트 구조물의 표면을 정리하는 단계;       a) cleaning the surface of the reinforced concrete structure requiring repair reinforcement; b) 상기 표면에 스크류 앵커를 일정한 간격을 두고 설치하는 단계;       b) installing screw anchors at regular intervals on the surface; c) 상기 스크류 앵커에 우산살 앵커를 설치하는 단계;       c) installing an umbrella anchor to the screw anchor; d) 상기 보수보강이 요구되는 철근 콘크리트 구조물의 측면에 단위 강화 FRP 측벽 판넬을 설치하고 연결재로 연결하면서 하부에는 단위 강화 FRP 바닥면 판넬에 연결재를 이용하여 보수보강하고자하는 규격의 보수보강체를 설치하는 단계;      d) Install unit reinforcement FRP side wall panel on the side of reinforced concrete structure which requires repair reinforcement and connect it with connecting material, and install reinforcement body of the standard to be reinforcement using connecting material on unit reinforcement FRP bottom panel. Doing; e) 상기 철근 콘크리트 구조물과 상기 단위 강화 FRP 판넬이 만나는 부분에 실링을 하고 철근 콘크리트 구조물과 보수보강체 사이에 콘크리트와 같은 충전재를 밀실하게 타설하는 단계; 및       e) sealing the portion where the reinforced concrete structure and the unit reinforced FRP panel meet and placing a filler such as concrete tightly between the reinforced concrete structure and the reinforcement body; And f) 상기 철근 콘크리트 구조물과 보수보강체 사이에 설치된 우산살 앵커와 단위 강화 FRP 판넬 몸체에 형성된 돌출부가 충전재와 일체로 접착되어 철근 콘크리트 구조물에 작용하는 하중에 일체로 작용하도록 양생하고 주변을 정리하는 단계로 이루어진 것을 특징으로 하는 우산살 앵커와 단위 강화 FRP 판넬을 조립하여 철근 콘크리트 구조물을 보수보강하는 보수보강체를 이용한 보수보강 시공방법.       f) Curing and arranging the surroundings so that the umbrella anchor installed between the reinforced concrete structure and the reinforcement reinforcement and the protrusion formed on the unit reinforced FRP panel body are integrally bonded with the filler to act integrally on the load acting on the reinforced concrete structure. Repair reinforcement construction method using a reinforcing reinforcement to repair the reinforced concrete structure by assembling the umbrella anchor and unit reinforced FRP panel, characterized in that consisting of steps. 제 9항에 있어서,        The method of claim 9, 상기 (d)와 (e) 단계에서 단위 강화 FRP 바닥면 판넬과 단위 강화 FRP 측벽 판넬에 연결재를 이용하여 연결조립하여 설치한 보수보강체가 보수보강하고자 하는 철근 콘크리트 구조물의 규격과 맞지 않을 경우에는 간격 조절재와 간격 조절 연결재를 선택적으로 삽입조립하고 양측에 상기 단위 강화 FRP 판넬을 길이에 맞게 삽입조립하여 보수보강하고자 하는 철근 콘크리트 구조물의 규격에 맞는 보수보강체를 설치하는 단계를 더 포함하는 것을 특징으로 하는 우산살 앵커와 단위 강화 FRP 판넬을 조립하여 철근 콘크리트 구조물을 보수보강하는 보수보강체를 이용한 보수보강 시공방법.       If the repairing reinforcement installed by connecting and assemble the unit reinforced FRP bottom panel and the unit reinforced FRP side panel by using the connecting material in the step (d) and (e) does not meet the specification of the reinforced concrete structure to be repaired and reinforced Optionally inserting and assembling the adjusting member and the spacing control connecting member and installing the reinforcing reinforcement in accordance with the standard of the reinforced concrete structure to be reinforced by inserting the unit reinforced FRP panel to the length on both sides, characterized in that it further comprises Repair reinforcement construction method using reinforcing reinforcement body to reinforce reinforced concrete structure by assembling umbrella anchor and unit reinforced FRP panel.
KR10-2003-0028591A 2003-05-06 2003-05-06 Repairing and reinforcing member for repairing and reinforcing ferro-concrete structures by fabricating umbrella rib anchors and unit reinforced FRP panels, and method for repairing and reinforcing using the member KR100476917B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR10-2003-0028591A KR100476917B1 (en) 2003-05-06 2003-05-06 Repairing and reinforcing member for repairing and reinforcing ferro-concrete structures by fabricating umbrella rib anchors and unit reinforced FRP panels, and method for repairing and reinforcing using the member

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR10-2003-0028591A KR100476917B1 (en) 2003-05-06 2003-05-06 Repairing and reinforcing member for repairing and reinforcing ferro-concrete structures by fabricating umbrella rib anchors and unit reinforced FRP panels, and method for repairing and reinforcing using the member

Related Child Applications (1)

Application Number Title Priority Date Filing Date
KR20-2003-0013995U Division KR200322808Y1 (en) 2003-05-06 2003-05-06 Repairing and reinforcing member for repairing and reinforcing ferro-concrete structures by fabricating umbrella rib anchors and unit reinforced FRP panels

Publications (2)

Publication Number Publication Date
KR20040095001A KR20040095001A (en) 2004-11-12
KR100476917B1 true KR100476917B1 (en) 2005-03-18

Family

ID=37374249

Family Applications (1)

Application Number Title Priority Date Filing Date
KR10-2003-0028591A KR100476917B1 (en) 2003-05-06 2003-05-06 Repairing and reinforcing member for repairing and reinforcing ferro-concrete structures by fabricating umbrella rib anchors and unit reinforced FRP panels, and method for repairing and reinforcing using the member

Country Status (1)

Country Link
KR (1) KR100476917B1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101674823B1 (en) * 2015-08-21 2016-11-10 인천대학교 산학협력단 Beam section enlargement method using socket shaped anchor

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101626395B1 (en) * 2015-07-28 2016-06-01 리플래시기술 주식회사 Method for Repairing or Reinforcing Concrete Structure
US10988945B2 (en) * 2018-07-13 2021-04-27 Reform Masonry Products, LLC Masonry form system and method of using same

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101674823B1 (en) * 2015-08-21 2016-11-10 인천대학교 산학협력단 Beam section enlargement method using socket shaped anchor

Also Published As

Publication number Publication date
KR20040095001A (en) 2004-11-12

Similar Documents

Publication Publication Date Title
KR101994852B1 (en) Concrete structure using reinforcing member reinforced by embedded grid, and repairing and strengthening method for the same
KR100991851B1 (en) Earthquake retrofit structure for brick wall and construction method thereof
KR20040046673A (en) Precast Tall Pier for Bridge and Constructing Method therefor
JP2009041227A (en) Structure and method for joining precast floor slabs together
KR100499977B1 (en) Reinforced concrete unit pier block using prestressed concrete steel wire assembly and H-beam, and constructing method of fabricated reinforced concrete pier using the unit pier block
KR100476917B1 (en) Repairing and reinforcing member for repairing and reinforcing ferro-concrete structures by fabricating umbrella rib anchors and unit reinforced FRP panels, and method for repairing and reinforcing using the member
KR100414448B1 (en) Reinforcing armature for repair of concrete structure and repair method using thereof
CN110924522B (en) Steel plate interface connecting structure and connecting method for reinforced concrete beam and column
KR200322808Y1 (en) Repairing and reinforcing member for repairing and reinforcing ferro-concrete structures by fabricating umbrella rib anchors and unit reinforced FRP panels
KR101639592B1 (en) Prefabricated lightweight girder and the bridge construction method using the same
KR100522298B1 (en) Improved prestressed steel reinforced concrete beam and bridge construction method using the same beam
JP4562631B2 (en) Repair structure of hinge part in concrete structure
KR100549986B1 (en) Fabricated repairing and reinforcing apparatus for reinforcing bearing force of beam in a bridge and construction method using the apparatus
KR100492885B1 (en) Precast Concrete Deck Being Connected by Connecting Bar and Roof Steel and Constructing Method of Such Precast Concrete Deck
KR20040001642A (en) Lining building method for tunnel
KR100651606B1 (en) Pc column-beam joint system for underground structure and construction method thereof
KR100697041B1 (en) Platetype girder bridge which platetype girder and parapet are in one body, and constructing method of bridge using the platetype girder bridge
KR100466017B1 (en) The Method of Reinforce Steel Box Girder type Bridge and The Structure thereof
KR200400034Y1 (en) Platetype girder bridge which platetype girder and parapet are in one body
KR200345787Y1 (en) Precast Concrete Deck Being Connected by Connecting Bar and Roof Steel
KR100442704B1 (en) Method and structure for reinforcement of ferroconcrete construction by using of exterior tension member
KR100528825B1 (en) Apparatus for repairing and reinforcing using FRP panel reinforced with wire mesh and umbrella rib shaped anchor, and constructing method for repairing and reinforcing reinforced concrete structures using the apparatus
KR200303271Y1 (en) Reinforced concrete unit pier block using prestressed concrete steel wire assembly and H-beam
KR200328853Y1 (en) Fabricated repairing and reinforcing apparatus for reinforcing bearing force of beam in a bridge
JP5525884B2 (en) Reinforcement joint structure and method for constructing the joint structure

Legal Events

Date Code Title Description
A201 Request for examination
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20130207

Year of fee payment: 9

FPAY Annual fee payment

Payment date: 20140123

Year of fee payment: 10

FPAY Annual fee payment

Payment date: 20150204

Year of fee payment: 11

FPAY Annual fee payment

Payment date: 20160218

Year of fee payment: 12

FPAY Annual fee payment

Payment date: 20180307

Year of fee payment: 14

FPAY Annual fee payment

Payment date: 20190226

Year of fee payment: 15

FPAY Annual fee payment

Payment date: 20200205

Year of fee payment: 16